Design Responsibility for Architectural Precast-Concrete Projects

Size: px
Start display at page:

Download "Design Responsibility for Architectural Precast-Concrete Projects"

Transcription

1 Design Responsibility for Architectural Precast-Concrete Projects Reported by ACI Committee 533 ACI 533.1R-02 Benjamin Lavon Chair Donald F. Meinheit Secretary Robert B. Austin Edward M. Frisbee Navin N. Pandya George F. Baty Harry A. Gleich James B. Quinn Harry A. Chambers Thomas J. Grisinger Ralph C. Robinson Sidney Freedman * Theodore W. Hunt Joseph R. Tucker Allan R. Kenney Primary author. Deceased. Architectural precast concrete is a unique subcategory of concrete construction that involves the same basic entities as other construction. This document outlines the responsibilities for various parties of the design/construction team for architectural precast-concrete projects. Keywords: Architect; architectural concrete; construction; design; design responsibility; general contractor; precast concrete. CONTENTS Chapter 1 Introduction, p R Background Chapter 2 General responsibilities, p R Architect 2.2 Engineer of record 2.3 General contractor 2.4 Precaster (manufacturer) 2.5 Erector 2.6 Inspection ACI Committee Reports, Guides, Standard Practices, and Commentaries are intended for guidance in planning, designing, executing, and inspecting construction. This document is intended for the use of individuals who are competent to evaluate the significance and limitations of its content and recommendations and who will accept responsibility for the application of the material it contains. The American Concrete Institute disclaims any and all responsibility for the stated principles. The Institute shall not be liable for any loss or damage arising therefrom. Reference to this document shall not be made in contract documents. If items found in this document are desired by the Architect/Engineer to be a part of the contract documents, they shall be restated in mandatory language for incorporation by the Architect/Engineer. Chapter 3 Forms of contracts, p R Negotiated versus competitive bid 3.2 Single-source responsibility 3.3 Mockups Chapter 4 Conclusion, p R-5 Chapter 5 References, p R Referenced standards and reports Appendix Prebid process, p R-6 CHAPTER 1 INTRODUCTION Design and construction of structures is a complex process. Defining the scope of work and the responsibilities of the involved parties by means of the contract documents is necessary to achieve a high-quality structure. This is a guide document for all parties involved in a precast-concrete project and defines the responsibilities of each party. This document does not specifically address the inspection functions but provides direction on who should be conducting inspections. These responsibilities are subject to relationships between the parties defined in the contract documents. 1.1 Background Practices regarding the assignment and acceptance of responsibility in design and construction vary throughout North America. In many cases, there has been confusion regarding the responsibility of the various parties. This situation has sometimes led to protracted legal proceedings. The first consensus document to attempt to define essential ACI 533.1R-02 became effective June 26, Copyright 2002, American Concrete Institute. All rights reserved including rights of reproduction and use in any form or by any means, including the making of copies by any photo process, or by electronic or mechanical device, printed, written, or oral, or recording for sound or visual reproduction or for use in any knowledge or retrieval system or device, unless permission in writing is obtained from the copyright proprietors R-1

2 533.1R-2 ACI COMMITTEE REPORT roles was Quality in the Constructed Project, published by the American Society of Civil Engineers (ASCE) in 1990 (ASCE 1990). In 1987, ACI organized a standing board committee on Responsibility in Concrete Construction. The document, Guidelines for Authorities and Responsibilities in Concrete Design and Construction, was published by the committee (ACI Committee on Responsibility in Concrete Construction 1995). One of the basic principles of the construction industry is that responsibility and authority should go hand in hand. Another principle is that every entity should be responsible for its own work. These principles are frequently violated. For example, an architect/engineer (A/E) can require that certain tasks not be undertaken by the contractor without the A/E s approval, but the A/E may not wish to accept responsibility for problems that develop resulting from requiring those tasks. This is a case of requiring compliance without accepting responsibility. There have also been cases where owners have sued architects and engineers for approving poor-quality construction but gave them no contract to monitor the work as it progressed. Safety enforcement agencies and plaintiffs lawyers have often charged engineers or architects with the responsibility for construction accidents. These last two situations typically are cases of responsibility without authority, although there could be instances where a design professional s work can affect jobsite safety. If the designers are involved with construction-management functions, they could be making decisions affecting worker safety as well as quality of construction. Construction has reached a level of complexity today where it is essential to have design input from the subcontractors. This input, whether submitted as value engineering proposals, in response to performance requirements, or simply offered as design alternatives, has a legitimate place in construction. Panels are designed for stripping, handling, and installation loads, usually by the panel manufacturer. Service loads are set by the governing building code and are multiplied by the appropriate load factor. Minimum load factors are set by the governing building code. Panel design should consider dead, live, and environmental loads including wind, earthquake (if applicable), temperature, and moisture effects. Service loads set by the governing building code should be considered only as minimum requirements. Frequently, a precaster wants to change some items in the design to make a fabrication or erection operation easier or more economical. In approving the changes, the A/E still has responsibility for proper interfacing with other materials in contact with precast concrete. This notion of responsibility is presented in the ASCE document (ASCE 1990) and in the Precast/Prestressed Concrete Institute s guidelines (PCI Ad-Hoc Committee for Responsibility for Design of Precast-Concrete Structures 1998). The engineer of record (EOR) always has to take overall responsibility for the structural design of the complete structure. Often, certain aspects of the design are delegated to specialty engineers working for the material suppliers or subcontractors. When any of this structural design work for that portion of the structure involves engineering (as opposed to simply detailing), then the design work should be under the control of a professional engineer licensed in the same state as the project who takes responsibility for the work done. One state, Florida, has formal legal procedures for this process. Local regulatory authorities should be consulted for their specific requirements. Contract documents often require that structural design be the responsibility of a professional engineer, regardless of government mandate. CHAPTER 2 GENERAL RESPONSIBILITIES 2.1 Architect The architect develops the design concept, overall structure geometry, selects the cladding material for appearance, provides details for weatherproofing, selects tolerances for proper interfacing with other materials, and specifies performance and quality characteristics and inspection and testing requirements in the project specifications. The architect and EOR should have responsibility for all aspects of the precast-concrete design. The architect can specify in the contract documents that design services for portions of the work are to be provided by the precaster. Such design services should be performed for the precaster by a licensed precast engineer who can be an employee of the precaster or an independent structural engineer. The architect and EOR should review these designs, including structural calculations. This review does not relieve the precaster and the specialty engineer of their design responsibility. The contract and the design documents should state clearly the scope of both the precast design and review responsibilities, and the responsibilities of others providing design services. The contract drawings prepared by the architect/engineer should provide the overall geometry of the structure and typical connection concepts to permit design, estimating, and bidding. Frequently, the architect s drawings will only show joints, reveals, or panel articulation. This lets the precaster determine panel sizes. In the prebid process, the precaster and erector should discuss their approach to panelize and subsequently connect the units to the building frame within the architectural and structural concepts of the project. In addition, the contract documents (design drawings and specifications) also should provide the general performance criteria, including concrete strength requirements for loading, deflection requirements, temperature considerations, and any tolerance or clearance requirements for proper interfacing with other parts of the structure. The contract documents should clearly define: Precast-concrete components that are the design responsibility of the precaster (who takes responsibility for elements at interfaces with other parts of the structure, such as the secondary steel bracing to prevent rotation of beams or panels); Details or concepts of supports, connections, and clearances that are part of the structure designed by the architect and that will interface with the precastconcrete components; and Permissible load transfer points and indicate connection types to avoid having the precaster make assumptions on connection types and piece counts during bidding. The architect and EOR should review designs, calculations, and shop drawings submitted for conformance with design criteria, loading requirements, and design concepts as specified in the design documents. This review, however, does not relieve the precaster and the precast engineer of their design responsibilities. Key design issues for the architect Buildings using architectural precast panels are becoming increasingly

3 DESIGN RESPONSIBILITY FOR ARCHITECTURAL PRECAST-CONCRETE PROJECTS 533.1R-3 complex. The architect should understand the issues that affect a precaster s bid and make sure the contract documents address these items clearly. For preparation of shop drawings, all items interfacing with other materials should be defined. Contract documents that lack detail generally require numerous requests for information. While such documents are easier and less expensive to produce, they may ultimately result in disputes, delays, and additional costs. The contract drawings developed by the architect should provide a clear interpretation of the configurations and dimensions of individual units and their relationship to the structure as a whole. To do this, the contract documents should supply the following data: Elevations, wall sections, and dimensions necessary to define the sizes and shapes of each different type of wall panel; Locations and sizes of all joints, both real (functional) and false (aesthetic). Joints between units should be completely detailed; Required materials and finishes for all surfaces, with a clear indication of which surfaces are to be exposed to view when in place; Corner details; Details for jointing and interfacing with other materials (coordinated with the general contractor); Details for special or unusual conditions, including fire requirements; Governing building code and design loads; Deflection limitations; and Specified dimensional tolerances for the precast concrete and the supporting structure, location tolerances for the contractor s hardware, clearance requirements, and erection tolerances for the precast concrete. Any exceptions to industry tolerances specified in the contract documents are not recommended. Lack of detail will extend shop drawing time and potentially lead to disputes over work scope, schedule delays, or both. Also, lack of detail can lead to unanticipated changes that will impact cost. Poor detailing of panel cross sections within the contract documents will often lead to disputes. Ideally, the assembly (or erection) drawing process should be as simple as submitting elevations showing panel sizes, surface features, and panel relationships; detail sheets showing panel cross sections and special edge conditions, and feature details; and connections showing mechanisms and locations of force transfer to the supporting structure. The review of shop drawings by the architect should be performed within the time specified in the contract documents. These drawings should be reviewed and any minor revisions made so that production can start. Verification of minor dimensional and detailing revisions is anticipated. When major shop drawing revisions are required, however, it can indicate a lack of planning or detailing within the contract documents. It is the architect s responsibility to establish the standards of acceptability for surface finish, color range, and remedial procedures for defects and damage. This can be best accomplished by the precaster producing at least three sample panels a minimum of 4 x 4 ft before the initial production to establish the range of acceptability with respect to color and texture variations, surface blemishes, and overall appearance. When the units have returns, the same size return should appear in the sample panels. 2.2 Engineer of record The EOR has responsibility for describing loading on precast element inserts and loading criteria (combinations, wind, seismic) for the structural design of the complete structure and the effects of the precast erection sequences on individual structural members, for example, steel spandrel beams when numerous concentrated panel loads are placed on them. The EOR should anticipate these loadings and provide means to support them. Responsibility for the precast-concrete design can be delegated to someone else, such as the precaster or precast engineer. The EOR should consider the consequences of the weight and eccentricity of the panels when designing the supporting structure. The EOR should also determine where, when, and what type of loading is to be assigned to the panels and the structure. The EOR has the responsibility of reviewing the delegated design work for compatibility with the overall structural design. This does not, however, relieve the preparer of the design work of the responsibility for doing it correctly. Panels typically span column to column and are supported on or near the column. The EOR should determine and show on the contract documents the locations for supporting the gravity and lateral loads, including midpoint lateral (tie-back) connections, if necessary. The panel loads are routinely provided by the precaster to the EOR. The EOR determines during assembly (erection) drawing review whether or not the structure is adequate, within defined deflection limitations, to resist the loads and forces. The EOR should also provide sufficient information on seismic detailing. It is important that preliminary meeting(s) with the architect, EOR, and precasters be held before structural members are ordered, fabricated, or both, so that panel sizes, shapes, and basic connections, as well as their locations can be established (refer to the Appendix). The EOR will know whether or not a spandrel panel is designed to transfer load to the columns, but the exact location of the load transfer can vary from precaster to precaster. For example, spandrel panel loads can be transferred from near the panel bottom or from near the top. The gravity supports of precast-concrete panels are almost always eccentric to the centerline of the supporting steel or concrete member. A concrete member is generally stiff and strong enough in torsion so that this is not a problem. Because the precaster does not design the columns or beams, the EOR should design to prevent excessive deflection and rotation of the supporting structure during and after erection of the precast concrete, as well as determine the need for diagonal bracing or web stiffening (CASE National Guidelines Committee 1994; CASE Task Group on Specialty Engineering 1996). The contract documents should address the issue of reimbursements to the EOR for engineering the bracing or reinforcement of the structure if the precaster s panelization changes the EOR s designed connection locations. In some areas, the precaster is responsible for designing the bracing and may also supply the secondary steel. These responsibilities should be clearly addressed in the contract documents and discussed in a prebid meeting. 2.3 General contractor The general contractor (GC) typically has responsibility and authority for implementing the design intent of the

4 533.1R-4 ACI COMMITTEE REPORT contract documents, which includes furnishing materials, equipment, labor, maintaining specified quality requirements, and coordinating all trades. The GC is responsible for construction means, methods, techniques, sequences, and construction procedures. Also, the GC should initiate, maintain, and supervise all safety procedures and programs on the construction site. Site access to the structure for erection of the precast elements can become a problem. The responsibility to provide and maintain access roads should be clearly stated in the contract documents. The GC has no design responsibility. The GC, however, does have considerable impact on the design process through its coordination role. The GC receives the different shop drawing submittals from the various trades and puts them together to form the completed design. The GC is normally responsible for project schedule, grid dimensions (which include control points, benchmarks, and lines on the building), quantities, and dimensional interfacing of the precast concrete with other trades, and maintenance of specified tolerances of the structure to ensure proper fit. During shop drawing review, the GC should notify the precaster when as-built conditions (dimensions) vary beyond tolerances on the contract drawings. In particular, dimensional tolerances between interfacing materials, such as precast concrete and glazing, should be considered. The GC should be a party to direct communication between the precaster, EOR, and the architect. Communication channels should be established among the parties. The GC needs to be informed in writing, particularly if decisions affect the GC s activities. Typically, the GC is responsible for placing embedments in cast-in-place concrete and coordinating steel attachments with the steel fabricator. In most instances, the most economical approach is to have gravity haunch connection hardware attached to steel columns by the steel fabricator. This necessitates awarding the precast-concrete contract in a timely manner. 2.4 Precaster (manufacturer) To achieve practical and economical construction, the precaster first designs panelization and then connections. Ideally, a precaster performs value engineering as early as during preliminary design (in a partnering relationship) to improve economics, structural soundness, and performance. The precaster should request clarification of ambiguities, in writing from the architect, through contractual channels on special conditions not clearly defined in the contract documents. When the construction schedule demands a rapid turnaround time for review of drawing submittals, the precaster should notify all concerned of their obligations to review and return submitted drawings within the requested time period. At that time, the architect s and EOR s cooperation is needed to expeditiously review submitted documents. The precaster or precaster s specialty engineer prepares detailed assembly, or erection drawings and design calculations that are usually signed and sealed. These drawings, calculations, or both, should show all design criteria, identify each material, show how precast panels interface with each other and the structure, and indicate the magnitude and location of all design loads imparted to the structure by the connections. The precaster or specialty engineer designs the precast panels for the specified loads and is responsible for selecting, designing, and locating hardware, and panel reinforcement or items associated with the precasters methods of handling, storing, shipping, and erecting precast-concrete units. If necessary, this also includes an erection and bracing sequence developed in conjunction with the erector, EOR, and GC to maintain stability of the structure during erection. Any additional design responsibility vested with the precast-concrete manufacturer should be defined clearly in the contract documents prepared by the architect. Most precast-concrete work is covered in Option II, Table 1. Option I in Table 1 has considerable liability for the architect and EOR. 2.5 Erector The responsibility for erection of architectural precast concrete is usually determined by the GC. The contract documents rarely require that the erection be part of the precast-concrete manufacturer s work, be performed by the precaster s workers, or be subcontracted to specialized erection firms. Fabrication and erection included into one contract is preferred by some precasters because this improves coordination and reduces vulnerability to backcharges. The GC, however, may choose to issue separate contracts for fabrication and erection. Erectors and precasters coordinate development of efficient connections for each project based on their equipment and expertise. 2.6 Inspection Quality control for product manufacturing will be provided by the precaster according to provisions contained in a comprehensive quality system manual developed by the precaster. The quality system manual will be available to the owner and EOR for review. Quality assurance will be provided through the precaster s participation in a recognized industry quality certification program. One such program is the PCI Plant Certification Program. Additional inspections may be required, by specification, through the owner s quality-assurance agency. Installation quality assurance will be provided by adherence to industry standards such as the PCI Erectors Manual. Additional quality assurance can be provided by requiring installation by an industry-qualified erector. CHAPTER 3 FORMS OF CONTRACTS 3.1 Negotiated versus competitive bid The price of architectural precast concrete is a relatively small percentage of the total building cost (usually less than 10%). Therefore, the possible difference in the price between the lowest precast bidder and the precaster who is ultimately awarded the contract will have a minor impact on the overall cost. In a negotiated project, the precaster can become part of the building team at the very early design stage and be more effective in providing valuable expertise on panel design, performance, and economics (refer to Appendix). 3.2 Single-source responsibility The architect or owner sometimes prefers single-source responsibility for wall cladding (which includes windows, precast, and all related sealants) responsibility for the following reasons: to enhance technical and aesthetic coordination between building systems; to establish a single-source warranty; to centralize control for erection and problemsolving issues; and generally, to provide for a single source of knowledge and total understanding of the entire system. In

5 DESIGN RESPONSIBILITY FOR ARCHITECTURAL PRECAST-CONCRETE PROJECTS 533.1R-5 Table 1 Design responsibilities Contract information supplied by designer Provide complete drawings and specifications detailing all aesthetic, functional and structural requirements plus dimensions. Detail all aesthetic and functional requirements but specify only the required structural performance of the precast-concrete units. Specified performance should include all limiting combinations of loads together with their points of application. This information should be supplied in such a way that all details of the unit can be designed without reference to the behavior of other parts of the structure. The division of responsibility for the design should be clearly stated in the contract. Option I Responsibility of manufacturer of precast concrete The manufacturer should make shop drawings (erection and production drawings) as required, with details as shown by the designer. Modifications may be suggested that, in manufacturer s estimation, would improve the economics, structural soundness, or performance of the precastconcrete installation. The manufacturer should obtain specific approval for such modifications. Full responsibility for the precast-concrete design, including such modifications, remains with the designer. Alternative proposals from a manufacturer should match the required quality and remain within the parameters established for the project. It is particularly advisable to give favorable consideration to such proposals if the modifications are suggested so as to conform to the manufacturer s normal and proven procedures. Option II The manufacturer has two alternatives: (a) Submit erection and shape drawings with all necessary details and design information for the approval and ultimate responsibility of the designer. (b) Submit erection and shape drawings for general approval and assume responsibility for part of the structural design; that is, the individual units, but not their effect on the building. Firms accepting this practice may either stamp (seal) drawings themselves, or commission engineering firms to perform the design and stamp the drawings. The choice between the alternatives (a) and (b) should be decided between the designer and the manufacturer prior to bidding, with either approach clearly stated in the specifications for proper allocation of design responsibility. Experience has shown that divided design responsibility can create contractual problems. It is essential that the allocation of design responsibility is understood and clearly expressed in the contract documents. single-source responsibility, detailing issues are delegated to the contractor and material suppliers of the wall. Single-source responsibility usually puts the precaster in a position of a broker/contractor without having the management and engineering skills to work out interfacing details for the window system, insulation, interior finishes, and sealants. A more logical entity for single-source responsibility is the GC. In some cases, the GC may prefer that single-source responsibilities be separated for greater profit potential. Generally, the precast-concrete industry tends to avoid single-source responsibility, not only because of technical concerns regarding materials whose quality they do not control directly but also due to economics. It can be uneconomical to package everything under the precaster s construction umbrella because this additional responsibility requires additional compensation. The notion of a single-source responsibility for exterior enclosure can break down if that single source is not clearly defined. 3.3 Mockups Panel-to-panel joint design is necessary to prevent air and water infiltration, and to properly seal windows and other openings. The architect is responsible for these designs. Because precast concrete is inherently watertight and impermeable, the panel joints and interfacing performance become the primary concerns. If testing is desired, it should be specified in the contract documents. Shipping a full-scale mockup to a testing lab for a wind-driven rain test, although costly and time consuming, is one way to satisfy these concerns. Also, aesthetics can be refined during this process. The cost of these tests needs to be identified in the bid documents and included in the precast budget. A mockup will help determine how the total facade is assembled. Also, it will help in establishing the actual field-construction techniques. If a leak develops, which usually occurs at the window to precast-concrete interface, the details need to be examined and modified. The contract documents should require that the same sealant contractor seal both the precast-to-precast panel joints and the window interface to avoid sealant incompatibility. CHAPTER 4 CONCLUSION A successful precast-concrete project requires teamwork. This means close cooperation between and coordination of all participants, including the owner, architect, engineer, precast-concrete manufacturer, erector, general contractor or construction manager, and all trades. The precast work scope and the responsibilities of each party (usually defined by the contract documents) should be established at an early stage in the development of a project to achieve the desired results and schedule (refer to Table 1). Each party has the responsibility for communicating with all other parties through the GC/CM to achieve optimum efficiency during construction, and quality in the completed structure. When authority and responsibility roles are correctly and properly defined by the contract documents and communicated, responsibility issues are easily resolved. CHAPTER 5 REFERENCES 5.1 Referenced standards and reports ACI Committee on Responsibility in Concrete Construction, 1995, Guidelines for Authorities and Responsibilities in Concrete Design and Construction, Concrete International, V. 17, No. 9, Sept., pp American Society of Civil Engineers (ASCE), 1990, Quality in the Constructed Project, Manuals and Reports on Engineering Practice No. 73, American Society of Civil Engineers, New York, N.Y. CASE National Guidelines Committee, 1994 National Practice Guidelines for the Structural Engineer of Record,

6 533.1R-6 ACI COMMITTEE REPORT 2nd Edition, Coalition of American Structural Engineers, Washington, D.C., 15 pp. CASE Task Group on Specialty Engineering, 1996, National Practice Guidelines for Specialty Structural Engineers, Coalition of American Structural Engineers, Washington, D.C., 12 pp. PCI Ad-Hoc Committee for Responsibility for Design of Precast-Concrete Structures, 1998, Recommendations on Responsibility for Design and Construction of Precast- Concrete Solutions, PCI Journal, July-Aug., Chicago, Ill. APPENDIX Prebid process Where the selection of a precaster cannot be negotiated or controlled by owner or architect but is governed by an openbid situation, the following prebid process is desirable. Step 1: Verification of architect s concepts and systems A preview of the proposed precast-concrete assumptions during the design development stage (50% complete) of the architectural contract documents should be arranged with at least one local precaster. This review confirms or modifies the concept so that a realistic approach is presented on the architect s bid drawings. Those attending the meeting should: Discuss panelization and piece and joint sizes, determine what can be made, and what can be shipped and erected efficiently; Discuss architect s concept for structural support of precast concrete so that the architect can communicate to the EOR what support requirements are needed; Review desired finish(es) and continue or finalize the sample process; and Review the architect s intent for any interfaces with adjacent systems, such as roofing, windows, or building entrances. Step 2: The prebid conference This should be a mandatory meeting for all precasters wanting to bid the project and is usually held at least 3 weeks before the bid date. The architect presents the project s precast-concrete concepts with the intent of communicating straightforward information so bids will be prepared on a comparable basis. Questions can be asked or clarifications made at this time. Items to be discussed include: How and where the project s precast concrete will be structurally attached to the building frame; Specifications and any special provisions; Design responsibilities and lines of communication; The architect s approved finish samples with information on the type and size of aggregates and cement used, where applicable; The finish acceptance criteria and inspection (who, what, when, and where); Prebid submittal requirements such as proposal drawings and finish samples; Mockups, if applicable; Potential problems, discrepancies, or both found in the contract documents; and Special erection needs and logistics. Step 3: Information submitted with bid or after-bid award This submittal allows a review of each precaster s intent and confirms the precaster s ability to conform to concepts and finish requirements. (Realistically, only the three low bidders are required to provide this submission.) This material should include: Proposal drawings expressing the panelization and structural concepts; Small-size finish samples; The history of the precaster s organization as well as confirmation of the plant s quality assurance (plant certification) program; A list of comparable projects, references, and financial capability; Key schedule items such as mockup panels, shop drawings and design submittals, mold production, scheduled start of manufacture, and production schedules; and Qualifications to the bid that can be listed and reviewed. If bidders are limited to a small group (two to four) by prequalification or other means, then all precasters are contacted during the development process; then limited prebid meetings, bid submittals, or both are needed. If the project will allow for a negotiated precast contract and the precaster is brought onto the project team in the initial stages of development, then prebid and bid submittal information can be eliminated. Step 4: The preconstruction conference A preconstruction conference should be held at the job site as soon as possible after award of the precast concrete and erection contracts. The GC/CM should conduct job site meetings frequently to coordinate the precast-concrete erection with the work of other trades and to facilitate the erection process. These meetings should include those subcontractors whose work affects or is affected by the precast-concrete erection. The coordinating meetings should consider all details of loading, delivery sequences and schedules, types of transportation, routes of ingress and egress for delivery trucks and erection cranes, handling techniques and devices, connections, erection methods and sequences, effects of temporary bracing on other trades, and on-site storage and protection. Questions regarding access, street use, sidewalk permits, oversized loads, lighting, or working hours should be addressed at this time.

Design and Construction Responsibilities for Architectural Precast Concrete

Design and Construction Responsibilities for Architectural Precast Concrete U I N G N E D U C A T I O N I T N O C Design and Construction Responsibilities for Architectural Precast Concrete Design and Construction Responsibilities for Architectural Precast Concrete Design and

More information

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS

PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 PRECAST CONCRETE ELEMENT DESIGN RESPONSIBILITIES AND CONTRACTUAL ARRANGEMENTS PRACTICE NOTE NO: 13 Version 1 Amended March 2001 Page 1 of 6 Scope This Practice Note is intended to identify responsibilities and contractual arrangements for precast elements used in buildings. Such

More information

Architectural Precasters Design Assist Role

Architectural Precasters Design Assist Role Architectural Precasters Design Assist Role Find a Design Assist Consultant: GATEPRECAST.COM 888-470-3450 Architectural Precasters Design Assist Role Design Assist is the procurement method by which, prior

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

How to Estimate the Cost of a. Precast Concrete Parking Structure

How to Estimate the Cost of a. Precast Concrete Parking Structure How to Estimate the Cost of a Precast Concrete Parking Structure 1 TABLE OF CONTENTS 1. INTRODUCTION 2. TYPES AND METHODS OF MEASUREMENT 3. SPECIFIC FACTORS THAT MAY AFFECT TAKE OFF AND PRICING 4. OVERVIEW

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following: SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Technical Note. Placing Drawings The Detail Drawings for Reinforcing Bars in Site-Cast Reinforced Concrete Construction ENGINEERING.

Technical Note. Placing Drawings The Detail Drawings for Reinforcing Bars in Site-Cast Reinforced Concrete Construction ENGINEERING. ENGINEERING ETN-C--5 Technical Note Placing Drawings The Detail Drawings for Reinforcing Bars in Site-Cast Reinforced Concrete Construction Introduction The terminology regarding the detail drawings for

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado

White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado 1 2 Structural Engineers Association of Colorado White Paper on: Recommended Practices for Specifying and Delegating Responsibilities for Precast Concrete Building Structures in Colorado Prepared by the

More information

GETTING STARTED DESIGNING ARCHITECTURAL PRECAST CONCRETE. Designer s NOTEBOOK T N U I N

GETTING STARTED DESIGNING ARCHITECTURAL PRECAST CONCRETE. Designer s NOTEBOOK T N U I N U I N GETTING STARTED DESIGNING ARCHITECTURAL PRECAST CONCRETE Designer s NOTEBOOK G N E D U C A T I O N I T N O C Getting Started Designing Architectural Precast Concrete Whether the project being considered

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

What Are Submittals?

What Are Submittals? Introduction Overview of the Submittal Process Comparison of AIA with ConsensusDOCS Architect and Contractor Obligations FAR Requirements State Licensing Requirements 1 What Are Submittals? Submittals

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS

SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SUGGESTIONS FOR IMPROVING THE STRUCTURAL STEEL SHOP DRAWING PROCESS SEAC/ RMSCA Steel Liaison Committee May 17, 2006 Disclaimer SEAC, RMSCA, nor its committees, writers, editors and individuals who have

More information

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

National BIM Standard - United States Version 3

National BIM Standard - United States Version 3 National BIM Standard - United States Version 3 5 Practice Documents 5.5 Mechanical, Electrical, Plumbing, And Fire Protection Systems (MEP) Spatial Coordination Requirements for Construction Installation

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

PRECAST CONCRETE STRUCTURES

PRECAST CONCRETE STRUCTURES PRECAST CONCRETE STRUCTURES 1. INTRODUCTION The concept of precast (also known as prefabricated ) construction includes those buildings, where the majority of structural components are standardized and

More information

1. Architectural precast concrete cladding units.

1. Architectural precast concrete cladding units. SECTION 034500 - PRECAST ARCHITECTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Architectural precast concrete cladding units. 1.2 DEFINITION A. Design Reference

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee

May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee Shop Drawings: Contractual and Legal Issues May 15, 2012 Hugh Anderson Legal Counsel to the Engineers Joint Contract Documents Committee Shop Drawings Defined CSI definition: Drawings that illustrate a

More information

SECTION PROJECT COORDINATION VIA BIM

SECTION PROJECT COORDINATION VIA BIM SECTION 01 31 13 PROJECT COORDINATION VIA BIM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

MANuFACturers industry QuALity statement.

MANuFACturers industry QuALity statement. MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off

More information

Designer s NOTEBOOK DESIGN ECONOMY, PART 3

Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Designer s NOTEBOOK DESIGN ECONOMY, PART 3 Design Economy Article XII (Part 3) PCI s Architectural Precast Concrete Services Committee offers insight on the architectural precast manufacturing process

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations

Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Sand-Set Pedestrian Use Installations Large Scale CalArc Pavers are part of the California Architectural

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION 01 3100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1,700 LBS. WITH LESS THAN 1/16" DEFLECTION. 1. THIS SUPPORT SYSTEM IS DESIGNED TO

More information

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS.

UNISTRUT CORPORATION 2. AREA DIRECTLY ABOVE THE SUPPORT TO BE FREE AND CLEAR OF ALL OBSTRUCTIONS. 3. EXISTING STRUCTURE TO BE CHECKED BY OTHERS. 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO 1. THIS SUPPORT SYSTEM IS DESIGNED TO MEDICAL EQUIPMENT SUPPORTS SECTION 05600 1. GENERAL

More information

3400 Tectura Designs Precast Concrete

3400 Tectura Designs Precast Concrete 3400 Tectura Designs Precast Concrete PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to furnish and complete the proper installation of precast concrete. B. Types of Precast Concrete work include:

More information

Simonson Design Lab, Inc. Design Agreement

Simonson Design Lab, Inc. Design Agreement 2016-2017 Simonson Design Lab, Inc. The Terms Consultation Time: The time you spend working directly with a designer either with or without your builder. We highly recommend you use the A Guide to Designing

More information

Department of Architectural Technology Spring 2018

Department of Architectural Technology Spring 2018 Department of Architectural Technology Spring 2018 ARCH 2431 BUILDING TECHNOLOGY III 1 lecture hours and 6 lab/studio hours, 4 credits Course Description: Course focus is on steel construction. This course

More information

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo 2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract

More information

Total Precast Concrete Structures

Total Precast Concrete Structures Total Precast Concrete Structures 1 This program is registered with CPCI for continuing professional education. CPCI s continuing-education program emphasizes on learning for architects, engineers and

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

B. Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. THREE Date: 12.11.17 Project: A NEW BUILDING FOR THE GREATER LIMESTONE COUNTY CHAMBER OF COMMERCE ATHENS, ALABAMA A3.1 GENERAL PROJECT

More information

submittals 1s e c t i o n

submittals 1s e c t i o n Architectural Woodwork Standards submittals 1s e c t i o n SECTION 1 introductory Information Introduction...25 What to Expect...25 Purpose...25 Level of Detail...25 Approvals...25 Scheduling...25 The

More information

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles.

B. Terracotta Precast Facade Assembly consisting of single-leaf, through body color terracotta clay tiles. SECTION 07 4229 TERRACOTTA CLAY TILE IN PRECAST SPECIFICTION FOR TERRART SOLID PART 1 GENERAL 1.1 SECTION INCLUDES A. Drawings and general provisions of the Contract, including General and Supplementary

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

JVI Vector Connector

JVI Vector Connector The JVI Vector Connector User Guidelines 1 of 11 INTRODUCTION JVI designed the Vector Connector for use as shear and alignment connections between precast concrete elements such as double-tee flanges,

More information

Listed below are the competencies required and examples from the aforementioned job:

Listed below are the competencies required and examples from the aforementioned job: 1. Technical Analysis Instructions: Describe a project for which you collected and interpreted or analyzed technical data for development of engineering designs and drawings from concepts and specifications.

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents Approved by Loyola Conference on May 2, 2006 Introduction In the course of fulfilling the

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

BPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn

BPDL Architectural precast concrete specifications USA TESTING AND INSPECTION A. Testing by Independent Agency : Materials and workmanship furn BPDL Architectural precast concrete specifications USA 01 PART 1 General 1.1 DESCRIPTION OF WORK The work includes, but is not limited to : 1. Architectural precast concrete 2. Structural design, fabrication,

More information

State College Area School District

State College Area School District State College Area School District The following is a guideline for project design submittals to the Facility Committee of the State College Area School District. During the design process the committee

More information

ATDESIGN. Working with an Assignment Photographer

ATDESIGN. Working with an Assignment Photographer Working with an Assignment Photographer Making sure your project is professionally photographed is an essential step in communicating your ideas. With the photographs being used to market your firm s expertise,

More information

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7)

Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7) Recommended Practice PS-24 Tracking the Procurement Process (TCM Framework Reference 7.7) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Final Revision 2 AACE International Recommended Practice PS-24 Tracking

More information

NITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA

NITTERHOUSE CONCRETE PRODUCTS, INC Molly Pitcher Highway South Chambersburg, PA NITTERHOUSE CONCRETE PRODUCTS, INC. 2655 Molly Pitcher Highway South Chambersburg, PA 17201 717-267-4505 GUIDE SPECIFICATION FOR ARCHITECTURAL PRECAST CONCRETE INDEX Page PART I - GENERAL...1 A. DESCRIPTION...1

More information

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)

2017 CDM Smith All Rights Reserved November 2016 SECTION PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) ATTACHMENT 5, CONTRACT 13, ADDENDUM 3 2017 CDM Smith 14955-109447 SECTION 01725 PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS) PART 1 GENERAL 1.01 DESCRIPTION A. The Owner and Contractor shall utilize the

More information

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 31 23 19 - DEWATERING TANKAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

MANUFACTURING & INSTALLATION GUIDELINES & GUIDE SPECIFICATIONS for STRUCTURAL PRECAST

MANUFACTURING & INSTALLATION GUIDELINES & GUIDE SPECIFICATIONS for STRUCTURAL PRECAST MANUFACTURING & INSTALLATION GUIDELINES & GUIDE SPECIFICATIONS for STRUCTURAL PRECAST www.fabconprecast.com CONTENTS: 2 Manufacturing Tolerances 4 Installation Tolerances 5 Definitions FABCON DESIGN GUIDELINES

More information

Chapter 1 General Design Information

Chapter 1 General Design Information Chapter 1 General Information Introduction The primary aim in both designing and checking is to produce a structure that will safely carry the anticipated loads. The design team, consisting of the designers,

More information

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY

SECTION SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY SECTION 16075 - SHORT CIRCUIT, COMPONENT PROTECTION, FLASH HAZARD AND SELECTIVE COORDINATION STUDY PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide a short-circuit, component protection, flash

More information

GUIDELINE SPECIFICATIONS

GUIDELINE SPECIFICATIONS GUIDELINE SPECIFICATIONS GORDON MILLENNIUM DECORATIVE METAL COLUMN COVERS DIVISION 05 7500 or DIVISION 09 2000 Note To Specifier: Column Covers are a finished, decorative product and should be installed

More information

AIA Continuing Education

AIA Continuing Education AIA Continuing Education Hall & Company is a Registered Provider with the American Institute of Architects Continuing Education Systems. Credit earned based on the completion of this program will be reported

More information

Merrick Pet Care New Distribution Center Hereford, Texas

Merrick Pet Care New Distribution Center Hereford, Texas Merrick Pet Care New Distribution Center Hereford, Texas DATE: March 16, 2015 ARCHITECTURAL/ELECTRICAL ADDENDUM #6 FROM: TO: PROJECT: Lavin Associates, Architects Plan Holders of Record Merrick Pet Care,

More information

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch

8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES. March 9, 2010 William T. Welch 8(A) CONTRACTING, MENTOR-PROTÉGÉ PROGRAM, & JOINT VENTURES March 9, 2010 William T. Welch THE AUDIENCE How many individuals here represent companies that are now or have been in the 8(a) program? How many

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

LOCOMOTIVE ENGINEERING DEPTT.

LOCOMOTIVE ENGINEERING DEPTT. SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved

More information

SECTION PRECAST HOLLOW CORE PLANKS

SECTION PRECAST HOLLOW CORE PLANKS PART 1 GENERAL 1.1 SECTION INCLUDES A. Roof planks. B. Floor planks. C. Accessories. 1.2 RELATED REQUIREMENTS A. Division 01 General Requirements. SECTION 03 4113 PRECAST HOLLOW CORE PLANKS B. Section

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

Total precast solution for large stadium projects meet tight schedule

Total precast solution for large stadium projects meet tight schedule Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Total precast solution for large stadium projects meet tight schedule T.J. D Arcy

More information

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum

SECTION SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum SECTION 013201 - SCHEDULE OF VALUES PART 1 - GENERAL 1.1 THE REQUIREMENT A. This Section defines the process whereby the Schedule of Values (Lump Sum Pay Unit price breakdown) shall be developed and ultimately

More information

Architecturally Exposed Structural Steelwork (AESS) Sample Specification (for Engineers)

Architecturally Exposed Structural Steelwork (AESS) Sample Specification (for Engineers) Architecturally Exposed Structural Steelwork (AESS) Sample Specification (for Engineers) Sample Specification (for Engineers) Architecturally Exposed Structural Steel (AESS) PART 1 GENERAL 1.1. RELATED

More information

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM SECTION 011000 SUMMARY PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Work under other contracts. 3. Use of premises. 4. Specification

More information

Brad Luke. Director Peddle Thorp Auckland

Brad Luke. Director Peddle Thorp Auckland Brad Luke Director Peddle Thorp Auckland Site Observation and Practical Completion Preparation PEDDLE THORP Introduction Architects Agreement for Services. Observation Work Plans. Auckland Council Quality

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

SECTION COUNTERTOPS ecox PART 1 GENERAL

SECTION COUNTERTOPS ecox PART 1 GENERAL SECTION 11456 COUNTERTOPS ecox PART 1 GENERAL 1.1 SECTION INCLUDES A. Countertops B. Bar tops C. Vanity tops D. Table tops E. Reception counters F. Cash/back wraps G. Transaction counters H. Service counters

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

A. Submit properly identified manufacturer's literature before starting work.

A. Submit properly identified manufacturer's literature before starting work. SECTION 10400 IDENTIFYING DEVICES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Labor and materials required for installation of plaque, school name and address numbers, directional signage, signage

More information

SPECIFICATIONS SPECIFICATION TYPES

SPECIFICATIONS SPECIFICATION TYPES SPECIFICATION TYPES PRESCRIPTIVE (closed): Specs outline exactly what product or material you want the contractor to use or owner/purchasing agent to buy PERFORMANCE (open): Specs tell what results you

More information

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL

SECTION ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL SECTION 03450 - ARCHITECTURAL PRECAST CONCRETE PART 1 - GENERAL 1.01 DESCRIPTION A. Work of this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information