floe dock steps for roll-in and sectional docks

Size: px
Start display at page:

Download "floe dock steps for roll-in and sectional docks"

Transcription

1 floe dock steps for roll-in and sectional docks ASSEMBLY INSTRUCTIONS kit P/N Step kit P/N Step kit P/N Step MULTIPLE PINCH POINTS KEEP HANDS & FEET CLEAR OF ALL MOVING PARTS DURING ASSEMBLY & INSTALLATION. TOOLS REQUIRED (2) 9/16 sockets or wrenches Torque wrench tape measure 7/2 allen wrench framing square Cordless drill 1/2 drill bit Center punch hammer required for attaching to a sectional dock. INSTRUCTION P/N ISSUED: //1 REVISED: 8/16 Want the best? Go with the FLOE! Page 1 Floe International, Inc. 87 State Hwy. 65 McGregor, MN All rights reserved.

2 FLOE dock steps exploded view and parts list KIT P/N Step Dock Stairs for water depths up to 2 Dock Deck is 16 above water Page 2

3 FLOE dock steps exploded view and parts list KIT P/N Step Dock Stairs for water depths 21 to 5 Dock Deck is 16 above water Page

4 FLOE dock steps exploded view and parts list KIT P/N Step Dock Stairs for water depths 1 to 7 Dock Deck is 16 above water Page

5 Fig. 1 for Roll-in docks Step Fasten the () stringers to the bottom handrail assembly. Attach the ends of the stringers that have the first two holes spaced 9-9/16 apart using /8 x 2 bolts, flat washers, and nylock nuts. Place the end caps on the steps and insert the steps between the stringers. Attach to the stringers using /8 x 1 1/ bolts, and flat washers on each step. Install mounting brackets and top step handrail weldment. Attach to the stringers using /8 x 1 1/ bolts, and flat washers. Tighten all nuts until snug. Do not overtighten. Overtightening will prevent the steps from leveling themselves. Page 5

6 Fig. 2 Step Install the handrail assemblies using /8 x 1 / bolts, flat washers and nylock jam nuts as in Detail B above. Be sure to install with the 11 long extension towards the top of steps. Tighten all nuts until snug. Do not over tighten. Page 6

7 Step Install the assembled stairs by attaching the mounting tubes to dock frame using () /8 X bolts and () /8 nylock nuts. Insert the bolts through the holes in the mounting tubes and spacers. If the bolt is to close to web on deck, do not add a spacer. The webbing will act as the spacer. See Fig. Space the center of the mounting tubes apart in desired stair location. Torque to 25 ft/lbs. Insert the heads of the bolts on the stairs mounting brackets into the key slots of the mounting tubes and be sure the heads of the bolts slide down into key slots to secure steps Note If you live in a cold climate that requires removal of your steps in the fall, special attention needs to be taken to make sure that the drain holes are unobstructed to provide proper drainage. Fig. Page 7

8 FLOE dock steps for sectional docks exploded view kit P/N Step kit P/N Step kit P/N Step Fig. For attachment to sectional docks, mounting holes must be drilled using a 1/2" drill bit. After determining the location the stairs, use a framing square and mark a vertical line across the top and bottom serration (these serrations are " apart and are intended to act as a hole spacing reference; refer to Detail F). Mark a second line " from the first as shown in Fig.. Use the hammer and center punch to make a dimple for the drill bit. This helps to prevent the drill from wandering during the drilling process. Keep the drill bit perpendicular to the dock frame while drilling. Install the assembled stairs by attaching the mounting tubes using () /8" x " bolts and () /8" Nylock nuts. Insert the bolts through the holes in the mounting tubes to the dock and through the dock side, and torque to 25 ft/lbs. Insert the heads of the bolts on the stairs mounting brackets into the key slots of the mounting tubes and be sure the heads of the Page 8 bolts slide down into key slots to secure steps Note If you live in a cold climate that requires removal of your steps in the fall, special attention needs to be taken to make sure that the drain holes are unobstructed to provide proper drainage.

FLOE DOCK STEPS FOR ROLL-IN AND SECTIONAL DOCKS

FLOE DOCK STEPS FOR ROLL-IN AND SECTIONAL DOCKS FLOE DOCK STEPS FOR ROLL-IN AND SECTIONAL DOCKS ASSEMBLY INSTRUCTIONS KIT P/N 510-2000-00 -STEP KIT P/N 510-2010-00 6-STEP KIT P/N 510-2016-00 8-STEP MULTIPLE PINCH POINTS KEEP HANDS & FEET CLEAR OF ALL

More information

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS

FLOE DOCK FURNITURE WARNING ASSEMBLY INSTRUCTIONS FLOE DOCK FURNITURE ASSEMBLY INSTRUCTIONS KIT P/N 510-00400-02 KIT P/N 510-00405-02 KIT P/N 510-00406-02 KIT P/N 510-00410-02 WARNING IT IS THE INSTALLER S RESPONSIBILITY TO PROPERLY INSTALL this chair

More information

FLOE quick attach & standard sectional dock and leg kits

FLOE quick attach & standard sectional dock and leg kits FLOE quick attach & standard sectional dock and leg kits assembly instructions KIT P/N 510-02550-00 X-SHALLOW KIT P/N 510-02551-00 SHALLOW KIT P/N 510-02552-00 MEDIUM KIT P/N 510-02553-00 DEEP WARNING

More information

ShorePort PWC Lift Instructions " x 138" Sandstone ShorePort " x 138" White ShorePort " x 138" Tan ShorePort

ShorePort PWC Lift Instructions  x 138 Sandstone ShorePort  x 138 White ShorePort  x 138 Tan ShorePort ShorePort PWC Lift Instructions 00-8" x 8" Sandstone ShorePort 009-8" x 8" White ShorePort 090-8" x 8" Tan ShorePort....... - PUT SAFETY FIRST To avoid the risk of personal injury or death, study and fully

More information

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench.

IN 578. Tools Required. Torque Specification: 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench. Tools Required 2011-C Ford F250/F350 No Drilling into Vehicle is Required 10mm Socket 7/16 Socket 1/2 Socket 1/2 Wrench 7/16 Wrench 1/8 Allen Wrench FL277 x 1 Torque Specification: 1/4 Bolts - 6 Ft Lbs.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS R5 STEP BOARD APPLICATION: 2009-2017 Dodge Ram 1500 Quad / Crew Cab 2010-2017 Dodge Ram 2500/3500 Crew Cab PART NUMBER: 28-51040, 28-51045, 28-51050, 28-51055 ITEM QUANTITY DESCRIPTION

More information

General Guidelines:

General Guidelines: ASSEMBLY INSTRUCTIONS Congratulations on your new Patriot Dock purchase. This manual contains instructions to assemble basic dock configurations for use at typical residential shoreline application. Please

More information

VSD-6500 Frame Exploded View LIFT P/N

VSD-6500 Frame Exploded View LIFT P/N VSD-6500 Frame Exploded View LIFT P/N 511-65075-01 34 34 45 96 55 108 22 9 7 55 54 34 89 90 56 24 99 23 111 SEE SHEET 4 34 91 45 106 20 55 26 68 95 5 55 109 7 22 8 54 53 71 66 5 95 31 58 6 6 46 60 73 25

More information

INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: PN Application: Sportsman 400, Magnum 425

INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: PN Application: Sportsman 400, Magnum 425 INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: PN 37845 Application: 1996-97 Sportsman 400, 1997-98 Magnum 425 Your safety, and the safety of others, is very important. To help you make informed decisions

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS NOTE: Bolts should remain hand tight until all bolts are installed. STEP 1 Installing the door base (both sides). 1. Locate the outer, roll cage, mounting bolt (passenger side is shown in the illustration).

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

RBP-1215B-RX DODGE RAM QUAD CAB RX3

RBP-1215B-RX DODGE RAM QUAD CAB RX3 RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side

More information

Instruction Guide 4A90L

Instruction Guide 4A90L Instruction Guide 4A90L Kargo Master Rancho Cordova, CA 95742 800-343-7486 CustomerService@KargoMaster.com DATE: *PLEASE READ ALL INSTRUCTIONS AND WARNINGS PRIOR TO ASSEMBLING, INSTALLING, AND USING THIS

More information

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)

GlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS

PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS PRO / PL SHOE REPLACEMENT & CONVERSION INSTRUCTIONS REIMANN & GEORGER CORPORATION HOISTING PRODUCTS BUFFALO, NY P/N 610096 10/19/05 Read the following instructions thoroughly before starting work to identify

More information

08+ KAWASAKI KLR PD NERF

08+ KAWASAKI KLR PD NERF 08+ KAWASAKI KLR PD NERF 0505-1299 Before you begin, place the bike on a hard level surface where you have room to work. Lay out the parts included in this kit and compare to the parts list on page 5 of

More information

MONKEY BARS OVERHEAD RACK INSTALLATION

MONKEY BARS OVERHEAD RACK INSTALLATION MONKEY BARS OVERHEAD RACK INSTALLATION Thank you for purchasing the New Monkey Bars Overhead storage rack. The most innovative overhead rack on the market WARNING THE PROPER INSTALLATION OF THIS STORAGE

More information

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)

GlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas) List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.

More information

TRIUMPH TIGER 800 PD NERF

TRIUMPH TIGER 800 PD NERF TRIUMPH TIGER 800 PD NERF 0505-0 Step Before you begin, place the bike on a hard level surface where you have room to work. Lay out the parts included in this kit and compare to the parts list on page

More information

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.

More information

3/4 Rear DuraRac Installation Instructions

3/4 Rear DuraRac Installation Instructions 3/4 Rear DuraRac Installation Instructions Ford Transit Low Roof 130 WB Frame Kit Part #: CRC 27-1010-001 V1.0.09.28.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED

More information

K-Emily Twin Nkl Canopy Bed K-Emily Twin Pink Canopy Bed K-Emily Purple Twin Canopy Bed

K-Emily Twin Nkl Canopy Bed K-Emily Twin Pink Canopy Bed K-Emily Purple Twin Canopy Bed Parts and Hardware List A. Headboard 1 pc B. Footboard 1 pc C. Side Rails 2 pcs D. Support Slats 3 pcs E. Leg Supports 3 pcs F. Long Canopy Rails 2 pcs G. Short Canopy Rails 2 pcs H. Long Posts 2 pcs I.

More information

BOX-118 E-Z-Go TXT Utility Box Mounting Kit Installation Instructions

BOX-118 E-Z-Go TXT Utility Box Mounting Kit Installation Instructions BOX-118 E-Z-Go TXT Utility Box Mounting Kit Installation Instructions Contents of BOX-118 Utility Box Mounting Kit: a (1 ea.) Utility Box Support Frame, Driver Side b (1 ea.) Utility Box Support Frame,

More information

Rear Katerack Installation Instructions

Rear Katerack Installation Instructions Rear Katerack Installation Instructions Ram Promaster City 2015+ Frame Kit Part #: CRC 26-1000-001 V1.0.12.04.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED

More information

Projector Flush Mount

Projector Flush Mount Projector Flush Mount ABtUS SIGAPORE PTE LTD Model: AV819 www.abtussingapore.com Patent Pending Revision 21/05/2012 ABtUS SINGAPORE PTE LTD www.abtussingapore.com User Operation Guide IMPORTANT NOTES Thank

More information

CTTR Tire Rack Required tools

CTTR Tire Rack Required tools CTTR Tire Rack Required tools Torque wrench, ratchet, 9/16 socket, tape measure, and square edge. ASSEMBLY REQUIREMENTS *Torque all T-bolt nuts to 35-40 foot pounds. Failure to follow the assembly instructions

More information

SWAG AIR-HYDRO RAM MOUNT ASSEMBLY INSTRUCTIONS

SWAG AIR-HYDRO RAM MOUNT ASSEMBLY INSTRUCTIONS SWAG AIR-HYDRO RAM MOUNT ASSEMBLY INSTRUCTIONS Tools needed for assembly: 5/16 HEX KEY WRENCH ¼ HEX KEY WRENCH ¾ SOCKET AND WRENCH 1.125 SOCKET HAMMER FLAT SCREW DRIVER GREASE FOR ASSEMBLY Step #1 Disassemble

More information

HIGH RISE Portable Restroom Assembly Instructions

HIGH RISE Portable Restroom Assembly Instructions HIGH RISE Portable Restroom Assembly Instructions 2530 Xenium Lane North, Minneapolis, MN 55441 Telephone: 763-553-1900 / Fax: 763-553-1905 800-328-3332/ www.satelliteindustries.com PN 20930 REV C 8/16

More information

CHEVY SuperBracket Mounting Kit #0826

CHEVY SuperBracket Mounting Kit #0826 CHEVY SuperBracket Mounting Kit #0826 #1200 SuperGlide (16K) #0800 SuperGlide (20.5K) Gross Trailer Weight (Maximum) Vertical Load Weight (Max. Pin Weight) 16,000 lbs. 4,000 lbs. Gross Trailer Weight (Maximum)

More information

55000/55010 Installation Instructions

55000/55010 Installation Instructions A. Install 55015 B. Bolt roof rails, 55020/55025, to front hoop. C. Assemble 55026 D. To install without drilling into bumper. E. If mounting directly to bumper. A. 55015 Installation Instructions 55000/55010

More information

Locker Pedestal Installation Instructions

Locker Pedestal Installation Instructions Locker Pedestal Installation Instructions LK-PED-INST-0314r1 Parts List Single Pedestal Back to Back Pedestal Horizontal Support Tube TS-169 Post Flange TS-190 Post Cap Fasteners Provided: #8 x ¾ round

More information

Retro Fit Gearbox Mount. Assembly Instructions. Assembly Instructions. Before You Start. General Information. Manual No M

Retro Fit Gearbox Mount. Assembly Instructions. Assembly Instructions. Before You Start. General Information. Manual No M Retro Fit Gearbox Mount Assembly Instructions Treker 4400NT & 4400ST Series Before You Start Assembly Instructions Manual No. 700-372M! When you see this symbol, the subsequent instructions and warnings

More information

32 Gallon Perforated Square Receptacle

32 Gallon Perforated Square Receptacle 32 Gallon Perforated Square Receptacle 992-031 24 5/" 24 5/" 39 1/2" 30 1/2" ITEM NO. PART NUMBER DESCRIPTION QTY. 1 653-006 Receptacle Base 1 2 653-045 32 Gallon Perforated Side 4 3 653-011 Arch Lid 1

More information

Authority22 Transition Roller for Existing Machines

Authority22 Transition Roller for Existing Machines Authority22 Transition Roller for Existing Machines Upgrade Packaging 1 per Authority22 14-860241-000 Package Transition Roller Upgrade Kit NOTE: Due to installation requirements, the parts will be packaged

More information

BOX-117 E-Z-Go RXV Utility Box Mounting Kit Installation Instructions

BOX-117 E-Z-Go RXV Utility Box Mounting Kit Installation Instructions BOX-117 E-Z-Go RXV Utility Box Mounting Kit Installation Instructions Contents of BOX-117 Utility Box Mounting Kit: a (1 ea.) Utility Box Support Frame, Driver Side b (1 ea.) Utility Box Support Frame,

More information

Installation Instructions

Installation Instructions Important 1. Acclimate materials 24 hrs before installation. Maintain temperature controlled environment after installation 2. Install in accordance with manufacturer s installation instructions. Failure

More information

KAWASAKI KLRE PD NERF HTP4-8-5 & HIGHWAY PEGS HTP4-1-4B

KAWASAKI KLRE PD NERF HTP4-8-5 & HIGHWAY PEGS HTP4-1-4B Thank you for purchasing Happy Trails products. Our products are proudly hand made in Boise Idaho, USA. If you have any questions or concerns about the installation of this product, please contact us directly

More information

INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: Application: 2002 and newer Yamaha Grizzly 660

INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: Application: 2002 and newer Yamaha Grizzly 660 INSTALLATION INSTRUCTIONS ATV PLOW Mount Kit: 64669 Application: 2002 and newer Yamaha Grizzly 660 Your safety, and the safety of others, is very important. To help you make informed decisions about safety,

More information

Rear Mount Installation Instructions

Rear Mount Installation Instructions Rear Mount Installation Instructions Ford Transit Low Roof 130 WB Frame Kit Part #: DTC 0809-011 V1.0.10.12.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED

More information

Katerack Wagon Shelving System

Katerack Wagon Shelving System Ford Transit Connect Assembly Installation Instructions Sheet 1 of 14 BEFORE YOU START! IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED IN THE SPECIFIED ORDER

More information

4099T Parts List. Front Bow Assy. (1) Rear Bow Assy. (1) Long Mounting Rail (2) Short Mounting Rail (2)

4099T Parts List. Front Bow Assy. (1) Rear Bow Assy. (1) Long Mounting Rail (2) Short Mounting Rail (2) 4099T Parts List Ver.2 Front Bow Assy. (1) Rear Bow Assy. (1) Small Mnt Foot (2) Large Mount Foot (2) Ladder Hook (2) Ladder Stop (2) Handle Extension (1) Long Mounting Rail (2) Short Mounting Rail (2)

More information

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions

Real Life Ninja Complete Starter Pack (14ft. Warped Wall) Assembly Instructions MATERIALS: 3 - Main Sections (Only 2 Sections for 10 ) 8 3 deck screws for joining sections inside of 2 Rock Wall Panels (with pre-installed t-nuts. Top panel comes with ladder mounting block preinstalled.)

More information

Installation and Assembly - Desktop Swivel Mount For 32" - 55" Flat Panel Display

Installation and Assembly - Desktop Swivel Mount For 32 - 55 Flat Panel Display Installation and ssembly - Desktop wivel ount For 32" - 55" Flat Panel Display odels: HP455 ax Load apacity: 75 lb (34 kg) IUED: 2012-06-28 HEET #: 125-9328-4 (2017-10-20) NOTE: Read instruction sheet

More information

Lab Style Table Frame Part No Assembly Guide Automation Technology

Lab Style Table Frame Part No Assembly Guide Automation Technology Ergonomic Workstations Lab Style Table Frame Part No. 8 0 Assembly Guide 7 90 70 Automation Technology SPECIFICATIONS Lab style frame part number... 80 Height... 70 mm (8.") Width... 90 mm (.7") Depth...

More information

Side DuraRac Installation Instructions

Side DuraRac Installation Instructions Side DuraRac Installation Instructions Ford Transit Low Roof 130 /148 WB Frame Kit Part #: CRC 22-1010-002 V1.0.08.10.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE

More information

Independent Containment System (ICS)

Independent Containment System (ICS) Installing the Independent Containment System (ICS) Complete these instructions to install the Independent Containment System (ICS). Prerequisites This installation requires a team of at least two people.

More information

INSTALLATION INSTRUCTIONS ATV SNOW PLOW WARN KIT PN: KAWASAKI KIT PN: KAF Application: Kawasaki Prairie

INSTALLATION INSTRUCTIONS ATV SNOW PLOW WARN KIT PN: KAWASAKI KIT PN: KAF Application: Kawasaki Prairie INSTALLATION INSTRUCTIONS ATV SNOW PLOW WARN KIT PN: 37838 KAWASAKI KIT PN: KAF90-220 Application: Kawasaki Prairie 1997-2002 Your safety, and the safety of others, is very important. To help you make

More information

2009 MODEL ASSEMBLY, INSTALLATION AND MAINTENANCE INSTRUCTIONS

2009 MODEL ASSEMBLY, INSTALLATION AND MAINTENANCE INSTRUCTIONS 2009 MODEL ASSEMBLY, INSTALLATION AND MAINTENANCE INSTRUCTIONS It is important that these instructions are adhered to in their entirety. Please read the instructions fully before starting installation

More information

Rugged Ridge Engine Transmission Skid Plate JK

Rugged Ridge Engine Transmission Skid Plate JK Installation Time: 1-2 Hours Tools Required: Rugged Ridge Engine Transmission Skid Plate 2012-2017 JK Sockets: 16mm, 17mm, 18mm deep well Socket Wrench Wrenches: 16mm, 18mm Torque Wrench Drill ½ Drill

More information

Chain Drive Vise. Installation Instructions. (revised 05/04/2016)

Chain Drive Vise. Installation Instructions. (revised 05/04/2016) Chain Drive Vise Installation Instructions (revised 05/04/2016) Lie-Nielsen Chain Drive Vise Instructions Table of Contents page About Your Chain Drive Vise 3 Parts List 4 Exploded Parts Diagram 5 step

More information

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens

Installation and Assembly - Universal Articulating Swivel Double-Arm for 42 - 60 Plasma Screens Installation and Assembly - Universal Articulating Swivel Double-Arm for 42" - 60" Plasma Screens Models: PLAV 70-UNL, PLAV 70-UNL-S PLAV 70-UNLP, PLAV 70-UNLP-S R This product is UL Listed. It must be

More information

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering 10) At this time assemble the power steering bracket and pump assembly from the instructions provided with the power steering bracket beginning at step 7. Return to step 10 on this sheet when complete.

More information

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering

FM2113PC/FM2114PC SBC Top Mount Alt, w/ A/C & Power Steering 10) At this time assemble the power steering bracket and pump assembly from the instructions provided with the power steering bracket beginning at step 7. Return to step 10 on this sheet when complete.

More information

Track Rack. * Track Racks are not lockable

Track Rack. * Track Racks are not lockable The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply

More information

80221 ARCHER BOW HUNTER Component Chart

80221 ARCHER BOW HUNTER Component Chart 80221 ARCHER BOW HUNTER Component Chart 81050 Roof 81055 Roof Cap 15009 decal 80111 Kit 82020 Door Panel 82030 Jamb 3710-00 Weldment Door Jamb 3711-00 Weldment Door Frame 3719-00 Door Handle 3722-00 Door

More information

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 TIRE RACK INSTALLATION INSTRUCTIONS 07-11 Dodge Sprinter Please read before beginning Stainless steel hardware may bind together

More information

SEAT-361 E-Z-Go RXV RHOX Seat Kit Installation Instructions

SEAT-361 E-Z-Go RXV RHOX Seat Kit Installation Instructions SEAT-361 E-Z-Go RXV RHOX Seat Kit Installation Instructions Contents of SEAT-361 RHOX 300 Series Rear Seat Kit: a (1 ea.) Front Seat Back Support, Driver Side b (1 ea.) Front Seat Back Support, Passenger

More information

FIRST TEAM SPORTS, INC.

FIRST TEAM SPORTS, INC. FIRST TEAM SPORTS, INC. INVADER EZ-CRANK PORTABLE BASKETBALL GOAL ASSEMBLY INSTRUCTIONS Revised - 08/04/10 BILL OF MATERIALS (1) BASE TANK (1) BACKBOARD MOUNT (2) 5/16 X ¾ HEX BOLT (1) LOWER POST (2) SPRING

More information

Continuous Handrail Kit Installation Instructions

Continuous Handrail Kit Installation Instructions Continuous Handrail Kit Installation Instructions ALUMINUM RAILING SYSTEM Canadian Version Wall Application (see page 2) Railing Application (see page 7) Wall anchors not provided Hardware included: 1x

More information

INSTALLATION GUIDE N5-DS48-4

INSTALLATION GUIDE N5-DS48-4 INSTALLATION GUIDE N5-DS48-4 Shelving ( steel ) Transit High Roof & Medium Roof Promaster Standard Roof & High Roof Nissan NV High Roof Sprinter Low Roof & High Roof Box Truck / Trailer QUICK START GUIDE

More information

RZR 4 Doors Part # Polaris RZR XP & Turbo ( ) Black

RZR 4 Doors Part # Polaris RZR XP & Turbo ( ) Black Racing 3191 N Washington St. Suite 2 Chandler, AZ 85225 1 (800) 708-9803 http://www.racing.com RZR 4 Doors Part # 07-1802 Polaris RZR XP 4 1000 & Turbo (2015-2018) Black Revision No: 01 Revision Date:

More information

Side Katerack Installation Instructions

Side Katerack Installation Instructions Side Katerack Installation Instructions Ram ProMaster City 2015+ Frame Kit Part #: CRC 28-1000-001 V1.0.12.06.18 IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED

More information

6 Passenger Roof Assembly & Installation

6 Passenger Roof Assembly & Installation 6 Passenger Roof Assembly & Installation Tools Required Supplied Components Hand Drill Quantity Description ¼ Drill Bit 3 Roof Sections 7/16 End Wrench 2 5 H Molding 7/16 Socket & Socket Wrench 2 Edge

More information

ASSEMBLY & INSTALLATION INSTRUCTIONS

ASSEMBLY & INSTALLATION INSTRUCTIONS ASSEMBLY & INSTALLATION INSTRUCTIONS VEHICLE MOUNT KIT 118 AND VEHICLE CENTER MEMBER 6050 TO FIT 2008 & LATER FORD F250-F550 4X4 Sno-Way, Down Pressure and EIS are registered trademarks of Sno-Way International,

More information

Trak-Slider Instructions

Trak-Slider Instructions Trak-Slider Instructions 1/4-20 x 3/4" Hex Head Bolt 1/4-20 Flanged Hex Nut Gusset 1/4-20 x 1/2" Allen Cap Screw 1/4-20 Nylock Nut Rivet 1/4-20 x 3/8" Pan Head Phillips Machine Screw 1/4 USS Flat Washer

More information

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions

CNC Router Parts PRO Machine Kit Cable Track Installation Instructions 1 1 X CABLE TRACK TRAYS & BRACKETS The cable track on the side of the system is supported by a metal tray (or multiple trays for longer systems such as a PRO4896). These trays hang from brackets on the

More information

Installation and Assembly: LCD UPRIGHT STAND FOR PEDESTAL CABINETS

Installation and Assembly: LCD UPRIGHT STAND FOR PEDESTAL CABINETS Installation and Assembly: LCD UPRIHT STAND OR PEDESTAL CABINETS Part Number 49-5672-30 EATURES Take all of the guess work out of selecting the proper stand for your pedestal cabinets. This custom stand

More information

Chain Drive Vise. Installation Instructions. (revised 11/29/2018)

Chain Drive Vise. Installation Instructions. (revised 11/29/2018) Chain Drive Vise Installation Instructions (revised 11/29/2018) Lie-Nielsen Chain Drive Vise Instructions Table of Contents page About Your Chain Drive Vise 3 Parts List 4 Exploded Parts Diagram 5 step

More information

ALUMINUM HEADKNOCKER RACK P/N HKRS4-1 / HKRS5-1

ALUMINUM HEADKNOCKER RACK P/N HKRS4-1 / HKRS5-1 ALUMINUM HEADKNOCKER RACK P/N HKRS4-1 / HKRS5-1 Package Contents: PARTS (1) CROSS BAR (2) LEGS WITH FEET (2) T BRACKETS (1) SCREEN ASSEMBLY (2) SCREEN L MOUNTS (2) LOWER SCREEN MOUNTS (2) LOAD SECURE POSTS

More information

Installation for Full Size Polaris Ranger Crew Doors

Installation for Full Size Polaris Ranger Crew Doors Installation for Full Size Polaris Ranger Crew Doors Order of Installation: Heater Doors Wiper on to Windshield Windshield Top & Back Panel Note: Most of the steps in these instructions need to be repeated

More information

RangerWare Fiberglass Door System Installation Instructions P/N

RangerWare Fiberglass Door System Installation Instructions P/N Page 1 of 9 RangerWare Fiberglass Door System Installation Instructions P/N 2878016 ORDER OF INSTALLATION Note: To assure proper order, read all Accessory Installation Instructions before beginning. 1.

More information

GENERATION II FENDERS

GENERATION II FENDERS INSTALLATION INSTRUCTIONS FOR 97-06 JEEP TJ GENERATION II FENDERS *Thank you for your purchase of our Generation II Fenders! We hope that you will love the new look and function of your Jeep with the addition

More information

Rugged Ridge 2 Receiver Hitch Kit (J21068)

Rugged Ridge 2 Receiver Hitch Kit (J21068) Rugged Ridge 2 Receiver Hitch Kit (J21068) Installation Time: 1-2 Hours Tools Required: ¾ Open End Wrench 18 mm Socket ¼ drive Pliers/Needle nose pliers/channel locks, etc. Torque wrench Phillips head

More information

NOTE: FABRIC SOLD SEPERATELY FOR 28', 30', & 32' CANOPIES ADDITIONAL KIT CANOPY FRAME EXTENSION IS REQUIRED.

NOTE: FABRIC SOLD SEPERATELY FOR 28', 30', & 32' CANOPIES ADDITIONAL KIT CANOPY FRAME EXTENSION IS REQUIRED. 10'-6" & 11'-6" WIDE BOAT LIFT CANOPY EXTENSIONS EXPLODED VIEW NO. PART NO. QTY. DESCRIPTION 1 001-70205-00 30 HHCS 1/2-13 x 1" SS 18-8 2 001-76072-00 30 NUT, NYLOCK 1/2-13 ALUMINUM 3 111-10054-00 10 ASSY,

More information

BOX-115 Club Car Precedent Utility Box Mounting Kit Installation Instructions

BOX-115 Club Car Precedent Utility Box Mounting Kit Installation Instructions BOX-115 Club Car Precedent Utility Box Mounting Kit Installation Instructions Contents of BOX-115 Utility Box Mounting Kit: a (1 ea.) Utility Box Support Frame, Passenger Side b (1 ea.) Utility Box Support

More information

Allow 60 from door face

Allow 60 from door face Setbacks Allow 60 from door face TOOLS NEEDED Tape Measure Marker or Pencil Masonry Drill Bit 3/8 Hammer Drill Hammer Socket Wrenches and Wrench: 9/16, 1/2, 7/16, 1/4 drive socket wrench and 1/2 socket

More information

The Festival Assembly Instructions

The Festival Assembly Instructions The Festival Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown CONTACT INFORMATION: HomePlace Structures 301 Commerce Drive New

More information

Installing the CACS Ceiling with Aisle Ducts

Installing the CACS Ceiling with Aisle Ducts Installing the CACS Ceiling with Aisle Ducts Complete these instructions to install the Cold Aisle Containment System (CACS) Ceiling with Aisle Ducts. The CACS Ceiling and Aisle Ducts are designed to work

More information

HAPPY TRAILS PRODUCTS

HAPPY TRAILS PRODUCTS Thank you for purchasing Happy Trails products. Our products are proudly hand made in Boise Idaho, USA. If you have any questions or concerns about the installation of this product, please contact us directly

More information

Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419)

Multi-Stage ASSEMBLY INSTRUCTIONS ST-8100 SERIES. 125 TAYLOR PARKWAY ARCHBOLD, OH PHONE: (419) FAX: (419) 125 TAYLOR PARKWAY ARCHBOLD, OH 43502 PHONE: (419) 445-8915 FAX: (419) 445-0367 www.biljax.com Multi-Stage ST-8100 SERIES ASSEMBLY INSTRUCTIONS ALL DRAWINGS ARE FOR ILLUSTRATION ONLY. PRINTED IN U.S.A.

More information

40993 Parts List. Front Bow Assy.(1) Rear Bow Assy.(1)

40993 Parts List. Front Bow Assy.(1) Rear Bow Assy.(1) 40993 Parts List Front Bow Assy.(1) Rear Bow Assy.(1) Rail Mnt Foot(4) Ladder Hook (2) Ladder Stop (2) Mounting Clip-ProMaster Only (6) Mounting Bracket(6) Long Mounting Rail(2) Short Mounting Rail(2)

More information

Parts and tools needed for installation- Cleaning and Painting -

Parts and tools needed for installation- Cleaning and Painting - Thank you for the purchase of our JK Rear Trail Doors. We have made these from 6061-T6 aluminum and reinforced them with stiffeners at the top that double as a comfortable armrest and support for Rugged

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS E-SERIES STEP BARS / 4 OVAL STEP BARS APPLICATION: 2011-2017 Jeep Grand Cherokee PART NUMBER: 23-3610, 23-3615, 21-3610, 21-3615, 23-73610 ITEM QUANTITY DESCRIPTION TOOLS NEEDED

More information

4832A Installation Sheet Part List

4832A Installation Sheet Part List 4832A Installation Sheet Part List (1) 4016A-43-003 Qty 1- (2) 4016A-43-002 Qty 1- (3) 4016A-43-001 Qty 2- (4) 4016A-10-005 Qty 1- (5) 4016A-43-004L Qty 1- Mounting Bolt Kit (A) (K) Qty 2 - Qty 6 - M10

More information

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5" PH Wood Screws. (30) Included - (24) Required

M10 x 75mm Sockethead Cap Screws. 5mm Fender Washer (12) Included - (8) Required. #10 x 2.5 PH Wood Screws. (30) Included - (24) Required Door System Unit - Hardware Tools Included: (2) 2mm Allen Wrenches, (2) 3mm Allen Wrenches, (2) 4mm Allen Wrenches, (2) 6mm Allen Wrenches, and (1) 8mm T-Handle Allen Wrench Tools Required: Phillips Screwdriver,

More information

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit)

Therma-Tru Door Gallery Setup Instructions Swing Unit with Hardware Kit - Hardware Part # MADGSWU15 (Swing Unit) Part # MADGHKSU10 (Hardware Kit) Swing Unit with Hardware Kit - Hardware Tools Included: 4mm Allen Wrench, 6mm Allen Wrench, 8mm T-Handle Allen Wrench (1) 3/4" Drill Bit, (1) 7/32" Drill Bit and Hole Template Guide Tools Required: Phillips

More information

Y Cap Topper Tracks, 49 Cross Bars. Y Cap Topper Tracks, 54 Cross Bars. Y Cap Topper Tracks, 59 Cross Bars.

Y Cap Topper Tracks, 49 Cross Bars. Y Cap Topper Tracks, 54 Cross Bars. Y Cap Topper Tracks, 59 Cross Bars. Y02-470 - 63 Cap Topper Tracks, 49 Cross Bars. Y02-480 - 63 Cap Topper Tracks, 54 Cross Bars. Y02-490 - 63 Cap Topper Tracks, 59 Cross Bars. Important: Parts List Please read these instructions carefully

More information

TABLE MKI small with Basin and under rack brackets kit

TABLE MKI small with Basin and under rack brackets kit TABLE MKI small with Basin and under rack brackets kit TBRA024 INSTALL TIME: 15 mins IMPORTANT WARNING! IT IS CRITICAL THAT ALL FRONT RUNNER PRODUCTS BE PROPERLY AND SECURELY ASSEMBLED AND ATTACHED TO

More information

STYLE BAR & TONNEAU COVER INSTALLATION

STYLE BAR & TONNEAU COVER INSTALLATION STYLE BAR & TONNEAU COVER INSTALLATION INSTALLATION MANUAL: 2005 to '09 Mustang P/N: 10-8002-C12071B Saleen Performance, Inc. 1225 East Maple Rd., MI 48083 800-888-8945 www.saleen.com 1 IF YOU ARE NOT

More information

INSTRUCTIONS INSTRUCCIONES CONSIGNES

INSTRUCTIONS INSTRUCCIONES CONSIGNES AUTOMOTIVE PRODUCTS, INC. INSTRUCTIONS INSTRUCCIONES CONSIGNES APPLICATION: 2007 13 CHEVY SILVERADO 1500 (except Classic ) MAX WINCH TRAY: HDX 46-22275 SPORTSMAN WINCH MOUNT GRILLE GUARD: 45-92270, 40-92275

More information

INSTALLATION INSTRUCTIONS UTV LIGHT BAR KIT Part Number: and Application: All UTV s*

INSTALLATION INSTRUCTIONS UTV LIGHT BAR KIT Part Number: and Application: All UTV s* INSTALLATION INSTRUCTIONS UTV LIGHT BAR KIT Part Number: 83970 and 84360 Application: All UTV s* * does not include Arctic Cat vehicles Your safety, and the safety of others, is very important. To help

More information

APS Small Seeds Box Assembly Instructions

APS Small Seeds Box Assembly Instructions APS Small Seeds Box Assembly Instructions For APS15 Series All Purpose Seeder Manual No. 313-473M Before You Start! When you see this symbol, the subsequent instructions and warnings are serious - follow

More information

Bumper Sign INSTALLATION INSTRUCTIONS

Bumper Sign INSTALLATION INSTRUCTIONS Bumper Sign INSTALLATION INSTRUCTIONS BUMPERSIGN TOOL CHECKLIST SDS MAX Rotary Hammer Drill Marker/Pencil SDS MAX 1 Carbide Drill Bit Tape Measure Torque Wrench with ½ Drive Power Source Vacuum ½ Drive

More information

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions

Introduction. Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Rocky Mountain Westy Swing Away Carrier Kit Installation Instructions Introduction Thank you for purchasing the Rocky Mountain Westy Swing Away Carrier Kit. We pride ourselves in the products we develop

More information

DuraRac Shelving System

DuraRac Shelving System GM Full Size Van Assembly Installation Instructions Sheet 1 of 13 BEFORE YOU START! IMPORTANT INSTALLATION STEPS ARE DENOTED USING A STOP SIGN. THESE STEPS MUST BE PERFORMED IN THE SPECIFIED ORDER TO ENSURE

More information

ASSEMBLY & INSTALLATION INSTRUCTIONS

ASSEMBLY & INSTALLATION INSTRUCTIONS ASSEMBLY & INSTALLATION INSTRUCTIONS VEHICLE MOUNT KIT 99101282 AND VEHICLE CENTER MEMBER FOR 26 SERIES: 99100890 TO FIT 2017 - LATER NISSAN TITAN 4X4 Sno-Way, Down Pressure and EIS are registered trademarks

More information

SERVICE ADVISORY SA-11

SERVICE ADVISORY SA-11 SUBJECT: This document provides repair procedures of the Brush block assembly, and it: BRUSH ASSEMBLY REPLACEMENT BRUSH MODULE REPLACEMENT BRUSH REPLACEMENT CONTENTS: Page: I. GENERAL 1 II. NOMENCLATURE

More information

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE

INSTRUCTION BOOKLET #C21. For Wallbed models: KING SIZE For Wallbed models: KING SIZE INSTRUCTION BOOKLET #C1 WARNING! ALL MURPHY/WALLBED SYSTEMS CONTAIN STORED ENERGY. FAILURE TO USE AND FOLLOW THESE INSTRUCTIONS DURING THE INSTALLATION PROCESS COULD RESULT

More information

INSTALLATION GUIDE. C20-DH STRAIGHT PARTITION Sprinter Partition ( Perforated Window, No Access, Steel )

INSTALLATION GUIDE. C20-DH STRAIGHT PARTITION Sprinter Partition ( Perforated Window, No Access, Steel ) INSTALLATION GUIDE C20-DH STRAIGHT PARTITION Sprinter Partition ( Perforated Window, No Access, Steel ) QUICK START GUIDE Phase 1 - Assembly q 1.1 Setup... q 1.2 Partition assembly... 3-4 5-6 Phase 2 -

More information

6' Wide Premium Greenhouse Benches

6' Wide Premium Greenhouse Benches 6' Wide Premium Greenhouse Benches Premium Greenhouse Bench with Rolling Top 2015 FarmTek All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 112416R6X08 6' W x 3' H x 8'

More information