60/100 Concentric Flue System Parts
|
|
- Madlyn Rachel Bishop
- 6 years ago
- Views:
Transcription
1
2 60/00 Concentric Flue System Parts MG88(MG85 m extended option) Std Concentric Flue 60/00 (Avanta Plus). Low profile bend (Avanta Plus). Telescopic terminal. Wall plates - ( x white) MG80 Vertical Terminal 60/00 (Avanta Plus). Vertical terminal. Boiler connector. Wall bracket MG89 Std Concentric Flue 60/00 (Avanta /8/4v). Boiler bend (Avanta /8/4v). Telescopic terminal. Wall plates - ( x white) MG885 Vertical Terminal 60/00 (Avanta /8/4v). Vertical terminal. Wall bracket
3 MG8790 Roof flashing (0 to 45 pitched) MG877 Roof flashing (flat) MG86-50mm MG87-500mm MG88-000mm Flue Extension Piece (cannot be cut) c/w Clamp MG to 5mm Flue extension piece (adjustable) c/w Clamp MG84-500mm MG84-000mm Flue Extension Piece (cuttable) c/w Clamp MG Bend c/w Clamp (single seal) MG Bend c/w Clamp (single seal)
4 Wall Plate See table for part Nos. MG8 LP Bend + adaptor plate (Avanta Plus) 654 LP adaptor plate (Avanta Plus) -supplied as standard with boiler- S6768 Boiler connector (Avanta Plus) - for vertical outlet supplied as standard with Part No. MG80 Vertical flue kit (Avanta Plus) - MG84 60/00mm Concentric Flue Spare Parts(not all illustrated) Part No Description 654 LP adaptor plate (Avanta Plus) MG78 Air inlet seal for LP boiler bend (flue side) MG87650 Clamp MG8770 Wall bracket 00mm MG745 Air inlet seal for Avanta 8v boiler bend MG8500 Wall plate - Black MG7568 Wall Plate - White 4
5 Avanta Plus 60/00mm Concentric Flue System 00 MG88 Std Concentric Flue 60/00 ( Avanta Plus) installed C/L of Terminal 98 Core Drill Wall - 5mm Dia.. Low profile bend (Avanta Plus). Telescopic terminal. Wall plates ( white) Top of boiler Wall Depth Max 450mm - Min 50mm.5 Terminal is telescopic NOTE: If the wall depth is less than 50mm the telescopic terminal can still be used by removing the boiler end part and cutting the remaining outer part down to suit wall depth (min 50mm) + 60mm out of wall to connect to bend) Remember to leave the inner pipe 0mm longer than the outer MG80 - Vertical Flue (Avanta Plus) Installed in Pitched Roof 0 o/d Min Hole in Roof 760± ±0 To inside of weather collar To suit site 0 99 o/d Pitch 0 to 45 Weather collar detail 805 ±0 to inside weather collar 0 65 ±0 to roof level 0 o/d Min Hole in roof 99 o/d To suit site MG80 - Vertical Flue (Avanta Plus) Installed in Flat Roof 5
6 Avanta /8/4ov 60/00mm Concentric Flue System C/L of Terminal Core Drill Wall - 5mm Dia. MG89 Std Concentric Flue 60/00 ( Avanta ov) installed 64 Top of boiler.5 Wall Depth Max 450mm - Min 50mm Terminal is telescopic. Boiler bend (Avanta ov). Telescopic terminal. Wall plates ( white) NOTE: If the wall depth is less than 50mm the telescopic terminal can still be used by removing the boiler end part and cutting the remaining outer part down to suit wall depth (min 50mm) + 60mm out of wall to connect to bend) Remember to leave the inner pipe 0mm longer than the outer MG885 - Vertical Flue (Avanta /8/4ov) Installed in Pitched Roof 45 0 o/d Min Hole in Roof 760±0 5 Weather collar detail 65 ±0 to roof level 805±0 To inside of weather collar 0 Pitch 0 to o/d 805 ±0 to inside weather collar 0 o/d Min Hole in roof 99 o/d 0 6 MG885 - Vertical Flue (Avanta /8/4ov) Installed on Flat Roof
7 Avanta Plus 60/00mm Plume Management Kits MG8 PMK-Horizontal Terminal Kit (Avanta Plus). PMK Wall terminal. LP boiler bend (Avanta Plus). Wall plates ( white and black) mm flue extension (60mm) 5. Support bracket (60mm) bend (60mm) 7. Flue outlet (60mm) 8. Bird guard NOTE: The horizontal terminal unit must be installed with the outlet pointing vertically upwards PMK Horizontal Terminal Kit installed C/L of Terminal.5 00 Wall Depth - Max 550mm - Min 50mm Terminal inner and outer can be cut to suit- Note: Maintain the 0mm difference Core Drill Wall - 5mm Dia. Max 00mm - Min 50mm Note: Can be extended with extra parts 98 Top of boiler 7
8 Avanta Plus 60/00mm Plume Management Kits MG8 + MG85 PMK-Horizontal Terminal Kit (Avanta Plus). PMK Wall terminal. LP boiler bend (Avanta Plus). Wall plates ( white and black) mm flue extension (60) 5. Support bracket (60) 6. Vertical outlet NOTE: The horizontal terminal unit must be installed with the outlet pointing vertically upwards The vertical outlet replaces the 90 bend, flue outlet and bird guard which are discarded PMK Horizontal Terminal Kit with a vertical outlet installed Roof level 00.5 Wall Depth - Max 550mm - Min 50mm Terminal inner and outer can be cut to suit- Note: Maintain the 0mm difference Standard Terminal Max 000mm - Min 50mm Note: Can be extended with extra parts C/L of Terminal Core Drill Wall - 5mm Dia. 98 Top of boiler 8
9 Avanta /8/4ov 60/00mm Plume Management Kits MG80 PMK-Horizontal Terminal Kit (Avanta ov). PMK Wall terminal. Boiler bend (Avanta ov). Wall plates ( white and black) mm flue extension (60mm) 5. Support bracket (60mm) bend (60mm) 7. Flue outlet (60mm) 8. Bird guard NOTE: The horizontal terminal unit must be installed with the outlet pointing vertically upwards PMK Horizontal Terminal Kit (Avanta /8/4ov) installed C/L of Terminal 00.5 Wall Depth - Max 550mm - Min 50mm Terminal inner and outer can be cut to suit- Note: Maintain the 0mm difference Core Drill Wall - 5mm Dia. Max 00mm - Min 50mm Note: Can be extended with extra parts 64 Top of boiler flue outlet 9
10 Avanta /8/4ov 60/00mm Plume Management Kits MG80 + MG85 PMK-Horizontal Terminal Kit (Avanta OV). PMK Wall terminal. LP boiler bend (Avanta OV). Wall plates ( white and black) mm flue extension (60mm) 5. Support bracket (60mm) 6. Vertical outlet 6 4 NOTE: The horizontal terminal unit must be installed with the outlet pointing vertically upwards The vertical outlet replaces the 90 bend, flue outlet and bird guard which is discarded. 5 PMK Horizontal Terminal (Avanta /8/4ov) with a vertical outlet installed Roof level 00.5 Wall Depth - Max 550mm - Min 50mm Terminal inner and outer can be cut to suit- Note: Maintain the 0mm difference Standard Terminal Max 000mm - Min 50mm Note: Can be extended with extra parts C/L of Terminal Core Drill Wall - 5mm Dia Top of boiler flue outlet
11 Avanta Plus 60/00mm PMK Balcony Terminal Kit MG8 PMK Balcony Flue 60/00mm(Avanta Plus). PMK Balcony terminal. LP Boiler bend (Avanta Plus). Wall plates ( white and black) 4. Two 000mm flue extensions (60mm) 5. Two Support brackets(60mm) 6. Flue outlet (60mm) 7. Bird guard NOTE: Horizontal Terminal unit must be installed with the flue exit point at the top of the air inlet. (flue exit is offset from centre line) PMK Balcony Flue 60/00 (Avanta Plus) installed for a M overhang Core Drill Wall - 5mm Dia. Balcony.5 00 C/L of Terminal 98 Top of boiler Wall Depth - Max 550mm -Min - 50mm Terminal can be cut to suit Standard Balcony Kit for up to M One additional length allowed up to a Max of M Note: the extension kit must be graded back to the Terminal at approx to allow condensate to drain to boiler
12 Avanta /8/4ov 60/00mm PMK Balcony Terminal Kit MG8 PMK Balcony Flue 60/00mm (Avanta ov). PMK Balcony terminal. Boiler bend (Avanta ov). Wall plates ( white and black) 4. Two 000mm flue extensions (60mm) 5. Two Support brackets(60mm) 6. Flue outlet (60mm) 7. Bird guard NOTE: Horizontal Terminal unit must be installed with the flue exit point at the top of the air inlet. (flue exit is offset from centre line) PMK Balcony Flue 60/00mm (Avanta ov) installed for a M overhang Core Drill Wall - 5mm Dia. Balcony.5 00 C/L of Terminal 64 Standard Balcony Kit for up to M overhang One additional length allowed up to a Max of M Top of boiler Wall Depth - Max 700mm - Min 50mm Terminal can be cut to suit Note: the extension kit must be graded back to the Terminal at approx to allow condensate to drain to boiler
13 60/00 Plume Management Spare Parts MG80 PMK-Horizontal Terminal only MG8 PMK-Balcony Terminal only MG849 PMK-90 Bend + horizontal outlet c/w bird guard (60) MG8 PMK-Horizontal outlet (60) MG8 PMK-90 Bend (60) MG8 PMK-45 Bend (60) MG84 PMK 000mm Flue Extension piece c/w wall bracket (60) MG85 PMK-Wall bracket (60) not illustrated MG85 PMK-Vertical outlet terminal (60) MG8 PMK-45 Angle deflector (60) for use with Std Wall Terminal Kits (MG88 and MG89) only
14
15
16
VERTICAL BALANCED FLUE SYSTEM INSTALLATION INSTRUCTIONS
VERTICAL BALANCED FLUE SYSTEM INSTALLATION INSTRUCTIONS ROOM SEALED NON-CONDENSING COMBINATION/SYSTEM BOILERS AND WATER HEATERS 24i 47 311 37/38 9/14 CBi 41 311 50/51 28i 47 311 54 14/19 CBi 41 311 52/53
More informationICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450)
ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) 565-6336 FAX: (450)565-6519 www.icc-rsf.com INSTALLATION AND OPERATION INSTRUCTIONS "Model VIP" CHIMNEY TYPE: FACTORY BUILT
More informationHEARTH PRODUCTS KITS AND ACCESSORIES VERTICAL TERMINATION KITS FOR SECURE FLEX VERTICAL VENTING
HEARTH PRODUCTS KITS AND ACCESSORIES 750052M Rev. C 05/2014 VERTICAL TERMINATION KITS FOR SECURE FLEX VERTICAL VENTING INSTALLATION INSTRUCTIONS FOR SECURE FLEX VERTICAL TERMINATION KITS (CATALOG NO. 56L74
More informationContemporary Collection
HZ30E - 10 Gas Fireplace Model HZ30E-NG10 HZ30E-LP10 Fuel Type Natural Gas Propane Gas Minimum Supply Pressure Manifold Pressure - High 5 W.C. (1.5 kpa) 3.5 W.C. (0.87 kpa) 11 W.C. (.74 kpa) 10 W.C. (.49
More informationICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JÉRÔME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450) INSTALLATION AND OPERATION INSTRUCTIONS
ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JÉRÔME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) 565-6336 FAX: (450)565-6519 INSTALLATION AND OPERATION INSTRUCTIONS "IS" CHIMNEY TYPE: SIZE: FACTORY BUILT CHIMNEY FOR
More informationContemporary Collection
HZ5E Gas Fireplace Model HZ5E-NG1 HZ5E-LP1 Fuel Type Natural Gas Propane Gas Minimum Supply Pressure 5 W.C.(1.5 kpa) 1 W.C. (.98 kpa) Manifold Pressure - High 3.5 W.C. (.87 kpa) 1 W.C. (.9 kpa) Manifold
More informationAdhesive Air Terminal Bases. Universal Surface Bases. Offset Parapet Air Terminal Bases. Section 3.2. Air Terminals & Air Terminal Bases
equipment catalog 3-5 Bases Adhesive Bases Used for mounting on membrane or built-up roofs. Mounted with adhesive or plastic roofing cement. The cast base has a mechanical conductor connector. BS-C-3/8ID-ADH-AT
More informationFS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions
Thermal Structures Inc. FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions Attached Flange & Double Barrier System FLOOR TO FLOOR (F) ROOF TO ROOF (R) FLOOR TO WALL (FW) ROOF TO WALL (RW)
More informationTREX ENHANCE RAILING (Also Applies to Trex Select Railing) Installation Instructions
TREX ENHANCE RAILING (Also Applies to Trex Select Railing) NOTE: All Enhance Railing lengths are manufactured at CLEAR SPAN dimensions (spanning between space of posts): 7" for 6' clear span. Note that
More informationInstallation Instructions Student 101 Fume Cupboard
Installation Instructions Student 101 Fume Cupboard Refer drawing on next page 0. If your fume cupboard is supplied with a flatpack bench frame, see step1. If your fume cupboard will be mounted on an existing
More informationRheem Room Sealed Kit - Installation Instructions. Installation must be carried out by a licenced plumber
Rheem 631275 Room Sealed Kit - Installation Instructions Installation must be carried out by a licenced plumber General The Rheem Room Sealed Balanced Flue Kit is designed to connect to a 631275 heavy
More informationThermostat Conversion Kit Data Sheet CHOICE OF INSTALLATION
22-022 Thermostat Conversion Kit Data Sheet The Thermostat Conversion Kit was designed and packaged with the serviceman in mind. It allows a quick and easy replacement of competitive devices with a new
More informationAccentra 52i Pellet Insert Zero Clearance Cabinet Part #
Accentra 52i Pellet Insert Zero Clearance Cabinet Accentra 52i Pellet Insert ZC Cabinet Accentra 52i Pellet Insert Mounting Frame Accentra 52i Pellet Insert www.harmanstoves.com R:\Todd\Instruction Sheets_3-89-574323_RevC
More informationECOVENT USA CHIMNEY MODEL EV-SHT 5"-8" DIAMETER INSTALLATION INSTRUCTIONS
ECOVENT USA CHIMNEY MODEL EV-SHT 5"-8" DIAMETER INSTALLATION INSTRUCTIONS A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS. IT IS
More informationINSTALLATION INSTRUCTIONS for PYROCLASSIC FIRES LTD. 100mm SLOPING CEILING FLUE KIT
INSTALLATION INSTRUCTIONS for PYROCLASSIC FIRES LTD 100mm SLOPING CEILING FLUE KIT THIS FLUE KIT HAS BEEN MANUFACTURED IN ACCORDANCE WITH AS/NZS 2918:2001 AND TESTED TO APPENDIX F WARNING: TO ENSURE SAFETY
More information150 MM FREE STANDING WOOD FIRE FLUE KIT INSTALLATION INSTRUCTIONS
www.jayline.co.nz www.fisherstoves.co.nz 150 MM FREE STANDING WOOD FIRE FLUE KIT INSTALLATION INSTRUCTIONS WARNING: This flue kit has been manufactured in accordance with as/nzs 2918:2001 and tested to
More informationTREX SELECT RAILING Installation Instructions
RAILING NOTE : All Trex Select Railing lengths are manufactured at ON CENTER dimensions (spanning from center of each post): 67-5/8" (76.8 cm) for 6' (.83 m) on center, and 9-5/8" (35.3 cm) for 8' (.44
More informationTREX SELECT RAILING. Installation Instructions PARTS
RAILING NOTE : All Trex Select Railing lengths are manufactured at ON CENTER dimensions (spanning from center of each post): 67-5/8" (76.8 cm) for 6' (.83 m) on center, and 9-5/8" (35.3 cm) for 8' (.44
More informationINSTALLATION AN EXPLODED VIEW OF A TYPICAL BRETT MARTIN RAINWATER INSTALLATION RAINWATER PRODUCT GUIDE
AN EXPLODED VIEW OF A TYPICAL BRETT MARTIN RAINWATER HANDLING Brett Martin Rainwater systems are light in weight and are therefore easy to handle. As with all other quality materials, Rainwater components
More informationRegency Bellavista B41XT-1 Gas Fireplace
Regency ellavista 1XT-1 Gas Fireplace Specifications: Model 1XT-NG 1XT-LP Fuel Type Natural Gas Propane Gas Minimum Supply Pressure Manifold Pressure - High Manifold Pressure - Low 5 W.C. (1.5 kpa) 3.5
More informationTYPE "B" GAS VENT. Do not connect gas vent to a solid or liquid fuelled appliance or any appliance requiring a chimney.
TYPE "B" GAS VENT SD (sizes 3", 4", 5", 6", 7") INSTALLATION INSTRUCTIONS Type "B" Gas Vents are strictly for interior or enclosed exterior use or exterior use above a roof line. Read vent and appliance
More informationINSTALL GUTTERING. 2 - Planning the work. Care is needed in setting out the guttering accurately, but actually fitting it is relatively easy.
INSTALL GUTTERING Care is needed in setting out the guttering accurately, but actually fitting it is relatively easy. Before you climb a ladder, make sure it is stable and fixed securely to the structure
More informationVertical Offset Base and Safety Rail System Installation Instructions
Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat
More informationC70 Window Roller Repair Taken from: Heres the problem:
C70 Window Roller Repair Taken from: http://www.volvospeed.com/vs_forum/topic/115086-how-to-c70-window-rollers-permanent-fix/ Heres the problem: This happened to two separate window assemblys on my c70
More informationBoat Lift Canopy Frame Assembly Instructions
Patriot Docks Boat Lift Canopy Frame Assembly Instructions Helpful Tips: Assembling and installing the canopy frame and cover is a two person job. Additional help makes installation easier and is recommended.
More informationPipe Product Catalog Table of Contents
Pipe Product Catalog Table of Contents Section A: Drawing #: Page Description A1 Reinforced Concrete Pipe A3 Storm Manhole Sizing Chart (48" - 96") A3.1 Storm Manhole Sizing Chart (108" - 144") A4 48"
More information1LG WALL MOUNTS - 1LG
WM WALL MOUNTS - 1LG 1LG The Universal One-Legged Mount (1LG) may be the one and only mount that can be installed on any part of any building. This mount is designed for many types of antennas home, TV,
More informationMODULAR HIGH TUNNEL INSTALLATION GUIDE
9615 Grandview Rd. Kansas City, MO 64137 Version: 15 JAN -2015 Sustainable Agriculture Solutions MODULAR HIGH TUNNEL INSTALLATION GUIDE (816) 444-7330 SmallFarmTools.com Thank you for purchasing a Modular
More informationU1500E Gas Fireplace
Model U1500E-NG U1500E-LP Fuel Type Natural Gas Propane Minimum Supply Pressure 5 W.C. (1.25 kpa) 11 W.C. (2.73 kpa) Manifold Pressure - High 3.5 W.C. (0.87 kpa) 10 W.C. (2.48 kpa) Manifold Pressure -
More information33/3547A. Special tools needed: #10-24 tap Drill bits: #25, 5/16, 13/32, 1/2
911404-00 Concealed Vertical Rod Exit Device 33/3547A Installation Instructions Devices covered by these instructions: 33/3547A and 33/3548A Concealed Vertical Rod Exit Device 33/3547A-F and 33/3548A-F
More informationBracket guide. LK Pipe Pole. LK Radiator fixture Uni
Bracket guide LK Radiator fixture Uni LK Radiator fixture Uni c/c 40 (Article no. 481 43 92) LK Radiator fixture Uni c/c 50 (Article no. 481 44 03) LK Pipe Pole (Article no. 481 43 91, 481 43 90) Used
More informationConcealed Thru-Roof Assemblies
Concealed Thru-Roof Assemblies IPC s concealed thru-roof assembly is ideal for new constructions or applications where installation will be concealed. The 240 assembly includes everything necessary for
More informationINS A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Verify Curb Installation Required Installation Tools...
INS-88.300-0A KSR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Verify Curb Installation... 2 2. Required Installation Tools... 2 3. Unpacking the KSR... 3 4. Attach KSR Bottom Rail to Curb... 5 5. Attach
More informationE N G L I S H GARDEN SHED. Assembly Instructions. Suitable for Models WITH VARYING DEPTHS
GARDEN SHED Assembly Instructions Suitable for Models 6' Wide 8' Wide 0' Wide WITH VARYING DEPTHS GI0003 November 0 INSTALLATION ADVICE It's Not That Difficult! The construction of your shed isn't as complicated
More informationOur non-positional lock system on the Selkirk. The Locktab is located on the female end of the gas vent.
LockTab Feature for Type Gas Vent Our non-positional lock system on the Selkirk Gas Vent is the best lock system on the market today. The incorporation of the LockTab feature simply improves our lock system
More informationThis installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format.
1.00 - Introduction This installation guide has been created to assist in constructing a Liniar conservatory roof from a kit format. Please note, each roof has been individually designed to meet specific
More informationProBuilder Series CoolSmart TV (42PB - sku# )(54PB - sku# )(72PB - sku# )
Compatibility ProBuilder Series CoolSmart TV ProBuilder Series Linear Fireplaces (42PB, 54PB & 72PB) Packing List Convection Manifold (with grill and mounting brackets pre-attached) 5 Diameter Aluminum
More informationInstallation Guide Simplicity Alfresco. V1.9 Lu070318
0333 305 5272 www.canoports.co.uk Installation Guide Simplicity Alfresco V1.9 Lu070318 Tools Required Below is a list of tools that you will require to install your the Simplicity Alfresco System. Cordless
More informationTRADE Prices Monday-Friday 7am-5pm. (HETAS Installers ONLY)
TRADE Prices 2017 (HETAS Installers ONLY) ex VAT sales@saltfire.co.uk 01929 555211 Monday-Friday 7am-5pm VITREOUS FLUE premium black enamel single skin flue pipe Straight Lengths V5250 250mm 11.99 V5500
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 2 CONTENTS 1. Preparing the ring beam 2 2. Installing the framework 3 3. How to install structural support posts 7 4. Insulation and waterproofing 8 5. Tile application:
More informationCAPTUR COMPONENTS. We make food look better.
CAPTUR COMPONENTS TOP EDGE GLASS CONNECTORS GCA6 6mm (1/4") Glass GCA10 10mm (3/8") Glass 2.76 2.90 2.76 2.90 TOP BOTTOM 1.13 1.13 6mm GLASS GC906 6mm (1/4") Glass 10mm GLASS GC9010 10mm (3/8") Glass Adjustable
More informationProBuilder Linear CoolSmart TV (42PB - sku# )(54PB - sku# )(72PB - sku# )
Compatibility ProBuilder Linear CoolSmart TV ProBuilder Series Linear Fireplaces (42PB, 54PB & 72PB) Packing List Convection Manifold (with grill and mounting brackets pre-attached) 5 Diameter Aluminum
More informationCountryAccents Pergola Assembly Instructions
CountryAccents Pergola Assembly Instructions Options 11 2" Squares Lattice Railing Gingerbread Scroll (For 5" Posts Only) Site Preparation Site preparation for either the round column or the 5" post pergola
More informationRBP-1215B-RX DODGE RAM QUAD CAB RX3
RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side
More informationNever fill any required clearance space with insulation or any other building materials surrounding the chimney.
INSTALLATION AND MAINTENANCE INSTRUCTIONS 1700ºF Air-Cooled Temp/Guard Chimney Sizes 8-16 Listing No. MH8251 Tested to UL103/ULC-S604 A MAJOR CAUSE OF RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCE
More informationINSTALLATION INSTRUCTIONS
NOTE: Bolts should remain hand tight until all bolts are installed. STEP 1 Installing the door base (both sides). 1. Locate the outer, roll cage, mounting bolt (passenger side is shown in the illustration).
More informationGROWING BETTER THROUGH DESIGN LEAN-TO. Lean-To. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN Lean-To LEAN-TO Assembly Instructions 04/02 2 Lean-To Greenhouse Base Plan Introduction / Tools / Contents This is a copy of our Lean-To greenhouse base plan. Dimensions shown
More informationC Series. Cool Surface System INSTRUCTION MANUAL FRONT VENT [ ] PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE
PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE C Series Cool Surface System FRONT VENT [50-3463] INSTRUCTION MANUAL 4001609 This Cool Surface System has been tested for compliance to Standards: ANSI
More information33/35A Series. Devices covered by these instructions: Rim Exit Device. CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device
911402-00 Rim Exit Device 33/35A Series Installation Instructions Devices covered by these instructions: 33/35A Rim Exit Device CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device
More informationGREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.
ASSEMBLY INSTRUCTIONS GREENHOUSE 'x8' (Internal Dimensions) Overall Dimensions (Approx.) 7. L 9 W 00 H cms 97." L 7" W 78.8" H 0 IMPORTANT You must read these instructions carefully before you start to
More informationREGENCY TIMBER BUILDINGS
REGENCY TIMBER BUILDINGS TEL 01948 830460 UNIT 22 PENLEY IND EST, PENLEY.WREXHAM. LL13 0LQ 1 Garage fitting instructions Tools needed handsaw, hammer, Stanley knife with hook blade, tape measure, battery
More information33/3527A. Devices covered by these instructions: 33/3527A-F (Fire) Surface Vertical Rod Exit Device
*911403-00* 911403-00 Surface Vertical Rod Exit Device 33/3527A Installation Instructions Devices covered by these instructions: 33/3527A Surface Vertical Rod Exit Device 33/3527A-F (Fire) Surface Vertical
More informationPEAKED ROOF w/ inner cover underneath. Telescoping Outer Covers. p.1
PEAKED ROOF w/ inner cover underneath Telescoping Outer Covers p.1 HIVE FRAMES - STEP 2 Our new wedge-top frames come with an optional, insertable wedge comb guide to make your frames foundationless or
More informationShed Assembly Instructions
Shed Kit Contents The shed kit includes all the parts needed to assemble your shed except for tools and fasteners such as screws and nails. The various pieces are pre-cut and many are marked to indicate
More informationInstallation & Maintenance Instructions
Installation & Maintenance Instructions This symbol on the product means the product is listed by Underwriters Laboratories, Inc. AMERI-VENT MODEL 10 FB FACTORY-BUILT CHIMNEY These are the three ways to
More informationG. Building the Cab, Cab Roof and Cab Boiler Extension Page 14 and Backhead.
G. Building the Cab, Cab Roof and Cab Boiler Extension Page 14 and Backhead. Cab. In order to ensure that the cab and tender would actually look right, as what often appears on a drawing is not always
More informationTREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions
TREX SIGNATURE (FORMERLY REVEAL) RAILING Installation Instructions NOTES:» SIGNATURE POSTS CANNOT BE USED WITH SIGNATURE TRADITIONAL OR SIGNATURE COCKTAIL DESIGNS, ONLY PRESSURE TREATED POSTS/ POST SLEEVES
More informationSimplex Baseboard System Baseboard System
Simplex Baseboard System Baseboard System I Complete installation programme I Trouble-free and time-saving installation I Various connection kits for all types of pipe Our service to you I Simplex Products
More informationINS A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE. 1. Unpacking the KSCR Splicing the KSCR (If Required)...
INS-88.500-0A KSCR INSTALLATION INSTRUCTIONS STANDARD PROCEDURE 1. Unpacking the KSCR... 2 2. Splicing the KSCR (If Required)... 4 3. Assemble Curb and Rail Corners... 5 4. Install Cross Bracing (If Required)...
More informationMidwest Roadside Safety Facility
C 1690" A 42926 75" 1905 150" 3810 G E F F 11 10 9 8 7 6 5 4 3 2 C D D 25 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 21.2 G E Impact 2270P 17 Spaces @ 75" [1905] Spacing = 106' 3" [32385] 1 1662 1/2"
More informationDURATECH CHIMNEY 5"-8" DIAMETER INSTALLATION INSTRUCTIONS
DURATECH 5"-8" DIAMETER INSTALLATION INSTRUCTIONS MH7399 A MAJOR CAUSE OF RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS. IT IS OF THE UTMOST IMPOR- TANCE
More informationGV Standard Sliding Over Roof Installation Instruction Manual
GV Standard Sliding Over Roof Installation Instruction Manual Technical experts in the design, manufacture and supply of precision engineered, architectural rooflights for residential and commercial buildings.
More informationGROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.
More informationW & A PARTS MANUAL STACKER BUSTER LEVEL BANDER. Model No Quality Products from W & A MANUFACTURING COMPANY
W & A PARTS MANUAL 12 ROW @ 38 STACKER BUSTER LEVEL BANDER Model No. 3668 SPECIALIZED FARM EQUIPMENT Quality Products from W & A MANUFACTURING COMPANY P.O. Box 5238, Pine Bluff, Arkansas 71611 Phone: (870)
More informationYOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B
YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B [THIS ISTALLATION MANUAL INCLUDES ASSEMBLY INSTRUCTIONS FOR THESE
More informationMONASET CM-2. Has these customer proven features...
MONASET CM-2 Has these customer proven features... We looked at our successful Monaset grinder very closely before we came up with the engineering refinements which, when combined with its field proven
More informationOmnidirectional Antenna Vertical Polarization Indoor and outdoor use
db Omnidirectional Antenna and outdoor use 17 27 Omni 17 27 6 2dBi 8 41 N female Connector position Bottom or top 17 27 MHz SWR < 1.8 2 dbi Intermodulation IM < 15 dbc (2 x 4 dbm carrier) ertical 5 W (at
More informationAssembly Instructions. DucoGrille Classic 130HP 06/04/16
Assembly Instructions DucoGrille Classic 130HP 06/04/16 DucoGrille Classic 130HP N fitting frame without flange Version: 06_04_2016 G fitting frame with flange Product presentation Mesh not shown 2 DucoGrille
More informationYWY M08 The new VELUX solution
YWY M08 The new VELUX solution VELUX roof windows and vertical window elements installed as a dormer in roof pitches between 42º and 52º YWY M08 is available as a double or triple unit and can be installed
More informationYOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual
YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces User s Manual [USA Fireplace Models [THIS ISTALLATION MANUAL INCLUDES ASSEMBLY INSTRUCTIONS FOR THESE MODELS: STAND ALONE 7565 CURVED TUNNEL DOUBLE
More informationMODERN BED FRAME ROCKLER BUILD IT WITH BUILD SIMPLIFY CUSTOMIZE. Plan Value $14.99
BUILD Stock # Item 63446 Baltic Birch Plywood /2" x 24" x 30" (2 qty) Stick veneer - Maple 24" x 96" 3/8" Dowels - Birch Bed Connector Hardware I-Semble Platform Bed Frame - Queen 3/8" Beadlock Basic Starter
More informationA - Railing Frame Material Specifications
A - Railing Frame Material Specifications NOTE: We strongly recommend stainless steel for exterior applications. R-1 8/1/02 B Stainless Steel Spacers (For Horizontal Railing Double Post End Post using
More informationFIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed)
FIXED FLAT ROOFLIGHT: INSTALLATION INSTRUCTIONS (Double & triple glazed) Thank you for choosing to purchase a ROOF Maker Fixed Flat Rooflight. Assembly Procedure Guidance Please take precaution when moving
More informationUNIVERSAL BASES. #60UB - Universal Mounting Base. Same as above for 1/2 inside threads.
UNIVERSAL BASES #60U - Universal Mounting Base. This base can be used for vertical or horizontal mounting. Base is threaded for 3/8 inside threads. Made of bronze material for pastedown or fastening with
More informationINSTRUCTION MANUAL ORDER NO. V3R MODEL V3R. Collinear Gain Vertical for MHz
ORDER NO. V3R MODEL V3R Collinear Gain Vertical for 216-225 MHz INSTRUCTION MANUAL General Description The new Hy-Gain V3R VHF antenna is a collinear 5/8-wave omnidirectional vertical antenna for the 216-225
More informationVeto spring agitator / kw burner heads
7.2004/2 Enclosure for Veto Chip Matic/ Veto Chip Matic Maxi instruction manual. Veto spring agitator / 160 640 kw burner heads Instruction manual Manufacturer ALA TALKKARI Veljekset Ala-Talkkari Oy Fin-62130
More information9 ft Naramata Spa Shelter Assembly Manual Outdoor Living Today
9 ft Naramata Spa Shelter Assembly Manual Outdoor Living Today Version #8 Feb 20th, 2015 Thank you for purchasing a Naramata /Getaway Spa Shelter from Outdoor Living Today. Please take the time to identify
More informationPortofino Case2 Installation Guide
Portofino Case2 Installation Guide vjun16 (for 17 or 24 mm Surface Wall Profile) DO NOT ASSEMBLE WITHOUT FULLY READING THESE INSTRUCTIONS Page 2 Thank you for purchasing this Portofino Case 2 shower enclosure.
More informationFIRECHARM R.S. Electronic
987616 Issue 7 FIRECHARM R.S. Electronic Room Sealed Live Fuel Effect Gas Fire G.C. No. 32 689 43 (BLACK) G.C. No. 32 689 44 (BRONZE) Installation and Servicing Instructions CE MARKED FOR USE IN G.B. &
More informationNEW equinox INSTALLATION GUIDE Issue
NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9
More informationSS13R SAFARI R-SPEC SNORKEL Nissan GQ Patrol with 4.2L TD42 Diesel Engine and Horizontal Pre-Cleaner.
SS13R SAFARI R-SPEC SNORKEL Nissan GQ Patrol with 4.2L TD42 Diesel Engine and Horizontal Pre-Cleaner. Parts List 01/04/2015 ITEM PART NO DESCRIPTION QTY 1 470-133-200R BODY - SNORKEL 1 2 000-135-800 3
More informationManual FOR YOUR SAFETY. Do not store or use gasoline or other flammable vapours and liquids in the vicinity of this or any other appliance.
E33 GAS INSERT ZERO CLEARANCE KIT Owner's & Installation KIT # 340-900 Manual PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE WARNING: Improper installation, adjustment, alteration, service or maintenance
More informationRoof Mount Ground Mount Specialised Clamps Spares Application Notes
DPA Solar Racking Solutions Solar PV Racking Catalogue Roof Mount Ground Mount Specialised Clamps Spares Application Notes www.dpasolar.com.au 1300 447 500 Rails & Splices Page 3 Mid & End Clamps Page
More informationDeauville Installation Guide
vjul16 (for 17 or 24 mm Surface Wall Profiles) DO NOT ASSEMBLE WITHOUT FULLY READING THESE INSTRUCTIONS Page 2 Thank you for purchasing this Deauville shower enclosure. Please study these instructions
More informationWarnings. Description. Prior to Installation Tools Needed
Warnings Failure to act in accordance with the following may result in death or personal injury. The JT Strong Arm Stabilizer System is intended to eliminate chassis movement in travel trailers and fifth
More informationSIT Group FLUE SYSTEMS
SIT Group LN PRODUCT LINE FLUE SYSTEMS Index Twin Flue System 80 2 Twin Flue System 60 8 Coaxial System 10 Flue System Kit 13 TWIN FLUE SYSTEM 80 SERIES CHARACTERISTICS Extruded aluminium tubes (alloy
More informationInstallation Guide. Tel: (519) Railway St. P.O Box 668 Seaforth, ON Canada N0K 1W0
Installation Guide Tel: (519) 527-2470 92 Railway St. P.O Box 668 Seaforth, ON Canada N0K 1W0 www.sunnorth.com Table of Contents...1 I. Table of Contents... 2 II. Installation Preparation... 2 Items Included...
More informationHBS-AP ASSEMBLING INSTRUCTIONS
ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK - ALUMINIUM PIPEWORK 97 HBS-AP ASSEMBLING INSTRUCTIONS 1. INTRODUCTION 1.1. This manual is very easy to consult and we recommend reading it before starting work,
More informationUniversal Installation Instructions. Preparation and Safety Information. Natural Lighting by Monodraught. Dust. Scaffolding
Natural Lighting by Monodraught Universal Installation Instructions Preparation and Safety Information Scaffolding For flat roofs and single storey buildings not exceeding 10 ft. ( m) in height, access
More informationWOOD FIRE FLUE KIT AND ACCESSORIES MANUAL
WOOD FIRE FLUE KIT AND ACCESSORIES MANUAL Masport Limited 1-37 Mt Wellington Highway Panmure Auckland 6 Ph: 09 571 1200 Fax: 09 571 5864 www.masport.com 2005 CONTENTS Ordering Information... Page 3 Freestanding
More informationCOMPONENTS OF THE CLICKFAST FASCIA AND GUTTER SYSTEM 5: INTERNAL MITRE
INTRODUCING THE CLICKFAST FASCIA AND GUTTER SYSTEM The Clickfast Fascia and Gutter System was originally designed by Stratco and has proven to be the most successful fascia and gutter system in Australia
More informationUltraroof380 Cornice Installation
Ultraroof380 Cornice Installation The complete guide to installing Cornice onto an Ultraroof380 (2 high decorative Cornice) PLEASE READ BEFORE FITTING CORNICE PRE INSTALLATION INFORMATION Recommended tools
More informationSTOL CH 701. Clamp a reference extrusion on the bottom of the spar. Clamp the bottom flange of the rib to the extrusion. Rear Root Rib 7V4-2
Rear Root Rib 7V4-2 Clamp a reference extrusion on the bottom of the spar. Clamp the bottom flange of the rib to the extrusion. Cleco the root nose rib to the spar Position the rear root rib at station
More informationVariable Pitch Collector Frame
Variable Pitch Collector Frame INSTALLATION INSTRUCTIONS FOR SOLAR WATER HEATER SYSTEMS This frame must be installed by an authorised person. Please leave this guide with a responsible officer or the householder.
More informationFS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions
Thermal Structures Inc. FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions FLOOR TO FLOOR (F) ROOF TO ROOF (R) FLOOR TO WALL (FW) ROOF TO WALL (RW) WALL TO WALL (W) CORNER WALL (CW) FLOOR
More information98/9927. Devices covered by these instructions: Surface Vertical Rod Exit Device
911375-00 Surface Vertical Rod Exit Device 98/9927 Installation Instructions Devices covered by these instructions: 98/9927 Surface Vertical Rod Exit Device 98/9927-F (Fire) Surface Vertical Rod Exit Device
More informationINSTALLATION INSTRUCTIONS PART#:17A045200MSS\17A045200MA MODULAR GRILL GUARD FOR FORD SUPER DUTY F250/F
INSTALLATION INSTRUCTIONS PART#:17A045200MSS\17A045200MA MODULAR GRILL GUARD FOR FORD SUPER DUTY F250/F350 08-09 1 guard, center section 1 brush guard, left side 1 brush guard, right side 1 wire guard
More informationMerloni Elettrodomestici. Technical Fitting Manual FRIDGE. Language Issue/Edition Page GB /
GB 99-11-03/01 1-38 Index 1 CONFORMITY OF APPLIANCE 3 2 MAIN ASSEMBLY TYPES 3 2.1 Under worktop 3 2.2 Double door 10 2.3 Combined 14 2.4 Single door Fridge or single door Freezer 19 2.5 Combined free-standing
More informationGROWING BETTER THROUGH DESIGN. Regent Royale Rosette Regal GREENHOUSE. Assembly Instructions 04/02
GROWING BETTER THROUGH DESIGN Regent Royale Rosette Regal GREENHOUSE Assembly Instructions 04/02 Greenhouse Base Plan We cannot emphasis how important it is to have a proper base for your Robinsons Greenhouse
More informationALL SEASON PATIO COVER
ALL SEASON PATIO COVER 61 Where the All Season Patio Cover is to be attached to the home, create a level line showing where the top of the mounting rail is to be located. Install each section with the
More information