Installing Windsor Slatestone Columns

Size: px
Start display at page:

Download "Installing Windsor Slatestone Columns"

Transcription

1 Installing Windsor Slatestone Columns Tools and Supplies You'll Need 1. Exterior Grade Screws use screws that are long enough to go through the faux column and firmly attach to the post behind the column. We recommend a narrow head screw (such as a #1 Robertson head trim head screw) to make touch-up easier and less noticeable. 2. Construction Adhesive/Glue we recommend either PL Premium Construction Adhesive, PL Premium Advanced 8X Construction Adhesive (which has 8X faster bonding), or Great Stuff Pro. 3. A Saw for cutting posts a circular saw, jig saw, band saw, table saw, or hand saw, it is your preference. Any woodcutting blade used with these saws will work great and cut smooth and easy. 4. Tape Measure. 5. Level. 6. Caulking gun for applying the Adhesive/Glue and Caulk. 7. FauxPanels color coordinated textured caulk. 8. Lumber as needed. Slatestone Post Column 1.) Cut the Post to Correct Height - Post covers are 41 tall. Measure up 41 on the post and cut it to this height. (Fig. 1) Note: If using a 6 x 6 post, skip ahead to Step-7. 2.) When using a 4 x 4 post, either fir out the post to 5 ½ x 5 ½ or use the optional Converter Kit Rings. 4 pieces per kit. (Fig. 2) 3.) Place the bottom ring (marked B), flange down, onto the deck. Pre-drill the four sides and attach the ring to the post using 2 galvanized screws. Use shims to make the ring snug and centered on post. (Fig. 3) 4.) Measure up 13 and 26 from the deck. Use a Speed Square to mark a line around the post at these heights. Slide the 2 rings (marked M) to these heights, shim and screw in place as described above. (Fig. 4) If attaching railings, the following must be done PRIOR to the placement and attachment of the post. 5.) Measure up and mark on the post to the height of the bottom and top rail. Fir out the post on these faces at these heights an additional 1. These will act as the landings for the rail mounts. Use a 3" x 3" x 1" block. Center the block at the scribed line. (Fig. 5) Consult local codes for height requirements of rails. 6.) Place the Column Enclosure - Slide the post over the rings, and seat the bottom of the post into the bottom ring. Face screw the post to the rings using 2 galvanized screws. It is best to screw through the post in a grout line or at the base of a rock. This will make it easier to hide the screws. Measure up 13 and 26 and screw through the rings at this height. (Fig. 6)

2 7.) Place the top ring and set in the top of the post. Shim to make the post plumb. Screw through the indented areas into the post. (Fig. 7) If using a 6 x 6 post, simply cut the post to 41", slide the post cover over the post, and secure using 2 ½ galvanized screws as described in #6 above. Be sure and shim the top of the post to make it plumb before screwing the post cover to the post. 8.) Attaching the Cap - Apply adhesive around the top surface of the post. (Fig. 8) In addition, apply adhesive to the inside top of the cap along the inside ledge. 9.) Install Rail Mounts - After locating the desired height of the railing, measure up on the outside of the post cover, and select the spot to place the rail mount. Trace the area of the stone you d like to cut, where you ll be fitting Trex universal mounts. (Fig ) 10.) Using a carpenter knife or chisel, cut out the high points of the artificial stone to achieve a smooth, flat surface. When the mounting location is ready, dry fit the Trex mount to the fake stone surface. (Fig ) 11.) Using two 3" deck screws minimum, attach the mount to the post, screwing through the pillar into the landing attached in Step 5. (Fig ) 12.) Finish the job using Windsor Textured Caulk and Touch-up kit to cover any space around the mountings and to hide screw heads. (Textured Caulk and Touch-Up kits sold separately). (Fig. 16) Slatestone Split Post Columns 1.) Cut the Post to Correct Height - Post covers are 41 tall. Measure up 41 on the post and cut it to this height. (Fig. 1) Note: If using a 6 x 6 post, skip ahead to Step-7. 2.) When using a 4 x 4 post, either fir out the post to 5 ½ x 5 ½ or use the optional Converter Kit Rings. 4 pieces per kit. (Fig. 2) 3.) Place the bottom ring (marked B), flange down, onto the deck. Pre-drill the four sides and attach the ring to the post using 2 galvanized screws. Use shims to make the ring snug and centered on post. (Fig. 3)

3 4.) Measure up 13 ½ and 27 ½ from the deck. Use a Speed Square to mark a line around the post at these heights. Slide the 2 rings (marked M) to these heights, shim and screw in place as described above. Place the top ring (marked T) and seat in the top of the post. (Fig. 4) If attaching railings, the following must be done PRIOR to the placement and attachment of the post. 5.) Measure up and mark on the post to the height of the bottom and top rail. Fir out the post on these faces at these heights an additional 1. These will act as the landings for the rail mounts. Use a 3" x 3" x 1" block. Center the block at the scribed line. (Fig. 5) Consult local codes for height requirements of rails. 6.) Position Side 1, with the arrow facing up. Seat the bottom of the post into the bottom ring. Face screw the post to the rings using 2 1/2" galvanized screws. It is best to screw through the post in a grout line or at the base of a rock. This will make it easier to hide the screws. Measure up 14" and 28" and screw through into the rings at this height. The posts are designed with a grout line at these heights. (Fig. 6) 7.) Shim to make the post plumb. Screw through the indented areas into the post. (Fig. 7) 8.) After securing side 1 in place, move side 2 into place. Make sure the arrow is facing up. Dry fit the piece to make sure all interlocking sections line up and are tight. Secure side 2 at the ring heights described above. (Fig. 8) 9.) Attaching the Cap - Apply adhesive around the top surface of the post. (Fig. 9) In addition, apply adhesive to the inside top of the cap along the inside ledge. (Fig. 10) 10.) Install Rail Mounts - After locating the desired height of the railing, measure up on the outside of the post cover, and select the spot to place the rail mount. Trace the area of the stone you d like to cut, where you ll be fitting Trex universal mounts. (Fig ) 11.) Using a carpenter knife or chisel, cut out the high points of the artificial stone to achieve a smooth, flat surface. When the mounting location is ready, dry fit the Trex mount to the fake stone surface. (Fig ) 12.) Using two 3" deck screws minimum, attach the mount to the post, screwing through the pillar into the landing attached in Step 5. (Fig )

4 13.) Finish the job using Windsor Textured Caulk and Touch-up kit to cover any space around the mountings and to hide screw heads. (Textured Caulk and Touch-Up kits sold separately). (Fig. 17) Slatestone Column Wraps 1.) Fir out the desired column to 14 ¼ x 14 ¼. Starter Strip - Determine the height above ground the bottom of the column should be. Measure up 2 ¾ from this point and strike a level line. Attach the top of the starter strip on this line. Level and attach starter strip on each face, stopping 2" from each corner. Optional: The panels can be face screwed at the bottom to eliminate the need for a starter strip. The screw heads will need to be caulked and painted for finished results. Paint Kit and caulk are sold separately. 2.) Each box contains 4 pieces, marked 1-4. Attach the male panel (number 1). Slide down and seat panel 1 onto the starter strip and attach on the screw hem guide points. 3.) Next, place the side pieces, (number 2 and 3) into the dovetail joints and check for tightness. From panel 1, panel 2 is on the right side, and panel 3 is on the left side. Make sure to place all panels with the top arrow pointing up. 4.) Attach panel number 4 at the base, then slide into panels 2 and 3. Make sure joints are tight, then screw at the top using the screw hem guide points. 5.) To make columns higher than 30, simply stack the next course using the tongue and groove attachment for the bottom, and the screw hem at the top. 6.) The 18" Post Cap is designed to fit the Slatestone Column with or without the screw hems. Screw Attachment: Drive one screw per side through the bottom lip of the cap all the way into the substrate. Be Careful to angle the Screws so they don t run through the top of the cap. Do not overdrive screws.

5 7.) Adhesive Attachments with Screw Hem: If the top course ends with the screw hem attached: Place adhesive in each corner of the cap and secure. 8.) Adhesive Attachments without Screw Hem: If the top course of corners has the screw hems cut off, face screw each piece 1 from the top so that the cap covers the screw heads. Place adhesive on inside cutouts as shown. Important Info... Be sure to follow and obey all safety rules and recommendations set forth by tool manufacturers. Always follow any, and all, local, state, and federal building codes. Always comply with any specified clearances set forth by the manufactures of stoves, fireplaces, furnaces, and any other heat sources, as well.

Install Windsor Corners

Install Windsor Corners Install Windsor Corners Tools and Supplies You'll Need 1. Exterior Grade Screws use screws that are long enough to go through the FauxPanel and firmly attach to the wall behind the FauxPanel. We recommend

More information

Inspired by Nature NEXTSTONE INSTALLATION MANUAL

Inspired by Nature NEXTSTONE INSTALLATION MANUAL Inspired by Nature NEXTSTONE INSTALLATION MANUAL CONTENTS Forward and Important Notes 3 Product Line.. 4 7 Basic Tools.. 8 Preparing the Wall.. 9 10 Starter Strip Installation. 11 Corner Installation.....

More information

Inspired by Nature NEXTSTONE INSTALLATION MANUAL

Inspired by Nature NEXTSTONE INSTALLATION MANUAL Inspired by Nature NEXTSTONE INSTALLATION MANUAL CONTENTS Forward and Important Notes 3 Product Line.. 4 7 Basic Tools.. 8 Preparing the Wall.. 9 10 Starter Strip Installation. 11 Corner Installation.....

More information

Installation Instructions for easy to install Texture Plus faux wall panels

Installation Instructions for easy to install Texture Plus faux wall panels Installation Instructions for easy to install Texture Plus faux wall panels Questions? Web chat, phone or email us. Easy Instructions For Use We make easy to install faux wall panels that look amazingly

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

Wall Panel Installation

Wall Panel Installation Wall Panel Installation Special care must be taken in handling of panels with grout lines, especially in cold weather. The indented grout lines are by necessity a little thinner than other areas of the

More information

Versette Cultured Stone Installation Instructions with Universal Corner

Versette Cultured Stone Installation Instructions with Universal Corner Versette Cultured Stone Installation Instructions with Universal Corner Personal Protective Equipment: 1. Safety Glasses/Goggles 2. NIOSH approved N-95 Series disposable particulate filtering face piece

More information

CONTENTS. Forward Important Notes 4. Product Line Basic Tools and Equipment Preparing the Wall

CONTENTS. Forward Important Notes 4. Product Line Basic Tools and Equipment Preparing the Wall FORWARD Compared to real or cast stone, StoneWorks polyurethane products are designed for an easier and quicker installation because it requires fewer steps and does not require masonry skills. This manual

More information

Adorn Mortarless Stone Veneer Installation Natural Concrete Products

Adorn Mortarless Stone Veneer Installation Natural Concrete Products Adorn Mortarless Stone Veneer Installation Adorn Mortarless Stone Veneer can be used on new or existing construction. Adorn is nailed or screwed onto the wall; therefore no brick ledge is required. Adorn

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS TOOLS REQUIRED Rechargeable, variable speed drill 3/8 diameter drill bit 3 Robertson bits #0, #1 and #2 Slot screwdriver Non marring hammer with 1 head Level Caulk or sealant

More information

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CCRR-0171 PFS AA-652 Drill/power screwdriver Assorted drill bits Hammer Miter or circular

More information

Installation Instructions Palladium Square Edge Panels

Installation Instructions Palladium Square Edge Panels Please read all instructions before installing wall panels Important 1. Before installation: a. Acclimate Palladium Panels, Trim, adhesives and wall substrates to room temperature 24 hours before installation.

More information

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS

INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS INOVO 4-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

How-to-Install. Laminate Countertops and Sheet Laminate. FREE brochure Reverso en español

How-to-Install. Laminate Countertops and Sheet Laminate. FREE brochure Reverso en español FREE brochure Reverso en español How-to-Install Laminate Countertops and Easy to install instructions provided inside Multiple colors available for unique design options Durable and easy to care for Accessory

More information

SLATTEX (Textured Slatwall) INSTALLATION GUIDE

SLATTEX (Textured Slatwall) INSTALLATION GUIDE SLATTEX (Textured Slatwall) INSTALLATION GUIDE Preparing for the Installation: Here are some suggestions to help you to help you simplify the installation process and maximize the beauty of your 3D Textured

More information

Before You Begin... TOOLS & PRODUCT INVENTORY

Before You Begin... TOOLS & PRODUCT INVENTORY Fireplace Surround Installation Instructions STANDARD WOOD FRAMING ONLY Congratulations on selecting an Eldorado Fireplace Surround! Eldorado Fireplace Surrounds have been designed to install in just 5

More information

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional

More information

Installation Guidelines

Installation Guidelines Installation Guidelines Tando Building Products provides these instructions as general guidelines only. Tando Building Products neither installs exterior cladding nor has any control over any installation.

More information

Product number: TS-CS/6 x 24 - TB - S

Product number: TS-CS/6 x 24 - TB - S Mincey Marble Mfg., Inc. 4321 Browns Bridge Road Gainesville, GA 30504 Ph: 800.533.1806 Fx: 770.531.0935 www.minceymarble.com Installation Instructions for Mincey Marble Manufacturing s Contemporary 6

More information

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2

2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2 Level Railing Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster Connectors installed)

More information

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5.

Block Frame Inovo Patio Door/Transom/Sidelite Field Mulling Instructions. simonton.com/installation. If mulling sidelites, skip to Step 5. Effective Date: 10/1/17 Tools Needed Kit Contents Safety Glasses Cordless Drill Phillips Screw Bit Two-step Drill Bit (3/8-1/8 ) Utility Knife Interior Mullion Exterior Mullion Cover Hardware Kit Clamps

More information

2017 UPDATED INSTALLATION INSTRUCTIONS

2017 UPDATED INSTALLATION INSTRUCTIONS 2017 UPDATED INSTALLATION INSTRUCTIONS with square composite or round metal balusters Manufactured by fiberondecking.com 800.573.8841 Horizon Railing 6 ft. and 8 ft. Installation Instructions Required

More information

INOVO 2-LITE SLIDING PATIO DOOR

INOVO 2-LITE SLIDING PATIO DOOR INOVO 2-LITE SLIDING PATIO DOOR ASSEMBLY AND INSTALLATION INSTRUCTIONS IMPORTANT: READ THE INSTRUCTIONS AND FAMILIARIZE YOURSELF WITH THE DOOR PARTS AND PIECES BEFORE BEGINNING ASSEMBLY AND INSTALLATION.

More information

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M Level Railing Installation Guide Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support #909915 Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster

More information

Balustrade Systems / Installation Instructions

Balustrade Systems / Installation Instructions A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST AFCO-Rail Post INSTALLATION INSTRUCTIONS TOOLS REQUIRED: Drill Bits (for the appropriate fastener) Drill (with adjustable clutch, recommended) Level String Line Tape Measure Tools to install fasteners

More information

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( )

Installation Guide. Pionite Decorative Surfaces One Pionite Road, Auburn, Maine PIONITE ( ) Installation Guide A Subsidiary of Panolam Surface Systems SMPBRO00-012 6/14 Pionite decorative laminates are designed for finished interior surfaces which require high impact, wear and stain resistance

More information

Revision Date: April 01, Paramount Enclosure

Revision Date: April 01, Paramount Enclosure Paramount Enclosure www.urbanindustries.com 15 Urban Industries, Inc. 2008 Tools The following tools are recommended for the installation of the Paramount Aluminum Enclosure and roof. 1 2 Level 1 4 Level

More information

Pocket Door Installation Instructions

Pocket Door Installation Instructions Installation Instructions Before getting started: Read instructions thoroughly. Be sure that you have the necessary tools and materials before starting the installation. Consult your local building code

More information

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside.

4. Partially open the operating panel and tilt the top toward the interior of the door (Figure 4). Lift the panel off the sill and set it aside. Effective Date: 10/1/2017 Tools Needed Kit Contents Hardware Kit Safety Glasses Cordless drill Phillips screw bit Two-step drill bit (3/8-1/8 ) utility knife Interior Mullion Exterior Mullion Cover clamps

More information

Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked - IL Panel System. Product number TS-VS/6 x 24 - Stacked - IL

Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked - IL Panel System. Product number TS-VS/6 x 24 - Stacked - IL Mincey Marble Mfg., Inc. 4321 Browns Bridge Road Gainesville, GA 30504 Ph: 800.533.1806 Fx: 770.531.0935 www.minceymarble.com Installation Instructions for Mincey Marble Manufacturing s 6 x 24 - Stacked

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

Suspension/Flogging Rack Design

Suspension/Flogging Rack Design This is a rack that can be transported and set up by one person, requires no tools for set up and has no bolts. Structurally it goes together using mortis and tenon joints. It can be used for suspensions

More information

Product number TS-CS/12 x 12. Please read the following before attempting to install your new 12 x 12 Contemporary cast marble panel system

Product number TS-CS/12 x 12. Please read the following before attempting to install your new 12 x 12 Contemporary cast marble panel system Mincey Marble Mfg., Inc. 4321 Browns Bridge Road Gainesville, GA 30504 Ph: 800.533.1806 Fx: 770.531.0935 www.minceymarble.com Installation Instructions for Mincey Marble Manufacturing s 12 x 12 Contemporary

More information

TREX TRANSCEND RAILING

TREX TRANSCEND RAILING RAILING NOTES:» RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED.» All

More information

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap.

Cabinet is 90% assembled, all you need to do is to attach the legs, lay the glass top on the cabinet, connect the faucet, drains & ptrap. Things you might need for the installation: vessel sink, plumber's putty(home depot), liquid nails(home depot), Bucket silicone caulk(home depot), Putty knife Plumber's putty Pipe wrench Channel-lock pliers

More information

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames

IDP Entry-Fit Steel Door Frames. Installation Instructions K2A and NK2A Series Frames IDP Entry-Fit Steel Door Frames Installation Instructions K2A and NK2A Series Frames IDP Inc 21300 W. 8 Mile Rd. Southfield, MI 48075 1-877-645-2770 www.idpframes.com email: info@idpframes.com K2A and

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

Regency Railing. Rail Installation Instructions

Regency Railing. Rail Installation Instructions Regency Railing Rail Installation Instructions Prior to installing railing: Please consult local zoning laws in regards to load requirements and bottom space requirements for rails. All supporting structures

More information

Tape Measure Metal Clippers Screw Bit Set With Extensions

Tape Measure Metal Clippers Screw Bit Set With Extensions IMPORTANT: Read through instructions thoroughly before beginning to replace any damaged material. Minor damage can be fixed with a fiberglass repair kit and color matched paint. Tools Required Tape Measure

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

PVC Column Wraps - Semi-Assembled INSTALLATION INSTRUCTIONS

PVC Column Wraps - Semi-Assembled INSTALLATION INSTRUCTIONS - Semi-Assembled INSTALLATION INSTRUCTIONS Page 1 of 2 Materials Needed Safety Glasses Pencil Tape Measure Miter, Jig or Skill Saw Combination Square Hammer or Air Nailer Nail Countersink Flat Head Fasteners

More information

PORCH-LOC INSTALLATION INSTRUCTIONS

PORCH-LOC INSTALLATION INSTRUCTIONS PORCH-LOC INSTALLATION INSTRUCTIONS 2017 HB&G Building Products, Inc. Porch-Loc Installation Instructions NOTE: DISCARD THE INSTALLATION INSTRUCTIONS AND HARDWARE THAT CAME IN YOUR PERMAPOST PACKAGING

More information

Canadian Installation Guide

Canadian Installation Guide Canadian Installation Guide Revised October 22, 2014 GenStone products are designed to provide a realistic look of stone or rock. Although installation of GenStone is much easier than traditional masonry

More information

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501) Disclaimer: Deck Rail Glass Railing Installation Guide This guide is not intended to replace a trained professional installer. The drawings and instructions contained within are for demonstration purposes

More information

WOODWORKS Walls. Installation Instructions WALL

WOODWORKS Walls. Installation Instructions WALL WALL Systems Between us, ideas become reality WOODWORKS Walls Installation Instructions 1. GENERAL 1.1. Product Description WoodWorks walls consist of 2' x 4', 2' x 8', 2' x 9' or 2' x 10' perforated and

More information

Installation Guide. Tools Recommended:

Installation Guide. Tools Recommended: Installation Guide GenStone products are designed to provide a realistic look of stone or rock at a fraction of the installed cost. To achieve this, we have engineered the time and hassle out of installation

More information

Harmony 1/4 Glass Railing Installation Instructions - Deck Application

Harmony 1/4 Glass Railing Installation Instructions - Deck Application Harmony 1/4 Glass Railing Installation Instructions - Deck Application Items Required for Installation Appropriate fasteners for mounting posts to deck Miter saw with carbide-tipped non-ferrous blade Cordless

More information

Make every component count.

Make every component count. Make every component count. Technical Bulletin Installation Instructions ABOUT THE MATERIAL The frame and material have been thoroughly tested for strength, durability and low maintenance, offering a never

More information

modular/panel-built sauna kit

modular/panel-built sauna kit modular/panel-built sauna kit installation instructions Please immediately check for any hidden damage that may have occurred in shipping. If any damage is found you must notify the delivering carrier

More information

Safety First! Review the Safety Checklist before performing tasks in this chapter.

Safety First! Review the Safety Checklist before performing tasks in this chapter. Chapter 17. Cabinets 17.1 LAYING OUT KITCHEN CABINET UPPER UNITS 17.2 INSTALLING KITCHEN CABINET SUPPORT STRIPS 17.3 INSTALLING KITCHEN CABINET UPPER UNITS 17.4 INSTALLING RANGE HOOD 17.5 INSTALLING KITCHEN

More information

Installa on Guide: Fence Distributors. YourNextFence.com

Installa on Guide: Fence Distributors. YourNextFence.com TM YourNextFence.com Plan Your Fence each line by dividing the length of each line in inches by 97. Round any remainder up. 2 Calculate Materials Tools Needed Stakes Circular Saw String Line Drill Marking

More information

Harvest (8094) Mystic (8078) Niagara (8095) Shenandoah (8057) 2 DURATA MORTARLESS STONE DURATA FLAT KIT PROFILE #:

Harvest (8094) Mystic (8078) Niagara (8095) Shenandoah (8057) 2 DURATA MORTARLESS STONE DURATA FLAT KIT PROFILE #: INSTALLATION GUIDE DURATA FLAT KIT PROFILE #: 75524510 PACKAGE CONTENTS: 3 flat panels 6 transitions 3 bracket kits (6 brackets, 12 screws) COVERAGE PER KIT: 7.08 sq ft. DURATA CORNER KIT PROFILE #: 75526011

More information

Wall Panel Installation Instructions

Wall Panel Installation Instructions Panel Installation Instructions Demolition - Common Tools Needed Reciprocating Saw Allen Wrench Set Hole Saw Set Pry Bar Dust Pan and Brush Putty Knife / Scraper Hex Bit Socket Set All Necessary Safety

More information

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally

More information

- Before You Begin - Standard Apex / Tall Apex Shed Kit Instructions IMPORTANT!

- Before You Begin - Standard Apex / Tall Apex Shed Kit Instructions IMPORTANT! Customer Service: (801)754-3334 810 W Utah Ave #8 Payson, Utah 84651 email: apexshedcompany@gmail.com Standard Apex / Tall Apex Shed Kit Instructions Tools Needed: Framing Hammer Tape Measure (25 ft.)

More information

Pattern Descriptions and Dimensions

Pattern Descriptions and Dimensions Engraving Not Provided Pattern Texture Code T H W ADDRESS PLAQUE, SMALL Smooth face, chiseled edges. 790 1.5 7.5 17 ADDRESS PLAQUE, GRANDE Smooth face, chiseled edges. 791 1.5 10.5 15 Packaging Item #

More information

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions TREX ENHANCE RAILING (Also Applies to Trex Select Railing) NOTE: All Enhance Railing lengths are manufactured at CLEAR SPAN dimensions (spanning between space of posts): 7" for 6' clear span. Note that

More information

INSTALLATION INSTRUCTIONS for EVERROCK SKIRTING

INSTALLATION INSTRUCTIONS for EVERROCK SKIRTING INSTALLATION INSTRUCTIONS for EVERROCK SKIRTING EVERLOCK SYSTEMS, INC. (ESI) has provided these suggested instructions as installation guidelines. ESI; however, neither installs the panels nor has any

More information

TREX PERGOLA INSTALLATION INSTRUCTIONS

TREX PERGOLA INSTALLATION INSTRUCTIONS RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket

More information

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

Fireball Fab Welded Baluster Insert Panel System Installation Instructions Fireball Fab Welded Baluster Insert Panel System Installation Instructions Prior to construction, check with your local regulatory agency for special code requirements in your area. Common railing height

More information

Parts List. Description. Installation Instructions

Parts List. Description. Installation Instructions Page 1 of 7 Parts List Aluminum Coping Hardware Kit 1 pkg Tek screws 1 tek screw nut driver 1 Snap strip removal tool 1 can Touch up spray paint 1 11/64 drill bit 8 pieces 1/8 Gray PVC 4 long 2 boxes Aluminum

More information

Installation Instructions

Installation Instructions Installation Instructions Follow these simple instructions to install your OneDayCab! IMPORTANT: Unpack and check shipment for damage. Verify color, size and parts before demolition. Installation of interiors

More information

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 INSTALLATION INSTRUCTIONS Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 LEVEL RAIL WITH CAP The testing was performed in accordance with procedures and methods referenced

More information

Chapter 9. Windows and Exterior Doors

Chapter 9. Windows and Exterior Doors Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail apron

More information

POST INSTALL INSTRUCTIONS

POST INSTALL INSTRUCTIONS POST INSTALL INSTRUCTIONS Layout your deck or patio to optimize the railing sections and posts. Use speed square for placement of post. Important to have blocking below decking and fastened to or through

More information

Installation Guidelines

Installation Guidelines Page 1 Two inch () Porch Screening System Extruded Screen Walls Only Kit Installation Guidelines Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Chop saw with a metal

More information

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11

CONTENTS. Transitions Board and Batten Vertical Installation... 10,11 INSTALLATION MANUAL CONTENTS Important Notes... 2-4 Weather Protective Barriers... 2 Storage and Transportation... 2 Tools and Equipment... 2 Fastener Choices... 3 Wall Preparation... 3,4 Flashing... 4

More information

Installation Instructions. Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX

Installation Instructions. Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX Conventional Wainscot Wall Padding Panels MODEL # RWC25321 RWC26321 RWC253X1 RWC263X1 RWC25321 RWC25XXX RWC26XXX Installation Instructions FOR CONVENTIONAL PANELS 07/05 SPT050026 CUSTOMIZED PADS We offer

More information

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website

Grade 11 Woods Lift Lid Coffee Table. Based on Under the big Top from Popular Mechanics Website Grade 11 Woods Lift Lid Coffee Table Based on Under the big Top from Popular Mechanics Website TABLE TOP 1. Select enough lumber to construct a top that is between 22 ½ and 24 wide after jointing. Ensure

More information

Windsor Chair Online. Assembly Instructions

Windsor Chair Online. Assembly Instructions Windsor Chair Online Assembly Instructions Date: 1/4/2007 Other Chairs Offered Philadelphia Arm Chair New England Comb Back Sackback d Arm Chair Bow Back Side Chair Fan Back Side Chair Page 1 Table of

More information

Chapter 20. Exterior Finish Work

Chapter 20. Exterior Finish Work Chapter 20. Exterior Finish Work 20.1 INSTALLING STORM DOORS 20.2 INSTALLING TOE KICK BOARD 20.3 INSTALLING PORCH RAILS 20.4 INSTALLING HOUSE NUMBERS 20.5 INSTALLING MAILBOX 20.6 AIR SEALING EXTERIOR PENETRATIONS

More information

CUSTOM SHUTTERS IN-A-BOX

CUSTOM SHUTTERS IN-A-BOX CUSTOM SHUTTERS IN-A-BOX SHUTTER ASSEMBLE INSTRUCTIONS & INSTALLATION INSTRUCTIONS 1. Inspect the contents of your package. Do not discard the shutter packaging box until you have started painting your

More information

Endura-Stone Installation Instructions

Endura-Stone Installation Instructions Endura-Stone Installation Instructions 1. Measure the total distance from the bottom of the beam to the platform. 2. Using a jack and post, jack up the beam only enough to remove the sting post, no more

More information

Outdoor Deck Turf Tile. Installation Instructions

Outdoor Deck Turf Tile. Installation Instructions Outdoor Deck Turf Tile Installation Instructions 1 Outdoor Deck Turf Tile Installation Instructions 1 Tool Checklist: Power Tools 7 1/2 Skill saw (13 amp or more) Jigsaw (13 amp or more) Standard Drill

More information

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: 175 SERIES FIXED STAIR CABLE RAIL - INSTALLATION INSTRUCTIONS PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: FIXED STAIR TOP RAIL (1) A FIXED STAIR BOTTOM RAIL (1) B D UPPER SADDLE BRACKET (1) C BRACKET

More information

Chapter 9. Windows and Exterior Doors

Chapter 9. Windows and Exterior Doors Chapter 9. Windows and Exterior Doors 9.1 INSTALLING WINDOWS 9.2 INSTALLING EXTERIOR HOUSE DOORS 9.3 INSTALLING SHED DOOR 9.4 INSTALLING BASEMENT EGRESS COMPONENTS Tools needed by volunteers: Hammer Nail

More information

COMPOSITE RAILING INSTALLATION

COMPOSITE RAILING INSTALLATION COMPOSITE RAILING INSTALLATION Tools All you ll need is a hammer and screw gun, circular saw (carbidetipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line.

More information

Balustrade System Installation - Cambridge & Huntington

Balustrade System Installation - Cambridge & Huntington A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner.

Steel Reinforced Joining Thank you for choosing Andersen. Please leave this guide with building owner. Steel Reinforced Joining (Horizontal/Vertical) for Andersen 400 Series Woodwright & Tilt-Wash Double-Hung, Picture, and Transom Windows and 400 Series Double-Hung Half Circle and Flexiframe Specialty Windows

More information

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...

INS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)... INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...

More information

Installation of Fiberglass Windows

Installation of Fiberglass Windows Installation of Fiberglass Windows Before you begin please read and understand these installation instructions. The following installation instructions are recommended by Norwood and failure to follow

More information

modular/panel-built sauna kit

modular/panel-built sauna kit modular/panel-built sauna kit installation instructions Please immediately check for any hidden damage that may have occurred in shipping. If any damage is found you must notify the delivering carrier

More information

ARTS AND CRAFTS CHAIR

ARTS AND CRAFTS CHAIR ARTS AND CRAFTS CHAIR 491 MATERIALS LIST--DINING CHAIR Key No. Size and description (use) A 2 1-3/4 x 1-3/4 x 16-1/4'' oak (front leg) B 2 1-3/4 x 3-3/4 x 40-1/2'' oak (rear leg) C 1 1-3/4 x 3-3/16 x 15''

More information

Cabinetry Installation

Cabinetry Installation Cabinetry Installation Easy to follow step-by-step kitchen cabinet installation Hammer Pry bar Screwdriver Phillips Flathead Level TOOL AND MATERIAL LIST Tape measure Pencil Straight edge Drill 3/16" drill

More information

GARDEN SCREEN FENCE 232

GARDEN SCREEN FENCE 232 GARDEN SCREEN FENCE 232 233 Materials List--Privacy Screen Key No. Size and description (use) A 16 3/4 x 1 x 53" cedar (horizontal slat) B 14 3/4 x 1 x 72" cedar (vertical slat) C 4 3/4 x 2-1/2 x 53" cedar

More information

Fortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS

Fortress Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL FORTRESS RAIL ORDERS Fortress Railing Overview 4 3 1 Fe 26 Iron Railing Systems Fortress Use the steps below for the following pages to complete your rail Vertical Cable and Glass Options Available Fortress Iron Railing System

More information

Ahead of the curve 2 Part

Ahead of the curve 2 Part F&C PROJECT Ahead of the curve 2 Part In the second part of this series, Chris Tribe constructs the table for his stylised cabinet which we looked at last month in F&C Accuracy in turning the legs for

More information

T r e x Art i s a n Se r i e s Railing

T r e x Art i s a n Se r i e s Railing T r e x Art i s a n Se r i e s Railing I n s t a l l a t i o n In s t ru c t i o n s Trex Railing Components A. Trex Top Rail B. Trex Bottom Rail C. Trex Railing Support Bracket D. TrexExpress Railing

More information

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15 PORCH RAIL INSTALLATION INSTRUCTIONS Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15 COMPONENT LIST LEVEL RAIL KIT Porch Rail was designed to meet the most stringent building codes.

More information

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING

INSTALLATION INSTRUCTIONS for Custom and Premium Pocket Windows (JII022) IMPORTANT INFORMATION AND GLOSSARY SAFETY AND HANDLING Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to

More information

Installation of Desert Aire FreshAire Evacuator Bench System

Installation of Desert Aire FreshAire Evacuator Bench System Installation of Desert Aire FreshAire Evacuator Bench System Unpack Evacuator and check for shipping damage. If there is damage, immediately notify shipper and contact Paddock Evacuator. Confirm that all

More information

INSTALLATION PROCEDURE

INSTALLATION PROCEDURE Vinyl Siding INSTALLATION PROCEDURE Tools Needed and Preparation MOST ESSENTIAL TOOLS The proper tools, materials and equipment can make the installation of Durabuilt Vinyl Siding much easier. Here are

More information

Installation Instructions for. Handrail Component System

Installation Instructions for. Handrail Component System Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32

More information

Building Instructions

Building Instructions Building Instructions Tools Required Tape measure Straight edge Pencil/pen Jigsaw Table Saw Circular Saw Electric drill 1 Hole saw bit Saw horses/table Protractor Staple gun Caulk gun Paint brush Wrenches

More information

Installation Guidelines

Installation Guidelines Installation Guidelines Exteria Building Products provides these instructions as general guidelines only. Exteria Building Products neither installs siding nor has any control over any installation. The

More information

Installation Manual 0318

Installation Manual 0318 Installation Manual 0318 DOUBLE 7 CEDAR SHINGLE INSTALLATION GUIDE General Information CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION / CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS

More information

Sliding Glass Door Assembly and Installation Guide

Sliding Glass Door Assembly and Installation Guide Sliding Glass Door Assembly and Installation Guide Index Door System Components and Hardware The following components are needed to complete the installation of your Sliding Patio Door unit. Check all

More information

TREX POST MOUNT DECKING AND CONCRETE

TREX POST MOUNT DECKING AND CONCRETE TREX POST MOUNT DECKING AND CONCRETE for Pressure-treated Wood Framing LOCATION AND INSTALLATION OF POST MOUNTS IMPORTANT NOTES:» EACH POST MUST BE ATTACHED AS SHOWN TO ENSURE A CODE COMPLIANT AND SAFE

More information

Silverware Chest Plan

Silverware Chest Plan Silverware Chest Plan 05L14.01 Introduction 1. Measure the space required for your cutlery before beginning this project to be sure that it will fit in the drawers and top compartment. The best way to

More information