EzyBrace For Light Steel Frame Systems

Size: px
Start display at page:

Download "EzyBrace For Light Steel Frame Systems"

Transcription

1 EzyBrace For Light Steel Frame Systems Systems for use with light steel framing have been updated in March 2017 to offer improved simplicity and efficiency. Key changes include: CORNER FASTENER PATTERNS must be placed no closer than the paper bound sheet and no closer than sheet ends or cut s. minimum paper bound UPDATED Bracing Design Software for light steel framing Download free from gib.co.nz/ezybrace NEW Bracing for steel framing GS2s-NOM The new GIB Bracing Element GS2s-NOM, allows internal steel frame walls lined with GIB plasterboard on both sides and fastened off as per GS2s-NOM specifications to contribute towards bracing resistance. (GS & GB elements, excluding GS2s-NOM) This encourages more even bracing distribution throughout the building, while also potentially reducing the amount of fasteners and bracing elements such as GS1s and GS2s. minimum Responsibly conservative bracing methodology GIB Bracing Systems have been proven in New Zealand conditions for over 40 years. Systems continues to use responsibly conservative and reliable Bracing Unit ratings. 300mm Unless stated all fastener spacings are maximums minimum paper bound 2 GS2s-NOM minimum 300mm 2 Unless stated all fastener spacings are maximums 1 GIB EZYBRACE FOR LIGHT STEEL FRAME SYSTEMS GIB HELPLINE OR GIB.CO.NZ FOR MORE INFO MARCH 2017

2 GIB EZYBRACE UPDATE FOR LIGHT STEEL FRAME SYSTEMS Design Software for Light Steel Frame Systems Developed in conjunction with National Association of Steel Frame Housing (NASH), updated software is now available for use with proprietor light steel framing systems. Improved functionality Easily add or delete bracing lines. Easily alter GIB Bracing elements mid plan or include custom bracing elements. Exterior line check function. Improved opening, printing and saving functions now select from up to of your most recently saved plans. In built help function Handy in built help function providing the answers to common design questions such as wind zones, earthquake zones and cladding weight Availability Systems Software is available for both Microsoft and Mac operating systems Download design software from gib.co.nz/ezybrace Naming Conventions for Light Steel Frame Systems Bracing element GS1s GS2s GS2s-NOM GB1s GBPs Description GIB Standard plasterboard one side Hold-downs required. GIB Standard plasterboard both sides Hold-downs required. GIB Standard plasterboard both sides, fixing pattern as GS2s-NOM specification sheet. GIB Braceline plasterboard one side Hold-downs required. GIB Braceline plasterboard one side, Structural plywood other side Hold-downs required. 2 GIB EZYBRACE FOR LIGHT STEEL FRAME SYSTEMS GIB HELPLINE OR GIB.CO.NZ FOR MORE INFO MARCH 2017

3 Systems specification GS1s GS1s 0.4 mm GIB Standard plasterboard one side Hold-down Steel framing dimensions and height as determined by Specific Engineering Design. C section studs shall have a minimum thickness of 0.75 mm and minimum nominal depth of 90 mm with 35 mm wide flanges. 5mm washer as illustrated, fixed to timber floor framing using a 12 mm x 0 mm galvanized coach screw or 4 x 75mm Type 17 class 3 screws. 5mm washer as illustrated, fixed to the concrete slab using a proprietary concrete anchor with a minimum uplift capacity of kn taking into consideration concrete slab thickness (internal walls) and distance (external walls). One layer of mm GIB Standard plasterboard. Use full height sheets where possible. The Bracing Unit ratings for system GS1s apply to mm GIB Standard plasterboard and any other or 13mm GIB plasterboard. 32mm x 6g GIB Grabber Drywall Screws. 50,0,150,225,300mm from each corner and then 1 thereafter around the perimeter of the bracing element. For vertically fixed sheets, place fasteners at 300mm centres to the intermediate sheet joints. For horizontally fixed sheets, place single fasteners to the sheet where it crosses the stud. Use daubs of GIBFix adhesive at 300mm centres to intermediate studs. Place fasteners no closer than 12mm from sheet s and any sheet end or cut. 4 place this 87mm end brace hold down washer 28mm 59mm seriously compromise performance. Follow the specifications. This specification sheet is issued in conjunction with the publication Systems 3 GIB EZYBRACE FOR LIGHT STEEL FRAME SYSTEMS GIB HELPLINE OR GIB.CO.NZ FOR MORE INFO MARCH 2017

4 Systems specification GS2s GS2s 0.4 mm GIB Standard plasterboard both sides Hold-down Steel framing dimensions and height as determined by Specific Engineering Design. C section studs shall have a minimum thickness of 0.75 mm and minimum nominal depth of 90 mm with 35 mm wide flanges. 5mm washer as illustrated, fixed to timber floor framing using a 12 mm x 0 mm galvanized coach screw or 4 x 75mm Type 17 class 3 screws. 5mm washer as illustrated, fixed to the concrete slab using a proprietary concrete anchor with a minimum uplift capacity of 12kN taking into consideration concrete slab thickness (internal walls) and distance (external walls). One layer of mm GIB Standard plasterboard each side of the frame. Use full height sheets where possible. The Bracing Unit ratings for system GS2s apply to mm GIB Standard plasterboard and any other or 13mm GIB plasterboard. 32mm x 6g GIB Grabber Drywall Screws. 50,0,150,225,300mm from each corner and then 1 thereafter around the perimeter of the bracing element. For vertically fixed sheets, place fasteners at 300mm centres to the intermediate sheet joints. For horizontally fixed sheets, place single fasteners to the sheet where it crosses the stud. Use daubs of GIBFix adhesive at 300mm centres to intermediate studs. Place fasteners no closer than sheet s and any sheet end or cut. 4 place this 87mm end brace hold down washer 28mm 59mm seriously compromise performance. Follow the specifications. This specification sheet is issued in conjunction with the publication Systems 4 GIB EZYBRACE FOR LIGHT STEEL FRAME SYSTEMS GIB HELPLINE OR GIB.CO.NZ FOR MORE INFO MARCH 2017

5 Systems specification GS2s-NOM GS2s-NOM 0.4 mm GIB Standard plasterboard both sides Hold-down Steel framing dimensions and height as determined by Specific Engineering Design. C section studs shall have a minimum thickness of 0.75 mm and minimum nominal depth of 90 mm with 35 mm wide flanges. 3mm washer as illustrated, fixed to timber floor framing using a 12 mm x 0 mm galvanized coach screw or 4 x 75mm Type 17 class 3 screws. 3mm washer as illustrated, fixed to the concrete slab using a proprietary concrete anchor with a minimum uplift capacity of 8kN taking into consideration concrete slab thickness. One layer of mm GIB Standard plasterboard each side of the frame. Use full height sheets where possible The Bracing Unit ratings for system GS2s-NOM apply to mm GIB Standard plasterboard and any other or 13mm GIB plasterboard. 32mm x 6g GIB Grabber Drywall Screws. 50, 300mm from each corner and 300mm maximum thereafter around the perimeter of the bracing element. For horizontally fixed sheets, place single fasteners to the sheet where it crosses the stud. Use daubs of GIBFix adhesive at 300mm maximum centres to intermediate studs. Place fasteners no closer than sheet s and any sheet end or cut. 300mm crs 60mm 2 GS2s-NOM Fastener pattern 4 place this 2 300mm crs 34mm 34mm end brace hold down washer seriously compromise performance. Follow the specifications. This specification sheet is issued in conjunction with the publication Systems 5 GIB EZYBRACE FOR LIGHT STEEL FRAME SYSTEMS GIB HELPLINE OR GIB.CO.NZ FOR MORE INFO MARCH 2017

6 Systems specification GBPs GBPs 0.4 mm GIB Braceline plasterboard one side and Hold-down 0 95 minimum 7mm structural plywood to 0.6 AS/NZS :2012 to the other side Steel framing dimensions and height as determined by Specific Engineering Design. C section studs shall have a minimum thickness of 0.55 mm and minimum nominal depth of 75mm with 35 mm wide flanges BMT bracket and 5 mm washer as illustrated, fixed to timber floor framing using a 12 mm x 0 mm galvanised coach screw BMT bracket and 5 mm washer as illustrated, fixed to the concrete slab using a proprietary concrete anchor with a minimum uplift capacity of 12 kn taking consideration concrete slab thickness (internall walls) and distance (external walls). mm GIB Braceline plasterboard one side of the frame. Use full height sheets where possible. The other side of the frame is lined with minimum 7 mm structural plywood AS/NZS :2012. The Bracing Unit ratings for system GBPs apply to mm GIB Braceline plasterboard. 32mm x 6g GIB Grabber Drywall Screws (use in both plasterboard and plywood fixing). 150 mm around the perimeter of the bracing element starting at mm from the bracing element corners. GIB Braceline For vertical fixing, place fasteners at 300 mm centres at sheet joints in the tapered sheet s in the field of the bracing element.for horizontal fixing, place single fasteners in the tapered where sheets cross studs.use daubs of GIBFix All-Bond adhesive at 300mm centres to intermediate studs in the body of the sheets. Place fasteners a minimum of vertical sheet s and horizontal sheet. Plywood Vertical sheet fixing only. Within the bracing element place fasteners at 150 mm centres along the sheet joints at 300 mm centres to intermediate framing. 4 place this 87mm 28mm 59mm Stud 75mm 5mm hold down washer 95BTM Bracket end brace hold down bracket and washer 55mm Width 3mm less than frame width seriously compromise performance. Follow the specifications. This specification sheet is issued in conjunction with the publication Systems 6 GIB EZYBRACE FOR LIGHT STEEL FRAME SYSTEMS GIB HELPLINE OR GIB.CO.NZ FOR MORE INFO MARCH 2017

7 Systems specification GB1s GB1s 0.4 mm GIB Braceline plasterboard one side Hold-down Steel framing dimensions and height as determined by Specific Engineering Design. C section studs shall have a minimum thickness of 0.75 mm and minimum nominal depth of 90 mm with 35 mm wide flanges. 5mm washer as illustrated, fixed to timber floor framing using a 12 mm x 0 mm galvanized coach screw or 4 x 75mm Type 17 class 3 screws. 5mm washer as illustrated, fixed to the concrete slab using a proprietary concrete anchor with a minimum uplift capacity of 12kN taking into consideration concrete slab thickness (internal walls) and distance (external walls). One layer of mm GIB Braceline plasterboard. Use full height sheets where possible. The Bracing Unit ratings for system GB1s apply to mm GIB Braceline. 32mm x 6g GIB Grabber Drywall Screws. 50,0,150,225,300mm from each corner and then 1 thereafter around the perimeter of the bracing element. For vertically fixed sheets, place fasteners at 300mm centres to the intermediate sheet joints. For horizontally fixed sheets, place single fasteners to the sheet where it crosses the stud. Use daubs of GIBFix adhesive at 300mm centres to intermediate studs. Place fasteners no closer than sheet s and any sheet end or cut. Fastener pattern 4 place this 87mm end brace hold down washer 28mm 59mm seriously compromise performance. Follow the specifications. This specification sheet is issued in conjunction with the publication Systems 7 GIB EZYBRACE FOR LIGHT STEEL FRAME SYSTEMS GIB HELPLINE OR GIB.CO.NZ FOR MORE INFO MARCH 2017

8 FOR MORE INFORMATION VISIT gib.co.nz OR CALL THE GIB HELPLINE

EzyBrace Systems. Specification and installation manual CBI 5113

EzyBrace Systems. Specification and installation manual CBI 5113 EzyBrace Systems Specification and installation manual CBI 5113 NATIONAL SUPPORT VISIT: Winstone Wallboards Limited 37 Felix Street, Penrose, Auckland 1061, New Zealand POST: PO Box 12 256, Penrose 1642,

More information

4.0 GENERAL WALL AND CEILING INSTALLATION

4.0 GENERAL WALL AND CEILING INSTALLATION 4.0 GENERAL WALL AND CEILING INSTALLATION This section covers the installation of GIB plasterboard in walls and ceilings. Installation guidance is also provided for speciality systems; GIB EzyBrace and

More information

BARRIER SPECIFICATION & INSTALLATION GUIDE SEPTEMBER 2017

BARRIER SPECIFICATION & INSTALLATION GUIDE SEPTEMBER 2017 BARRIER SPECIFICATION & INSTALLATION GUIDE SEPTEMBER 2017 Information contained within is specific to structural plywood products and must not be used with any other plywood products, no matter how similar

More information

GUIDE. Elephant INSTALLATION. Elephant Plasterboard Installation Guide August

GUIDE. Elephant INSTALLATION. Elephant Plasterboard Installation Guide August Elephant Plasterboard Installation Guide August 2015 Elephant INSTALLATION GUIDE www.elephantplasterboard.co.nz Elephant Plasterboard Installation Guide Publications These publications are continuously

More information

GOLDENEDGE MDF PANELBRACE WALL BRACING SYSTEMS. Product. Scope. Building Regulations. Appraisal No. 779 [2018] Logo

GOLDENEDGE MDF PANELBRACE WALL BRACING SYSTEMS. Product. Scope. Building Regulations. Appraisal No. 779 [2018] Logo PANELBRACE WALL BRACING This Appraisal replaces Appraisal No. 779 (2013). s Technical Assessments of products for building and construction. Logo Nelson Pine Industries Limited PO Box 3049 Richmond Nelson

More information

BARRIER. Specification & Installation Guide. September 2015

BARRIER. Specification & Installation Guide. September 2015 BARRIER Specification & Installation Guide September 2015 Information contained within is specific to Ecoply Barrier structural plywood products and must not be used with any other plywood products, no

More information

FORTRESS BOTTOM PLATE ANCHORS. Product. Scope. Building Regulations. Appraisal No. 687 [2017]

FORTRESS BOTTOM PLATE ANCHORS. Product. Scope. Building Regulations. Appraisal No. 687 [2017] FORTRESS BOTTOM PLATE This Appraisal replaces BRANZ Appraisal No. 687 (2010) BRANZ Appraisals Technical Assessments of products for building and construction. Manufacturing Suppliers Limited 560 Rosebank

More information

Design Guide Pryda Connectors for Steel Framing

Design Guide Pryda Connectors for Steel Framing Pryda Connectors for Steel Framing Copyright: (c) Pryda Australia A Division of ITW Australia November 2012 November 2012 Design Guide Pryda Connectors for Steel Framing INDEX General Notes General information

More information

3.1 General Provisions

3.1 General Provisions WOOD FRAME CONSTRUCTION MANUAL 107 3.1 General Provisions 3.1.1 Prescriptive Requirements The provisions of this Chapter establish a specific set of resistance requirements for buildings meeting the scope

More information

ENGINEERED STRUCTURAL BRACING

ENGINEERED STRUCTURAL BRACING ENGINEERED STRUCTURAL BRACING www.r6brace.com.au 2 R6 Brace Key Features Complies with BCA Tested & certified by the Engineered Wood Products Association of Australasia (EWPAA) Performs in all weather

More information

GlasRoc Sheathing Type X

GlasRoc Sheathing Type X Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity

More information

Clopay Models 835/837 Sliding Door System Installation Guide

Clopay Models 835/837 Sliding Door System Installation Guide Clopay Models 835/837 Sliding Door System Installation Guide The aim of this instruction is to guide you through the process of construction and fitting of Sliding Doors. Due to the number of sizes available

More information

STRUCTURAL BRACKETS CATALOGUE

STRUCTURAL BRACKETS CATALOGUE 0/2 STRUCTURAL BRACKETS CATALOGUE SUPERIOR QUALITY, HOT DIP GALVANISED, HEAVY DUTY BRACKETS FOR FIXING TIMBER TO TIMBER, TIMBER TO CONCRETE, TIMBER TO STEEL The BOWMAC product range is designed to cut

More information

GAMMA BRACING FRAME NEW ZEALAND S MOST ADVANCED BRACING SYSTEM FOR TIMBER FRAME CONSTRUCTIONS

GAMMA BRACING FRAME NEW ZEALAND S MOST ADVANCED BRACING SYSTEM FOR TIMBER FRAME CONSTRUCTIONS GAMMA BRACING FRAME Maintains Integrity Specify With Confidence Provides A Safe Enviroment Provides Structural Integrity Provides A Secure Enviroment Protects Your Most Valuable Asset Withstands Multiple

More information

Vertical Offset Base and Safety Rail System Installation Instructions

Vertical Offset Base and Safety Rail System Installation Instructions Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat

More information

GLOSSARY OF TERMS SECTION 8

GLOSSARY OF TERMS SECTION 8 GLOSSARY OF TERMS SECTION 8 Anchor Bolt Angle Base Plate Bay Blocking CCB Centerline Chord Cladding Clip Closure Strip An A-307 steel bolt embedded in the concrete footing to anchor the base plate of the

More information

Timber to Timber - Timber to Concrete - Timber to Steel

Timber to Timber - Timber to Concrete - Timber to Steel 01/2017 TIMBER CONNECTORS NOT TO BE USED IN EXTERIOR SITUATIONS Stainless Steel alternatives are available where stated Timber to Timber - Timber to Concrete - Timber to Steel MiTek manufactures and markets

More information

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals

PEDESTAL INSTALLATION. Guidelines for installing adjustable height pedestals BASIC REQUIREMENTS Irrespective of the type of pavers or tiles that will be installed over pedestals, the following basic requirement must be met. Decks must be designed not to exceed the load capacity

More information

Column and Beam Fire Protection SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337

Column and Beam Fire Protection SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337 SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337 PLASTERBOARD LAYOUT 337 PLASTERBOARD FIXING 337 CONSTRUCTION DETAILS 341 Column and Beam Fire Protection Column and beam protection systems

More information

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN

A1-1 D O R S E T A V E N U E SITE PLAN SITE PLAN -2,000 MORNING PATIO ±0 D O R S E T A V E N U E -2,800 SITE PLAN SCALE 1:200 CHECK ALL DIMENSIONS AND LEVELS ON SITE PRIOR TO CONSTRUCTION, REPORT ANY DISCREPANCIES TO THE ER SK 21.03.2014 SITE PLAN 21.03.14

More information

E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals

E2 REDWAY FLASHINGS. Product. Scope. Appraisal No. 977 [2017] Appraisal No. 977 (2017) BRANZ Appraisals E2 REDWAY FLASHINGS BRANZ Appraisals Technical Assessments of products for building and construction. Redway Developments Limited 162 Kendal Ave Burnside Christchurch Tel: 03 358 5775 Email: info@e2flashings.co.nz

More information

How-To-build guide Garden shed

How-To-build guide Garden shed How-To-build guide Garden shed What you can build using this guide This guide will show you how to build a re-locatable garden shed. Before you begin building Contact your local territorial authority to

More information

The Influence of Nails and Plasterboard on the Racking Resistance of Stud Walls

The Influence of Nails and Plasterboard on the Racking Resistance of Stud Walls Building 1 Grosvenor Court, Hipley Street OLD WOKING, SURREY GU22 9LL Tel: +44 (0) 1483 769518 Fax: +44 (0) 1483 770863 E-mail: design@silvatecdesigncom Internet: wwwsilvatecdesigncom The Influence of

More information

STRUCTURAL BRACKETS CATALOGUE

STRUCTURAL BRACKETS CATALOGUE 08/2011 STRUCTURAL BRACKETS CATALOGUE SUPERIOR QUALITY, HOT DIP GALVANISED, HEAVY DUTY BRACKETS FOR FIXING TIMBER TO TIMBER, TIMBER TO CONCRETE, TIMBER TO STEEL The BOWMAC product range is designed to

More information

Fixings. Products - Fixings.

Fixings. Products - Fixings. Fixings Our range of fixing products cater for every drywall need, ensuring simple yet secure fixing of plasterboard and metal framing. The range includes Gyproc screws, engineered for board-to-metal,

More information

Site Preparation Information for:

Site Preparation Information for: Site Preparation Information for: Product Series - Big Doors Product Type - MultiGlide Door Read these instructions and the Product Safety Information before starting procedure. For: MultiGlide Door Instructions/Videos

More information

Desk/Wall-Mount Rack

Desk/Wall-Mount Rack Desk/Wall-Mount Rack Patent(s) Pending Installation Instructions Post P/N: 119-1752 119-1781 119-1782 119-4014 Frame P/N: 119-1591 119-1754 119-1755 Kit Contents (2) Frames (4) Posts Assembly Hardware

More information

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION

SECTION R507 DECKS DECKING LEDGER BOARD BEAM. FOOTING BEAM SPAN CANTILEVER For SI: 1 inch = 25.4 mm FIGURE R507.2 DECK CONSTRUCTION SECTION R507 DECKS R507.1 Application. The provisions of this section shall provide prescriptive requirements for the design and construction of all uncovered, wood-framed, single-span exterior decks.

More information

Plasterboard Ceiling Systems

Plasterboard Ceiling Systems Plasterboard Ceiling Systems 400C Issue 1 2 Plasterboard Ceiling Systems Contents Standard Ceilings Design...3-7 Introduction... 3 Fire Ratings... 3 Systems Mass... 3 Decoration... 3 General Construction

More information

Site Installation Guide

Site Installation Guide Site Installation Guide Site Checklist Stop and read this now. Tick box when checked. Floor Joist Layout If a floor joist design/layout was done, was a site copy of the layout provided with the joists,

More information

Adjustable Countertop Installation

Adjustable Countertop Installation Adjustable Countertop Installation Applies to Models: A1, A2, A3, A4, A5, & A6 Required Tools: Stud Finder, Level 1/4 deep well socket, Screwdrivers, Tape Measure, Drill and Drill Bits Language of origin:

More information

Designed for Building Designed for Living

Designed for Building Designed for Living Designed for Building Designed for iving decorative hardware Add Beauty and Strength to Your Custom Outdoor iving Structures ith Outdoor Accents, a new line of decorative timber connectors and fasteners

More information

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4

INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 the unique loft conversion & flooring system INSTALLATION INSTRUCTIONS for TB6.2,TB7.0, TB7.8 & TB8.4 Unit 6, Devizes Trade Centre, Hopton Park, Devizes, Wiltshire, SN10 2EH t 01380 739000 e info@telebeam.co.uk

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

Track Rack. * Track Racks are not lockable

Track Rack. * Track Racks are not lockable The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply

More information

Load-carrying capacity of timber frame diaphragms with unidirectional support

Load-carrying capacity of timber frame diaphragms with unidirectional support Load-carrying capacity of timber frame diaphragms with unidirectional support Jørgen Munch-Andersen, Danish Timber Information, 2012-06-26 Introduction The rules for determining the load-carrying capacity

More information

STRUCTURAL PLYWOOD WALL BRACING. Limit States Design Manual

STRUCTURAL PLYWOOD WALL BRACING. Limit States Design Manual STRUCTURAL PLYWOOD WALL BRACING Limit States Design Manual TABLE OF CONTENTS Introduction... 3 Benefits of using EWPAA Structural Plywood... 3 Why Plywood Bracing... 3 Design Methodology... 4 Design Approach...

More information

WALL TO FABRICATED FLOOR

WALL TO FABRICATED FLOOR WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN

More information

Shaft Wall SYSTEMS 210 INSTALLATION 211. Shaft Wall systems are fire rated non-load bearing walls used for shafts and service ducts.

Shaft Wall SYSTEMS 210 INSTALLATION 211. Shaft Wall systems are fire rated non-load bearing walls used for shafts and service ducts. SYSTEMS 210 INSTALLATION 211 GENERAL REQUIREMENTS 211 FRAMING 212 PLASTERBOARD LAYOUT 213 PLASTERBOARD FIXING 214 CONSTRUCTION DETAILS 217 Shaft Wall Shaft Wall systems are fire rated non-load bearing

More information

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS

ADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS ADGV_001_FASTPOS Panel Timber Frame 12mm from top edge 600mm MAX CTRS TIMBER STUDS 200 mm MAX CTRS 50mm from corner Fastener Positioning Scale 1:20 No. ADGV_001 ADGV_003_SHTEDGEPOS Centre line of Timber

More information

BIKE FILE (301)

BIKE FILE   (301) B IK E F I L E High Efficiency The Bike File is our most space efficient u-lock compatible product. Sturdy sliding hangers allow nine bikes to be securely stored in an eight-foot section while allowing

More information

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA

MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA 7/16 PETRARCH ARCHITECTURAL WALL PANELS APPLIED OVER A STUDWALL BY MEANS OF A FIELD ASSEMBLED BACK FASTENED SYSTEM DESIGN CONCEPT 7/16 panels may be installed

More information

ISSUE Erection Manual

ISSUE Erection Manual Erection Manual The details and information in this book are for guidance of the erection of panels and flooring only. They are not site specific. Refer to the relevant panel drawings for the site, which

More information

LVL8 H1.2 GENERAL FRAMING. Eco Friendly Revolutionary H1.2 Treatment Azotek by Zelam

LVL8 H1.2 GENERAL FRAMING. Eco Friendly Revolutionary H1.2 Treatment Azotek by Zelam LVL8 H1.2 GENERAL FRAMING Eco Friendly Revolutionary H1.2 Treatment Azotek by Zelam NPIL/MARCH2015 Introduction to NelsonPine LVL8 H1.2 NelsonPine LVL is an engineered wood composite made from rotary peeled

More information

INTERNAL LININGS INSTALLATION GUIDE

INTERNAL LININGS INSTALLATION GUIDE Your partner in building solutions INTERNAL LININGS INSTALLATION GUIDE General remarks on This installation guide is to be used in conjunction with: specifications Architects specific details Pacific Build

More information

Mach Wall Installation Instructions

Mach Wall Installation Instructions Mach Wall Installation Instructions Planning the Job Since Mach Wall is an innovative product that accomplishes 3 tasks at the same time (frame, insulate and drywall) and it replaces traditional framing,

More information

FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions

FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions Thermal Structures Inc. FS 5800 EXPANSION JOINT EJ FIRE BARRIER* Installation Instructions FLOOR TO FLOOR (F) ROOF TO ROOF (R) FLOOR TO WALL (FW) ROOF TO WALL (RW) WALL TO WALL (W) CORNER WALL (CW) FLOOR

More information

nam4t/m6 ubracreboaardl

nam4t/m6 ubracreboaardl natural al M4/M6 BRACEBOARD COMPANY OVERVIEW Australian Hardboards Limited is the sole Australian manufacturer of 100% all natural thin hardboards. Well established, our greatest strength is our ability

More information

WHY YOU SHOULD USE TUFFLOOR. components

WHY YOU SHOULD USE TUFFLOOR. components Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative

More information

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion. ASSEMBLY INSTRUCTIONS SYSTEM SUPER 2.5 EZ Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your

More information

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side

Fastener Schedule. a, b, c. FASTENER Roof 3-8d (2 1 / ) / ) 3-10d. 3-10d ( ) 3-16d box nails. (3 1 2 toe nails on one side ITEM 1 DESCRIPTION OF BUILDING ELEMENTS Blocking between joists or rafters to top plate, toe 2 Ceiling joists to plate, toe 3 4 5 6 Ceiling joists not attached to parallel rafter, laps over partitions,

More information

City of Manteca Boarding Requirements

City of Manteca Boarding Requirements City of Manteca Boarding Requirements There should be no boarding above the first floor unless entry is possible without use of a ladder, and the opening is large enough for a person to easily pass through.

More information

User Manual. Frame KIT VG-LFH15FWA VG-LFH20FWA VG-LFH25FWA

User Manual. Frame KIT VG-LFH15FWA VG-LFH20FWA VG-LFH25FWA User Manual Frame KIT VG-LFH15FWA VG-LFH20FWA VG-LFH25FWA The color and the appearance may differ depending on the product, and the specifications are subject to change without prior notice to improve

More information

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)?

3. Are component and cladding design pressures consistent with ASCE 7 for the wind speed and exposure category (ASCE 7 Fig. 6-3)? Mobile County Public Works Residential Plan Reviewers Checklist For Structural Requirements of Wood Framed Residences Recommendation: Permit as Noted Revise Plans and Resubmit MCPW Ref. No. Design Criteria:

More information

JAMES HARDIE RIGID AIR BARRIERS

JAMES HARDIE RIGID AIR BARRIERS Product 1.1 James Hardie Rigid Air Barriers are a range of rigid wall underlay materials including RAB Board and HomeRAB Pre-Cladding. They are sealed fibre cement sheets designed for use as rigid wall

More information

Pryda Timber Connectors

Pryda Timber Connectors Pryda Timber Connectors A complete guide to the design, specification and installation of Pryda Bracing March 2014 ESSENTIAL NOTES PRYDA PRODUCT GUIDES INTRODUCTION The information in this Product Guide

More information

FASTENERS BUILDING DEPARTMENT

FASTENERS BUILDING DEPARTMENT FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and

More information

APPENDIX FENCE GENERAL NOTES

APPENDIX FENCE GENERAL NOTES APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors IF INSTALLING A TOUCH LATCH, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS FIRST

More information

Ordering example: WSK-600 / B x H x L = 155 mm. M8 hexagon head screw, fixed by a locknut. Threaded bolt

Ordering example: WSK-600 / B x H x L = 155 mm. M8 hexagon head screw, fixed by a locknut. Threaded bolt Ordering example: / B x H x L = 155 mm P-3464/5595-MPA BS General / ordering example Dimensions B (width) x H (height) in mm (always corresponds to the clear shaft or smoke control damper dimensions) Available

More information

SLATTEX (Textured Slatwall) INSTALLATION GUIDE

SLATTEX (Textured Slatwall) INSTALLATION GUIDE SLATTEX (Textured Slatwall) INSTALLATION GUIDE Preparing for the Installation: Here are some suggestions to help you to help you simplify the installation process and maximize the beauty of your 3D Textured

More information

Pryda Timber Connectors

Pryda Timber Connectors Pryda Timber Connectors Pryda Lintel Guide Engineered Steel Wall Lintels March 2014 ESSENTIAL NOTES PRYDA PRODUCT GUIDES INTRODUCTION The information in this Product Guide is provided for use in Australia

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B PFD30 SG Fire Door Kit FITTING INSTRUCTIONS For use with 44mm thick doors only For Single and Double doors SUGGESTED TOOLS DRILL G-CLAMP TAPE MEASURE (Image for reference only) HACKSAW POCKET

More information

96 (Standard Length)

96 (Standard Length) Setbacks 96 (Standard Length) Bike Files may be lined up end to end to fill the available space. A 36 aisle should be left between the ends of bikes in racks facing one another. 36 aisle 50 Installation

More information

APPENDIX 1 : Post and Beam Model

APPENDIX 1 : Post and Beam Model Good Practice Guide to Hut Building Prepared by Reforesting Scotland s Campaign for a Thousand Huts (5th Draft) APPENDIX 1 : Post and Beam Model Peter Caunt & Bernard Planterose June 2017 www.thousandhuts.org

More information

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models

Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models Sturdi-Wall Design Manual for SW46, SW66, SW63, SW64, SW60, SW83, SW84, and SW80 Models Project Number ME086-05 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com January

More information

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints

DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints Easy Step by Step Guide DIY SHED GUIDE Planning your Project I Simple Illustrations I Hints TIMBERLINK. MADE OF TASMANIA. DIY Shed Guide Timberlink Green Outdoor Structural Range Timberlink Green Outdoor

More information

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ ASSEMBLY INSTRUCTIONS SYSTEM SUPER 1.5 EZ Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your

More information

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Guide A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Details A B C D F E A Masonry Wall Connection Details Blockwork

More information

rondo exangle drywall finishing sections

rondo exangle drywall finishing sections rondo exangle drywall finishing sections SUMMARY The EXANGLE range of building board finishing profiles are designed to give plasterers a clean, defined edge on straight or curved details for internal

More information

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST Set A Set B PFD60 Fire Door Kit FITTING INSTRUCTIONS IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST SUGGESTED

More information

A Shell construction

A Shell construction A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill

More information

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose

More information

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.

Call (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements. Call (770) 777 7007 Structural Deck Support System: Product Numbers: H1-GQ, H2-GCL (Also applies to H1-GK and H2-GCR) STEP 1: Following the spacing guidelines per the deck design and joist layout, mark

More information

DUTCH GABLE FREESTANDING CARPORT

DUTCH GABLE FREESTANDING CARPORT DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If

More information

Safety Anchor. Your ultimate source of stability and security THE UP TO 88% ENERGY REDUCTION THE SAFETY ANCHOR SYSTEM

Safety Anchor. Your ultimate source of stability and security THE UP TO 88% ENERGY REDUCTION THE SAFETY ANCHOR SYSTEM THE SAFETY SYSTEM THE Safety Anchor Your ultimate source of stability and security Safety Anchors are excited to introduce our enhanced range of innovative anchors. Safety Anchor will incorporate superior

More information

Joshua Woodsman

Joshua Woodsman CONSTRUCTION GUIDE of one of our design Please Note This electronic document is protected by the identifier against unauthorized dissemination on the Internet. Before building any structure make sure you

More information

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs.

Fibre Cement G C. Batten Fixing Setout ST-01. Jan 2014 A4 PROFILE DATE SCALE DETAIL DETAIL NO. Plank joint. 600mm stud crs. Plank joint 600mm stud crs 600mm 600mm 600mm Horizontal Structural Timber Cavity atten 50x20mm H3.1 atten fixing points 800mm 800mm 300mm 800mm Max. Nog spacing 50mm All intermediate battens to be 50x20mm

More information

602.4, TABLE 602.4, , , , , , , , , TABLE

602.4, TABLE 602.4, , , , , , , , , TABLE 602.4, TABLE 602.4, 602.4.1, 602.4.2, 602.4.3, 602.4.4, 602.4.5, 602.4.9, 2304.11, 2304.11.1, TABLE 2304.11.1.1, 2304.11.2, 2304.11.3, 602.4.8, 602.4.8.2, 602.4.8.1, 602.4.6, 602.4.6.2, 602.4.6.1, 2304.11.4,

More information

ENGINE CRATE FABRICATION

ENGINE CRATE FABRICATION I have been often asked about building a crate to ship an engine. Below is one crate I built and some information that should make it easier for you to build such a crate. Please be aware that the 600

More information

XIAMEN MIBET NEW ENERGY CO., LTD SOLAR PANEL SUPPORT FRAME MRAC ANGLE-ADJUSTABLE MOUNTING SYSTEM FOR METAL CLAD FLAT ROOF

XIAMEN MIBET NEW ENERGY CO., LTD SOLAR PANEL SUPPORT FRAME MRAC ANGLE-ADJUSTABLE MOUNTING SYSTEM FOR METAL CLAD FLAT ROOF Project number: Xiamen Mibet New Energy Co., Ltd. No. 69 Xintian Road Jimei District Xiamen China Attention : Cathy Xu. Dear Madam, RE: XIAMEN MIBET NEW ENERGY CO., LTD SOLAR PANEL SUPPORT FRAME MRAC ANGLE-ADJUSTABLE

More information

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

Versatrim Side-Snap Frame

Versatrim Side-Snap Frame Versatrim Side-Snap Frame net door width finished opening width rough opening width (finished opening width plus 1 1/2") Figure 1 Cross section of strike and hinge jambs The rough opening width is equal

More information

Garage Design Guide. October 2018

Garage Design Guide. October 2018 Garage Design Guide October 2018 The Corporation of the Township of Hamilton 8235 Majestic Hills Drive, P.O. Box 1060, Cobourg Ontario K9A 4W5 Tel: 905-342-2810 Fax: 905-342-2818 Email: Tim Jeronimus (Chief

More information

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES

HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES HOME STRENGTHENING GUIDE HOW TO ECONOMICALLY STRENGTHEN YOUR HOUSE AGAINST EARTHQUAKES AND HURRICANES Grenville W Phillips II BSc, BEng, MASc, MURP, CEng, FIStructE, FCIHT, MAPM, MCSCE, MBAPE Chartered

More information

INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1515

INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1515 INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1515 Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these instructions and properly

More information

INTUBATT FLOOR/CEILING SYSTEM & BOXOUT SYSTEM FOR FRL 120/120/120 RISF 120 INSTALLATION GUIDE

INTUBATT FLOOR/CEILING SYSTEM & BOXOUT SYSTEM FOR FRL 120/120/120 RISF 120 INSTALLATION GUIDE INTUBATT FLOOR/CEILING SYSTEM & BOXOUT SYSTEM FOR FRL 120/120/120 RISF 120 INSTALLATION GUIDE Intubatt Floor/Ceiling System Installation For sales and technical support please go to: www.tbafirefly.com.au

More information

HUS 6 Screw anchor, Redundant fastening

HUS 6 Screw anchor, Redundant fastening HUS 6 Screw anchor, Anchor version HUS-A 6 Carbon steel Concrete Screw with hex head HUS-H 6 Carbon steel Concrete Screw with hex head HUS-I 6 Carbon steel Concrete Screw with hex head Benefits - Quick

More information

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND

Flanged Dowel Box. Load Transfer System INDUSTRIAL SLAB ON GROUND Flanged Dowel Box INDUSTRIAL SLAB ON GROUND Designed for construction joints in Post Tension or large shrinkage specifications Large lateral movement and expansion capacity Eliminates the need to drill

More information

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7

The WANZ Guide to Window Installation. as described in E2/AS1 Amendment 7 The WANZ Guide to Window Installation as described in E2/AS1 Amendment 7 1 November 2017 Version 1.4 0800 397 263 technical@altus.co.nz The WANZ Guide to Window Installation as described in E2/AS1 Amendment

More information

Strong, lightweight composite structural I -Beam.

Strong, lightweight composite structural I -Beam. Strong, lightweight composite structural I -Beam. This Installation Guide has been prepared as a source of information to provide general guidance to consultants and in no way replaces the services of

More information

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS ASSEMBLY INSTRUCTIONS Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your cyc, so please take

More information

Exterior Wall Fastener Schedule

Exterior Wall Fastener Schedule City of Republic Community Development Department Exterior Wall Fastener Schedule REVISION DATE: JANUARY 2017 Design and construction (2012 IRC Section R602.3): Exterior walls of wood frame construction

More information

Building for High Wind Resistance in Light-Frame Wood Construction

Building for High Wind Resistance in Light-Frame Wood Construction Building for High Wind Resistance in Light-Frame Wood Construction DESIGN GUIDE Meeting the Challenge of High Wind Design Designing a structure to withstand the devastating forces of tornados is one of

More information

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030

INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr. MODEL No: GSS3030 INSTRUCTIONS FOR: GALVANIZED STEEL SHED 3 x 3 x 2.1mtr MODEL No: GSS3030 Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these instructions

More information

INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1508

INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1508 INSTRUCTIONS FOR: GALVANIZED STEEL SHED MODEL No: GSS1508 Thank you for purchasing a Sealey product. Manufactured to a high standard this product will, if used according to these instructions and properly

More information

Definitions and Design Considerations... W-CR-2

Definitions and Design Considerations... W-CR-2 General Information SECTION DIRECTORY Definitions and Design Considerations... W-CR-2 Combination Assembly Recommendations and Limitations Typical Sealant... W-CR-4 Single-Unit Opening... W-CR-4 Two-Way

More information

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs

Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs Storage and Installation of welded LL Hollow Metal Door Frames in Steel Studs Introduction This guide specification is intended to stress the necessary precautions and requirements for receipt, storage,

More information

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT

TRADITIONAL GABLE ATTACHED PATIO AND CARPORT. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT TRADITIONAL GABLE ATTACHED PATIO AND CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building an ATTACHED Outback TRADITIONAL GABLE PATIO or CARPORT BEFORE YOU START Carefully read

More information