Installation instructions
|
|
- Garry Wells
- 6 years ago
- Views:
Transcription
1 Installation instructions Cellular cladding
2 - 2 - Summary Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Horizontal installation - general rules - light colours 6 Horizontal installation - general rules - dark colours 7 Ventilation 8 Dilatation 9 Principles of positioning the screws in the fixing holes 10 Horizontal installation - general rules 11 Horizontal installation - CONNEX system Horizontal installation on a timber frame wall Horizontal installation on masonry 16 Installation on masonry wall with metal brackets Warranty summary 19
3 - 3 - Installation - general rules 1. General rules storage: cellular cladding profiles should be stored inside, on a dry, flat and firm base, without direct contact with the ground. While still in its protective sleeving they should not be stored in places where they may be exposed to direct sunlight. installation temperature: the installation should be carried out at ambient temperatures of between 5 C and 30 C. Prior to installation the profiles should be allowed to adjust to atmospheric conditions at the installation site for approx. 24 hrs. keep expansion gaps: the change in size due to significant changes in ambient temperature is a natural and inalienable feature of any item of almost any material, including cellular PVC. Therefore, during the installation always mind the necessity of maintaining ca 8- expansion gaps between panel ends and the inside parts of finishing trims, as shown in the drawings. If the installation takes place in higher ambient temperatures (25-30 C) the clearance should be reduced to ca. 3-4 mm. Bear in mind that with every 10 C of temperature change, total profile length may expand/contract by approx. 0.7 mm per each meter of length. keep ventilation gap behind the cladding panels as specified below. Light colours of cladding (white, creme, beige, claystone, light grey, light blue, sand) - ventilation gap of min. 20 mm. Dark colours (anthracite, olive, grey, quartz grey, blue, Wood Design colours) - ventilation gap of min. 40 mm. working with the profiles: cellular PVC profiles and accessory trims can be worked using conventional carpentry tools for cutting, drilling and shaping. Saws with fine-toothed blades should be used and power tools should be operated at the same or higher speeds to those normally used for timber work. 2. Preparation of the supporting structure The supporting structure should be made of timber battens or studs, fastened to walls directly or with the use of metal brackets. IMPORTANT: all battens should be levelled to reduce any surface irregularities; if necessary, use wedges to level out the irregularities. Timber battens requirements: - should be made of good quality timber, free of knots, the humidity of 15 18%, suitably treated with preservative - should be firmly and reliably fixed using screws / wall plugs or other fixings suitable for the type of substrate - the spacing between intermediate battens/studs directly behind the cladding should not exceed 40 cm centers (max 60 cm for light colours: white, cream, beige, claystone, light blue, light grey) - at the corners of a wall and under joint trims use double battening (or battens of double width) - battens/studs behind the facade cladding should always provide a proper ventilation gap behind the facade panels: a) min. 20 mm for light colours (white, cream, beige, claystone, light blue, light grey, sand) b) min. 40 mm for all other (darker) colours Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other). 3. Installation of finishing trims Fix the ventilation trims and the starter trims and at the bottom of the area to be clad. IMPORTANT: in order for the cladding to be installed properly in a level fashion, the starter trims at the bottom of the walls MUST be level. Keep the ends of starting trims at least 5 mm apart to allow for expansion. Fix the inner parts of perimeter trims over supporting battens; fix vertical trims using specified fixings at recommended intervals of 30 cm. Do not fix outer parts of the 2-part trims before panels are installed. The outer parts should be put aside and protected from damage until ready for use. 4. Installation of cladding boards Plan out the places of panel butt-joints on the area to be clad. If a center joint trim is to be used, it should be fixed on a supporting batten at least of the same width (use 2 battens if necessary). If joint covers are to be used to butt-join adjacent panels, they should be staggered to make a regular pattern on a wall. Cut the panels to required lengths based on that planning. Mount the first cladding board on the starter trim, ensuring that the back leg of the panel is engaged in the trim slot. Board fixing should commence at the center of its length to the batten through the nailing slot or groove at the top edge, then work progressively outwards. Fasteners should always be placed in the middle of the length of a slot. If a nail slot falls outside a supporting batten, use a batten offcut, fasten it to the substrate under the required slot and screw the panel to the timber offcut with a fastener. Always make sure that each end of a board is screwed/nailed to a batten. IMPORTANT: Never drive the head of the fastener tight into the panel surface, as it may hinder any thermal movement. Keep a small clearance between the fastener heads and panel surface so that each panel can be moved horizontally left/right after all its fasteners have been screwed to the battens. IMPORTANT: maintain expansion gaps between panel ends and the inside parts of the finishing trims, as indicated above. The gaps will subsequently be concealed by the outer parts of finishing trims. All joint covers and vertical trims must be fixed on supporting battens. Joint covers should be installed tight to the panel ends as work proceeds - their spacing lugs will automatically provide proper clearance between adjacent panel lengths. Joint covers cannot be placed directly one over another. Joint covers forming a vertical line should be separated from each other by at least 2 courses of cladding panels. Provide packing behind any panels cut along the top edge; panel off-cuts may be suitable for that purpose. 5. Insert the top parts of all 2-part trims to finish the installation No fixings are required. 6. Cleaning and maintenance Cellular cladding profiles are finished, practically maintenance-free products. The Manufacturer will not guarantee any product that has been painted, treated or coated with any other material. Clading panels and trims may be cleaned occassionally with a non-abrasive, mild household detergent solution of temperature not exceeding 40 C. No solvents or similar aggressive fluids should be used. Rinse the surface thoroughly with water after cleaning.
4 - 4 - Cladding boards - detailed description FS-201 Single board Covering width: 180 mm. Installation: horizontal. FS-202 Double board Covering width: 332 mm. Installation: horizontal LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP),Wood Design silvergrey (SG), Wood Design golden oak (GO), Blue (BL)
5 - 5 - Trims and accessories FS-211 Starter trim FS-252 Top edge trim, 2-piece J-201 Joint cover for FS Installed between adjacent panels, always on a supporting batten, in order to butt-join FS-201 cladding boards Installed on the lower edge of a wall, on the ventilation trim. It is used to fix the first cladding panel; invisible after installation. Installed at the top or side edge of a wall, esp. suitable where panels have been cut to required height. FS-282 Center joint trim, 2-piece 35 J-202 Joint cover for FS-202 GROUND CLEARANCE 24 Installed between adjacent panels, always on a supporting batten, in order to butt-join FS-202 cladding boards. FS-222 Universal corner, 2-piece Installed vertically for continuous joints between cladding boards on a wall FS-251 Universal trim INOX-UP3.5X35-TX15-A2 Fitting screw 38 8 Usage per 1 m²: single board: 15 pcs double board: 9 pcs Installed in corners of walls, can be used as an internal or external corner detail mm Installed vertically on a side edge or along a diagonal top edge of a wall, can be used as an alternative to FS-252 trim
6 - 6 - Horizontal installation - general rules - LIGHT COLOURS Rys. 1. Single board, double board - installation scheme ROOF mm FITTING SCREW INOX ø 3,5x mm (max 600 mm) 39 mm J-201 / J = min. 20 mm GROUND CLEARANCE 25 FITTING SCREW INOX ø 3,5x35 LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other).
7 - 7 - Horizontal installation - general rules - DARK COLOURS Rys. 2. Single board, double board - installation scheme ROOF mm FITTING SCREW INOX ø 3,5x mm 39 mm J-201 / J = min. 40 mm GROUND CLEARANCE 25 FITTING SCREW INOX ø 3,5x35 DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP),Wood Design silvergrey (SG), Wood Design golden oak (GO), Blue (BL) Batten thickness dependent on the wall where the cladding is installed (masonry, timber frame, other).
8 - 8 - The principle of ventilated cladding requires that the air path must not be obstructed both at the top and bottom of the clad area. 2 Bottom ventilation 3 Window joinery Door / window head 1c 3 3 1a 1b 3 MASKING BOARD 15 mm 2 GROUND CLEARANCE 1 Top ventilation 1a Ventilation under eaves 1b Ventilation under metalwork 1c Ventilation under soffit boards Windowsill mm mm 15 mm mm mm mm
9 - 9 - Dilatation Proper allowance for expansion is made by: keeping sufficient expansion gaps at each board end screwing fasteners not too tight so that the boards can move freely positioning fasteners inside nail slots, at least 1 cm away from their extremes 1 Universal corner FS Universal corner FS ~ ~ 4 ~ ~ 2 Center joint trim FS Top edge trim FS Joint cover J-201 / J-202 Dilatation ~ ~ ~6 mm Dilatation Front Back
10 Principles of positioning the screws in the fixing holes min.
11 Horizontal installation - general rules Rys. 3. Rules for joining the cladding profiles (FS-201/FS-202) with J-201/J-202 joint covers Rys. 4. Joining the cladding profiles (FS-201/FS-202) with FS-282 trims 400 mm* ROOF mm 400 mm* max 6000 mm ROOF mm FS-282 FS-201 / FS-202 FS-201/202 JOINT COVER J-201/J-202 GROUND CLEARANCE GROUND CLEARANCE * max 600 mm for light colours * max 600 mm for light colours
12 Horizontal installation - system Rys. 5. Rules for joining the cladding profiles (FS-201) - system 400 mm ROOF mm B2 A C B1 FS-222 INSTALLATION DIRECTION FS GROUND CLEARANCE min. 1 cm ~10 cm 3 5 cm ~20 mm x - ventilation gap MIN 20 mm LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) MIN 40 mm DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL) x min. 1 cm
13 Horizontal installation - system Rys. 6. Rules for joining the cladding profiles (FS-201) - system ROOF min. 400 mm mm FS-222 FS-282 max 10 m GROUND CLEARANCE
14 Horizontal installation on a timber frame wall Rys vertical section Single board / double board on a timber frame wall Rys. 8. Ventilation gap required for LIGHT COLOURED cladding on a timber frame wall - horizontal section INNER WALL OSB PLANK Min. 20 mm VAPOUR MEMBRANE FS-201 / FS-202 TIMBER STUD 22x45 mm FITTING SCREW INOX 3,5x35 GAP 400 mm (max 600 mm) LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) TIMBER STUD 22x45 mm Rys. 9. Ventilation gap required for DARK COLOURED cladding on a timber frame wall - horizontal section OSB PLANK INNER WALL OSB PLANK Min. 40 mm VAPOUR MEMBRANE FS-211 TRIM VAPOUR MEMBRANE 2x TIMBER STUD 22x45 mm FITTING SCREW INOX 3,5x35 GAP 400 mm GROUND CLEARANCE DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL)
15 Installation around windows, timber frame wall Rys. 10. Joinery detail on a timber frame wall - vertical section Rys. 11. Joinery corner detail on a timber frame wall - horizontal section TIMBER STUD 22x45 mm OSB PLANK VAPOUR MEMBRANE 15 mm FS-211 TRIM FS-222 TIMBER STUD 22x45 mm OSB PLANK VAPOUR MEMBRANE FS mm PACKING (offcut of a panel) TIMBER STUD 22x45 mm OSB PLANK 5 mm VAPOUR MEMBRANE
16 Horizontal installation on masonry Rys vertical section Single board / double board, horizontal installation on masonry Rys. 13. Ventilation gap on masonry wall - horizontal section WALL Min. 40 mm TIMBER STUD 50x50 mm 400 mm FITTING SCREW INOX 3,5x35 TRIM TIMBER STUD 50x50 Rys. 14. Ventilation gap required on insulated masonry wall between studs - horizontal section WALL TIMBER STUD min 40 mm FS-211 FITTING SCREW INOX ø 3,5x35 TRIM 400 mm (max 600 mm - LIGHT COLOURS) TRIM GROUND CLEARANCE LIGHT COLOURS: white (WH), creme (CR), beige (BE), claystone (CS), light grey (LG), light blue (LB), sand (SA) DARK COLOURS: anthracite (AN), olive (OL), grey (GR), quartz grey (QG), Wood Design graphite (GP), Wood Design silvergrey (SG), Wood Design golden oak (GO), blue (BL)
17 Installation on masonry wall with metal brackets Rys vertical section Single board / double board on insulated masonry wall with brackets Rys. 16. Ventilation gap required on insulated masonry wall with brackets - vertical section mm PACKING (offcut of a panel) BRACKET TIMBER STUD 50x50 mm WALL BRACKET Min. 40 mm TIMBER STUD 50x50 mm 400 mm FITTING SCREW INOX 3,5x35 TRIM BRACKET FS-211 TRIM GROUND CLEARANCE
18 Installation around windows with metal brackets Rys vertical section Joinery detail on insulated masonry wall Rys horizontal section Joinery corner detail on insulated masonry wall TIMBER STUD TIMBER STUD 50x50 BRACKET FS-201 / FS-202 FS-222 BRACKET FS-211 ALUMINUM PROFILE, VENTED TIMBER STUD FS mm BRACKET 5 mm TIMBER STUD 50x50
19 Warranty summary On the basis of the results of laboratory quality tests, the Profile VOX Ltd. (hereinafter referred to as: The Producer) hereby grants the 10-year warranty for the system of external cellular cladding panels KERRAFRONT and the system of PZ607 profiles (hereinafter referred to as: The Products). The Producer hereby guarantees that in the Warranty Period the Products shall maintain their physical and mechanical properties, i.e. they shall not crack, peel, swell, corrode, and shall maintain their impermeability and resistance to frost during normal use. Moreover, the Producer declares that The Products are manufactured with use of 100 per cent lead-free stabilizers. As for the colour fastness of The Products as exposed to UV radiation in climatic conditions of moderate climate zone, with air temperatures not exceeding 40ºC at elevations up to 1800 metres above sea level, the Producer informs that the changes can have uniform character, and they should not exceed the 3rd grade of the grey scale per every 100 kly of insolation (as defined in the EN A02 Standard). This Warranty covers locations in climatic conditions as stated above and is valid for ten years from the date of purchase, provided that The Producer shall have been notified in writing of finding the faults within 1 month of their finding, and not more than 12 years from the date of manufacturing. Presenting the proof of purchase is a prerequisite for the investigation of the complaint. This Warranty does not cover faults resulting from using The Products for other purposes than originally intended, improper storage conditions, or site assembly not in conformity with assembly instructions as published on the Producer's website. Moreover the warranty does not cover faults resulting from using accessories or substances not recommended in the Producer's assembly instructions, impact of foreign objects, cracking or subsiding of walls, fire, earthquake, lightning discharge, hurricane, hailstorm, acts of vandalism, extremely low or high air temperatures, or other events that may be classified as Force Majeure. On the grounds of site inspection and examination performed by the Producer's representatives, each element that shall have been found as not conforming to the quality requirements, shall be repaired or replaced with the fault-free element, or a money compensation shall be paid for faulty Products and the cost of replacement thereof, subject to the Producer's discretion. The Producer's share in the costs resulting from fulfilling liabilities as resulting from this warranty document shall be in direct proportion of the number of unexpired months of the warranty period - to the number of months of the whole warranty period. For the purposes of calculating the number of the unexpired warranty months the date of purchase and the date of making the claim shall be taken into account. For the avoidance of doubt, the Producer points out that this Warranty excludes their liability for costs of any work in case of faults that are visible prior to the assembly. In no event shall the Producer be liable for any loss or damage resulting from the Products faults, whether direct, indirect, special or consequential, other than in the scope indicated above. Due to constant commitment of the Producer in the process of quality improvement and development of the Products, in case the Product is replaced pursuant to this Warranty, in a situation whereas the manufacturing of the products as assembled by the Buyer is discontinued, or the products will have been modified, The Producer reserves the right to use elements as they deem most equivalent to originally used Products.
20 Profile VOX Sp. z o.o. Sp. k. ul. Gdyńska Czerwonak Poland phone: (+48) profile@vox.pl V:
KERRAFRONT INSTRUCTION FOR INSTALLATIONS AND USE. Cellular cladding FS-201 / FS-202. kerrafront.com
KERRAFRONT INSTRUCTION FOR INSTALLATIONS AND USE Cellular cladding kerrafront.com - 2 - SUMMARY Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Horizontal
More informationKERRAFRONT INSTRUCTION FOR INSTALLATION AND USE. Cellular cladding. profile.vox.pl
KERRAFRONT INSTRUCTION FOR INSTALLATION AND USE Cellular cladding profile.vox.pl - 2 - SUMMARY Installation - general rules 3 Cladding boards - detailed description 4 Trims and accessories 5 Ventilation
More informationUlltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.
Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction
More informationInstallation Instructions
Installation Instructions Roof edge trim profile Series TAG multi-piece aluminium profile Front face height: 250-1050 mm supplied with patented 4F brackets as standard height-adjustable, horizontally moveable,
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationInstallation instructions: Elements Vulcan+ Newport Hector Cladding
Technical Data Wood Species Thermally Modified Softwood (Pinus Radiata) Images Profile Newport Hector - Light Band Sawn face - Secret fix 5.4 6.0 8.5 3.0 25.0 3.0 111.0 3.0 12.0 R 3.0 7.0 7.0 123.0 15.0
More informationINSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS
www.capecodsiding.com INSTALLATION, STORAGE AND WALL CONSTRUCTION DETAILS IMPORTANT READ THE FOLLOWING INSTRUCTIONS CAREFULLY BEFORE INSTALLING YOUR WOOD SIDING. FAILURE TO STRICTLY FOLLOW THESE INSTALLATION,
More informationShingle Installation Guidelines
Shingle Installation Guidelines General Guidelines Materials to be used Key definitions Cost of roofing Preparation of the roofing deck Materials used for roofing should conform to approved norms and regulations
More informationWall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK WA 1 - Ü 150 E
Wall flashing profiles FP 60 WA 1 WA 150 WA 1 - ÜK 150-275 WA 1 - Ü 150 E 1 F Ü R D I E ZU K U N FT G E DAC HT. The alwitra waterproofing system alwitra wall flashing profiles are part of the practically
More informationLinda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE
Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE Ruler Pencil Masking tape Measuring tape Silicone sealant & silicone gun Power drill & screwdriver High-grab adhesive Jig
More informationDYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals
DYNEX SOFFIT SYSTEM BRANZ Appraisals Technical Assessments of products for building and construction. Dynex Extrusions Limited PO Box 19-133 Avondale Auckland Tel: 09 828 2800 Fax: 09 828 2801 Web: www.dynex.co.nz
More information15mm Solid European Droploc Oak Fitting Guide & Warranty Information
15mm Solid European Droploc Oak & Warranty Information Introduction Congratulations on your purchase of your brand new Timba Floor 15mm European Solid Oak Flooring. Prior to installation please examine
More informationInstallation Guide - Evolution Series Wood Siding
Installation Guide - Evolution Series Wood Siding The following instructions pertain to the installation of Fraser Wood Siding Evolution Series on a typical wood frame construction allowing for nail penetration
More informationINSTALLATION MANUAL STORAGE
IMVersion 1.1 INSTALLATION MANUAL GENERAL GUIDE: The information in this IM is intended to serve as a general guide to proper installation with no warranties intended or implied. Prime Panels assumes no
More informationResysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines
Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly
More informationINSTALLATION GUIDE. Biowood Outdoor Wall Panel BWWPO20018 Shiplap 8x6 Deep. Green Resources Material Australia Pty Ltd
Green esources Material Australia Pty Ltd Congratulations on the fine choice you have made in the selection of this product. outdoor wall panels will give you many years of carefree maintenance. When installed
More informationWPC DECKING TERRACE BOARDS
WPC DECKING TERRACE BOARDS INSTALATION AND MAINTENANCE INSTRUCTIONS MATERIALS SUBSTRATE PREPARATION DEVOREX WPC Decking system is produced from high quality materials containing selected wood flour and
More informationSECTION LAP SIDING. A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories.
SECTION 07460 LAP SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A. Fiber cement lap siding, panels, single, trim, fascia, moulding and accessories. B. Factory-finished fiber cement lap siding, panels, single,
More informationEaves Lining Installation Guide
Eaves Lining Installation Guide feb 13 Design Pine Eaves Lining - Installation Like most building products, Design Pine eaves lining has both advantages and limitations therefore a clear understanding
More informationKuraStone TM Installation Guide
Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18
More informationFITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING
FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING SECTION 1 Installers Responsibility Pre-Installation SECTION 2 Glue Down (Solid & Engineered Flooring) SECTION 3 Secret Nailing (Solid & Engineered Flooring)
More informationNewTech - CleverDeck Composite Decking Installation Guidelines
NewTech - CleverDeck Composite Decking Installation Guidelines Composite decking has unique characteristics and requires specific fixing requirements that differ from timber. We strongly recommend that
More informationIntegrity Polygon and Round Top Installation and Finishing Instructions
Integrity Polygon and Round Top Installation and Finishing Instructions 08/20/2004 70852 BEFORE YOU BEGIN IMPORTANT: Read these instructions thoroughly before beginning to install your Integrity Polygon
More informationFeature T&G Timber Floor Installation and Finishing Recommendations
Feature T&G Timber Floor Installation and Finishing Recommendations DATA SHEET 3 RECOMMENDED INSTALLATION PRACTICES Version 1 October 2005 3.0 Introduction This data sheet outlines the recommended practices
More informationLUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February
LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally
More informationInstallation instructions for co-extruded louver-board profiles
Installation instructions for co-extruded louver-board profiles www.silvadec.com / info@silvadec.com / tel.:+33 (0)2.97.45.09.00 TO BE READ CAREFULLY BEFORE INSTALLATION Before starting installation on
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationCLASSIC RANGE PLUS RANGE PHOTO WALL. Pre-installation check-list
CLASSIC RANGE PLUS RANGE PHOTO WALL The following is an installation guide for fitting Multipanel CLASSIC RANGE, PLUS RANGE, PHOTO WALL Jig saw or Hand saw Measuring Tape Ruler Pencil High-grab adhesive
More informationQuality you can feel. Exterior. Interior
Product guide Quality you can feel As a leading supplier of cutting-edge, intelligently-designed products, Deeplas is at the forefront of design and innovation. Exterior An aesthetically pleasing collection
More informationFlashing Materials. Rough Opening Preparation
Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or
More informationInstallation Manual for M4-Exterior Sheathing
Installation Manual for M4-Exterior Sheathing 1 Application Area - Testing M4 complying with: 2015 and 2012 International Building Code (IBC) and 2015 and 2012 International Residential Code (IRC). The
More informationInstallation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes
Installation Instructions Split Shake, Staggered Shake, Shingle, Perfection Shingle, and Shapes General Guidelines These instructions show one type of installation and are intended for the professional
More informationVinyl Windows and Doors Manufactured by Pella Corporation
Vinyl Windows and Doors Manufactured by Pella Corporation Part Number: V981255 2009 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACIÓN FOR BOW WINDOWS WITHOUT HEAD AND SEAT BOARD
More informationSHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE
SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE SHIPLOCK CLADDING CN-04E / CN-04W / CN-W008 Prior to the installation of any form of Cladding, it is recommended
More informationAL13 v-line general installation guide
01 TM AL13 v-line general installation guide Vol 1 Version 1 pantented product TM AL13 architectural system www.al13.com CLAD THE WORLD TM How to Install v-line 01 TM AL13 architectural system SHEATHING
More informationOverlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework.
facade Overlapping panel Cladding system made up of horizontal overlapping panels fixed on a wooden or metal wall-mounted framework. Specification and installation guide Presentation of the system VMZ
More informationCladding. Quick Installation Guide. HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable.
Cladding Quick Installation Guide HardiePlank Cladding with ColorPlus Technology. For façades that last longer. Simple. Reliable. Durable. Installation instructions This document is a step by step guide
More informationGeneral Installation Instructions LED
General Installation Instructions LED To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions and other hazards, please read all warnings
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationInstallation Manual for Thermo Panel
Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on
More informationROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION
ROOFING APPLICATION STANDARD (RAS) No. 115 STANDARD PROCEDURES FOR ASPHALTIC SHINGLE INSTALLATION 1. Scope 4. Underlayment 2. 1.1 This roofing application standard has been developed to provide a responsive
More informationtechnical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit
Roofline Installation Details This is intended to provide you with a brief overview of the popular products in Kestrel s Roofline range, where they can be used and the main criteria for installation. Typical
More informationProduct Information & Installation Instructions
Product Information & Installation Instructions TUFF-STRAND TM OSB Sheathing OSB Structural Panels from MARTCO Installation Instructions: Site-Built and Modular Construction Important Notice to Buyers
More informationGeneral Installation Guidelines
g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More informationREMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.
Vinyl Windows and Doors Manufactured by Pella Corporation WINDOW REPLACEMENT INSTRUCTIONS FOR DOUBLE-HUNG VENT REPLACEMENT WINDOWS INTO EXISTING DOUBLE-HUNG FRAME USING FRAME SCREWS FROM THE EXTERIOR Part
More informationContents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit
The Smart Choice in Soffit Installation Guide Looks great - A contemporary tongue and groove styled soffit, with hidden fixings, that provides a versatile and sleek lining complimenting a range of building
More informationInstallation Manual 0318
Installation Manual 0318 DOUBLE 7 CEDAR SHINGLE INSTALLATION GUIDE General Information CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION / CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS
More informationAsh Brook Golf Course Scotch Plains, New Jersey
SECTION 062013 - EXTERIOR FINISH CARPENTRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationInstallation Guide. Deckorum. Composite Decking
Installation Guide Deckorum Composite Decking 1. Introduction Welcome to Deckorum Installation Guide Please fully read the installation guide before commencing any installation works. This will provide
More informationSun Windows General Information New Construction Hinged Door Installation Instructions
A G H F H H A. Apply Weather Resistive Barrier B. Apply Bottom Flashing Tape C. Install Sill Pan End Caps & Pan D. Caulk Sides & Top Nailing Surface, Set Door, Fasten E. Apply Side Flashing Tape F. Apply
More informationE-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20'
E-Z BUILD SHED GUIDE 12' 12' 12' 16' 12' 20' BUILD You can construct your own E-Z frame shed with the help of this step by step guide. North American softwood dimensional lumber sizes: Nominal Actual in
More informationtechnical bulletin Roofline Installation Details No.7 Fascia Installation Details Typical Eaves Details K16 Fascia & 9mm Vented Soffit
Roofline Installation Details This is intended to provide you with a brief overview of the popular products in Kestrel s Roofline range, where they can be used and the main criteria for installation. Typical
More informationCOMPOSITE SIDING INSTALLATION GUIDE
CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,
More informationInstaller s Handbook. Pocket Guide to Roofline & Cladding Installation BBA BRITISH BUILDING PRODUCTS
Uniclass L5:P7113 CI/SfB (4-) Hn7 Installer s Handbook Pocket Guide to Roofline & Cladding Installation BBA BRITISH BOARD OF AGRÉMENT CERTIFICATE NO.91/2620 CERTIFICATE NO.91/2622 BS 7619 Licence No. KM33730
More informationINSTALLATION INSTRUCTIONS
CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16
More informationXL JOINERY LTD LA PORTE VISTA MODULAR 3 ASSEMBLY INSTRUCTIONS
XL JOINERY LTD LA PORTE VISTA MODULAR 3 2090mm High x 4687mm Wide ASSEMBLY INSTRUCTIONS READ AND UNDERSTAND THESE INSTRUCTIONS FULLY PRIOR TO STARTING INSTALLATION. IT IS STRONGLY RECOMMENDED THAT A COMPETENT
More informationVinyl Windows and Doors
Vinyl Windows and Doors Part Number: V983571 2011 Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION 350 SERIES WINDOW INTO EXISTING WOOD FRAME WINDOW Lea las instrucciones en español
More informationExternal cladding technical instructions
External cladding technical instructions Contents External cladding technical instructions... 1 General... 2 Vertical cladding... 3 Horizontal cladding... 5 Lower end of the cladding and the plinth...
More informationSauna & Steam. Traditional Sauna Installation Instruction Manual
Traditional Sauna Installation Instruction Manual Oceanic Ltd, Pountney Street, Wolverhampton, WV2 4HX Phone: 01902 450 550 sales@oceanic-saunas.co.uk www.oceanic-saunas.co.uk Contents 1.Introduction................................................
More informationVinyl Windows Manufactured by VPI Quality Windows
Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.
More information4256HM JAMES HARDIE MONOLITHIC CLADDING
4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James
More informationHills Folding Frame Double and Single
Hills Folding Frame Double and Single Product Manual 2 Introduction Congratulations Congratulations on the purchase of your Hills Folding Frame Clothesline, which will bring you many years of trouble free
More informationThe better way to build TM. Installation Manual ROOF SIPs
The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................
More informationInstallation Instructions
TEL: 09 579-8895 FAX: 09 579-2933 EMAIL: sales@nzfiredoors.co.nz NZ Fire Doors Ltd, 89 Gavin Street, Ellerslie, PO Box 12709, Penrose 1642, Auckland, New Zealand. www.nzfiredoors.co.nz Installation Instructions
More informationTruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines
TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly
More informationInstallation Instructions
Installation Instructions General Notes & Product Information Product profiles & details may vary by installation. Consult architectural drawings, details & specifications before installation of any Marlite
More informationVeranda Decorative Lattice & Deck Skirting Special Order Catalog
Veranda Products. Built by Barrette. Veranda Decorative Lattice & Deck Skirting Special Order Catalog NEW! Designer Series Deck Skirting in 4 styles V1 2/17 1 Your Decorative Lattice Options Choose the
More informationXenon 05 Installation Instructions & Parts List
Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationSeries 1600 WeatherGuard Dock Enclosure
Fairborn USA Inc. 205 Broadview Street Upper Sandusky, OH 43351 1-800-262-1188 Fax 1-419-294-4980 Series 1600 WeatherGuard Dock Enclosure All Models! WARNING Do not install this product unless you read
More information4. Metal roof jacks at penetrations and attachments
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -
More informationCembrit Patina. Cembrit Cover. Cembrit Solid. Cembrit Transparent
Rainscreen Cladding Your choice. In addition to the range of colours and shades, Cembrit cladding boards are available in four compositions, each with distinctive performance and characteristics. Cembrit
More informationInspire Aledora Slate Application Guidelines
July 2014 Inspire Aledora Slate Application Guidelines Only Basic Roofing Tools Required Hand fastened or fastened with a pneumatic nail gun Utility knife or a standard circular saw Tape measure, pry bar,
More informationALLORA SWING PANEL INSTALLATION INSTRUCTIONS
ALLORA SWING PANEL INSTALLATION INSTRUCTIONS Before Installation Please check that your Allora Swing Panel is undamaged SEQUENCE OF INSTALLATION These instructions are also available from the Athena website:
More informationSiding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE
Siding Systems NOVIKSTONETM DS DRY STACK STONE GENERAL INFORMATION CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW
More information3M Air and Vapour Barrier 3015 Technical guide
3M Air and Vapour Barrier 3015 Technical guide Product overview Typical physical properties For installation ease and flexibility, 3M Air and Vapour Barrier 3015 High performance 3M acrylic adhesive grabs
More informationInstallation Guide Maibec Resistech Panel, Shingle Strips and Trims Solid Colours
TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours TM Maibec Resistech Panel, Shingle Strips and Trims Solid Colours This installation guide applies to the installation of Maibec Resistech
More informationJAMES HARDIE RIGID AIR BARRIERS
Product 1.1 James Hardie Rigid Air Barriers are a range of rigid wall underlay materials including RAB Board and HomeRAB Pre-Cladding. They are sealed fibre cement sheets designed for use as rigid wall
More informationInstallation Guide. deckorum Composite Decking
Installation Guide deckorum Composite Decking 1. Introduction Welcome to Deckorum installation Guide Please fully read the installation guide before commencing any installation works. This will provide
More informationA REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS
WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS Per: 2006 B.C.B.C. Part 9 DISCLAIMER THE INFORMATION CONTAINED IN THIS DOCUMENT REPRESENTS CURRENT WOOD FRAME
More informationInstallation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. The Fastening Make shingle fastening simpler
More informationOPERATION AND MAINTENACE MANUAL. mcr ALPE EI 120
ASSA ABLOY Mercor Doors sp. z o.o. ul. Arkońska 6, bud. A2 80-387 Gdańsk tel. (58) 732 63 00 fax. (58) 732 63 02/03 www.mercordoors.com.pl e-mail: mercordoors@assaabloy.com OPERATION AND MAINTENACE MANUAL
More informationFold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE
Fold-A-Way Patio Door ASSEMBLY & INSTALLATION GUIDE This instruction guide provides the minimum recommended procedures to correctly prepare the rough opening, install a fold-a-way patio door unit and apply
More informationStep-by-Step Installation Instructions for
Step-by-Step Installation Instructions for Customer helpline number: 01604 633607 8892_Step_By_Step_900_Quad_V5.indd 1 1/9/10 18:01:22 Before Starting: Please read and understand these instructions. Not
More informationStep-by-Step Installation Instructions for
Step-by-Step Installation Instructions for Version 5-06/11 Before Starting: Please read and understand these instructions. Not following these instructions will invalidate your warranty (although this
More informationSECTION CARPENTRY
SECTION 06100 CARPENTRY PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Carpentry work including grounds, nailers, blocking, miscellaneous framing, plywood backing panels, plywood sheathing, preservative
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationFor ANGLE-DROP Styles
For ANGLE-DROP Styles BEFORE INSTALLATION: 1. READ THESE DETAILED INSTALLATION INSTRUCTIONS. 2. Material and tool requirements: - Estimate square footage and add 10%. - Select underlayment (over concrete
More informationPlease read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation!
Please read these instructions thoroughly prior to beginning the Acrovyn Z-Clip Wall Panel installation! This instruction sheet is intended to provide a specific guide to follow for the installation of
More informationVinyl Windows and Doors Manufactured by VPI Quality Windows
Vinyl Windows and Doors Manufactured by VPI Quality Windows Part Number: 511_Installation ENDURANCE CASEMENT\AWNING\PW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction These
More informationInstallation Guide (888)
BamDeck Installation Guide (888) 788-2254 The Collection Decking Systems BAMDECK 4G 5-7/16 Wide Plank Dims: 192 L x 5-7/16 W x 13/16 H BAMDECK 4G WIDE 8-1/4 Wide Plank Dims: 96 L x 8-1/4 W x 13/16 H BAMDECK
More informationVYTEC ARCHITECTURAL SPECIFICATIONS
SCOPE OF WORK SECTION 07464 SIMULATED WOOD SIDING PART 1 GENERAL 1.1 SECTION INCLUDES A) Vytec Solid Vinyl Siding. B) Vytec Vinyl Accessories and Trim. C) Vytec Vinyl Soffits. 1.2 RELATED SECTIONS A) Section
More informationINSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2012 Pella Corporation Part Number: 80WH0101 INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Installation Instructions for Typical Wood Frame Construction.
More informationGARDEN SHED BRIGHTOLN
ASSEMBLY INSTRUCTIONS GARDEN SHED BRIGHTOLN Dimensions: 10x10 (1 1/8") IMPORTANT Before beginning the assembly of your garden shed, please read the instructions carefully and follow them closely. By doing
More informationAquaGuard - Water Resistant Flooring Installation guidelines
AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important
More informationPocket Door Installation Instructions
Installation Instructions Before getting started: Read instructions thoroughly. Be sure that you have the necessary tools and materials before starting the installation. Consult your local building code
More informationMethod of Build 1. Fire. Sound
Method of Build 1 General Viso Fire & Acoustic in the solid form differs from most other systems as it can be erected using 12.5mm & 15.0mm boards within the same Aluminium framework. Also hidden fix board
More informationInstallation Instructions for Panel Siding and Soffit
Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808
More information