A COMPLETELY BALANCED DRILLING SYSTEM FOR OVERBURDEN DRILLING SUPER MAXBIT
|
|
- Gladys Walker
- 6 years ago
- Views:
Transcription
1 GK11F A COMPLETELY BALANCED DRILLING SYSTEM FOR OVERBURDEN DRILLING SUPER MAXBIT The SUPER MAXBIT gives stbility when drilling collpsing overburden formtions.
2 SUPER MAXBIT The SUPER MAXBIT gives stbility when drilling collpsing overburden formtions. This is n dvnced technology compred to the other eccentric drilling methods. It consists of two to three wings connected to the Down The Hole Hmmer. The bit hed re extendble/retrctble when the drill string rottes in the forwrd/reverse direction. Drilling nd csing re possible simultneously with the use of csing shoe. The SUPER MAXBIT hs following dvntges: High-speed drilling similr to stndrd DTH bit. Stright hole drilling. Uniform rottion while drilling of boulders, snd nd grvel. Relibility of extending nd retrcting proven by customer experiences. MECHANISM Open Forwrd Close Reverse DTH Hmmer Csing Pipe Csing O. D. Bit Guge (Extended) Bit Guge (Retrcted) Csing I. D. Csing Shoe Bit Hed Close (Pulling out) Csing O. D. Bit Guge (Extended) Bit Guge (Retrcted) Csing I. D. Open (Drilling) COMPONENTS Csing Shoe Pin Bit Hed ( ) 2pcs for two wing type 3pcs for three wing type Pin is ttched with rubber plug. Retiner ring nd rubber plug re not ttched under 4" bit. Plese be creful not to get your finger snpped when ssembling. 1
3 y Rottion Speed of Bit Trget externl rottion speed to 15-20m/min. Refer to the following figure for rottion. Select the rnge of uniform rottion during drilling. Rottion Speed (min-1) OTHERS Rottion Speed Nominl Size (in.) y Setting Compressor Pressure Set between 0.7 to 1.0MP ( psi) Consider the depth of underground wter when drilling through the lyer. (In cse of 30m (90ft) depth, dd 0.3MP (45psi) to the ir pressure.) Do not set over 1.5MP (225psi) Air Consumption Set the ir supply using the following formul. Q= V(D2 d 2 ) Q : Air supply (m 3 /min) D : Inside dimeter of csing (mm) Nominl Size (in.) d : Outside dimeter of jcket or hmmer (mm) V : Air speed 1,100-1,500 (m/min) Recommended Air Consumption Air Supply (m 3 /min) (cfm) ,170-1,590 1,480-2,010 2,080-2,830 2,540-3,460 2,860-3,920 3,180-4,310 y Exchnge of components is necessry Wings 1. When the wer detection mrk on wing disppers. 2. When the crbide wer is excessive. 3. When wing body wers nd crbides pop out. Wer Mrk Wer Mrk When the wer detection mrks on the device end dispper. Wer Mrk Wer Mrk Pin When the wer ttins the following vlue. Plese exchnge the pin if you observe excessive wer. Two Wing Type Three Wing Type Amount of Wer (mm) Amount of Wer (mm) Amount of Wer (mm) Geometry APPLICATIONS The SUPER MAXBIT is designed for drilling in grvel, cly, snd mixture, boulders nd esy collpsing overburden. The system is pplicble for the vrious intentions with the combintion of pproprite rig nd drill. Piling After csing through the collpsing overburden, insert H-steel, then pull up the csing. Foundtion Foundtionl construction of buildings nd bridges up to 32"(ø800) of csing dimeter. Wter Well Drilling wter wells down to m in depth. Pipe Roof, Wter Service Wter Remove,Anchoring It chives excellent results for drilling of long holes nd hrd formtions using the Down The Hole Hmmer. Top-Hmmer pplictions re vilble. Geotherml, Oil Well Surfce drilling down to 50m in depth for geotherml nd oill well. Fore Piling For piling s reinforced method of tunneling in collpsing overburden. 2
4 TROUBLE SHOOTING Trouble Reson Solution Less hmmering. The bit does not rotte t ll. Cutting re not flushed out of the hole well. Csing pipes re not driven down. Air pressure is too low to work. (The hole is too deep tht cuses shortge of ir pressure) Just drilling through cly formtion. Drive sub is loosen.(in the thred) Snd or cly infiltrting into the hmmer. Cutting re reminning between driver sub nd bit wing. Cutting re sticking in bit blow hole. Drilling through frctured zone. Hit scrp iron. The bottom of the hole is filled with cuttings. Mchine torque is too low. Sticking through cve zone. Less ir compresor or ir volume. Just drillings through cly formtion. Cutting re stying inside the csing pipe. Drilling through crcky formtion tht leks out ir so much. Air leking from slited csing pipe. Brekge of the weld joint. Compressor should be replced with bigger one, or instll one more compressor nd ir receiver tnk. The frequent hole clening is necessry. Rotte in forwrd direction my screw down. Pull up csing pipe nd screw down, the drill strings with the driver sub properly. Wipe off snd or cly inside the hmmer. Flushing out cuttings enough. Flushing frequently. The bit should be operted with lower feed pressure. Pull up the drill strings, nd remove scrp iron by csing rotry bit. After tht,strt drilling with SUPER MAXBIT. Wter inside the csing pipe, nd cuttings should be flushed out esily. Mchine should be replced with bigger one. Pull up the drill strings nd csing pipe bout 20-30cm, then screw down slowly with hmmering. Compresor should be reprced with bigger one or instll one more compresor nd ir receiver tnk. The frequent hole clening is necessry. Wter inside the csing pipe nd cutting should be flushed out esily. Wter inside the csing pipe nd cutting should be flushed out esily. Before drilling, plugging up the slit of csing pipe by using tpe. Weld crefully so tht the weld on the inside of the csing pipe. Check the csing pipe is verticl nd is liner. Check tht ech weld is strigh nd smooth so tht the friction between the csing pipe nd hole wll is minimm. Brekge of the pin. The bit wings does not open. The bit wings does not close. The drill strings cn not be pulled out. Brekge of the thred joint. Knocking on the side pin by hmmering while the bit is not on the bottom. Hmmering in snd formtion. The bit wings is not on the bottom of the hole. Cly or mud hs instruded into the hole of the device. Ground condition is too sticky to open. The bit wings is not on the bottom of the hole. Cutting re sticking round the bit wings so much. The thickness of the weld inside of the csing pipes exceeds limittion. (>0.5mm=1/64") Never use threded joint csing pipe in deep hole. (more thn 20m) Keep the bit wings on the bottom of the hole. Feed nd ir pressure must be crefully wtched to keep the fce t the bit wing. Keep the bit wings on the bottom with higher feed pressure. Clen the holes of the device. Pull up the bit, (you should throw some smll grvel.) nd put smll mount of grvel into the hole to get some friction which is needed for extension. Keep the bit wings on the bottom with higher feed pressure. Flushing out cuting enough. Pull up the drill strings slowly with forwrd slow rottion crefully. Plese do not hurry to pull up, becuse the overweld of csing tubes cn be ground off by the device shoulder. So it my tke long time to do so. Welding Cshing pipe There is concve on the outside of the csing pipes which hs broken during drilling. In wter well drilling, sometimes rock or grvel will be pushed into slots of strner tht will cuse concve on the csing pipes. So crefull opertions re necessry. Grvel 3
5 APPROPRIATE CASING AND HAMMER SIZE D1 Bit Guge (Extended) D4 D3 Csing I. D. D2 Csing O. D. Csing Shoe Csing Pipe Type Two Wing Three Wing Extended D1 Bit Guge Retrcted Applicble Csing Pipe Mx. O.D. D2 Min. I.D. D3 Nominl Size O. D. D4 Hmmer Size mm in. mm in. mm mm in. mm in " 92 3" " 115 4" " 141 5" " 167 6" " 187 6" " 218 8" " 240 8" " " " " " " " " " " " " " " When ordering, informtion bout csing dimeters (O.D. nd I.D.) is necessry. Order mde bits cn be mnufctured upon request. 1 : Wter Well 2 : Piling, Foundtion 3 : Pipe Roof, Wter Service, Wter Remove, Anchoring 4 : Geotherml, Oil Well 5 : Fore Piling 4
6 MMC HARTMETALL GmbH (Germny) GIMPO BRANCH (South Kore) MITSUBISHI MATERIALS CORPORATION OVERSEAS OPERATIONS CENTER (Jpn) MITSUBISHI MATERIALS U.S.A. CORPORATION (U.S.A.) MMC METAL DE MEXICO, S.A. DE C.V. (Mexico) MITSUBISHI MATERIALS (Shnghi) CORPORATION (Chin) PERTH BRANCH (Austrli) MMC METAL DO BRASIL LTDA. (Brzil) JAPAN / ROCK TOOLS MITSUBISHI MATERIALS CORPORATION OVERSEAS OPERATIONS CENTER KFC bldg., 8F, 1-6-1, Yokomi, Sumid-ku, Tokyo , Jpn TEL FAX E-Mil: rocktool@mmc.co.jp Subsidiries of MITSUBISHI MATERIALS CORPORATION U.S.A. Germny Brzil Mexico MITSUBISHI MATERIALS U.S.A. CORPORATION Rock Tools Office 2690 Slisbry Highwy, Sttesville, NC 28677, U.S.A TEL FAX E-Mil: rock@mmus.com MMC HARTMETALL GMBH Comeniusstr. 2,40670 Meerbusch, Germny TEL FAX E-Mil: eric-mmc@wndoo.fr MMC METAL DO BRASIL LTDA. Ru Cincinto Brg, ndr.bel Vist- CEP São Pulo-SP., BRASIL TEL FAX E-Mil: mmbr@mmbr.com.br MMC METAL DE MEXICO S.A. DE C.V. Av. L Cnd No.16 Prque Industril Bernrdo Quintn El mrques, Queretro. TEL FAX E-Mil: gonzlez@mmcmex.com Austrli South Kore Chin 58 Ctlno Circuit Cnning Vle, WA 6155 Austrli PO Box 1550, Cnning Vle B/C WA 6970 Austrli TEL FAX E-Mil: dmin@ryoko.com.u 761, Jiwol-Ri, Pttn-Myeon, Hwseong-Si, Gyeonggi-Do , Kore TEL FAX MITSUBISHI MATERIALS (Shnghi) CORPORATION Room 3905, UNITED PLAZA 1468, Nnjing Rod West, Shnghi, Chin TEL FAX E(1B)
Update B158J New Chip Breaker Inserts for Turning Expanded Inserts
2009.4 Updte B158J Expnded s New Chip Breker s for Turning Breker Offers the best performnce for utomotive prts pplictions! ysmooth chip control even t vried depths of cut, feeds nd cutting speeds! New
More information''Violet'' drill series.
0. Updte B00G NEW SIZES VA-PDS VA-PDM VIOLET SERIES, HIGH PRECISION DRILLS VA-PDS VA-PDM VA-PDS-SUS VA-PDM-SUS A new stndrd for high precision drills! ''Violet'' drill series. Stble, long life Consistent
More informationDIN ANSI Shark Line Material specific application taps. New products 2017
DIN ANSI Shrk Line Mteril specific ppliction tps New products 2017 SHARK LINE SHARK INTRODUCTION Dormer brnd mteril specific ppliction-bsed rnges DIN ANSI Shrk Tps fer high performnce nd process security.
More informationTOOLS NEWS CRN ENDMILL FOR COPPER ELECTRODE
TOOLS NEWS CN ENDMILL FO COPPE ELECTODE 007. Updte B00G Series expnsion, Corner dius type now included! A gret vriety of products. Totl sizes of 0 in 7 series. Copper Electrode End Mill Series CN Series
More informationSPX Offers low cutting resistance for heavy machining & deep shoulder milling
Shell type ddition! 010. Updte B111G Indexble End ill for Deep Shoulder illing Offers low cutting resistnce for hevy mchining & deep shoulder milling y Wvy cutting edge geometry breker breks the chips
More information* * 33/3549A CS 33/3549A. 2-Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions
*23970726* 23970726 33/3549A CS 33/3549A Instlltion Instructions This instruction covers new instlltion of the 33/3549A conceled verticl device for luminum nd hollow metl doors. RF Also covered is the
More informationFOREPOLING PRODUCT CATALOGUE ROBIT FOREPOLING PRODUCT CATALOGUE ROBIT
ROBIT FOREPOLING PRODUCT CATALOGUE ROBIT FOREPOLING PRODUCT CATALOGUE RoX+ 76,1 systems RoX+ 88,9 systems RoX+ 101,6 systems RoX+ 114,3 systems RoX 139,7 systems RoX+ 168,3 systems RoX+ GFRP 76,1 systems
More informationMC5020 Breakthrough for cast iron machining.
B170A CVD Coted Grde for Ct Iron Milling Brekthrough for ct iron mchining. y nure tble, relible mchining to cover ll ct iron milling ppliction. CVD Coted Grde for Ct Iron Milling y Feture h excellent wer,
More informationMSRS90. Hi efficiency Notched and No-hand insert for MSRS90
MGCO MR90 Multiple Cutter i efficiency Notched nd Nohnd insert for MR90 1Notched insert reduces cutting force reduction t the first pss tle mchining without chtter 2mooth chip evcution Prevents frcture
More informationET 51 EXTERIOR ROOF DRIP SIDE FINISH MOULDING INSTALLATION
EXTERIOR ROOF DRIP SIDE FINISH MOULDING 51 INSTALLATION The procedure descried elow is for the LH side. Use the sme procedure for oth the RH nd LH sides, unless otherwise specified. 1. INSTALL ROOF SIDE
More informationThe worlds smallest ball nose.* 1 Ultra high precision type.* 2. R0.02mm, a world first! * 1. Expansion. ULTRA HIGH PRECISION [±0.
Expnsion Mircle high precision bll nose end mills B08E The worlds smllest bll nose. Ultr high precision type. 0.0mm, world first! 0.0mm ) According to survey by Mitsubishi Mterils Kobe Tools. ) VCPSB-P
More informationCompared to generators DC MOTORS. Back e.m.f. Back e.m.f. Example. Example. The construction of a d.c. motor is the same as a d.c. generator.
Compred to genertors DC MOTORS Prepred by Engr. JP Timol Reference: Electricl nd Electronic Principles nd Technology The construction of d.c. motor is the sme s d.c. genertor. the generted e.m.f. is less
More informationLEXUS IS250/IS350 FRONT SPOILER Section I - Installation Preparation. Part Number: Section I - Installation Preparation.
Section I - Instlltion Preprtion Prt Numer: 0854-53830 Section I - Instlltion Preprtion Kit Contents 3 Description Front spoiler Hrdwre g Instruction mnul Additionl Items Required For Instlltion Conflicts
More informationTubing Spacers. Backing Plate. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a. a a a. a a. a a
Grnd Slm Instlltion Instructions TACO Metls Inc., 98 NE 179th Street Mimi, Florid 33162 hndyhnk@tcomrine.com tcomrine.com This Box Contins: 1- Port side Grnd Slm 1- Strbord side Grnd Slm 4-5/16 x 1 stinless
More informationMulti-Point Astragal Prehanger Installation Instructions
Multi-Point Astrgl Prehnger Instlltion Instructions 8817 West Mrket Street Colfx, NC 27235 800.334.2006 www.endurproducts.com Tools Required: Endur Router Templte (or equivlent) Router with 5/8" dimeter
More informationFOR DEVICES SOLD PRIOR TO
23970734 98/9949 CS 98/9949 FOR DEVICES SOLD PRIOR TO 8-10-16 This instruction covers new instlltion of the 98/9949 conceled verticl device for hollow metl nd luminum doors. RF Instlltion Instructions
More informationFrom Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your
From Off-The-Shelf to Market-Ready New ge Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your end-use. visit newageenclosures.com/services or call 855-4N-ENCL
More informationExtremely small "footprint" and the highest circuit density available AK550. Front Wire Entry
FIXED PRINTED CIRCUIT Tubulr Screw Clmp For use when stndrd size printed circuit terminl blocks re too lrge for vilble spce or where very smll circuit bord is utilized. Our new subminiture design offers
More informationUltimate Trilennium Astragal Prehanger Installation Instructions
Ultimte Trilennium Astrgl Prehnger Instlltion Instructions Tools Required: Flthed Screwdriver Shers Phillips Screwdriver Power Drill with 1" Drill Bit Tpe Mesure 1" Spde Bit Kit Includes: Full Astrgl Full
More informationFrom Off-The-Shelf to Market-Ready New Age Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your
From Off-The-Shelf to Market-Ready New ge Enclosures is your Single Source Solution. Let us quote modifiying our Stock Enclosures to meet your end-use. visit newageenclosures.com/services or call 855-4N-ENCL
More informationA620G MEDICAL APPLICATIONS
A620G MEDICAL APPLICATIONS INDEX MEDICAL HIP-SYSTEM y Co-Cr Alloy y Titnium Alloy y UHMWPE Externl Turning The combintion of VP coting nd highstrength micro-grin cemented crbide substrte increses wer resistnce.
More informationDIN/ANSI Shark Line Material Specific Application Taps. New Products 2017
DIN/ANSI Shrk Line Mteril Specific Appliction Tps New Products 2017 SHARK INTRODUCTION Dormer brnd mteril specific ppliction-bsed rnges DIN ANSI Shrk Tps fer high performnce nd process security. Shrk Line
More informationASSEMBLY INSTRUCTIONS
ASSEMBLY INSTRUCTIONS Multi Line 6 x8 255x193x203cm / 100 1 /2 x76 x80 Poly-Tex, Inc. PO Box 458 27725 Dnville Avenue Cstle Rock, MN 55010 We Site: www.poly-tex.com English - 69717 Hoy Greenhouse Service
More informationUltimate Push Button Astragal Prehanger Installation Instructions
Ultimte Push Button Astrgl Prehnger Instlltion Instructions Tools Required: Flthed Screwdriver Shers Phillips Screwdriver Power Drill with 1" Drill Bit Tpe Mesure Kit Includes: Full Astrgl Full Length
More informationREVERSE CIRCULATION. www. .com MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD
REVERSE CIRCULATION MINERAL EXPLORATION ENVIRONMENTAL GEOTECHNICAL GEOTHERMAL ROTARY SONIC HDD www..com REVERSE CIRCULATION DRILLING TABLE OF CONTENTS REVERSE CIRCULATION DRILLING OVERVIEW...2 REVERSE
More informationMEASURE THE CHARACTERISTIC CURVES RELEVANT TO AN NPN TRANSISTOR
Electricity Electronics Bipolr Trnsistors MEASURE THE HARATERISTI URVES RELEVANT TO AN NPN TRANSISTOR Mesure the input chrcteristic, i.e. the bse current IB s function of the bse emitter voltge UBE. Mesure
More informationA621A MEDICAL APPLICATIONS
A621A MEDICAL APPLICATIONS INDEX MEDICAL HIP-SYSTEM y Co-Cr Alloy y Titnium Alloy y UHMWPE Externl Turning Excellent for highly ccurte mchining of difficult-to-cut mterils. Drilling Employs new TRI-Cooling
More informationRectangular type APS-10 to 15 Series
Rectngulr type APS- to 15 Series From n ultr-thin design to n operting distnce of 15 mm, wide-rnging rectngulr types re vilble to meet diversified requirements. Types output type/dc 3-wire type Shpe Operting
More informationCHAPTER 2 LITERATURE STUDY
CHAPTER LITERATURE STUDY. Introduction Multipliction involves two bsic opertions: the genertion of the prtil products nd their ccumultion. Therefore, there re two possible wys to speed up the multipliction:
More informationMax. Rec. Load. Wt. Per Inch lbs. kn lbs. kn lbs. kg. Wt. Per Inch lbs. kn lbs. kn lbs. kg 750 F (399 C)
FIG. 10 FIG. 15 & 15L Function: Designed for use in pipe hanger assemblies. (Type 304 or 316 Stainless Steel upon request) Ordering: Specify figure number, rod size, length (), material, and finish. 650
More informationCanopy Bed Frame. Date: 8 Jun 15 www. potterybarn.com Page 1 of 12 Rev:
Cnopy Bed Frme Dte: 8 un 15 www. potterybrn.com Pge 1 of 12 Importnt Sfety Instructions: WARNIN: Do not llow children to climb on, pull on, or hng from cnopy. Filure to follow these instructions cn result
More informationVEIKKO KUOSA ROBIT NON-STOP CASING SYSTEM FOR ANCHORING AND MICROPILING
VEIKKO KUOSA ROBIT NON-STOP CASING SYSTEM FOR ANCHORING AND MICROPILING Conference Paper for International Workshop on Micropiles Washington, DC September 22-25, 2010 i ABSTRACT INTERNATIONAL SOCIETY FOR
More informationFitting & User Instructions
Issue 03 Alexnder Universl Furniture Risers Note: These frmes require the ddition of n ttchment. (See pges 4 - ) Bse Frme Mrk Bse Frme Mrk Fitting & User Instructions These instructions pply to the rising
More informationWave Bike Rack specs SPECS AND INSTALL INSTRUCTIONS. Deluxe Wave Style Bike Rack. Series Names & Model # s. Product maintenance. Thermoplastic Coating
SPES ND INSTLL INSTRUTIONS Deluxe Wave Style ike Rack SKU: Series Names & Model # s 8 F7WIRQ InGround Post Mount Wave ike Racks Wave ike Rack specs KP/G3, KP/G5, KP/G7, KP/G9, KP/G11, KP/G13 Plate Surface
More informationTAW Drill. Indexable insert drill, yet always stable drilling. Stable drilling with indexable drill B060A. MIRACLE Coated VP15TF
B060A Stable drilling with indexable drill Indexable insert drill, yet always stable drilling Grade for high rigidity and longer tool life MIRACLE Coated MIRACLE coating displays high welding resistance
More informationPB-735 HD DP. Industrial Line. Automatic punch and bind machine for books and calendars
PB-735 HD DP Automtic punch nd bind mchine for books nd clendrs A further step for the utomtion of double loop binding. A clever nd flexible mchine ble to punch nd bind in line up to 9/16. Using the best
More informationSafety Relay Unit. Main contacts Auxiliary contact Number of input channels Rated voltage Model Category. possible 24 VAC/VDC G9SA-501.
Sfety Rely Unit The Series Offers Complete Line-up of Compct Units. Four kinds of -mm wide Units re ville: A -pole model, -pole model, nd models with poles nd OFF-dely poles, s well s Two-hnd ler. Simple
More informationIIHS LATCH Measurement Tool Set Drawings REV1. iihs.org
IIHS LTCH Measurement Tool Set Drawings REV1 iihs.org REV. DESCRIPTION DTE BY DD STORGE CSE. CHNGE IIHS LOGO. 2/1/2017 RGJ LTCH FORCE TOOL WITH DEPTH SHIELD SHEET 3-4, 9 WGNER INSTRUMENTS FDX100 WWW.WGNERINSTRUMEMTS.COM
More informationUPTOWN CANOPY FRAME T/F/Q
UPTOWN CANOPY FRAM T/F/Q Dte: 30 Mr 16 www.pbteen.com Pge 1 of 12 mportnt Sfety nstructions: Plese red ll instructions crefully before ssembling. For your sfety, ssembly by two or more dults is strongly
More informationINSTRUCTIONS INSTRUCCIONES CONSIGNES
PPLICTION: 2003-15 1500/2500/3500 HD SILVERDO/SIERR EXTENDED C/DOULE C/CREW C INCLUDING DIESEL EQUIPPED & 03-0 CLSSIC MODELS PRT # 5-5165, 5-5155 HDX RUNNING ORDS UTOMOTIVE PRODUCTS, INC. 1 INSTRUCTIONS
More informationAquauno Select MINUTES. (duration) FREQUENCY LED. OFF 8h AQUAUNO SELECT 5 MIN FREQUENCY. the timer is being programmed;
Aquuno Select Pg. INSTALLATION. Attch the timer to cold wter tp, following these simple instructions. Do not instll the timer in pit or vlve ox, elow ground level or indoors. Do not use the timer with
More informationProduct handbook. Drilling & Threading. The perfect thread
roduct hndbook Drilling & Threding _ Wlter Titex & Wlter rototyp The perfect thred COTETS 2 Appliction exmples 2 Longitudinl member mchining 4 Ger mchining 6 roduct informtion 6 Wlter Titex X treme lus
More informationDP400 / DM350. Inverter. Total Solutions from the Single Source Provider DP400 PULSED MAG - PULSED MIG CO2 - MAG - MIG - FCAW
DP400 / DM350 Digitl Controlled DC Inverter Arc Welding Mchines CAT. NO. A446 Simple Opertion Perfect Welds from Arc Strt to End Inverter Totl Solutions from Single Source Provider DP400 PULSED MAG - PULSED
More informationPlease Do Not Return Product to Store!
Instlltion Guide for ndersen Luminire Retrctble Insect Screen Door with Slidewy Insect Screen System Designed for 6 wide by 80 tll single hinged doors with suitble mounting surfce. For instlltion help
More informationJob Sheet 2. Variable Speed Drive Operation OBJECTIVE PROCEDURE. To install and operate a Variable Speed Drive.
Job Sheet 2 Vrible Speed Drive Opertion OBJECTIVE To instll nd operte Vrible Speed Drive. PROCEDURE Before proceeding with this job, complete the sfety check list in Appendix B. 1. On the Vrible Speed
More informationRoller chains. Roller chains
re chrcterised by n bove-verge service life due to excellent wer resistnce, high consistency, mtchless precision nd considerbly higher breking strength nd ftigue strength thn required by DIN/ ISO stndrd.
More informationDRILLING & WORKING TOOLS
EAGLE EQUIPMENT SUPPLIES & SERVICES PTE LTD 48 Toh Guan Road East #06-107 Enterprise Hub, Singapore 608586 Tel : (65) 6795 2411 Fax: (65) 6795 5877 Email: eesss@singnet.com.sg Company Registration (UEN)
More informationWheeler Rex Ashtabula, Ohio Tel: Fax:
Wheeler Rex Ashtabula, Ohio Tel: 800 321 7950 Fax: 440 992 2925 wheeler@wheelerrex.com www.wheelerrex.com December 2012 There are three different types of shell cutters. Nominal Hole Size Part No. 4" 3395
More informationTP Series - Triple PV Top of Pole Solar LED Lighting System
TP Series - Triple PV Top of Pole Solr LED Lighting System Instlltion Mnul MKTG-TP34-02-EN-1113 Instlltion Mnul TP Series Importnt Notes nd Wrnings This instlltion nd instruction mnul provides instlltion
More informationProducts no longer available
echnicl dt sheet otry ctutor F2-P(-O) ultifunctionl rotry ctutor with emergency control for 2 nd 3 wy control bll vlve orque Nm Nominl voltge C/DC 2 V Control: odulting DC... V or vrible Position feedbck
More informationU-bass Kit Assembly Instructions
U-bass Kit Assembly Instructions Compiled by playubass.com This guide is built from the instructions found here: http://kalabrand.com/ubass-kit/index.html Tools Needed 5/8 (16 mm) Wrench 7/16 (~11 mm)
More informationAppendix B Drilling Methods
Appendix B Drilling Methods B-1. Introduction A brief discussion of available drilling methods is included below. It is not the intent of this manual to include a detailed description of these methods.
More informationRadiant systems 0801EN March 2016 Radiant plasterboard ceiling and/or floor system ISO /7
RADIANT CEILING SYSTEM Description is rdint ceiling/wll system relized with 600x1200 mm EPS200 preformed pnels coted with 0,3 mm luminium thermo-conductor sheets, where the plstic pipe with n externl Ø
More informationVIEWING OPTIONS: In Adobe PDF Viewer, from the main toolbar choose View, then Page Display, turn on Two-Up and Show Cover Page During Two-Up
VIEWING OPTIONS: To make our catalog easier to read we recommend using a two page display, as some sections have one page for the exploded view and one for the parts listing. Changing these settings will
More informationINSTALLATION INSTRUCTIONS
INSTLLTION INSTRUCTIONS GEN X STEP BRS PPLICTION: 2014-2015 Chevrolet Silverado & GMC Sierra 1500 Double Cab 2014-2015 Chevrolet Silverado & GMC Sierra 1500 Crew Cab 2015+ Chevrolet Silverado & GMC Sierra
More informationMFAH. Minimizes Burrs for High Quality Machining Results. Low Cutting Force Design
igh fficiency Milling Cutter for Finishing Aluminum MFA igh fficiency Milling Cutter for Finishing Aluminum MFA NW CG Imge Low Cutting Force Minimizes Burrs nd Chipping for igh Qulity Mchining Results
More informationArray chip resistors size ARC241/ARC242 ARV241/ARV242
Arry chip resistors FEATURES 4 0603 sized resistors in one 1206-sized pckge Reduced reel exchnge time Low ssembly costs Reduced PCB re Reduced size of finl equipment Higher component nd equipment relibility.
More informationThe new generation end mill series. Ideal for efficient and economical machining of general milling applications.
New vibration control solid carbide end mill series SHV, MHV TAR vibration control end mill series The new generation end mill series. Ideal for efficient and economical machining of general milling applications.
More informationReversible and Proportional Electric Actuators
Reversible nd Proportionl Electric s The MP s re used for two-position, floting, nd proportionl control of dmpers, vlves, nd progrm switches in heting, ventiltion, nd ir conditioning pplictions or similr
More informationTemposonics Magnetostrictive, Absolute, Non-contact Linear-Position Sensors
Temposonics Magnetostrictive, Absolute, Non-contact Linear-Position Sensors M-Series Mobile Hydraulic in-cylinder Sensor Model MH PWM Output Data Sheet SENSORS Document Part Number 551119 Revision B M-Series
More informationUltimate Flip Lever Astragal Prehanger Installation Instructions
Ultimte Flip Lever Astrgl Prehnger Instlltion Instructions Tools Required: Flthed Screwdriver Shers Phillips Screwdriver Tpe Mesure Kit Includes: Full Astrgl Full Length Trim Strip Screw Pck Field Pck
More information1. What does it mean: to drill? 2. Why do you drill? 3. What kind of different applications are there? 4. What do you need for drilling? 5.
Drilling Technique A Brief Description Drilling Technique 1. What does it mean: to drill? 2. Why do you drill? 3. What kind of different applications are there? 4. What do you need for drilling? 5. What
More informationSynchronous Machine Parameter Measurement
Synchronous Mchine Prmeter Mesurement 1 Synchronous Mchine Prmeter Mesurement Introduction Wound field synchronous mchines re mostly used for power genertion but lso re well suited for motor pplictions
More informationPacking List MODEL TEL-IAL-481 For Inactive Leaf TRIDENT double door
Items: SECURITECH GROUP, INC. MP uxiliary POLICE LOCK Packing List MODEL TEL-IL-481 For Inactive Leaf TRIDENT double door Items with * are pre-installed or assembled Fasteners: Part# Qty Name Description/Usage
More informationA PERFECT ALLIANCE. ODU AMC ADVANCED VALUE ADDED SERVICES. Cable Assembly Rapid Manufacturing. odu-usa.com
PERFECT LLINCE. ODU MC Cable ssembly Rapid Manufacturing DVNCED VLUE DDED SERVICES odu-usa.com DVNCED CBLE SSEMBLY RPID MNUFCTURING ODU MC ODU-US provides a wide range of rapid standard cable manufacturing
More informationInstallation and Assembly: Flat Panel Pull-out Swivel Wall Mount
Installation and ssembly: Flat Panel Pull-out Swivel Wall Mount Models: SP850-V2X2 2300 White Oak Circle urora, Il 60502 (800) 865-2112 Fax: (800) 359-6500 www.peerlessmounts.com ISSUED: 01-17-12 SHEET
More informationINSTRUCTIONS FOR AIRFLEX 36WCBEP/36WCSEP WEAR PLATE REPLACEMENT USING GASKET SEALING TAPE
INSTRUCTIONS FOR AIRFLEX 36WCBEP/36WCSEP WEAR PLATE REPLACEMENT USING GASKET SEALING TAPE The material included in this kit is to be used for WC styles of brakes that are designed or upgraded to the EP
More informationStandard Kit #1 (3-way switch)
Standard Kit #1 (3-way switch) Please Read All Instructions Before Beginning. Tools you will need: Soldering Iron (35 watt preferably) Solder Wet Sponge Wire Clippers 3/8 Drill Bit 1/4 Drill Bit Variable
More informationMSRS90. Notched Inserts Reduce Cutting Forces When Entering the Workpiece Stable Machining without Chattering
90 Notched Inserts Reduce Cutting Forces When ntering the Workpiece tle Mchining without Chttering mooth Chip vcution Prevents Frcturing Cused y Biting Chips MGACOAT NANO For xtended Tool Life igh Mchining
More information* * 98/9949 CS 98/ Point Latch includes these additional parts. 1-Point Latch (LBL) Customer Service. Installation Instructions
*23970734* 23970734 98/9949 CS 98/9949 Instlltion Instructions This instruction covers new instlltion of the 98/9949 conceled verticl device for hollow metl nd luminum doors. RF Also covered is the CS
More informationHighly efficient machining of difficult-to-cut materials, such as stainless steal and superalloy.
B041G CDV for stainless steel turning Excellent toughness in relation to notch wear resistance. Highly efficient machining of difficult-to-cut materials, such as stainless steal and superalloy. yminimizing
More informationInstallation and Assembly: Flat \ Tilt Wall Mount for VESA 400x400
Installation and ssembly: Flat \ Tilt Wall Mount for VES 400x400 Model: T642-003 Max Load Capacity: 100 lb (45.4 kg) 3215 W. North ve. Melrose Park, IL 60160 (800) 729-0307 or (708) 865-8870 Fax: (708)
More informationApplication Note. Differential Amplifier
Appliction Note AN367 Differentil Amplifier Author: Dve n Ess Associted Project: Yes Associted Prt Fmily: CY8C9x66, CY8C7x43, CY8C4x3A PSoC Designer ersion: 4. SP3 Abstrct For mny sensing pplictions, desirble
More informationMaintenance of the pilot bits
Maintenance of the pilot bits 1. Impact shoulders The impact, feed and torque stresses generated during drilling cause gradually wear to the shoulders of the pilot bit and the ring bit. This wear is usually
More informationE-PLEX 1 MORTISE INSTALLATION INSTRUCTIONS
E-PLEX 1 MORTISE INSTALLATION INSTRUCTIONS TABLE OF CONTENTS Tools Required.................................................................3 Exploded Instll Prts...........................................................4
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More information1/8" Balsa 8B 7B 6B. For Radio Control. Wingspan - 25" CAD Drawing by Paul Bradley Sheet 1 of 12 INCHES. Cowl pattern.
R1 1/8" alsa R2 owl pattern 1/16" Square enter Windshield Pattern 1/16" Square filler forward of stab 9T 8T 7T R3 10 R4 T1 T2 9 Side Windows Pattern Fuselage sides are built using 1/16" square stock 8
More informationMSR/MSB Mechanical Setting Tool
Tech Unit No: 0620000004 Revision: C Approved By: Quality Engineer Date: 201-1-9 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical
More informationCompact Hydraulic System for Energy Savings and High Precision. POWER Meister
Compact Hydraulic System for Energy Savings and High Precision POWER Meister POWER Meister Compact Hydraulic System Superior Energy Savings High Precision AC servo motor controls rotational speed and direction
More informationSUPERIOR "SHOOTER" TAP DESIGN
CHROMTE CIC 200 "SHOOTER" TPS TM It used to be said that 90% of all taps broke before they wore out. Chromate's CIC 200 "Shooter" Tap literally "shoots" the chips out ahead of the tap. This is most important
More information4-8 HSF 250 Patriot. Line Stop Fitting Installation Instructions. Installation Instructions and Best Practices continued on back
HSF 250 Patriot Heavy Duty Line Stop Fitting - 4, 6, 8 inch Nominal Sizes Line Stop Fitting Installation Instructions Push and Pin Completion Plug Installation Instructions IMPORTANT: Read installation
More informationReady To Go SimpleSpec tm. Installation Manual. For more information, please visit 3-form.com or call
Contents Overview ( 1) 3/8" Varia Panel = Cable Tensioner with Cover Plate KIT Stainless Steel: 3-15-1636-K Black Oxide: 3-15-2005-K Cable Tensioner with Cover Plate SS: 3-15-1636 BO: 3-15-2005 + M8 Thread
More information670 Freestyle/Style Door with In-Line Panel
M 670 Freestyle/Style oor with In-Line Pnel Style Series Option Metl HK87 Slide MGNETIC PULL HNLE KIT with Mgnet Vinyl 083 JM E 989 MGNETIC OOR STOP N H900 PN HE SCREW C (CUH or MG) 781 HEER 716 HEER /
More informationMODEL 200/220 ASSEMBLY INSTRUCTIONS
V-Twin MFG. Coats Tire Changer VT Part No. 16-0510 This tool should only be used by a knowledgeable and trained motorcycle technician V-Twin Mfg. accepts no responsibility for improper use. MODEL 200/220
More informationAPPLICATION MANUAL. application manual >> ARMA-CHEK R. application manual
APPLICATION MANUAL R ppliction mnul >> ARMA-CHEK R ppliction mnul R R APPLICATION MANUAL 1 GENERAL 3» Working with Arm-Chek R 3» Tools for instlling Arm-Chek R 3» Correct use of Armflex dhesive 4» Applying
More informationStaple Specification:
H-1027, H-1028 H-3064 PNEUMATIC STICK STAPLER stapler specifications Dimensions: L x H x W 13.5 x 8.75 x 6" Weight (Without Fasteners) Compressed Air: Maximum psi: Recommended Operating Pressure: Air Consumption:
More informationTHREAD PROTECTORS & END CAPS
Sir William Smith Road, Kirkton Industrial Estate, Arbroath, Angus, Scotland, U.K. DD11 3RD Tel: +44 (0) 1241 877776. Fax: +44 (0) 1241 871037 E-mail: sales@pioneeroiltools.com Website: www.pioneeroiltools.com
More informationMATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.
Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.
More informationStandard Kit #1 (5-way switch)
Standard Kit #1 (5-way switch) Please Read All Instructions Before Beginning. Tools you will need: Soldering Iron (35 watt preferably) Solder Wet Sponge Wire Clippers 3/8 Drill Bit 1/4 Drill Bit Variable
More informationCASING PATCHES. Operation
Overview Logan High Pressure Type L Packer Type Casing Patches are designed to engage and seal off a properly prepared casing string. The Casing Patch design leaves the operator with a casing string that
More informationInstallation Guide. Capped Cellular PVC Fencing. Table of Contents. Storage and Handling Tools Needed Fence Layout and Locating Posts
Capped Cellular PVC Fencing Installation Guide Table of Contents Storage and Handling Tools Needed Fence Layout and Locating Posts Installation instructions 4 x 4 Over Sleeve Post - 3.5 Rail Privacy Shadowbox
More informationThe DeltaGrip System. Safety and Operating Instructions. Trigger. Air Supply Connection. Handle Assembly. Air Line Assembly.
The DeltaGrip System Safety and Operating Instructions Trigger Air Supply Connection Handle Assembly Air Line Assembly Punch Die Pneumatic Diaphragm Assembly Shackle, Pin & Jam Nut Jaw Frame Shoulder Screw
More informationMATKI ONE MOWP - WETROOM PANEL & BRACE BAR MOWV - WETROOM PANEL & CEILING BAR
MATKI ONE MOWP - WETROOM PANEL & BRACE BAR MOWV - WETROOM PANEL & CEILING BAR INSTALLATION PARTS LIST MOWV MOWP MATKI PLC, CHURCHWARD ROAD, YATE, BRISTOL, BS37 5PL TELEPHONE:0454 3886 (AFTER SALES) FAX:0454
More informationPUSH-PULL-PROPS. and accessories ROBUSTA-GAUKEL GMBH MOUNTING TECHNOLOGY &CO.KG
PUSH-PULL-PROPS and accessories MOUNTING TECHNOLOGY ROBUSTA-GAUKEL GMBH &CO.KG MOUNTING TECHNOLOGY PUSH-PULL-PROPS AND ACCESSORIES INDEX General information...................... 3 Push-pull-prop Type
More informationCHAPTER 3 AMPLIFIER DESIGN TECHNIQUES
CHAPTER 3 AMPLIFIER DEIGN TECHNIQUE 3.0 Introduction olid-stte microwve mplifiers ply n importnt role in communiction where it hs different pplictions, including low noise, high gin, nd high power mplifiers.
More informationSHEREX FASTENING SOLUTIONS PNEUMATIC SPIN-SPIN INLINE STYLE RIVET NUT INSTALLATION TOOL SSG-902 MANUAL
SHEREX FASTENING SOLUTIONS PNEUMATIC SPIN-SPIN INLINE STYLE RIVET NUT INSTALLATION TOOL SSG-902 MANUAL SSG-902 Specifications R.P.M. - 1500 *Air Pressure - 60-90 psi (oiled) Weight - 2 lbs. (0.9 kg) Air
More informationDRAWING TABLE SYSTEM
DRWING TBLE SYSTEM DT31, DT61S, & CDTC71 MODEL VIEWS MY NOT REPRESENT EXCT MODEL PURCHSED : : CRETED NME THIS DRWING IS THE SOLE PROPERTY OF DIVERSIFIED WOOD CRFTS. IT MY NOT BE LTERED OR CHNGED WITHOUT
More informationSEATBELT SOLUTIONS, LLC.
Custom 3-Point Seatbelt Installation Guide for: 1963-67 Corvette Note: The information enclosed in this installation guide is to be used as merely an outline to assist you during the process of installation.
More informationTUR DOORS SHOWER DOORS
TUR DOORS SHOWER DOORS INSTALLATION INSTRUCTIONS TUB DOORS: LBTDB6062 SHOWER DOORS: LBSDB4876 LBSDB6076 VERSION: 3.2 PREPARATION FOR INSTALLATION TUB DOORS SHOWER DOORS PREPARATION FOR INSTALLATION READ
More informationCloset Wall Drawer Unit
88 5531 751 Closet Wall Drawer Unit A. B. C. Shelf D. E. F. For assembly see instructions in carton 88 5531 752. 88 5531 752 Closet Wall Drawer Unit G. H. I. Plinth M. Bottom L. N. 2 pc. J. K. O. Drawer
More information