CONNECTION. Certified System Components. Subsea Connections

Size: px
Start display at page:

Download "CONNECTION. Certified System Components. Subsea Connections"

Transcription

1 CONNECTION TM Certified System Components Subsea Connections

2 Subsea Connections from Cameron: reliable, versatile links to tie production systems together. Right from the start, the leader Cameron s subsea production experience goes back to the industry s first subsea wellhead completion in That was in the Gulf of Mexico, using a Cameron Christmas tree. A long string of other Cameron subsea product innovations followed. The legendary U BOP, first hydraulic production controls system, first guidelineless drilling system, first freestanding riser system these are just a few familiar milestones along Cameron s path of leadership. This leadership continues today with such innovations as the SpoolTree Christmas tree and the MOSAIC (Modular Subsea and Integrated Completion) production system. More advances are on the horizon. As the industry pushes into new frontiers, we ll be there, with the technology to do it right. Cameron s experience with diverless flowline connections began with the Fairley field (offshore Brunei) in the late 60s. Making the connections that move produced fluids from subsea wellheads to surface production facilities is a challenge that Cameron has been meeting successfully for decades. We have consistently led the way in the development of subsea connection systems for flowlines, export lines, umbilicals and multibore production lines. Now we ve advanced the state of the art once again. With standardized, preengineered subsea connections that are part of the MOSAIC system. Two types of connections collet and clamp are available in a virtually unlimited array of configurations to satisfy any subsea production system requirement. These McPAC seal plates can be configured to satisfy any subsea system requirement systems are extremely versatile, rocksolid reliable and offered in a full range of sizes and pressure ratings. Common interfaces simplify field development MOSAIC modular subsea components have common interfaces that allow use of a variety of connection systems vertical, horizontal, diver-assist and ROV-assisted. These common interfaces make it possible to use the same connection technology for all components in a field development, including well jumpers, pipeline jumpers, umbilical terminations and pigging loops. This CVC Collet connector McPAC Clamp connector simplifies installation tool requirements, reduces the number of running procedures to be accommodated and minimizes the spare parts inventory. Reusable installation tools reduce costs Installation tools for both vertical and horizontal Cameron subsea connection systems are retrievable and reusable, so multiple connections can be made without additional tool investment. The cost savings add up quickly, especially on larger projects. All the hydraulic systems for connection installation are incorporated in the tools there are no hydraulics on the subsea connections themselves. This simplicity is one of the reasons for the proven reliability of our connections. And for developments requiring fewer connections where reuseable tooling is less important, we can provide integral connectors with self-contained hydraulic actuators. 2

3 Accessories enhance flexibility A full line of accessories adds to the flexibility of our subsea connection systems. These accessories include pressure caps, metrology devices and stab and hingeover alignment structures. Installing pressure caps on connection hubs permits full use of the pressure system without connecting the hubs to other MOSAIC components. These pressure caps are equipped with control panels for deployment and retrieval by an ROV. Metrology devices enable an ROV to precisely measure angles, offsets and distances between MOSAIC components. These measurements are used to fabricate the jumpers that will connect the components. Stab and hinge-over alignment structures rotate hubs into proper position for connection. They are particularly useful for installing umbilicals. Cameron provides cost-effective engineering solutions Cameron engineers have a long history of standardizing interfaces, optimizing components and fine-tuning proven technology to meet customer needs quickly and cost-effectively. It pays to involve our engineering professionals right from the start, because they can make the most significant contributions to project success at the critical stages of concept selection, front-end engineering design (FEED) and detail design. Cameron subsea connections can be configured to satisfy any production system requirement. Modular Subsea And Integrated Completion systems: The MOSAIC concept MOSAIC systems are the result of a design philosophy that eliminates the usual tradeoffs you expect with a pre-engineered, modular system. With MOSAIC systems, you gain simplified installation procedures, reduced personnel training and faster delivery. And you don t have to give up flexibility, expandability and desirable product features and benefits as you do with ordinary systems. The ordinary approach to modularity is fixed assemblies run progressively to large structures, which are not appropriate for many applications. MOSAIC systems are modular at the component level, standardized to work together in many combinations. The result is a cost-effective system that can be adapted to virtually any subsea job. The MOSAIC system is more easily expanded as field development needs evolve, and its components contain the technology that provides the performance you need. Cameron s subsea connections are an integral part of the MOSAIC system. They re the perfect fit for today s subsea economics. 3

4 Collet connections cut subsea installation time. Spreader beam installation of CVC jumper Cameron CVC and CHC collet connections are engineered for fast make-up using a push-pull motion. A hydraulically operated actuator ring locks pivoting collet segments under the tapered profile of a hub to form a strong mechanical connection that can handle high separation forces. Pressure is contained by an AX gasket that forms a metal-to-metal seal between the connector and the hub. Resilient rings in the gasket serve as secondary seals. Our collet connectors can be oriented either vertically (CVC) or horizontally (CHC) and are offered in both nonintegral and integral designs. Non-integral connectors, available in pipe sizes up to 20, are positioned and closed by a separate actuator, which is recoverable after use. Integral connectors, available in pipe sizes from 6 to 54, are positioned and closed by internal hydraulic cylinders. The receiver structure and hub support for collet connectors are very compact. This reduces weight and allows other components to be placed closer together to save space. In vertical installations, collet connectors are lowered directly onto the hubs, No draw-together motion is needed to make up the connection, and no flexibility loops are required. Another advantage is that pressure caps and enclosures can be vertically installed and removed. Spreader beams permit guidelineless installation Rigid jumpers with vertically oriented hubs can be installed without using guidelines by running the jumpers on spreader beams from a construction vessel or drilling rig. Installation tools are attached to downward-facing collet connectors at both ends of the jumper, and the rigid spreader beam is attached to the installation tools and the center of the jumper. The jumper is then lowered by crane to its subsea location. This procedure requires a vessel or rig with dynamic positioning (DP) and two cranes. If that combination is not available, the jumper can be run on guidelines using a single crane. On guidelineless installations, an ROV monitors the operation, transmitting images to the surface to guide lowering of the jumper onto the hubs. After the jumper is in position, the ROV operates valves on the installation tools to lock the collet connectors to their hubs and pressure test the gaskets. Once the integrity of the connections has been verified, the ROV releases the installation tools from the connections and the spreader beam from the jumper. The crane then retrieves the spreader beam with the installation tools attached. Installation tools hydraulically draw hubs together To compensate for measurement errors and sled movement, collet connection installation tools have a built-in gimbal of 3 degrees. This, in addition to the capability of the connection system itself to accommodate 17 degrees of ROV Panel Connector Make-Up Cylinders Top Plate Ring Actuator Ring Alignment Funnel Hub Alignment Structure Running Tool Jumper Pipe Soft Land Cylinders Collet Connector CVC System 4

5 misalignment from the sled seafloor angle, permits connections to be made at high-angles to minimize or eliminate misalignments. Cameron performs a standard test to ensure that rigid jumpers can be successfully connected with up to 6 of offset in the x, y and z axes and as much as 2 degrees of misalignment in pitch, roll and yaw. Because the installation tools are ROV operated, there s no umbilical to worry about. The tool s ROV panel contains the hydraulic control system required to test the connected jumper seal and operate the connector and soft landing system. An alignment funnel guides the initial landing of the tool and connector assembly. Latch dogs in the funnel lock onto the receiver structure as the soft landing system is engaged to hydraulically force the hub and collet connector faces together. This double-acting feature permits hydraulically controlled separation of the hubs for easy and safe gasket replacement. Since the tool latches to the same size connector top plate and actuator ring regardless of bore size, a single tool can be used with 4 to 12 flowline bores. Regardless of size, the connections provide an effective barrier, with hubs and collet dogs environmentally isolated. Collet connection installation tools have mechanical overrides for backup if hydraulic power is lost. A redundant secondary lock system ensures connection integrity by restricting the movement of the actuator ring while the connector is locked on the hub. King Field, Gulf of Mexico Water Depth: 5485 ft (1671 meters) Challenge: Provide an efficient, first-end connection system for Steel Catenary Risers (SCR) to be laid away from deepwater SCR anchor bases to a Dry Completion Unit or FPSO. Solution: Cameron engineers designed the flowline connection system for firstend, stab-and-hinge-over installation using a lay vessel with seabed support from a mono-pile support structure. The hinge-over positions the SCR flowline hubs facing upward for fast, easy attachment of the vertical collet connectors on the rigid, tree-to-flowline jumpers, as well as the flowline pigging loops. Using the same type of collet connector on all components results in several economic benefits for the operator, over and above the installation time saved. Fewer installation tools are needed, the number of running procedures to be accommodated is minimized, and the necessary spare parts inventory is reduced. Gullfaks Field, North Sea Water Depth: 140 meters (460 ft) specified for 600 meters (1969 ft) Running and Connection Tool for Gullfaks being tested Challenge: Tie production/test lines from eight subsea wells to production platform via two customer-designed 7 km flowline bundles. The jumper pre-stressing and connection required pull-in loads and strokes greater than currently available in the industry. The bundles include water heating lines to prevent hydrate formation, requiring the use of dual and triple bore connections. Solution: Cameron designed, built and tested a new tool with the capacity necessary to make up the large, horizontal collet connections the operator required. This ROV-operated Running and Connection Tool (RCT) can handle 8 to 18 nominal pipe, including multi-bores a capability critical to the success of the project because of the number and variety of flowline bundle connections. Twenty-two of the 34 collet connections manufactured by Cameron are multi-bore configurations including 12 x 3 x 3 and 8 x 3 x 3 connectors. Gemini Field, Gulf of Mexico Water Depth: 3400 ft (1036 meters) Challenge: Work within tight time constraints to design, build and deploy a four-well, deepwater gas production system. The project required reliable, vertical connections suitable for fast, guidelineless, ROV installation of four 4 flexible-pipe well jumpers and two 12 rigid-pipe flowline jumpers. Solution: Cameron s proven collet connection technology was adapted to meet the project s requirements within the operator s ambitious time frame. Non-integral collet connectors rated for 5000-psi WP were used on all the jumpers and the 12 pigging loop on the manifold. Installation costs were minimized because the operating tools for both the 4 and 12 connectors could be retrieved and reused. 5

6 Clamp connections are the most economical solution for many subsea applications. Cameron McPAC clamp-type connection systems are used for everything from large pipelines to small in-field flowlines and umbilicals, in deep water and in shallow. They can be run with or without guidelines and installed with ROV assistance, eliminating the need for divers. Improved McPAC connection tool is ROV operated An improved, high-capacity McPAC Connection tool is an important component of the total package. Connection is a totally separate operation from the deployment method, so it can be performed immediately after deployment or delayed as long as necessary. Hydraulic power to operate the connection tool is supplied by an ROV no guidelines or umbilicals are required. A hydraulic motor in the compact tool drives two jackscrews to make the connection. Hydraulic Motor McPAC hubs ready for shipment Since the motor and the actuating saddle are integrated modules, an ROV can be used both to deploy the tool and to retrieve the seal plate. The tool can also be deployed using guidelines when that method is preferable. After connection of the lines to the hub is completed, the tool is used to pressure test the metal-to-metal seals. It is then retrieved for reuse on the next connection, leaving only the connected lines subsea. Actuating Saddle Metal-to-Metal Seal Clamp Jackscrew Seal Plate McPAC System 6

7 McPAC end connections now come in two sizes Two sizes of standard hubs and clamps are now available for making first and second end connections of flowline/hydraulic control bundles, electrical cables and pipelines. The larger size is used for large-bore flowlines, multi-bore lines and umbilicals, the smaller size for small- and single-bore lines. HSAS provides final alignment Final alignment and make-up of the clamp are provided by the Hub Support and Alignment Structure, which has a sliding McPAC jumper with HSAS being run support saddle. The connection tool strokes the hub into position. McPAC connections have been successfully used in subsea systems for two decades. McPAC connectors are economical and reliable, two highly desired traits in today s subsea business. A pivoting Hub Support and Alignment Structure (HSAS) with an orienting stab alignment pin permits totally guidelineless connection of horizontal flowlines. When used to make a first end connection, the HSAS is deployed in vertical position and stabbed into the flowline porch structure at the wellhead, where the inboard hub is mounted. Then the HSAS pivots to horizontal and the stab pin latches to the porch base, providing a hinge point for flowline layaway and hub horizontal alignment. Troika Field, Gulf of Mexico Water Depth: 2760 ft (842 meters) Challenge: Design, manufacture, test and install the industry s first fully insulated, deepwater, oil production system to enhance flow assurance. The connections had to be insulated without compromising reliability or installability. Solution: Versatile Cameron McPAC horizontal connections were used throughout Troika insulated clamp connection the system to reduce installation cost and complexity. One of the reasons for the proven reliability of Cameron McPAC clamp-type connections is that no hydraulics are left subsea. This feature provides for a simple means of insulation, which was installed by ROV after test. Only one tool was needed to install all the connections for the 10 rigid pipeline jumpers, the 15-line umbilical and the multi-bore flowline jumpers, each of which had a 4 product line and eight hydraulic lines. If it is ever necessary to retrieve the manifold, the connections can be retracted and the jumpers left in place undisturbed. Malampaya Field, Philippines Water Depth: 850 meters (2789 ft) Challenge: Develop a gas production system with a 30-year life and the flexibility to add more wells if an adjoining field is produced. All materials that would be exposed to gas were to be corrosion resistant, and the operator specified the use of horizontal connectors to permit the manifold to be retrieved, if necessary, without disturbing the jumpers and umbilicals. Solution: Field-proven Cameron clamptype connectors will provide the required long-term reliability. The tool used to install them can be retrieved and reused repeatedly and fits a wide range of connections. That means just one tool can make all the connections for the tree-tomanifold jumpers, pipeline jumpers and umbilicals, substantially reducing the operator s cost. The tree-to-manifold jumpers will have two 1 lines piggybacked on the 6 flowline one for methanol injection and McPAC hubs for Malampaya manifold the other to vent the annulus. Cameron s multi-bore connections will save installation time by attaching all three lines simultaneously when the ROV makes up the jumper connection. 7

8 Western Hemisphere Cameron PO Box 1212 Houston Texas Tel Fax Eastern Hemisphere Cooper Cameron (U.K.) Ltd. 5 Mondial Way Harlington Hayes UB3 5AR Tel Fax subsea@camerondiv.com Asia Pacific/Middle East Cooper Cameron (Singapore) Pte. Ltd. No. 2 Gul Circle, Jurong Industrial Est Locked Bag Service No. 3 Jurong Town Post Office Singapore Republic Of Singapore Tel Fax subsea@camerondiv.com MOSAIC, SpoolTree, Cameron, CAMLAST, STM, STC, CAMTROL, McPAC, CVC, CHC and Cameron Willis are trademarks of the Cooper Cameron Corporation, Cameron Division. Cooper Cameron Corporation, Cameron Division, Printed in USA, 8/00, HG/7.5M, WR10002/TC1380

Cameron MOSAIC. Systems for the Malampaya Project

Cameron MOSAIC. Systems for the Malampaya Project MOSAIC Certified MALAMPAYA Cameron MOSAIC Systems for the Malampaya Project The Malampaya Project LUZON CALM Loading Buoy UPSTREAM Onshore Gas Plant DOWNSTREAM Alternative Fuel Electricity Power Stations

More information

UCON Connection Systems

UCON Connection Systems UCON Connection Systems UCON Connection Systems Subsea fields are developed using a variety of connection system solutions. Over the past two decades, FMC Technologies has manufactured a complete range

More information

Cameron MBO Multi-Bowl Wellhead System

Cameron MBO Multi-Bowl Wellhead System Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead

More information

Vertical Tie-in Systems

Vertical Tie-in Systems Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed

More information

Vertical Tie-in Systems

Vertical Tie-in Systems Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed

More information

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application

VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

Subsea Structural Engineering Services. Capability & Experience

Subsea Structural Engineering Services. Capability & Experience Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation

More information

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS

15,000 psi 20,000 psi. BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS 15,000 psi 20,000 psi BigBore IIe HPHT SUBSEA WELLHEAD SYSTEMS DXe Gasket Profile DXe Locking Profile BigBore IIe SUBSEA WELLHEAD SYSTEM Mud Stick 18 ¾" BigBore IIe Wellhead Housing The BigBore IIe Subsea

More information

Horizontal Tie-in Systems

Horizontal Tie-in Systems Horizontal s Horizontal Systems Horizontal Tie-in may be used for both first-end and second end tie-in of both flowlines, umbilicals and Jumper spools. The Termination Head on the line may be hauled in

More information

Offshore Systems. Cameron s Subsea Production Philosophy

Offshore Systems. Cameron s Subsea Production Philosophy Offshore Systems In today s fast-paced, cost-conscious subsea production industry, Cameron has successfully met the challenge to deliver safe, reliable system solutions. This experience allows Cameron

More information

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS

BigBore IIe. 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe 15,000 psi 20,000 psi SUBSEA WELLHEAD SYSTEMS BigBore IIe SUBSEA WELLHEAD SYSTEM System Overview Dril-Quip s BigBore IIe Subsea Wellhead System meets the demands of HPHT well environments.

More information

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths

More information

OneSubsea Pumps and Subsea Processing Systems

OneSubsea Pumps and Subsea Processing Systems OneSubsea Pumps and Subsea Processing Systems Pumps and Subsea ProcessING Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our aim is to provide comprehensive technical

More information

Marine Risers. Capability & Experience

Marine Risers. Capability & Experience Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct

More information

MARS. Multiple application reinjection system

MARS. Multiple application reinjection system MARS Multiple application reinjection system Unique Technology. Universal Application. Historically, installing processing hardware on existing subsea trees has been a high-risk and costly activity due

More information

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient

Standard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient Standard Horizontal Subsea Trees Integrated offshore offering for reliable, high-quality, and capitalefficient performance Standard Horizontal Subsea Trees Through standardized processes, common core components,

More information

An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years!

An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years! An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years! Grayloc Products An Oceaneering International Company Oceaneering is a global oilfield provider

More information

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies

INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success Deepsea technologies Streamlining Subsea Production Systems for Smaller Fields AFGlobal

More information

Riser Installation in Deep & Ultra Deep Water

Riser Installation in Deep & Ultra Deep Water Riser Installation in Deep & Ultra Deep Water Frank Lim 38 th Annual Offshore Pipeline Technology Conference Amsterdam, February 2015 Outline Introduction Overview of current deepwater riser systems and

More information

INTEGRATED SUBSEA PRODUCTION SYSTEMS. Delivering Cost-Effective Technologies and Efficient Project Execution

INTEGRATED SUBSEA PRODUCTION SYSTEMS. Delivering Cost-Effective Technologies and Efficient Project Execution INTEGRATED SUBSEA PRODUCTION SYSTEMS Delivering Cost-Effective Technologies and Efficient Project Execution Virtus Connection s The Retlock connector and its sealing technology is the cornerstone of AFGlobal

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

Subsea Control Systems

Subsea Control Systems Subsea Control Systems Simplifying Subsea Production INGENIOUS SIMPLICITY Proserv s direct hydraulic and multiplexed production subsea control systems provide control and shutdown of subsea wells together

More information

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY

QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY PEMEX-INTSOK Deepwater Technology Seminar, May 9-10, 2013 UNITECH is QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY Global Reach UNITECH equipment and people support some of the world s most challenging

More information

DXe SUBSEA WELLHEAD CONNECTORS

DXe SUBSEA WELLHEAD CONNECTORS DXe SUBSEA WELLHEAD CONNECTORS Illustration shown: DXe-3 Connector with DXe latching segment Upper Body Indicator Rod Ring Gasket Retainer Latch Segment Spreader Upper Split Ring Retractor Latch Port Ring

More information

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Managing Director, Enpro Subsea idonald@enpro-subsea.com Agenda Enpro

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

Oil&Gas Subsea Subsea Technology and Equipments

Oil&Gas Subsea Subsea Technology and Equipments Subsea Technology Equipments and Oil&Gas Subsea Subsea Technology and Equipments The exploration and production of oil and gas reservoirs in a variety of water depth has become a challenge to the offshore

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

Learn more at

Learn more at Deepwater Riser System Challenges and Issues David Walters 2H Offshore Presentation Objectives Review riser system options Update on current industry status Highlight key issues Discuss current industry

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

Deepwater Precommissioning Services

Deepwater Precommissioning Services Deepwater Precommissioning Services Featuring Denizen remote subsea technologies Drilling Evaluation Completion Production Intervention Pipeline & specialty services Nitrogen services Pipeline services

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

Pressurised Subsea Pipeline Repair Recent Case Studies

Pressurised Subsea Pipeline Repair Recent Case Studies Despite good pipeline design and integrity management schemes, pipelines can and do get damaged and need to be repaired. Damage can be caused by any number of factors, such as dragged anchors, landslides,

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

Innovative Subsea Engineering

Innovative Subsea Engineering Innovative Subsea Engineering www.subsea.co.uk Innovative Subsea Engineering Formed in 1985 by a team of experienced engineers and diving professionals, Subsea Innovation is a company dedicated to delivering

More information

Flow Assurance. Capability & Experience

Flow Assurance. Capability & Experience Flow Assurance Capability & Experience Capability Overview Flow assurance encompasses the thermal-hydraulic design and assessment of multiphase production/ transport systems as well as the prediction,

More information

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton 7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling

More information

By: Derek Watson and Lee Robins, Tracerco, UK

By: Derek Watson and Lee Robins, Tracerco, UK TRACERCO DISCOVERY SUBSEA CT (COMPUTED TOMOGRAPHY) HELPS TO OPTIMISE YOUR OPERATIONAL PIGGING CAMPAIGN AND VERIFY ILI RESULTS: TECHNOLOGY FOR PIPELINE INTEGRITY AND FLOW ASSURANCE VISUALISATION By: Derek

More information

Subsea Chokes and Flow Modules

Subsea Chokes and Flow Modules Subsea Chokes and Flow Modules 2 Relia Designed for maximum flexibility and reliability, FMC s F Series Subsea Chokes and Flow Modules are ideal for production, injection, gas lift and waterflood applications.

More information

U-Series. Subsea Screw Jacks & Bevel Gearboxes

U-Series. Subsea Screw Jacks & Bevel Gearboxes U-Series Subsea Screw Jacks & Bevel Gearboxes The Power Jacks U-Series: strength in depth The U-Series is a new proposition from Power Jacks: a range of subsea products specifically designed to operate

More information

June 24, 2010 RPSEA Project 1502 Thomas E. Williams int.com

June 24, 2010 RPSEA Project 1502 Thomas E. Williams  int.com June 24, 2010 RPSEA Project 1502 Thomas E. Williams www.nautilus int.com RPSEA 1502 Coiled Tubing from a Small Vessel June 2010 Update Presentation Topics Background Project Objectives System Configuration

More information

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA

Dagang Zhang China-America Frontiers of Engineering Symposium San Diego, USA Dagang Zhang COTEC Offshore Engineering Solutions China Offshore Oil Engineering Company 2011 China-America Frontiers of Engineering Symposium San Diego, USA Presentation Outline Current Status of Deepwater

More information

Jim Britton Deepwater Corrosion Services Inc. Houston, TX. UTC 2008 Bergen

Jim Britton Deepwater Corrosion Services Inc. Houston, TX. UTC 2008 Bergen Smart Cathodic Protection Retrofit Methods for ROV Installation Jim Britton Deepwater Corrosion Services Inc. Houston, TX. Presentation Outline Introduction Key Factors to Consider Anode System Tie-Back

More information

Implementing a Deepwater- Pipeline-Management System

Implementing a Deepwater- Pipeline-Management System Implementing a Deepwater- Pipeline-Management System L.T.M. Samosir, D. Popineau, and A. Lechon, Total S.A. Summary As an operator, Total has experienced significant deepwater maintenance and repair activities,

More information

Local Contribution to the Aasta Hansteen development

Local Contribution to the Aasta Hansteen development Local Contribution to the Aasta Hansteen development 05th June 20 Stian Sande Who are we Presentation overview What is our role on Aasta Hansteen Onshore activites and local contribution What do we expect

More information

Offshore Pipelines. Capability & Experience

Offshore Pipelines. Capability & Experience Offshore Pipelines Capability & Experience Capability Overview INTECSEA is a leading engineering and project delivery company in the offshore oil and gas sector. It operates across the full project cycle

More information

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION

ENGINEERING SOLUTIONS AND CAPABILITIES. Capacity enhancement for deep water operations THE CHALLENGE THE SOLUTION Capacity enhancement for deep water operations ENGINEERING SOLUTIONS AND CAPABILITIES THE CHALLENGE THE SOLUTION Operations are taking place in much deeper waters and in more diverse locations, Aquatic

More information

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director

Doing More With Lightweight. Well Intervention Subsea Europe Drummond Lawson. London, 30 th October Managing Director Doing More With Lightweight Well Intervention Subsea Europe 2008 London, 30 th October 2008 Drummond Lawson Managing Director What Is It? Lightweight Subsea Well Intervention (LSWI) Re-entering existing

More information

Bespoke ROV Tooling..The story behind the Subsea Bumble Bee

Bespoke ROV Tooling..The story behind the Subsea Bumble Bee A Worlds First! Bespoke ROV Tooling..The story behind the Subsea Bumble Bee During the summer of 2015, Subsea Tooling Services was approached by a large and well known Aberdeen based ROV operator to design,

More information

Wellhead Control Products, Inc. Hangers

Wellhead Control Products, Inc. Hangers Wellhead Control Products, Inc. Hangers The RH series was designed to be a highly workable coiled tubing hanger with greater reliability and more efficiency than other coiled tubing hanger systems. The

More information

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept

Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept Background Why? What are the business drivers? Subsea, Surface or FLNG? Subsea Dehydration & The SubCool Hybrid Concept The Market :- Focus on Platform or Gas-to-Surface Replacement Summary Many global

More information

Diverse Capabilities Targeted Solutions

Diverse Capabilities Targeted Solutions Diverse Capabilities Targeted Solutions Today s Leader, Tomorrow s Innovation As a vertically integrated manufacturer with direct control over the entire supply chain from raw materials to finished product,

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

U-Series. Subsea Screw Jacks & Bevel Gearboxes

U-Series. Subsea Screw Jacks & Bevel Gearboxes U-Series Subsea Screw Jacks & Bevel Gearboxes The Power Jacks U-Series: strength in depth The U-Series is a new proposition from Power Jacks: a range of subsea products specifically designed to operate

More information

Engineering and Procurement We are designing and purchasing everything we can firmly identify

Engineering and Procurement We are designing and purchasing everything we can firmly identify Tamar Field Development NPC PROJECT UPDATE 13 JUNE, 2010 1 Engineering and Procurement We are designing and purchasing everything we can firmly identify Offshore and Onshore FEED Studies Subsea FEED Engineering

More information

Floating Systems. Capability & Experience

Floating Systems. Capability & Experience Floating Systems Capability & Experience Capability Overview INTECSEA has more than 30 years of extensive experience with all types of floating systems: TLPs, spars, monohulls and semi-submersibles. Key

More information

Marine Well Containment Company Outer Continental Shelf Summer Seminar

Marine Well Containment Company Outer Continental Shelf Summer Seminar Marine Well Containment Company Outer Continental Shelf Summer Seminar June 4, 2015 INTRODUCTION 2 Why We re Here In order to receive a permit to drill in the U.S. Gulf of Mexico, regulations require operators

More information

16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems

16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems OIL & GAS Introduction to Subsea Production Systems 08 Production Control Systems September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER Module structure Section 1 Introduction to control systems

More information

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director

Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations. Presented by: James Young, JDR Engineering Director Umbilical Manufacturer s Perspective on the Challenges of Deep Water Operations Presented by: James Young, JDR Engineering Director 1 MCE DEEPWATER DEVELOPMENT 2015 1. Introduction 2. JDR Cables and Umbilicals

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG

SUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG Introduction to Eni Our new mission: We are an energy company. We are working to build a future where everyone can access energy resources efficiently and sustainably. Our work is based on passion and

More information

Technip Floating Production: A Comprehensive Portfolio

Technip Floating Production: A Comprehensive Portfolio Technip Floating Production: A Comprehensive Portfolio Fortis Bank Floating Production Luncheon Ivan Replumaz - CEO Offshore Branch ISIN FR0000131708 I. II. III. IV. V. FLOATER BRIEF INTRODUCTION TECHNIP

More information

INS for life of field

INS for life of field INS for life of field Mark Carter Business Development Manager : Inertial Oceanology 2012 Positioning Requirements Drilling Construction Pipe Lay IRM Decommissioning Rig DP (Dual Redundant) Site Survey

More information

Working for the future POSGRIP Technology

Working for the future POSGRIP Technology Working for the future POSGRIP Technology A Request for Joint Industry Support to enable roll-out of a new method of wellhead design October 2008 Page 1 1.1 - The Principals of POS-GRIP A New Method for

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery White Paper Deepwater Exploration and Production Minimizing Risk, Increasing Recovery Deepwater exploration, development and production present unique challenges to operators, and minimizing risk and maximizing

More information

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our

More information

Dry trees for cost effective solution with the Wellhead Barge: WHB

Dry trees for cost effective solution with the Wellhead Barge: WHB Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and

More information

Training: Industry Overview

Training: Industry Overview The Fundamentals of Subsea Date & Time: Wednesday, November 4, 2015 9:00 am 4:30 pm Host Company: EIC Location: EIC, 11490 Westheimer Rd Ste 110, Houston, TX, 77077 Contact: Natalia Bueno Email: natalia.bueno@the-eic.com

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s commitments Determined to accelerate and further deploy the capabilities and practices that enhance safety in our company and the deepwater industry 200+ meetings

More information

Evolution of Deepwater Subsea / Offshore Market

Evolution of Deepwater Subsea / Offshore Market Evolution of Deepwater Subsea / Offshore Market Amar UMAP Vice President, Technip COOEC Alliance DMFT 2014 Zhu Hai, China 18 October 2014 Table of contents 1. Evolution of Offshore/ Subsea Oil & Gas Industry

More information

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018

Offshore Support Vessels Located in the US Gulf of Mexico in March 2018 Offshore Support Vessels Located in the US Gulf of Mexico in March 18 IMCA March 1, 18 Prepared by IMCA The International Marine Contractors Association (IMCA) is the international trade association representing

More information

REAL TIME SUBSEA MONITORING AND CONTROL SMART FIELD SOLUTIONS

REAL TIME SUBSEA MONITORING AND CONTROL SMART FIELD SOLUTIONS REAL TIME SUBSEA MONITORING AND CONTROL SMART FIELD SOLUTIONS David V. Brower Astro Technology Inc. 510 Ellington Field #200 11602 Aerospace Ave. Houston, Texas 77034 USA (281) 464-9992 dbrower@astrotechnology.com

More information

Marty Massey, Chief Executive Officer Marine Well Containment Company

Marty Massey, Chief Executive Officer Marine Well Containment Company Marty Massey, Chief Executive Officer Marine Well Containment Company Phil Smith, General Manager Emergency Management and Deepwater Regulatory, Shell Energy Resources Company About MWCC Leading deepwater

More information

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014

Introduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 September 2014 Introduction to Subsea Production Systems 02 What is Subsea? September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER What is Subsea? 3 1 What is Subsea? 4 Subsea example 5 2 Subsea example 6

More information

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING

OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING Red Marine provides intelligent engineering solutions to global clients working in the oil & gas, nuclear and renewable energy industries. With a broad

More information

Subsea STP Buoy Mooring

Subsea STP Buoy Mooring Subsea STP Buoy Mooring Subsea Australasia 2010, Perth Ben Crouch, Sales Engineer, First Subsea Ltd Always Part of the Solution Presentation Overview First Subsea Ball and Taper Technology Subsea Mooring

More information

MSV Seawell. The vessel that pioneered subsea light well intervention

MSV Seawell. The vessel that pioneered subsea light well intervention MSV Seawell The vessel that pioneered subsea light well intervention PRODUCTION ENHANCEMENT WELL MAINTENANCE SATURATION DIVING WELL ABANDONMENT/FIELD DECOMMISSIONING MSV Seawell specifications Classification

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

Getting to Grips with Deepwater Handling Operations

Getting to Grips with Deepwater Handling Operations Getting to Grips with Deepwater Handling Operations Mark Wood, Regional Manager SE Asia, First Subsea Ltd Agenda First Subsea Trends in Offshore Handling Deepwater Handling Challenges Ball and Taper Technology

More information

Subsea Lift. Inwell and caisson lifting systems

Subsea Lift. Inwell and caisson lifting systems Subsea Lift Inwell and caisson lifting systems Two Decades of Subsea Experience With more than 70 percent of the Earth s surface covered by water, it was inevitable for oil and gas fields to eventually

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

Controls and Communications Connectors Diamould electrical connectors

Controls and Communications Connectors Diamould electrical connectors Controls and Communications Connectors Diamould electrical connectors APPLICATIONS Subsea production systems controls Connectivity to tree, manifold, choke, and chemical injection metering valve (CIMV)

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE

INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE INTEGRATED SERVICES AND PRODUCTS ACROSS THE FIELD LIFE CYCLE 4 What we do 6 Why choose us? 7 Service and product capabilities For more than 35 years, we have been providing clients with standalone and

More information

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014! PT Hallin Marine June 18 th, 2014! Introduction Issues and Risks Inspection, Maintenance & Repair Case Study Conclusions and Recommendations 2 Introduction Subsea Pipeline IMR q Obtain data to assess the

More information

Advanced Technologies Diversified Solutions

Advanced Technologies Diversified Solutions Advanced Technologies Diversified Solutions HAI Technologies 2016 Commercial in Confidence Subsea Chemical Injection - SCIU Subsea Chemical Injection Unit - SCIU HAI Technologies Chemical Delivery System

More information

Advances in Subsea Integrity Monitoring Systems. Ross Macleod Business Development Director, Ashtead Technology

Advances in Subsea Integrity Monitoring Systems. Ross Macleod Business Development Director, Ashtead Technology Advances in Subsea Integrity Monitoring Systems Ross Macleod Business Development Director, Ashtead Technology Introduction to Ashtead Technology The market leading independent subsea sensor and ROV equipment

More information

Subsea Positioning In deep water

Subsea Positioning In deep water Subsea Positioning In deep water PETRONAS - PETRAD - INTSOK CCOP DEEPWATER SUBSEA TIE-BACK Damai Puri Resort & Spa, Kuching, Sarawak, MALAYSIA 24TH - 26TH January, 2011 Supplier to the oil & gas industry

More information

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013

Offshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Offshore Development Concepts: Capabilities and Limitations Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Outline Platforms Floating Structures Semi-Submersible/ Floating Production

More information

SUBSEA 101. Find more Subsea 101 case studies online

SUBSEA 101. Find more Subsea 101 case studies online SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section

More information

Offshore Construction Management Services. Capability & Experience

Offshore Construction Management Services. Capability & Experience Offshore Construction Management Services Capability & Experience Capability Overview INTECSEA has a proven track record for providing solutions to problems faced when implementing frontier projects, by

More information

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery

Flexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery Flexible Pipe Solutions a competitive approach for Shallow water development Sylvain Cabalery Agenda 1. Subsea at Technip in Brief and Asia Pacific presence 2. Flexible Pipes Solutions a. Main differences

More information

BRENT BYPASS & FRAM Subsea Projects

BRENT BYPASS & FRAM Subsea Projects BRENT BYPASS & FRAM Subsea Projects James Woods Team Lead Subsea Execution 06 April 2012 1 NGTS Overview 06 April 2012 2 Brent Bypass The opportunity exists to put in place effective means to provide the

More information

Lifting & Positioning Solutions for the Oil & Gas Industry. Onshore Offshore Subsea Marine

Lifting & Positioning Solutions for the Oil & Gas Industry. Onshore Offshore Subsea Marine Lifting & Positioning Solutions for the Oil & Gas Industry Onshore Offshore Subsea Marine 02 Company EXPERTISE HAS BEEN BUILT ON A HISTORY OF MORE THAN 100 YEARS OF ENGINEERING, CRAFTSMANSHIP, VISIONARY

More information