Macondo Blowout Lessons Learned for Prevention and Mitigation

Size: px
Start display at page:

Download "Macondo Blowout Lessons Learned for Prevention and Mitigation"

Transcription

1 Macondo Blowout Lessons Learned for Prevention and Mitigation Lars Herbst, P.E. BSEE Gulf of Mexico Regional Director 05 October 2017 To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement.

2 Topics Lookback at Incident and Causes BSEE Response: Prevention BSEE Response: Mitigation Forward Looking 2

3 3 What s your why?

4 4 Joint Investigation Team

5 JIT Reports - USCG Fire Evacuation / Search and Rescue Flooding and Sinking Safety Systems (Personnel and Process) 5

6 JIT Reports - BSSE Well Design, Cementing, and Flow Path Temporary Abandonment, Kick Detection, and Emergency Response Ignition Source and Explosion BOP Stack Compliance with Regulations and Company Policies 6

7 7 Everything Was There?

8 8 So what went wrong?

9 Conclusion The blowout at the Macondo well on April 20, 2010, was the result of a series of decisions that increased risk coupled with a number of actions that failed to fully consider or mitigate those risks. While it is not possible to discern which precise combination of these decisions and actions set the blowout in motion, it is clear that increased vigilance and awareness by BP, Transocean and Halliburton personnel at critical junctures during operations at the Macondo well would have reduced the likelihood of the blowout occurring. 9

10 Conclusion BP s failure to appropriately analyze and evaluate risks associated with the Macondo well in connection with its decision making during the days leading up to the blowout was a contributing cause of the blowout. 10

11 Conclusion BP s failure to inform the parties operating on its behalf of all known risks associated with Macondo well operations was a contributing cause of the blowout and kick detection. 11

12 Conclusion The Deepwater Horizon crew s (BP and Transocean) collective misinterpretation of the negative tests was a cause of the well control failure. 12

13 Conclusion BP Drilling Engineer s failure to investigate or resolve the negative test anomalies noted by BP s well site leader was a possible contributing cause of the kick detection failure. 13

14 Conclusion The failure of BP s well site leaders and the Transocean Deepwater Horizon rig crew to recognize the risks associated with these multiple problems that occurred between April 19 and April 20 was a possible contributing cause of the blowout. 14

15 Conclusion The Deepwater Horizon crew s inability to accurately monitor pit levels while conducting simultaneous operations during the critical negative test was a contributing cause of the kick detection failure. 15

16 Conclusion The failure of the Deepwater Horizon crew (including BP, Transocean, and Sperry Sun personnel) to detect the influx of hydrocarbons until hydrocarbons were above the BOP stack was a cause of the well control failure. 16

17 Conclusion The Deepwater Horizon crew s hesitance to shut in the BOP immediately was a possible contributing cause of the well control failure. 17

18 Conclusion The overall complacency of the Deepwater Horizon crew was a possible contributing cause of the kick detection failure. 18

19 Conclusion The failure of the personnel on the Deepwater Horizon bridge, monitoring the gas alarms, to notify the Deepwater Horizon crew in the engine control room about the alarms so that they could take actions to shut down the engines was a contributing cause of the response failure. Bly Report Vapor Dispersion at 240 Seconds 19

20 Conclusion The rig crew s failure to initiate the emergency disconnect system until after the hydrocarbons were had risen above the BOP stack was a possible contributing cause of the response failure. 20

21 21 Bow-tie Diagram of Hazards and Barriers

22 Prevention - Need for the well control regulations? Deepwater Horizon tragedy Other well control incidents Revised and new industry standards Codification of decades of BSEE policies 22

23 Development Process Deepwater Horizon April 20, 2010 Drilling safety rule- August 2012 Completion of API Standard 53 November 2012 Publication of proposed Well Control Rule April 2015 Final Well Control Rule published April 29, 2016 Well Control Rule effective July 28, 2016, with implementation staged over several years 23

24 Drilling Safety Rule Wellbore Integrity Best cement practices API RP 65-Part 2 Certification by PE that casing & cement program is fit for purpose Two independent tested barriers across each flow path during completion (PE certification) Proper installation, sealing and locking of casing & liner BSEE approval before displacing fluids Enhanced deep water well control training 24

25 Drilling Safety Rule Well Control Equipment & Procedures Documentation & schematics for all control systems I3P verification that B/S rams cuts DP at MASP Subsea BOP equipped w/ ROV intervention Maintain ROV & trained crew on all floating rigs Auto-shear and deadman on all DP rigs Documentation of subsea BOP Inspection & Maintenance procedures per API RP 53 ROV intervention testing on subsea BOP stump test Function test of auto-shear and deadman during subsea BOP stump test Deadman test during initial seafloor test 25

26 Summary of Content of Well Control Rule- Effective July 28, 2016 Incorporation of industry standards as baseline Performance criteria for Blowout Preventers (BOPs) Establish criteria for maintenance and repair of BOP equipment Safe drilling practices and procedures Real time monitoring requirements Formal third party certification program Downhole equipment 26

27 27 Final Rule Effective Dates

28

29 April 20, 2010 APRIL 21, 2010 April 22, 2010 April 23, 2010 Macondo Well Blowout ROV intervention on BOP Horizon Rig Sinks Hydrocarbon flow at two locations subsea 31 April 27,2010 May 5, 2010 May 6, 2010 May 15, 2010 May 26, 2010 June 4, 2010 July 13, 2010 August 3, 2010 September 19, 2010 Two Relief Well Permits are approved Capping valve placed on drillpipe Coffer dam attempted Riser insertion tube installed Top Kill Attempted Top hat installed w production to vessels Containment cap installed to stop flow Static kill attempt successful Cement permanently seals well

30 32 EARLY STAGES OF SOURCE CONTROL

31 33 TOP KILL ATTEMPTED

32 34 TOP HAT INSTALLED, PRODUCTION FLOWS TO VESSELS ON SURFACE

33 35 CAPPING STACK INSTALLED TO STOP FLOW

34 Post Response Public Forums addressed various aspects of containment Issued Notice to Lessees to clarify regulations regarding containment Worked closely with Containment Organizations to meet expectations 36

35 37 MWCC Capping Stack

36 38 HWCG Capping Stack

37 Well Containment Screening Tool BSEE evaluates each deep water well design to determine which of the following categories a well falls into: A.) Can the well be Shut in with full well bore integrity B.) If well bore integrity cannot be demonstrated and it is determined that a casing shoe will breakdown causing underground flow, it can be demonstrated that the underground flow would not broach the seafloor? 39 C.) If well bore integrity is not capable of being achieved or if a shut in will result in an underground flow that broaches the seafloor, containment can only be approved if an operator can demonstrate cap, flow, and collection capability.

38 40 Well Containment Screening Tool

39 41 Well Containment Screening Tool

40 Lessons Learned Summary - [Mitigation] Have capping stack and flowback capability and all support equipment to deploy. This must be analyzed on a well by well basis for both pressure and flow rate capacity Operator must have capability to prepare a a well or BOP stack to receive a capping stack. This means subsea debris removal ( shears and saws ) equipment must be available. Have Temporary flowback plan utilizing a subsea divert method such as a top hat 42

41 Lessons Learned Summary Proper hazard analysis is critical to a safe and successful containment effort. Simulated ops planning is also critical to completing containment. Equipment to deploy subsea dispersant is necessary to protect the safety of workers at surface that are conducting direct vertical access work and other support vessels. 43

42 Forward Looking [Mitigation] Continue to conduct drills on incident command structure and responsibilities. Ensure decision makers are clearly identified within the individual responsibility parties and the Federal Government. Ensure that they have the proper technical background, are not swayed by outside influences, and are fully supported all the way up the chain of command on both sides. 44

43 Success to Failure Are they really that far apart? Success Complacency Failure 43

44 More than 50 BSEE employees worked directly on the response and source control efforts involved with the Deepwater Horizon explosion and oil spill. Countless other BSEE staff supported their co-workers and kept the everyday work of the agency continuing, which was crucial to the United States energy security. We are, and will remain, proud of the hard work that was accomplished through this time of extraordinary challenge.

45 45 Questions?

46 BSEE Website: BSEEgov Bureau of Safety and Environmental Enforcement BSEEgov 48 To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight and enforcement.

New Developments in Regulation of U.S. Offshore Oil and Gas Operations

New Developments in Regulation of U.S. Offshore Oil and Gas Operations New Developments in Regulation of U.S. Offshore Oil and Gas Operations Peking University Law School and The University of Texas School of Law Carol Dinkins Partner Vinson & Elkins, LLP August 21, 2012

More information

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety

Industry & Govt Changes Post Macondo. Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety Industry & Govt Changes Post Macondo Charlie Williams Chief Scientist Shell Executive Director - Center for Offshore Safety 1 Deepwater Industry Focus/Approach Joint Industry Task Force Groups Offshore

More information

Industry & Govt Changes Post Macondo

Industry & Govt Changes Post Macondo Cover graphic should fill and not exceed the defined grey box. Industry & Govt Changes Post Macondo Gary F. Devlin VP Quality & Customer Experience March 2013 Deepwater Industry / Focus Approach Joint

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

OCS leasing program draft PEIS comments Attachment A

OCS leasing program draft PEIS comments Attachment A Effective Oversight Requires Key Legislative, Regulatory, Enforcement and Transparency Upgrades Analysis by Lois N. Epstein, P.E. Engineer and Arctic Program Director The Wilderness Society Anchorage,

More information

Industry Response - Post Macondo

Industry Response - Post Macondo Industry Response - Post Macondo Charlie Williams Chief Scientist Well Engineering Shell Energy Resource Company CSIS Energy and National Security Program - future of offshore oil & gas developments in

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

AADE Houston Chapter. Group. 26 January 2011

AADE Houston Chapter. Group. 26 January 2011 AADE Houston Chapter Deepwater and Emerging Technologies Group 26 January 2011 BOEMRE Compliance Guidelines Department of Interior s Increased Safety Measures for Energy Development on the Outer Continental

More information

DEA Technology Forum 17 Nov. 2011

DEA Technology Forum 17 Nov. 2011 DEA Technology Forum 17 Nov. 2011 Helix Company Fast Response Update System GOM Subsea Oil Spill Control & Containment Steve Scanio Helix Energy Solutions Deepwater Spill Defense Shields Surface Collection

More information

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company

DEA Quarterly Meeting 18 November Bill Pike NISC, an IBM Company DEA Quarterly Meeting 18 November 2010 Bill Pike NISC, an IBM Company DISCLAIMER I am an employee of NISC, an IBM company, working under contract in the U.S. Department of Energy s National Energy Technology

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s commitments Determined to accelerate and further deploy the capabilities and practices that enhance safety in our company and the deepwater industry 200+ meetings

More information

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs

Defining the New Normal for Offshore Drilling Copenhagen 16 June Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Defining the New Normal for Offshore Drilling Copenhagen 16 June 2011 Alan Spackman Vice President, Offshore Regulatory & Technical Affairs Montara & Macondo Investigations Report of the Montara Commission

More information

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND

JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND JOINT INDUSTRY OFFSHORE OPERATING PROCEDURES TASK FORCE, JOINT INDUSTRY OFFSHORE EQUIPMENT TASK FORCE, JOINT INDUSTRY SUBSEA WELL CONTROL AND CONTAINMENT TASK FORCE, and JOINT INDUSTRY OIL SPILL PREPAREDNESS

More information

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Sinking of the Deepwater Horizon. 11 perish and 115 survive Sinking of the Deepwater Horizon 11 perish and 115 survive The Rig Rig cost about $500,000 per day to contract With all the drilling spread, helicopters, support vessels, other services cost about $1,000,000

More information

False Sense of Safety

False Sense of Safety False Sense of Safety Online Appendix: Analysis of Each New Safety Measure s Effect on Offshore Drilling Safety By Michael Craig and Jacqueline Savitz New Safety Measure (NTL or Rulemaking) NTL 2010- N06

More information

Bureau of Safety and Environmental Enforcement. [Docket ID: BSEE ; 15XE1700DX EEEE EX1SF0000.DAQ000]

Bureau of Safety and Environmental Enforcement. [Docket ID: BSEE ; 15XE1700DX EEEE EX1SF0000.DAQ000] 4310-VH-P DEPARTMENT OF THE INTERIOR Bureau of Safety and Environmental Enforcement 30 CFR Part 250 [Docket ID: BSEE-2015-0002; 15XE1700DX EEEE500000 EX1SF0000.DAQ000] RIN 1014 AA11 Oil and Gas and Sulphur

More information

Offshore Regulatory Oversight on the U.S. Arctic Outer Continental Shelf

Offshore Regulatory Oversight on the U.S. Arctic Outer Continental Shelf Offshore Regulatory Oversight on the U.S. Arctic Outer Continental Shelf Michael Farber, Senior Advisor, Bureau of Safety and Environmental Enforcement (BSEE) To promote safety, protect the environment

More information

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and

pipeline FSHR and tether for fatigue, stress, and any other abnormal condition (e.g., corrosion) that may negatively impact the riser or tether; and (3) A description of how you met the design requirements, load cases, and allowable stresses for each load case according to API RP 2RD (as incorporated by reference in 250.198); (4) Detailed information

More information

High Reliability Organizing Conference. Deepwater Horizon Incident Investigation

High Reliability Organizing Conference. Deepwater Horizon Incident Investigation 1 High Reliability Organizing Conference Deepwater Horizon Incident Investigation April 20, 2011 2 Disclaimer The PowerPoint presentation given by Mark Griffon, Board Member, United States Chemical Safety

More information

The Role of Business and Engineering Decisions in the Deepwater Horizon Oil Spill

The Role of Business and Engineering Decisions in the Deepwater Horizon Oil Spill PT-13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. john s, NL, Canada March, 2013 Paper Code. (PT-13 - Reynolds)

More information

INVESTIGATION REPORT VOLUME 2

INVESTIGATION REPORT VOLUME 2 U.S. CHEMICAL SAFETY AND HAZARD I NVESTIGATION BOARD INVESTIGATION REPORT VOLUME 2 EXPLOSION AND FIRE AT THE MACONDO WELL (11 Fatalities, 17 Injured, and Serious Environmental Damage) DEEPWATER HORIZON

More information

MPD Application Process

MPD Application Process MPD Application Process Fred Brink Chief, District Operations Support (DOS) September 19, 2017 To promote safety, protect the environment and conserve resources offshore through vigorous regulatory oversight

More information

ENSURING SUCCESSFUL OFFSHORE FACILITY RESPONSE

ENSURING SUCCESSFUL OFFSHORE FACILITY RESPONSE Bureau of Safety and Environmental Enforcement U.S. Department of the Interior ENSURING SUCCESSFUL OFFSHORE FACILITY RESPONSE Bryan Rogers Oil Spill Response Division Gulf Of Mexico In the event of an

More information

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective

Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Enhancing Industry Capability for drilling Deepwater Wells A Chevron Perspective Kevin Taylor September 26, 2011 Eleventh U.S.-China Oil and Gas Industry Forum Chevron is a Major Operator in Subsea and

More information

IWCF Well Control Level 5. Celle Drilling Conference 2017

IWCF Well Control Level 5. Celle Drilling Conference 2017 IWCF Well Control Level 5 Celle Drilling Conference 2017 Contents IWCF well control level 5 course program Background - who is it for Structure and contents Delivery approach Questions Why? Level 5 background

More information

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012

SUBSEA WELL CONTAINMENT. Global Basis. Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 SUBSEA WELL CONTAINMENT Global Basis Deepwater & Emerging Technologies Group (DETG) AADE Houston Chapter 25 January 2012 Bill Mahler Wild Well Control, Inc. Response Components - Plus Many More Components

More information

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011

API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 API RP 53 Recommend Practices for Blowout Prevention Equipment Systems for Drilling Wells vs. Standard 53 4 th Edition 2011 Meeting with BOEMRE March 1, 2011 Presented by: Frank Gallander Chevron Chair

More information

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010

NTL No N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 NTL No. 2010-N05 Increased Safety Measures for Energy Development on the OCS Effective June 8, 2010 Frequently Asked Questions (FAQ s) Updated July 9, 2010 A. General Questions QA1: With the issuance of

More information

GAO OIL AND GAS. Interior Has Strengthened Its Oversight of Subsea Well Containment, but Should Improve Its Documentation

GAO OIL AND GAS. Interior Has Strengthened Its Oversight of Subsea Well Containment, but Should Improve Its Documentation GAO United States Government Accountability Office Report to Congressional Requesters February 2012 OIL AND GAS Interior Has Strengthened Its Oversight of Subsea Well Containment, but Should Improve Its

More information

Table of Contents. Gregg S. Perkin, P.E. Engineering Partners International August 26, 2011 EXPERT REPORT MACONDO

Table of Contents. Gregg S. Perkin, P.E. Engineering Partners International August 26, 2011 EXPERT REPORT MACONDO GreggS.Perkin,P.E. EngineeringPartnersInternational August26,2011 EXPERTREPORT MACONDO TableofContents INTRODUCTION...3 AUTHORQUALIFICATIONS...5 FINDINGS:...6 BACKGROUNDANDDISCUSSIONOFTHEMACONDOWELLANDHORIZON

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

ER responsibility matrix (RACI) & Source Control ER Plan (SCERP)

ER responsibility matrix (RACI) & Source Control ER Plan (SCERP) ER responsibility matrix (RACI) & Source Control ER Plan (SCERP) 1 Context ER review jointly ER exercises RACI and SCERP Piper-α recommendations shallow water blowouts yearly large scale ER exercise 2

More information

Final Rule AADE Lunch and Learn

Final Rule AADE Lunch and Learn Final Rule AADE Lunch and Learn John Hoefler Global Technical Manager - Drill Through Equipment / Compliance Manager Working together for a safer world Agenda General Comments Key Dates Discussion of high

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s Commitment The Deepwater Horizon incident was a tragic accident that took 11 lives and impacted thousands of people and the Gulf environment Going forward,

More information

June 16, Via Electronic Transmission. Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079

June 16, Via Electronic Transmission. Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079 June 16, 2010 Via Electronic Transmission Lamar McKay Chairman and President BP America, Inc 501 Westlake Park Boulevard Houston, TX 77079 Dear Mr. McKay: As the ranking member of the Committee on Finance,

More information

Veterans and Offshore Drilling

Veterans and Offshore Drilling Veterans and Offshore Drilling Why care, what it entails, and is it safe. Meeting begins at 3:00 PM Eastern Offshore Oil and Natural Gas Briefing Erik Milito Director, Upstream & Industry Operations American

More information

Deepwater Horizon Failure of Blowout Preventer (BOP)

Deepwater Horizon Failure of Blowout Preventer (BOP) Deepwater Horizon Failure of Blowout Preventer (BOP) Jim Thomson September 2016 Jim Thomson September 2016 1 20 April 2010, Gulf of Mexico 11 dead $350m (2001 cost) platform destroyed Largest ever oil

More information

Understanding the human factor in high risk industries. Dr Tom Reader

Understanding the human factor in high risk industries. Dr Tom Reader Understanding the human factor in high risk industries 4 th December 2013 ESRC People Risk Seminar Series Dr Tom Reader 1 Presentation outline 1. Human Factors in high-risk industries 2. Case study: The

More information

University of Macondo

University of Macondo University of Macondo The need for a continuing conversation T HE SAFETY LESSONS OF THE MACONDO OIL SPILL of 2010 are elusive, as companies and regulators that were involved in the incident are reluctant

More information

Title of Presentation. Presenter s Name Date of Presentation

Title of Presentation. Presenter s Name Date of Presentation Title of Presentation Presenter s Name Date of Presentation Offshore Oil Production: Early Innovations 1947: Kerr-McGee goes offshore beyond piers and begins era of offshore oil and gas. Prior Ocean Energy

More information

I. Executive Summary. In addition to CRE s incorporated ICR comments, CRE makes the following comments.

I. Executive Summary. In addition to CRE s incorporated ICR comments, CRE makes the following comments. Center for Regulatory Effectiveness ( CRE ) Comments on Proposed Requirements for Exploratory Drilling on the Arctic Outer Continental Shelf; Bureau of Safety and Environmental Enforcement ( BSEE ), and

More information

Spill Prevention and Spill Response. Canada-Newfoundland and Labrador Offshore Petroleum Board

Spill Prevention and Spill Response. Canada-Newfoundland and Labrador Offshore Petroleum Board Spill Prevention and Spill Response BOP Stack Containment Boom Legislative Requirements Regulations Drilling and Production Regulations Certificate of Fitness Oil and Gas Debris and Spills Liability Petroleum

More information

SUBSEA DROPPED OBJECTS. New GoM requirements for 2016 and their wider implicationsengineering Services Feb 2017

SUBSEA DROPPED OBJECTS. New GoM requirements for 2016 and their wider implicationsengineering Services Feb 2017 SUBSEA DROPPED OBJECTS New GoM requirements for 2016 and their wider implicationsengineering Services Feb 2017 1 Contents 2 minute Introduction to Wild Well Control - Engineering services The BSEE 2016

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

Role of Industry Standards in improving Offshore Safety

Role of Industry Standards in improving Offshore Safety Role of Industry Standards in improving Offshore Safety Standards Background Role of Standards Standards and Regulations David Miller, PE, F. ASCE, Director, Standards 1 API Standards Background API established

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

On the Development of the Blowout Preventer PRA Model

On the Development of the Blowout Preventer PRA Model On the Development of the Blowout Preventer PRA Model Jan Swider *ac, Charley Gallo bc, Gregg Walz c, and Jim Raney c a Cogoto, Inc., Simi Valley, USA b The Frontline Group, Houston, USA c Anadarko Petroleum

More information

Well Intervention Vessels Used in the G.O.M. Macondo Incident Response. Helix - Well Ops June 2011

Well Intervention Vessels Used in the G.O.M. Macondo Incident Response. Helix - Well Ops June 2011 Well Intervention Vessels Used in the G.O.M. Macondo Incident Response Mark de Castro Mark de Castro Helix - Well Ops June 2011 Helix Vessels at Macondo Helix Q4000 Helix Express Helix Producer I 2 Q4000

More information

Marine Well Containment Company Response Overview New Orleans Area Committee

Marine Well Containment Company Response Overview New Orleans Area Committee Marine Well Containment Company Response Overview New Orleans Area Committee Marty Massey, Chief Executive Officer Carmine Dulisse, HSE Officer November 10, 2011 Agenda Company Overview How MWCC Responds

More information

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed.

Company Update. Spill Containment Fast Response to GOM Subsea Oil Spills. Changing the way you succeed. Company Update Spill Containment Fast Response to GOM Subsea Oil Spills Changing the way you succeed. Helix Deepwater Scope of Operations Changing the way you succeed. 2 Vessel selection Working in Gulf

More information

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D.

GOMR OCS Subsea Pipelines Regulatory Perspectives. Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. GOMR OCS Subsea Pipelines Regulatory Perspectives Pipeline Section, Regional Field Operations Gulf of Mexico Region Chief, Angie D. Gobert Overview Governing Regulations & Guidance Documents GOMR Pipeline

More information

Lessons Learned from the US Chemical Safety and Hazard Investigations Board. presented at

Lessons Learned from the US Chemical Safety and Hazard Investigations Board. presented at Lessons Learned from the US Chemical Safety and Hazard Investigations Board presented at The IAEA International Conference on Human and Organizational Aspects of Assuring Nuclear Safety Exploring 30 Years

More information

Recent advancement in well-control technology improves safety and allows cost savings for well designs

Recent advancement in well-control technology improves safety and allows cost savings for well designs Recent advancement in well-control technology improves safety and allows cost savings for well designs Simulation While Drilling and Relief Well Injection Spool 1 Doing More for Less What can we cut? Largest

More information

Responding to Montara and Macondo Actions by Australia's oil and gas industry

Responding to Montara and Macondo Actions by Australia's oil and gas industry Responding to Montara and Macondo Actions by Australia's oil and gas industry International Regulators Offshore Safety Conference Mark McCallum Deputy Chief Executive Montara Incident 21 August 2009 Incident

More information

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0

International Well Control Forum IWCF. Well Control Training Syllabus. Drilling Level 2. 1 st January 2014 Version 3.0 International Well Control Forum IWCF Well Control Training Drilling Level 2 1 st January 2014 Version.0 Drilling Well Control Written Test Level 2 Surface & Subsea BOP Stack s and Structure Written Test

More information

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response APPEA AWIC UPDATE Click to edit Mutual Master Aid subtitle style Self Audit Checklist Source Control First Response Presenter: Tom Nolan Perth 1st 4 th March, 2010 2012 WHAT IS APPEA? The Australian Petroleum

More information

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014

NOIA ANNUAL MEETING CONCERNS/INITIATIVES. BSEE Update. Joe Levine BSEE Washington DC April 11, 2014 NOIA ANNUAL MEETING Technology BSEE OCS Policy TECHNOLOGY Committee CONCERNS/INITIATIVES BSEE Update Joe Levine BSEE Washington DC April 11, 2014 Presentation Overview BSEE Research Program Research Drivers

More information

SAFESTACK TECHNOLOGY, LLC William M. Caldwell, Principal 1211 Government Street Ocean Springs, MS 39564

SAFESTACK TECHNOLOGY, LLC William M. Caldwell, Principal 1211 Government Street Ocean Springs, MS 39564 SAFESTACK TECHNOLOGY, LLC William M. Caldwell, Principal Caldwell@safestack.net 1211 Government Street Ocean Springs, MS 39564 May 15, 2015 Via U.S. First Class Mail, and electronic submission: regs@bsee.gov;

More information

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director Doing More With Lightweight Well Intervention Subsea Europe 2008 London, 30 th October 2008 Drummond Lawson Managing Director What Is It? Lightweight Subsea Well Intervention (LSWI) Re-entering existing

More information

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame

Regulatory Reforms in Mexico Energy Production and Environmental Protection. A Technical Regulator for a New Market Frame Regulatory Reforms in Mexico Energy Production and Environmental Protection A Technical Regulator for a New Market Frame February 12th, 2014 CONTENT Legal Framework Strategic Design Regulatory Policy Gradual

More information

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.

More information

Marine Well Containment Company Outer Continental Shelf Summer Seminar

Marine Well Containment Company Outer Continental Shelf Summer Seminar Marine Well Containment Company Outer Continental Shelf Summer Seminar June 4, 2015 INTRODUCTION 2 Why We re Here In order to receive a permit to drill in the U.S. Gulf of Mexico, regulations require operators

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

Interspill UK Response Readiness. Mick Borwell Environmental Issues Director Oil & Gas UK

Interspill UK Response Readiness. Mick Borwell Environmental Issues Director Oil & Gas UK Interspill 2012 UK Response Readiness Mick Borwell Environmental Issues Director 20 April 2010 will be a date forever etched on the collective memory of the oil industry. This was the night that a massive

More information

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010

The Marine Well Containment System. LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 The Marine Well Containment System LSU Center for Energy Studies Energy Summit 2010 October 26, 2010 Restoring Confidence in Deepwater Drilling Operations Our initiatives are aligned with Administration

More information

AGREED UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA MAGISTRATE JUDGE. BOP disconnected from the BOP stack during an EDS operation

AGREED UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA MAGISTRATE JUDGE. BOP disconnected from the BOP stack during an EDS operation UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA In re Oil Spill by the Oil Rig Deepwater 1VIDL No 2179 Horizon in the Gulf of Mexico on April 20 2010 SECTION This Document Relates To All Actions

More information

BSEE Oil Spill Preparedness Division Response Research Branch

BSEE Oil Spill Preparedness Division Response Research Branch BSEE Oil Spill Preparedness Division Response Research Branch Jay Cho, Ph.D Remote Sensing Research Program To promote safety, protect the environment and conserve resources offshore through vigorous regulatory

More information

Experience, Role, and Limitations of Relief Wells

Experience, Role, and Limitations of Relief Wells Experience, Role, and Limitations of Relief Wells Introduction This white paper has been developed and issued on behalf of the Joint Industry Task Force on Subsea Well Control and Containment. This group

More information

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010

NTL No N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 NTL No. 2010-N06 Information Requirements for EPs, DPPs and DOCDs on the OCS Effective June 18, 2010 Frequently Asked Questions (FAQ s) Updated July 15, 2010 Updated July 21, 2010 1. Q. What OCS areas

More information

Well Control Considerations of MPD on Deepwater Rigs

Well Control Considerations of MPD on Deepwater Rigs Well Control Considerations of MPD on Deepwater Rigs Don Hannegan, P.E., Strategic Technologies Development - Well Construction Products DEA Q1 - March, 2014 2013 Weatherford. All rights reserved. 1 MPD:

More information

August 6, Re: Blowout Preventer Systems and Well Control Revisions, 1014 AA39. Via electronic submission to:

August 6, Re: Blowout Preventer Systems and Well Control Revisions, 1014 AA39. Via electronic submission to: August 6, 2018 Department of the Interior Bureau of Safety and Environmental Enforcement Attention: s and Standards Branch 45600 Woodland Road Sterling, VA 20166 Re: Blowout Preventer Systems and Well

More information

Memorandum. all federal actions in this Court pursuant to 28 U.S.C Eventually,

Memorandum. all federal actions in this Court pursuant to 28 U.S.C Eventually, Memorandum TO: Prof. Hooks FROM: Gary Johnson RE: Alleged Responsibility for Various Acts DATE: November 16, 2012 Procedural History On August 10, 2010, the Judicial Panel on Multidistrict Litigation centralized

More information

Emergency response in case of a blowout in shallow waters

Emergency response in case of a blowout in shallow waters Netherlands Oil and Gas Exploration and Production Association Vincent Claessens Cees van Oosterom Emergency response in case of a blowout in shallow waters 1 The regulator: State Supervision of Mines

More information

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10)

Module No. # 01 Lecture No. # 3 Safety in design and operations. (Refer Slide Time: 00:10) Health, Safety and Environmental Management in Petroleum and offshore Engineering Prof. Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute Of Technology, Madras Module No. #

More information

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

Effects of Water Depth on Offshore Equipment and Operations Topic #3: Well Drilling & Completion Design and Barriers

Effects of Water Depth on Offshore Equipment and Operations Topic #3: Well Drilling & Completion Design and Barriers Table of Contents General Purpose... 1 Introduction... 4 The Well Design Process... 4 Environmental and Operational Loads... 6 Casing Design... 6 Barriers... 7 Analysis... 9 A) Current Technologies & Challenges

More information

February 23, Re: EO & Well Control and Blowout Preventer Rule. Via Electronic Transmittal. Dear Mr. Whiteman:

February 23, Re: EO & Well Control and Blowout Preventer Rule. Via Electronic Transmittal. Dear Mr. Whiteman: February 23, 2018 Chad Whiteman Office of Management and Budget Office of Information and Regulatory Affairs New Executive Office Building 725 17th St. NW Washington, DC 20503 Re: EO 13795 & Well Control

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

Marty Massey, Chief Executive Officer Marine Well Containment Company

Marty Massey, Chief Executive Officer Marine Well Containment Company Marty Massey, Chief Executive Officer Marine Well Containment Company Phil Smith, General Manager Emergency Management and Deepwater Regulatory, Shell Energy Resources Company About MWCC Leading deepwater

More information

A review of offshore blowouts and spills to determine desirable capabilities of a subsea capping stack

A review of offshore blowouts and spills to determine desirable capabilities of a subsea capping stack Louisiana State University LSU Digital Commons LSU Master's Theses Graduate School 2012 A review of offshore blowouts and spills to determine desirable capabilities of a subsea capping stack Louise Matilde

More information

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION

UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION UNITED STATES DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT SERVICE GULF OF MEXICO OCS REGION NOTICE TO LESSEES AND OPERATORS OF FEDERAL OIL, GAS, AND SULPHUR LEASES,OUTER CONTINENTAL SHELF, GULF OF MEXICO

More information

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc.

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc. Lloyd s BOP Register energy Risk servicesmodel Project Development Scotty Roper Project Manager Moduspec USA, Inc. October 18, 2012 Agenda Project summary Product demonstration Conclusion Who we are Lloyd

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells

Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells Increased Safety & Efficiency from a Dedicated Light Well Intervention Vessel on Deepwater Subsea Wells A Truly Integrated Service Delivery 09 August 2017 Agenda Introduction to Light Well Intervention

More information

Capping stack:an industry in the making

Capping stack:an industry in the making Capping stack:an industry in the making Jack Chen, Li Xunke 2, Xie Wenhui 2, Kang Yongtian (. DMAR Engineering Inc., Houston, Texas 77094, USA;2. China National Offshore Oil Corporation (CNOOC), Beijing

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

Case 2:10-md CJB-SS Document 2064 Filed 04/20/11 Page 1 of 22 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA * * * * * * * * * *

Case 2:10-md CJB-SS Document 2064 Filed 04/20/11 Page 1 of 22 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA * * * * * * * * * * Case 2:10-md-02179-CJB-SS Document 2064 Filed 04/20/11 Page 1 of 22 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA In re: Oil Spill by the Oil Rig Deepwater Horizon in the Gulf of Mexico, on

More information

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A

EUOAG Workshop. Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A EUOAG Workshop Workshop on decommissioning of offshore installations Challenges, options and lessons learned PP&A Johnny Gundersen Principal Engineer, PSA Norway Content Requirements for PP&A in Norway

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

BSEE BAST Determination Process

BSEE BAST Determination Process BSEE BAST Determination Process Mick Else Chief, ETB BAST Section (WDC) Transportation Research Board NAS RTM Dissemination Workshop September 22, 2016 Houston, TX To promote safety, protect the environment

More information

Floating Production Installations

Floating Production Installations Floating Production Installations The Preferred Choice for Class MODEC Production Installation Industry Firsts In 1975, ABS took the lead in offshore asset classification when it provided services for

More information

SubSea MudLift Drilling: from JIP to the Classroom

SubSea MudLift Drilling: from JIP to the Classroom Session 2478 SubSea MudLift Drilling: from JIP to the Classroom Jerome J. Schubert, Ph.D. PE Texas A&M University Abstract As the worlds proven oil reserves continue to be depleted through consumption

More information

WHITE PAPER ON AUTOMATIC BLOWOUT PREVENTERS FOR ELIMINATING TRAGEDIES SUCH AS THE EXPLOSION ON BOARD OF THE DEEPWATER HORIZON ON APRIL 20, 2010

WHITE PAPER ON AUTOMATIC BLOWOUT PREVENTERS FOR ELIMINATING TRAGEDIES SUCH AS THE EXPLOSION ON BOARD OF THE DEEPWATER HORIZON ON APRIL 20, 2010 July 17, 2017 A.D. Wauconda Illinois WHITE PAPER ON AUTOMATIC BLOWOUT PREVENTERS FOR ELIMINATING TRAGEDIES SUCH AS THE EXPLOSION ON BOARD OF THE DEEPWATER HORIZON ON APRIL 20, 2010 Prepared by Clint Nelson

More information

API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd

API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd API STANDARD 53 PROVES IDEAL TRAINING AIDE Michael Gibson, PhD; IDEAS Singapore Pte Ltd This paper has been written for presentation at the API Axis Conference to held in Kuala Lumpur, Malaysia, 13-15

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13

Tore Aarsland. Chairman of the Editorial Revision Committee / Senior Design C6 Technologies. 10-Jan-13 Tore Aarsland Chairman of the Editorial Revision Committee / Senior Design Engineer @ C6 Technologies 10-Jan-13 1. The well barrier philosophy of the standard is harmonised to NORSOK D-010. The use of

More information

Oil and Gas UK Well Integrity Guidelines

Oil and Gas UK Well Integrity Guidelines Oil and Gas UK Well Integrity Guidelines The Well, the Completion and the Xmas Tree The Equipment and the People A Definition of Well Integrity Key UK Legislative Requirement for Well Integrity Oil and

More information

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our

More information