Mineral Exploration and Development Section Regulation 308/12 Update

Size: px
Start display at page:

Download "Mineral Exploration and Development Section Regulation 308/12 Update"

Transcription

1 Mineral Exploration and Development Section Regulation 308/12 Update PRESENTATION BY: Ontario Ministry of Northern Development and Mines 2015 Prospectors and Developers Association of Canada Convention

2 2 What is the Current Landscape? Exploration Plans Number of Plans

3 3 What is the Current Landscape? Exploration Permits Number of Permits

4 4 Why Review Relatively New Regulations? Regulation 308/12 (Exploration Plans and Exploration Permits) has been in effect since November 2012 and became mandatory as of April 1, 2013 The MNDM committed to a review of the early exploration regulatory regime 1 year after implementation MNDM is committed to being responsive and improving the plans and permits process where opportunities exist, and to being open to comments and feedback from industry, the public, and Aboriginal communities

5 5 Regulatory Review Process MNDM staff were asked to provide feedback they d received from clients and Aboriginal communities about their experiences with the exploration plans and permits process as well as their own suggestions to improve the process An internal (MNDM) working group was established to assess the feedback in October 2014 Recommended changes for consideration fell into three general categories: Regulation Provincial Standards for Early Exploration Operational/Administrative (including policies and procedures)

6 6 Scope of Regulatory Review Mining Act Regulation 308/12 Regulation 240/00 Regulation 45/11 Regulation 6/96 Other. Provincial Standards Operational Policies

7 7 Proposed Regulation Changes Expand the list of those required to take the Mining Act Awareness Program to include not only the Qualified Supervisor, but also those involved in the early exploration work, as well as the proponent Comment: This would enhance the education and understanding of those involved in the execution of early exploration activities

8 8 Proposed Regulation Changes Clarify how the regulation applies to lands within a Closure Plan Comments: The intent of the provision was to allow Closure Plan proponents to do early exploration on the lands covered by their Closure Plan without needing an exploration plan or permit. Non Closure Plan proponents seeking to explore on mining claims within a Closure Plan would be subject to the early exploration regulatory process.

9 9 Proposed Regulation Changes Broaden discretion of the Director to require an exploration permit for exploration plan activities. Comments: Currently only potential impacts to Aboriginal or treaty rights may trigger the requirement for a proponent to apply for an exploration permit when undertaking plan activities A number of stakeholders (ENGOs, Cottagers, and industry) said they wanted a broader discretion for the Director to require an exploration permit for exploration plan activities.

10 10 Proposed Regulation Changes Allow proponent the option to submit an exploration permit application that includes exploration plan activities along with exploration permit activities. Comment: Industry and MNDM staff indicated it would simplify the process and allow Aboriginal communities to see all exploration activities within a project

11 11 Proposed Regulation Changes Clarify MNDMs process to amend permits taking into consideration: Administrative changes Project/scope and potential impact changes Directors discretion to require an amendment Comment: This would provide clearer guidance to proponents about the permit amendment process

12 12 Housekeeping Items Proposed Regulation Changes Clarification to avoid potential confusion or ambiguity in the current regulation Clarify the rules around the establishment of a circulation date Update definitions and terminology to ensure consistency throughout the 308/12 regulation: Prospectors Awareness Program/MAAP

13 Proposed Changes to the Provincial Standards for Early Exploration (PS) Proposed changes include Clarification of language in the PS and standardization of terminology with other legislation: 13 contained water body Enhancing environmental standards to which early exploration activities are held including: Establishment of standard buffers around water bodies (30m) Addition of drilling fluid standards similar to other jurisdictions Requiring mobilization and demobilization notices pre-post execution of early exploration work

14 14 Proposed Revisions to Policy Regulatory and operational changes will be supported by a revised Consultation Policy More effective and predictable processes at plans and permits stages could be established by: Re-emphasizing the graduated approach to consultation and that plans and permits trigger a process at the low end of the consultation spectrum Delegating procedural aspects of consultation to proponents on a case-bycase basis. Providing clearer guiding principles and parameters to staff for decisionmaking, leading to more consistent approaches

15 15 Proposed Revisions to Policy Proportionality of both process and of arrangements could be reinforced by: Expanding the Policy to address consultation across the entire mining sequence - illustrating how and why process and expectations change as projects advance Emphasizing arrangements at later stages of the mining sequence, when potential benefits and opportunities increase Creating a clearer distinction between the Crown s consultation obligations and proponents business interests in reaching agreements (social licence) by: simplifying and stating more clearly what is relevant to MNDM s consultation considerations pointing to existing examples and industry best practices and guidance with regard to proportionality of commitments at various stages

16 16 Operational, Administrative, and Process Changes Update and improve early exploration proponent guidance for plan submission and permit application: Sample maps and instructions on how to use MNDM online tools Update existing A Practitioners Guide to Planning and Permitting a Mineral Development Project in Ontario document to encompass early exploration and consider enhancing the document with Best Management Practices Update the Mining Act Awareness Program (MAAP) content Update the early exploration activity information sheets circulated to Aboriginal communities to provide more clarity on potential impacts Require individual consultation reports for each Aboriginal community

17 17 What s Next? Engage with Aboriginal communities Provide the public and other stakeholders an opportunity to comment on proposed changes Solicit input from industry at regional symposiums and via focus groups THANK YOU!

18 Ontario 18

Caroline Thomas Chief Counsel, Exploration, Property & Aboriginal Affairs, Vale. Paul MacLean President, EEM Sustainable Management

Caroline Thomas Chief Counsel, Exploration, Property & Aboriginal Affairs, Vale. Paul MacLean President, EEM Sustainable Management Speaker Panel Nalin Sahni, B.Sc. (Eng.), M.E.M., J.D. Associate, FMC Law Practice focused on litigation and commercial transactions with complex environmental, energy, Aboriginal, and mining issues Geological

More information

Ontario s Modernized Mining Act Implementation Report

Ontario s Modernized Mining Act Implementation Report Ontario s Modernized Mining Act Implementation Report Ontario Ministry of Northern Development and Mines Presented by: Chris Bath Consultant, Mineral Exploration and Development Content of Today s Presentation

More information

Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018

Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018 Overview of Mineral Exploration and Development Regulations in Ontario Municipality of Trent Lakes March 8, 2018 Shannon Dennie Ministry of Northern Development and Mines Presentation Content 2 1. Provide

More information

ONTARIO S MINING ACT

ONTARIO S MINING ACT ONTARIO S MINING ACT Julie Abouchar Specialist in Environmental Law Certified by the Law Society of Upper Canada Katherine Koostachin Willms & Shier Environmental Lawyers LLP www.willmsshier.com CCAB Roundtable

More information

Modernizing Ontario s Mining Act. Finding A Balance Consultations

Modernizing Ontario s Mining Act. Finding A Balance Consultations Modernizing Ontario s Mining Act Finding A Balance Consultations How to Respond Comments can be forwarded to MNDM by October 15th: E-Mailed to: miningact@ontario.ca Mailed to: Mining Act Modernization

More information

A STRATEGY TO IMPROVE CANADA S MINERAL EXPLORATION INVESTMENT CLIMATE

A STRATEGY TO IMPROVE CANADA S MINERAL EXPLORATION INVESTMENT CLIMATE A STRATEGY TO IMPROVE CANADA S MINERAL EXPLORATION INVESTMENT CLIMATE Submission by the Prospectors and Developers Association of Canada (PDAC) to the House Standing Committee on Finance Pre-Budget Consultations

More information

clarify the roles of the Department and minerals industry in consultation; and

clarify the roles of the Department and minerals industry in consultation; and Procedures for Crown Consultation with Aboriginal Communities on Mineral Exploration Mineral Resources Division, Manitoba Science, Technology, Energy and Mines The Government of Manitoba recognizes it

More information

Community Engagement Guidelines for Applicants and Holders of Water Licences and Land Use Permits DRAFT October 2012

Community Engagement Guidelines for Applicants and Holders of Water Licences and Land Use Permits DRAFT October 2012 Community Engagement Guidelines for Applicants and Holders of Water Licences and Land Use Permits DRAFT October 2012 Mackenzie Valley Land and Water Board Gwich in Land and Water Board Sahtu Land and Water

More information

EXPLORATION DEVELOPMENT OPERATION CLOSURE

EXPLORATION DEVELOPMENT OPERATION CLOSURE i ABOUT THE INFOGRAPHIC THE MINERAL DEVELOPMENT CYCLE This is an interactive infographic that highlights key findings regarding risks and opportunities for building public confidence through the mineral

More information

Microwave Licensing Policy Framework

Microwave Licensing Policy Framework June 2001 Spectrum Management and Telecommunications Policy Radio Systems Policy Microwave Licensing Policy Framework Aussi disponible en français - PR-022 INDUSTRY CANADA RADIOCOMMUNICATION ACT Notice

More information

Guide to Assist Land-use Authorities in Developing Antenna System Siting Protocols

Guide to Assist Land-use Authorities in Developing Antenna System Siting Protocols Issue 2 August 2014 Spectrum Management and Telecommunications Guide to Assist Land-use Authorities in Developing Antenna System Siting Protocols Aussi disponible en français Contents 1. Introduction...

More information

Update on Taxonomy Release version EIOPA Insurance & Reinsurance Stakeholder Group meeting Frankfurt, 29 March2017

Update on Taxonomy Release version EIOPA Insurance & Reinsurance Stakeholder Group meeting Frankfurt, 29 March2017 9. Update on Taxonomy Release EIOPA Insurance & Reinsurance Stakeholder Group meeting Frankfurt, 29 March2017 With the document Governance of Taxonomy Releases and Schedule 2017 published in December 2016

More information

Aboriginal Consultation and Environmental Assessment Handout CEAA November 2014

Aboriginal Consultation and Environmental Assessment Handout CEAA November 2014 Introduction The Government of Canada consults with Aboriginal peoples for a variety of reasons, including: statutory and contractual obligations, policy and good governance, building effective relationships

More information

IAASB Main Agenda (March, 2015) Auditing Disclosures Issues and Task Force Recommendations

IAASB Main Agenda (March, 2015) Auditing Disclosures Issues and Task Force Recommendations IAASB Main Agenda (March, 2015) Agenda Item 2-A Auditing Disclosures Issues and Task Force Recommendations Draft Minutes from the January 2015 IAASB Teleconference 1 Disclosures Issues and Revised Proposed

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

Justice Select Committee: Inquiry on EU Data Protection Framework Proposals

Justice Select Committee: Inquiry on EU Data Protection Framework Proposals Justice Select Committee: Inquiry on EU Data Protection Framework Proposals Response by the Wellcome Trust KEY POINTS The Government must make the protection of research one of their priorities in negotiations

More information

Proposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies

Proposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies Proposed Changes to the ASX Listing Rules How the Changes Will Affect New Listings and Disclosure for Mining and Oil & Gas Companies ASX has recently issued two releases that may result in amendments to

More information

Draft Guidance Statement on Mine Dewatering

Draft Guidance Statement on Mine Dewatering Submission February 2016 Draft Guidance Statement on Mine Dewatering Department of Environment Regulation Contact Kirrillie Caldwell k.caldwell@cmewa.com The Chamber of Minerals and Energy of Western Australia

More information

DESIGN INSTITUTE OF AUSTRALIA ABN GPO Box 355 Melbourne, VIC 3001

DESIGN INSTITUTE OF AUSTRALIA ABN GPO Box 355 Melbourne, VIC 3001 DESIGN INSTITUTE OF AUSTRALIA ABN 12 004 412 613 GPO Box 355 Melbourne, VIC 3001 SUBMISSION TO THE ADVISORY COUNCIL ON INTELLECTUAL PROPERTY'S REVIEW OF THE DESIGNS SYSTEM RESPONSE TO THE OPTIONS PAPER

More information

Thank you for the opportunity to comment on the Audit Review and Compliance Branch s (ARC) recent changes to its auditing procedures.

Thank you for the opportunity to comment on the Audit Review and Compliance Branch s (ARC) recent changes to its auditing procedures. Jim Riva, Chief Audit Review and Compliance Branch Agricultural Marketing Service United States Department of Agriculture 100 Riverside Parkway, Suite 135 Fredericksburg, VA 22406 Comments sent to: ARCBranch@ams.usda.gov

More information

DERIVATIVES UNDER THE EU ABS REGULATION: THE CONTINUITY CONCEPT

DERIVATIVES UNDER THE EU ABS REGULATION: THE CONTINUITY CONCEPT DERIVATIVES UNDER THE EU ABS REGULATION: THE CONTINUITY CONCEPT SUBMISSION Prepared by the ICC Task Force on Access and Benefit Sharing Summary and highlights Executive Summary Introduction The current

More information

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures February 2014 Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures Aussi disponible en français Contents 1. Intent... 1 2. Mandate... 1 3. Policy... 1 4. Background... 1 5. Review

More information

Ministry of Justice: Call for Evidence on EU Data Protection Proposals

Ministry of Justice: Call for Evidence on EU Data Protection Proposals Ministry of Justice: Call for Evidence on EU Data Protection Proposals Response by the Wellcome Trust KEY POINTS It is essential that Article 83 and associated derogations are maintained as the Regulation

More information

MULTI-YEAR AREA-BASED PERMITTING (MYAB) PROPONENT GUIDE for MINERAL and COAL EXPLORATION

MULTI-YEAR AREA-BASED PERMITTING (MYAB) PROPONENT GUIDE for MINERAL and COAL EXPLORATION MULTI-YEAR AREA-BASED PERMITTING (MYAB) PROPONENT GUIDE for MINERAL and COAL EXPLORATION 1. What is a Multi-Year Area-Based Permit? Multi-year area-based (MYAB) permitting is the practice of authorizing

More information

Indigenous and Public Engagement Working Group Revised Recommendations Submitted to the SMR Roadmap Steering Committee August 17, 2018

Indigenous and Public Engagement Working Group Revised Recommendations Submitted to the SMR Roadmap Steering Committee August 17, 2018 Indigenous and Public Engagement Working Group Revised Recommendations Submitted to the SMR Roadmap Steering Committee August 17, 2018 The information provided herein is for general information purposes

More information

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution

Herts Valleys Clinical Commissioning Group. Review of NHS Herts Valleys CCG Constitution Herts Valleys Clinical Commissioning Group Review of NHS Herts Valleys CCG s constitution Agenda Item: 14 REPORT TO: HVCCG Board DATE of MEETING: 30 January 2014 SUBJECT: Review of NHS Herts Valleys CCG

More information

Scoping of Impact Assessment in Canada Are We Losing our Focus?

Scoping of Impact Assessment in Canada Are We Losing our Focus? Scoping of Impact Assessment in Canada Are We Losing our Focus? Earle Hickey, M. Sc. and Heather Giddens, MES Stantec Consulting Ltd. Dartmouth, Nova Scotia Canada Introduction Scoping is a critical component

More information

TRANSPORT CANADA FINAL WRITTEN SUBMISSION TO THE NUNAVUT IMPACT REVIEW BOARD RESPECTING: AGNICO EAGLE MINES LIMITED WHALE TAIL PIT PROJECT

TRANSPORT CANADA FINAL WRITTEN SUBMISSION TO THE NUNAVUT IMPACT REVIEW BOARD RESPECTING: AGNICO EAGLE MINES LIMITED WHALE TAIL PIT PROJECT TRANSPORT CANADA FINAL WRITTEN SUBMISSION TO THE NUNAVUT IMPACT REVIEW BOARD RESPECTING: AGNICO EAGLE MINES LIMITED WHALE TAIL PIT PROJECT NIRB #16MN056 August 14, 2017 EXECUTIVE SUMMARY Transport Canada

More information

Cross-Border Communication for Public Safety Licensees

Cross-Border Communication for Public Safety Licensees Issue 1 June 2016 Spectrum Management and Telecommunications Client Procedures Circular Cross-Border Communication for Public Safety Licensees Aussi disponible en français Contents 1. Principle...1 2.

More information

Re: Scheduling of a Project Certificate Workshop for TMAC Resources Inc. s Phase 2 Hope Bay Belt Project week of October 29, 2018

Re: Scheduling of a Project Certificate Workshop for TMAC Resources Inc. s Phase 2 Hope Bay Belt Project week of October 29, 2018 NIRB File No.: 12MN001 NWB File No. 2AM-DOH1323 and 2AM-BOS---- October 15, 2018 To: Phase 2 Hope Bay Belt Distribution List Sent via email Re: Scheduling of a Project Certificate Workshop for TMAC Resources

More information

Environmental Assessment in Canada and Aboriginal Law: Some Practical Considerations for Navigating through a Changing Landscape

Environmental Assessment in Canada and Aboriginal Law: Some Practical Considerations for Navigating through a Changing Landscape ABORIGINAL LAW CONFERENCE 2013 PAPER 1.2 Environmental Assessment in Canada and Aboriginal Law: Some Practical Considerations for Navigating through a Changing Landscape These materials were prepared by

More information

Public Information and Disclosure RD/GD-99.3

Public Information and Disclosure RD/GD-99.3 Public Information and Disclosure RD/GD-99.3 March, 2012 Public Information and Disclosure Regulatory Document RD/GD-99.3 Minister of Public Works and Government Services Canada 2012 Catalogue number CC172-82/2012E-PDF

More information

Consultation on the Technical and Policy Framework for Radio Local Area Network Devices Operating in the MHz Frequency Band

Consultation on the Technical and Policy Framework for Radio Local Area Network Devices Operating in the MHz Frequency Band January 2017 Spectrum Management and Telecommunications Consultation on the Technical and Policy Framework for Radio Local Area Network Devices Operating in the 5150-5250 MHz Frequency Band Aussi disponible

More information

Health Based Exposure Limits (HBEL) and Q&As

Health Based Exposure Limits (HBEL) and Q&As Health Based Exposure Limits (HBEL) and Q&As The EMA guideline (EMA/CHMP/ CVMP/ SWP/169430/2012) & EMA/CHMP/CVMP/SWP/463311/2016 Graeme McKilligan, UK, MHRA. Content Intent of HBEL Post Implementation

More information

Stakeholder involvement in Canadian Initiatives for Deep Geological Repositories for the Long Term Management of Radioactive Wastes

Stakeholder involvement in Canadian Initiatives for Deep Geological Repositories for the Long Term Management of Radioactive Wastes Stakeholder involvement in Canadian Initiatives for Deep Geological Repositories for the Long Term Management of Radioactive Wastes ICGR December 6-9, 2016 Paris, France Haidy Tadros Director General DNCFR

More information

Use of the Graded Approach in Regulation

Use of the Graded Approach in Regulation Use of the Graded Approach in Regulation New Major Facilities Licensing Division Directorate of Regulatory Improvement and Major Projects Management Background Information for Meeting of the Office for

More information

AS/NZS :2014

AS/NZS :2014 AS/NZS 4024.1100:2014 Australian/New Zealand Standard Safety of machinery Part 1100: Application guide AS/NZS 4024.1100:2014 AS/NZS 4024.1100:2014 This joint Australian/New Zealand standard was prepared

More information

MVLWB. Engagement Guidelines for Applicants and Holders of Water Licences and Land Use Permits

MVLWB. Engagement Guidelines for Applicants and Holders of Water Licences and Land Use Permits MVLWB Engagement Guidelines for Applicants and Holders of Water Licences and Land Use Permits Mackenzie Valley Land and Water Board Gwich in Land and Water Board Sahtu Land and Water Board Wek èezhìi Land

More information

BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP

BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP BLM ACTION CENTER www.blmactioncenter.org BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP Planning What you, the public, can do the Public to Submit Pre-Planning During

More information

MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014

MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 I. INTRODUCTION 1. At the May 2013 CIF Committee meetings, the CIF Administrative Unit was requested to give

More information

TITLE V. Excerpt from the July 19, 1995 "White Paper for Streamlined Development of Part 70 Permit Applications" that was issued by U.S. EPA.

TITLE V. Excerpt from the July 19, 1995 White Paper for Streamlined Development of Part 70 Permit Applications that was issued by U.S. EPA. TITLE V Research and Development (R&D) Facility Applicability Under Title V Permitting The purpose of this notification is to explain the current U.S. EPA policy to establish the Title V permit exemption

More information

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 16 thereof,

Having regard to the Treaty on the Functioning of the European Union, and in particular Article 16 thereof, Opinion of the European Data Protection Supervisor on the proposal for a Directive of the European Parliament and of the Council amending Directive 2006/126/EC of the European Parliament and of the Council

More information

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR August 31, 2009 Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR-1000-1 Executive Summary A vendor pre-project design review of a new nuclear power plant provides an opportunity

More information

Closing Argument. on the proposed Gahcho Kue Diamond Mine. Submitted to the Review Panel for EIR [2006]

Closing Argument. on the proposed Gahcho Kue Diamond Mine. Submitted to the Review Panel for EIR [2006] Closing Argument on the proposed Gahcho Kue Diamond Mine Submitted to the Review Panel for EIR0607-001 [2006] December 21, 2012 Introduction This document contains closing argument for the Tåîchô Government.

More information

Standing Committee on the Law of Patents Twenty-Sixth Session

Standing Committee on the Law of Patents Twenty-Sixth Session Standing Committee on the Law of Patents Twenty-Sixth Session Marco M. ALEMAN Director, Patent Law Division, WIPO Geneva, July 3 to 6, 2017 SCP/26/5 CONSTRAINTS FACED BY DEVELOPING COUNTRIES AND LEAST

More information

Terrestrial Radiocommunication Agreements and Arrangements

Terrestrial Radiocommunication Agreements and Arrangements Spectrum Management Terrestrial Radiocommunication Agreements and Arrangements Agreement Regarding the Use of Frequency Bands 150.050-162.000 MHz, 451.500-454.500 MHz, and 456-460 MHz Paired with 466-470

More information

How it works and Stakeholder Benefits

How it works and Stakeholder Benefits UNFC 2009 - Applications in Uranium and Thorium Resources: Focus on Comprehensive Extraction How it works and Stakeholder Benefits David MacDonald Santiago 9-12 July 2013 Stakeholders of our reported resources

More information

Deputy Minister of Industry Tourism and Investment

Deputy Minister of Industry Tourism and Investment Deputy Minister of Industry Tourism and Investment 34th Annual Geoscience Forum (November 21, 2006) Key Messages/Speaking Points Introductory Comments It is a pleasure for me to be here at the 34th Annual

More information

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012

What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012 What We Heard Report Inspection Modernization: The Case for Change Consultation from June 1 to July 31, 2012 What We Heard Report: The Case for Change 1 Report of What We Heard: The Case for Change Consultation

More information

8th Floor, 125 London Wall, London EC2Y 5AS Tel: +44 (0) Fax: +44 (0)

8th Floor, 125 London Wall, London EC2Y 5AS Tel: +44 (0) Fax: +44 (0) Ms Kristy Robinson Technical Principal IFRS Foundation 30 Cannon Street London EC4M 6XH 27 January 2016 Dear Kristy This letter sets out the comments of the UK Financial Reporting Council (FRC) on the

More information

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario

Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario August 7, 2001 See Distribution List RE: Establishment of Electrical Safety Regulations Governing Generation, Transmission and Distribution of Electricity in Ontario Dear Sir/Madam: The Electrical Safety

More information

ITU Radio Regulations. ITU Radiocommunication Bureau

ITU Radio Regulations. ITU Radiocommunication Bureau ITU Radio Regulations ITU Radiocommunication Bureau 1 International treaty governing the use of the radiofrequency spectrum and the satellite orbits. Defines rights and obligations of ITU Member States

More information

British Columbia s Environmental Assessment Process

British Columbia s Environmental Assessment Process British Columbia s Environmental Assessment Process Seminar #2 Guide for Aboriginal Groups and the General Public on the BC Environmental Assessment Process February 23, 2016 Paul Craven About the BC Environmental

More information

January 8, Licensing Requirements for Implantable Medical Devices Manufactured by 3D Printing; Draft Guidance. Dear Sir or Madame:

January 8, Licensing Requirements for Implantable Medical Devices Manufactured by 3D Printing; Draft Guidance. Dear Sir or Madame: 701 Pennsylvania Avenue, NW Suite 800 Washington, D.C. 20004 2654 Tel: 202 783 8700 Fax: 202 783 8750 www.advamed.org January 8, 2019 Bureau of Policy, Science and International Programs Therapeutic Products

More information

ABORIGINAL ENGAGEMENT GUIDEBOOK A Practical and Principled Approach for Mineral Explorers

ABORIGINAL ENGAGEMENT GUIDEBOOK A Practical and Principled Approach for Mineral Explorers ABORIGINAL ENGAGEMENT GUIDEBOOK A Practical and Principled Approach for Mineral Explorers REVISED EDITION - MAY 2015 Includes guidance related to Tsilhqot in and Grassy Narrows Supreme Court of Canada

More information

Data Analytics and the ISAs

Data Analytics and the ISAs Bob Dohrer, IAASB Member and Working Group Chair IAASB Meeting March 2016 Agenda Item 6 Page 1 Overview Objectives of discussion Key messages from Data Analytics Working Group s (DAWG s) outreach to date

More information

I hope you will find these comments constructive and helpful.

I hope you will find these comments constructive and helpful. Delayed Office Opening for Employee Training This office will be closed from 8.45am - 11.00am on the first Thursday of each month. Services for Children, Young People & Families Head of Service: Jacquie

More information

Re: AREVA's Response to Opportunity to Comment on the CEAA Expert Panel Report

Re: AREVA's Response to Opportunity to Comment on the CEAA Expert Panel Report May 5, 2017 Honourable Catherine McKenna. P.C., MP. Minister of Environment and Climate Change Canada 200. Sacré-Coeur Blvd Gatineau, Quebec K1A 0H3 via e-mail: ec.ministre-minister.ec@canada.ca CEAA.EAReview-FxarnenEE.ACEEceaa-acce.gc.ca

More information

Licensing Procedure for Wireless Broadband Services (WBS) in the Frequency Band MHz

Licensing Procedure for Wireless Broadband Services (WBS) in the Frequency Band MHz Issue 1 February 2010 Spectrum Management and Telecommunications Client Procedures Circular Licensing Procedure for Wireless Broadband Services (WBS) in the Frequency Band 3650-3700 MHz Note: Section 6.5

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/ENERGY/GE.3/2017/7 Distr.: General 17 February 2017 Original: English Economic Commission for Europe Committee on Sustainable Energy Expert Group on Resource

More information

INFRASTRUCTURE. Other infrastructure needed is a reliable power supply based on sound economics.

INFRASTRUCTURE. Other infrastructure needed is a reliable power supply based on sound economics. Presentation to the Northwest Territories Chamber of Commerce Annual General Meeting By Mike Vaydik, General Manager, NWT & Nunavut Chamber of Mines June 8, 2005 Good morning. I must say that this is a

More information

Aboriginal Outreach and the PDAC MOU signing: Assembly of First Nations and PDAC, March 4, 2008

Aboriginal Outreach and the PDAC MOU signing: Assembly of First Nations and PDAC, March 4, 2008 Aboriginal Outreach and the PDAC MOU signing: Assembly of First Nations and PDAC, March 4, 2008 Philip Bousquet Senior Program Director 416-362-1969 ext 230 pbousquet@pdac.ca Prospectors and Developers

More information

1 Canada needs mining. 2 Canada s competitive advantage. 3 Challenges to the industry. 4 Collaboration and engagement

1 Canada needs mining. 2 Canada s competitive advantage. 3 Challenges to the industry. 4 Collaboration and engagement Area of focus: Unlocking Canada s Resource Potential 1 Canada needs mining In 2016 the minerals and metals sector contributed $87 billion or 3% to Canada s GDP Our homes, communities, technologies and

More information

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1 Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1 May 2018 Public Information and Disclosure Regulatory document REGDOC-3.2.1 Canadian Nuclear Safety Commission (CNSC) 2018

More information

24 May Committee Secretariat Justice Committee Parliament Buildings Wellington. Dear Justice Select Committee member,

24 May Committee Secretariat Justice Committee Parliament Buildings Wellington. Dear Justice Select Committee member, 24 May 2018 Committee Secretariat Justice Committee Parliament Buildings Wellington Dear Justice Select Committee member, Submission to the Justice Committee Review Privacy Bill Thank you for the opportunity

More information

North York Moors National Park Authority

North York Moors National Park Authority Item 13 North York Moors National Park Authority 1 October 2018 Government Consultations on: i) Permitted Development rights for Shale Gas Exploration; ii) Inclusion of Shale Gas Production Projects in

More information

Public and Aboriginal engagement Public Information and Disclosure REGDOC-3.2.1

Public and Aboriginal engagement Public Information and Disclosure REGDOC-3.2.1 Public and Aboriginal engagement Public Information and Disclosure REGDOC-3.2.1 August 2017 Public Information and Disclosure Regulatory document REGDOC-3.2.1 Canadian Nuclear Safety Commission (CNSC)

More information

Office for Nuclear Regulation

Office for Nuclear Regulation Office for Nuclear Regulation Redgrave Court Merton Road Bootle Merseyside L20 7HS www.hse.gov.uk/nuclear PROJECT ASSESSMENT REPORT Report Identifier: ONR-Policy-all-PAR-11-001 Revision: 2 Project: Implementation

More information

Policy guidance regarding authorisation for Earth Stations on Vessels (ESVs)

Policy guidance regarding authorisation for Earth Stations on Vessels (ESVs) Policy guidance regarding authorisation for Earth Stations on Vessels (ESVs) Publication date: September 2010 Earth Station on Vessels Contents Section Page 1 Policy Guidance regarding authorisation of

More information

BETWEEN. Her Majesty the Queen in Right of Canada, as represented by the Minister of Fisheries and Oceans AND

BETWEEN. Her Majesty the Queen in Right of Canada, as represented by the Minister of Fisheries and Oceans AND Memorandum of Understanding to advance measures to benefit the recovery of the Southern Resident Killer Whale through Trans Mountain Expansion Project Conditions BETWEEN Her Majesty the Queen in Right

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) ENT 123 MI 428 CODEC 1299

COUNCIL OF THE EUROPEAN UNION. Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) ENT 123 MI 428 CODEC 1299 COUNCIL OF THE EUROPEAN UNION Brussels, 19 May 2014 (OR. en) 9879/14 Interinstitutional File: 2013/0165 (COD) T 123 MI 428 CODEC 1299 NOTE From: To: General Secretariat of the Council Council No. prev.

More information

A New Marine Protected Areas Act

A New Marine Protected Areas Act A New Marine Protected Areas Act SUBMISSION FORM Contact information NAME: Bob Dickinson (Chairperson) ORGANISATION: ADDRESS: Department of Conservation,, COUNTRY: New Zealand TELEPHONE: 03 546 3151 EMAIL:

More information

The Canadian Navigable Waters Act

The Canadian Navigable Waters Act The Canadian Navigable Waters Act RESTORING LOST PROTECTIONS AND KEEPING CANADA S NAVIGABLE WATERS OPEN FOR PUBLIC USE FOR YEARS TO COME CANADA.CA/ENVIRONMENTALREVIEWS OVERVIEW 2 What we are doing In the

More information

Agency Information Collection Activities: Submission for Review; Information

Agency Information Collection Activities: Submission for Review; Information This document is scheduled to be published in the Federal Register on 11/04/2015 and available online at http://federalregister.gov/a/2015-28096, and on FDsys.gov 9110-9F DEPARTMENT OF HOMELAND SECURITY

More information

Questions and answers on the revised directive on restrictions of certain dangerous substances in electrical and electronic equipment (RoHS)

Questions and answers on the revised directive on restrictions of certain dangerous substances in electrical and electronic equipment (RoHS) MEMO/08/763 Brussels, 3 December 2008 Questions and answers on the revised directive on restrictions of certain dangerous substances in electrical and electronic equipment (RoHS) What is RoHS about? The

More information

Aboriginal Consultation Framework for the Northern Gateway Pipeline Project

Aboriginal Consultation Framework for the Northern Gateway Pipeline Project Aboriginal Consultation Framework for the Northern Gateway Pipeline Project This document sets out a framework for how the federal government will rely on the Joint Review Panel process to the extent possible

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

Mr Hans Hoogervorst International Accounting Standards Board 1 st Floor 30 Cannon Street London EC4M 6XH. MV/288 Mark Vaessen.

Mr Hans Hoogervorst International Accounting Standards Board 1 st Floor 30 Cannon Street London EC4M 6XH. MV/288 Mark Vaessen. Tel +44 (0)20 7694 8871 15 Canada Square mark.vaessen@kpmgifrg.com London E14 5GL United Kingdom Mr Hans Hoogervorst International Accounting Standards Board 1 st Floor 30 Cannon Street London EC4M 6XH

More information

Selecting, Developing and Designing the Visual Content for the Polymer Series

Selecting, Developing and Designing the Visual Content for the Polymer Series Selecting, Developing and Designing the Visual Content for the Polymer Series A Review of the Process October 2014 This document provides a summary of the activities undertaken by the Bank of Canada to

More information

A stronger system to protect the health and safety of Canadians. Exploring the Future of the Food Regulatory Framework Under the Food and Drugs Act

A stronger system to protect the health and safety of Canadians. Exploring the Future of the Food Regulatory Framework Under the Food and Drugs Act A stronger system to protect the health and safety of Canadians Exploring the Future of the Food Regulatory Framework Under the Food and Drugs Act Purpose and Scope To stimulate a discussion about how

More information

Asking the Right Questions? National Stakeholders and Regional Dialogue Sessions. Regarding NWMO Discussion Document 1 Asking the Right Questions

Asking the Right Questions? National Stakeholders and Regional Dialogue Sessions. Regarding NWMO Discussion Document 1 Asking the Right Questions June 2004 DPRA Final Report National Stakeholders and Regional Dialogue Sessions Regarding NWMO Discussion Document 1 Asking the Right Questions DPRA Canada Asking the Right Questions? The Future Management

More information

Upstream Oil and Gas. Spill Prevention, Preparedness, Response, and Recovery. March 2013

Upstream Oil and Gas. Spill Prevention, Preparedness, Response, and Recovery. March 2013 Upstream Oil and Gas Spill Prevention, Preparedness, Response, and Recovery March 2013 Canadian Association of Petroleum Producers (CAPP) Members explore for, develop and produce natural gas, natural gas

More information

Specific Matter for Comment 1 Do you generally agree with the proposals in the ED? If not, please provide reasons.

Specific Matter for Comment 1 Do you generally agree with the proposals in the ED? If not, please provide reasons. May 30, 2014 Ms. Stephenie Fox Technical Director International Public Sector Accounting Standards Board International Federation of Accountants 277 Wellington Street, 4 th Floor Toronto, Ontario M5V 3H2

More information

APPENDIX 5 Document Requests

APPENDIX 5 Document Requests CELA Submissions Point Lepreau 457 APPENDIX 5 Document Requests CMD 17-H2 - Submission from CNSC Staff - RECEIVED CMD 17-H2.1 - NB Power Submission - Commission Hearing RECEIVED PowerPoint - Jan 26 CNSC

More information

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS

November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS November 18, 2011 MEASURES TO IMPROVE THE OPERATIONS OF THE CLIMATE INVESTMENT FUNDS Note: At the joint meeting of the CTF and SCF Trust Fund Committees held on November 3, 2011, the meeting reviewed the

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

Senate Bill (SB) 488 definition of comparative energy usage

Senate Bill (SB) 488 definition of comparative energy usage Rules governing behavior programs in California Generally behavioral programs run in California must adhere to the definitions shown below, however the investor-owned utilities (IOUs) are given broader

More information

TENTH MEETING ON THE CANADIAN AMATEUR RADIO ADVISORY BOARD (CARAB) PLACE: CANADIAN EMERGENCY PREPAREDNESS COLLEGE

TENTH MEETING ON THE CANADIAN AMATEUR RADIO ADVISORY BOARD (CARAB) PLACE: CANADIAN EMERGENCY PREPAREDNESS COLLEGE TENTH MEETING ON THE CANADIAN AMATEUR RADIO ADVISORY BOARD (CARAB) DATE: Monday, May 25, 1998 TIME: 09:00 to 15:00 PLACE: CANADIAN EMERGENCY PREPAREDNESS COLLEGE ARNPRIOR, ONTARIO CHAIR: J. FARRELL HOPWOOD

More information

Comments on Public Consultation on Proposed Changes to Singapore's Registered Designs Regime

Comments on Public Consultation on Proposed Changes to Singapore's Registered Designs Regime Mr. Simon Seow Director, IP Policy Division Ministry of Law 100 High Street, #08-02, The Treasury Singapore 179434 via email: Simon_Seow@mlaw.gov.sg Re: Comments on Public Consultation on Proposed Changes

More information

Ai Group Submission. in response to the REVIEW OF ELECTRICITY (CONSUMER SAFETY) ACT 2004 ISSUES PAPER

Ai Group Submission. in response to the REVIEW OF ELECTRICITY (CONSUMER SAFETY) ACT 2004 ISSUES PAPER Ai Group Submission in response to the REVIEW OF ELECTRICITY (CONSUMER SAFETY) ACT 2004 ISSUES PAPER APRIL 2010 EXECUTIVE SUMMARY The Australian Industry Group (Ai Group) welcomes the opportunity to comment

More information

15 August Office of the Secretary PCAOB 1666 K Street, NW Washington, DC USA

15 August Office of the Secretary PCAOB 1666 K Street, NW Washington, DC USA 15 August 2016 Office of the Secretary PCAOB 1666 K Street, NW Washington, DC 20006-2803 USA submitted via email to comments@pcaobus.org PCAOB Release No. 2016-003, PCAOB Rulemaking Docket Matter No. 034

More information

City of Greater Sudbury Radio-communication and Broadcasting Antenna Systems Public Consultation Protocol

City of Greater Sudbury Radio-communication and Broadcasting Antenna Systems Public Consultation Protocol City of Greater Sudbury Radio-communication and Broadcasting Antenna Systems Public Consultation Protocol May 30, 2016 1.0 OBJECTIVES The objectives of this protocol are as follows: 1) To establish a siting

More information

Submission to the Productivity Commission inquiry into Intellectual Property Arrangements

Submission to the Productivity Commission inquiry into Intellectual Property Arrangements Submission to the Productivity Commission inquiry into Intellectual Property Arrangements DECEMBER 2015 Business Council of Australia December 2015 1 Contents About this submission 2 Key recommendations

More information

The European Securitisation Regulation: The Countdown Continues... Draft Regulatory Technical Standards on Content and Format of the STS Notification

The European Securitisation Regulation: The Countdown Continues... Draft Regulatory Technical Standards on Content and Format of the STS Notification WHITE PAPER March 2018 The European Securitisation Regulation: The Countdown Continues... Draft Regulatory Technical Standards on Content and Format of the STS Notification Regulation (EU) 2017/2402, which

More information

Building Canada s Advanced Wireless Networks: Protocol Development

Building Canada s Advanced Wireless Networks: Protocol Development Building Canada s Advanced Wireless Networks: Protocol Development Meeting with Markham Development Services Committee May 20, 2014 1 Origins of this meeting Development Services Committee resolved to

More information

Standing Committee on the Law of Patents

Standing Committee on the Law of Patents E SCP/17/7 ORIGINAL: ENGLISH DATE: OCTOBER 20, 2011 Standing Committee on the Law of Patents Seventeenth Session Geneva, December 5 to 9, 2011 PROPOSAL BY THE DELEGATION OF DENMARK Document prepared by

More information

Current Initiatives Regarding Pedestrian Interaction with Equipment

Current Initiatives Regarding Pedestrian Interaction with Equipment Ministry of Labour Overview Operations Occupational Health & Safety Employment Standards Current Initiatives Regarding Pedestrian Interaction with Equipment Presented by: Jamie Cresswell Provincial Mining

More information

ORBIT/SPECTRUM ALLOCATION PROCEDURES REGISTRATION MECHANISM

ORBIT/SPECTRUM ALLOCATION PROCEDURES REGISTRATION MECHANISM ORBIT/SPECTRUM ALLOCATION PROCEDURES REGISTRATION MECHANISM 1 Basic principles During the last 40 years, from the Administrative Radio Conference in 1963 and up to and including the last World Radiocommunication

More information

Clarification for 14 CFR Part Vibration Test

Clarification for 14 CFR Part Vibration Test Clarification for 14 CFR Part 33.83 Vibration Test Comments on the Draft Policy Statement PS-ANE-33.83-01 published online for public comment at http://www.faa.gov/aircraft/draft_docs/policy/ Submitted

More information

Spectrum Utilization Policy, Technical and Licensing Requirements for Broadband Public Safety in the Band MHz

Spectrum Utilization Policy, Technical and Licensing Requirements for Broadband Public Safety in the Band MHz June 2006 Spectrum Management and Telecommunications Spectrum Utilization Policy Spectrum Utilization Policy, Technical and Licensing Requirements for Broadband Public Safety in the Band 4940-4990 MHz

More information