MAXILITE P7 1

Size: px
Start display at page:

Download "MAXILITE P7 1"

Transcription

1 MAXILITE P7 1

2 MAXILITE P7 ROOFING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations and MAXITILE written application may lead to personal injury, affect system performance, violate local building codes, and void the product warranty. We suggest that you read these instructions at least twice. STORAGE: MAXITILE products must be stored flat and off ground prior to installation. Protect products from direct weather exposure. To prevent damage, keep roofing products in the original packaging until it is ready to install. Use the plastic bonnet provided to keep the product dry and to prevent moisture from setting on the surface. If MAXITILE products are stored outside, they should be protected with an additional waterproof covering. MAXILITE P7, RAKE TILE, HIP AND RIDGE TILE: Field tiles, rake tiles, hip and ridge tiles must be installed with a minimum 4 inches head lap. Twenty one pieces of field tile cover one square (100 sq. ft.), 5 squares per pallet. 216 rake, hip or ridge tiles per pallet, covers 360 lineal feet. 2

3 BIRD STOP, HIP AND RIDGE SEAL: The MAXILITE P7 bird stop is 37 inches long and made of metal. Install only one bird stop at a time. If there is an alignment problem, the next piece can be slid or right to get the proper fit with the tile. The bird stop can also be cut in shorter lengths to further ease alignment. Hip and ridge seals are plastic and come in black only. CUTTING: Refer to the Material Safety Data Sheet (MSDS) for important safety practices prior to using any roofing product. MAXITILE recommends that all cutting of products be performed outdoors. Use mechanical ventilation when possible. For irregular cuts and holes, use a jig saw or a hole saw with a masonry blade. Special round openings can be made by drilling several holes around the circumference of the desired opening and tapping out center. Always cut over the top of a barrel of tile. For score-and snap cutting, use a carbide tipped scoring tool or a sharp knife: Using a straight edge as a guide, carefully draw the scoring tool several times towards yourself, applying even pressure. Bend upwards and break. A HEPA vacuum should be used when cleaning up dry debris and dust from cutting area. Do not use compressed air, broom or brush. If you consider sweeping, wet down the floor and debris with a fine mist to suppress dust during sweeping. All scrap, cutoffs and debris should be disposed of in a covered container protected from the elements according to local codes. No special handling is required. WARNING: AVOID BREATHING SILICA DUST. MAXITILE roofing products may contain trace amount (<0.5%) of crystalline silica, which is known to the State of California to cause cancer and is considered by IARC and NIOSH to be a cause from some occupational sources. Breathing excessive amounts of respirable silica dust can also cause a disabling and potentially fatal lung disease called silicosis, and has been linked with other diseases. Some studies suggest smoking may increase these risks. During installation or handling: (1) work in outdoor areas with ample ventilation; (2) use fiber cement shears for cutting or, where not feasible, use a dust-reducing circular saw attached to a HEPA vacuum; (3) warn others in the immediate area; (4) wear a properly-fitted, NIOSH-approved dust mask or respirator (e.g. N-95) in accordance with applicable government regulations and manufacturer instructions to further limit respirable silica exposures. During clean-up, use HEPA vacuums or wet methods, never dry sweep. For further information, refer to our installation guide and Material Safety Data Sheet available at or by calling (800) FAILURE TO ADHERE TO OUR WARNINGS, MSDS, AND INSTALLATION GUIDES MAY CAUSE SERIOUS PERSONAL INJURY OR DEATH. MAXILITE P7 3

4 PITCH: 3:12 minimum, 21:12 maximum. For pitches below 3:12, MAXILITE P7 must be installed over an approved waterproof covering (including battens and counter battens) complying with the applicable building code. ROOF DECK: MAXILITE P7 must be installed over code complying solid wood sheathing. Minimum ½ inch rated plywood decking is recommended for use with standard roof. See ICC Evaluation Report for fire classification. UNDERLAYMENT: Class A fire rating (new construction): one layer of non-perforated Type II (commonly called No. 30) felt in according with ASTM D 226 and one layer of 72-pound mineral-surfaced non-perforated cap sheet complying with ASTM D Class B fire rating (new construction): a minimum one layer of non-perforated Type II (commonly called No. 30) felt complying with ASTM D 226 shall be installed. See ICC Evaluation Report for fire classification. DECK PREPARATION: Felt must be installed in a manner to allow water to run off only at the eave. Underlayment must be installed in accordance with the applicable building code. Install the following nailers: At gables: At hips: At ridge: 2 inches X 2 inches and must be nailed approximately 1 inch from edge. 2 inches X 6 inches on edge, holding back 6 inches from eave. 2 inches X 4 inches on edge plus 1 inch X 2 inches. Wrap gable, hip and ridge nailers with non-perforated Type II (commonly called No. 30) felt in accordance with ASTM D 226. Install base flashing around pipes, vents, chimneys, etc. Skylights should have a 2 inches X 6 inches curb to flash against using same type of flashing as chimneys. Check to make sure that the roof is square. Apply horizontal chalk lines. The first chalk line should be 22 inches up from the eave, 23 inches if there are gutters. Maximum spacing for the remaining lines is 20 inches. 4

5 FASTENERS: Nails and screws must be corrosion-resistant, preferably hot-dipped galvanized for best results, in accordance with local building codes. MAXITILE is not responsible for corrosion resistance of fasteners. MAXITILE products can be hand nailed using a smooth faced hammer, never use a waffle hammer, and fastened with pneumatic tools. When hand nailing, first perforate the opening to be used for fastening in order to avoid accidental breakage of the roofing product. Always drive fasteners perpendicular to roofing and solid deck. Do not over-drive under drive fastener heads and never drive fastener in at an angle. Fastener head must be flush on the surface of the product (no air space). If fastener is countersunk, patch fastener hole and add a fastener. Repair nail-sizes holes by filling with adhesive. Exposed Fastener: 4-1/2 inches long (114.3 mm), inch shank diameter (4.44 mm), corrosion-resistant lag screw with inch diameter heads (9.52 mm) with 1 ½ inches X 1 ½ inches galvanized metal washer with neoprene brushing. Hidden Fastener: Ring-shank nails, a minimum of 1-3/4 inches (44.45 mm) long and having inch diameter (3.30 mm) shank, with a 1 inch (25.4 mm) X 1 inch (25.4 mm) galvanized cap washer (Cap-n-nail). In lieu of nails, No. 11 gauge (3.0 mm) (0.12 inch diameter shank), 1-3/4 inches long (44.45 mm), corrosion-resistant screws having inch diameter heads (9.5 mm), with a neoprene-lined washer can be used. Adhesive: Polyurethane construction adhesive conforming to AFG-01, ASTM D 557 or ASTM D Wind Clip: Use a wire clip, 1/8 inch diameter conforming to ANSI Nails: Corrosion-resistant 8d common nails. MAXILITE P7 5

6 Incorrect Correct INSTALLATION OF FIELD TILE FOR WIND SPEED MPH: MAXILITE P7 roofing tile is applied with the staggered joint installation method. 1. On gable roofs, before installing field tile, the trim tile should be installed at the gable. 2. As a general rule, begin by applying field tile at a gable and run toward a valley, hip or wall. 3. Start by installing a full width six corrugation tile at the lower edge of the gable with an overhang of 1 inch at the gable and 2 inches at the eave (1 inch if gutters). Apply the following tiles in the first course by side lapping one full corrugation. 4. You may start at either end of the roof. 5. Place the exposed fastener through the top of each corrugation behind the bird stop or in the eave course (first course only) into the roof deck, a minimum 2 inches from the bottom edge. Then install the hidden fastener through at each valley of corrugation of the each panel located 2 inches from the top edge of the tile panel. Avoid over tightening the fasteners to prevent breakage of the panel. The fasteners should only be tightened moderately. Cover the fastener heads with adhesive. (The exposed fastener can also be applied in last course if desired). 6. Before laying the next course, apply a 1 inch wide dab of adhesive to the side slope of each corrugation (horizontal side lapping), and a thick bead of adhesive on every overlapped corrugation. 7. Cut one full corrugation of field tile and start the second course with this three-corrugation panel (only the first tile panel). Install the tile with a minimum 4 inches head lap over the previous course. Apply adhesive (review step 6) and place a full width panel continued until flush the rake edge. 8. The third course should be stared with a filed tile cut vertically in two full corrugations. Repeat step The fourth course is installed with a field tile cut vertical in half. Repeat step The fifth course is installed as the first course. Repeat steps 3 to 9 until reaching the edge. 11. For all field tile application, install the hidden fastener at each valley of corrugation of the panel located 2 inches from the top edge of the tile panel. Also a wind clip at the lower edge of each overlapping corrugation may be installed. 6

7 INSTALLATION OF FIELD TILE FOR WIND SPEED > 110 MPH: 1. Prior to installing field tiles on gabled roofs, the trim tile should be installed at the gable. 2. As a general rule, begin by applying field tile at a gable and run toward a valley, hip or wall. 3. Start by installing a full width six-corrugation panel at the lower edge of the gable with an overhang of 1 inch at the gable and 2 inches at the eave (1 inch if there are gutters). Apply the following tiles in the first course by side lapping one full corrugation. 4. In high wind areas, the field and ridge trim tile should be installed with the laps facing downwind of the prevailing wind direction. 5. Place the exposed fastener through the top of each corrugation either behind the bird stop or in the eave course (first course) into the roof deck, a minimum 2 inches from the bottom edge. Then install the hidden fastener, secured through every other valley of corrugation of the panel located 2 inches from the top edge of the tile panel. Avoid over tightening fasteners to prevent breakage of tile panel. The fasteners should only be tightened moderately. Cover the fastener heads with adhesive. Also a 1 inch wide by minimum ¼ inch thick dab of adhesive may be applied to the sides of each barrel and a thick bead on every overlapped barrel, before laying the next course. MAXILITE P7 7

8 6. Cut one full barrel of a field tile and start the second course with this five corrugations tile (only the first tile panel). Install the tile with a minimum 4 inches head lap over the previous course and place an exposed fastener on the first barrel at 2 inches from the lower edge. You can apply adhesive (Review step 5) and place a full width tile continued until flush the rake edge. 7. The third course should be started with a field tile cut vertically in two full corrugations. Repeat step The fourth course is installed with a field cut vertically in half. Repeat step The fifth course is installed the same as the first course. Repeat steps 3 to 8 until reaching the ridge. 10. For all field tiles, install the hidden fastener at every other valley of corruption of the panel located 2 inches from the top edge of the tile panel. Also can install an exposed fastener at the top of every crown corrugation. A wind clip must be installed at the lower edge of each overlapping corrugation.

9 The following is only a suggestion and is not intended to be a set of instructions. Each flashing situation will be slightly different. Review IBC of Section ; IRC Section R for additional details for valley and flashing. VALLEY: Valley metal should extend 12 inches on each side of the valley. The metal should be of proper gauge (minimum No. 26). Valley metal should have at least a 1 inch rise in the middle and be crimped back at the outer edges. It should have a minimum 6 inches head lap. No fasteners should penetrate the metal. Where debris may be a factor, tiles should be held back from the center of the valley to sufficiently allow run off. RAKE INSTALLATION: Nail 2 inches X 2 inches approximately 1 inch from edge of roof. The nailer must be covered with non-perforated Type II (commonly called No. 30) felt in accordance with ASTM D 226. Install rake tile using two corrosion-resistant 8d common nails (top and bottom). Starting from the eave, apply the field tile over previously installed rake tiles. In most cases, a double gable trim system will be needed at one end of a gable roof. For an aesthetic match, plan for double rake tile at both ends. For flared gables, use a tile pan type metal flashing under the field tile next to the 2 inches X 2 inches nailer. For high wind areas, fasten externally through the rake tile into place utilizing three nails (one centered) or three screws and washers at each head lap, then cover the fastener with adhesive. MAXILITE P7 9

10 HIP INSTALLATION: Toenail a 2 inches X 6 inches nailer on the top of the hip rafter after the installation of the field tile. Hold 6 inches back from edge. Field tile should be cut as close to the nailer as possible. The hip must be covered with non-perforated Type II (commonly called No. 30) felt in accordance with ASTM D 226. Apply mortar to the valley corrugation or use a plastic hip seal (for pitches 4:12 to 7:12). The hip tile must be fastened to the nailer, starting at the eave, with minimum 4 inches tile head laps, using one corrosion-resistant 8d common nail. Apply a thick bead of adhesive along each vertical head lap. Complete hips before starting the ridge. The lower hip tiles can be closed with mortar, a cutout of a bird stop or a stack of cutoffs of ridge tiles with mortar between each piece. For high wind areas, fasten externally through the hip tile into the place utilizing two nails (one centered) or two screws and washers at each head lap and then cover the fastener with adhesive. RIDGE INSTALLATION: 2 inches X 4 inches ridge nailer with 1 inch X 2 inches nailer on top wrapped with non-perforated Type II (commonly called No. 30) felt in accordance with ASTM D 226. The top course of field tile should be snug with the ridge nailer. The void between the pans of the field tile and the ridge tile must be water proofed before installing the ridge tile. Use mortar (in accordance with IBC section or IRC section R607.1 as applicable) or a plastic ridge seal (for pitches 4:12 to 7:12). A strip of chicken wire or fiberglass webbing can be installed along the length of the ridge and contoured into the mortar to keep it in place. The ridge tile must be installed with minimum 4 inches head lap and using a nail. The fastener must penetrate minimum 1 inch into the nailer. For high wind areas, fasten externally through the ridge tile into place utilizing two nails or two screws and washer (one centered) at each head lap and then cover the fastener with adhesive. 10

11 ROOF MAINTENENCE: Normal maintenance tasks will be determined by the geographical area and the exposure of the roofing; (before beginning refer to your paint manufacturer for washing and recoating requirements related to paint performance); the tasks shall include but not be limited to: In very humid climates, MAXILITE is subject to the growth of algae or fungus. Such growth, which is more of an aesthetic problem rather than one of damage to the integrity of the material, can be eliminated with the application of certain fungicides. Check with the fungicide manufacturers. Clean out and repair gutters, flashing around pipes, chimneys, walls and protrusions, blocked pipes or flashing as required. In order to maintain the integrity of your roof, it is advisable to periodically clean off debris, such as leaves and pine needles. Wash down the roofing surfaces every 6 to 12 months with a garden hose or low pressure water spray to remove dirt and debris, or a medium bristle (nonmetal) brush that is suitable for cleaning fiber cement products. Do not clean up with high pressure water blasts or sand blasting because it may damage the surface and/or fiber cement product. Avoid using steam cleaners or using pressurized cleaning equipment on field tile roofing. Do not apply directly acid or soda on fiber cement surface. Acid solution for washing can be use to clean primer or painted fiber cement surfaces. If it is necessary, add 1 part of muriatic acid to 5 parts water. Always saturate MAXILITE surfaces with water before applying cleaning agent particularly when using an acid solution. A mild detergent and soft brush may be used for stubborn dirt or stains. When reapplying exterior finishes, refer to your paint manufacturer. Patch damaged areas with a good quality spackling compound. Brush or wipe surface to remove loose fibers, dirt or efflorescence. Remove oil and grease spots. Ensure that surface is thoroughly clean and dry. Then either brush or spray a coating of top quality 100% acrylic latex exterior paint. MAXILITE P7 11

12 APPROVALS: In accordance with ICC-ES Legacy report ESR-2058, MAXILITE P7 is in compliance with the following codes: 2006 International Building Code (IBC) and 2006 International Residential Code (IRC). MAXILITE P7 is also recognized for application in the following: Texas Department of Insurance Product Evaluation RC-205. These documents should also be consulted for additional information concerning the suitability of this product for specific applications. Additional Installation Information, Warranties, and Warnings are available at Woodham Drive Houston, Texas (800)

LAP ROOFING INSTALLATION GUIDE

LAP ROOFING INSTALLATION GUIDE MaxiLITE P10 TM LAP ROOFING INSTALLATION GUIDE Read all instructions prior to installing any roofing product. Failure to install and finish this product in accordance with all local building codes, regulations

More information

SHAKELITE & SLATELITE 1

SHAKELITE & SLATELITE 1 www.maxitile.com SHAKELITE & SLATELITE 1 SHAKELITE & SLATELITE ROOFING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance

More information

MAXISHINGLE LAP SIDING INSTALLATION GUIDE

MAXISHINGLE LAP SIDING INSTALLATION GUIDE MAXISHINGLE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations

More information

MULTISHAKE LAP SIDING INSTALLATION GUIDE STORAGE AND HANDLING: PACKAGING:

MULTISHAKE LAP SIDING INSTALLATION GUIDE STORAGE AND HANDLING: PACKAGING: MULTISHAKE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations

More information

LAP SIDING INSTALLATION GUIDE

LAP SIDING INSTALLATION GUIDE MaxiPLANK TM LAP SIDING INSTALLATION GUIDE and MAXITILE We suggest that you read these instructions at least twice. MaxiPLANK TM designs: Classic, Colonial and Provenzal. MaxiPLANK TM is 12 in length with

More information

LAP SIDING INSTALLATION GUIDE

LAP SIDING INSTALLATION GUIDE MultiSHAKE TM LAP SIDING INSTALLATION GUIDE and MAXITILE We suggest that you read these instructions at least twice. MultiSHAKE TM spread and zero smoke generation. MultiSHAKE TM is available in Staggered

More information

LAP SIDING INSTALLATION GUIDE

LAP SIDING INSTALLATION GUIDE MAXIPANEL LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16

More information

RED DIAMOND SHINGLES Roof Installation Introduction:

RED DIAMOND SHINGLES Roof Installation Introduction: RED DIAMOND SHINGLES Roof Installation Introduction: The guidelines set forth in this manual are intended for use with the application of Red Diamond shingles. Wallaba specie (Eperua Falcata) shingles

More information

eco-shake INSTALLATION INSTRUCTION

eco-shake INSTALLATION INSTRUCTION 1 eco-shake INSTALLATION INSTRUCTION NOTE: Shuffling the eco-shakes during installation may be necessary to obtain a uniform color throughout the roof. Due to the natural wood content in the ecoshakes,

More information

lap siding Visit for the most recent version.

lap siding Visit   for the most recent version. INSTALLATION REQUIREMENTS lap siding Visit www.artisanluxury.com for the most recent version. EFFECTIVE JAN 2011 IMPORTANT: FAILURE TO INSTALL AND FINISH THIS PRODUCT IN ACCORDANCE WITH APPLICABLE BUILDING

More information

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK

StormMaster Slate General Instructions 1.) GENERAL INSTRUCTIONS 2.) ROOF DECK VENTILATION 3.) ROOF DECK StormMaster Slate General Instructions IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM

More information

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application

SG-30 A P P L I C A T I O N I N S T R U C T I O N S. Directions For Application 1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE

More information

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS

More information

HardieTrim NT3 TM board is a decorative non-load bearing trim product. Figure 3. Fasten HardieTrim Flat Tab to minimum 7/16" OSB.

HardieTrim NT3 TM board is a decorative non-load bearing trim product. Figure 3. Fasten HardieTrim Flat Tab to minimum 7/16 OSB. 4/4 & 5/4 Boards with Back Grooves EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS Visit www.jameshardie.com for the most recent version. IMPORTANT: FAILURE TO INSTALL AND FINISH

More information

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD

HERITAGE LAMINATED ASPHALT SHINGLES Frederick, MD Application Instructions for FORMERLY 30 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS

More information

INSTALLATION GUIDE SAVANNAH SMOOTH & SIERRA PREMIUM SHAKE

INSTALLATION GUIDE SAVANNAH SMOOTH & SIERRA PREMIUM SHAKE INSTALLATION GUIDE SAVANNAH SMOOTH & 1 NICHIHA INSTALLATION GUIDE FOR SAVANNAH SMOOTH & GENERAL INSTRUCTIONS FOR SAVANNAH SMOOTH & CONSTRUCTION REQUIREMENTS Savannah Smooth and Sierra Premium Shake boards

More information

Florida Product Approval HardiePlank Lap Siding

Florida Product Approval HardiePlank Lap Siding Florida Product Approval HardiePlank Lap Siding For use inside HVHZ: o HardiePlank Lap Siding fastener types, fastening schedule, and installation shall be in accordance with the Miami-Dade County Florida

More information

DIRECTIONS FOR APPLICATION

DIRECTIONS FOR APPLICATION Instructions 1 General NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE DIRECTIONS

More information

A P P L I C A T I O N I N S T R U C T I O N S

A P P L I C A T I O N I N S T R U C T I O N S 1 2 3 General Instructions NOTICE: THESE SHINGLES MUST BE APPLIED TO CONFORM WITH ALL APPLICABLE BUILDING CODES. THESE DIRECTIONS REPRESENT COMMON AND ACCEPTED ROOFING PRACTICES. DEVIATIONS FROM THESE

More information

Shapes Siding. Perfection Shingles. Chalk Line

Shapes Siding. Perfection Shingles. Chalk Line Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years.

ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years. ICC-ES Evaluation Report ESR-1129 Reissued June 1, 2011 This report is subject to renewal in two years. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:

More information

STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS AND INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS AND INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS AND INDIVIDUAL SHINGLES REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS EFFECTIVE APRIL 2009 Visit www.jameshardie.com for the most recent version. IMPORTANT:

More information

Tuff-Rib Install Guide

Tuff-Rib Install Guide Install Guide bestbuymetalroof.com Page 2 of 27 Page 3 of 27 1. Page 4 2. a. Installation Guide b. Panel Squaring Pages 5, 6 Pages 7, 8 3. Pages 9, 10 4. a. Fascia (optional) b. Eave / 1.5x3.5 Angle c.

More information

installation guide Villa

installation guide Villa installation guide Villa Table of Contents Introduction............................. 2 Safety................................... 2 Tools.................................... 2 Codes & Requirements....................

More information

NT3. Figure 3. Fasten HardieTrim Flat Tab to minimum 7/16" OSB with min 2, 6d

NT3. Figure 3. Fasten HardieTrim Flat Tab to minimum 7/16 OSB with min 2, 6d 4/4 & 5/4 Boards with Back Grooves INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS INSTALLATION OUTDOORS 1. Position cutting station so that wind will blow dust away from user and others in working

More information

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the

b) Symphony comes pre-packaged in color and width blends. There is no need to mix Symphony at the job site. Currently Symphony is available in the PART 1 GENERAL 1) DESCRIPTION a) CertainTeed Symphony TM composite slate is an innovative roofing product that simulates the appearance, texture, and contours of traditional natural slate. It is a carefully

More information

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD

PREMIUM LAMINATED ASPHALT SHINGLES Frederick, MD Application Instructions for FORMERLY 50 THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR

More information

4/4, 5/4 Boards EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

4/4, 5/4 Boards EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS 4/4, 5/4 Boards EFFECTIVE JULY 2011 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS STORAGE & HANDLING: Store flat and keep dry and covered prior to installation. Installing wet or saturated may

More information

Barrel Vault Counter Batten and Batten

Barrel Vault Counter Batten and Batten Barrel Vault Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation

More information

Brava Old World Slate Installation Guide

Brava Old World Slate Installation Guide Brava Old World Slate Installation Guide Brava Roof Tile Phone: 844-290-4196 www.bravarooftile.com This document includes the recommended and suggested installation procedures for Brava Old World Slate

More information

Cambridge English Application Instructions

Cambridge English Application Instructions Cambridge English Application Instructions ROOF SLOPE: Never apply asphalt shingles to roof slopes less than 2:12. For slopes 2:12 to 4:12 (LOW SLOPE), see special underlayment requirements outlined below.

More information

Boards. British Columbia

Boards. British Columbia 4/4 & 5/4 INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS These instructions are to be used for HardieTrim HZ Boards ONLY and are ONLY valid in British Columbia. HardieTrim board is a decorative

More information

Five Star Panel Installation Instructions

Five Star Panel Installation Instructions Five Star Panel Installation Instructions How to Store Five Star Panels You will need to store FIVE STAR PANELS in dry place to prevent staining, deterioration and possibly void all warranties. Stand the

More information

Capstone Application Instructions

Capstone Application Instructions Capstone Application Instructions Information Sheet Updated: 2007 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer L IFETIME D ESIGNER S HINGLES APPLICATION INSTRUCTIONS

More information

BARRELL VAULT BATTENLESS

BARRELL VAULT BATTENLESS i BARRELL VAULT BATTENLESS INSTALLATION GUIDE INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Barrel Vault battenless

More information

KuraStone TM Installation Guide

KuraStone TM Installation Guide Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18

More information

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013.

ICC-ES Evaluation Report Reissued September 1, 2012 This report is subject to renewal September 1, 2013. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1790 Reissued September 1, 2012 This report is subject to renewal September 1, 2013. A Subsidiary of the International Code Council

More information

REPORT HOLDER: ISAIAH INDUSTRIES, INC. EVALUATION SUBJECT:

REPORT HOLDER: ISAIAH INDUSTRIES, INC. EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1360 Reissued 08/2018 This report is subject to renewal 08/2019. DIVISION: 07 00

More information

Slate Shingle Specifications

Slate Shingle Specifications Slate Shingle Specifications California Slate is a proud member of the Slate Roofing Contractors Association of North America, Inc. (SRCA) which publishes Section 07310 Slate Shingles setting forth architectural

More information

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION

ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION ROOFING APPLICATION STANDARD (RAS) No. 130 INSTALLATION CRITERIA FOR WOOD SHINGLES AND SHAKES APPLICATION 1. 2. 3. Scope 1.1 This application standard provides the minimum installation criteria for wood

More information

HardieSoffit Panel Product Description

HardieSoffit Panel Product Description Product Information HardieSoffit Panel Product Description HARDIEsoffit HardieSoffit panels are 8-ft. and 12-ft. long, 1 /4-in. thick factory-primed fiber-cement panels designed to be used on the underside

More information

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles

Hatteras Shingles. CertainTeed Shingle Applicator s Manual. YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles CertainTeed Applicator s Manual Hatteras s 14 YOUR OBJECTIVE: To learn the correct procedures for installing Hatteras shingles HATTERAS SHINGLES Hatteras shingles are a premium oversize (18" x 36") roofing

More information

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF ROUNDS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF ROUNDS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS Siding STRAIGHT EDGE, STAGGERED EDGE, HALF ROUNDS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS EFFECTIVE SEPTEMBER 201 Visit www.jameshardie.com for the most recent version.

More information

HardieSoffit Panel Products Description

HardieSoffit Panel Products Description Working Safely HardieSoffit Panel Products Description HARDIESOFFIT PANELS HardieSoffit panels are 8-ft. and 12-ft. long, 1 /4-in. thick factory-primed fiber-cement panels designed to be used on the underside

More information

Installation Manual for Thermo Panel

Installation Manual for Thermo Panel Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on

More information

ROOFING APPLICATION STANDARD (RAS) No. 130

ROOFING APPLICATION STANDARD (RAS) No. 130 ROOFING APPLICATION STANDARD (RAS) No. 130 1. Scope 1.1 This application Standard provides the minimum installation criteria for wood shingles and shakes. 2. Definitions 2.1 For definitions of terms used

More information

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS NEW Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS EFFECTIVE JANUARY 2011 Visit www.jameshardie.com for the most recent

More information

PROJECT INSTRUCTIONS Roofing

PROJECT INSTRUCTIONS Roofing PROJECT INSTRUCTIONS Roofing This handout outlines some basic regulations contained within the 2015 Minnesota State Building Code, as well as other good building practices. However, this handout is not

More information

Turada Hardwood Shingles and Shakes Installation instructions

Turada Hardwood Shingles and Shakes Installation instructions 1. General 1.1 Maximum Exposure: Maximum exposure for wood shingles and shakes shall comply with Table 1 herein, unless specifically specified in the roof assemblies Product Approval. 1.2 Solid and Spaced

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1754 Reissued 11/2017 This report is subject to renewal 11/2018. DIVISION: 07 00

More information

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017

RESIDENTIAL ROOFS ADDENDUM NUMBER ONE. August 28, 2017 RESIDENTIAL ADDENDUM NUMBER ONE August 28, 2017 The following additions to, deletions from, and clarifications of the Contract Documents govern insofar as they apply and shall take precedence over those

More information

Timberline and Sovereign Expanded Fastener Placement Area

Timberline and Sovereign Expanded Fastener Placement Area Timberline and Sovereign Expanded Fastener Placement Area Information Sheet Updated: 2004 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer Less Fastening Hassles! Announcing

More information

ROOFING City of Grand Rapids Building Safety Division

ROOFING City of Grand Rapids Building Safety Division ROOFING City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Grand

More information

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ

Installation Guide. Cedar Shake. Distributed by: BEST MATERIALS LLC, Phoenx AZ RPM ROOFING Installation Guide Cedar Shake Distributed by: BEST MATERIALS LLC, Phoenx AZ 602-272-8128 800-474-7570 www.bestmaterials.com Table of Contents OVERVIEW... 1 CAUTION... 1 DISCLAIMER... 1 PRODUCT

More information

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing

GlassMaster General Instructions - Ardmore, OK & Hampton, GA <br /> Atlas Roofing GlassMaster General Instructions - Ardmore, OK & Hampton, GA (For Metric Size Franklin, OH Instructions Click Here) IMPORTANT: THE STATEMENTS EXPRESSED ON THIS WRAPPER ARE THE RECOMMENDATIONS FOR THE APPLICATION

More information

ICC-ES Evaluation Report Issued February 1, 2011 This report is subject to re-examination in one year.

ICC-ES Evaluation Report Issued February 1, 2011 This report is subject to re-examination in one year. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-3098 Issued February 1, 2011 This report is subject to re-examination in one year. A Subsidiary of the International Code Council

More information

Durabrac Gable Bracket Installation Guide

Durabrac Gable Bracket Installation Guide Durabrac Gable Bracket Installation Guide Durabrac vinyl gable brackets are manufactured from high quality natural white vinyl with UV inhibitors. There are currently six styles and three sizes to choose

More information

Corrugated Installation and Technical Guide

Corrugated Installation and Technical Guide Corrugated Installation and Technical Guide AmeriLux International, in partnership with Menards, offers high quality polycarbonate, pvc and fiberglass panels which feature the latest in product technology.

More information

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES

F-WAVE REVIA SYNTHETIC ROOFING SHINGLES F-WAVE REVIA SYNTHETIC ROOFING SHINGLES Installation Manual for Steep-Slope Residential Installations For support with all other Steep-Slope Installations, please call F-Wave Technical Support at 888-GO-FWAVE.

More information

Terrabella Shake & Shingle Znap Ver. 2.0

Terrabella Shake & Shingle Znap Ver. 2.0 Terrabella Shake Znap Actual length = 52.6 Actual Width = 16.33 Coverage length = 49.7 Coverage width = 14 Terrabella Shingle Znap Actual Length = 52.375 Actual Width = 15.25 Coverage Length = 49.375 Coverage

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL SHINGLES SECTION: METAL ROOF TILES REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1754 Reissued 11/2017 This report is subject to renewal 11/2018. DIVISION: 07 00

More information

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS Siding STRAIGHT EDGE, STAGGERED EDGE, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS EFFECTIVE SEPTEMBER 1 Visit www.jameshardie.com for the most recent

More information

STRAIGHT EDGE, STAGGERED EDGE NOTCHED, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS

STRAIGHT EDGE, STAGGERED EDGE NOTCHED, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS Siding STRAIGHT EDGE, STAGGERED EDGE NOTCHED, HALF-ROUND PANELS & INDIVIDUAL SHINGLES INSTALLATION REQUIREMENTS - PRIMED & COLORPLUS PRODUCTS EFFECTIVE APRIL 2009 Visit www.jameshardie.com for the most

More information

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25

3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 3-Tab Shingle Instructions DURA-SEAL 20 DURA-SEAL 25 1 Directions For Applying Malarkey 3-Tab Shingles GENERAL INSTRUCTIONS Install Malarkey 3-tab shingles according to building code and local amendments.

More information

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Installation Guide.   Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation Step 7. Transition s and Accessories Step 3. Valley Step 6. Hip and Ridge Installation Step 2. Rake Trim Step 5. Installing the Shingles Step 1. Eave Starter Installation Step 4. Endwall s Installation

More information

Inspire Slate Starter Piece Hip and Ridge. 13 1/2" Height: 13 ½" Width: 12" Squares/ Pallet. Bundles/ Square

Inspire Slate Starter Piece Hip and Ridge. 13 1/2 Height: 13 ½ Width: 12 Squares/ Pallet. Bundles/ Square December 2017 Classic Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,

More information

INSTALLATION GUIDE LEARN MORE AT DECRA.COM

INSTALLATION GUIDE LEARN MORE AT DECRA.COM Villa Tile INSTALLATION GUIDE LEARN MORE AT DECRA.COM Table of Contents DECRA Villa Tile Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheet... 3 Codes & Requirements... 3 Roof

More information

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S

ONDUVILLA. The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S ONDUVILLA The Attractive Alternative to Shingles I N S T A L L A T I O N I N S T R U C T I O N S 1 INSTALLATION INSTRUCTIONS Even though ONDUVILLA is easy to install, it is important to read through these

More information

Effective April 1, 2013

Effective April 1, 2013 Effective April 1, 2013 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ASPHALT SHINGLES REPORT HOLDER: IKO INDUSTRIES LIMITED 0 Most Widely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3532 Reissued 01/2017 This report is subject to renewal 01/2019. DIVISION: 07 00 00 THERMAL

More information

SmartVent Eave Edge Installation Instructions

SmartVent Eave Edge Installation Instructions SmartVent Eave Edge Installation Instructions STEP 1: Cut a slit 1 wide (or a series of 1 ¾ holes at 3 on center) into the roof decking 6 to 7 up from the drip edge. SmartVent is rated 9NFA. Ensure drip

More information

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866)

Installation Guide. Titan Old World Slate REV Titan Manufacturing Phone: (407) Fax: (866) Installation Guide Titan Old World Slate REV70908 Titan Manufacturing Phone: (407) 587-5492 Fax: (866) 741-2147 www.titanroofsystems.com This document includes the recommended and suggested installation

More information

Inspire Aledora Slate Application Guidelines

Inspire Aledora Slate Application Guidelines July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,

More information

ARMORTAB R SUPER TM Shingles Installation Instructions

ARMORTAB R SUPER TM Shingles Installation Instructions ARMORTAB R SUPER Shingles Installation Instructions ARMORTAB SUPER DO NOT REMOVE THE RELEASE TAPE The release tape on the top of the ARMORTAB SUPER is designed to prevent adhesion between the shingles,

More information

Ekoroof LiteTile Dimensions

Ekoroof LiteTile Dimensions Ekoroof LiteTile Dimensions 7 3 3.5 Height 40 Width 20 Length Weight per Panel: 3 kg / 6.61 lbs 2 2 Area per panel 800 in / 5.55 ft 2 Panels per Square: 20 (including overlap, for a 100 ft covered area)

More information

Effective February, 2015

Effective February, 2015 Effective February, 2015 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning

More information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.

More information

AIA Specification. Section Slate Shingles PART 1 GENERAL

AIA Specification. Section Slate Shingles PART 1 GENERAL AIA Specification Section 07315 Slate Shingles PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

HardieTrim Boards Products Description

HardieTrim Boards Products Description Working Safely Tools for Cutting and Fastening Installation Product Information Finishing and Maintenance HardieWrap Weather Barrier Boards Products Description HARDIETRIM 5/4 BOARDS 5/4 boards is a decorative

More information

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12)

C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l. and Carriage House STEEP. Slope Application. (over 21/12) C e r t a i n T e e d S h i n g l e A p p l i c a t o r s M a n u a l Grand Manor 16 and Carriage House YOUR OBJECTIVE: To learn the correct method of installing each of these roofing products. These shingles

More information

OAKRIDGE R SUPER TM Shingles Installation Instructions

OAKRIDGE R SUPER TM Shingles Installation Instructions Shingles Installation Instructions CAUTION DO NOT REMOVE THE RELEASE TAPE The release tape on the top of the OAKRIDGE SUPER TM is designed to prevent adhesion between the shingles, so please do not remove

More information

B. Related Sections: The following Sections contain requirements that relate to this Section:

B. Related Sections: The following Sections contain requirements that relate to this Section: SECTION 07311 - ASPHALT SHINGLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

Multi-Width Shake. Widths: 9, 8, 7, 6, 4 Length: 22 Thickness at butt: 5/8 Single-Width Shake. Widths: 9 Length: 22 Thickness at butt: 5/8 N DaVinci Shake Multi-Width Shake Single-Width Shake INSTALLATION GUIDE DaVinci polymer shakes are carefully engineered to provide the authentic look of hand-split shakes with dramatically increased durability

More information

Boards CUTTING INSTRUCTIONS STORAGE & HANDLING:

Boards CUTTING INSTRUCTIONS STORAGE & HANDLING: Boards EFFECTIVE APRIL 2018 These instructions are to be used for HZ Boards ONLY and are ONLY VALID in the following states: WA, OR, CA, NV, UT, ID, CO, WY, MT, AZ, NM. IMPORTANT: FAILURE TO FOLLOW JAMES

More information

STORMMASTER SHAKE GENERAL INSTRUCTIONS

STORMMASTER SHAKE GENERAL INSTRUCTIONS STORMMASTER SHAKE GENERAL INSTRUCTIONS IMPORTANT: THE STATEMENTS EXPRESSED ON THIS PAGE ARE THE RECOMMENDATIONS FOR THE APPLICATION OF THE ROOFING PRODUCTS AS OUTLINED AND ILLUSTRATED. ANY DEVIATION FROM

More information

1.04 QUALITY ASSURANCE

1.04 QUALITY ASSURANCE SECTION 07312 ARCHITECTURAL ASPHALT SHINGLES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights

1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and Highlights 1 Exam Prep NRCA Roofing Manual: Steep-Slope Roof Systems 2013 Tabs and s These 1 Exam Prep Tabs are based on the National Roofing Contractors Association (NRCA) manual listed below: Steep-Slope Roof Systems

More information

HardiePanel Vertical Siding Product Description

HardiePanel Vertical Siding Product Description Working HardiePanel Description HardiePanel vertical siding is factory-primed fiber-cement vertical siding available in a variety of sizes and textures. Examples of these are shown below. Textures include

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

Stone coated steel roof tile INSTALLATION GUIDE

Stone coated steel roof tile INSTALLATION GUIDE Stone coated steel roof tile INSTALLATION GUIDE Ⅰ. Introduction These installation details are provided to demonstrate recommended installation methods for KD One roof products and accessories. Consult

More information

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1

Table of Contents. Fasteners... 4 Venting Preparation Installation with Battens - DECRA Tile & DECRA Shake 1 Table of Contents DECRA Tile & Shake Roof Overview... 2 Introduction... 3 Safety... 3 Tools.... 3 Estimating Sheets... 4 Codes & Requirements... 4 Roof Slope... 4 Underlayment... 4 Deck Preparation....

More information

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

DECRA Shingle Installation Guidelines

DECRA Shingle Installation Guidelines Installation Guide DECRA Shingle Installation Guidelines General Instructions Failure to use these guidelines may void the product warranty. Local building codes may require additional application techniques

More information

Wave Profile Installation Guide

Wave Profile Installation Guide Wave Profile Installation Guide American Pa o Covers Plus Proudly Builds With Tools & Hardware Wave Profile Installation Guide Tape Measure Square Level Felt tipped Marker and/or grease pencil 3/8" Nut

More information