CERN/LHCC LHCC February 2005 LARGE HADRON COLLIDER COMMITTEE

Size: px
Start display at page:

Download "CERN/LHCC LHCC February 2005 LARGE HADRON COLLIDER COMMITTEE"

Transcription

1 LARGE HADRON COLLIDER COMMITTEE Minutes of the seventy-fourth meeting held on Wednesday and Thursday, 2-3 February 2005 CERN/LHCC LHCC February 2005 OPEN SESSION: 1. ALICE Status Report: J. Schukraft 2. Report on the 10 th Workshop on Electronics for the LHC Experiments: G. Hall 3. RD42 Status Report: H. Kagan 4. MOEDAL Status Report: J. Pinfold CLOSED SESSION: Present: S. Bertolucci (Chairman), K. Borras, P. Dauncey, J. Engelen, F. Forti, M. Hauschild, S. de Jong, V. Kekelidze, J. Knobloch, J. Martin, M. Martinez-Perez, P. McBride, C. Niebuhr, B. Peyaud, K. Potter, D. Schlatter, S. Smith*, E. Tsesmelis (Secretary), C. Vallée, T. Wyatt Apologies: J. Haba, M. Mangano *) Part time 1. PROCEDURE The Chairman welcomed the new member M. Martinez-Perez to the Committee and thanked the outgoing member T. Wyatt for his dedication and invaluable help. The minutes of the seventy-third LHCC meeting (LHCC / LHCC 73) and the report from the LCG Comprehensive Review (LHCC / G-082) were approved without modification. 2. REPORT FROM THE CHIEF SCIENTIFIC OFFICER The Chief Scientific Officer (CSO) reported on the status of the LHC Project. Installation of the QRL cryoline has restarted and installation of magnets in the LHC tunnel is expected to start in March The revised LHC machine installation schedules being prepared. 3. REPORT FROM THE ALICE REFEREES The LHCC heard a report from the ALICE referees, concentrating on the general status of the detector construction and the Technical Design Report of the Forward Detectors. Good progress was reported on various sub-detectors. Problems with the SiO 2 passivation for the SPD have been solved, bonding for the SPD has re-started at the firm VTT and the delivered front-end read-out chips for the SDD have an acceptable yield. Integration tests of the ITS and TPC will continue into April Production of TRD chambers is ongoing. The Production Readiness Review for the TRD read-out electronics is completed with the grounding for the PASA read-out chip remaining as an outstanding issue. Tendering for the TOF FEA read-out boards has started while

2 2 that for the module production is finished. Dismantling of the dipole muon magnet has started in order for it to be transported to its final position. The Muon Filter is under construction and good progress was reported on the read-out electronics. The liquid circulation system for the HMPID has been built. The Committee also heard a further report on the referees reactions to the ALICE Technical Design Report on the Forward Detectors submitted in September 2004 (LHCC / ALICE TDR 011). The next ALICE Comprehensive Review is scheduled for the March 2005 session of the LHCC. Included in this review will be the electronics schedules of all ALICE detectors and the general ALICE schedule and milestones including a just-in-time list of milestones. 4. ALICE TECHNICAL DESIGN REPORT ON THE FORWARD DETECTORS The LHCC has completed its scientific and technical evaluation of the ALICE Technical Design Report on the Forward Detectors Forward Multiplicity Detector (FMD), T0 and V0 - submitted in September The LHCC congratulates the ALICE Collaboration for the work presented in the Technical Design Report. The Committee has no major concerns. An ancillary document (LHCC /G- 90) contains items of lesser concern as well as a list of agreed milestones for monitoring the progress of the project. The LHCC review was not an engineering review, although some engineering aspects of the project were presented and discussed with the referees. The LHCC recommends that ALICE follows the established practice of conducting independent reviews of the engineering designs. Written reports should be made available to the LHCC through its referees. Recommendation The LHCC recommends general approval of the ALICE Technical Design Report on the Forward Detectors, pending a final cost evaluation. The LHCC considers the schedule given in the Technical Design Report and the list of milestones in the ancillary document to be reasonable. They will be used by the Committee to measure and regulate the future progress of the project. 5. REPORT FROM THE ATLAS REFEREES The LHCC heard a report from the ATLAS referees, concentrating on the general progress and the status of the detector construction. Good progress was reported on several ATLAS systems. Barrel Toroid 1 (BT-1) and Barrel Toroid 2 (BT-2) have been installed, construction of the Tile Calorimeter is completed and good results were obtained from the Barrel Calorimeter alignment exercise, the SCT Barrel-3 has been assembled and delivered to CERN, the TRT Barrel is close to being completed, the LAr End-cap Calorimeter has been cooleddown and filled and the ATLAS beryllium beampipe is at CERN. The Committee noted some critical technical issues. Non-conformities were reported on the Barrel Toroid 3 (BT-3) due to degraded ground insulation between the pancake conductor and the coil casing. Transport of the coil to Point 1 has been paused and BT-3 will be installed last and will now be located near the ground connection in the electrical circuit. The last coil will be ready to be installed in the ATLAS cavern in June 2005 as scheduled. The rate for the Pixel module production is ramping-up but the overall production schedule is considered to be critical. The first three Barrel MDT stations have been installed in their final ATLAS positions in the UX15 underground cavern and construction of the End-cap MDTs is on schedule. Production of TGC chambers is ongoing but the time cycle for production and testing will be shortened in order to advance the completion of all chambers from the current mid-2006 date, which is considered to be late. Manufacture of RPCs is continuing but the previously reported panel delamination problem, most likely due to the poor control of the glue technology, has not yet been resolved. A

3 3 recovery plan is being implemented with industry but the production of the panels remains critical. Integration and tests of the combined MDT/RPC systems is advancing in building BB5 but delays have been reported due to shortages in RPC units, auxiliary systems, and space and crane logistics. Finally, storage area for muon chambers has been reported and a large number of delicate transports are required in Analysis of data collected during the ATLAS Combined Test Beam (CTB) is wellunderway. Results will be shown at a dedicated workshop in February 2005 and at the June 2005 ATLAS Physics Workshop, with a view of publication towards the end of the year. 6. REPORT FROM THE CMS REFEREES The LHCC heard a report from the CMS referees, concentrating on the status of the ECAL, Tracker and Computing projects and on the CMS overall schedule. The referees reported on the ECAL. Production of crystals at BTCP continues as planned and the delivered crystals are of good quality. The next contract with BTCP is being prepared. Pre-series crystals from SIC have been delivered and are of good quality. Their radiation hardness is improving. The contract with SIC is being placed. The timely production of ECAL crystals remains a risk for the CMS schedule, but the situation is improving. Excellent progress was reported on the ECAL electronics integration and on the Manufacturing Progress Review, at which a team of two LHCC referees participated as external members. Recommendations from the review are being implemented and key components are now off the critical path. Results from the test beam analysis are excellent. Integration work to finish EB+ remains challenging but the team is well-motivated and focused. The referees also reported on the Tracker. The Tracker has long been on the critical path for completion of CMS by July Fabrication of the detector has recently incurred delays by the Hybrid electronics at the firm Cicorel and with the Thick sensors at ST Microelectronics. The problem with the poor metal via quality at Cicorel has now been solved and series production is beginning. The production contract at ST Microelectronics has been closed at the end of 2004 and Thick Sensor production has been transferred to Hamamatsu. The quality of the Hamamatsu sensors is good but the production rate is still slightly less than required. However, these delays have resulted in there being no contingency remaining in the Tracker schedule. Recommendations made at the November 2004 Manufacturing Progress Review are being implemented, including the re-organisation of the Tracker Project for the construction and integration phases. A follow-up is proposed for early 2005 in order to review the progress. The referees reported on the Computing and Physics Studies. Preparation of the Computing Technical Design Report is ongoing and is due in time for the June 2005 session of the LHCC. The Physics Technical Design Report is due at the end of 2005 and will be submitted in two volumes Volume I covering detector and software issues, and results from the full analysis while Volume II will deal with the physics reach. The Committee took note of the CMS schedule. The present CMS Master Schedule (Version 34.1) leads to the start of the Tracker installation on 1 November 2006 and the milestone to close CMS being set to 1 July However, there is strong pressure to bring forward the ready-to-close milestone. 7. REPORT FROM THE REVIEW OF COMPUTING RESOURCES FOR THE LHC EXPERIMENTS The LHCC heard a report on the Review of Computing Resources for the LHC Experiments. The Review provided a critical examination of the current estimates on computing capacity requirements in terms of disks, tapes, CPUs and networks for the Tier-0,

4 4 Tier-1 and Tier-2 centres in the light of the presently understood characteristics of the LHC experimental programme. The Review was based on the computing model documents submitted by the LHC experiments at the end of The LHCC took note of several issues and concerns. There has been a significant increase in the required computing resources compared to the LHC Computing Review of 2001 with the most significant increase for all experiments being in the amount of the required disk storage. In addition, the experiences from the recent data challenges have provided a foundation for testing the validity of the computing models but tests are at this moment incomplete. There is a concern about the validity of the data analysis components of the computing models and there is a risk that resource requirements for disks and CPUs will increase if the Grid functionality is not properly used. A report from the Review is in preparation and will include the findings and recommendation. It will include the three main recommendations from the Committee: a) the average and peak computing requirements of the four experiments require further detailed study, b) plans for the distributed analysis during the initial LHC period should be developed, c) the dependence of the computing model on factors such as the raw event size and reconstruction time should be addressed for each experiment, d) details of the ramping-up of the system in the years should be determined and a plan for the evolution of the required resources should be worked out, e) a complete accounting of the offline computing resources required at CERN is needed for the period , and f) requests for Tier-1 / Tier-2 functionality at CERN should be supported and the associated planning should be refined for the four experiments. Preparations for the Computing Memorandum of Understanding continue and the Computing Technical Design Reports for the four experiments are due for the June 2005 session of the LHCC. 8. REPORT FROM THE LCG REFEREES The LHCC heard a report from the LCG referees, concentrating on the follow-up to the Comprehensive Review in November Conclusions from the glite Management Task Force include that the first release of the middleware be deployed at major sites by the end of May This should be in time to be included in the LCG service challenge that must demonstrate full capability in July 2005 prior to providing a stable service in the latter half of The LHCC took note of the concerns of the experiments since they were not directly involved in the process of the task force. In particular, testing of glite is needed to ensure that the new software meets the requirements of the experiments. The referees will continue following developments and will report again to the March 2005 session of the LHCC. Concerns were expressed on CASTOR at the Comprehensive Review because delivery of the new release had been delayed by nine months. Significant effort in the development and testing has been performed over the last few months. Good progress has been made and the CASTOR team is close to deploying the new version. In response to the Comprehensive Review recommendation for interoperability of the various Grid middleware, good progress has already been made. In particular, the LCG Grid team and the US Grid team have started to explore the technical aspects for interoperability and a committee has been set up to discuss and promote this issue. Several points of collaboration have been identified and real interoperability is considered to be feasible. 9. REPORT FROM THE RD42 REFEREE The LHCC heard a report from the RD42 referee on the collaboration s programme concerning the development of intrinsically radiation-hard Chemical Vapour Deposition (CVD) diamond devices.

5 5 Good progress was reported for the past year. In particular, improvements were reported on the charge collection distance of polycrystalline CVD (pcvd) diamond and good results were shown on the response, charge versus sensor thickness and the transient current measurements been made on single crystal CVD (sccvd) diamond. The Committee also took note of the continuing development of diamond pixel detectors and of applications to beam monitoring and beam abort systems for collider experiments. The LHCC considers that the proposed research programme for 2005, concentrating on the construction and test of diamond pixel detector modules with the ATLAS and CMS front-end electronic chips, the characterization of higher quality sccvd, continuation of irradiation tests and test of the beam condition monitors for use in collider experiments such as ATLAS and CMS, to be reasonable. In view of the above and given the modest request for resources for further work, the referee recommends that the R&D project be continued in A status report is expected to be submitted to the LHCC in one year s time. The Committee agrees to the continuation of the project on this basis. 10. REPORT FROM THE TOTEM REFEREE The LHCC heard a report from the TOTEM referee. The Committee took note of the TOTEM milestones on the Roman Pots and Roman Pot detectors, the T1 CSC detectors and the T2 GEM detectors and of the request for test beam in Work for preparing the Memorandum of Understanding has started and the preparation of the Letter of Intent together with CMS on diffraction physics is ongoing. 11. REPORT FROM THE MOEDAL REFEREE The Committee heard a report from the MOEDAL referee. MOEDAL proposes to identify the signature of monopoles and other highly-ionising particles through a track-etch detector marking a damage zone along the trajectory of the incoming particle. Identification of particles will be made by looking for aligned etch pits in multiple sheets. The MOEDAL detector is proposed to be installed in the LHCb Vertex Locator (VELO) region at Point 8. The referee reported on the MOEDAL work-plan for The plan consists of reporting a final design and procedures to the LHCC in June 2005, which will lead to the submission of the Technical Proposal by the end of Construction of the detector is planned for 2006 with installation scheduled for Given that the design of the LHCb detector is now complete, the technical design of the MOEDAL detector can now proceed and is to be done in close collaboration with the LHCb Collaboration in the coming months. Studies should be continued on safety issues, testing of material with relativistic heavy-ion beams and simulations of the physics processes. The Committee endorses the plan and encourages the MOEDAL Collaboration to continue developing their experimental design with a view of preparing the Technical Proposal. 12. TEST BEAMS The SPS and PS Physics Coordinator gave a report on the status of CERN s accelerator complex and on the LHC test beams. Dismantling of the former West Area test beam lines is currently underway. The Gamma Irradiation Facility (GIF) continues to operate in stand-alone mode, namely with source only and without particle beams. The former users of the West Area lines need to move to other beam areas such as to the PS East Hall or the SPS North Area. The Coordinator reported on the ongoing work at the PS and SPS. The consolidation programme is advancing well. Construction of the new CERN Control Centre (CCC), which will bring together under one roof operations hosted previously at the Meyrin Control Room (MCR), the Prevessin Control Room (PCR ), the Technical Control Room (TCR) and the LHC Cryogenics Control Room, is also progressing well.

6 6 Finally, good progress was reported on preparations of the new ion injector chain for the LHC, with the new Pb 27+ sources and electron cooling systems at CERN and with first beam into the Low Energy Ion Ring (LEIR) expected for August 2005 and commissioning of LEIR scheduled for March Commissioning of ion beams in the PS and SPS machines is scheduled to start in late He also presented the first draft schedule for operation of the CERN accelerators in The schedule is based only on accelerator technical feasibility grounds and input from the user community is requested. 13. LHCb COMPREHENSIVE REVIEW The third of the LHCC Comprehensive Reviews of LHCb took place on 31 January 1 February The LHCC referees addressed the following areas: Vertex Locator, Inner Tracker and Trigger Tracker, Outer Tracker, RICH Detectors, Calorimeters, Muon System, Trigger & Physics, Online System & Computing, and the topics of Management, Technical Coordination, Integration, Schedules and Costs. Since the previous Comprehensive Review in January 2004, the LHCb Collaboration has made very significant progress towards the realisation of an experimental set-up ready to record proton-proton collisions at the LHC. The LHCC expects LHCb to have a working detector installed in time for the beginning of LHC operation in 2007 provided the timely delivery of the sub-detectors and the smooth advancement of the production schedules is ensured. Detector technologies to be used have successfully gone through the R&D phase and construction of final components is well underway. The Electromagnetic Calorimeter (ECAL) is ready for installation, while the Hadronic Calorimeter (HCAL) is nearly ready for putting in its final position and will meet its installation milestone. Installation of the infrastructure and technical services in the experimental area are well advanced. Issues concerning interference due to the installation of LHC Machine components in the LHCb experimental hall that could potentially cause delays to the LHCb installation are being addressed. The LHCC noted as a concern the delays and resulting tight schedules in the production of the Vertex Locator (VELO), Trigger Tracker, RICH-1, and Muon System. The principal conclusions and concerns of the LHCC are summarised below. They will allow the Committee to follow up the outstanding issues and to monitor future progress of this project in forthcoming sessions of the LHCC prior to the next LHCb Comprehensive Review one year hence. The LHCC noted the good progress in the sensors, Hybrid electronics and Pitch Adaptors but expressed concern at difficulties experienced in the ancillary systems particularly the RF box, and bellows. The request for test beam in 2006 for the VELO was noted. Good progress was reported on the Inner Tracker and Trigger Tracker. The Committee will continue monitoring the status of sensor delivery and ladder production for the Trigger Tracker as these items are now on the Trigger Tracker critical path. Good progress was reported on the Outer Tracker, with its module production, infrastructure and read-out electronics advancing according to schedule. Studies of ageing effects of the Ar/CO 2 gas need to be continued and completed. Good progress was reported in all areas for the RICH-1 and RICH-2, including the mechanics, optics, magnetic shielding, and read-out electronics. The major outstanding concerns remain with the tight schedules for both the RICH-1 installation and production of the Hybrid Photo Detectors (HPDs). Significant progress was reported on the calorimeters. No major concerns were raised for the LHCb calorimeters. Construction of the calorimeters is either complete or well-advanced and good progress was reported on all ancillary systems.

7 7 Production of MWPC detectors and the associated read-out electronics has started. The Muon Filter is almost complete. The overall schedule is tight but conceivable and a significant amount of work remains for The LHCC awaits submission of the Addendum to the LHCb Muon System Technical Design Report describing the 3-GEM detector for the M1 Inner Station. Good progress was reported on the Level-0, Level-1 and High Level Trigger (HLT). The LHCC concurs with the new LHCb approach of increasing the role of data for calibration and checking of systematics. Good progress was reported on the Online System and Computing and no major concerns were noted. LHCb is on schedule to submit the Computing Technical Design Report in June The LHCC considers that the planned tests for the Online System are essential and encourages the group to continue preparing these tests. Much progress was reported on the work in the UX85 experimental cavern. The LHCC considers that although the schedule is tight, it is realistic to expect LHCb to have a working detector installed in time for the beginning of LHC operation in Installation of the LHC cryogenics line junction in the UX85 cavern has a very strong impact on the overall LHCb installation schedule. Issues related to over-costs in the RICH and Muon System are being dealt within the Resource Review Board. 14. REFEREES Following changes to the LHCC membership, the new referee teams are as follows: ALICE: P. Dauncey, J. Haba, C. Vallée (Co-ordinator) ATLAS: F. Forti, V. Kekelidze (Co-ordinator), M. Martinez-Perez CMS: S. de Jong, J. Martin (Co-ordinator), P. McBride, S. Smith LHCb: K. Borras (Co-ordinator), C. Niebuhr, B. Peyaud TOTEM: K. Borras MOEDAL: B. Peyaud LHCf: M. Mangano, C. Niebuhr RD39: S. de Jong RD42: V. Kekelidze RD50: C. Vallée LCG: F. Forti, P. McBride 15. DATES FOR LHCC MEETINGS Provisional Dates for 2005: 9-10 March May June September November

8 8 The LHCC received the following documents: RD50 Status Report (LHCC /G006) CMS Computing Model (LHCC /G83) * LHCb Computing Model (LHCC /G84) * ATLAS Computing Model (LHCC /G85) * ALICE Computing Model (LHCC /G86) * RD-42 Status Report (LHCC /RD-007) LHCb Comprehensive Review (LHCC /G89)* Review of the ALICE Forward Detectors: FMD, T0 and V0 TDR (LHCC /G90)* * restricted circulation Emmanuel Tsesmelis E mail: LHCC.Secretary@CERN.CH Tel , LHCC Secretariat: Janet Grant (Bldg. 14/4-022) Tel , janet.grant@cern.ch

CERN/LHCC LHCC September 2007 LARGE HADRON COLLIDER COMMITTEE. Minutes of the ninetieth meeting held on Tuesday, 25 September 2007

CERN/LHCC LHCC September 2007 LARGE HADRON COLLIDER COMMITTEE. Minutes of the ninetieth meeting held on Tuesday, 25 September 2007 CERN/LHCC 2007-027 LHCC 90 25 September 2007 LARGE HADRON COLLIDER COMMITTEE Minutes of the ninetieth meeting held on Tuesday, 25 September 2007 OPEN SESSION 1. LHC Status Report: Lyn Evans 2. ATLAS Status

More information

Status of ATLAS & CMS Experiments

Status of ATLAS & CMS Experiments Status of ATLAS & CMS Experiments Atlas S.C. Magnet system Large Air-Core Toroids for µ Tracking 2Tesla Solenoid for inner Tracking (7*2.5m) ECAL & HCAL outside Solenoid Solenoid integrated in ECAL Barrel

More information

What do the experiments want?

What do the experiments want? What do the experiments want? prepared by N. Hessey, J. Nash, M.Nessi, W.Rieger, W. Witzeling LHC Performance Workshop, Session 9 -Chamonix 2010 slhcas a luminosity upgrade The physics potential will be

More information

Status of the LHCb Experiment

Status of the LHCb Experiment Status of the LHCb Experiment Werner Witzeling CERN, Geneva, Switzerland On behalf of the LHCb Collaboration Introduction The LHCb experiment aims to investigate CP violation in the B meson decays at LHC

More information

The Compact Muon Solenoid Experiment at the LHC. Images of Assembly and Installation

The Compact Muon Solenoid Experiment at the LHC. Images of Assembly and Installation The Compact Muon Solenoid Experiment at the LHC Images of Assembly and Installation Contents 1. Civil Engineering Pages 8 to 13 2. Assembly in the Surface Building Pages 14 to 35 3. Lowering of the Heavy

More information

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration

The LHCb Upgrade BEACH Simon Akar on behalf of the LHCb collaboration The LHCb Upgrade BEACH 2014 XI International Conference on Hyperons, Charm and Beauty Hadrons! University of Birmingham, UK 21-26 July 2014 Simon Akar on behalf of the LHCb collaboration Outline The LHCb

More information

The Commissioning of the ATLAS Pixel Detector

The Commissioning of the ATLAS Pixel Detector The Commissioning of the ATLAS Pixel Detector XCIV National Congress Italian Physical Society Genova, 22-27 Settembre 2008 Nicoletta Garelli Large Hadronic Collider MOTIVATION: Find Higgs Boson and New

More information

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring

LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring LHCb Preshower(PS) and Scintillating Pad Detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Olloqui on behalf of the LHCb Collaboration Universitat de Barcelona, Facultat de Física,

More information

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol

PoS(VERTEX2015)008. The LHCb VELO upgrade. Sophie Elizabeth Richards. University of Bristol University of Bristol E-mail: sophie.richards@bristol.ac.uk The upgrade of the LHCb experiment is planned for beginning of 2019 unitl the end of 2020. It will transform the experiment to a trigger-less

More information

Diamond sensors as beam conditions monitors in CMS and LHC

Diamond sensors as beam conditions monitors in CMS and LHC Diamond sensors as beam conditions monitors in CMS and LHC Maria Hempel DESY Zeuthen & BTU Cottbus on behalf of the BRM-CMS and CMS-DESY groups GSI Darmstadt, 11th - 13th December 2011 Outline 1. Description

More information

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction

Herwig Schopper CERN 1211 Geneva 23, Switzerland. Introduction THE LEP PROJECT - STATUS REPORT Herwig Schopper CERN 1211 Geneva 23, Switzerland Introduction LEP is an e + e - collider ring designed and optimized for 2 100 GeV. In an initial phase an energy of 2 55

More information

Machine-Detector Interface. Emmanuel Tsesmelis / TS-LEA LHCMAC17 9 June 2005

Machine-Detector Interface. Emmanuel Tsesmelis / TS-LEA LHCMAC17 9 June 2005 Machine-Detector Interface Emmanuel Tsesmelis / TS-LEA LHCMAC17 9 June 2005 Table of Contents General Organization Experiment-Machine Communications Beam Monitoring Radiation Monitoring Machine-induced

More information

The Inner Tracker detector of the LHCb experiment.

The Inner Tracker detector of the LHCb experiment. The Inner Tracker detector of the LHCb exeriment. CERN and LHC LHCb detector Inner Tracker EPFL CERN and LHC Large Hadron Collider * collisions * 7 TeV er beam 4 exeriments: CMS & Atlas Alice and LHCb

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS CR -2015/213 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 05 October 2015 (v2, 12 October 2015)

More information

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production.

Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4 Q1-2 Q3-4. Final design and pre-production. high-granularity sfcal Performance simulation, option selection and R&D Figure 41. Overview of the time-line and milestones for the implementation of the high-granularity sfcal. tooling and cryostat modification,

More information

irpc upgrade project for CMS during HL-LHC program

irpc upgrade project for CMS during HL-LHC program irpc upgrade project for CMS during HL-LHC program 1) CMS muon spectrometer 2) irpc project 3) Team, activities, timing M. Gouzevitch (IPNL, France) and T.J Kim (Hanyang University, Korea) FJPPL/FKPPL

More information

The CMS Silicon Strip Tracker and its Electronic Readout

The CMS Silicon Strip Tracker and its Electronic Readout The CMS Silicon Strip Tracker and its Electronic Readout Markus Friedl Dissertation May 2001 M. Friedl The CMS Silicon Strip Tracker and its Electronic Readout 2 Introduction LHC Large Hadron Collider:

More information

arxiv: v2 [physics.ins-det] 20 Oct 2008

arxiv: v2 [physics.ins-det] 20 Oct 2008 Commissioning of the ATLAS Inner Tracking Detectors F. Martin University of Pennsylvania, Philadelphia, PA 19104, USA On behalf of the ATLAS Inner Detector Collaboration arxiv:0809.2476v2 [physics.ins-det]

More information

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips

Strip Detectors. Principal: Silicon strip detector. Ingrid--MariaGregor,SemiconductorsasParticleDetectors. metallization (Al) p +--strips Strip Detectors First detector devices using the lithographic capabilities of microelectronics First Silicon detectors -- > strip detectors Can be found in all high energy physics experiments of the last

More information

The ATLAS detector at the LHC

The ATLAS detector at the LHC The ATLAS detector at the LHC Andrée Robichaud-Véronneau on behalf of the ATLAS collaboration Université de Genève July 17th, 2009 Abstract The world s largest multi-purpose particle detector, ATLAS, is

More information

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration

PoS(EPS-HEP2017)476. The CMS Tracker upgrade for HL-LHC. Sudha Ahuja on behalf of the CMS Collaboration UNESP - Universidade Estadual Paulista (BR) E-mail: sudha.ahuja@cern.ch he LHC machine is planning an upgrade program which will smoothly bring the luminosity to about 5 34 cm s in 228, to possibly reach

More information

The Status of ATLAS. Xin Wu, University of Geneva On behalf of the ATLAS collaboration. X. Wu, HCP2009, Evian, 17/11/09 ATL-GEN-SLIDE

The Status of ATLAS. Xin Wu, University of Geneva On behalf of the ATLAS collaboration. X. Wu, HCP2009, Evian, 17/11/09 ATL-GEN-SLIDE ATL-GEN-SLIDE-2009-356 18 November 2009 The Status of ATLAS Xin Wu, University of Geneva On behalf of the ATLAS collaboration 1 ATLAS and the people who built it 25m high, 44m long Total weight 7000 tons

More information

Spectrometer cavern background

Spectrometer cavern background ATLAS ATLAS Muon Muon Spectrometer Spectrometer cavern cavern background background LPCC Simulation Workshop 19 March 2014 Jochen Meyer (CERN) for the ATLAS Collaboration Outline ATLAS Muon Spectrometer

More information

RD51 ANNUAL REPORT WG1 - Technological Aspects and Development of New Detector Structures

RD51 ANNUAL REPORT WG1 - Technological Aspects and Development of New Detector Structures RD51 ANNUAL REPORT 2009 WG1 - Technological Aspects and Development of New Detector Structures Conveners: Serge Duarte Pinto (CERN), Paul Colas (CEA Saclay) Common projects Most activities in WG1 are meetings,

More information

Preparing for the Future: Upgrades of the CMS Pixel Detector

Preparing for the Future: Upgrades of the CMS Pixel Detector : KSETA Plenary Workshop, Durbach, KIT Die Forschungsuniversität in der Helmholtz-Gemeinschaft www.kit.edu Large Hadron Collider at CERN Since 2015: proton proton collisions @ 13 TeV Four experiments:

More information

Development of n-in-p Active Edge Pixel Detectors for ATLAS ITK Upgrade

Development of n-in-p Active Edge Pixel Detectors for ATLAS ITK Upgrade Development of n-in-p Active Edge Pixel Detectors for ATLAS ITK Upgrade Tasneem Rashid Supervised by: Abdenour Lounis. PHENIICS Fest 2017 30th OUTLINE Introduction: - The Large Hadron Collider (LHC). -

More information

The LHCb trigger system

The LHCb trigger system IL NUOVO CIMENTO Vol. 123 B, N. 3-4 Marzo-Aprile 2008 DOI 10.1393/ncb/i2008-10523-9 The LHCb trigger system D. Pinci( ) INFN, Sezione di Roma - Rome, Italy (ricevuto il 3 Giugno 2008; pubblicato online

More information

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data

Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data Development of a Highly Selective First-Level Muon Trigger for ATLAS at HL-LHC Exploiting Precision Muon Drift-Tube Data S. Abovyan, V. Danielyan, M. Fras, P. Gadow, O. Kortner, S. Kortner, H. Kroha, F.

More information

The LHCb Experiment. Experiment and what comes after. O. Ullaland Ljubljana January Theodor Kittelsen, Soria Moria (with modifications)

The LHCb Experiment. Experiment and what comes after. O. Ullaland Ljubljana January Theodor Kittelsen, Soria Moria (with modifications) The LHCb Experiment. Our Path to a Running Experiment and what comes after. O. Ullaland Ljubljana January 2008 Theodor Kittelsen, Soria Moria (with modifications) 1 LHCb is dedicated to the Search for

More information

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Milestone Report

AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators. Milestone Report AIDA-2020-MS15 AIDA-2020 Advanced European Infrastructures for Detectors at Accelerators Milestone Report Design specifications of test stations for irradiated silicon sensors and LHC oriented front-end

More information

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. CMS detector performance.

The Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland. CMS detector performance. Available on CMS information server CMS CR -2017/412 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 08 November 2017 (v3, 17 November 2017)

More information

CERN PS, SL & ST Divisions

CERN PS, SL & ST Divisions EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH ORGANISATION EUROPÉENNE POUR LA RECHERCHE NUCLÉAIRE CERN PS, SL & ST Divisions CERN-PS-2002 CERN-SL-2002 CERN-ST-2002 1 st February 2002 TOWARDS A COMMON MONITORING

More information

arxiv: v1 [physics.ins-det] 26 Nov 2015

arxiv: v1 [physics.ins-det] 26 Nov 2015 arxiv:1511.08368v1 [physics.ins-det] 26 Nov 2015 European Organization for Nuclear Research (CERN), Switzerland and Utrecht University, Netherlands E-mail: monika.kofarago@cern.ch The upgrade of the Inner

More information

1. PUBLISHABLE SUMMARY

1. PUBLISHABLE SUMMARY Ref. Ares(2018)3499528-02/07/2018 1. PUBLISHABLE SUMMARY Summary of the context and overall objectives of the project (For the final period, include the conclusions of the action) The AIDA-2020 project

More information

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group

The LHCb VELO Upgrade. Stefano de Capua on behalf of the LHCb VELO group The LHCb VELO Upgrade Stefano de Capua on behalf of the LHCb VELO group Overview [J. Instrum. 3 (2008) S08005] LHCb / Current VELO / VELO Upgrade Posters M. Artuso: The Silicon Micro-strip Upstream Tracker

More information

arxiv: v1 [physics.ins-det] 25 Feb 2013

arxiv: v1 [physics.ins-det] 25 Feb 2013 The LHCb VELO Upgrade Pablo Rodríguez Pérez on behalf of the LHCb VELO group a, a University of Santiago de Compostela arxiv:1302.6035v1 [physics.ins-det] 25 Feb 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

More information

ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH

ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Minutes-214 21 January 2016 ORGANISATION EUROPEENNE POUR LA RECHERCHE NUCLEAIRE CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN RESEARCH BOARD MINUTES OF THE 214 th MEETING OF THE RESEARCH BOARD HELD

More information

LHC Experiments - Trigger, Data-taking and Computing

LHC Experiments - Trigger, Data-taking and Computing Physik an höchstenergetischen Beschleunigern WS17/18 TUM S.Bethke, F. Simon V6: Trigger, data taking, computing 1 LHC Experiments - Trigger, Data-taking and Computing data rates physics signals ATLAS trigger

More information

Data acquisition and Trigger (with emphasis on LHC)

Data acquisition and Trigger (with emphasis on LHC) Lecture 2 Data acquisition and Trigger (with emphasis on LHC) Introduction Data handling requirements for LHC Design issues: Architectures Front-end, event selection levels Trigger Future evolutions Conclusion

More information

LHC detector upgrade challenges

LHC detector upgrade challenges LHC detector upgrade challenges Outline: Introduction LHC machine phase I and II -> overall detector limitations Phase I detector changes for ATLAS and CMS Phase II challenges, some examples LHCb and ALICE

More information

The LHCb VELO Upgrade

The LHCb VELO Upgrade Available online at www.sciencedirect.com Physics Procedia 37 (2012 ) 1055 1061 TIPP 2011 - Technology and Instrumentation in Particle Physics 2011 The LHCb VELO Upgrade D. Hynds 1, on behalf of the LHCb

More information

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project LHC Project Document No. CERN Div./Group or Supplier/Contractor Document No. AC/TCP EDMS Document No. 107398 Date: 1999-11-16 Quality

More information

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements

8.882 LHC Physics. Detectors: Muons. [Lecture 11, March 11, 2009] Experimental Methods and Measurements 8.882 LHC Physics Experimental Methods and Measurements Detectors: Muons [Lecture 11, March 11, 2009] Organization Project 1 (charged track multiplicity) no one handed in so far... well deadline is tomorrow

More information

Thin Silicon R&D for LC applications

Thin Silicon R&D for LC applications Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC Next Linear Collider:Physic requirements Vertexing 10 µ mgev σ r φ,z(ip ) 5µ m 3 / 2 p sin

More information

Status of the LHCb experiment

Status of the LHCb experiment Status of the LHCb experiment Elie Aslanides CPPM, IN2P3-CNRS et Université de la Méditerranée, France on behalf of the LHCb Collaboration LISHEP Itacuruçá, Rio de Janeiro, April 4, 2006 Introduction LHCb

More information

VELO: the LHCb Vertex Detector

VELO: the LHCb Vertex Detector LHCb note 2002-026 VELO VELO: the LHCb Vertex Detector J. Libby on behalf of the LHCb collaboration CERN, Meyrin, Geneva 23, CH-1211, Switzerland Abstract The Vertex Locator (VELO) of the LHCb experiment

More information

Specifications of the RF box for the upgraded LHCb vertex detector

Specifications of the RF box for the upgraded LHCb vertex detector date: 2014-04-17 Specifications of the RF box for the upgraded LHCb vertex detector authors: MD,JK,PW,RW,TK,WH (Nikhef/VU) Contents 1 Introduction 1 2 Design 2 2.1 3D model.................................

More information

LHCb Trigger & DAQ Design technology and performance. Mika Vesterinen ECFA High Luminosity LHC Experiments Workshop 8/10/2016

LHCb Trigger & DAQ Design technology and performance. Mika Vesterinen ECFA High Luminosity LHC Experiments Workshop 8/10/2016 LHCb Trigger & DAQ Design technology and performance Mika Vesterinen ECFA High Luminosity LHC Experiments Workshop 8/10/2016 2 Introduction The LHCb upgrade will allow 5x higher luminosity and with greatly

More information

Large Silicon Tracking Systems for ILC

Large Silicon Tracking Systems for ILC Large Silicon Tracking Systems for ILC Aurore Savoy Navarro LPNHE, Universite Pierre & Marie Curie/CNRS-IN2P3 Roles Designs Main Issues Current status R&D work within SiLC R&D Collaboration Tracking Session

More information

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group

The LHCb Vertex Locator : Marina Artuso, Syracuse University for the VELO Group The LHCb Vertex Locator : status and future perspectives Marina Artuso, Syracuse University for the VELO Group The LHCb Detector Mission: Expore interference of virtual new physics particle in the decays

More information

ATLAS ITk and new pixel sensors technologies

ATLAS ITk and new pixel sensors technologies IL NUOVO CIMENTO 39 C (2016) 258 DOI 10.1393/ncc/i2016-16258-1 Colloquia: IFAE 2015 ATLAS ITk and new pixel sensors technologies A. Gaudiello INFN, Sezione di Genova and Dipartimento di Fisica, Università

More information

LHC/ATLAS Upgrade Review

LHC/ATLAS Upgrade Review LHC/ATLAS Upgrade Review KEK, Nov 22-23, 2013 Review committee: J Dorfan, E Elsen (chair), F Gianotti, M Lamont, J Nash, M Nojiri, L Rossi, A Schopper and B Strauss. Apologies were received from K Yokoya.

More information

Aging studies for the CMS RPC system

Aging studies for the CMS RPC system Aging studies for the CMS RPC system Facultad de Ciencias Físico-Matemáticas, Benemérita Universidad Autónoma de Puebla, Mexico E-mail: jan.eysermans@cern.ch María Isabel Pedraza Morales Facultad de Ciencias

More information

Stato del progetto RICH di LHCb. CSN1 Lecce, 24 settembre 2003

Stato del progetto RICH di LHCb. CSN1 Lecce, 24 settembre 2003 Stato del progetto RICH di LHCb CSN1 Lecce, 24 settembre 2003 LHCb RICH detectors Particle ID over 1 100 GeV/c provided by 2 RICH detectors RICH2: No major changes since RICH TDR PRR in february 2003 Superstructure

More information

Recommended Locations of Beam Loss Monitors for the ATLAS Roman Pots

Recommended Locations of Beam Loss Monitors for the ATLAS Roman Pots LHC Project Note 397 19 March 2007 Richard.Hall-Wilton@cern.ch Recommended Locations of Beam Loss Monitors for the ATLAS Roman Pots R.J.Hall-Wilton TS/LEA, D.Macina TS/LEA, V.Talanov TS/LEA Keywords: long

More information

The CMS Outer HCAL SiPM Upgrade.

The CMS Outer HCAL SiPM Upgrade. The CMS Outer HCAL SiPM Upgrade. Artur Lobanov on behalf of the CMS collaboration DESY Hamburg CALOR 2014, Gießen, 7th April 2014 Outline > CMS Hadron Outer Calorimeter > Commissioning > Cosmic data Artur

More information

PWO Crystal ECAL. Ren-yuan Zhu California Institute of Technology May 19 th US CMS Collaboration Meeting, May 19, 2001 Ren-yuan Zhu, Caltech

PWO Crystal ECAL. Ren-yuan Zhu California Institute of Technology May 19 th US CMS Collaboration Meeting, May 19, 2001 Ren-yuan Zhu, Caltech PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001 1 The Calorimeter Supermodule 36 supermodules in barrel, 4 Dees in endcaps. 1700 crystals/supermodule, 4000 crystals/dee

More information

Mechanical Engineering

Mechanical Engineering Mechanical Engineering The Mechanical Engineering within STFC Technology is project based, projects varying in time from a few days to many years. The larger projects are usually collaborations with other

More information

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC

Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC Layout and prototyping of the new ATLAS Inner Tracker for the High Luminosity LHC Ankush Mitra, University of Warwick, UK on behalf of the ATLAS ITk Collaboration PSD11 : The 11th International Conference

More information

The LHCb Vertex Locator (VELO) Pixel Detector Upgrade

The LHCb Vertex Locator (VELO) Pixel Detector Upgrade Home Search Collections Journals About Contact us My IOPscience The LHCb Vertex Locator (VELO) Pixel Detector Upgrade This content has been downloaded from IOPscience. Please scroll down to see the full

More information

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II

Performance of the ATLAS Muon Trigger in Run I and Upgrades for Run II Journal of Physics: Conference Series PAPER OPEN ACCESS Performance of the ALAS Muon rigger in Run I and Upgrades for Run II o cite this article: Dai Kobayashi and 25 J. Phys.: Conf. Ser. 664 926 Related

More information

arxiv: v2 [physics.ins-det] 13 Oct 2015

arxiv: v2 [physics.ins-det] 13 Oct 2015 Preprint typeset in JINST style - HYPER VERSION Level-1 pixel based tracking trigger algorithm for LHC upgrade arxiv:1506.08877v2 [physics.ins-det] 13 Oct 2015 Chang-Seong Moon and Aurore Savoy-Navarro

More information

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics

Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics Installation, Commissioning and Performance of the CMS Electromagnetic Calorimeter (ECAL) Electronics How to compose a very very large jigsaw-puzzle CMS ECAL Sept. 17th, 2008 Nicolo Cartiglia, INFN, Turin,

More information

Hardware Trigger Processor for the MDT System

Hardware Trigger Processor for the MDT System University of Massachusetts Amherst E-mail: tcpaiva@cern.ch We are developing a low-latency hardware trigger processor for the Monitored Drift Tube system in the Muon spectrometer. The processor will fit

More information

Physics at the LHC and Beyond Quy Nhon, Aug 10-17, The LHCb Upgrades. Olaf Steinkamp. on behalf of the LHCb collaboration.

Physics at the LHC and Beyond Quy Nhon, Aug 10-17, The LHCb Upgrades. Olaf Steinkamp. on behalf of the LHCb collaboration. Physics at the LHC and Beyond Quy Nhon, Aug 10-17, 2014 The LHCb Upgrades Olaf Steinkamp on behalf of the LHCb collaboration [olafs@physik.uzh.ch] Physics at the LHC and Beyond Quy Nhon, Aug 10-17, 2014

More information

Results of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades

Results of FE65-P2 Pixel Readout Test Chip for High Luminosity LHC Upgrades for High Luminosity LHC Upgrades R. Carney, K. Dunne, *, D. Gnani, T. Heim, V. Wallangen Lawrence Berkeley National Lab., Berkeley, USA e-mail: mgarcia-sciveres@lbl.gov A. Mekkaoui Fermilab, Batavia, USA

More information

The ALICE Upgrade. W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 3rd, 2016

The ALICE Upgrade. W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 3rd, 2016 The ALICE Upgrade W. Riegler, ECFA HL-LHC Experiment Workshop, Oct. 3rd, 2016 ALICE Upgrade Strategy Goal: o High precision measurements of rare probes at low p T, which cannot be selected with a trigger.

More information

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS

NAMING CONVENTIONS FOR BUILDINGS AND CIVIL ENGINEERING WORKS CH-1211 Geneva 23 Switzerland the Large Hadron Collider project Div./Group or Supplier/Contractor Document No. AC/TCP EDMS Document No. 107398 Date: 1999-10-07 Quality Assurance Definition NAMING CONVENTIONS

More information

ATLAS strip detector upgrade for the HL-LHC

ATLAS strip detector upgrade for the HL-LHC ATL-INDET-PROC-2015-010 26 August 2015, On behalf of the ATLAS collaboration Santa Cruz Institute for Particle Physics, University of California, Santa Cruz E-mail: zhijun.liang@cern.ch Beginning in 2024,

More information

Lecture 11. Complex Detector Systems

Lecture 11. Complex Detector Systems Lecture 11 Complex Detector Systems 1 Dates 14.10. Vorlesung 1 T.Stockmanns 1.10. Vorlesung J.Ritman 8.10. Vorlesung 3 J.Ritman 04.11. Vorlesung 4 J.Ritman 11.11. Vorlesung 5 J.Ritman 18.11. Vorlesung

More information

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties

Attilio Andreazza INFN and Università di Milano for the ATLAS Collaboration The ATLAS Pixel Detector Efficiency Resolution Detector properties 10 th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors Offline calibration and performance of the ATLAS Pixel Detector Attilio Andreazza INFN and Università

More information

Silicon Sensor and Detector Developments for the CMS Tracker Upgrade

Silicon Sensor and Detector Developments for the CMS Tracker Upgrade Silicon Sensor and Detector Developments for the CMS Tracker Upgrade Università degli Studi di Firenze and INFN Sezione di Firenze E-mail: candi@fi.infn.it CMS has started a campaign to identify the future

More information

Beauty Experiments at the LHC

Beauty Experiments at the LHC Beauty Experiments at the LHC Historical perspective. Why propose fixed target experiments? Gajet: beautiful beauty trigger LHB: 800 Tesla magnet and life-target. Proposed collider experiments What does

More information

The VELO Upgrade. Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a

The VELO Upgrade. Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a The VELO Upgrade Eddy Jans, a (on behalf of the LHCb VELO Upgrade group) a Nikhef, Science Park 105, 1098 XG Amsterdam, The Netherlands E-mail: e.jans@nikhef.nl ABSTRACT: A significant upgrade of the LHCb

More information

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration

ATLAS Muon Trigger and Readout Considerations. Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ATLAS Muon Trigger and Readout Considerations Yasuyuki Horii Nagoya University on Behalf of the ATLAS Muon Collaboration ECFA High Luminosity LHC Experiments Workshop - 2016 ATLAS Muon System Overview

More information

PoS(LHCP2018)031. ATLAS Forward Proton Detector

PoS(LHCP2018)031. ATLAS Forward Proton Detector . Institut de Física d Altes Energies (IFAE) Barcelona Edifici CN UAB Campus, 08193 Bellaterra (Barcelona), Spain E-mail: cgrieco@ifae.es The purpose of the ATLAS Forward Proton (AFP) detector is to measure

More information

Track Triggers for ATLAS

Track Triggers for ATLAS Track Triggers for ATLAS André Schöning University Heidelberg 10. Terascale Detector Workshop DESY 10.-13. April 2017 from https://www.enterprisedb.com/blog/3-ways-reduce-it-complexitydigital-transformation

More information

Tracking and Alignment in the CMS detector

Tracking and Alignment in the CMS detector Tracking and Alignment in the CMS detector Frédéric Ronga (CERN PH-CMG) for the CMS collaboration 10th Topical Seminar on Innovative Particle and Radiation Detectors Siena, October 1 5 2006 Contents 1

More information

High Luminosity ATLAS vs. CMOS Sensors

High Luminosity ATLAS vs. CMOS Sensors High Luminosity ATLAS vs. CMOS Sensors Where we currently are and where we d like to be Jens Dopke, STFC RAL 1 Disclaimer I usually do talks on things where I generated all the imagery myself (ATLAS Pixels/IBL)

More information

Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC

Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC Operation and Performance of the ATLAS Level-1 Calorimeter and Level-1 Topological Triggers in Run 2 at the LHC Kirchhoff-Institute for Physics (DE) E-mail: sebastian.mario.weber@cern.ch ATL-DAQ-PROC-2017-026

More information

Hardware Trigger Processor for the MDT System

Hardware Trigger Processor for the MDT System University of Massachusetts Amherst E-mail: tcpaiva@cern.ch We are developing a low-latency hardware trigger processor for the Monitored Drift Tube system for the Muon Spectrometer of the ATLAS Experiment.

More information

High-Speed Mobile Communications in Hostile Environments

High-Speed Mobile Communications in Hostile Environments High-Speed Mobile Communications in Hostile Environments S Agosta, R Sierra and F Chapron CERN IT department, CH-1211 Geneva 23, Switzerland E-mail: stefano.agosta@cern.ch, rodrigo.sierra@cern.ch, frederic.chapron@cern.ch

More information

Operation and performance of the CMS Resistive Plate Chambers during LHC run II

Operation and performance of the CMS Resistive Plate Chambers during LHC run II Operation and performance of the CMS Resistive Plate Chambers during LHC run II, Isabel Pedraza Benemérita Universidad Autónoma de Puebla On behalf of the CMS collaboration XXXI Reunión Anual de la División

More information

Overview over CERN SPS test beams

Overview over CERN SPS test beams Overview over CERN SPS test beams A. Gerbershagen On behalf of CERN Experimental Areas Group 17/1/2018 A. Gerbershagen - Overview over CERN SPS secondary beams 1 CERN Accelerator Complex SPS : protons/ions

More information

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer

Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1 upgrade of the Muon Spectrometer Advancements in Nuclear Instrumenta2on Measurement Methods and their Applica2ons 20-24 April 2015, Lisbon Congress Center Design and Construction of Large Size Micromegas Chambers for the ATLAS Phase-1

More information

The ATLAS Toroid Magnet

The ATLAS Toroid Magnet The ATLAS Toroid Magnet SUN Zhihong CEA Saclay DAPNIA/SIS 1 The ATLAS Magnet System The ATLAS Barrel Toroid Mechanical computations on the Barrel Toroid structure Manufacturing and assembly of the Barrel

More information

Current Status of ATLAS Endcap Muon Trigger System

Current Status of ATLAS Endcap Muon Trigger System Current Status of ATLAS Endcap Muon Trigger System Takuya SUGIMOTO Nagoya University On behalf of ATLAS Japan TGC Group Contents 1. Introduction 2. Assembly and installation of TGC 3. Readout test at assembly

More information

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern

The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern The 1st Result of Global Commissioning of the ATALS Endcap Muon Trigger System in ATLAS Cavern Takuya SUGIMOTO (Nagoya University) On behalf of TGC Group ~ Contents ~ 1. ATLAS Level1 Trigger 2. Endcap

More information

Trigger and Data Acquisition at the Large Hadron Collider

Trigger and Data Acquisition at the Large Hadron Collider Trigger and Data Acquisition at the Large Hadron Collider Acknowledgments This overview talk would not exist without the help of many colleagues and all the material available online I wish to thank the

More information

VErtex LOcator (VELO)

VErtex LOcator (VELO) Commissioning the LHCb VErtex LOcator (VELO) Mark Tobin University of Liverpool On behalf of the LHCb VELO group 1 Overview Introduction LHCb experiment. The Vertex Locator (VELO). Description of System.

More information

Pixel characterization for the ITS/MFT upgrade. Audrey Francisco

Pixel characterization for the ITS/MFT upgrade. Audrey Francisco Pixel characterization for the ITS/MFT upgrade Audrey Francisco QGP France, Etretat, 14/10/2015 Outline 1 The MFT upgrade 2 Pixel sensor Technology choice Full scale prototypes 3 Characterization campaign

More information

Status of UVa

Status of UVa Status of GEM-US @ UVa Kondo Gnanvo University of Virginia, Charlottesville, SoLID Collaboration Meeting @ JLab 05/15/2015 Outline GEM trackers for SoLID GEM R&D program @ UVa Plans on SoLID-GEM specific

More information

The CMS ECAL Laser Monitoring System

The CMS ECAL Laser Monitoring System The CMS ECAL Laser Monitoring System IPRD 2008 11th Topical Seminar On Innovative Particle and Radiation Detectors Adi Bornheim California Institute of Technology On behalf of the CMS ECAL Collaboration

More information

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration

CMS Tracker Upgrades. R&D Plans, Present Status and Perspectives. Benedikt Vormwald Hamburg University on behalf of the CMS collaboration R&D Plans, Present Status and Perspectives Benedikt Vormwald Hamburg University on behalf of the CMS collaboration EPS-HEP 2015 Vienna, 22.-29.07.2015 CMS Tracker Upgrade Program LHC HL-LHC ECM[TeV] 7-8

More information

The CMS HGCAL detector for HL-LHC upgrade

The CMS HGCAL detector for HL-LHC upgrade on behalf of the CMS collaboration. National Taiwan University E-mail: arnaud.steen@cern.ch The High Luminosity LHC (HL-LHC) will integrate 10 times more luminosity than the LHC, posing significant challenges

More information

Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S.

Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S. UvA-DARE (Digital Academic Repository) Measurement of the charged particle density with the ATLAS detector: First data at vs = 0.9, 2.36 and 7 TeV Kayl, M.S. Link to publication Citation for published

More information

EUDET Pixel Telescope Copies

EUDET Pixel Telescope Copies EUDET Pixel Telescope Copies Ingrid-Maria Gregor, DESY December 18, 2010 Abstract A high resolution beam telescope ( 3µm) based on monolithic active pixel sensors was developed within the EUDET collaboration.

More information

A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment

A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment 3 rd Workshop on LHCbUpgrade II LAPP, 22 23 March 2017 A High Granularity Timing Detector for the Phase II Upgrade of the ATLAS experiment Evangelos Leonidas Gkougkousis On behalf of the ATLAS HGTD community

More information

TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS

TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS IWAA2004, CERN, Geneva, 4-7 October 2004 TEST AND CALIBRATION FACILITY FOR HLS AND WPS SENSORS Andreas Herty, Hélène Mainaud-Durand, Antonio Marin CERN, TS/SU/MTI, 1211 Geneva 23, Switzerland 1. ABSTRACT

More information

A new strips tracker for the upgraded ATLAS ITk detector

A new strips tracker for the upgraded ATLAS ITk detector A new strips tracker for the upgraded ATLAS ITk detector, on behalf of the ATLAS Collaboration : 11th International Conference on Position Sensitive Detectors 3-7 The Open University, Milton Keynes, UK.

More information