1 Post Sanction Guidelines for BIG Beneficiaries 1 P age

2 Index S. No. Particulars Pg. No. 1. Acceptance of Offer and Signing of agreement 3 2. Monitoring of Milestones and Completion of project 3 3. Change of PI 3 4. Extension of project duration 3 5. Budget re-appropriation 3 6. Change in the Shareholding Pattern 4 7. Individual to Company Conversion 4 8. Technology transfer/licensing 4 9. Due acknowledgement of BIRAC Support Sharing updates and achievement Foreclosure/Termination Merger/Acquisition Technology Readiness Level.6 2 P age

3 1. Acceptance of Offer and Signing of agreement: The grantee needs to convey acceptance on the offer for BIG grant and sign necessary documents within a maximum period of 21 days from communication of offer to the grantee by the partner, failing which, the offer for funding shall automatically stand cancelled and the project will be treated as withdrawn. 2. Monitoring of Milestones and Completion of project: The grantee is required to submit progress reports (soft copy pdf format only) periodically during the course of the project. The report is to be submitted on completion on every milestone. Next release for the project will be made only if the milestone report is found to be satisfactory by the partner. On completion of the project, a consolidated completion report is to be submitted within a period of 4 weeks from the completion date. The last release will be made only after submission of completion report. 3. Change of PI: This request is normally not accepted. However, in cases where the request is found to be justified by BIRAC, the new PI will be required to make a presentation before the Technical Expert Committee at BIRAC. Decision by the Committee will be based on technical capabilities and competence of the new PI. 4. Extension of project duration: As per new Guidelines, no extension is permitted for projects from 8 th Batch onwards. The project needs to be completed within the original proposed duration. 5. Budget re-appropriation: The grantee is required to limit the expenses under various heads as per terms of sanction order. In case the grantee foresees any deviation in planned budget heads (on account of reasons such as increase/decrease in equipment cost or rentals, need to engage an additional manpower, outsourcing an additional activity or conducting an experiment internally in place of outsourcing etc.), the grantee should initially try to meet the deviations from contingency. In case there is a major 3 Page

4 change, budget from one head may be moved to another, keeping the overall sanctioned budget same. However, such re-appropriation will have to be substantiated with necessary documentary proofs and shall require permission from BIRAC (through partner). 6. Change in the Shareholding Pattern: In case the grantee is a company, the grantee is not allowed to change shareholding of the company during the course of the project without prior permission from BIRAC. This is in view of the fact that such a change may impact eligibility of the company under BIG scheme. However, if the change is absolutely essential, the grantee will be required to seek necessary permission for the same from BIRAC (through partner). 7. Individual to Company Conversion: Since one of the goals of BIG is to promote creation of scientific start-ups, we allow an individual applicant to set up a new company and transfer the application/project to the newly formed company. The newly formed company will need to meet all eligibility criteria as per BIG Guidelines (version 2) and comply with the due diligence requirements. The Project Leader will also need to remain the same and need to be a promoter shareholder in the new start- up. 8. Technology transfer/licensing: Transfer/licensing related to technology/project funded under BIG is permitted even during the course of project. However, information regarding any such transfer/licensing needs to be immediately shared with BIRAC. 9. Due acknowledgement of BIRAC Support: BIG is a generous funding scheme by Government of India. We, therefore, expect all grantees to provide due acknowledgement to BIRAC support while publishing, marketing the resultant product(s)/process(es) by way of mentioning a statement as provided below: a. While publishing/presenting resultants of the project: 4 P age

5 The financial support of the Biotechnology Industry Research Assistance Council, Government of India for this project (title) is duly acknowledged b. While marketing the resultant products: The partial* financial support of the Biotechnology Industry Research Assistance Council, Government of India in development of this Product is duly acknowledged * Partial phrase to be mentioned in cases of co-funding only. Please note that use of BIRAC logo is not permitted without written approval. 10. Sharing updates and achievements: A grantee, who receives BIG support at any point of time during his/her entrepreneurial journey, becomes a valued member of BIRAC- BIG family, irrespective of the outcome of the BIG funded project. As a family, we love to hear updates from grantees and encourage grantees to be in touch with BIRAC by keeping us updated about developments and achievements, even after they graduate from BIG. 11. Foreclosure/Termination: The agreement signed between the partner and grantee provides for foreclosure/termination as follows: 11.1 In case, during the tenure of the Project, it is found that the Project or any Project component is not likely to lead to successful completion, BIRAC may decide to foreclose the Project or the Project component as warranted. The decision of the BIRAC shall be final in all respects. The BIG Innovator shall immediately refund any funds unutilized out of BIRAC s disbursements, after deducting the legally committed expenses to third party vendors, to BIG Partner, along with detailed accounts of funds received, utilized and unutilized. The entire outstanding amount as on the date of foreclosure will become due and payable immediately. 5 P age

6 11.2 The BIG Innovator may, before the completion of the Project, terminate this Agreement by giving three months notice in writing to BIG Partner/BIRAC. BIG Partner/BIRAC may also terminate this Agreement by written notice for committing breach of any term of this Agreement and either not rectifying it to the satisfaction of BIG Partner/BIRAC or not satisfying BIG Partner/BIRAC about its inevitability within a reasonable period. In the event of termination of the Agreement, no further disbursement shall be made by BIG Partner and the BIG Innovator shall be liable to return immediately the amount of grant-in-aid already availed of from BIG Partner with simple interest at the rate of 12 (twelve) per cent per annum within 30 (thirty) days of termination of the Agreement. In case of failure to repay, without prejudice to any other rights under this agreement, the amount can be recovered by initiating any procedure available in Law. 12. Merger/Acquisition: In case the BIG funded company is acquired by any other company (merger) or the funded company acquires another company (acquisition) during the course of project, the company would be required to inform BIRAC immediately about the same. Shareholding pattern consequent to such a deal will also have to be examined to assess continued eligibility of the company after merger/acquisition. 13. Technology Readiness Level: All BIRAC supported projects are assessed on a scale of 1 to 9 called Technology Readiness Level (TRL) scale. TRL is assigned to a project based on stage of development and the detailed parameters are enclosed at Annexure 1. Each project is assigned a TRL upon start and is then continuously monitored for shift in TRL during the course of project. a. Partners are required to assign TRL to every project and keep on monitoring for TRL jumps. 6 P age

7 Annexure 1 Technology Readiness Level (TRL) Table Stages of Product Pre- Commercialization/ Product Late Stage Technology Validation/Early Stage Technology Prototype Technology Readiness Level (TRL) TRL 9 TRL 8 TRL 7 TRL 6 TRL 5 TRL 4 Characteristics Technology ready for full scale commercial deployment Technology incorporated in commercial design Tech proven to work in final form in expected conditions Prototype ready. Integrated Pilot System demonstrated Prototype system verified by testing in the actual operational environment Lab testing of integrated system with support elements in a simulated environment High Fidelity Prototype Design, development & lab testing of tech components integrated, to establish that they will work together Low Fidelity Prototype Proof of Concept TRL 3 Critical function, proof of concept (PoC) established Laboratory studies aim to validate analytical predictions of separate components of the technology Ideation TRL 2 TRL 1 Applied Research: technology concept and/or application formulated Analytical Studies/Experimentation/Feasibility Assessment Basic Research: basic principles are observed and reported Fundamental investigations and Paper Studies

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit)

Incentive Guidelines. Aid for Research and Development Projects (Tax Credit) Incentive Guidelines Aid for Research and Development Projects (Tax Credit) Issue Date: 8 th June 2017 Version: 1 http://support.maltaenterprise.com 2 Contents 1. Introduction 2 Definitions 3. Incentive

More information

EU Support for SME Innovation: The SME Instrument

EU Support for SME Innovation: The SME Instrument Audit preview Information on an upcoming audit EU Support for SME Innovation: The SME Instrument April 2019 2 Traditionally, start-ups and small and medium-sized enterprises (SMEs) in the EU have faced

More information

COLLABORATIVE R&D & IP ISSUES IN TECHNOLOGY TRANSFER IN UNIVERSITY SYSTEM

COLLABORATIVE R&D & IP ISSUES IN TECHNOLOGY TRANSFER IN UNIVERSITY SYSTEM COLLABORATIVE R&D & IP ISSUES IN TECHNOLOGY TRANSFER IN UNIVERSITY SYSTEM Avinash Kumar Addl. Dir (IPR) DRDO HQ, DRDO Bhawan, Rajaji Marg New Delhi- 100 011 avinash@hqr.drdo.in IPR Group-DRDO Our Activities

More information

FCH2 JU under Horizon 2020 rules - Rules for Participation - Ethics - IPR

FCH2 JU under Horizon 2020 rules - Rules for Participation - Ethics - IPR FCH2 JU under Horizon 2020 rules - Rules for Participation - Ethics - IPR www.fch.europa.eu Lionel Boillot Project Manager Transport Applications Changes in the Rules for Participation H2020 Annexes From

More information

Definitions proposals for draft Framework for state aid for research and development and innovation Document Original text Proposal Notes

Definitions proposals for draft Framework for state aid for research and development and innovation Document Original text Proposal Notes Definitions proposals for draft Framework for state aid for research and development and innovation Document Original text Proposal Notes (e) 'applied research' means Applied research is experimental or

More information

An Introdcution to Horizon 2020

An Introdcution to Horizon 2020 TURKEY IN HORIZON 2020 ALTUN/HORIZ/TR2012/0740.14-2/SER/005 An Introdcution to Horizon 2020 Thies Wittig Deputy Team Leader Project "Turkey in Horizon 2020" Dr. Thies Wittig Ø PhD in Computer Science Ø

More information

Technology Readiness for the Smart Grid

Technology Readiness for the Smart Grid CIGRE US National Committee 2013 Grid of the Future Symposium Technology Readiness for the Smart Grid Presented by Keith E. Lindsey President Lindsey Manufacturing Co. Outline What is Technology Readiness?

More information

FP7 AAT Level 0. FP7 AAT Level 0. Roberto Bojeri. Workshop ACARE Italia. Torino, 17 Maggio 2012

FP7 AAT Level 0. FP7 AAT Level 0. Roberto Bojeri. Workshop ACARE Italia. Torino, 17 Maggio 2012 FP7 AAT Level 0 Roberto Bojeri Workshop ACARE Italia Torino, 17 Maggio 2012 1 Content: questions answered by this presentation Perché? 1. Scope of the Level 0 Cosa? 2. The new "instrument" Level 0 Dove?

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

GUIDELINE DOCUMENT FOR FUNDING APPLICATION

GUIDELINE DOCUMENT FOR FUNDING APPLICATION GUIDELINE DOCUMENT FOR FUNDING APPLICATION 1 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. FUNDING AND SUPPORT SCHEMES... 3 2.1 Risk funding schemes... 3 3. ELIGIBILITY... 4 3.1 Who is eligible?... 4 3.2 Minimum

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

Office of Technology Development (OTD) Gap Fund

Office of Technology Development (OTD) Gap Fund The University of Southern Mississippi Office of Technology Development (OTD) Gap Fund SUBMISSION PROCESS The Office of Technology Development (OTD) Gap Fund is intended to further the commercial potential

More information

STRUCTURE OF THE H2020 PROPOSAL, TYPES OF ACTIONS, TLR. Summer School for Young Researchers, September 2017, Odessa

STRUCTURE OF THE H2020 PROPOSAL, TYPES OF ACTIONS, TLR. Summer School for Young Researchers, September 2017, Odessa STRUCTURE OF THE H2020 PROPOSAL, TYPES OF ACTIONS, TLR Summer School for Young Researchers, 25-28 September 2017, Odessa FROM THE IDEA TO THE PROJECT Idea Partner Proposal ADMINISTRATIVE PROCEDURES Single/Two-stage

More information

Moving from R&D to Manufacture

Moving from R&D to Manufacture Moving from R&D to Manufacture Webinar to SBIR awardees May 9, 2013 Clara Asmail Senior Technical Advisor NIST MEP 1 Agenda Overview of NIST MEP program Technology Acceleration and MEP s role Sampling

More information

Technology: Lighting Units

Technology: Lighting Units Triple E Register Eligibility Criteria Category: Lighting Technology: Lighting Units Lighting units are products that are specifically designed to provide high efficiency interior or exterior illumination.

More information

Fast Track to Innovation A 3 Million Opportunity

Fast Track to Innovation A 3 Million Opportunity Fast Track to Innovation A 3 Million Opportunity About FreeMind The largest international consulting firm, specializes in non-dilutive funding Optimizing non-dilutive funding potential Est. 1999 45 Fulltime

More information

HR001117S0014 Nascent Light Matter Interactions Frequently Asked Questions (FAQs) as of 12/14/17

HR001117S0014 Nascent Light Matter Interactions Frequently Asked Questions (FAQs) as of 12/14/17 HR001117S0014 Nascent Light Matter Interactions Frequently Asked Questions (FAQs) as of 12/14/17 39Q: The abstract template requests links in the bibliography to relevant papers, references, and resumes.

More information

Filmmaker Assistance Program Guidelines and Application North West Centre (Northwest Territories, Alberta, Saskatchewan, Manitoba, Nunavut, &

Filmmaker Assistance Program Guidelines and Application North West Centre (Northwest Territories, Alberta, Saskatchewan, Manitoba, Nunavut, & Filmmaker Assistance Program Guidelines and Application North West Centre (Northwest Territories, Alberta, Saskatchewan, Manitoba, Nunavut, & Northwestern Ontario) National Film Board of Canada North West

More information

ADDENDUM D COMERICA WEB INVOICING TERMS AND CONDITIONS

ADDENDUM D COMERICA WEB INVOICING TERMS AND CONDITIONS Effective 08/15/2013 ADDENDUM D COMERICA WEB INVOICING TERMS AND CONDITIONS This Addendum D is incorporated by this reference into the Comerica Web Banking Terms and Conditions ( Terms ). Capitalized terms

More information

Funding excellence in innovation. Eurostars Application Assessment Guidelines. Version 2.0 March 2012

Funding excellence in innovation. Eurostars Application Assessment Guidelines. Version 2.0 March 2012 The Eurostars TM Programme Funding excellence in innovation Eurostars Application Assessment Guidelines March 2012 The Eurostars Programme is a joint initiative of EUREKA and the European Community This

More information

Guidelines: Review and evaluation of high-end infrastructure proposals and award of funding allocations

Guidelines: Review and evaluation of high-end infrastructure proposals and award of funding allocations SUB-PROGRAMME: BASIC SCIENCES AND INFRASTRUCTURE Guidelines: Review and evaluation of high-end infrastructure proposals and award of funding allocations 1. Introduction The Department of Science and Technology

More information

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site.

Certificate by the Architect: Certified that no addition and deletion has been made to the tender documents downloaded from the IIT Madras web site. INDIAN INSTITUTE OF TECHNOLOGY MADRAS ENGINEERING UNIT CHENNAI 600 036 NOTICE INVITING TENDERS FOR APPOINTMENT OF ARCHITECTURAL CONSULTANT No: 35/ ARC / 2013 14 TECHNICAL BID COVER 2 NAME OF WORK: Providing

More information

GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE. Section 1 - Introduction

GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE. Section 1 - Introduction GUIDELINES FOR THE APPLICATION FOR A SPACE STATION CARRIER LICENCE Section 1 - Introduction 1.1 Pursuant to section 7(5) of the Telecommunications Ordinance (hereinafter the Ordinance ), the Communications

More information

EXPLORING HOW ENGINEERING ENTREPRENEURSHIP COMPETENCIES ALIGN WITH ABET CRITERION 3A-K

EXPLORING HOW ENGINEERING ENTREPRENEURSHIP COMPETENCIES ALIGN WITH ABET CRITERION 3A-K EXPLORING HOW ENGINEERING ENTREPRENEURSHIP COMPETENCIES ALIGN WITH ABET CRITERION 3A-K ELIZABETH KISENWETHER PENN STATE UNIVERSITY EXK13@PSU.EDU NATHALIE D UVAL-COUETIL & JACOB WHEADON PURDUE UNIVERSITY

More information

MARCH 21 24, 2018 COLORADO CONVENTION CENTER DENVER, CO

MARCH 21 24, 2018 COLORADO CONVENTION CENTER DENVER, CO Guidelines for Commercially Supported Symposia (CME and NCE) HOPA 14TH ANNUAL CONFERENCE MARCH 21 24, 2018 COLORADO CONVENTION CENTER DENVER, CO Industry Partner, We invite you to participate in the Hematology/Oncology

More information

COMMERCIAL INDUSTRY RESEARCH AND DEVELOPMENT BEST PRACTICES Richard Van Atta

COMMERCIAL INDUSTRY RESEARCH AND DEVELOPMENT BEST PRACTICES Richard Van Atta COMMERCIAL INDUSTRY RESEARCH AND DEVELOPMENT BEST PRACTICES Richard Van Atta The Problem Global competition has led major U.S. companies to fundamentally rethink their research and development practices.

More information

H2020 Theme Oriented Training on ICT. H2020 Overview. Thies Wittig. Deputy Team Leader Project "Turkey in Horizon 2020"

H2020 Theme Oriented Training on ICT. H2020 Overview. Thies Wittig. Deputy Team Leader Project Turkey in Horizon 2020 TURKEY IN HORIZON 2020 ALTUN/HORIZ/TR2012/0740.14-2/SER/005 H2020 Theme Oriented Training on ICT H2020 Overview Thies Wittig Deputy Team Leader Project "Turkey in Horizon 2020" Dr. Thies Wi:g Ø PhD in

More information

Air Force Small Business Innovation Research (SBIR) Program

Air Force Small Business Innovation Research (SBIR) Program Air Force Small Business Innovation Research (SBIR) Program Overview SBIR/STTR Program Overview Commercialization Pilot Program Additional l Info Resources 2 Small Business Innovation Research/ Small Business

More information

BITS NEWS E-BULLETIN

BITS NEWS E-BULLETIN BITS NEWS E-BULLETIN UNDER CSI DEPARTMENT OF INFORMATION TECHNOLOGY IT is the area of managing technology and spans a wide variety of areas that include computer software, information systems, computer

More information

Client s Statement of Rights & Responsibilities*

Client s Statement of Rights & Responsibilities* Client s Statement of Rights & Responsibilities* Notification to Clients of Their Rights and Responsibilities Preamble Good communication is essential to an effective attorney-client relationship. A lawyer

More information

Emerging Talent Shorts Application Guidelines

Emerging Talent Shorts Application Guidelines Emerging Talent Shorts Application Guidelines Introduction Supported by National Lottery funding from Creative Scotland and BFI NETWORK, Scottish Film Talent Network connects with new and emerging Scottish

More information

IRISH SIMMENTAL CATTLE SOCIETY CATTLE SOCIETY LTD. HERDBOOK REGULATIONS

IRISH SIMMENTAL CATTLE SOCIETY CATTLE SOCIETY LTD. HERDBOOK REGULATIONS IRISH SIMMENTAL CATTLE SOCIETY CATTLE SOCIETY LTD. HERDBOOK REGULATIONS 1. Herdbook Contents The Herdbook of the Society shall include: a) Particulars of the Pedigree of Registered Simmental Cattle. b)

More information

The Nagoya Protocol: Compliance. Implications of the E.U. law for Microbiologists

The Nagoya Protocol: Compliance. Implications of the E.U. law for Microbiologists The Nagoya Protocol: Compliance Implications of the E.U. law for Microbiologists 1 Nagoya Protocol Compliance In this talk I will outline: The role of compliance How developed countries will respond The

More information

Module 2 Lesson 201 Project Coordinator (PC) Duties

Module 2 Lesson 201 Project Coordinator (PC) Duties Module 2 Lesson 201 Project Coordinator (PC) Duties RDT&E Team, TCJ5-GC Oct 2017 1 Overview/Objectives The intent of lesson 201 is to provide instruction on: Project Coordinator Duties Monthly Obligation

More information

The official web site for the event is:

The official web site for the event is: DEVELOP HER ALL-FEMALE HACKATHON SEPTEMBER 15 16, 2018 INTRODUCTION Use your talent, passion, and determination to help close the gender gap in Technology! Accenture Advanced Technology Centers in the

More information

Atento S.A. (Translation of Registrant s name into English)

Atento S.A. (Translation of Registrant s name into English) UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 6-K Report of Foreign Private Issuer Pursuant to Rule 13a-16 or 15d-16 of the Securities Exchange Act of 1934 For the month

More information

Interactive Retainer Letter

Interactive Retainer Letter Interactive Retainer Letter General Notes on Retainer Agreements (Non-Contingency) Retainer letters are recommended practice in Alberta for non-contingency retainers. The Code of Conduct makes reference

More information

TURKEY IN HORIZON 2020 ALTUN/HORIZ/TR2012/ /SER/005. Funding Schemes. (Instruments) H2020 Focused Group Training

TURKEY IN HORIZON 2020 ALTUN/HORIZ/TR2012/ /SER/005. Funding Schemes. (Instruments) H2020 Focused Group Training TURKEY IN HORIZON 2020 ALTUN/HORIZ/TR2012/0740.14-2/SER/005 Funding Schemes (Instruments) H2020 Focused Group Training "Legal and Financial Issues" Ankara, Nov 9 & 10, 2017 Thies Wittig The H2020 Structure

More information

ECSEL JU Update. Andreas Wild Executive Director

ECSEL JU Update. Andreas Wild Executive Director ECSEL JU Update Andreas Wild Executive Director ARTEMIS & ITEA Co-summit, Berlin, 11 March 2015 Content 2014 Outcome 2015 Progress 1. All topics open 2. RIA versus IA 3. No restrictions 2015 Plans and

More information

Annex N10 to Bank Service Agreement POS-Terminal Service

Annex N10 to Bank Service Agreement POS-Terminal Service 1. For the purposes of this Annex the below definitions shall have the following meanings: 1.1. Authorization permit given by the Card issuer or/and Card payment system for performing Acquiring by the

More information

Arshad Mansoor, Sr. Vice President, Research & Development INNOVATION SCOUTS: EXPANDING EPRI S TECHNOLOGY INNOVATION NETWORK

Arshad Mansoor, Sr. Vice President, Research & Development INNOVATION SCOUTS: EXPANDING EPRI S TECHNOLOGY INNOVATION NETWORK RAC Briefing 2011-1 TO: FROM: SUBJECT: Research Advisory Committee Arshad Mansoor, Sr. Vice President, Research & Development INNOVATION SCOUTS: EXPANDING EPRI S TECHNOLOGY INNOVATION NETWORK Research

More information

1 SERVICE DESCRIPTION

1 SERVICE DESCRIPTION DNV GL management system ICP Product Certification ICP 4-6-3-5-CR Document number: ICP 4-6-3-5-CR Valid for: All in DNV GL Revision: 2 Date: 2017-05-05 Resp. unit/author: Torgny Segerstedt Reviewed by:

More information

SF Certified International Shipping Customer Agreement V1.0

SF Certified International Shipping Customer Agreement V1.0 SF Certified International Shipping Customer Agreement V1.0 SF Certified International Shipping (further referred as SF CIS ) is a service provided by S.F. Express Co., Ltd. (further referred as SF ) to

More information

Policy 7.6 Intellectual Property Policy

Policy 7.6 Intellectual Property Policy Policy 7.6 Intellectual Property Policy Responsible Official: VP for Research Administration Administering Division/Department: Technology Transfer Effective Date: March 15, 2011 Last Revision: July 14,

More information

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C Appeals Policy Council for the Accreditation of Educator Preparation 1140 19th Street, N.W., Suite 400 Washington, D.C. 20036 Website: caepnet.org Phone: 202.223.0077 July 2017 Document Version Control

More information

EUROPASS DIPLOMA SUPPLEMENT

EUROPASS DIPLOMA SUPPLEMENT EUROPASS DIPLOMA SUPPLEMENT TITLE OF THE DIPLOMA (ES) Técnico Superior en Diseño y Amueblamiento TRANSLATED TITLE OF THE DIPLOMA (EN) (1) Higher Technician in Design and Furnishing ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

More information

Nanotechnologies, Advanced Materials and Production

Nanotechnologies, Advanced Materials and Production Enhancement of Jordan-European S&T Partnerships Nanotechnologies, Advanced Materials and Production The project (311910) is co-funded by the European Community's Capacities Programme under FP7 (2007-2013)

More information

SCRIPT DEVELOPMENT PROGRAM GUIDELINES. Objective:

SCRIPT DEVELOPMENT PROGRAM GUIDELINES. Objective: SCRIPT DEVELOPMENT PROGRAM GUIDELINES Note: Supporting Document Checklist Appears at the end of this document Objective: The Harold Greenberg Fund (Fund) is, a national funding organization that supports

More information

LIPP Program Guidelines

LIPP Program Guidelines LOW INCOME PROTECTION PLAN HARVARD LAW SCHOOL, WASSERSTEIN SUITE 5027 CAMBRIDGE, MASSACHUSETTS 02138 TEL: (617) 495-0643 FAX: (978) 367-3820 lipp@law.harvard.edu 2017-2018 LIPP Program Guidelines Many

More information

ANNEXURE II. PROFORMA I PROFORMA FOR NEW RESEARCH UNIVERSITY RESEARCH PROJECT PROPOSAL (Single copy only)

ANNEXURE II. PROFORMA I PROFORMA FOR NEW RESEARCH UNIVERSITY RESEARCH PROJECT PROPOSAL (Single copy only) ANNEXURE II PROFORMA I PROFORMA FOR NEW RESEARCH UNIVERSITY RESEARCH PROJECT PROPOSAL (Single copy only) 1. Name of the Dept. / Research Station 2. Title of the university research project 3. Source of

More information

MULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT

MULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT MULTIPLE ENTRY CONSOLIDATED GROUP TSA USER AGREEMENT Dated CORNWALL STODART LAWYERS PERSON SPECIFIED IN THE ORDER FORM (OVERLEAF) CORNWALL STODART Level 10 114 William Street DX 636 MELBOURNE VIC 3000

More information

U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND

U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND U.S. ARMY RESEARCH, DEVELOPMENT AND ENGINEERING COMMAND Army RDTE Opportunities Michael Codega Soldier Protection & Survivability Directorate Natick Soldier Research, Development & Engineering Center 29

More information

Specification For. Asset Information Pr8701

Specification For. Asset Information Pr8701 Specification For Asset Pr8701 Written Direction Control Document Sponsor Document Owner Subject Matter Expert References Infrastructure Technical Standards Committee Manager, Capital Delivery, SIS Network

More information

DMTC Guideline - Technology Readiness Levels

DMTC Guideline - Technology Readiness Levels DMTC Guideline - Technology Readiness Levels Technology Readiness Levels (TRLs) are a numerical classification on the status of the development of a technology. TRLs provide a common language whereby the

More information

Wedding Photography Proposal & Agreement Photos By Tracy Miz. B. Photography P.O. Box 2368 Flournoy, Ca

Wedding Photography Proposal & Agreement Photos By Tracy Miz. B. Photography P.O. Box 2368 Flournoy, Ca Wedding Photography Proposal & Agreement Photos By Tracy Miz. B. Photography P.O. Box 2368 Flournoy, Ca 96029 530-339-0165 Mizbphotography12@gmail.com Basic Information: Location of Wedding & Reception:

More information

CUSTOMER APPLICATION

CUSTOMER APPLICATION TARGETED DEMAND SIDE MANAGEMENT TARGETED STEAM AIR CONDITIONING INCENTIVE PROGRAM CUSTOMER APPLICATION [Code for electronic completion and submission] Welcome! This is your ( you or customer ) application

More information

Raw materials topics in Horizon 2020 Societal Challenge 5 Work Programme 2016

Raw materials topics in Horizon 2020 Societal Challenge 5 Work Programme 2016 Raw materials topics in Work Programme 2016 Brokerage event Conference of the EIP on Raw Materials Brussels, 10 December 2015 Manuel Gómez Herrero Patrice Millet European Commission. Directorate-General

More information

2018 FILM PROJECT GUIDELINES AND APPLICATION FORM

2018 FILM PROJECT GUIDELINES AND APPLICATION FORM 2018 FILM PROJECT GUIDELINES AND APPLICATION FORM CITY OF VINCENT FILM PROJECT Aims of the The City of Vincent, in partnership with Revelation Film Festival is running the 2018 City of Vincent Film Project

More information

INFORMATION SESSION FOR TSSSU

INFORMATION SESSION FOR TSSSU INFORMATION SESSION FOR TSSSU 2019-20 9 OCT 2018 PERKINS HO HEAD, ENTREPRENEURSHIP & SOCIAL INNOVATION OFFICE OF RESEARCH & KNOWLEDGE TRANSFER SERVICES (ORKTS) CONTENT OF THIS SESSION Learn About TSSSU

More information

REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014

REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014 REQUEST FOR INFORMATION (RFI) United States Marine Corps Experimental Forward Operating Base (ExFOB) 2014 OVERVIEW: This announcement constitutes a Request for Information (RFI) notice for planning purposes.

More information

Moving from R&D to Manufacture

Moving from R&D to Manufacture Moving from R&D to Manufacture NSF I/UCRC Annual Meeting January 9, 2014 Clara Asmail Senior Technical Advisor NIST MEP Agenda Overview of NIST MEP program Technology Acceleration and MEP s role Sampling

More information

1.1 The International Correspondence Chess Federation (ICCF) is a non-profit federation which organises a purely recreational sports activity.

1.1 The International Correspondence Chess Federation (ICCF) is a non-profit federation which organises a purely recreational sports activity. International Correspondence Chess Federation ICCF Financial Regulations ( Valid from 0 1 / 0 1 / 2018 ) 1. Introduction 1.1 The International Correspondence Chess Federation (ICCF) is a non-profit federation

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

Postgraduate Diploma In Patinformatics (Patent Informatics)

Postgraduate Diploma In Patinformatics (Patent Informatics) URDIP Postgraduate Diploma In Patinformatics (Patent Informatics) Offered by CSIR Unit for Research and Development of Information Products (URDIP) Under the Aegis of Admission Brochure (2017 2018) About

More information

KKR & Co. Inc. Goldman Sachs U.S. Financial Services Conference December 4, 2018

KKR & Co. Inc. Goldman Sachs U.S. Financial Services Conference December 4, 2018 KKR & Co. Inc. Goldman Sachs U.S. Financial Services Conference December 4, 2018 KKR Today Private Markets Public Markets Capital Markets Principal Activities $104bn AUM $91bn AUM Global Franchise $19bn

More information

त न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments

त न ब. BUREAU OF INDIAN STANDARDS Hallmarking Department, BIS. Subject: Draft BIS Hallmarking Regulations for comments त न ब ल र व, ए 11 प ल 2017 व :- ट प पव वलए ए ल र व वन द त न ब ( ए ) व वन 2016 प न त त त क ए ए ए ल र व वन द, व त ज न ट प पव वलए प स ट प पव, कद ल जट ए hallmarking@bis.gov.in 28/04/2017 त ज ज त लग :- ऊप क

More information

Access to Research Infrastructures under Horizon 2020 and beyond

Access to Research Infrastructures under Horizon 2020 and beyond Access to Research Infrastructures under Horizon 2020 and beyond JEAN MOULIN A presentation based on slides provided by: the European Commission DG Research & Innovation Unit B4 Research Infrastructures

More information

(A Sample Letter of Agreement for manuscript preparation) (Sample) Letter of Agreement

(A Sample Letter of Agreement for manuscript preparation) (Sample) Letter of Agreement lifewriters.ca Toll-free: 800.864.9152 Assisted memoirs, family stories, and corporate histories Email: info@lifewriters.ca (A Sample Letter of Agreement for manuscript preparation) Mr. John Doe 850 Eighth

More information

Raupapa Whakaari Funding Dramas to the world

Raupapa Whakaari Funding Dramas to the world New Zealand Film Commission / New Zealand On Air Raupapa Whakaari Funding Dramas to the world In conjunction with Guidelines for Applicants February 2019 We encourage you to read these guidelines carefully

More information

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY

SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY SAUDI ARABIAN STANDARDS ORGANIZATION (SASO) TECHNICAL DIRECTIVE PART ONE: STANDARDIZATION AND RELATED ACTIVITIES GENERAL VOCABULARY D8-19 7-2005 FOREWORD This Part of SASO s Technical Directives is Adopted

More information

COAL CREEK COMMUNITY PARK MUSEUM AND COLLECTION POLICY

COAL CREEK COMMUNITY PARK MUSEUM AND COLLECTION POLICY South Gippsland Shire Council COAL CREEK COMMUNITY PARK MUSEUM AND COLLECTION POLICY Policy Number C05 Directorate Development Services Council Item No. E.15 Department Economic Development Tourism and

More information

Mid Term Exam SES 405 Exploration Systems Engineering 3 March Your Name

Mid Term Exam SES 405 Exploration Systems Engineering 3 March Your Name Mid Term Exam SES 405 Exploration Systems Engineering 3 March 2016 --------------------------------------------------------------------- Your Name Short Definitions (2 points each): Heuristics - refers

More information

Schedule - 20 LED LAMPS

Schedule - 20 LED LAMPS Date: 8 th February, 2018 Revision 2 (*Red color represents the changes inserted.) Schedule - 20 LED LAMPS 1. SCOPE 1.1. This schedule specifies the energy labeling requirements for self-ballasted nondirectional

More information

The basics of successful IP-Management in Horizon 2020

The basics of successful IP-Management in Horizon 2020 The basics of successful IP-Management in Horizon 2020 Jörg Scherer CEO Eurice GmbH Prague 11/05/2017 Roadmap Setting the scene The Framework Our service offer Speaker profile: Jörg Scherer Managing Director

More information

THE GOLF CLUB AT REDMOND RIDGE CLUB CARD PLAN No Initiation Fee and One Low Monthly Price for Year-Around Golf

THE GOLF CLUB AT REDMOND RIDGE CLUB CARD PLAN No Initiation Fee and One Low Monthly Price for Year-Around Golf THE GOLF CLUB AT REDMOND RIDGE CLUB CARD PLAN No Initiation Fee and One Low Monthly Price for Year-Around Golf BENEFITS: Year-round golf at The Golf Club at Redmond Ridge Mon-Fri Anytime and Saturday,

More information

Public Art Network Best Practice Goals and Guidelines

Public Art Network Best Practice Goals and Guidelines Public Art Network Best Practice Goals and Guidelines The Public Art Network (PAN) Council of Americans for the Arts appreciates the need to identify best practice goals and guidelines for the field. The

More information

Technology Evaluation. David A. Berg Queen s University Kingston, ON November 28, 2017

Technology Evaluation. David A. Berg Queen s University Kingston, ON November 28, 2017 Technology Evaluation David A. Berg Queen s University Kingston, ON November 28, 2017 About me Born and raised in Alberta Queen s alumni (as well as University of Calgary & Western) Recently retired from

More information

Frequently asked questions

Frequently asked questions Frequently asked questions Check out our most frequently asked questions about our Crowdfunding Universal Platform, becoming a Participant or Project Manager and the rules around your account. We re here

More information

SUPPORT FOR THE DEVELOPMENT OF EUROPEAN VIDEO GAMES

SUPPORT FOR THE DEVELOPMENT OF EUROPEAN VIDEO GAMES SUPPORT FOR THE DEVELOPMENT OF EUROPEAN VIDEO GAMES F.A.Q. - Frequently Asked Questions Call for Proposals EACEA/20/2015 Deadline for submitting applications: 03/03/2016 This document is intended to provide

More information

Contract of Agreement for Cultural Exchange Between Au Pair and Host Family Employer in Sweden

Contract of Agreement for Cultural Exchange Between Au Pair and Host Family Employer in Sweden Recommended Contract of Agreement Form for Au Pair in Sweden Philippine Honorary Consulate General Stockholm, Sweden Contract of Agreement for Cultural Exchange Between Au Pair and Host Family Employer

More information

LOCOMOTIVE ENGINEERING DEPTT.

LOCOMOTIVE ENGINEERING DEPTT. SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved

More information

LIPP Program Guidelines

LIPP Program Guidelines LOW INCOME PROTECTION PLAN HARVARD LAW SCHOOL, WASSERSTEIN SUITE 5027 CAMBRIDGE, MASSACHUSETTS 02138 TEL: (617) 495-0643 lipp@law.harvard.edu 2018-2019 LIPP Program Guidelines Many Harvard Law School graduates

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

A POLICY in REGARDS to INTELLECTUAL PROPERTY. OCTOBER UNIVERSITY for MODERN SCIENCES and ARTS (MSA)

A POLICY in REGARDS to INTELLECTUAL PROPERTY. OCTOBER UNIVERSITY for MODERN SCIENCES and ARTS (MSA) A POLICY in REGARDS to INTELLECTUAL PROPERTY OCTOBER UNIVERSITY for MODERN SCIENCES and ARTS (MSA) OBJECTIVE: The objective of October University for Modern Sciences and Arts (MSA) Intellectual Property

More information

REPORT DOCUMENTATION PAGE

REPORT DOCUMENTATION PAGE REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions,

More information

TECHNOLOGY WITH A HUMAN TOUCH

TECHNOLOGY WITH A HUMAN TOUCH TECHNOLOGY WITH A HUMAN TOUCH 2 SILVER TECHNOLOGY WITH A HUMAN TOUCH TECHNOLOGY WITH A HUMAN TOUCH The SILVER project searches for new technologies to assist the elderly people in their everyday lives.

More information

MARQUES comments in response to the public consultation on the first suite of 5 new European Cooperation projects

MARQUES comments in response to the public consultation on the first suite of 5 new European Cooperation projects MARQUES comments in response to the public consultation on the first suite of 5 new European Cooperation projects General Comments MARQUES recognises that the European Trade Mark and Design Network under

More information

Independence - Freedom - Happiness. Hanoi, 20 March 1996

Independence - Freedom - Happiness. Hanoi, 20 March 1996 NATIONAL ASSEMBLY SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness Hanoi, 20 March 1996 MINERAL LAW Being natural resources which are an important asset of the nation and which are generally

More information

Sanjay Lalit, FCS Practising Company Secretary, Mumbai

Sanjay Lalit, FCS Practising Company Secretary, Mumbai ISSUE OF SWEAT EQUITY BY UNLISTED COMPANIES Sanjay Lalit, FCS Practising Company Secretary, Mumbai cssklco@gmail.com Sweat equity is one's contribution to a business or project in the form of an effort

More information

Using the Streamlined Systems Engineering (SE) Method for Science & Technology (S&T) to Identify Programs with High Potential to Meet Air Force Needs

Using the Streamlined Systems Engineering (SE) Method for Science & Technology (S&T) to Identify Programs with High Potential to Meet Air Force Needs Using the Streamlined Systems Engineering (SE) Method for Science & Technology (S&T) to Identify Programs with High Potential to Meet Air Force Needs Dr. Gerald Hasen, UTC Robert Rapson; Robert Enghauser;

More information

Best Practices for Technology Transition. Technology Maturity Conference September 12, 2007

Best Practices for Technology Transition. Technology Maturity Conference September 12, 2007 Best Practices for Technology Transition Technology Maturity Conference September 12, 2007 1 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information

More information

OBN BioTuesday: Sources of Public Non-Dilutable Funding & Export Support to UK R&D Companies

OBN BioTuesday: Sources of Public Non-Dilutable Funding & Export Support to UK R&D Companies OBN BioTuesday: Sources of Public Non-Dilutable Funding & Export Support to UK R&D Companies SME Instrument and Eurostars Jane Watkins National Contact Point Horizon 2020 SME Instrument and Eurostars Jane

More information

Technology transfer offices: a boost to licensing in Mexico

Technology transfer offices: a boost to licensing in Mexico Technology transfer offices: a boost to licensing in Mexico A drive towards establishing organised technology transfer offices in universities has obvious benefits for domestic companies, but may also

More information

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission

July Contents. Gas Demand Side Response Methodology Final Version. UK Gas Transmission July 2016 Contents ef Gas Demand Side Response Methodology Final Version UK Gas Transmission Background This document sets out the Gas Demand Side Response (DSR) Methodology which is required to be established

More information

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard

Technology transactions and outsourcing deals: a practitioner s perspective. Michel Jaccard Technology transactions and outsourcing deals: a practitioner s perspective Michel Jaccard Overview Introduction : IT transactions specifics and outsourcing deals Typical content of an IT outsourcing agreement

More information

California State University, Northridge Policy Statement on Inventions and Patents

California State University, Northridge Policy Statement on Inventions and Patents Approved by Research and Grants Committee April 20, 2001 Recommended for Adoption by Faculty Senate Executive Committee May 17, 2001 Revised to incorporate friendly amendments from Faculty Senate, September

More information

World Original Design Contest of Board Game Agreement

World Original Design Contest of Board Game Agreement World Original Design Contest of Board Game Agreement Hangzhou Yoka Networking Technology Co., Ltd.(hereinafter referred to as Hangzhou Yoka), founded in 2015, is a special board game company in Chinese

More information

Communications and New Media Title: Writing for Media Catalog Number: CNMS Credit Hours: 3 Total Contact Hours: 45

Communications and New Media Title: Writing for Media Catalog Number: CNMS Credit Hours: 3 Total Contact Hours: 45 ! South Portland, Maine 04106 Communications and New Media Title: Writing for Media Catalog Number: CNMS-125 01 Credit Hours: 3 Total Contact Hours: 45 Lecture (or Lab): Room HILDM-102 Instructor: Huey

More information

Canterbury Artisan Festival 2016 Juried Craft Fair Application

Canterbury Artisan Festival 2016 Juried Craft Fair Application 2016 Juried Craft Fair Application Saturday, September 17, 2016, 10 am to 5pm Canterbury Shaker Village, Canterbury, NH Returning Artists For 2016, artists returning from the 2015 Canterbury Artisan Festival

More information