LETTING : CALL : 029 COUNTIES : GOODHUE
|
|
- Shonda Blake
- 5 years ago
- Views:
Transcription
1 PAGE : -1 NUMBER OF DAYS: 80 BRIDGE COUNT : 2 CONTRACT DESCRIPTION : GRADING, SURFACING, LIGHTING AND BRIDGE NO CONTRACT LOCATION: LOCATED ON T.H. 61 FROM 30' NORTH OF NORTH LAKESHORE DRIVE TO 1140' NORTH OF 332ND STREET. RECOMMENDATION: AWARD TO LOW BIDDER I, THE UNDERSIGNED CERTIFY THAT THIS ABSTRACT IS A CORRECT TABULATION OF ALL BIDS RECEIVED ON THIS (THESE) PROJECT(S): THAT THE LEGAL REQUIREMENTS RELATING TO COMPETITIVE BIDDING ON PUBLIC PROJECTS HAVE BEEN COMPLIED WITH: THAT SAID BIDS WERE OPENED IN PUBLIC AND AWARD HAS BEEN MADE TO THE LOWEST RESPONSIBLE BIDDER. APPROVED: STATE AID OR CONSTRUCTION ENGR ASST. DIV. DIRECTOR, OPERATIONS PLUS ITEM TOTAL % OVER % OVER RANK VENDOR NO./NAME TIME: BID BID LOW BID EST EST- ENGINEER'S ESTIMATE $ 2,792, $ 3,192, % % 1 M630 MINNOWA CONSTRUCTION INC $ 3,085, $ 3,485, % % 2 K250 EDWARD KRAEMER & SONS INC $ 3,883, $ 4,283, % % SECTION 0001 GRADING, SURFACING AND LIGHT /00003 LUMP CONSTRUCTION SURVEYING /08010 LUMP SUPPLEMENTAL DESCRIPTION QUALITY MANAGEMENT
2 PAGE : /00010 LUMP MOBILIZATION / EACH FIELD OFFICE TYPE D / EACH FIELD LABORATORY TYPE DX /00010 LUMP MAINT AND RESTORATION OF HAUL ROADS / ACRE CLEARING / TREE CLEARING / TREE GRUBBING / L F PAVEMENT MARKING REMOVAL-PERMANENT / L F REMOVE GUARD RAIL-PLATE BEAM / S Y REMOVE BITUMINOUS PAVEMENT / S Y REMOVE BITUMINOUS SHOULDER PAVEMENT / EACH REMOVE PIPE APRON / EACH REMOVE MARKER / EACH REMOVE SIGN TYPE C / EACH REMOVE ENERGY ABSORBING TERMINAL / L F SAWING BITUMINOUS PAVEMENT (FULL DEPTH) / EACH SALVAGE MARKER / EACH SALVAGE DELINEATOR
3 PAGE : / EACH SALVAGE SIGN TYPE C / EACH SALVAGE SIGN TYPE D / EACH SETTLEMENT PLATES / C Y EXCAVATION - COMMON / C Y COMMON EMBANKMENT (CV) / C Y SELECT GRANULAR EMBANKMENT MODIFIED 10% (CV) / TON AGGREGATE SURFACING CLASS / C Y AGGREGATE BASE (CV) CLASS / TON AGGREGATE SHOULDERING CLASS / L F EXPANSION JOINTS DESIGN E8H / S Y BRIDGE APPROACH PANELS / TON TYPE SP 12.5 WEARING COURSE MIXTURE (3, B) / L F " RC PIPE CULVERT / EACH " RC SAFETY APRON / C Y RANDOM RIPRAP CLASS III / L F PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337
4 PAGE : / L F PORTABLE PRECAST CONCRETE BARRIER DESIGN PINNED / L F RELOCATE PORTABLE PRECAST CONC BARRIER DESIGN / L F RELOCATE PORT PRECAST CONC BARRIER DES 8337-PINNED / EACH LIGHTING UNIT TYPE SPECIAL / L F " NON-METALLIC CONDUIT / L F UNDERGROUND WIRE 1 COND NO / EACH SERVICE CABINET SECONDARY TYPE A / EACH EQUIPMENT PAD B / EACH HANDHOLE / L F TRAFFIC BARRIER DESIGN SPECIAL / L F TRAFFIC BARRIER DESIGN B / EACH GUIDE POST TYPE B / EACH END TREATMENT-TANGENT TERMINAL / EACH IMPACT ATTENUATOR BARRELS / EACH RELOCATE IMPACT ATTENUATOR BARRELS / AMBY IMPACT ATTENUATOR NO 1
5 PAGE : / AMBY IMPACT ATTENUATOR NO / L F WIRE FENCE DESIGN / EACH METAL BRACE ASSEMBLY(CHAIN LINK FENCE) / EACH ELECTRICAL GROUND /00010 LUMP TRAFFIC CONTROL / EACH RAISED PAVEMENT MARKER TEMPORARY / EACH MEDIAN BARRIER DELINEATOR / EACH TUBE DELINEATOR / EACH INSTALL SIGN TYPE C / EACH INSTALL SIGN TYPE D / EACH INSTALL DELINEATOR / EACH PLAQUE TYPE X / EACH INSTALL MARKER / L F SILT FENCE, TYPE HEAVY DUTY / L F SILT FENCE, TYPE SUPER DUTY / L F SILT FENCE, TYPE MACHINE SLICED / L F FLOTATION SILT CURTAIN TYPE WORK AREA / ACRE SEEDING
6 PAGE : / LB SEED MIXTURE / LB SEED MIXTURE / TON MULCH MATERIAL TYPE / ACRE DISK ANCHORING / S Y EROSION CONTROL BLANKETS CATEGORY / LB FERTILIZER TYPE / MGAL RAPID STABILIZATION METHOD / L F REMOVABLE PREFORMED PLASTIC MARKING / EACH PAVEMENT MESSAGE (LT ARROW) REMOVABLE POLY PREFORMED / EACH PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM-GROUND IN / L F " SOLID LINE WHITE-EPOXY / L F " BROKEN LINE WHITE-EPOXY / L F " SOLID LINE YELLOW-EPOXY / L F " BROKEN LINE YELLOW-EPOXY / L F " DOUBLE SOLID LINE YELLOW-EPOXY SECTION TOTALS $ 1,256, $ 1,375, $ 1,545, SECTION 0002 BRIDGE NO 25024
7 PAGE : / S F BRIDGE SLAB CONCRETE (3YAHP) / L F TYPE MOD P-1 (TL-2) RAILING CONCRETE (3Y46A) / L F TYPE P-2 (TL-4) RAILING CONCRETE (3Y46A / L F TYPE MOD P-2 (TL-4) RAILING CONCRETE (3Y46A) / LB REINFORCEMENT BARS (EPOXY COATED) /00010 LUMP STRUCTURE EXCAVATION /00300 LUMP FOUNDATION PREP PILE BENT PIERS / S F BRIDGE DECK PLANING / L F ORNAMENTAL METAL RAILING / L F STRUCTURAL TUBE RAILING DESIGN T / EACH ELASTOMERIC BEARING PAD TYPE / EACH ELASTOMERIC BEARING PAD TYPE / EACH ELASTOMERIC BEARING PAD TYPE / EACH SHEAR STUDS /08010 LUMP SUPPLEMENTAL DESCRIPTION PRECAST PIER WALL / EACH SUPPLEMENTAL DESCRIPTION PRECAST PIER CAP ELEMENT
8 PAGE : / EACH SUPPLEMENTAL DESCRIPTION PRECAST PIER BASE ELEMENT / EACH SUPPLEMENTAL DESCRIPTION PRECAST WINGWALL ELEMENT / EACH SUPPLEMENTAL DESCRIPTION PRECAST ABUTMENT ELEMENT / L F PRESTRESSED BEAMS INV-T 18" TYPE / L F PRESTRESSED BEAMS INV-T 18" TYPE / L F PRESTRESSED BEAMS INV-T 18" TYPE / S F ANTI-GRAFFITI COATING / S F ARCHITECTURAL SURFACE FINISH (MULTI COLOR) / S F ARCHITECTURAL CONCRETE TEXTURE (ASHLAR STONE) / EACH ANCHORAGES TYPE / EACH ANCHORAGES TYPE REINF BARS / EACH ANCHORAGES TYPE REINF BARS (STAINLESS STEEL) / EACH SUPPLEMENTAL DESCRIPTION REMOVE ANCHORAGE /00010 LUMP REMOVE EXISTING BRIDGE
9 PAGE : / L F C-I-P CONCRETE PILING DELIVERED 12" / L F C-I-P CONCRETE PILING DELIVERED 16" / L F C-I-P CONCRETE PILING DRIVEN 12" / L F C-I-P CONCRETE PILING DRIVEN 16" / EACH C-I-P CONCRETE TEST PILE 70 FT LONG 12" / EACH C-I-P CONCRETE TEST PILE 75 FT LONG 12" / EACH C-I-P CONCRETE TEST PILE 80 FT LONG 16" / EACH PILE REDRIVING /00011 LUMP STEEL SHEET PILING (TEMPORARY) / EACH COUPLERS (REINFORCEMENT BARS) T /00010 LUMP DRAINAGE SYSTEM TYPE (B910) / C Y RANDOM RIPRAP CLASS V / S Y GEOTEXTILE FILTER TYPE IV (MOD) /00011 LUMP CONDUIT SYSTEM (LIGHTING) SECTION TOTALS $ 1,535, $ 1,710, $ 2,337, CONTRACT TOTALS $ 2,792, $ 3,085, $ 3,883, COST PLUS TIME TOTALS $ 3,192, $ 3,485, $ 4,283,398.10
M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022)
BID TABULATION SUMMARY JOB 970010 PAGE 1 STATE PROJECT NO. 27-618-70 BIDS RECEIVED UNTIL 2:00 P.M. ON 01/14/97 MINNESOTA PROJECT NO.S: DPI 015-8(021) DPI 015-8(022) AT THE JUNCTION OF AUTO CLUB ROAD AND
More informationSUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard
More informationSTANDARD BID ITEM NUMBERS
10701 TRAFFIC CONTROL LUMP SUM 10702 Traffic Control for Storm Sewer Installation LUMP SUM 10703 Traffic Control for Water Main Installation LUMP SUM 10704 Traffic Control for Sanitary Sewer Installation
More informationROUTES: 65 SECTIONS: miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED:
ARKANSAS DEPARTMENT OF TRANSPORTATION CA0801 HWY. 110 - CLINTON (WIDENING) (S) FEDERAL AID PROJECT ACNHPP-0071(31) THE PURPOSE OF THIS PROJECT IS TO WIDEN HIGHWAY 65 IN VAN BUREN COUNTY. THIS PROJECT CONSISTS
More information50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges
50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:
More information11/06/2014 Pay Items - 1
Pay Item Description Pay Unit 90701 Mobilization.... LS 91101 Excavation.... L.F. 91102 Excavation.... mi 91103 Excavation.... LS 91104 Borrow..... C.Y. 91105 Borrow..... LS 91106 Existing Trail Restoration...
More informationPLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS
PLAN RATINGS & COMMON ERRORS TO WATCH FOR IN PLANS Project Design Services Unit June 2018 http://ihub/projectdelivery/design/index.html PROJECT RATING FORM This is filled out for ALL Process B projects.
More informationCITY OF DANA POINT DEVELOPMENT REVIEW
Section I EARTHWORK CITY OF DANA POINT DEVELOPMENT REVIEW COST ESTIMATE UNIT PRICE LIST May 2002 Page 1 of 12 Section I EARTHWORK TABLE OF CONTENTS SECTION AND TOPICS...PAGE INTRODUCTION... i I EARTHWORK...
More informationPORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT ADDENDUM NO. 1
PORT OF ST. HELENS SCAPPOOSE INDUSTRIAL AIRPARK PARALLEL TAXIWAY B RELOCATON AIP PROJECT 3-41-0056-024-2018 ADDENDUM NO. 1 Addendum No. 1 hereby amends the contract documents and drawings for the Scappoose
More informationImmediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board Room, 440 River Crest Court
Dated 06-29-17 SPECIAL VILLAGE BOARD MEETING Notice of Meeting and Agenda Wednesday, July 5, 2017 Time: Place: Immediately following the Committee of the Whole meeting Mukwonago Municipal Building/Board
More informationMiscellaneous. Demolition
Public Improvements Miscellaneous 1 Mobilization L.S. ** 2 Clearing and Grubbing L.S. *** 3 Structural Concrete Incl. Reinforcing C.Y. $1,325.00 4 6" PVC Sleeves L.F. $26.00 Demolition 5 Remove Asphalt
More informationPlate 8132A - Preformed Rigid PVC Conduit Loop Detector, is a new plate requested by OTST.
DISTRIBUTION: 7 MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Design Services Section TRANSMITTAL LETTER NO. (0-0) MANUAL: Standard Plates DATED: January 9, 00 SUBJECT:
More informationStandard Plate Sheer Reinforcement for Precast Drainage Structures has been updated upon recommendation of the Bridge Office.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (13-03) MANUAL: Standard
More informationABC and Innovative Bridge Construction for Minnesota Local Roads
ABC and Innovative Bridge Construction for Minnesota Local Roads May 23, 2013 To box the cha of t unl qua gra ma all g You ma add Tex Chris Werner, PE Senior Bridge Engineer HDR Engineering, Inc. 763-278-5918
More informationPART 4 STANDARD DRAWINGS FOR CONSTRUCTION
4.0. INTRODUCTION PART 4 STANDARD DRAWINGS FOR CONSTRUCTION In this document, Ivins City adopts the most recent edition (currently 2007), including all amendments, of the APWA Utah Chapter s Manual of
More informationDigitally Signed 06/02/2015
Digitally Signed 06/0/05 Digitally Signed 06/0/05 Digitally Signed 06/0/05 FED. ROAD DIST. NO. STATE FED. AID PROJ. NO. SHEET NO. TOTAL SHEETS 6--5 6 ARK. JOB NO. 08057 6 8 075 QUANTITIES 5706 SUMMARY
More informationSYMBOL DESCRIPTION TRAFFIC CONTROL SIGN TYPE III BARRICADE = IMPACT ATTENUATOR STRIPING KEY TRIANGLE - PAINT PLASTIC MARKING 1ST DIGIT WIDTH 4" OR 8"
TES & GUIDELINES TRAIC CONTROL DEVICES & SYMBOLS LEGEND INDEX 2. GENERAL IRMATION: THE CONTRACTOR SHALL URNISH, INSTALL AND MAINTAIN THE DEVICES IN THIS TRAIC CONTROL PLAN UNLESS OTHERWISE TED. IELD CONDITIONS
More informationDESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA
DESIGN GUIDELINES (SD) COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 ELMHURST STREET HAYWARD, CA 94544-1395 PUBLIC WORKS DESIGN GUIDELINES TABLE OF CONTENTS SD-100 SERIES SPECIAL DRAWINGS SD-100 8/1991 SILT
More informationBRIDGE RAILING, 4 TUBE B-26-F POST DETAILS MICHIGAN DEPARTMENT OF TRANSPORTATION
\ ƒ" x 1 " SLOTTED HOLE IN POST AND \ ƒ"! HOLE IN RAIL \ "! x 6" SLOTTED ROUND HEAD BOLTS, WITH 1 PLATE WASHER, 1 LOCK WASHER AND HEX. NUT \ ƒ" x 1 " SLOTTED HOLE IN POST AND \ ƒ"! HOLE IN RAIL \ "! x
More informationCONTRACT PLANS READING
CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More informationSTANDARD DRAWINGS INDEX MODIFIED FOR CENTRAL REGION Revised August 6, 2018
SYMBOLS STANDARD DRAWINGS INDEX No Statewide Standard - Use Regional A3 Legend Detail Sheet BRIDGE AND STRUCTURES B-08.00 Bin Walls 1 CONSTRUCTION-BARRICADES AND SIGNING C-04.12 Location of Double Traffic
More informationE:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM
600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn
More informationBRIDGE S-803-A TEST PILE EA 4, , , , ,
OFFICE OF STATE AID ROAD CONSTRUCTION BID LETTING- PROJECT #: LSBP-65(16) AMOUNT RANK CONTRACT. SURETY OF BID 1 Joe Mcgee ConsSafe Co. 337,266.65 2 Jordan Crane In.Co.of West 345,347.00 3 Fordice Const.Fidelity
More informationESTIMATED QUANTITIES SHEET CSAH 066 / HENNEPIN COUNTY PROJECT 1451 BRIDGE 27J67 S.A.P /8/17
I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DESIGNED BY: ESTIMATED QUANTITIES JOHN D. EKOLA, PROFESSIONAL ENGINEER 53076 LICENSE NO. /8/7 DRAWN BY:
More informationGENERAL ELEVATION SECTION A-A
NORTH OR WEST Final pavement Elev. m @ roadway 12 352 out to out precast backwall panels Final pavement Elev. m @ roadway SOUTH OR EAST Pile cut-f Elev. m Pile cut-f Elev. m 3:1 3:1 Approx. existing groundline
More informationKansas Department of Transportation DISTRICT 4. Project(s): Min: Max:
Page 1 of 11 BETTIS ASPHALT & (2) APAC-KANSAS INC SHEARS DIVISION (3) KILLOUGH SECTION: 01 COMMON ITEMS Cat Alt Set: Cat Alt Member: LCC: 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationPrecast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone
Precast Bridge Built in only Eight Days by Peter E. Stamnas and Mark D. Whittemore. New Hampshire Department of Transportation Minimizing construction-related traffic delays and improving workzone safety
More information1.1 RELATED DOCUMENTS
SECTION 050505 -BEVEL RAIL ENDS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 Specification Sections
More informationDIVISION PAVEMENT MARKINGS AND MARKERS
DIVISION 61 66 PAVEMENT MARKINGS AND MARKERS 66.01 SCOPE: The purpose of these specifications is to describe the minimum requirements of the City of Chesapeake for pavement markings and shall be in addition
More informationW 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI ph Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603
869 86 863 W 869 SN 303 S. Paterson Street, Ste. 1 Madison, WI 53703 ph 608-709-1250 Structural Engineering: /Users/paulcuta/Desktop/1603 Finals/1603 Re Submit/15002_Titleblock.dwg 868 SN LEGEND W 867
More informationBridge Design and Drafting Manual Oregon Department of Transportation
Bridge Design and Drafting Manual - 2005 SECTION 2: DRAFTING PRACTICES 2.1 COMPUTER AIDED DRAFTING (CAD) 2.1.1 Standard File Format The standard file format for submission of electronic CAD files to the
More informationALL YOUR PRECAST SOLUTIONS
PO Box 265 Waverly, WV 26184 304-464-4441 ENERGY PRODUCTS ALL YOUR PRECAST SOLUTIONS UP STREAM MID STREAM DOWN STREAM Carr Concrete began in 1974 as Marietta Wilbert, Inc. of Marietta, Ohio. The only product
More informationThis addendum forms a part of the Contract Documents dated: August 10, 2012.
Addendum # 1 Date Issued: August 28, 2012 Issued By: Project: Owner: Renker Eich Parks Architects 1609 Dr. Martin Luther King Street North St. Petersburg, Florida 33704 Ph# (727) 821-2986 Fax # (727) 896-4911
More informationSection 914. JOINT AND WATERPROOFING MATERIALS
914.01 Section 914. JOINT AND WATERPROOFING MATERIALS 914.01. General Requirements. Joint and waterproofing material for use in concrete construction must meet the requirements of this section. 914.02.
More informationAny of the above may be used as source documents. Let's discuss each of these types of documentation.
INTRODUCTION TO DOCUMENTATION Much of the work of preparing final estimates involves careful and orderly documentation of measurements and computations. You will become familiar with the various types
More information6/19/2014. Milton Madison Bridge Slide. Project Partners. The Challenge. Aaron L. Stover, PE, SE Michael Baker Jr., Inc.
Kentucky Society of Professional Engineers May 23 rd, 2014 Lexington KY Milton Madison Bridge Slide Aaron L. Stover, PE, SE Michael Baker Jr., Inc. Project Partners The Challenge Milton, KY Existing Bridge
More informationGENERAL NOTES ABBREVIATIONS DRAWING THEME STRUCTURAL DRAWING LIST SUBMITTALS S101 GENERAL NOTES SOUTH DYKE RIVERFRONT WALKWAY
GENERAL NOTES ABBREVIATIONS DRAWING THEME SUBMITTALS STRUCTURAL DRAWING LIST GENERAL NOTES S0 LETTERS OF ASSURANCE TENDER DOCUMENTS DESIGN BY CONTRACTORS TEMPORARY AND ANCILLARY WORKS AND SITE SAFETY FIELD
More informationTYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.
FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88
More informationINSTALLATION GUIDE PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975
INSTALLATION GUIDE 2009-2017 PermaTrak. Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 Table of Contents Project Overview Forward, Acceptability Criteria, Safety,
More informationCONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 MAY 1993 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS 422.01 SCOPE 422.02 REFERENCES 422.03 DEFINITIONS
More informationMidland County Road Commission AS AWARDED 2017 Material Bid Tablulations
Ace Saginaw Paving Central Asphalt Pyramid Paving Hodgins Asphalt Paving ITEM 1 HMA PAVING "/ton" Item 1.a. HMA 13A "/ton" $52.75 $43.51 $53.25 $58.00 Item 1.b. Wedging, Partial Lane "/ton" $58.25 $58.43
More informationCITY OF TOMBALL. Section FIRE HYDRANTS 1.01 SECTION INCLUDES. A. Fire hydrants. B. Adjustment of fire hydrants and gate valves.
Section 02520 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fire hydrants. B. Adjustment of fire hydrants and gate valves. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment is on a unit price basis
More informationEXTERIOR BUILDING, ROOFING, AND SITE IMPROVEMENTS
CONTRACT NUMBER: IFB-8-B006 ARCHITECT / ENGINEER : HURST-ROSCHE, INC. NO. LINOIS 62203 (68) 398-0890 -7 E. RANDLE ST./ N. FRITZ ST. 402 CHERRY ST., 404-406 ST. LOUIS ST. 502-506 DEE ST. 50-505 PLUM ST.
More informationSECTION G ESTIMATE OF QUANTITIES
PROJECT STATE OF SOUTH DAKOTA NH 2115(45)87 SHEET G2 TOTAL SHEETS G27 SECTION G ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 560E0068 7'x3' Precast Concrete
More informationAPPROXIMATE QUANTITIES PROPOSED TENNESSEE DEPARTMENT OF TRANSPORTATION February 10, 2017 LETTING
COUNTY: BLEDSOE, GRUNDY, MARION, SEQUATCHIE (CNR914) 001 PROJECT: 98029-4230-04 TYPE: Mowing and/or Litter Removal LENGTH: Project Length: 364.990 miles WRK DAY: On or before December 31, 2017 806-01 MOWING
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationPrecast Concrete Pavement
Precast Concrete Pavement Phillip Sturdivant, P.E. Louisiana Department of Transportation and Development www.dotd.la.gov What is Precast Concrete Pavement? Precast concrete pavement is what it says it
More informationF-5-1a. Concrete Bollards (Detail 1 of 2) WEIGHT: 166kg. WEIGHT: 227kg. WEIGHT: 113kg. WEIGHT: 212kg
Contents F-5-1a Concrete Bollards F-5-1b Concrete Bollards F-5-2 Concrete Bollards with City Logo F-5-3 Cast Iron Bollards F-5-4 Decorative Steel Bollard F-5-5 Swivel P Gate Steel Bollard F-5-6 Steel Bollard
More informationJointed Precast Concrete Pavement
NATIONAL PRECAST CONCRETE ASSOCIATION Manual for Jointed Precast Concrete Pavement 3rd Edition Authors Peter Smith, P.E. Mark B. Snyder, Ph.D., P.E. Graphic Designer Deborah Templeton NPCA Precast Concrete
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationCity of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS
City of Regina Standard Construction Specification SECTION 2999 LISTING OF ROADWAY STANDARD DRAWINGS R-1 Alternate Pavement Structures July/10 R-2 Typical Cross Sections for Asphaltic Concrete Pavements
More informationInformation for File # RMM
Information for File # 3-4-RMM Applicant:, L.P. Corps Contact: Ryan Malterud Address: 8 Fifth Street East, St. Paul, Minnesota 56 E-Mail: Ryan.M.Malterud@usace.army.mil Phone: (65) 9-586 Primary County:
More informationAnne Arundel County Dept. of Inspections and Permits Storm Drain Checklist
Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated
More information4.1. Foremen 4.2. Concrete plant manager 4.3. Concrete plant operator 4.4. Personnel performing saw cutting and joint sealing
10-1. JOINTED PLAIN CONCRETE PAVEMENT GENERAL Summary This work includes constructing jointed plain concrete pavement. Comply with Section 40, "Concrete Pavement," of the Standard Specifications. Submittals
More informationEXCAVATION AND BACKFILL
Standard Specification 2565.3, 2451, and 1805 A basic understanding of specifications is needed to properly replace the disturbed soil and restore the condition of the excavated area. The size of the disturbed
More informationINVITATION FOR BID (IFB) IFB NO. GSWA
INVITATION FOR BID (IFB) IFB NO. GSWA-005-16 AGAT AND MALOJLOJ RESIDENTIAL TRANSFER STATION IMPROVEME AND DEDEDO RESIDENTIAL TRANSFER STATION CLOSURE ADDENDUM NO. 6 September 22, 2016 ALL BIDDERS MUST
More informationInstallation Instructions
Installation Instructions SRT-350 8 POST Guardrail End Treatment Revised July 2005 TRINITY HIGHWAY SAFETY PRODUCTS, INC. BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY 2 SRT TM 8-POST SYSTEM FOR SPECIFIC
More informationMunicipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS
Municipality of Anchorage Public Works Department Project Management and Engineering Division BID TABS 2016 20.02 M 20.03 M 20.03 SP 20.04 M 20.04 M 20.04 M 20.06 M 20.06 M 20.07 M 20.07 M 20.08 M 20.08
More informationSECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.
SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section
More informationSTORM M ANHOLE FOR 42" PIPE AND SM ALLER JOB NO. SHEET NO. DATE MARCH 2015 OF MIN OF 3 CRSES MAX OF 5 CRSES 30"MAX 3 OR 3.5 PRECAST ECCENTIC CONC
01-APR-2015 13:33 = I:\MSV8i\Plotting\piblack.ptb V:\201001\\C\8x11_Howell_Det\stm_det01_8x11_st01.dgn TIME = MIN 3 CRSES MAX 5 CRSES 3 OR 3.5 PRECAST ECCENTIC CONC ID PIPE GRADE A CONC FILL 4" 8" 2-0"SUMP
More informationVILLAGE OF VILLA PARK CENTRAL BOULEVARD IMPROVEMENTS LOCATION MAP (NOT TO SCALE) CORTESI AVE. MYRTLE AVE. CENTRAL BLVD.
Q:\VillaPark_IL\11283000 Astor-Myrtle Sewer Separation Preliminary Design\D.4 CAD\Sheets\North\1. Cover.dwg INDEX OF SHEETS 1 COVER 2 GENERAL NOTES 3 SUMMARY OF QUANTITIES 4 ALIGNMENT 5-9 DRAINAGE AND
More informationValue Engineering Design Build MODULAR INFRASTRUCTURE
Value Engineering Design Build MODULAR INFRASTRUCTURE VALUE ENGINEERING When infrastructure projects find themselves in densely populated areas, or occur on a site with poor conditions, the opportunity
More informationSUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.
REQUIREMENTS (indicate with an "") 011100 1.4 Detailed Construction Phasing Plan 011100 1.4 Sub-Surface Utility Location Plan 013100 1.3 Letter Designating Project Superintendent 013100 1.3 Construction
More informationA. Extent of structural precast concrete work is shown on drawings and in schedules.
SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification
More informationRevised BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES CHAPTER VIII TRAFFIC CONTROL DEVICES
CHAPTER I CHAPTER II CHAPTER III CHAPTER IV CHAPTER V CHAPTER VI GENERAL INFORMATION PRELIMINARY DESIGN SURVEYS DETAIL DESIGN BRIDGE REPORT AND LAYOUT PAVEMENT STRUCTURE DESIGN CHAPTER VII UTILITIES Revised
More informationSUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT
SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationSECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS
9. STANDARD DETAILS SECTION III STANDARD DRAWINGS ROYSE CITY GENERAL CONSTRUCTION NOTES & DETAILS j:\clerical\royse city\1-4086 general services\168-tech const standards review\tcss manual\2018 tcss manual\sec-9a
More information2. What are the estimated volumes for the Residuum Harvesting See response to Question 1
No. Question Answer 1. What are the approximate earthwork quantities for this job? FBP approximate quantities will be provided via amendment with or before the CADD files. Contractor is still responsible
More informationMDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop
500 460 MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop Check if Applicable TRAFFIC SIGNAL SPECIAL DETAILS INDEX/CHECKLIST *One completed checklist required
More informationSECTION MASONRY ANCHORAGE AND REINFORCEMENT. Display hidden notes to specifier. (Don't know how? Click Here)
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 04080 MASONRY ANCHORAGE AND REINFORCEMENT Display hidden notes to specifier. (Don't know how? Click Here) A. Post installed masonry anchors. B. Miscellaneous
More informationSKT-SP Tangent Terminal
Assembly Instructions for metric SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435
More informationStandard Details Index NWTP Improvements and MF System Installation
Detail Standard Details Index NWTP Improvements and MF System Installation Marco Island, Florida Description 0315-001 PLASTIC WATERSTOP 0315-003 HYDROPHILIC/GROOVE WATERSTOP 0315-011 WATERSTOP JOINT 0315-154
More informationIntroduction 3. System Overview 3. Before Installation 3. Limitations and Warnings 4. Safety Statements 4. Parts Identification 5.
June 2015 Table of Contents Introduction 3 System Overview 3 Before Installation 3 Limitations and Warnings 4 Safety Statements 4 Parts Identification 5 Preparation 7 Soil Conditions 7 Tools Required 7
More informationSECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT
1085.1 1085.2(k) SECTION 1085 PRECAST REINFORCED CONCRETE BOX CULVERT 1085.1 DESCRIPTION This work is the manufacture, storage, delivery, installation, and assembly of precast reinforced concrete box culvert
More informationOhio Department of Transportation Office of Roadway Engineering January 18, 2013
Ohio Department of Transportation Office of Roadway Engineering January 18, 2013 To: Holders of the Traffic Standard Construction Drawings (SCDs) and Plan Insert Sheets (PISs) As of January 18, 2013, eighteen
More informationPrecast Concrete Pavement Background Concepts. Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001
Precast Concrete Pavement Background Concepts Project 1517 FHWA, CTR & TxDOT Gary Graham November 15, 2001 Project Background CTR contracted by FHWA/TxDOT to investigate the feasibility of using precast
More informationState of the Art Precast, Prestressed Concrete Bridges and Industry Innovations
State of the Art Precast, Prestressed Concrete Bridges and Industry Innovations William N. Nickas, P.E. Managing Director, Transportation Services Precast/Prestressed Concrete Institute Chicago, IL. LEARNING
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationIndex Pipe Hangers and Straps
Index Pipe Hangers and Straps Fig. 1 Standard Clevis Hanger MSS-SP-69, Type 1 WW-H-171E, Type 1 Page 14 Fig. 1CI Clevis Hanger for A.W.W.A. Page 16 Fig. 81 Clevis Hanger WW-H-171E, Type 12 Page 70 Fig.
More informationExhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia
Exhibit A SCOPE OF WORK AND DELIVERABLES T.H. 169 Mountain Iron to Hoover Road in Virginia PROJECT OVERVIEW S.P. 6935-89 is on T.H. 169 from 0.07 miles west of CR 109 in Mt. Iron to Hoover Road in Virginia
More informationSOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017
SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE TO CONTRACTORS FOR REGULAR HIGHWAY LETTING June 13, 2017 Letting Location: SCDOT Headquarters Building Conference Room 332 955 Park Street Columbia, SC
More informationSection 808. FENCING
808.01 Section 808. FENCING 808.01. Description. This work consists of providing and erecting, or moving existing, woven wire fence, temporary fence, protective fence, chain link fence, high-tensile wire
More informationJames Luebke, PE Structural Development Engineer WisDOT Bureau of Structures
James Luebke, PE Structural Development Engineer WisDOT Bureau of Structures 1 Highlights WisDOT s ABC Development of PBES Piers Road of Development, Implementation, and Institutionalization Lessons Learned
More information3. Barrier elements. Barrier posts. Stainles steel
3. Urban Equipment Building Equipment Stainles steel e 3.1 Tubular hoops 216-223 3.2 Access barriers 224-227 3.3 Height restriction barriers 228-231 3.4 Protective railing 232-237 3.5 City fence 238-240
More informationTAXIWAY B NORTH ROAD RUNWAY TAXIWAY C NORTH ROAD VICINITY MAP. Plans Prepared By:
CONSTRUCTION PLANS CITY OF NAPLES AUTHORITY (APF) NAPLES, COLLIER COUNTY, FLORIDA NAA BID NO. : TBD FAA AIP NO.: N/A FDOT FM NO.: N/A HANSON PROJ. NO. 15A0023 CITY OF NAPLES AUTHORITY BOARD OF COMMISSIONERS
More informationPrecast Concrete Box Culverts
We have made it easy for you to find a PDF Ebooks without any digging. And by having access to our ebooks online or by storing it on your computer, you have convenient answers with precast concrete box
More information² TL Beton-StB 07 = German technical conditions for construction materials for concrete road pavements
Introduction A transverse joint frequently crossed by heavy goods traffic tends to form steps if it not perfectly doweled. This is associated with negative effects on ride comfort and driving safety as
More informationWork Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition
Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing
More informationCITY OF SAN MARCOS ENGINEERING DIVISION
AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION ENGINEER S COST ESTIMATE USING UNIT PRICES FOR BOND PURPOSES-REVISED NOVEMBER 9, 2006 (Calculations are already set-up in
More information