Installation instructions

Size: px
Start display at page:

Download "Installation instructions"

Transcription

1 Installation instructions Cellular cladding

2 - 2 - Summary Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Horizontal installation - general rules - light colours 6 Horizontal installation - general rules - dark colours 7 Ventilation 8 Dilatation 9 Principles of positioning the screws in the fixing holes 10 Horizontal installation - general rules 11 Horizontal installation - CONNEX system Horizontal installation on a timber frame wall Horizontal installation on masonry 16 Installation on masonry wall with metal brackets Warranty summary 19

3 - 3 - Installation - general rules 1. General rules storage: cellular cladding profiles should be stored inside, on a dry, flat and firm base, without direct contact with the ground. While still in its protective sleeving they should not be stored in places where they may be exposed to direct sunlight. installation temperature: the installation should be carried out at ambient temperatures of between 5 C and 30 C. Prior to installation the profiles should be allowed to adjust to atmospheric conditions at the installation site for approx. 24 hrs. keep expansion gaps: the change in size due to significant changes in ambient temperature is a natural and inalienable feature of any item of almost any material, including cellular PVC. Therefore, during the installation always mind the necessity of maintaining ca 8- expansion gaps between panel ends and the inside parts of finishing trims, as shown in the drawings. If the installation takes place in higher ambient temperatures (25-30 C) the clearance should be reduced to ca. 3-4 mm. Bear in mind that with every 10 C of temperature change, total profile length may expand/contract by approx. 0.7 mm per each meter of length. keep ventilation gap behind the cladding panels as specified below. Light colours of cladding (white, creme, beige, claystone, light grey, light blue, sand) - ventilation gap of min. 20 mm. Dark colours (anthracite, olive, grey, quartz grey, blue, Wood Design colours) - ventilation gap of min. 40 mm. working with the profiles: cellular PVC profiles and accessory trims can be worked using conventional carpentry tools for cutting, drilling and shaping. Saws with fine-toothed blades should be used and power tools should be operated at the same or higher speeds to those normally used for timber work. 2. Preparation of the supporting structure The supporting structure should be made of timber battens or studs, fastened to walls directly or with the use of metal brackets. IMPORTANT: all battens should be levelled to reduce any surface irregularities; if necessary, use wedges to level out the irregularities. Timber battens requirements: - should be made of good quality timber, free of knots, the humidity of 15 18%, suitably treated with preservative - should be firmly and reliably fixed using screws / wall plugs or other fixings suitable for the type of substrate - the spacing between intermediate battens/studs directly behind the cladding should not exceed 40 cm centers (max 60 cm for light colours: white, cream, beige, claystone, light blue, light grey) - at the corners of a wall and under joint trims use double battening (or battens of double width) - battens/studs behind the facade cladding should always provide a proper ventilation gap behind the facade panels: a) min. 20 mm for light colours (white, cream, beige, claystone, light blue, light grey, sand) b) min. 40 mm for all other (darker) colours Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other). 3. Installation of finishing trims Fix the ventilation trims and the starter trims and at the bottom of the area to be clad. IMPORTANT: in order for the cladding to be installed properly in a level fashion, the starter trims at the bottom of the walls MUST be level. Keep the ends of starting trims at least 5 mm apart to allow for expansion. Fix the inner parts of perimeter trims over supporting battens; fix vertical trims using specified fixings at recommended intervals of 30 cm. Do not fix outer parts of the 2-part trims before panels are installed. The outer parts should be put aside and protected from damage until ready for use. 4. Installation of cladding boards Plan out the places of panel butt-joints on the area to be clad. If a center joint trim is to be used, it should be fixed on a supporting batten at least of the same width (use 2 battens if necessary). If joint covers are to be used to butt-join adjacent panels, they should be staggered to make a regular pattern on a wall. Cut the panels to required lengths based on that planning. Mount the first cladding board on the starter trim, ensuring that the back leg of the panel is engaged in the trim slot. Board fixing should commence at the center of its length to the batten through the nailing slot or groove at the top edge, then work progressively outwards. Fasteners should always be placed in the middle of the length of a slot. If a nail slot falls outside a supporting batten, use a batten offcut, fasten it to the substrate under the required slot and screw the panel to the timber offcut with a fastener. Always make sure that each end of a board is screwed/nailed to a batten. IMPORTANT: Never drive the head of the fastener tight into the panel surface, as it may hinder any thermal movement. Keep a small clearance between the fastener heads and panel surface so that each panel can be moved horizontally left/right after all its fasteners have been screwed to the battens. IMPORTANT: maintain expansion gaps between panel ends and the inside parts of the finishing trims, as indicated above. The gaps will subsequently be concealed by the outer parts of finishing trims. All joint covers and vertical trims must be fixed on supporting battens. Joint covers should be installed tight to the panel ends as work proceeds - their spacing lugs will automatically provide proper clearance between adjacent panel lengths. Joint covers cannot be placed directly one over another. Joint covers forming a vertical line should be separated from each other by at least 2 courses of cladding panels. Provide packing behind any panels cut along the top edge; panel off-cuts may be suitable for that purpose. 5. Insert the top parts of all 2-part trims to finish the installation No fixings are required. 6. Cleaning and maintenance Cellular cladding profiles are finished, practically maintenance-free products. The Manufacturer will not guarantee any product that has been painted, treated or coated with any other material. Clading panels and trims may be cleaned occassionally with a non-abrasive, mild household detergent solution of temperature not exceeding 40 C. No solvents or similar aggressive fluids should be used. Rinse the surface thoroughly with water after cleaning.

4 - 4 - Cladding boards - detailed description FS-201 Single board Covering width: 180 mm. Installation: horizontal. FS-202 Double board Covering width: 332 mm. Installation: horizontal LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP),Wood Design silvergrey (SG), Wood Design golden oak (GO), Blue (BL)

5 - 5 - Trims and accessories FS-211 Starter trim FS-252 Top edge trim, 2-piece J-201 Joint cover for FS Installed between adjacent panels, always on a supporting batten, in order to butt-join FS-201 cladding boards Installed on the lower edge of a wall, on the ventilation trim. It is used to fix the first cladding panel; invisible after installation. Installed at the top or side edge of a wall, esp. suitable where panels have been cut to required height. FS-282 Center joint trim, 2-piece 35 J-202 Joint cover for FS-202 GROUND CLEARANCE 24 Installed between adjacent panels, always on a supporting batten, in order to butt-join FS-202 cladding boards. FS-222 Universal corner, 2-piece Installed vertically for continuous joints between cladding boards on a wall FS-251 Universal trim INOX-UP3.5X35-TX15-A2 Fitting screw 38 8 Usage per 1 m²: single board: 15 pcs double board: 9 pcs Installed in corners of walls, can be used as an internal or external corner detail mm Installed vertically on a side edge or along a diagonal top edge of a wall, can be used as an alternative to FS-252 trim

6 - 6 - Horizontal installation - general rules - LIGHT COLOURS Rys. 1. Single board, double board - installation scheme ROOF mm FITTING SCREW INOX ø 3,5x mm (max 600 mm) 39 mm J-201 / J = min. 20 mm GROUND CLEARANCE 25 FITTING SCREW INOX ø 3,5x35 LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other).

7 - 7 - Horizontal installation - general rules - DARK COLOURS Rys. 2. Single board, double board - installation scheme ROOF mm FITTING SCREW INOX ø 3,5x mm 39 mm J-201 / J = min. 40 mm GROUND CLEARANCE 25 FITTING SCREW INOX ø 3,5x35 DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP),Wood Design silvergrey (SG), Wood Design golden oak (GO), Blue (BL) Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other).

8 - 8 - The principle of ventilated cladding requires that the air path must not be obstructed both at the top and bottom of the clad area. 2 Bottom ventilation 3 Window joinery Door / window head 1c 3 3 1a 1b 3 MASKING BOARD 15 mm 2 GROUND CLEARANCE 1 Top ventilation 1a Ventilation under eaves 1b Ventilation under metalwork 1c Ventilation under soffit boards Windowsill mm mm 15 mm mm mm mm

9 - 9 - Dilatation Proper allowance for expansion is made by: keeping sufficient expansion gaps at each board end screwing fasteners not too tight so that the boards can move freely positioning fasteners inside nail slots, at least 1 cm away from their extremes 1 Universal corner FS Universal corner FS ~ ~ 4 ~ ~ 2 Center joint trim FS Top edge trim FS Joint cover J-201 / J-202 Dilatation ~ ~ ~6 mm Dilatation Front Back

10 Principles of positioning the screws in the fixing holes min.

11 Horizontal installation - general rules Rys. 3. Rules for joining the cladding profiles (FS-201/FS-202) with J-201/J-202 joint covers Rys. 4. Joining the cladding profiles (FS-201/FS-202) with FS-282 trims 400 mm* ROOF mm 400 mm* max 6000 mm ROOF mm FS-282 FS-201 / FS-202 FS-201/202 JOINT COVER J-201/J-202 GROUND CLEARANCE GROUND CLEARANCE * max 600 mm for light colours * max 600 mm for light colours

12 Horizontal installation - system Rys. 5. Rules for joining the cladding profiles (FS-201) - system 400 mm ROOF mm B2 A C B1 FS-222 INSTALLATION DIRECTION FS GROUND CLEARANCE min. 1 cm ~10 cm 3 5 cm ~20 mm x - ventilation gap MIN 20 mm LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) MIN 40 mm DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL) x min. 1 cm

13 Horizontal installation - system Rys. 6. Rules for joining the cladding profiles (FS-201) - system ROOF min. 400 mm mm FS-222 FS-282 max 10 m GROUND CLEARANCE

14 Horizontal installation on a timber frame wall Rys vertical section Single board / double board on a timber frame wall Rys. 8. Ventilation gap required for LIGHT COLOURED cladding on a timber frame wall - horizontal section INNER WALL OSB PLANK Min. 20 mm VAPOUR MEMBRANE FS-201 / FS-202 TIMBER STUD 22x45 mm FITTING SCREW INOX 3,5x35 GAP 400 mm (max 600 mm) LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) TIMBER STUD 22x45 mm Rys. 9. Ventilation gap required for DARK COLOURED cladding on a timber frame wall - horizontal section OSB PLANK INNER WALL OSB PLANK Min. 40 mm VAPOUR MEMBRANE FS-211 TRIM VAPOUR MEMBRANE 2x TIMBER STUD 22x45 mm FITTING SCREW INOX 3,5x35 GAP 400 mm GROUND CLEARANCE DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL)

15 Installation around windows, timber frame wall Rys. 10. Joinery detail on a timber frame wall - vertical section Rys. 11. Joinery corner detail on a timber frame wall - horizontal section TIMBER STUD 22x45 mm OSB PLANK VAPOUR MEMBRANE 15 mm FS-211 TRIM FS-222 TIMBER STUD 22x45 mm OSB PLANK VAPOUR MEMBRANE FS mm PACKING (offcut of a panel) TIMBER STUD 22x45 mm OSB PLANK 5 mm VAPOUR MEMBRANE

16 Horizontal installation on masonry Rys vertical section Single board / double board, horizontal installation on masonry Rys. 13. Ventilation gap on masonry wall - horizontal section WALL Min. 40 mm TIMBER STUD 50x50 mm 400 mm FITTING SCREW INOX 3,5x35 TRIM TIMBER STUD 50x50 Rys. 14. Ventilation gap required on insulated masonry wall between studs - horizontal section WALL TIMBER STUD min 40 mm FS-211 FITTING SCREW INOX ø 3,5x35 TRIM 400 mm (max 600 mm - LIGHT COLOURS) TRIM GROUND CLEARANCE LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL)

17 Installation on masonry wall with metal brackets Rys vertical section Single board / double board on insulated masonry wall with brackets Rys. 16. Ventilation gap required on insulated masonry wall with brackets - vertical section mm PACKING (offcut of a panel) BRACKET TIMBER STUD 50x50 mm WALL BRACKET Min. 40 mm TIMBER STUD 50x50 mm 400 mm FITTING SCREW INOX 3,5x35 TRIM BRACKET FS-211 TRIM GROUND CLEARANCE

18 Installation around windows with metal brackets Rys vertical section Joinery detail on insulated masonry wall Rys horizontal section Joinery corner detail on insulated masonry wall TIMBER STUD TIMBER STUD 50x50 BRACKET FS-201 / FS-202 FS-222 BRACKET FS-211 ALUMINUM PROFILE, VENTED TIMBER STUD FS mm BRACKET 5 mm TIMBER STUD 50x50

19 Warranty summary On the basis of the results of laboratory quality tests, the Profile VOX Ltd. (hereinafter referred to as: The Producer) hereby grants the 10-year warranty for the system of external cellular cladding panels KERRAFRONT and the system of PZ607 profiles (hereinafter referred to as: The Products). The Producer hereby guarantees that in the Warranty Period the Products shall maintain their physical and mechanical properties, i.e. they shall not crack, peel, swell, corrode, and shall maintain their impermeability and resistance to frost during normal use. Moreover, the Producer declares that The Products are manufactured with use of 100 per cent lead-free stabilizers. As for the colour fastness of The Products as exposed to UV radiation in climatic conditions of moderate climate zone, with air temperatures not exceeding 40ºC at elevations up to 1800 metres above sea level, the Producer informs that the changes can have uniform character, and they should not exceed the 3rd grade of the grey scale per every 100 kly of insolation (as defined in the EN A02 Standard). This Warranty covers locations in climatic conditions as stated above and is valid for ten years from the date of purchase, provided that The Producer shall have been notified in writing of finding the faults within 1 month of their finding, and not more than 12 years from the date of manufacturing. Presenting the proof of purchase is a prerequisite for the investigation of the complaint. This Warranty does not cover faults resulting from using The Products for other purposes than originally intended, improper storage conditions, or site assembly not in conformity with assembly instructions as published on the Producer's website. Moreover the warranty does not cover faults resulting from using accessories or substances not recommended in the Producer's assembly instructions, impact of foreign objects, cracking or subsiding of walls, fire, earthquake, lightning discharge, hurricane, hailstorm, acts of vandalism, extremely low or high air temperatures, or other events that may be classified as Force Majeure. On the grounds of site inspection and examination performed by the Producer's representatives, each element that shall have been found as not conforming to the quality requirements, shall be repaired or replaced with the fault-free element, or a money compensation shall be paid for faulty Products and the cost of replacement thereof, subject to the Producer's discretion. The Producer's share in the costs resulting from fulfilling liabilities as resulting from this warranty document shall be in direct proportion of the number of unexpired months of the warranty period - to the number of months of the whole warranty period. For the purposes of calculating the number of the unexpired warranty months the date of purchase and the date of making the claim shall be taken into account. For the avoidance of doubt, the Producer points out that this Warranty excludes their liability for costs of any work in case of faults that are visible prior to the assembly. In no event shall the Producer be liable for any loss or damage resulting from the Products faults, whether direct, indirect, special or consequential, other than in the scope indicated above. Due to constant commitment of the Producer in the process of quality improvement and development of the Products, in case the Product is replaced pursuant to this Warranty, in a situation whereas the manufacturing of the products as assembled by the Buyer is discontinued, or the products will have been modified, The Producer reserves the right to use elements as they deem most equivalent to originally used Products.

20 Profile VOX Sp. z o.o. Sp. k. ul. Gdyńska Czerwonak Poland phone: (+48) profile@vox.pl V:

KERRAFRONT INSTRUCTION FOR INSTALLATIONS AND USE. Cellular cladding FS-201 / FS-202. kerrafront.com

KERRAFRONT INSTRUCTION FOR INSTALLATIONS AND USE. Cellular cladding FS-201 / FS-202. kerrafront.com KERRAFRONT INSTRUCTION FOR INSTALLATIONS AND USE Cellular cladding kerrafront.com - 2 - SUMMARY Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Horizontal

More information

KERRAFRONT INSTRUCTION FOR INSTALLATION AND USE. Cellular cladding. profile.vox.pl

KERRAFRONT INSTRUCTION FOR INSTALLATION AND USE. Cellular cladding. profile.vox.pl KERRAFRONT INSTRUCTION FOR INSTALLATION AND USE Cellular cladding profile.vox.pl - 2 - SUMMARY Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Ventilation

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

Installation Instructions

Installation Instructions Installation Instructions Roof edge trim profile Series TAG multi-piece aluminium profile Front face height: 250-1050 mm supplied with patented 4F brackets as standard height-adjustable, horizontally moveable,

More information

Shapes Siding. Perfection Shingles. Chalk Line

Shapes Siding. Perfection Shingles. Chalk Line Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter

More information

Installation instructions: Elements Vulcan+ Newport Hector Cladding

Installation instructions: Elements Vulcan+ Newport Hector Cladding Technical Data Wood Species Thermally Modified Softwood (Pinus Radiata) Images Profile Newport Hector - Light Band Sawn face - Secret fix 5.4 6.0 8.5 3.0 25.0 3.0 111.0 3.0 12.0 R 3.0 7.0 7.0 123.0 15.0

More information

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS

INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,

More information

Shingle Installation Guidelines

Shingle Installation Guidelines Shingle Installation Guidelines General Guidelines Materials to be used Key definitions Cost of roofing Preparation of the roofing deck Materials used for roofing should conform to approved norms and regulations

More information

Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK WA 1 - Ü 150 E

Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK WA 1 - Ü 150 E Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK 150-275 WA 1 - Ü 150 E 1 F Ü R D I E ZU K U N FT G E DAC HT. The alwitra waterproofing system alwitra wall flashing profiles are part of the practically

More information

Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE

Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE Ruler Pencil Masking tape Measuring tape Silicone sealant & silicone gun Power drill & screwdriver High-grab adhesive Jig

More information

DYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals

DYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals DYNEX SOFFIT SYSTEM BRANZ Appraisals Technical Assessments of products for building and construction. Dynex Extrusions Limited PO Box 19-133 Avondale Auckland Tel: 09 828 2800 Fax: 09 828 2801 Web: www.dynex.co.nz

More information

15mm Solid European Droploc Oak Fitting Guide & Warranty Information

15mm Solid European Droploc Oak Fitting Guide & Warranty Information 15mm Solid European Droploc Oak & Warranty Information Introduction Congratulations on your purchase of your brand new Timba Floor 15mm European Solid Oak Flooring. Prior to installation please examine

More information

Installation Guide - Evolution Series Wood Siding

Installation Guide - Evolution Series Wood Siding Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration

More information

INSTALLATION MANUAL STORAGE

INSTALLATION MANUAL STORAGE IMVersion 1.1 INSTALLATION MANUAL GENERAL GUIDE: The information in this IM is intended to serve as a general guide to proper installation with no warranties intended or implied. Prime Panels assumes no

More information

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

INSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd

INSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd Green esources Material Australia Pty Ltd Congratulations on the fine choice you have made in the selection of this product. outdoor wall panels will give you many years of carefree maintenance. When installed

More information

WPC DECKING TERRACE BOARDS

WPC DECKING TERRACE BOARDS WPC DECKING TERRACE BOARDS INSTALATION AND MAINTENANCE INSTRUCTIONS MATERIALS SUBSTRATE PREPARATION DEVOREX WPC Decking system is produced from high quality materials containing selected wood flour and

More information

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.

SECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. SECTION 07460 LAP SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. B. Factory-finished fiber cement lap siding, panels, single,

More information

Eaves Lining Installation Guide

Eaves Lining Installation Guide Eaves Lining Installation Guide feb 13 Design Pine Eaves Lining - Installation Like most building products, Design Pine eaves lining has both advantages and limitations therefore a clear understanding

More information

KuraStone TM Installation Guide

KuraStone TM Installation Guide Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18

More information

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING SECTION 1 Installers Responsibility Pre-Installation SECTION 2 Glue Down (Solid & Engineered Flooring) SECTION 3 Secret Nailing (Solid & Engineered Flooring)

More information

NewTech - CleverDeck Composite Decking Installation Guidelines

NewTech - CleverDeck Composite Decking Installation Guidelines NewTech - CleverDeck Composite Decking Installation Guidelines Composite decking has unique characteristics and requires specific fixing requirements that differ from timber. We strongly recommend that

More information

Integrity Polygon and Round Top Installation and Finishing Instructions

Integrity Polygon and Round Top Installation and Finishing Instructions Integrity Polygon and Round Top Installation and Finishing Instructions 08/20/2004 70852 BEFORE YOU BEGIN IMPORTANT: Read these instructions thoroughly before beginning to install your Integrity Polygon

More information

Feature T&G Timber Floor Installation and Finishing Recommendations

Feature T&G Timber Floor Installation and Finishing Recommendations Feature T&G Timber Floor Installation and Finishing Recommendations DATA SHEET 3 RECOMMENDED INSTALLATION PRACTICES Version 1 October 2005 3.0 Introduction This data sheet outlines the recommended practices

More information

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally

More information

Installation instructions for co-extruded louver-board profiles

Installation instructions for co-extruded louver-board profiles Installation instructions for co-extruded louver-board profiles www.silvadec.com / info@silvadec.com / tel.:+33 (0)2.97.45.09.00 TO BE READ CAREFULLY BEFORE INSTALLATION Before starting installation on

More information

Dubnium 11 Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.

More information

CLASSIC RANGE PLUS RANGE PHOTO WALL. Pre-installation check-list

CLASSIC RANGE PLUS RANGE PHOTO WALL. Pre-installation check-list CLASSIC RANGE PLUS RANGE PHOTO WALL The following is an installation guide for fitting Multipanel CLASSIC RANGE, PLUS RANGE, PHOTO WALL Jig saw or Hand saw Measuring Tape Ruler Pencil High-grab adhesive

More information

Quality you can feel. Exterior. Interior

Quality you can feel. Exterior. Interior Product guide Quality you can feel As a leading supplier of cutting-edge, intelligently-designed products, Deeplas is at the forefront of design and innovation. Exterior An aesthetically pleasing collection

More information

Flashing Materials. Rough Opening Preparation

Flashing Materials. Rough Opening Preparation Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or

More information

Installation Manual for M4-Exterior Sheathing

Installation Manual for M4-Exterior Sheathing Installation Manual for M4-Exterior Sheathing 1 Application Area - Testing M4 complying with: 2015 and 2012 International Building Code (IBC) and 2015 and 2012 International Residential Code (IRC). The

More information

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes

Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional

More information

Vinyl Windows and Doors Manufactured by Pella Corporation

Vinyl Windows and Doors Manufactured by Pella Corporation Vinyl Windows and Doors Manufactured by Pella Corporation Part Number: V981255 2009 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR BOW WINDOWS WITHOUT HEAD AND SEAT BOARD

More information

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE SHIPLOCK CLADDING CN-04E / CN-04W / CN-W008 Prior to the installation of any form of Cladding, it is recommended

More information

AL13 v-line general installation guide

AL13 v-line general installation guide 01 TM AL13 v-line general installation guide Vol 1 Version 1 pantented product TM AL13 architectural system www.al13.com CLAD THE WORLD TM How to Install v-line 01 TM AL13 architectural system SHEATHING

More information

Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework.

Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. facade Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. Specification and installation guide Presentation of the system VMZ

More information

Cladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable.

Cladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable. Cladding Quick Installation Guide HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable. Installation instructions This document is a step by step guide

More information

General Installation Instructions LED

General Installation Instructions LED General Installation Instructions LED To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions and other hazards, please read all warnings

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

Curium 19H Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

Installation Manual for Thermo Panel

Installation Manual for Thermo Panel Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on

More information

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION

ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive

More information

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

technical bulletin Roofline Installation Details  No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit Roofline Installation Details This is intended to provide you with a brief overview of the popular products in Kestrel s Roofline range, where they can be used and the main criteria for installation. Typical

More information

Product Information & Installation Instructions

Product Information & Installation Instructions Product Information & Installation Instructions TUFF-STRAND TM OSB Sheathing OSB Structural Panels from MARTCO Installation Instructions: Site-Built and Modular Construction Important Notice to Buyers

More information

General Installation Guidelines

General Installation Guidelines g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working

More information

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.

Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy

More information

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT. Vinyl Windows and Doors Manufactured by Pella Corporation WINDOW REPLACEMENT INSTRUCTIONS FOR DOUBLE-HUNG VENT REPLACEMENT WINDOWS INTO EXISTING DOUBLE-HUNG FRAME USING FRAME SCREWS FROM THE EXTERIOR Part

More information

Contents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit

Contents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit The Smart Choice in Soffit Installation Guide Looks great - A contemporary tongue and groove styled soffit, with hidden fixings, that provides a versatile and sleek lining complimenting a range of building

More information

Installation Manual 0318

Installation Manual 0318 Installation Manual 0318 DOUBLE 7 CEDAR SHINGLE INSTALLATION GUIDE General Information CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION / CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS

More information

Ash Brook Golf Course Scotch Plains, New Jersey

Ash Brook Golf Course Scotch Plains, New Jersey SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Installation Guide. Deckorum. Composite Decking

Installation Guide. Deckorum. Composite Decking Installation Guide Deckorum Composite Decking 1. Introduction Welcome to Deckorum Installation Guide Please fully read the installation guide before commencing any installation works. This will provide

More information

Sun Windows General Information New Construction Hinged Door Installation Instructions

Sun Windows General Information New Construction Hinged Door Installation Instructions A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply

More information

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'

E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20' E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20' BUILD You can construct your own E-Z frame shed with the help of this step by step guide. North American softwood dimensional lumber sizes: Nominal Actual in

More information

technical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit

technical bulletin Roofline Installation Details  No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit Roofline Installation Details This is intended to provide you with a brief overview of the popular products in Kestrel s Roofline range, where they can be used and the main criteria for installation. Typical

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS

Installer s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS Uniclass L5:P7113 CI/SfB (4-) Hn7 Installer s Handbook Pocket Guide to Roofline & Cladding Installation BBA BRITISH BOARD OF AGRÉMENT CERTIFICATE NO.91/2620 CERTIFICATE NO.91/2622 BS 7619 Licence No. KM33730

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16

More information

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS

XL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT

More information

Vinyl Windows and Doors

Vinyl Windows and Doors Vinyl Windows and Doors Part Number: V983571 2011 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION 350 SERIES WINDOW INTO EXISTING WOOD FRAME WINDOW Lea las instrucciones en español

More information

External cladding technical instructions

External cladding technical instructions External cladding technical instructions Contents External cladding technical instructions... 1 General... 2 Vertical cladding... 3 Horizontal cladding... 5 Lower end of the cladding and the plinth...

More information

Sauna & Steam. Traditional Sauna Installation Instruction Manual

Sauna & Steam. Traditional Sauna Installation Instruction Manual Traditional Sauna Installation Instruction Manual Oceanic Ltd, Pountney Street, Wolverhampton, WV2 4HX Phone: 01902 450 550 sales@oceanic-saunas.co.uk www.oceanic-saunas.co.uk Contents 1.Introduction................................................

More information

Vinyl Windows Manufactured by VPI Quality Windows

Vinyl Windows Manufactured by VPI Quality Windows Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

Hills Folding Frame Double and Single

Hills Folding Frame Double and Single Hills Folding Frame Double and Single Product Manual 2 Introduction Congratulations Congratulations on the purchase of your Hills Folding Frame Clothesline, which will bring you many years of trouble free

More information

The better way to build TM. Installation Manual ROOF SIPs

The better way to build TM. Installation Manual ROOF SIPs The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................

More information

Installation Instructions

Installation Instructions TEL: 09 579-8895 FAX: 09 579-2933 EMAIL: sales@nzfiredoors.co.nz NZ Fire Doors Ltd, 89 Gavin Street, Ellerslie, PO Box 12709, Penrose 1642, Auckland, New Zealand. www.nzfiredoors.co.nz Installation Instructions

More information

TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines

TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

Installation Instructions

Installation Instructions Installation Instructions General Notes & Product Information Product profiles & details may vary by installation. Consult architectural drawings, details & specifications before installation of any Marlite

More information

Veranda Decorative Lattice & Deck Skirting Special Order Catalog

Veranda Decorative Lattice & Deck Skirting Special Order Catalog Veranda Products. Built by Barrette. Veranda Decorative Lattice & Deck Skirting Special Order Catalog NEW! Designer Series Deck Skirting in 4 styles V1 2/17 1 Your Decorative Lattice Options Choose the

More information

Xenon 05 Installation Instructions & Parts List

Xenon 05 Installation Instructions & Parts List Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably

More information

Radon 07 Installation Instructions & Parts List

Radon 07 Installation Instructions & Parts List Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by

More information

Series 1600 WeatherGuard Dock Enclosure

Series 1600 WeatherGuard Dock Enclosure Fairborn USA Inc. 205 Broadview Street Upper Sandusky, OH 43351 1-800-262-1188 Fax 1-419-294-4980 Series 1600 WeatherGuard Dock Enclosure All Models! WARNING Do not install this product unless you read

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

Cembrit Patina. Cembrit Cover. Cembrit Solid. Cembrit Transparent

Cembrit Patina. Cembrit Cover. Cembrit Solid. Cembrit Transparent Rainscreen Cladding Your choice. In addition to the range of colours and shades, Cembrit cladding boards are available in four compositions, each with distinctive performance and characteristics. Cembrit

More information

Inspire Aledora Slate Application Guidelines

Inspire Aledora Slate Application Guidelines July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,

More information

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS

ALLORA SWING PANEL INSTALLATION INSTRUCTIONS ALLORA SWING PANEL INSTALLATION INSTRUCTIONS Before Installation Please check that your Allora Swing Panel is undamaged SEQUENCE OF INSTALLATION These instructions are also available from the Athena website:

More information

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE Siding Systems NOVIKSTONETM DS DRY STACK STONE GENERAL INFORMATION CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW

More information

3M Air and Vapour Barrier 3015 Technical guide

3M Air and Vapour Barrier 3015 Technical guide 3M Air and Vapour Barrier 3015 Technical guide Product overview Typical physical properties For installation ease and flexibility, 3M Air and Vapour Barrier 3015 High performance 3M acrylic adhesive grabs

More information

Installation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours

Installation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours This installation guide applies to the installation of Maibec Resistech

More information

JAMES HARDIE RIGID AIR BARRIERS

JAMES HARDIE RIGID AIR BARRIERS Product 1.1 James Hardie Rigid Air Barriers are a range of rigid wall underlay materials including RAB Board and HomeRAB Pre-Cladding. They are sealed fibre cement sheets designed for use as rigid wall

More information

Installation Guide. deckorum Composite Decking

Installation Guide. deckorum Composite Decking Installation Guide deckorum Composite Decking 1. Introduction Welcome to Deckorum installation Guide Please fully read the installation guide before commencing any installation works. This will provide

More information

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME

More information

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. The Fastening Make shingle fastening simpler

More information

OPERATION AND MAINTENACE MANUAL. mcr ALPE EI 120

OPERATION AND MAINTENACE MANUAL. mcr ALPE EI 120 ASSA ABLOY Mercor Doors sp. z o.o. ul. Arkońska 6, bud. A2 80-387 Gdańsk tel. (58) 732 63 00 fax. (58) 732 63 02/03 www.mercordoors.com.pl e-mail: mercordoors@assaabloy.com OPERATION AND MAINTENACE MANUAL

More information

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE

Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply

More information

Step-by-Step Installation Instructions for

Step-by-Step Installation Instructions for Step-by-Step Installation Instructions for Customer helpline number: 01604 633607 8892_Step_By_Step_900_Quad_V5.indd 1 1/9/10 18:01:22 Before Starting: Please read and understand these instructions. Not

More information

Step-by-Step Installation Instructions for

Step-by-Step Installation Instructions for Step-by-Step Installation Instructions for Version 5-06/11 Before Starting: Please read and understand these instructions. Not following these instructions will invalidate your warranty (although this

More information

SECTION CARPENTRY

SECTION CARPENTRY SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative

More information

Curium 19.4H Installation Instructions & Parts List

Curium 19.4H Installation Instructions & Parts List Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

For ANGLE-DROP Styles

For ANGLE-DROP Styles For ANGLE-DROP Styles BEFORE INSTALLATION: 1. READ THESE DETAILED INSTALLATION INSTRUCTIONS. 2. Material and tool requirements: - Estimate square footage and add 10%. - Select underlayment (over concrete

More information

Please read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation!

Please read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation! Please read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation! This instruction sheet is intended to provide a specific guide to follow for the installation of

More information

Vinyl Windows and Doors Manufactured by VPI Quality Windows

Vinyl Windows and Doors Manufactured by VPI Quality Windows Vinyl Windows and Doors Manufactured by VPI Quality Windows Part Number: 511_Installation ENDURANCE CASEMENT\AWNING\PW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction These

More information

Installation Guide (888)

Installation Guide (888) BamDeck Installation Guide (888) 788-2254 The Collection Decking Systems BAMDECK 4G 5-7/16 Wide Plank Dims: 192 L x 5-7/16 W x 13/16 H BAMDECK 4G WIDE 8-1/4 Wide Plank Dims: 96 L x 8-1/4 W x 13/16 H BAMDECK

More information

VYTEC ARCHITECTURAL SPECIFICATIONS

VYTEC ARCHITECTURAL SPECIFICATIONS SCOPE OF WORK SECTION 07464 SIMULATED WOOD SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A) Vytec Solid Vinyl Siding. B) Vytec Vinyl Accessories and Trim. C) Vytec Vinyl Soffits. 1.2 RELATED SECTIONS A) Section

More information

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS 2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.

More information

GARDEN SHED BRIGHTOLN

GARDEN SHED BRIGHTOLN ASSEMBLY INSTRUCTIONS GARDEN SHED BRIGHTOLN Dimensions: 10x10 (1 1/8") IMPORTANT Before beginning the assembly of your garden shed, please read the instructions carefully and follow them closely. By doing

More information

AquaGuard - Water Resistant Flooring Installation guidelines

AquaGuard - Water Resistant Flooring Installation guidelines AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important

More information

Pocket Door Installation Instructions

Pocket Door Installation Instructions Installation Instructions Before getting started: Read instructions thoroughly. Be sure that you have the necessary tools and materials before starting the installation. Consult your local building code

More information

Method of Build 1. Fire. Sound

Method of Build 1. Fire. Sound Method of Build 1 General Viso Fire & Acoustic in the solid form differs from most other systems as it can be erected using 12.5mm & 15.0mm boards within the same Aluminium framework. Also hidden fix board

More information

Installation Instructions for Panel Siding and Soffit

Installation Instructions for Panel Siding and Soffit Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808

More information