IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
|
|
- Mary Jones
- 5 years ago
- Views:
Transcription
1 IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call (The manufacturer will not be responsible for delays or lost installation time, due to failure to follow all instructions.) ATTENTION INSTALLERS: We recommend that the protective covering be left on the shelter components until assembly has been completed. Remove covering just enough to install bolts and fasten shelter together. Metal shavings left on roof or other surfaces will quickly rust and stain the surface finish. Cutting, drilling and installing roof panels, fasteners and other components will cause metal shavings. These shavings MUST be carefully removed at the end of each day by either sweeping or brushing the installed roof and other surfaces. 1. It is EXTREMELY IMPORTANT that, before setting any anchor bolts, the current footing layout is obtained from the manufacturer and the bolts are accurately set. 1A 1B Anchor Bolts are not included and must be furnished at time of installation. Consult local building codes and drawings if ordered and furnished. We recommend using High Quality Stainless Steel Anchor Bolts in areas with a corrosive climate. Check local building codes. 2. If the shelter is set on a concrete slab (or footings), the slab must be exactly level so that all the posts will be at the exact same elevation when mounted on the slab and anchored down. 3. If the shelter is set on an unlevel surface, it will bolt together if assembled with all bolts loose. When the bolts are tightened, some of the steel joints will have gaps and the unit may not be exactly plumb; however, the strength of the structure will not be affected. 4. In areas with frequent rain, the slab or footing elevation should be at least 1 above the elevation of the surrounding landscaping to prevent water from ponding around the base plate and anchor bolts. 5. In most cases, the anchor bolt nuts should not be tightened completely, until the frame is assembled and squared, and the roof panels have been installed. 6. In all cases, the center to center of roof panel lock spacing, the 24 c/c for the 3-V roof panels, must be maintained as the panels are installed. IF THIS IS NOT DONE, the problems may not show-up until towards the end of the panel installation, when they will not fit properly. If this happens, go back and check the spacing and re-set if necessary.
2 7. As is common in the erection of all types of metal structures, due to job site conditions - unlevel slabs, footings, etc., slight modifications such as reaming of some holes or even drilling a new hole or two, may become necessary and must be done on the job site. 8. Installing Tek screws at a high rpm may cause the Tek screws to become damaged or break during installation. If damage or breakage occurs, lower the speed of the drill. 9. Predrilling holes and removing metal shavings and debris from between components before fastening together will help prevent any rusting or staining of surrounding surfaces. 10. After assembly of the gutter is complete, be sure to drill holes in the gutter at the desired locations and install scuppers or downspouts. 11. Touch up paint has been supplied with your shelter to cover minor scratches or bolt and screw heads to give your shelter that finished look. Use a template for touch up painting to achieve a good finish and minimize over spray.
3 Contact (800) MERAMEC SHELTER ASSEMBLY & INSTALLATION INSTRUCTIONS NOTE: If dawings oredered and supplied for this unit, refer to those for exact details and special notes. Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Elec. Drill w/ Bits, String, Mallet 1.) Please read all instructions and the General Notes Page carefully. Check the Bill of Materials for any missing parts, and gather necessary tools. To prevent scratching of painted materials, place on a tarp, paper, or protective material. 2.) For ease of assembly and installation, familiarize yourself with component parts. ATTENTION Metal shavings left on roof and other surfaces will quickly rust and stain the surface finish. INSTALLERS: Cutting,drilling and installing roof panels,fasteners or other components will cause metal shavings. These shavings MUST be carefully removed at the end of each day either by sweeping or brushing the installed roof and other surfaces.
4 Contact (800) MERAMEC SHELTER ASSEMBLY & INSTALLATION INSTRUCTIONS Bolt Cover Plate Corner Post Base Plate Washer NOTE: IT IS VERY IMPORTANT TO INSTALL BASE PLATE WASHER DURING POST ASSEMBLY Anchor Bolt Centered On Corner Posts Typical Meramec Tubular Post To Assembly And Anchor Bolt Placement Detail
5 Meramec Shelter - Bill of Material Post Roof Panel Gutter Fascia Projection Fascia Corner Cap
6 STEP 1 Layout the legs and rafters (see Fig. 1-1), and then bolt together using the 3/4" bolts and nuts (see Fig. 1-2). NOTE: Access holes in rafter go on top. Do Not Tighten Bolts Completely At This Time. Raise post and rafter assembly into place and set base plate onto the anchor bolt. Do Not Tighten Bolts Completely At This Time. NOTE: It Is Very Important To Install Base Plate Washer During Post Assembly. Leg Leg Top of 3/4" Bolt (4 Req'd per Leg) Fig. 1-1 Fig. 1-2 Top of STEP 2 Bolt together the rafter assemblies using the 3/4" bolts and nuts (see Fig. 2-1). Do Not Tighten Bolts Completely At This Time. Tie rafter assemblies together with boards on either side for alignment while installing the roof panels. Check for level. Align as necessary. Tighten nuts on anchor bolts and all other connections. Shims may be necessary to level and tighten bolts on base plates. 3/4" Bolts (4 Req'd. per Connection) Top of Post Post Top of Fig. 2-1 Fig. 2-2
7 STEP 3 If the unit has a ridge cap, place the ridge cap on top of the center rafter and fasten to rafter using #5 Tek screws at 12" on center bothe sides. Smaller shelters will not have a ridge cap. Next, beginning at the edge of the roof, istall the roof panels using #5 Tek screws at 8" on center. Fasten roof panels to the rafters and the ridge cap. NOTE: Install only two screws at the start to allow flex for attaching the next panel. Continue over the top (roof deck) the panels will easily bend over the peak. Check progression of panels to be sure you are maintaining 24" center to center of panel locks. Ridge Cap Post Decking Roof Panel Center Line of Lock Fig. 3-1 Fig. 3-2 HINT: To speed in the joining of 2 pans, hold a 2x4 under the lock, and lightly tapping on top with a rubber mallet. Install only two Tek screws at the start to allow flex for attaching the next panel. NOTE: Be sure to maintain 24" centers with panels (Center to Center of Locks). Ridge Cap Post Decking #2 Tek 8" O.C. Peak Roof Panel Fig. 3-3 Fig. 3-4 ATTENTION INSTALLERS: Metal shavings left on roof and other surfaces will quickly rust and stain the surface finish. Cutting, drilling and installing roof panels,fasteners and other components will cause metal shavings. These shavings MUST be carefully removed at the end of each day either by sweeping or brushing the installed roof and other surfaces.
8 STEP 4 Attach the roof panels to the gutter fascia and projection fascia using #8 Tek screws at 8" o.c. (see Fig. 4-2). NOTE: See Fig. 4-1 for location of gutter and projection fascia.. After the gutter and projection fascia are installed, attach the corner caps using #8 Tek screws. Drill several holes in the bottom of the gutter for drainage, at the desired locations. Gutter Fascia Gutter Fascia Fig. 4-1 Projection Fascia Fig. 4-2 Roof Panel #8 Tek 8" O.C. STEP 5 After gutter fascia and projection fascia are installed, attach fascia cover and corner caps using #8 Tek screws, (see Fig. 5-1 & 5-2). Also, there are cover plates for the access holes in the posts. These should be installed at this time. #8 Tek Screws (4 Req'd.) Fascia Cover Corner Cap #8 Tek Screws (4 Req'd.) Fig. 5-1 Fig. 5-2
9 Note: Touch up paint has been supplied with your shelter to cover minor scratches or bolts and screw heads to give your shelter the finished look. Use a template for touch up painting to achieve a good finish and minimize over spray. CONGRATULATIONS! ASSEMBLY COMPLETED Other Products Available from AMERICANA BUILDING PRODUCTS: Fabric Window Awnings, Aluminum Patio Covers and Window Awnings, Glass Enclosures, Screen Enclosures, Park Shelters, Aluminum Railings & Columns, Retractable Fabric Awnings & More!
10 STEP 1 Drill a 2 3/4" dia. hole approximently 4" O.C. in the bottom of the Gutter. Apply Silicone to the lip of the Gutter Flange insert through the top of gutter (see Fig 1-1). Attach the Rolled Alum. Elbow over the Flange Neck with 1 - #15 x 1 1/4 Tek Screw (see Fig. 1-2). Gutter Flange (Apply Silicone to Lip) Fascia Gutter #5 x 1 1/4" Tek Screw Rolled Alum. Elbow Rolled Alum. Elbow Fig. 1-1 Fig. 1-2 STEP 2 Attach downspout support brackets to columns using #5 x 1 1/4" Tek Screw (see Fig. 2-2). Evenly space brackets splitting the column into thirds as to best support downspout (see Fig. 2-1). Column Rolled Alum. Elbow #5 x 1 1/4" Tek Screw Column Downspout Bracket Downspout Suprt. Brckt. Fig. 2-1 Fig. 2-2
11 STEP 3 Temporally secure extruded downspout to brackets & insert a rolled alum. elbow into the top securing with a #5 x 1 1/4" Tek Screw (see Fig. 3-1). Align the mouths of the Rolled Elbows. Measure the distance between elbows adding an 1 1/2" to each end to find overall length of rolled alum. splice, cut as required (see Fig. 3-2). Rolled Alum. Elbow Extruded Alum. Downspout (Temporally Secured to Brackets) #5 x 1 1/4" Tek Screw Column Fig. 3-1 Fig. 3-2 STEP 4 Install rolled alum. splice by releasing lower elbow - downspout assy and inserting lower end of splice into elbow securing with #5 x 1 1/4" Tek Screw. Repostion exruded alum. downspout againist support brackets securing with #5 x 1 1/4" Tek Screw, but at the same time insert upper rolled alum. elbow into upper end of splice and secure with #5 x 1 1/4" Tek Screw (see Fig 4-1). Cut extruded alum. downspout to desired length and insert bottom into alum. scupper securing with #5 1 1/4" Tek Screw (see Fig 4-2). Upper Rolled Alum. Elbow Extruded Downspout #5 1 1/4" Tek Screw Rolled Alum. Splice Lower Rolled Alum. Elbow #5 x 1 1/4" Tek Screw Downspout Suprt. Brkt. Alum. Scupper #5 x 1 1/4" Tek Screw Fig. 4-1 Fig. 4-2 Column
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS FOR AZTEC SHELTER ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will
More informationIMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS
IMPORTANT -- SPECIAL INSTALLATION INSTRUCTIONS ** READ ALL INSTALLATION INSTRUCTIONS BEFORE STARTING!** If at any point, you have questions, call 1-800-851-0865...(The manufacturer will not be responsible
More information4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS
4-SIDED NAVAJO SHELTER ARIZONA MODEL INSTALLATION INSTRUCTIONS Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Chalk Line, Elec.
More informationLAS VEGAS PATIO COVER INSTALLATION INTSRUCTIONS
STEP 8. Drill 2-5/8" dia. holes in the outer face of the ledger board spaced evenly (approximently 24" O.C.). Hoist the ledger board into place, centering it in front of the gutter. Anchor the inner face
More informationOZARK DOOR CANOPY ASSEMBLY INSTRUCTIONS
OZARK DOOR CANOPY ASSEMBLY INSTRUCTIONS Recommended Tools: Level, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw, Silicone Caulking, Screw Drivers (Regular & Phillips) Before
More informationLevel, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw, Silicone Caulking, Screw Drivers (Regular & Phillips)
Delta Door Canopy Installation Instructions Recommended Tools: Before You Begin: Level, Pliers, 3/8" Electric Drill, Carpenters Square, Tape Measure, Metal Hack Saw, Silicone Caulking, Screw Drivers (Regular
More informationATTACHED PERGOLA ARBOR INSTALLATION INSTRUCTIONS
ATTACHED PERGOLA ARBOR INSTALLATION INSTRUCTIONS Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Chalk Line Elec. Drill w/ Bits
More informationRecommended Tools: Before You Begin:
Recommended Tools: Before You Begin: Saftey Glasses, Tape Measure, Carpenters Level, Framing Square, Hex Head Nut Drivers, Chalk Line Elec. Drill w/ Bits (Masonry Drill, Bits. & Anchors maybe required
More informationYUKON PATIO COVER INSTALLATION INSTRUCTIONS
YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact
More informationInstallation Guidelines
Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and
More informationFREESTANDING DOUBLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS
FREESTANDING DOUBLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS Before You Begin: Recommended Tools: Note on Masonry Units: Note on Electric Drills: Note on Cutting and Drilling: 1) Please read all instructions
More informationATTACHED DOUBLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS
ATTACHED DOUBLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS Before You Begin: Recommended Tools: Note on Masonry Units: Note on Electric Drills: Note on Cutting and Drilling: 1) Please read all instructions and
More informationATTACHED SINGLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS
ATTACHED SINGLE HEADER PERGOLA ASSEMBLY INSTRUCTIONS Before You Begin: Recommended Tools: Note on Masonry Units: Note on Electric Drills: Note on Cutting and Drilling: 1) Please read all instructions and
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationCOURTYARD DOOR CANOPY INSTALLATION INSTRUCTIONS
COURTYARD DOOR CANOPY INSTALLATION INSTRUCTIONS Recommended Tools: Electric Drill w/ Bits, Rachet or Nut Driver w/ Sockets, Level, Tape Measure, Screw Drivers (Phillips & Regular), Ladder Before You Begin:
More informationInstallation Guidelines
Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and
More informationCOURTYARD PATIO COVER INSTALLATION INSTRUCTIONS
COURTYARD PATIO COVER INSTALLATION INSTRUCTIONS Recommended Tools: Electric Drill w/ Bits, Rachet or Nut Driver w/ Sockets, Level, Tape Measure, Screw Drivers (Phillips & Regular), Ladder Before You Begin:
More informationALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS
ALUMA-VENT AWNING REGULAR END STYLE INSTALLATION INSTRUCTIONS Contact us at: 1-888-442-2928 or www.americana.com Options in your kit: A. Splice Pg 16 B. Column Pg 17 C. C-Channel Brace Pg 19 D. Runner
More informationALL SEASON PATIO COVER
ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the
More informationDouble Beam Freestanding Pergola Installation Guide
Double Beam Freestanding Pergola Installation Guide Patent Pending. Copyright 2011 USAVinyl, LLC - All Rights Reserved The information contained in these instructions are proprietary to USAVinyl, LLC and
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationTRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT
TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read
More informationALUMA VENT AWNING REGULAR END STYLE ASSEMBLY INSTRUCTIONS
Contact us @ (800)851-0865 ALUMA VENT AWNING REGULAR END STYLE ASSEMBLY INSTRUCTIONS Recomended Tools: Elec. Drill or Battery Powered Screw Driver 1/4" Socket Phillips Screw Driver Pliers Plus: The correct
More informationALUMA VENT AWNING WITH VALANCE END ASSEMBLY INSTRUCTIONS
Contact us @ (800)851-0865 ALUMA VENT AWNING WITH VALANCE END ASSEMBLY INSTRUCTIONS Recomended Tools: Drill or Elec. Screw-driver 1/4" Socket Phillips Screw Driver Pliers Plus: The correct screws/anchors
More informationTitan Series Awning Assembly and Installation Instructions
Titan Series Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle them.
More informationSanta Fe Cover INSTALLATION GUIDE. Alumawood TM Newport with MAXX Panel TM Installation Guide
Alumawood TM Newport with MAXX Panel TM Installation Guide Santa Fe Cover INSTALLATION GUIDE Whatever the weather, you can enjoy the sophisticated charm of a lattice cover. The Santa Whatever the weather,
More informationTHANK YOU FOR PURCHASING FROM HERITAGE PATIOS
Installation Guide THANK YOU FOR PURCHASING FROM HERITAGE PATIOS Your purchase is engineered by nearly a half century of commercial and residential product design proudly manufactured in the USA from responsibly
More informationAWNING / PATIO COVER INSTALLATION INSTRUCTIONS
AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means
More informationRenaissance Pavilion. Assembly Manual
Renaissance Pavilion Assembly Manual Thank you for your purchase of this pavilion. Renaissance Pavilion Assembly Manual This manual is designed to simplify the assembly process, however we recommend having
More information11 6 Round Building Assembly Instructions
11 6 Round Building Assembly Instructions 11 6 Round Building Hardware List 1. Pro Rib Brite White 36 Wide X 68 Long (Siding Steel) 11 2. Top Wall Wheel Ring 3 3. Base Ring 3 4. 1 ½ X 68 Aluminum Tubes
More informationPergola Installation Instructions
Pergola Installation Instructions TOOLS REQUIRED HAMMER DRILL 1/2 MASONRY BIT PENCIL DRILL 3/16 DRILL BIT LEVEL SQUARE LADDER WRATCHET & SOCKETS RUBBER MALLET 2 TAPE MEASURE Column/Post Placement Table
More informationGrowSpan Estate Pro I Greenhouse
GrowSpan Estate Pro I Greenhouse Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104564 11'-8" W x
More informationInstallation Instructions - Model V4JSD 1
Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)
More information4-lite Patio Door. Installation Instructions
4-lite Patio Door Installation Instructions IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. Note: Only the 5-0 x 6-8
More informationCURVED ROOF ASSEMBLY INSTRUCTIONS ATTACHED VERANDAH. Your supplementary guide to building an ATTACHED CURVED ROOF VERANDAH or PATIO BEFORE YOU START
ROOF ATTACHED VERANDAH ASSEMBLY INSTRUCTIONS Your supplementary guide to building an ATTACHED ROOF VERANDAH or PATIO This set of instructions should be used in conjunction with the Stratco instruction
More informationINTRODUCTION. EqunioxRoof.com. Pro Tip
INSTALLATION MANUAL INTRODUCTION The Equinox Louvered Roof System is designed to be installed in an aluminum frame. All these sections are 1/8" thick extruded aluminum. All engineering for this system
More informationCertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS. Fence Installation Guide 3', 4' & 6' High
CertainTeed INSTALLATION GUIDE SIMTEK FENCE PRODUCTS Fence Installation Guide 3', 4' & 6' High INSTALLATION GUIDE These instructions are designed to assist both professional installers and do-it-yourselfers
More informationCLEARSPAN GABLE STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. WITH GAZEBO END ATTACHED PATIO
CLEARSPAN GABLE WITH GAZEBO END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your supplementary guide to building an ATTACHED CLEARSPAN GABLE VERANDAH or PATIO WITH GAZEBO END This set of instructions
More informationClearSpan Hydroponic Table Kit
ClearSpan Hydroponic Table Kit Hydroponic Table Kit (The 109314 (4' x 16') model is shown.) Designed to grow healthy plants without soil using mineral-nutrient solutions. 2009 ClearSpan All Rights Reserved.
More informationAustin Standing Seam Awning Assembly and Installation Instructions. Assembly Instructions
Austin Standing Seam Awning Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use work gloves to handle
More informationOpen Lattice tube Patio Cover- Basic Installation Guidelines
Before You Begin: DOUBLE HEADER/SINGLE RAFTER Open Lattice tube Patio Cover- Basic Installation Guidelines 1. Take the time to read and understand the basic guidelines before opening or starting your patio
More informationOpen Lattice Tube Patio Cover- Basic Installation Guidelines
Open Lattice Tube Patio Cover- Basic Installation Guidelines Before You Begin: 1. Take the time to read and understand the basic guidelines before opening or starting your patio kit. 2. Please read this
More informationAssembly Instructions 10 X 10 Aluminum Roof Support
Assembly Instructions 10 X 10 Aluminum Roof Support Aluminum Roof Support Bolt Package 16-5/16 X 2 ¼ SS Bolt 24-5/16 X 1 SS Bolt 40-5/16 SS Nylon Lock Nuts 16-5/16 SS Flat Washers 28-4 ½ Wood Screws 36-1
More informationASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER
ASSEMBLY INSTRUCTIONS FOR SOFTOP SHADE COVER Our unique assembly process quickly transforms individual pieces into a finished structure that will give you a lifetime of service. Great care has been taken
More informationINSTALLATION INSTRUCTIONS
Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.
More informationOpen Lattice tube Patio Cover- Basic Installation Guidelines
Before You Begin: DOUBLE HEADER/DOUBLE RAFTER Open Lattice tube Patio Cover- Basic Installation Guidelines 1. Take the time to read and understand the basic guidelines before opening or starting your patio
More informationTURNSTILE CANOPIES OPTIONS. We offer a complete line of rollformed and extruded aluminum
TURNSTILE CANOPIES We offer a complete line of rollformed and extruded aluminum canopies and walkway covers. From the smallest door canopy to the largest walkway cover, all materials undergo constant inspection
More informationHorizontal Cable Systems
ALUMINUM RAILING INSTALLATION INSTRUCTIONS Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm
More information3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS
3-LITE PATIO DOOR INSTALLATION INSTRUCTIONS IMPORTANT: Read the instructions and familiarize yourself with the door parts and pieces before beginning assembly and installation. TOOLS NEEDED: Tape Measure
More informationINSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS
INSTALLATION INSTRUCTIONS FOR ULTRA LATTICE AND ALUMAWOOD ARBORS GENERAL INFORMATION: Lattice arbors are designed to be freestanding or attached. They are designed to resist a 10 lb. to 30 lb. per square
More informationClopay Models 835/837 Sliding Door System Installation Guide
Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available
More informationSafety Glasses Safety Gloves Ladders Measuring Tape Spirit Level String Line. Tin-Snips Rivet Gun Caulking Gun Silicone Socket Set
BEFORE YOU START Carefully read these instructions and refer to them constantly during each stage of construction. If you do not have all the necessary tools or information, contact Stratco for advice.
More informationHeartland Pergola. Assembly Manual
Heartland Pergola Assembly Manual Pergola Assembly Manual Thank you for your purchase of this Pergola This manual is designed to simplify the assembly process, however we recommend having an experienced
More informationLevel Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M
Level Railing Installation Guide Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support #909915 Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster
More informationVINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS
P a g e 1 VINYL CLASSIC FREESTANDING PERGOLA ASSEMBLY INSTRUCTIONS Shown: 8' x 12' Vinyl Classic Pergola with 12" Top and Main Runner Spacing The design of this pergola is based on all posts being installed
More informationOXYGEN INSTALLATION. Revision date
12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex
More informationHorizontal Cable Systems
ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:
More informationINSTALLATION INSTRUCTIONS
Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS A CSW Industrials Company FR and FRE Roof Expansion Joint Covers IMPORTANT The following instructions are very important. Read them carefully, and be sure you understand them
More information2x Bottom Bracket. 1x Rail Support STEP 1 STEP 2
Level Railing Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster Connectors installed)
More informationINSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT
INSTALLATION INSTRUCTIONS 12' x 18' x 7' FRAME (12 x 20 x 7 ROOF COVERAGE) 2 SQUARE CARPORT Our unique assembly process quickly transforms the individual pieces into a finished structure that will give
More informationQwik-Fence Installation Instructions
Qwik-Fence Installation Instructions 1 Tools Required The following installation instructions should be used as a guide for installing Folding Guard Qwik-Fence Partitions. Good common sense and appropriate
More informationCONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013
U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -
More informationAssembly Instructions 10 X 10 Aluminum Frame Building
Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal
More informationIDR assembly instructions:
IDR assembly instructions: Required Tools: 2 X 12mm Open End Wrench 14mm open end wrench #2 Phillips Head Screw Driver (Drill with adjustable torque clutch recommended) 8mm nut driver (Supplied in IDR-AK)
More informationP SERIES. and MASON CORPORATION
P SERIES CATAL ALOG Carpor ports and Patio Cover ers Corporate Office 123 Oxmoor Road West Birmingham, AL 35209 P.O. Box 59226 Birmingham, AL 35259-9226 Telephone: 1/800/868-4100 Fax: (205) 945-4304 Mason-Columbia
More informationINS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...
INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...
More informationDeck Mount Installation with Bench
Deck Mount Installation with Bench 1. Mark track with square. 2. Cut tracks with saw. 3. Drill ¼ hole (if needed.) 4. Countersink track. 5. Countersink all track 6. File all track ends. ends. 7. Lay out
More informationGrowSpan Round Premium High Tunnels
GrowSpan Round Premium High Tunnels Photo may show a different but similar model. 2016 Growers Supply All Rights Reserved. Reproduction is prohibited without permission. STK# PB01680R4 PB01690R4 DIMENSIONS
More informationOval Vinyl Gazebo. Assembly Manual
Oval Vinyl Gazebo Assembly Manual Gazebo Assembly Thank you for your purchase of this Gazebo. This manual is designed to simplify the assembly process, however we strongly recommend having an experienced
More informationATLANTIS RAIL Contact Information
ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing
More informationGABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
GABLE ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction 2 Components 3 Step 1a Marking out the Perimeter of the Carport with Footing only 3 Step 2a Footing Set-Out for Concrete
More informationFLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL
FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL Table of Contents Introduction... 2 Components... 3 Step 1 Marking out the Perimeter of the Carport... 3 Step 2a Footing Set-Out for Concrete Block Pad
More informationInstallation Manual. / / 8641 S. Warhawk Road, Conifer, CO /
Installation Manual BEFORE INSTALLATION, READ ALL INSTRUCTIONS AND WARNINGS CAREFULLY General Assembly and Erection Instructions for freestanding & wall attached full gutter canopies - refer to your order
More informationSILVERBACK INSTALLATION MANUAL
SILVERBACK INSTALLATION MANUAL R-SERIES SOLAR RACKS T OLL FREE 866-766-3727 WWW.ROOFSCREEN.COM Introduction... 2 The Silverback Solar Racking System... 2 This manual... 2 Application... 2 System Overview...
More informationMODERN PERGOLA INSTALLATION GUIDE. When only the best will do.
MODERN PERGOLA INSTALLATION GUIDE When only the best will do. TOOLS LIST Drill(s) 3/8" Magnetic Driver (s) 12" Drill Extension #2 Square Drive bit for Drill or Driver Level Tape Measure Hammer Drill if
More informationFireball Fab Welded Baluster Insert Panel System Installation Instructions
Fireball Fab Welded Baluster Insert Panel System Installation Instructions Prior to construction, check with your local regulatory agency for special code requirements in your area. Common railing height
More informationV nyl Gazebo truct c it Assembly Instr ons
V nyl Gazebo Vi Assembly Instr ct tr t u ru ons ct c i ti Pre-assembly Instructions A C B #1 - Site properly prepared. 4" - 6" clean stone 9 linear blocks 2" x 8" x 16" C C A A B B #1a - 12" sauna tubes,
More informationKOLO SHELTER Installation Instructions Parts List
Parts List Roof Cap Rafter Upright Polycarbonate Polycarbonate Drop Polycarbonate Flange Center Weldment (Short length shown above) Polycarbonate Edge Bolt.25 x 6.5 Bolt.625 x 7.5 Threaded Rod.75 x 14
More informationRAILING R A IL ING 51
RAILING RAILING 5 TREX TRANSCEND RAILING NOTES:» TREX TRANSCEND RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED
More informationClearSpan PolyMax Windbreak Wall
ClearSpan PolyMax Windbreak Wall Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: April 2007ldg STK# DIMENSIONS
More informationSliding Door Kit
YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE DOOR KIT. Thank you for purchasing this GrowSpan door kit. When properly assembled and maintained, this product will provide years of reliable
More informationInstallation Instructions
Important 1. Acclimate materials 24 hrs before installation. Maintain temperature controlled environment after installation 2. Install in accordance with manufacturer s installation instructions. Failure
More information12x12 Pavilion. Assembly Manual
12x12 Pavilion Assembly Manual 12x12 Pavilion Assembly Manual Congratulations on purchasing your new Pavilion. Thank You for your purchase and Welcome to the YardCraft Famiy. This manual is designed to
More informationClearSpan Attached-Style Awning
ClearSpan Attached-Style Awning Photo may show a different but similar model. 2007 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. Revision date: July 2007ldg STK# DIMENSIONS
More information10 x 10 Flat Top Two Tone Pergola
0 x 0 Flat Top Two Tone Pergola Models: Bordeaux ASSEMBLY GUIDE OPTIONAL ACCESSORIES Arch Kit System ( Arches) Privacy Fence Panel System ( Panels & Middle Post) Bolt Down Bracket Kit ( for Pergola) Ver.0-00
More informationTHE HANDY GARDEN SHED. SNSD-E Owner s Manual
THE HANDY GARDEN SHED SNSD-E Owner s Manual 1 BEFORE YOU START Owner s Manual Prior to installation, it is important that you contact your local government authority to determine if building approval is
More informationInstallation Instructions for. Before You Begin TOOLS REQUIRED
Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationWorkbench Instructions for Assembly
Workbench Instructions for Assembly Technical Electronic Workstations and Industrial Workbenches Includes: Cabinets Privacy Panels Stringers Bottom Shelves Table of Contents Tools Required for Assembly...
More informationAustin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions. Assembly Instructions
Austin Standing Seam Awning with Overhead Braces Assembly and Installation Instructions Be sure to use safety glasses when assembling and installing the awning. Some metal parts may have sharp edges. Use
More informationINSTALLATION INSTRUCTIONS LS X 12-2 X 7 1/2 FRAME LOAFING SHED
INSTALLATION INSTRUCTIONS LS-12 12 X 12-2 X 7 1/2 FRAME ACTUAL FRAME BASE SIZE: 12 X 12-2 LOAFING SHED Our unique assembly process quickly transforms the individual pieces into a finished structure that
More informationPAT installation of a Sun Dome over a in-ground
PAT. 3766573 Installation of Sun Domes for in-ground pool GENERAL INSTRUCTIONS: STEP 1. Read thru the entire instructional materials before beginning any installation. You will find that the installation
More informationINSTALLATION INSTRUCTIONS GUIDE
CERTAINTEED RAILING AND DECKING INSTALLATION INSTRUCTIONS GUIDE Kingston Vinyl Railing and Vinyl Decking CONTENTS Important Information Before You Begin...3 Helpful Hints, Tips, Fire Information and Tools
More informationKwik-Lock. Installation Instructions. Attention Dealers: Please give this owners manual to the customer when the product is delivered.
Serving the Truck & Trailer Industry Since 1944 Installation Instructions Attention Dealers: Please give this owners manual to the customer when the product is delivered. Call 800-535-9545 www.aeroindustries.com
More informationConnect Transit Shelter
Tools Required *denotes special tools required Connect Shelter, 8ft Connect Shelter, 12ft *Soft, non abrasive protective surface such as a furniture blanket *Source of compressed air (for thorough dust
More informationInstallation Instructions 3520WW/3520WWB Handrail
Important 1. Acclimate materials 24 hrs before installation. Maintain temperature controlled environment after installation 2. Install in accordance with manufacturer s installation instructions. Failure
More informationMULTISPAN GABLE WITH HIP END ATTACHED PATIO
MULTISPAN GABLE WITH HIP END ATTACHED PATIO STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your supplementary guide to building an ATTACHED MULTISPAN GABLE VERANDAH or PATIO WITH HIP END This set of instructions
More information