Template. Blue 242. May 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

Size: px
Start display at page:

Download "Template. Blue 242. May 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation"

Transcription

1 ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV (800) or (508) (508) NOVA II System Installation Instructions The NOVA II System features powder-coated aluminum posts, handrails and foot rails and horizontal cable infill. The cable infill utilizes HandiSwage fittings with 1/8 cable. The NOVA II System is offered in black, white and bronze color options. The following guide will take you step-by-step through the process of installing your NOVA II System. Along the way, we ll offer you tips and tricks to help you get your railing installed today and ready for tomorrow. DO NOT INSTALL WITHIN ONE (1) MILE OF SALT WATER. ATLANTIS RAIL SYSTEMS WILL NOT WARRANTY A NOVA II SYSTEM IF INSTALLED WITHIN ONE (1) MILE OF SALT WATER. NOVA II STAIR SYSTEMS ACCOMMODATE STAIR ANGLES BETWEEN 29 AND 39 DEGREES ONLY. Deviation Note Note Requirement Hint Table of Contents Tools 1 Tips for a Successful Installation 2 HandiSwage Components 2 Additional Components 2 Mounting Options 3 Components for NOVA II Level Section 3 Level Post Installation 4 Level Rail Installation 5 Cable Installation on Level Sections 7 Cable Installation on Corner Sections 9 Components for NOVA II Stair Section 9 Stair Post Installation 11 Stair Rail Installation 12 Cable Installation on Stair Sections 17 NOVA II System Cable Mounting Hardware 17 NOVA II System Accessories 18 NOVA II System Specifications 19 NOVA II System Product Specifications 19 Tools Required & Recommended Power Drill with Adjustable Clutch Vice Grips Hand Swage Tool Miter Saw with a Non-Ferrous Carbide Tipped Blade Rubber Mallet Cable Cutter #2 Phillips Driver Bit 1/4, 1/8, 3/8,5/32 & 9/64 Drill Bits 5/16, 3/8, 7/16 & 1/2 Open Wrench 1/8 & 3/32 Allen Wrenches Level Tape Measure Carpenter s Square Touch-up Paint Chalk Line Silicone Caulk Hacksaw Cable Grip Pad After Swage Gauge RailEasy Drilling Loctite Threadlocker Safety Glasses Gloves Template Blue All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

2 Atlantis Rail offers installation tools (C ) to aid in your installation process. Ask your Sales Representative for more information. Tips for a Successful Installation Read the instructions completely before beginning the installation. Plan your railing project. Sketch your project with the actual measurements of your deck or balcony complete with post locations. Check carton(s) to determine part count is complete. After cutting rails, cable stabilizers, or posts, paint exposed metal with rust resistant finish for maximum protection against elements. Installation is best accomplished with two (2) people. Always wear personal protection equipment; safety glasses, work gloves, etc. Use care not to over-torque the screws. Pre-drilling is recommended. Provided hardware to install the NOVA II System is for use with NOVA II aluminum posts. If installing to other surfaces, you must acquire the appropriate hardware as needed for proper installation. ATLANTIS RAIL SYSTEMS PROVIDES A VARIETY OF MOUNTING OPTIONS FOR POSTS AND RAILS USED IN OUR SYSTEMS. PRODUCTS OF THIS NATURE REQUIRE THAT MOUNTING SURFACES ARE CONSTRUCTED TO BE CONSIDERED STRUCTURAL PER BUILDING CODE DEFINITION FOR THE SURFACE MATERIAL USED. STRUCTURAL INTEGRITY AND BUILDING CODE COMPLIANCE OF MOUNTING SURFACES ARE THE RESPONSIBILITY OF THE END USER AND / OR INSTALLER. THE USE OF ANY OF OUR MOUNTING METHODS ARE AT THE OPTION AND DECISION OF THE END USER AND / OR INSTALLER AND SHOULD BE SELECTED TO MATCH THE STRUCTURAL MATERIAL USED TO CREATE THE MOUNTING SURFACE. ALWAYS REFER TO YOUR LOCAL BUILDING CODE OFFICIALS PRIOR TO INSTALLING ANY ATLANTIS RAIL SYSTEM TO ENSURE ALL CODE AND SAFETY REQUIREMENTS ARE MET. ATLANTIS RAIL SYSTEMS IS NOT RESPONSIBLE FOR IMPROPER OR NON-RECOMMENDED INSTALLATIONS. HandiSwage Components Additional Components C0731-H C0731-H HandiSwage Standard Stud 1/8 (1/4-28 RH) - 2 Pack HandiSwage Standard Stud 1/8 (1/4-28 RH) - 10 Pack NOVA II Cover Nut Sets 30, 34 & 38 Stair Spacer Cable Grommets NOVA Post Mounting Hardware Kit All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

3 Components for NOVA II Level Section A. Top Rail B. Bottom Rail C. Top Rail Bracket D. Bracket Key E. Screw Cover F. Bottom Rail Bracket G. Stabilizer & Support Block Connector H. Self-Drilling Screw I. Button Head Screw J. Support Block K. Cable Stabilizer, Drilled L. Support Block Base Kit O. 3-1/2 Square Driver Bit P. Post Cap M1. 36 Universal Post, Drilled M2. 42 Universal Post, Drilled N1. 36 Corner Post, Drilled N2. 42 Corner Post, Drilled Q. Post Skirt R. Post Pad, Drilled S. Lag Bolt T. Plastic Cover Nut U. RailEasy 1/8 Stud V. Plastic Washer W. Cable Grommet All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

4 Level Post Installation Measure, Mark & Pre-drill the Posts The following instruction are for level sections with a bottom rail. From the top of the post, measure down 36-3/16 for a 36 post (actual post size is 38 ) and mark a level, horizontal line on the post. Measure down 41-3/4 for a 42 post (actual post size is 44 ). Measure 1-1/2 in from the side of the post and mark a vertical center line that intersects with the horizontal line. On the horizontal line, starting at the intersection, measure out 1/2 on either side and make a vertical mark (See Figure A). These intersections are the screw hole marks for the bottom rail bracket (Component F). Using a 5/32 drill bit, pre-drill the bottom bracket holes. PRE-DRILLING THE HOLES ON THE POST IS REQUIRED. Locate & Install Level Posts Measure and locate the position of the post(s) based on the project layout. Install the post (Component M1, M2, N1 & N2) by attaching the aluminum mounting flange to the mounting surface. Position the post so the fastener will go into the floor joist, and make sure the decking is firmly attached to the joist at the location of the post. If necessary, use wood blocking as reinforcement underneath the decking where the posts are located. Post mounting fasteners must be able to secure into the joist or reinforcement braces, not just the decking itself. When installing posts on top of a wood surface, lags must be into at least 3 of code compliant wood blocking. Figure A. On the horizontal line, starting at the intersection, measure out 1/2 on either side and make a vertical mark. WHEN INSTALLING THE NOVA II SYSTEM ON TREATED WOOD SURFACES, INSTALL THE PROVIDED POST PAD, DRILLED (COMPONENT R; INCLUDED IN THE POST KIT) BETWEEN THE POST BASE AND THE TREATED SURFACE. Position the post on the mounting surface. Four (4) 3/8 diameter mounting holes are provided on the mounting flange. Mark the mounting flange hole locations and remove the post (See Figure B). Pre-drill the marked locations into the decking and reinforcement using a 1/4 drill bit. If the post pad (Component R) is being used, line it up with the pre-drilled holes. Mark the post pad center hole on the mounting surface, remove and pre-drill the marked location using a 1/4 drill bit. This will allow any water that builds up in the post to escape. Remount the post assembly. Make sure the posts are positioned so the post holes are aligned properly to run cable and mount top rails (Component A). Place provided post pad, drilled (Component R) between the post and mounting surface (See Figure C). If using the NOVA post mounting hardware kit (A0908-HD10), insert the lag bolts (Component S) and secure the base to the mounting surface using a 1/2 socket and ratchet set. Avoid scuffing the posts with a power drill or other tools. Make certain the posts are plumb. If the post requires adjustment, add stainless steel washers under the post pad. Once the posts are installed, apply silicone to the top of the Figure B. When the final position is determined for the post, mark the hole locations of the four (4) 3/8 diameter mounting holes provided on the base and remove the post assembly. Figure C. Place post pad between the post and mounting surface All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

5 lag bolts and secure the plastic cover nuts (Component T) to prevent moisture from getting below the post through the lag bolt holes (See Figure D). Pre-Drill Mid Posts If a post is being used as a mid-post versus an end or corner post, holes must be pre-drilled for mounting a top rail. From the top of the post, measure down 2-3/4 and mark a level, horizontal line on the post. Measure 1-1/2 in from the side of the post and mark a vertical center line that intersects with the horizontal line. Place the bracket key (Component D) top hole over the intersection mark. Make sure the bottom hole lines up with the vertical line. Mark the holes and pre-drill using an 5/32 drill bit (See Figure E). Figure D. Apply silicone to the top of the lag bolts and secure the plastic cover nuts to prevent moisture from penetrating the holes. Figure E. Mark saddle bracket screw hole locations on the post. Level Rail Installation Measure & Cut the Rails IF THE BETWEEN POST MEASUREMENT IS EXACTLY 6, PROCEED TO INSTALL CONNECTORS STEP. Carefully measure the opening between posts and calculate the length of rail that needs to be trimmed. Divide the necessary trim length in half, and take equal amounts from each side of the rail. To ensure the centering of the cable stabilizer, trim must always be taken from both ends of the rail. Make all determinations before marking and cutting the rails. To account for the top rail brackets (Component C) take an extra 5/8 off either end of the top rail (Component A). Mark the rails and cut using a miter saw with a non-ferrous carbide tipped blade. Install Connectors Locate the pre-drilled holes in the middle of the underside of the bottom rail (Component B). Using the #8 self-drilling screws (Component H), the square driver bit (Component O) and a power drill, install the stabilizer and support block connectors (Component G) on the top and bottom rails (See Figure F). Figure F. Using the #8 self-drilling screws, install the stabilizer and support block connectors on the top and bottom rails. TO AVOID STRIPPING THE SCREW, START DRIVING IT IN WITH A POWER DRILL, THEN FINISH WITH A SCREW DRIVER. IF THE BETWEEN POST MEASUREMENT IS 4 OR UNDER, A CABLE STABILIZER IS NOT NEEDED, THEREFORE CONNECTORS DO NOT HAVE TO BE INSTALLED All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

6 Install the Support Block For a 36 post (actual post size is 38 ), the support block (Component J) should be cut to 2. For a 42 post (actual post size is 44 ), the support block should be cut to 2-1/2. Measure and mark the support block and cut using a miter saw with a non-ferrous carbide tipped blade. IF THE BETWEEN POST MEASUREMENT IS 4 OR UNDER, A CABLE STABILIZER IS NOT NEEDED, THEREFORE THE SUPPORT BLOCK AND SUPPORT BLOCK BASE KIT DO NOT HAVE TO BE INSTALLED. To find the location of the support block base kit, measure the distance between the posts and divide by two (2). Make a level line at that measurement between the post. The line should be perpendicular to the direction the rails will be oriented. Now, take a straight edge, like a 2x4 post, and abut it to the side of each post. Where the line meets the straight edge, measure in 1-1/2 and make an intersecting line. This intersection is where the location of the support block base kit is to be installed (See Figure G). The support block base kit (Component L) consists of one (1) connector, one (1) #12 flat head wood screw, one (1) rectangular nylon gasket, one (1) rectangular mounting plate, two (2) #10 pan head wood screws and two (2) nylon washers. Using the rectangular mounting plate, place the center hole over the intersection point. Make sure the mounting holes on either side of the center hole are lined up with the center line running parallel with the rail orientation (See Figure H). Pre-drill the holes with a 1/8 drill bit. Assemble the support block base kit as shown in Figure I. Before installing the base kit, make sure the nylon gasket is between the mounting plate and the mounting surface (See Figure I). Install two (2) #10 wood screws making sure to include the nylon washers (See Figure J). Insert the pre-cut support block onto the base kit connector. Figure G. To find the placement of the support block base kit, find the center of the rail section. Figure H. Place the center hole of the rectangular mounting plate over the intersection point and make sure the outside holes are lined up with the center line running parallel with the rail orientation. Mark the hole locations. Figure I. (Left) Make sure the nylon gasket is between the support block base plate and the mounting surface. Figure J. (Right) Install the support block base kit using two (2) #10 wood screws. USE PLIERS TO HOLD THE CONNECTOR IN PLACE WHILE INSTALLING THE #12 FLAT HEAD WOOD SCREW THROUGH IT. Slide the post skirt (Component Q) to the bottom of the post to cover the mounting flange. Install the post skirt on the posts BEFORE installing the bottom rail. Install the Bottom Rail Slide the bottom rail brackets (Component F) over each end of the bottom rail. The bottom rail bracket screw holes must point down and counter bore holes must face toward the center of the rail section (See Figure K). Install the bottom rail making sure the connector on the underside of the bottom rail is inserted into the support block. Use the supplied #10 self-drilling screws to install the rail. Check to make sure bottom rail is level. Figure K. Slide the bottom brackets onto the bottom rail. The bottom bracket screw holes must point down and the counter bore holes must face toward the center of the rail section. IF THE SUPPORT BLOCK ASSEMBLY IS DRIVING THE BOTTOM RAIL UP, REMOVE AND SHORTEN THE SUPPORT BLOCK AS NEEDED All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

7 Install the Top Rail & Cable Stabilizer Locate the two (2) pre-drilled holes at the top of the post. Install the bracket keys (Component D) in these holes using the supplied #10 self-drilling screws. The bracket key counter bore holes must face towards the center of the rail (See Figure L). Insert the cable stabilizer (Component K) over the connector on the top of the bottom rail (Component B). Make sure to align the stabilizer holes with the holes on the posts (See Figure M). Place the top rail brackets on each end of the top rail. Slide the top rail assembly over the pre-installed bracket keys and insert the connector on the bottom of the top rail into the cable stabilizer (See Figure N). Locate the holes on each side of the top rail brackets. Install the supplied button head screws (Component I) into these holes using a 1/8 Allen wrench. Once the screws are tightened down, place the screw cover (Component E) over the holes on the ends of the top rail brackets. Locate the holes on the underside of the top rail bracket. With an 5/32 drill bit, pre-drill the top post using the top rail bracket holes as a template. Install the supplied #10 self-drilling screws into the pre-drilled holes to secure the top rail (See Figure O). Figure L. Install the bracket key using the supplied #10 self-drilling screws. Figure M. (Left) Align the stabilizer holes with the holes on the posts. Figure N. (Right) Slide the top rail assembly over the pre-installed bracket keys. USE THE #10 COATED SELF-DRILLING SCREWS TO INSTALL INTO THE TOP RAIL BRACKET. Install the post cap (Component P) by adding a small bead of silicone around the inside lip of the cap. Place it firmly on top of the post. Figure O. Install the supplied #10 self-drilling screws into the pre-drilled holes to secure the top rail. Cable Installation on Level Sections Running the Cable Beginning at the top, attach the cable to the HandiSwage Stud (part number C0731-H0703-2, C0731-H ) in accordance with the hand swaging tool instructions. FOLLOW ALL WARNINGS AND WEAR PROPER SAFETY EQUIPMENT WHEN WORKING WITH CABLE TO PREVENT INJURY. Using the NOVA II Cover Nut Set, place the plastic washer and nut on the end of the HandiSwage Stud threaded shank. Hand tighten until 1/2 of thread extends beyond the nut (See Figure P). Set aside the cover for installation later. On the other end of the cable run, place the plastic washer and nut on the end of another HandiSwage Stud. Leave the tensioning nut as much travel as possible. Put the stud against the opposite post and pull the cable tight by hand to the back of the stud. Mark and cut the cable at the notch before the threads (See Figure Q). Swage the second fitting in accordance with the swaging tool instructions. Feed the cable through all intermediate stabilizers and posts. Repeat the above steps until all the cables are run BEFORE applying tension. Plastic Washer Figure P. (Left) Attach the first cable to the HandiSwage stud. Place the plastic washer and nut on the end of the shank. Figure Q. (Right) Pull the cable tight to the back of the swage fitting. Mark and cut the cable as shown. Swage the second fitting in accordance with the swaging tool instructions All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

8 Tensioning the Cable Before tensioning any of the cables, it is important to be sure that the frame for the NOVA II System is completed. Make sure the posts are installed securely and in accordance with the recommended installation procedures in the previous steps. Install all top and bottom rails. The posts will deflect beyond allowable limits if you attempt to tension the cables on an incomplete railing system. Before tensioning with tools, hold the stud fittings firm and tighten the nuts by hand until all cables are snug. ATLANTIS RAIL REQUIRES USING LOCTITE THREADLOCKER BLUE 242 ON THE THREADS OF THE HANDISWAGE STUD. APPLY A DROP TO THE THREADS AS CLOSE TO WHERE THE NUT WILL BE TIGHTENING AGAINST THE WASHER AS POSSIBLE. USE A DAMP CLOTH TO CLEAN UP EXCESS RESIDUE IMMEDIATELY. When tensioning the cable, you must hold the stud or cable in a neutral position while turning the nut to apply tension. There are two (2) methods to accomplish this; both requiring a pair of vice grip pliers. Option one (1) is to hold the back of the swage stud with the vice grips which requires at least 1/4 space between the tensioning nut and the end of the stud (See Figure R). Option two (2) is to use a Cable Grip Pad (part number E ) to hold the cable just outside the post while you tension the stud using the tensioning nut (See Figure S). Figure R. Option one (1) is to hold the back of the stud with vice grips while tightening the nut. Figure S. Option two (2) is to use a cable grip pad to hold the cable just outside the post while tightening the nut. USING METHOD TWO (2) REQUIRES A HANDISWAGE CABLE GRIP PAD. NEVER CLAMP PLIERS OR VICE GRIPS DIRECTLY ON THE CABLE. Set the vice grips with a 1/8 space total between the cable and the vice grip jaws. Place the pad on the cable and then apply the vice action to the pliers. Tension the Center Cable Beginning with the center run of cable. Hold the hand swage stud firm using one (1) of the methods described above and tighten the tensioning nut with a 7/16 wrench. Tighten the nut three (3) or four (4) full rotations until the cable is snug. Do not over-tension! Don t worry if this cable moves a little, we will come back around to it later. Tension the Remaining Cables Alternate tensioning the cables from the center, working above and below the center cable as if tightening the lug nuts on a tire (See Figure T). Again tension the nuts three (3) or four (4) full rotations or until the cable is snug. You will notice as you tension, the cables surrounding it will slacken. When this happens, stop tensioning and move onto the next cable. Make Final Adjustments Go back to the center cable and re-tighten the cables until all are tight and relatively equal in tension. You may find that you need to do this three (3) or four (4) times getting down to even a quarter turn of the tensioning nut each time. Tension from both sides when necessary Figure T. Begin with the center run of cable and alternate working above and below until all the cables are tight All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

9 Install the Cover Nuts With the cables tensioned, it s time to install the cover nuts. Using a hacksaw, cut the remaining shank flush with the tensioning nut. Then place the cover nut over the assembly until it is flush with the post (See Figure U). Figure U. Cut the remaining shank flush with the tensioning nut, then place the cover nut over the assembly. Cable Installation on Corner Sections Install the RailEasy 1/8 Stud Locate the side of the corner post (Component Mb or Nb) with the threaded holes. Including the plastic washer (Component V, supplied), insert the RailEasy 1/8 Stud (Component U) into the corner post hole and thread it into the corner post insert (See Figure V). Threaded Holes THE RAILEASY 1/8 STUD MUST HAVE A HANDISWAGE STUD AT THE OPPOSITE END OF THE CABLE RUN IN ORDER TO TENSION THE CABLE. With the RailEasy 1/8 Studs installed in the corner post, insert the cable into the receiver cone. Push and twist the cable opposite the lay of the wire strands. The cable should slide into the receiver cone approximately 3/16 past the bottom of the wedge (See Figures W and X). Fully tighten the receiver cone onto the threaded stud using a 7/16 and 3/8 open wrenches. Upon doing this, the wedge will crimp down on the cable and hold it in place. With the cable installed in one (1) RailEasy Stud, pull the cable to the opposite HandiSwage Stud. Follow the instruction in the Cable Installation on Level Sections to install the HandiSwage Studs. Figure V. Insert the RailEasy 1/8 Stud into the corner post hole and thread it into the corner post insert. RailEasy 1/8 Stud Components Threaded Stud 3. Wedge 2. Spacer 4. Receiver Cone Figure W. Exploded view of the RailEasy 1/8 Stud for easy identification of each component. Figure X. Cutaway view of the RailEasy 1/8 Stud Components for NOVA II Stair Section X. Top Stair Rail Y. Bottom Stair Rail Z. Top Stair Rail Bracket Mount AA. Upper Stair Rail Bracket All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

10 AB. Lower Stair Rail Bracket AC. Bottom Stair Rail Bracket Mount AD.. Bottom Stair Rail Bracket AE. Cable Stabilizer, Undrilled AF. Support Block AG. Stabilizer & Support Block Connector AH Self-Drilling Screw AI. Support Block Base Kit AJ. 3-1/2 Square Driver Bit AK. Set Screw AN. Post Cap AO Post Skirt AL. 36 Top/Mid Stair Post, Undrilled AM. 42 Bottom Stair Post, Undrilled AP. Post Pad, Drilled AQ. Lag Bolt AR. Plastic Cover Nut ALWAYS REFER TO YOUR LOCAL BUILDING CODE OFFICIALS PRIOR TO INSTALLING ANY ATLANTIS RAIL SYSTEM TO ENSURE ALL CODE AND SAFETY REQUIREMENTS ARE MET. ATLANTIS RAIL SYSTEMS IS NOT RESPONSIBLE FOR IMPROPER OR NON-RECOMMENDED INSTALLATIONS. STAIRS FOR THE NOVA II SYSTEM ARE DESIGNED AT 36 REGARDLESS OF DECK RAIL HEIGHT, PER BUILDLING CODE. STAIRS ARE EXPECTED TO HAVE LESS CABLE RUNS THAN STRAIGHT SECTIONS DUE TO THE GEOMETRY OF A STAIRWAY. NOVA II STAIR SYSTEMS ACCOMMODATE STAIR ANGLES BETWEEN 29 AND 39 DEGREES ONLY All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

11 Stair Post Installation Find the Location for the Upper & Lower Stair Posts Begin by determining where the top and bottom stair posts (Components AL & AM) will be located. Mark the desired location of the post. TO ENSURE POST LOCATION IS COMPATIBLE WITH RAILING, PRIOR TO SECURING TO THE MOUNTING SURFACE, PLACE BOTH POSTS IN POSITION, AND LAY THE BOTTOM STAIR RAIL (COMPONENT Y) ALONG THE STAIR-NOSING FROM TOP TO BOTTOM ADJACENT TO BOTH POSTS (SEE FIGURE Y). ON THE RAIL SIDE OF THE POST, MEASURE UP FROM THE TOP OF THE RAIL AND ENSURE THERE IS A MINIMUM OF 34 FOR A 36 RAIL HEIGHT. THE POST LOCATION MAY HAVE TO BE ADJUSTED TO ENSURE MINIMUM IS OBTAINED. REPEAT THIS STEP FOR THE BOTTOM POST. To achieve a 36 high railing, use a 44 post (Component AM) at the bottom of the stairs and a 38 post at the top of the top stairs (Component AL) and intermediate posts. For a wood mounting surface, position the post so the fasteners will go into the stair stringer or blocking. Make sure the decking is firmly attached to the stair stringer at the location of the posts. Use wood blocking as reinforcement underneath the decking where the posts are located. Fasteners which hold the base flange to the mounting surface should be able to secure into at least 3 of solid wood (stair stringers or reinforcement braces). WHEN INSTALLING THE NOVA II SYSTEM ON TREATED WOOD SURFACES AND CONCRETE, INSTALL THE PROVIDED POST PAD, DRILLED (COMPONENT AP; INCLUDED IN THE POST KIT) BETWEEN THE POST BASE AND THE TREATED SURFACE. Figure Y. To ensure post location is compatible with railing, prior to securing to the deck surface, place both posts in position, and lay the bottom rail along the stair-nosing from top to bottom adjacent to both posts. 2 Figure Z. You may use a deck termination post as your top stair post if the post is located no more than 2 from the edge of the deck at the stairway and the stairs are not transitioning straight down from a level section. YOU MAY USE A LEVEL TERMINATION POST AS YOUR TOP STAIR POST IF THE POST IS LOCATED NO MORE THAN 2 FROM THE EDGE OF THE DECK AT THE STAIRWAY AND THE STAIRS ARE NOT TRANSITIONING STRAIGHT DOWN FROM A LEVEL SECTION (SEE FIGURE Z). Install Upper & Lower Stair Posts When the final position is determined for the post, mark the hole locations of the four (4) 3/8 diameter mounting holes provided on the base and remove the post assembly (See Figure AA). Pre-drill the marked locations into the mounting surface and reinforcement using a 1/4 drill bit. If the post pad (Component AP) is being used, line it up with the pre-drilled holes. Mark the post pad center hole on the mounting surface, remove and pre-drill the marked location using a 1/4 drill bit. This will allow any water that builds up in the post to escape. Remount the post assembly. If mounting the posts to pressure treated lumber or concrete, place the provided Figure AA. Mark the hole locations of the four (4) 3/8 diameter mounting holes provided on the base and remove the post assembly All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

12 post pad between the post and mounting surface (See Figure AB). If using the NOVA post mounting hardware kit (A0908-HD10), insert the lag bolts (Component AQ) and secure the base to the mounting surface using a 1/2 socket and ratchet set. Make certain the posts are plumb. If the post requires adjustment, add stainless steel washers under the post pad. Once the posts are installed, apply silicone to the top of the lag bolts and secure the plastic cover nuts (Component AR) to prevent moisture from getting below the post through the lag bolt holes. Install the post skirt (Component AO) on the top and bottom stair posts BEFORE installing the saddle brackets. Stair Rail Installation Install the Bottom Stair Rail Bracket Mounts Lay the bottom stair rail (Component Y) on the stair nosing from top to bottom, adjacent to the posts. Draw a line on the underside of the bottom stair rail onto the side of the stair post (See Figure AC). Repeat this step for top, bottom and intermediate stair posts. Using a square, transfer the line onto the faces of the stair posts where the rails will be mounted. For the top and mid stair posts (Component AL), measure up 1 from the reference line and mark another horizontal, level line. For the bottom stair post (Component AM), measure up 2 from the reference line and mark a horizontal, level line. Measure 1 in from each side of the post and mark a vertical line that intersects with the horizontal line. There will be two (2) vertical lines intersection with the horizontal line. These intersections are the screw hole marks for the bottom stair rail bracket mounts (Component AC). Using a 5/32 drill bit, pre-drill the bottom stair rail bracket mount holes (See Figure AD1). With the supplied #10 self-drilling screws (Component AH), install the bottom stair rail bracket mounts. Make sure the opening of the slot is facing up (See Figure AD2). Install the Top Stair Rail Bracket Mounts Clamp a long straight edge to the side of the top and bottom stair posts, parallel with the angle formed by the steps. Adjust the straight edge so if measured from the tip of the stair nosing, it would be 36 (See Figure AE). Draw a chalk line on the top of the straight edge onto the side of the post. Repeat this step for top, bottom and intermediate stair posts. Using a square, transfer the line onto the faces of the stair posts where the rails will be mounted. On the top stair post, from that line, measure down 2 and draw a horizontal, level line. On the bottom stair post, from that line, measure down 1 and draw a horizontal, level line. Measure in 7/8 from each side and draw a vertical line that intersects with the horizontal line. Do this for top and bottom posts (See Figure AF1). Using a 5/32 drill bit, pre-drill holes at the intersections. Line up the top stair rail bracket mount (Component Z) with the pre-drilled holes. Make sure the opening of the slot is facing down, towards the stairs (See Figure AF2). Using the supplied #10 self-drilling screws, carefully drive in the screws and firmly attach the bracket mounts. Figure AB. Place the Post Pad between the post and mounting surface. Figure AC. Draw a line on the underside of the bottom stair rail onto the side of the stair post. Figure AD1. (Left) Measure, mark and pre-drill holes using a 5/32 drill bit for the bottom stair rail bracket mounts. Figure AD2. (Right) Install the bottom stair rail bracket mounts with the opening of the slot facing up. Figure AE Clamp a long straight edge to the side of the top and bottom stair posts, parallel with the angle formed by the steps and if measure from the tip of the stair nosing, it would be 36. Figure AF1. (Left) Measure, mark and pre-drill holes using a 5/32 drill bit for the top stair rail bracket mounts. Figure AF2. (Right) Install the top stair rail bracket mounts with the opening of the slot facing down All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

13 Measure, Mark & Cut the Stair Rails Measure from the upper corner to upper corner of the pre-installed bottom stair rail bracket mounts (See Figure AG). Take that measurement and subtract 2-3/4 for the top stair rail and subtract 1-5/8 for the bottom stair rail. Cut the stair rails to the appropriate lengths using a miter saw with a metal cutting blade. Install the Bottom Stair Rail Slide the bottom stair rail brackets (Component AD) onto the ends of the bottom stair rail. Make sure that the brackets are positioned so that the larger face is facing upward so that the larger face is facing upward bracket that is on the rail end that will be attached to the top stair post and the smaller face is facing upward on the bracket that is on the rail end that will be attached to the bottom stair post. Starting at the bottom stair post, take the bottom stair rail assembly and slide the bump-out or pivoting rib on the bottom stair rail bracket into the slot on the bottom stair rail bracket mount. Repeat on the top stair post. Once the bottom stair rail is positioned appropriately, locate the set screw holes on the side of the bottom stair rail bracket mounts. Loosely install the provided set screws (Component AK) using an 3/32 Allen wrench (See Figure AH). Install the Top Stair Rail Place the upper and lower stair rail brackets (Components AA & AB) on the ends of the top stair rail. Make sure the lower stair rail bracket is on the bottom stair post side and the upper stair rail bracket is on the top stair post side. Starting at the top stair post, take the top stair rail assembly and slide the bump-out or pivoting rib on the upper stair rail bracket into the slot on the top stair rail bracket mount. Repeat on the bottom stair post. Once the top stair rail is positioned appropriately, locate the set screw holes on the side of the top stair rail bracket mounts. Loosely install the provided set screws using an 3/32 Allen wrench (See Figure AI). Measure & Cut Cable Stabilizer IF THE BETWEEN POST MEASUREMENT IS 5 OR UNDER, A CABLE STABILIZER IS NOT NEEDED, THEREFORE THE CONNECTORS, SUPPORT BLOCK AND SUPPORT BLOCK BASE KIT DO NOT HAVE TO BE INSTALLED. With the rails loosely installed, find where to place the cable stabilizer (Component AE) by measuring the horizontal distance between the inside of the top and bottom stair posts and divide that measurement by two (2). Do not measure on the angle of the stairs (See Figure AJ). Using a straight edge or level, take the measurement found in the step above and mark the side of the top and bottom stair rails. Transfer the markings using a square to the underside of the top stair rail and the top and underside of the bottom stair rail. Hold and center the stabilizer on the reference marks on the side of the rails and mark the angle on the stabilizer from the underside of the top stair rail and the top of the bottom stair rail Figure AG. Measure from the upper corner to upper corner of the pre-installed bottom stair rail bracket mounts. Figure AH. Slide the bottom stair rail brackets onto the ends of the bottom stair rail and loosely install using the supplied set screws. Figure AI. Slide the upper and lower stair rail brackets onto the ends of the top stair rail and loosely install using the supplied set screws. Figure AJ. Measure the horizontal distance between the inside of the top and bottom stair posts and divide that measurement by two (2) All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

14 (See Figure AK). These are the markings of where to cut the cable stabilizer. Cut the stabilizer along the marked lines using a miter saw with a non-ferrous carbide tipped blade. Install the Support Block Base Kit & Connectors The support block base kit (Component AI) consists of one (1) connector, one (1) #12 flat head wood screw, one (1) rectangular nylon gasket, one (1) rectangular mounting plate, two (2) #10 pan head wood screws and two (2) nylon washers. Assemble the support block base kit as shown in Figure AL. Insert the support block (Component AF) onto the connector of the pre-assembled support block base kit. Place the assembly on the surface of the step and align it with the center reference mark on the bottom stair rail. Transfer a line from the underside of the bottom stair rail onto the support block (See Figure AL). Cut the support block along the marked line using a miter saw with a metal cutting blade. Remove the top and bottom stair rails. Do not remove the rail bracket mounts. Keep the bottom stair rail brackets on the bottom stair rail. Find and mark the center of the width of the underside of the top stair rail (Component X) and the top and underside of the bottom stair rail. This mark should intersect with the cable stabilizer reference mark found in the step above. Pre-drill the intersections with a 1/8 drill bit. Mount the stabilizer and support block connectors (Component AG) with #8 self-drilling screws (See Figure AM). Place the support block base kit assembly (including the support block) onto the connector on the underside of the bottom rail. Make sure the bottom stair rail brackets are on the bottom stair rail. Starting at the bottom stair post, take the bottom stair rail assembly and slide the bump-out or pivoting rib on the bottom stair rail bracket into the slot on the bottom stair rail bracket mount. Repeat on the top stair post. Do not install. Transfer marks onto the step where the support block base kit mounting plate is (See Figure AN). Remove the bottom stair rail and pre-drill the base kit marks with a 1/8 drill bit. Before installing the base kit, make sure the nylon gasket is between the mounting plate and the step. Install two (2) #10 pan head wood screws making sure to include the nylon washers. Insert the support block onto the base kit connector. Install the bottom stair rail making sure the connector on the underside of the bottom rail is inserted into the support block. Figure AK. Hold and center the stabilizer on the reference marks and mark the angle on the stabilizer. Figure AL. Proper assembly sequence of the support block base kit. Figure AM. Place assembly on the surface of the step and align it with the center reference mark on the bottom stair rail. Transfer a line on the support block. IF THE SUPPORT BLOCK ASSEMBLY IS DRIVING THE BOTTOM STAIR RAIL UP, REMOVE AND SHORTEN THE SUPPORT BLOCK AS NEEDED. Once the bottom stair rail is positioned appropriately, locate the set screw holes on the side of the bottom stair rail bracket mounts. Install the provided set screws using an 3/32 Allen wrench. Insert the cable stabilizer over the connector on the top of the bottom stair rail. Place the upper and lower stair rail brackets on the ends of the top stair rail. Make sure the lower stair rail bracket is on the bottom stair post side and the upper stair rail bracket is on the top stair post side. Place the top stair rail onto the stabilizer. Figure AN. Install the stabilizer and support block connectors using a #8 self-drilling screw All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

15 Starting at the bottom stair post, take the top stair rail assembly and slide the bump-out or pivoting rib on the lower stair rail bracket into the slot on the top stair rail bracket mount. Repeat on the top stair post. Make sure the connector on the underside of the top stair rail is inserted into the stabilizer. Once the top stair rail is positioned appropriately, locate the set screw holes on the side of the top stair rail bracket mounts. Install the provided set screws using an 3/32 Allen wrench. IF THE STABILIZER IS DRIVING THE TOP STAIR RAIL UP, REMOVE AND SHORTEN AS NEEDED. Install the post cap (Component AO) by adding a small bead of silicone around the inside lip of the cap. Place it firmly on top of the post. Measure & Mark the Stair Posts & Cable Stabilizer At the top stair post, measure the space between the top of the bottom stair rail bracket mount and the underside of the top stair rail bracket mount (See Figure AP). Subtract that measurement by twenty- four (24) and divide by two (2). Take this measurement and draw a horizontal, level line from the top of the bottom stair rail bracket mount. Find the center of the post by measuring in 1-1/2 from the side and draw a vertical center line. Make sure this line intersects with the horizontal line. At the bottom stair post, measure the space between the top of the bottom stair rail bracket mount and the underside of the top stair rail bracket mount. Subtract that measurement by twenty-four (24) and divide by two (2). Take that measurement and subtract 3/4. The lower set of tensioners will be 3/4 lower than the upper set of tensioners. Take this measurement and draw a horizontal, level line from the top of the bottom stair rail bracket mount. Find the center of the post by measuring in 1-1/2 from the side and draw a vertical center line. Make sure this line intersects with the horizontal line (See Figure AQ). Atlantis Rail recommends using a RailEasy Drilling Template to space cable at 3 on-center. This is the spacing used on all pre-drilled NOVA II posts. Place the bottom center hole on the drilling template at the location where the 2 lines intersect on the post. Make sure the vertical center line lines up with the center holes on the drilling template (See Figure AR). Mark all drilling holes for the HandiSwage Tensioners (part number C ). Repeat for each stair post. Be sure to orient the tensioner holes on the drilling template in the appropriate direction of the tensioner either point up (for bottom stair posts) or down (for top stair posts). Figure AO. (LEFT) Transfer marks onto the step where the support block base kit mounting plate is. Figure AP. (LEFT) Measure the space between the top of the bottom stair rail bracket mount and the underside of the top stair rail bracket mount. Figure AQ. (LEFT) Measure up from the top of the bottom stair rail bracket and make a horizontal, level line. Measure in 1-1/2 from the side and draw a vertical center line. Figure AR. (RIGHT) Place the center hole on the drilling template at the location where the 2 lines intersect on the post. Make sure the vertical center line lines up with the center holes on the drilling template. Atlantis Rail offers a drilling template (C ) to aid in your installation process. Ask your Sales Representative for more information. To find the placement of the holes on the undrilled cable stabilizer, first, find the center of the stabilizer face and draw a vertical line on the two (2) face sides where cable will run All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

16 through. Take a string and tape one side to the top center hole mark on the top stair post. Take the other side of the string and tape it to the top center hole mark of the bottom stair post. Draw a line where the string crosses the stabilizer on the side of the stabilizer (See Figure AS). Using a square, transfer the horizontal line on both faces of the stabilizer. Make sure these horizontal lines intersect with the vertical center line. Using the center hole on the RailEasy Drilling Template, mark all center holes on both faces of the stabilizer. Figure AS. Take a string and tape each end to the top center hole mark on the top and bottom stair posts. Draw a line where the string crosses the stabilizer. Drill the Stair Posts & Cable Stabilizer Pre-drill the holes on the top and bottom stair posts using a 9/64 drill bit. Before installing the tensioners, place the NOVA Tensioner Backing Disk (part number A0908-TB04-10) between the tensioner base and post, making sure the hole patterns line up (See Figure AT). Fasten the tensioners using three (3) #8 x 1-1/2 screws (supplied). Figure AT. Place the NOVA Tensioner Backing Disk between the HandiSwage Tensioner base and the post and make sure the hole patterns line up. FACE THE NOTCH ON THE TENSIONER BASE DOWNWARD ON THE TOP STAIR POST AND UP ON THE BOTTOM STAIR POST TO ENSURE PROPER SWIVELING ACTION (FIGURE AU). Figure AU. Face the notch on the tensioner base down on the top stair post and up on the bottom stair post. Using a 3/8 drill bit, drill a hole at the intersection of each center hole mark on the cable stabilizer. Drill from both sides. Do not drill angled holes. Once all the holes on both faces of the cable stabilizer are drilled out, affix a NOVA Stair Stabilizer Grommet (part number A0908-SG01-25) around each hole (See Figure AV). These grommets must be installed BEFORE installing the cable. Figure AV. Using a 3/8 drill bit, drill all the holes on each face of the cable stabilizer and affix a NOVA Stair Stabilizer Grommet around each hole. IF A STAIR POST IS BEING USED AS A MID POST, TREAT IT LIKE A STABILIZER KIT. MARK THE CABLE HOLES USING THE SAME TECHNIQUE. USING A 3/8 DRILL BIT, DRILL OUT THE CABLE HOLES ON BOTH FACES. DO NOT DRILL ANGLED HOLES. AFFIX A NOVA STAIR STABILIZER GROMMET AROUND EACH HOLE (FIGURE AW). Figure AW. If a stair post is being used as a mid post, use a 3/8 drill bit to drill all the holes on each face and affix NOVA Stair Stabilizer Grommet around each hole All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

17 Cable Installation on Stair Sections Install the Cable With the HandiSwage Tensioners (See Figure AX) installed on the stairs, begin by extending the threaded stud outward a minimum of 3/4 for the first 20 feet plus 1/4 for each additional 10 feet. To insert the cable into the receiver cone, push and twist the cable opposite the lay of the wire strands. The cable should slide into the receiver cone approximately 3/16 past the bottom of the wedge. Fully tighten the receiver cone onto the threaded stud using 7/16 and 3/8 open wrenches. Upon doing this, the wedge will crimp down on the cable and hold it in place. With the cable installed in one (1) tensioner, pull the cable to the opposite tensioner. Pull the cable tight to the tensioner and cut it between the beginning of the threads and the fixed nut on the threaded stud. Using the first run as a guide, cut the remaining runs to the same length. This will ensure uniformity among the tensioners. Thread the cable through the cable stabilizer (Component AE) and install the cable into the opposite tensioner using the same process as before. Tensioning the Cable Begin with the center run of cable. Using a 3/8 open wrench, hold the threaded stud in place and rotate the tensioner body with a 5/16 open wrench. Tension each side equally until taut. Do NOT over-tension. Over-tensioning will cause posts to deform and deflect. When all cable runs are properly tensioned, tighten the lock nuts to maintain tension. When tensioning, it is important to begin with the center run of cable and alternate working above and below the center, much like tightening the lug nuts on a tire (See Figure AY). This will help to ensure that your posts don t deflect during tensioning. It will also help to tension equally throughout. Continue tensioning all the cables in this same fashion until all cables are tight HandiSwage Tensioner Components 1. Patented Base 3. Lock Nut 5. Spacer 7. Receiver Cone 2. Tensioner Body 4. Threaded Stud 6. Wedge Figure AX. HandiSwage Tensioner components Figure AY. Begin with the center run of cable and alternate working above and below until all the cables are tight. NOVA II System Cable Mounting Hardware HandiSwage Stud C0731-H The HandiSwage Stud is the main tensioning component on the level NOVA II sections (See Figure AZ). Attach the cable to the hand swage stud in accordance with the hand swaging tool instructions. Affix a NOVA Cover Nut Set to allow for tensioning of the cable. Available in packs of two (2). HandiSwage Tensioner C The HandiSwage Tensioner is used on the NOVA II stair sections. It features a slotted base to allow for angles up to 45. Affix the base to the NOVA II stair posts with three (3) #8 x 1-1/2 screws. Attach the cable by inserting it into the receiver cone and tightening the cone onto the threaded stud. Upon doing this, the wedge will crimp down on the cable and hold it in place (See Figure BA). Available in packs of two (2). Plastic Washer Figure AZ. The HandiSwage Stud is used on NOVA II level sections and features minimal hardware obstruction Figure BA. The HandiSwage Tensioner is used on NOVA II stair sections and features a compression fitting and a slotted base for a quick and easy installation All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

18 NOVA II System Accessories NOVA Tensioner Backing Disk A0908-TB04-10 This backing disk is used in conjunction with the HandiSwage Tensioner. Place the NOVA Tensioner Backing Disk between the tensioner base and post (See Figure BB). Make sure the hole patterns line up and install the tensioner. Available in packs of ten (10). NOVA Cover Nut Sets The NOVA Cover Nut Sets includes a plastic washer, stainless steel nut and plastic cover nut. They are used with the HandiSwage Stud for tensioning capabilities. Place the plastic washer and stainless nut onto the shank of the stud, tension, remove the excess thread and affix the plastic cover nut for a finished look (See Figure BC). Available in black, white and bronze colors and in packs of ten (10) or twelve (12). NOVA End/Corner Grommet - C0916-B003 The end/corner grommet helps prevent movement and deflection of the cable, as well as, reduces dirt and moisture from getting inside the posts. These grommets are used on end and corner level posts (Components M & N). It fits over the HandiSwage Stud. Once the cable infill is installed, place the slotted side on the cable and push down until it snaps onto the cable (See Figure BD). Push the tapered end onto the stud and into the end or corner post hole until only the flange is showing (See Figure BE). Available in packs of twenty five (25). NOVA Mid Grommet - C The mid grommet helps prevent movement and deflection of the cable, as well as, reduces dirt and moisture from getting inside the posts. These grommets are used on the universal level posts (Component M) where the cable is passing through (not terminating with a HandiSwage Stud). Once the cable infill is installed, place the slotted side on the cable and push down until it snaps onto the cable (See Figure BF). Push the tapered into the mid post hole until only the flange is showing (See Figure BG). Available in packs of twenty five (25). Universal Stabilizer Mid Grommet - C0916-A003 This grommet helps prevent movement and deflection of the cable, as well as, reduces dirt and moisture from getting inside the posts. These grommets are used on cable stabilizer (Component K) level sections. Once the cable infill is installed, place the slotted side on the cable and push down until it snaps onto the cable (See Figure BF). Push the tapered end into the cable stabilizer hole until only the flange is showing (See Figure BG). Available in packs of twenty five (25). NOVA Stair Stabilizer Grommet - A0908-SG01-25 The stair stabilizer grommet helps prevent movement and deflection of the cable, as well as, reduces dirt and moisture from getting inside the posts. These grommets are used on stair stabilizers (Component AE). This grommet must be put on BEFORE the cable is run through the stabilizer. Affix the grommet around each hole in the stair stabilizer (See Figure BH). Available in packs of twenty five (25). Figure BB. Place the NOVA Tensioner Backing Disk between the HandiSwage Tensioner base and the post and make sure the hole patterns line up. Figure BC. Place the plastic washer and nut onto the shank of the HandiSwage Stud, tension, remove the excess thread and affix the plastic cover nut. Figure BD. Place the slotted side on the cable and push down. Figure BE. Push the tapered end onto the HandiSwage Stud and into the end or corner post hole. Figure BF. Place the slotted side on the cable and push down. Figure BG. Push the tapered end into the mid post or cable stabilizer hole. Figure BH Affix the NOVA Stair Stabilizer Grommet around each hole in the stair stabilizer All Rights Reserved Atlantis Rail Systems, HandiSwage and RailEasy is a registered trademark and

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template

Tape Measure Carpenter s Square Touch-up Paint Chalk Line. Blue 242. Template ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Rd. Plymouth, MA 02360 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com NOVA System Installation Instructions The

More information

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue

Cable Cutter Square. 25 Tape Measure. Chalk Line Level Loctite 242 Blue ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030

ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA North Las Vegas, NV 89030 ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

Hammer. Loctite 242 Blue. April 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation

Hammer. Loctite 242 Blue. April 2018 trademarks of Suncor Stainless, Inc. Loctite is a registered trademark of Henkel Corporation ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Rd. Plymouth, MA 02360 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com HandiSwage Cable Railing Installation Instructions

More information

Safety Glasses Work Gloves Chop Saw with Cutting Disk. Half Round File Pencil Marker

Safety Glasses Work Gloves Chop Saw with Cutting Disk. Half Round File Pencil Marker ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

Chalk Line. #4 Phillips Driver Bit. Cable Cutters

Chalk Line. #4 Phillips Driver Bit. Cable Cutters ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

ATLANTIS RAIL Contact Information

ATLANTIS RAIL Contact Information ATLANTIS RAIL Contact Information Customer Service (800) 541-6829 (508) 732-9191 Spectrum System Installation Instructions Atlantis Rail s Spectrum System is an easy to install, universal cable railing

More information

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013

ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013 ATLANTIS RAIL HandiSwage Installation Instructions ATLANTIS RAIL Contact Information Atlantis Rail Systems November, 2013 Atlantis Rail s HandiSwage System is an easy to use cable railing product utilizing

More information

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST

AFCO-Rail Post INSTALLATION INSTRUCTIONS AFCO-RAIL POST AFCO-Rail Post INSTALLATION INSTRUCTIONS TOOLS REQUIRED: Drill Bits (for the appropriate fastener) Drill (with adjustable clutch, recommended) Level String Line Tape Measure Tools to install fasteners

More information

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT:

PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: 175 SERIES FIXED STAIR CABLE RAIL - INSTALLATION INSTRUCTIONS PARTS INCLUDED IN FIXED STAIR CABLE RAIL KIT: FIXED STAIR TOP RAIL (1) A FIXED STAIR BOTTOM RAIL (1) B D UPPER SADDLE BRACKET (1) C BRACKET

More information

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses

#4 Phillips Driver Bit 1/8, 4mm, 5.5mm & 8mm (5/16 ) Allen Wrench. Safety Glasses ATLANTIS RAIL Contact Information: Atlantis Rail Systems 70 Armstrong Road 3900 Civic Center Drive Plymouth, MA 02360 North Las Vegas, NV 89030 (800) 541-6829 or (508) 732-9191 (508) 732-9798 www.atlantisrail.com

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS v2012 orizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications:

More information

Horizontal Cable Systems

Horizontal Cable Systems ALUMINUM RAILING INSTALLATION INSTRUCTIONS Horizontal Cable Systems 1) Check Contents Of Packages: Verify that all parts have arrived and that they match the packing list. 1A) Coastal applications: Confirm

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for FortressCable H-Series Stair Panels with Simplified Stair Bracket SSB-05 and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and

More information

Create cable assemblies to fit your style

Create cable assemblies to fit your style 2015 Feeney (11/15) Quick-Connect Brochure #2015-975B Create cable assemblies to fit your style Quick-Connect Solutions Guide The fast and easy way to create your own CableRail assemblies! Our CableRail

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for Fortress Horizontal Cable Panel System with UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

RAILING R A IL ING 51

RAILING R A IL ING 51 RAILING RAILING 5 TREX TRANSCEND RAILING NOTES:» TREX TRANSCEND RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED

More information

The following instructions will guide you through the installation of your new vinyl railing.

The following instructions will guide you through the installation of your new vinyl railing. Installation Guide St. James Vinyl T-Rail Tools Required Protective eye glasses 3/8 x 3 Concrete Anchors/Fasteners (for Tape measure concrete installations) Variable speed drill/screwdriver Philips Driver

More information

4Post Trakslider Instructions

4Post Trakslider Instructions 4Post Trakslider Instructions FOR ASSEMBLY ASSISTANCE CONTACT CUSTOMER SERVICE AT 1-866-217-0330 (MONDAY THRU FRIDAY 8 AM - 5 PM EST) PAGE 1 OF 31 INST0083 REV2 WS 4/16/08 Tools Required for Assembly Or

More information

Installation Instructions

Installation Instructions File #2013-640A Installation Instructions for DesignRail Aluminum Rail Kits with CableRail Cable Infill - LEVEL RAILING 36-42 high railing for residential applications between wood or non-ferrous metal

More information

Installing AZEK Evolutions Rail

Installing AZEK Evolutions Rail Installing Evolutions Rail TM Contemporary Installing AZEK Evolutions Rail Installing Evolutions Rail Contemporary Style... 2 Installing CableRail by Feeney for Evolutions Rail Contemporary Style... 8

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for FortressCable H-Series Cable Panel System With UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain

More information

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 6 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 6 Stainless

More information

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CCRR-0171 PFS AA-652 Drill/power screwdriver Assorted drill bits Hammer Miter or circular

More information

Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension!

Transform Cable Rail MUST be installed on 4 x 4 wooden posts sleeved with Transform post sleeves to support cable tension! CABLE RAIL INSTALLATION INSTRUCTIONS OVERVIEW...2 LEVEL...3 STAIR...13 Transform Cable Rail MUST be installed on 4" x 4" wooden posts sleeved with Transform post sleeves to support cable tension! 1 Need

More information

I N S T A L L A T I O N I N S T R U C T I O N S. RailEasy MARINER

I N S T A L L A T I O N I N S T R U C T I O N S. RailEasy MARINER I N S T A L L A T I O N I N S T R U C T I O N S RailEasy MARINER Atlantis Rail Systems 2007 Atlantis Rail Mariner Installation Guide Atlantis Rail Systems December 2, 2008 Atlantis Rail Systems Contact

More information

Franklin Mills Stackable Movable Lateral Instructions

Franklin Mills Stackable Movable Lateral Instructions Franklin Mills Stackable Movable Lateral Instructions Table of Contents: Table of contents...1 Tools Required...2 Stationary Shelving Assembly...3-7 Mobile Shelving Assembly...8-16 Rail Assembly...8-11

More information

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

Now available at participating Feeney (2/14) AF# A. Stores. 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View! 2014 Feeney (2/14) AF# 2009-236A Now available at participating Stores 1/8'' Stainless Steel Cable Assemblies to Enhance Any Railing and Any View! Easy-to-install, prefabricated cable assemblies are an

More information

Installation Instructions for. Handrail Component System

Installation Instructions for. Handrail Component System Handrail STEP-BY-STEP Installation Instructions for Handrail Component System Rise in Inches Run in Inches 8 8.5 9 9.5 10 10.5 11 11.5 12 12.5 13 13.5 14 14.5 15 8.5 47 45 43 42 40 39 38 36 35 34 33 32

More information

Open Up Your View With CABLE SYSTEMS

Open Up Your View With CABLE SYSTEMS Open Up Your View With CABLE SYSTEMS PRESENTED BY CROWN HERITAGE Our Cable Multiple options to accomodate any deck or stair design Marine Grade 316 stainless steel Swaging is the term used for attaching

More information

The following instructions will guide you through the installation of your new vinyl railing stair kit.

The following instructions will guide you through the installation of your new vinyl railing stair kit. Installation Guide Vinyl Standard Stair Railing Tools Required Protective eye glasses Tape measure Variable speed drill/screwdriver Rotary hammer or hammer drill and masonry percussion bit recommended

More information

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 INSTALLATION INSTRUCTIONS Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 LEVEL RAIL WITH CAP The testing was performed in accordance with procedures and methods referenced

More information

Clearview Railing System Installation Instructions

Clearview Railing System Installation Instructions Clearview Railing System Installation Instructions Disclaimer: AGS Stainless, Inc. has its Clearview Railing Systems designed by a professional engineer to meet the requirements of the latest national

More information

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit

PRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit R INSTALLATION INSTRUCTIONS PRODUCT: LOKI CONFIGURATION: SINGLE DOOR MOUNT: GLASS MOUNT Product is covered by U.S. patents. For more information visit www.krownlab.com . TOOLS + MATERIALS REQUIRED TOOLS

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View! 2017 Feeney (2/17) Packaged Products Catalog #2011-338G 1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View! Standard Cable Assemblies Easy-to-install, prefabricated cable assemblies

More information

1. TOOLS + MATERIALS REQUIRED

1. TOOLS + MATERIALS REQUIRED R INSTALLATION INSTRUCTIONS PRODUCT: BALDUR + ODEN CONFIGURATION: BI-PARTING DOOR MOUNT: TOP MOUNT Product is covered by U.S. patents. For more information visit www.krownlab.com. TOOLS + MATERIALS REQUIRED

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 36 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 36 Stainless

More information

** Do Not Contact the Store ** For Assistance, including missing or broken parts, Call Customer Service at:

** Do Not Contact the Store ** For Assistance, including missing or broken parts, Call Customer Service at: 3/01/2007 VISIT THE LITIME WEB SITE: WWW.LITIME.COM ** Do Not Contact the Store ** For Assistance, including missing or broken parts, Call Customer Service at: 1 (800) 225-3865 Double Shed Doors for Back

More information

JK TrailGate JK TrailGate

JK TrailGate JK TrailGate INSTALLATION INSTRUCTIONS INST-17-66-010_A JK TrailGate IMPORTANT: Thank you for purchasing this Poison Spyder product. Please read through this entire document before proceeding with installation. If

More information

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.

Fortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards. Installation Instructions for Fortress Vertical Cable Panel System with Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required

More information

model tsa-sa48 Sliding Crosscut Table installation guide

model tsa-sa48 Sliding Crosscut Table installation guide model tsa-sa48 Sliding Crosscut Table installation guide A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

PVC Composite Railing & Stair Kit

PVC Composite Railing & Stair Kit FREEDOM-WEB PVC Composite Railing & Stair Kit INSTALLATION INSTRUCTIONS Read all instructions prior to installing product. Refer to manufacturers safety instructions when operating any tools. To register

More information

TREX TRANSCEND RAILING

TREX TRANSCEND RAILING RAILING NOTES:» RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED.» All

More information

Assembly Instructions 10 X 10 Aluminum Frame Building

Assembly Instructions 10 X 10 Aluminum Frame Building Assembly Instructions 10 X 10 Aluminum Frame Building 27 97 9 8 47 36 74 52 10 10 X 10 Square Building W/ Dome Includes: The Steel Entry Door with a Dead Bolt Lock assembly and Aluminum Door Frame. Metal

More information

Shetland Stalls Installation Instructions

Shetland Stalls Installation Instructions Shetland Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 1/9/18 Before you start Kit can accommodate up to 12 wide stall front

More information

OXYGEN INSTALLATION. Revision date

OXYGEN INSTALLATION. Revision date 12345 1 Hardware List 12345 Flat head wood screw #9 x 7/8 long with #2 Phillips drive, silver Used to attach surfaces and end panels Hex set screw ½-13 x 2 long with 1/4 hex drive, black Used on Legs Hex

More information

Face Mount to Through-the-Post Mount

Face Mount to Through-the-Post Mount Face Mount to Through-the- Mount Cable Runs through Two Corners When going around two corners, it s necessary to tension the cable from both ends as shown in Deck 4. Use the 672 series The tensioning devices

More information

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Introduction Thank you for purchasing the Rocky Mountain Westy Swing Away Carrier Kit. We pride ourselves in the products we develop

More information

INSTALLATION INSTRUCTIONS GUIDE

INSTALLATION INSTRUCTIONS GUIDE CERTAINTEED RAILING AND DECKING INSTALLATION INSTRUCTIONS GUIDE Kingston Vinyl Railing and Vinyl Decking CONTENTS Important Information Before You Begin...3 Helpful Hints, Tips, Fire Information and Tools

More information

Stair Parts Installation. Tricks

Stair Parts Installation. Tricks Stair Parts Installation Tips & Tricks Introduction Your DIY staircase guide Welcome to the Stairpart home installation guide. Your stairway is both a functional and focal point in your home, so keeping

More information

Frameless Inline Door With Return QCI5263

Frameless Inline Door With Return QCI5263 INSTALLATION INSTRUCTIONS Frameless Inline Door With Return QCI5263 WALL MOUNT HINGES FRAMELESS DOOR / PANEL / RETURN PANEL QCI5263 REV. 0 Page 1 Certified 06/17/2016 Parts List with wall mount hinges

More information

1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View!

1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View! 2015 Feeney (3/15) Packaged Products Catalog #2011-338D 1/8 Stainless Steel Cable Assemblies to Enhance Any Railing and Any View! Standard Cable Assemblies Easy-to-install, prefabricated cable assemblies

More information

Installation Instructions - Model V4JSD 1

Installation Instructions - Model V4JSD 1 Installation Instructions - Model V4JSD 1 Support Assemblies: Parts list: (Note see enclosed cut sheet for quantities and dimensional information) A vertical structural member (1 ½ x 1 ½ modular frame)

More information

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR

Customer Notice: Congratulations again on your SawStop purchase, and thank you! -SawStop Tualatin, OR Customer Notice: Congratulations on the purchase of this Sliding Crosscut Attachment. As the owner of a SawStop saw, you are familiar with our high standards for quality, fit and finish. Different from

More information

ATTRACTIVE VERSATILE DURABLE

ATTRACTIVE VERSATILE DURABLE CABLERAIL 7 CHECK THE CABLERAIL ADVANTAGES Attractive, affordable, and very low-maintenance. Invisible appearance will not impair views. Made from strong and weather-tough type 6 stainless steel cable.

More information

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY EmagiKit Privacy Pod Plus Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY DIMENSIONS AND COMPONENTS 47 47 Ceiling Unit 2-B 2-L 2-R Glass Door Corner Trim Door Handle 90 Adjustable Height Work Surface 1-B

More information

Chapter 1. Beam and Sill Plates

Chapter 1. Beam and Sill Plates Chapter 1. Beam and Sill Plates 1.1 ESTABLISHING SQUARE SILL PLATE CHALK LINES 1.2 INSTALLING TREATED SILL PLATES 1.3 INSTALLING LAMINATE BEAM Tools needed by volunteers: Hammer Nail apron Tape measure

More information

Assembly Instructions

Assembly Instructions InTandem Table System November 20 InTandem Table System - Worksurface #4 x/" 4 wood screw power beam Tools Provided T-0 Extended Torx Driver T-25 Torx Driver Additional Tools Required Soft protective

More information

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS

Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS FREEDOM-WEB Ready-To-Assemble VersaRail INSTALLATION INSTRUCTIONS Read all instructions prior to installing product. Refer to manufacturers safety instructions when operating any tools. To register your

More information

Instruction Manual. The Clear Choice! Aluminum Railing. Stainless Railing. Cable Railing. Trellis Systems. Maintenance Free. 316 Stainless Steel

Instruction Manual. The Clear Choice! Aluminum Railing. Stainless Railing. Cable Railing. Trellis Systems. Maintenance Free. 316 Stainless Steel Instruction Manual Aluminum Railing Stainless Railing Cable Railing Trellis Systems Maintenance Free 316 Stainless Steel Virtually Invisible Light Strong Durable Custom Colors The Clear Choice! 1 Table

More information

Tools & Materials Needed

Tools & Materials Needed 15/16" ALUMINUM RAILING SYSTEM Installation Guide Canadian Version Tools & Materials Needed Hacksaw or metal cutting saw Drill Drill bits: 1/8", 5/32", 3/16", 7/32", 1/4" 3/8" socket or wrench Phillips

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

NX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS

Post & Rail. Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail POST SUPPORT OPTIONS Post & Rail Includes: Crossbuck, 2-Rail, 3-Rail and 4-Rail STAGGER RAIL ENDS FOR GREATER STRENGTH ALLOW 1-1/2" GAP ON HINGE SIDE OF GATE AND 1-1/4" ON LATCH SIDE OF GATE HARDWARE DIG HOLES 30" MINIMUM

More information

Tools & Materials Needed

Tools & Materials Needed Installation Guide U.S. Version Tools & Materials Needed Hacksaw or metal cutting saw Drill Drill bits: 1/8", 5/32", 3/16", 7/32", 1/4" 3/8" socket or wrench Phillips screwdriver Measuring tape Non-corrosive

More information

POST INSTALL INSTRUCTIONS

POST INSTALL INSTRUCTIONS POST INSTALL INSTRUCTIONS Layout your deck or patio to optimize the railing sections and posts. Use speed square for placement of post. Important to have blocking below decking and fastened to or through

More information

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions

TREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions TREX ENHANCE RAILING (Also Applies to Trex Select Railing) NOTE: All Enhance Railing lengths are manufactured at CLEAR SPAN dimensions (spanning between space of posts): 7" for 6' clear span. Note that

More information

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE

HOUSE PARTS PACKED IN HOUSE BOX PARTS IN PLASTIC BAG (HARDWARE) PARTS IN SMALL PLASTIC BAG (FLOOR CLIPS) PARTS PACKED IN BUNDLE Check parts against this list before starting assembly. Refer to illustrations on pages 6 and 7 to view house parts. If any shortages are found, refer to Packing Slip for claim instructions. Item 3 5 6

More information

Video Wall Installation Instructions 2W X 3H, 3W X 3H

Video Wall Installation Instructions 2W X 3H, 3W X 3H Video Wall Installation Instructions 2W X 3H, 3W X 3H www.microndisplaysolutions.com Table of Contents Important Safety Instructions... 3 Configuration... 4 Package Contents, included and optional items...

More information

UNIT No FRAMELESS PIVOT SHOWER DOOR

UNIT No FRAMELESS PIVOT SHOWER DOOR INSTALLATION INSTRUCTIONS UNIT No. 3600 FRAMELESS PIVOT SHOWER DOOR NEED INSTALLATION HELP? Call 1-800-45-BASCO (452-2726) Monday - Friday 8:00 A.M. - 4:30 P.M. Eastern Time QCI0020 Rev. 3 Page 1 of 8

More information

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts

Installation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox

More information

GATE INSTALLATION. Tools & Materials Needed. peakproducts.com. Self-drilling screw. Lag bolt

GATE INSTALLATION. Tools & Materials Needed. peakproducts.com. Self-drilling screw. Lag bolt GATE INSTALLATION Gate opening (W), must not exceed 46". Remove the latch side of the gate (Fig. 1). Cut the top and bottom gate rails 7 1/2" shorter than the gate opening (Fig. 2). Align the top rail

More information

Installation Instructions for Vista Air Vertically Folding Walls

Installation Instructions for Vista Air Vertically Folding Walls Installation Instructions for Vista Air Vertically Folding Walls Use these instructions in conjunction with your shop drawings to see the specifics that are particular to the model you are installing.

More information

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M

Level Railing. Installation Guide. v2.5 W W W. S O L U T I O N S A L U M I N U M. C O M Level Railing Installation Guide Top Rail Bottom Rail Aluminum Baluster 2x Bottom Bracket 1x Rail Support #909915 Kit Includes: 1 - Top Rail (with Baluster Connectors installed) 1 - Bottom Rail (with Baluster

More information

Kit 102 Series Installation Instructions for Wood or Metal Posts on Level Runs

Kit 102 Series Installation Instructions for Wood or Metal Posts on Level Runs Kit 102 Series Installation Instructions for Wood or Metal Posts on Level Runs A. Drill Posts Hole size for 1/8" or 3/16" cable installation This kit may also be used for stairs or runs that exit the end

More information

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16

Equilibrium. Conference Table. Installation Instruction. Revision B 11/07/16 Equilibrium Conference Table Installation Instruction Revision B 11/07/16 Equilibrium End User Agreement Enwork Equilibrium table bases must be installed directly onto a four inch minimum thickness concrete

More information

TREX PERGOLA INSTALLATION INSTRUCTIONS

TREX PERGOLA INSTALLATION INSTRUCTIONS RECOMMENDED TOOLS/SUPPLIES: Pencil 4' Level Measuring Tape Framing Square/Speed Square 8' High Step Ladder (Two recommended) Hacksaw or Bolt Cutters Socket Wrench with 9/16" Socket and 3/4" Deep Socket

More information

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions

DekPro Prestige Aluminum Rail System Level Railing Installation Instructions ing Installation Guide Please read all instructions completely before starting any installation of DekPro Prestige Railing Systems. SAFETY: Always be safe and follow all instructions when using power tools

More information

Sliding Crosscut Table installation guide

Sliding Crosscut Table installation guide Sliding Crosscut Table installation guide model tsa-sa48 A Note About Color Variations Among Anodized Aluminum Components Congratulations on the purchase of this SawStop Sliding Crosscut Table. We at SawStop

More information

Bumper Sign INSTALLATION INSTRUCTIONS

Bumper Sign INSTALLATION INSTRUCTIONS Bumper Sign INSTALLATION INSTRUCTIONS BUMPERSIGN TOOL CHECKLIST SDS MAX Rotary Hammer Drill Marker/Pencil SDS MAX 1 Carbide Drill Bit Tape Measure Torque Wrench with ½ Drive Power Source Vacuum ½ Drive

More information

INSTALLATION VIDEOS ONLINE

INSTALLATION VIDEOS ONLINE Railing Installation Guide GLASS PICKET CABLE INSTALLATION VIDEOS ONLINE Videos are broken up into small segments which covers most aspects of glass, picket, and cable railing installations. Cable railing

More information

Oxford Stalls Installation Instructions

Oxford Stalls Installation Instructions Oxford Stalls Installation Instructions RAMM Horse Fencing and Stalls 13150 Airport Hwy. Swanton, OH 43558-9615 1-800-434-8456 Rev. 8/15/17 Before You Start Typical stall sizes are 10 x 10, 12 x 12 or

More information

NX7 SERIES 5-1/2 HANDRAIL

NX7 SERIES 5-1/2 HANDRAIL STORAGE & HANDLING The handrails are shipped unassembled. Upon receipt, immediately check all material for any damage that may have occurred in transit and verify that all of the items and quantities are

More information

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.

More information

General Guidelines:

General Guidelines: ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please

More information

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334

More information

Tools & Materials Needed

Tools & Materials Needed Installation Guide Canadian Version Tools & Materials Needed Hacksaw or metal cutting saw Drill Drill bits: 1/8", 5/32", 3/16", 7/32", 1/4" 3/8" socket or wrench Phillips screwdriver Measuring tape Non-corrosive

More information

Low Headroom Rear Mount TorqueMaster

Low Headroom Rear Mount TorqueMaster Low Headroom Rear Mount Supplemental Instruction Insert This supplemental installation instruction is to be used as a supplement to the main Installation Instruction and Owner s Manual provided with the

More information

Gared Pro-S Portable Backstop

Gared Pro-S Portable Backstop Models: 9616 & 9618 Installation, Operation and Maintenance Instructions Please read all instructions before attempting installation or operation of these units SAVE THESE INSTRUCTIONS FOR FUTURE USE PUBLICATION

More information

Contractors Rack Assembly and Installation Instructions

Contractors Rack Assembly and Installation Instructions Part # 18601 & 16601 Contractors Rack Assembly and Installation Instructions 4751 Littlejohn St. Unit A, Baldwin Park, CA 91706 Page 1 of 12 11/13/08 Thank you for purchasing the Paramount Restyling Contractors

More information

March 25, The Wagner Companies W Brown Deer Road Milwaukee, WI P F

March 25, The Wagner Companies W Brown Deer Road Milwaukee, WI P F INSTALLATION GUIDE March 25, 2016 The Wagner Companies 10600 W Brown Deer Road Milwaukee, WI 53224 888-243-6914 P - 414-214-0444 F - 414-214-0450 technical@mailwagner.com www.shop.wagnercompanies.com www.wagnercompanies.com

More information

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP

MX8 SERIES 6-1/4 HANDRAIL W/ VINYL HANDGRIP 6-1/4 HANDRAIL W/ VINYL HANDGRIP TYPICAL ASSEMBLY 5 2 BUTT JOINT 12 10 9 1 8 11 6 3 7 4 BUTT JOINT COMPONENT LIST 1 LEFT RETURN 7 UPPER IMPACT ABSORBER 2 RIGHT RETURN 8 LOWER IMPACT ABSORBER 3 OUTSIDE

More information

Sunrise Deck Assembly Instructions for Kingston Left

Sunrise Deck Assembly Instructions for Kingston Left Sunrise Deck Assembly Instructions for Kingston Left It s easiest to build the deck frame first like it will be lying on its back and then after all 4 legs and horizontals are in place, tip the deck toward

More information

The Festival Assembly Instructions

The Festival Assembly Instructions The Festival Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown CONTACT INFORMATION: HomePlace Structures 301 Commerce Drive New

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.

More information

YUKON PATIO COVER INSTALLATION INSTRUCTIONS

YUKON PATIO COVER INSTALLATION INSTRUCTIONS YUKON PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin: Consult your local building department for any required permits You may be required to obtain a building permit for this structure. Contact

More information