Technical Manual. ceiling - Seamless

Size: px
Start display at page:

Download "Technical Manual. ceiling - Seamless"

Transcription

1 Technical Manual

2

3 1. Introduction 1.1 General flex - Ceiling is an autoclave cellulose fibre reinforcement cement ceiling board manufactured by Hume Cemboard Industries Sdn Bhd, an ISO9001 and ISO14001 certified company. The basic compositions comprised of portland cement, cellulose fibre, fine ground sand and water. is a ceiling system complete with the supply of fasteners, jointing compound, perforated paper tape interlocking clip and ceiling batten by HCI utilising the flex - Ceiling board. 1.2 Application The is specially designed for internal & external ceiling application. It helps to diminish the usual array of problems such as water stains, mould, termite, fire and abrasive external weather conditions. However, the installers must ensure that the product meets the aesthetic requirement before installation. HCI will not be responsible for rectifying aesthetic surface variations upon installation. For internal usage, balconies, eaves, soffits and low rise external (4 stories height); it is recommended to use ceiling batten as the framing. For external high rise (above 4 stories height), it is recommended to use the Lexington Heavy Duty Ceiling System or other heavy duty ceiling batten system that s available. The installer is responsible to consult with Lexington s Expertise or other heavy duty ceiling system manufacturer prior to installation. 1.3 Features and Benefits Aesthetically-Appealing Low Maintenance Durable Mould Resistant Environmentally-Friendly Termite Resistant Hazard Free Weather Resistant Resistant to Moisture (water permeability, warm water, soak dry & heat rain) 1.4 Tests and Certification flex - Ceiling meets the national and international fibre cement standards, namely MS1296, ISO 8336, BS EN and ASTM C1186. It also meets the Fire Resistant Class O requirement. Rebated Area 1.5 Standard Size and Mass flex - Ceiling meets the national and international fibre cement standards, namely MS1296, ISO 8336, BS EN and ASTM C1186. It s also meets the Fire Resistant Class O requirement. Length (mm) Width (mm) Thickness Approx. Mass (kg/m2) Edge sides rebated 01

4 2. Accesories / Tools 2.1 Components Supplied by Hume Cemboard Industries ceiling batten Use ceiling batten which is a Light Gauge Cold Formed Galvanized Steel C-Section 38mm (width) x 12mm (depth) x 0.35mm (total coated thickness). It is rolled steel structure used for ceiling hanger, ceiling main runner, ceiling joist and ceiling nogging. interlocking clip Use interlocking clip which is Light Gauge Pre- Pressed Galvanized Steel with 0.5mm total coated thickness. It is used as the clip between the runner batten and joist batten. fastener - Needle Point Countersunk self-embedding head needle point, No 6 x19mm long. It is used for all fastening in, included fastening ceiling battens, fastening to ceiling battens (joist & nogging). jointing compound Appearance: White paste, 28kg / pail Drying time at EMC: 2 hrs, depending on the surrounding condition. Mix with 10% white cement mixing ratio to conceal the jointing recessed and square edge area and fastener heads to prevent moisture penetration and flat surface for decorative finishing. The jointing compound must be applied according to the jointing compound Technical Data Sheet (TDS). perforated paper tape 50mm x 150m / roll. Joint reinforcement paper tape used with flex - Ceiling sheets. access panel Available in 2 sizes, 450x450mm & 600x600mm in 3.5mm board thickness. scoring knife Use only Taping Tool that s provided by Hume Cemboard Industries for flush jointing application using perforated paper jointing tape. 02

5 2.2 Components / Tools which not supplied by Hume Cemboard Industries Hume Cemboard Industries recommends the following components and tools to be used in conjunction with flex - Ceiling sheets. Hume Cemboard Industries does not supply these components or a warranty. Please contact respective component manufacturers for information on warranties and information. Paintable Polyurethane Sealant Suitable Paintable Polyurethane is to be used in expansion joint and gaps between wall and ceiling board. It can be applied at internal & external areas. Recommended to use Bostik Seal N Flex 1. Backing Tape Backing tape is used to prevent the sealant from directly being attached to the ceiling joist / nogging It is applied on to the ceiling joist / nogging before installing the board at the gap area. Scrapper For flush jointing application purposes and removal of excessive compounds from the panel surface, the recommended size of the scrappers are 4 (100mm) and 6 (150mm) Pen Knife Tool for easy cutting of flex - Ceiling sheets. Scoring Knife Tool for easy scoring of flex - Ceiling sheets. Cordless Knife Use only cordless driver with adjustable torque selection. It s a requirement that the installer needs to check and select the suitable torque speed to prevent over fastening during the board installation. 03

6 3. Ceiling Installation 3.1 ceiling batten FRAMING INSTALLATION a. Install the ceiling hanger at 900mm c/c (max.). b. Install the ceiling runner at 610mm c/c (max.) span between 2 runners and fasten to ceiling hanger. c. Install the ceiling joist at 407mm c/c (max) span between 2 perpendicular joists and lock it using the interlocking clip to the runner batten. d. For ceiling joist, at the board jointing, adjust the joist to be at the centre of 2 joining boards. e. Ensure the ceiling runners & joists are reasonably flat and level. f. Kindly refer to Figure 1 for the ceiling batten installation guide and specification. g. The joists at ceiling parameter should be installed at 50mm (max.) gap from wall. h. A nogging is required at 1220mm board joint. Kindly refer Figure 1, Detail C. Use ceiling batten manually flange pre-cut as nogging to fit perpendicular of web to the joist. The nogging is installed by slotting in the back of the board and then fasten the board to nogging accordingly as shown in Figure 2. Fastener is not required for the ceiling nogging to joist as it will create additional gap to the flush joint area. i. All the ceiling battens are fastened using the fastener - Needle Point screws. 100mm 900mm max. c/c Ceiling 407mm c/c Ceiling 610mm max. c/c c ceiling batten mm 900 c/ ax. m 900mm max. c/c 61 Wall 0m m ma Interlocking clip Main 900mm max. c/c xc /c 2mm 34mm x12mm x 0.3mm nominal TCT for Ceiling Hanger, Ceiling Main Runner, Ceiling Joist, Ceiling Nogging and Protrusion Line Ceiling 50mm from side end Support batten soffit of slab or fixed to roof truss flex - Ceiling 1220mm(W) x 2440mm(L) x 3.5mm(T) 50mm 34m m 100mm 900mm max. c/c 50 mm 61 0m m DETAIL A ma x. c Board joint mm 40 mm DETAIL C 1220mm(W) x 2440mm(L) x 3.5mm(T) (Long sides edges to be laid parallel to ceiling joist) m 7m /c m 7m Ceiling 610mm max. c/c Wall Ceiling 407mm c/c 50mm DETAIL B Ceiling nogging Interlocking clip Ceiling nogging joist Board joint Runner DETAIL B Figure 1: DETAIL C ceiling batten guide & specification. Slot in the nogging then only fasten it Figure 2: Installation of ceiling nogging mm max. c/c Ceiling 407mm c/c Ceiling 50mm from side end Main 900mm max. c/c Support batten soffit of slab or fixed to roof truss

7 Flush Jointing Method 3.2 Board Installation board are to be in dry condition when installed. If board is wet, please allow it to dry. Board in wet condition is difficult to install because they are heavier and will have tendency to break due to moisture that is still retained in the board INSTALLATION a. Install board at along the ceiling joist in a staggered pattern. Refer to Figure 3. b. At least 2 workers are required for board installation. Workers are required to hold the board on each side. Fasten the board from center to side, refer to Figure 4. This will minimize the board undulating effect. c. Fasten the board to ceiling joist as per Figure 3. The fasteners distance is at 200mm c/c maximum at board edges and 300mm c/c maximum at board center for internal and external. Use only fastener - Needle Point screws. d. Fasten the board 12mm minimum from edge and 50mm minimum from corners as shown in Figure 3. e. All fasteners must be embedded into the board. Use the scrapper to check the fasteners levelness. 610mm max. c/c Ceiling nogging Ceiling 407mm c/c Ceilling 610mm max. c/c 407mm max. c/c 12mm min. 50mm min. 300mm 1220mm 407mm 300mm 200mm 407mm 407mm 300mm 2440mm Figure 3: Board installation layout Side Side Center Side Side Fastening start from center to side Figure 4: Board fastening method 05

8 3.2.2 FLUSH JOINTING (At Board Jointing Areas & Fasteners) It is recommended to do the flush jointing when all the lighting fittings opening / manhole opening are completed. Prepare the jointing compound by mixing jointing compound with 10% White Cement. The allowable working period for the mixed jointing compound is 3 hourrs maximum. a. Use damp sponge to clean the board jointing surface and ensure the board surface is free from dust. b. Embed the perforated paper tape with jointing compound using the taping tool along the recessed joint area. c. Press and distribute the excessive jointing compound from the perforated paper tape using 150 mm scrappers. Immediately apply another jointing compound (approximately 150 mm wide) using 150 mm scrapers onto the perforated paper tape. Ensure the perforated layer of paper tape is fully covered by jointing compound. d. Do not over flush the jointing compound. The recommended times for flushing is 5. e. To flush onto fastener points, apply first and second layers of jointing compound. f. Ensure the fastener points are smooth. g. When dry (duration about 4 to 6 hours, depending on the surrounding condition and compound thickness), lightly scrap away the uneven surface of the flush joint areas and fasteners areas using scrapper to get an even finish before any finishing. Apply another layer of jointing compound if necessary. Refer to Figure 5 for flush joint detail. (Butt joint) moderate contact 1220mm(W) x 2440mm(L) x 3.5mm(T) Ceiling joist / ceiling nogging First coat jointing compound (Approximatery 100mm wide) perforated paper tape embeded in jointing compound (apply using Taping tool) Second coat jointing compound (Approximatery 150mm wide) Figure 5: Flush Joint Detail 06

9 4. Expansion Joint Expansion joints for is required in long runs of both directions. These joints are correspondence to thermal expansion between ceiling systems with supporting structure or any significant structural movement is expected. Expansion joint should be provided at every 9.0m. For installation under roof spaces less than 600mm, the expansion joint must be reduced to 6.0m for insulated ceilings and 3.6m for uninsulated ceilings in both direction. Put a backing tape (or any tape, just to prevent the sealant from directly attached to ceiling joist / nogging) on the ceiling joist / nogging before installing the board. Provide minimum 5mm wide gap between sheets and seal with paintable Polyurethane Sealant (Bostik Seal N Flex 1). Do not jointing compound at the control joint. Refer Figure 6 for expansion joint installation. apply Polyurethane PU Sealant Ceiling joist / ceiling nogging fastener - Needle Point 1220mm(W) x 2440mm(L) x 3.5mm(T) 5mm min. Backing tape Figure 6: Expansion Joint Installation 5. Side Elevation Side / edge installation can be either using protrusion line, shadow line trim or paintable PU sealant. 5.1 Protrusion Line Finishing at Ceiling to Wall Edges The installation of protrusion line finishing using for protrusion line finishing installation drawing. ceiling batten only can only be done after the ceiling frames are levelled. Refer Figure 7 a) Put a piece of off cut ceiling board to the aligned ceiling joist and mark the level of the board that touches the wall. b) Install the ceiling batten above the marked line approximately 3-4mm. flex - Ceiling board into the c) Slot the without any gap. ceiling batten that is attached to the wall surface. The flex - Ceiling board is tight fitted d) If any noticeable gap on the protrusion line finishing, white paintable sealant (Bostik Seal N Flex 1) can be used to cover it. Anchorage / Fastener Ceiling 407mm max. c/c fastener - Needle Point 1200mm(W) x 2440mm(L) x 3.5mm(T) ceiling batten Protrusion Line Figure 7: Protrusion Line Finishing Installation 07

10 5.2 Shadow Line Finishing at Ceiling to Wall Edges For shadow line installation, kindly refer to Figure 8. A shadow line stopping angle is required. a) At wall to ceiling edges, slot in the shadow line stopping angle. b) Fasten the shadow line stopping angle together with the flex - Ceiling and ceiling joist. Ceiling 407mm c/c fastener Needle Point 1220mm(W) x 2440mm(L) x 3.5mm(T) Shadowline stopping angle Figure 8: Shadow Line Trim 5.3 Paintable Sealant Finishing at Ceiling to Wall Edges For edge paintable sealant installation, a 6mm gap is required to be filled with paintable PU sealant. (Bostik Seal N Flex 1) Kindly refer to Figure 9. a) Apply the paintable PU sealant to the gap between walls to ceiling as per manufacturer s recommendation. b) Allow the sealant to fully cure / dry prior to painting. Ceiling hanger Ceiling 900mm max. c/c Ceiling 407mm c/c fastener - Needle Point 1220mm(W) x 2440mm(L) x 3.5mm(T) 6mm gap filled with Paintable PU sealant Figure 9: Paintable PU Sealant 08

11 6. Panel Finishes 8. Working Instruction Prior to application of paint finishes, remove any jointing compound residual and ensure the ceiling surfaces are dry. The water-based acrylic paint should be applied 2 layers minimum. Make sure the board surface is in smooth condition and free from dust or any contaminant prior to painting. Coating should be completed within 1 month from the board installation. Gloss paints are not recommended. Always follow the paint manufacturer s recommendation for paint suitability, mixing and application. 8.1 Cutting 7. Glancing Light Cutting must be carried out in a well-ventilated area using following method: Score and snap - Score the sheet with scoring knife. Repeat until depth reaches 1/3 sheet thickness. Snap sheet upward to achieve clean break. Trim cut edge with rasp if necessary. - Normal pen knife can also be used in score and snap method. In some installation areas, the glancing light may be noticeable in board joints. Thus, try to avoid using high gloss level paint for ceiling system. Work closely with the ceiling contractors to minimize this glance appearance. The effect of glance light can be reduced by using curtains or blinds to block the direct light at ceiling areas, artificial light shading devices or use light/ matt finished paints. 8.2 Drilling Small holes can be formed using high-speed (HSS) drill bits. Larger circular holes can be created by drilling a series of small holes around the perimeter of the proposed hole, and gently tapping out the waste piece. Smoothen the rough drilled edge with rasp if necessary. 8.3 Handling and Storage flex - Ceiling must be stacked on flat ground and supported with level bearers prior to installation. Ensure all timber bearers of a stacked sheet are aligned with other stacks. Improper sheet stacking may result in permanent sheet deformation that causes unsightly appearance such as undulating. flex - Ceiling must always be kept dry, preferably stored under a protected shade. When stored outdoors, it must be protected from water ingress and and weather by covering the board with tarpaulin sheet. Allow wet sheet to reach equilibrium under a natural ventilated condition prior to installation. 9. Best Practice for PRIMAceiling Seamless Aside from the normal installation guide, installers are recommended to refer the Best Practice guide for on the following items below: Downlight Installation Exhaust Fan Installation Manhole Installation Heavy Ceiling Light Fitting / Ceiling Fan Installation Air Conditional Cassette Unit Installation Repairing of Opening Hole Heavy Duty Ceiling System 09

12 50 Years 50 Years Durability WARRANTY Hume Cemboard Industries Sdn Bhd ( the Company ) warrants that it will at all times ensure that the products referred to herein ( the Products ) shall be supplied by it to the purchaser free of any manufacturing defects and defective materials used in their manufacture. In the event and if contrary to this assertion the Products prove to be defective, whether as a result of manufacturing defects or arising from the Company s use of defective materials, the Company will supply replacement Products. The Company shall, however, have the option and may choose to reimburse the purchaser the purchase price of the Products instead. The Company shall not be liable for any economic or consequential losses arising from any use of defective Products. This warranty shall be void unless the purchaser has, in its handling and installation of the Products, complied with the recommendations contained in this brochure and other good building practices expected of a reasonable purchaser. ADVISORY NOTE Successful installations of Hume Cemboard Industries Sdn Bhd s Products depend on a large number of factors that are outside of the scope of this brochure. Particular design, detail, construction requirements and workmanship are beyond the control of the Company. As such, Hume Cemboard Industries Sdn Bhd s warranty does not extend to non-usability of Products or damage to Products arising from poor or defective designs or systems or poor quality of workmanship in the installation of Products. For more information, please contact us at: No. 12 Jalan Tandang, Petaling Jaya, Selangor, Malaysia. Malaysia Sales Tel: Fax: sales@humecemboard.com.my Oversea Sales Tel: Fax: exporthci@humecemboard.com.my V2

Contents. Multi Functions Board

Contents. Multi Functions Board Technical Manual Contents Multi Functions Board Eco-friendly fibre cement flat sheets for ceiling, eaves & soffit lining, wall cladding, flooring, partition, roof sarking, water tank support and permanent

More information

UCO Vistabord Fixing Manual

UCO Vistabord Fixing Manual UCO Vistabord Fixing Manual UCO Multiflex UCO Flexabord Fibre Cement Board WALLS & CEILINGS Ceiling soffit using Vistabord at Suria KLCC, Malaysia. UAC BERHAD (5149-H) his sign endorses that the product

More information

Timber Appeal. With Fibre Cement Durability

Timber Appeal. With Fibre Cement Durability Timber Appeal With Fibre Cement Durability ENVIRONMENTAL FRIENDLY Minimises the cutting down of trees for timber. Raw material from managed resources. DIMENSIONALLY STABLE An autoclaved composite material

More information

Installation Guide. Versilux Lining INTERIORS

Installation Guide. Versilux Lining INTERIORS Installation Guide Versilux Lining INTERIORS Australia June 2018 Make sure your information is up to date. When specifying or installing James Hardie products, ensure that you have the current technical

More information

INSTALLATION MANUAL AUSTRALIA FEBRUARY 2005

INSTALLATION MANUAL AUSTRALIA FEBRUARY 2005 INSTALLATION MANUAL AUSTRALIA FEBRUARY 2005 1 INTRODUCTION CONTENTS 1 INTRODUCTION 2 2 SAFE WORKING INSTRUCTIONS 4 2.1 Cutting 4 2.2 Score and Snap 4 2.3 Fibreshear Heavy Duty by Toolex 4 2.4 Hand sawing

More information

Installation Guide. PineRidge Lining INTERIORS

Installation Guide. PineRidge Lining INTERIORS Installation Guide PineRidge Lining INTERIORS Australia August 2018 Make sure your information is up to date. When specifying or installing James Hardie products, ensure you have the current installation

More information

Installation Guide. Villaboard Lining INTERIORS

Installation Guide. Villaboard Lining INTERIORS Installation Guide Villaboard Lining INTERIORS Australia June 2018 Make sure your information is up to date. When specifying or installing James Hardie products, ensure that you have the current technical

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

DYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals

DYNEX SOFFIT SYSTEM. Product. Scope. Building Regulations. Appraisal No. 908 [2016] Appraisal No. 908 (2016) BRANZ Appraisals DYNEX SOFFIT SYSTEM BRANZ Appraisals Technical Assessments of products for building and construction. Dynex Extrusions Limited PO Box 19-133 Avondale Auckland Tel: 09 828 2800 Fax: 09 828 2801 Web: www.dynex.co.nz

More information

Installation Manual for Thermo Panel

Installation Manual for Thermo Panel Installation Manual for Thermo Panel 1 About Thermo Panel is a building wrap, insulation, air and water barrier, mold inhibitor and cold bridge eliminator all-in-one. Delivering an R-value of up to 5 on

More information

Ignitability Index Spread of Flame Index Heat Evolved Index Smoke Developed Index. Range 0-20 Range 0-10 Range 0-10 Range

Ignitability Index Spread of Flame Index Heat Evolved Index Smoke Developed Index. Range 0-20 Range 0-10 Range 0-10 Range (Expressed Panel Facade System) is a versatile, glass fibre-reinforced, recycled wood fibre and magnesium cement based cladding. The panels are fabricated from a combination of recycled timber materials,

More information

Shapes Siding. Perfection Shingles. Chalk Line

Shapes Siding. Perfection Shingles. Chalk Line Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter

More information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information

LP SmartSide Soffit ON SITE STORAGE PREPARATION. Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture. General Information Application Instructions Vented and Non-Vented Smooth Finish or Cedar Texture A B A - Open / Closed (Page 5) B - Vented (Page 6) ON SITE STORAGE Store off the ground well supported, on a flat well-drained

More information

Axent FASCIA. Installation Manual AUGUST 2014 I NEW ZEALAND

Axent FASCIA. Installation Manual AUGUST 2014 I NEW ZEALAND Axent FASCIA Installation Manual AUGUST 2014 I NEW ZEALAND Content 1 INTRODUCTION 3 2 SAFE WORKING PRACTICES 5 Warning 5 Recommended safe working practices 5 Working instructions 6 HardieBlade saw blade

More information

Loose Lay Luxury Vinyl Plank

Loose Lay Luxury Vinyl Plank Loose Lay Luxury Vinyl Plank FLEX COLLECTION Installation & maintenance * PLEASE READ CAREFULLY * Installation, maintenance & warranty guideline for loose lay luxury vinyl products. Adherence to This guideline

More information

CEILINGS INSTALLATION GUIDE

CEILINGS INSTALLATION GUIDE Your partner in building solutions CEILINGS INSTALLATION GUIDE Your partner in building solutions General remarks on Eterpan Ceilings This installation guide is to be used in conjunction with: Pacific

More information

4256HM JAMES HARDIE MONOLITHIC CLADDING

4256HM JAMES HARDIE MONOLITHIC CLADDING 4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James

More information

INTERNAL LININGS INSTALLATION GUIDE

INTERNAL LININGS INSTALLATION GUIDE Your partner in building solutions INTERNAL LININGS INSTALLATION GUIDE General remarks on This installation guide is to be used in conjunction with: specifications Architects specific details Pacific Build

More information

Contents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit

Contents. Installation Guide. Dynex Soffit Installation Guide V03 March The Smart Choice in Soffit The Smart Choice in Soffit Installation Guide Looks great - A contemporary tongue and groove styled soffit, with hidden fixings, that provides a versatile and sleek lining complimenting a range of building

More information

Installation Instructions

Installation Instructions www.marlite.com Effective Date 03/01/2018 ARTIZAN FRP, SYMMETRIX FRP, ENVUE FRP, STANDARD FRP Installation Instructions Statements expressed in this technical bulletin are recommendations for the application

More information

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines

Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines Resysta 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

The Passive Fire Protection Handbook

The Passive Fire Protection Handbook Uniclass L5:P:N3 CI/SfB Rf9 EPIC E:X:Y41 (K)+(K3) December 003 NBSPlus The Passive Fire Protection Handbook SUPALUX SUPALUX Applications Timber and steel frame partitions Single skin solid wall Fire protection

More information

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system

Posi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Guide A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Details A B C D F E A Masonry Wall Connection Details Blockwork

More information

WARNING. Not suitable for children under 36 months Contents

WARNING. Not suitable for children under 36 months Contents For domestic and family use only Children of any age should not be left to play unsupervised Retain Instructions for future reference WARNING. Not suitable for children under 36 months Contents Length

More information

Finishing Plasterboard

Finishing Plasterboard Finishing Plasterboard 4.1 Levels of Finish 346 Australian Standard Requirements 346 Level 3 Finish 347 Level 4 Finish 347 Level 5 Finish 347 4.2 Back-Blocking 348 Back-Blocking Requirements 349 Back-Blocking

More information

SECTION BULLET- RESISTANT DOORS

SECTION BULLET- RESISTANT DOORS 1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Crosshook 3S CrossHook 4S GB Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 2

More information

rondo exangle drywall finishing sections

rondo exangle drywall finishing sections rondo exangle drywall finishing sections SUMMARY The EXANGLE range of building board finishing profiles are designed to give plasterers a clean, defined edge on straight or curved details for internal

More information

PANEL INSTALLATION GUIDE

PANEL INSTALLATION GUIDE GUIDE The Manufacturer has provided these instructions as installation guidelines in accordance with ASTM E-330. The manufacturer, however neither installs the panels nor has any control over the installation.

More information

The Passive Fire Protection Handbook

The Passive Fire Protection Handbook Uniclass L5:P:N3 CI/SfB Rf9 EPIC E:X:Y41 (K)+(K3) December 003 NBSPlus The Passive Fire Protection Handbook MASTERBOARD MASTERBOARD Applications Partitions Ceilings Wall and roof linings Soffit, porch

More information

Vinyl Windows Manufactured by VPI Quality Windows

Vinyl Windows Manufactured by VPI Quality Windows Vinyl Windows Manufactured by VPI Quality Windows Part Number: 531&591 Installation 531 & 591 SERIES SLIDING AND HUNG WINDOW INSTALLATION INSTRUCTIONS Installation Instructions for Typical Construction.

More information

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008)

SPECIFICATION FOR. BRANZ Appraisal Certificate # 621 (2008) SPECIFICATION FOR TEKTON WEATHERIZATION SYSTEM BRANZ Appraisal Certificate # 621 (2008) MW TWS 10/07/2012 Page 1 SYSTEM DESCRIPTION The Tekton Weatherization System consists of TEKTON Wall Underlay, Tekton

More information

PRIMED STRAND REVERSIBLE SHAKE

PRIMED STRAND REVERSIBLE SHAKE PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems

More information

JAMES HARDIE RIGID AIR BARRIERS

JAMES HARDIE RIGID AIR BARRIERS Product 1.1 James Hardie Rigid Air Barriers are a range of rigid wall underlay materials including RAB Board and HomeRAB Pre-Cladding. They are sealed fibre cement sheets designed for use as rigid wall

More information

Vanity Installation Instructions

Vanity Installation Instructions Vanity Installation Instructions Segments of these instructions will relate to your vanity. Please read these instructions thoroughly and ensure the appropriate instructions are used during the installation

More information

Horizontal Shaft Wall

Horizontal Shaft Wall SYSTEMS 317 INSTALLATION 319 GENERAL REQUIREMENTS 319 FRAMING 319 PLASTERBOARD LAYOUT 320 PLASTERBOARD FIXING 320 CONSTRUCTION DETAILS 321 Horizontal Shaft Wall Horizontal Shaft Wall is constructed in

More information

March High performance building boards

March High performance building boards CI/SfB March 2009 (4-) Rf9 High performance building boards High performance building boards Contents 3 Product Selector 4-5 Bluclad 6-7 Hydropanel 8-9 Eterboard 10-11 Duripanel 12 Handling & Storage 2

More information

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS.

RENU PANELING SYSTEM Installation Guide PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. Version 1.0 ALL STATED SIZES ARE NOMINAL DIMENSIONS. RENU PANELING SYSTEM Installation Guide Version 1.0 PLEASE READ GUIDE COMPLETELY BEFORE ASSEMBLY. ALL STATED SIZES ARE NOMINAL DIMENSIONS. Components Trim Track (TT) 1" x 1 3 4" (GER3TTAA): fastens to

More information

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE)

THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) THERMO-FIT REPLACEMENT WINDOW INSTALLATION INSTRUCTIONS (BRICKMOULD / NO NAILING FLANGE) fig.3 Casement, Awning, Fixed Casement, Direct-Set, Double-Hung, Single-Hung & Horizontal Slider Windows Materials

More information

Installation Manual for M4-Exterior Sheathing

Installation Manual for M4-Exterior Sheathing Installation Manual for M4-Exterior Sheathing 1 Application Area - Testing M4 complying with: 2015 and 2012 International Building Code (IBC) and 2015 and 2012 International Residential Code (IRC). The

More information

4. Metal roof jacks at penetrations and attachments

4. Metal roof jacks at penetrations and attachments - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - SECTION 07 61 00 METAL SHINGLE ROOFING - - - - - - - - - - -

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS CERBER FIBER CEMENT SIDING - SIERRA PREMIUM SHAKE Construction Requirements Sierra Premium Shake boards must be installed over vertical wood framing spaced no greater than 16 oc. with an APA rated 7/16

More information

AquaGuard - Water Resistant Flooring Installation guidelines

AquaGuard - Water Resistant Flooring Installation guidelines AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important

More information

HR175 Sash Replacement Kit Installation Instructions

HR175 Sash Replacement Kit Installation Instructions HR175 Sash Replacement Kit Installation Instructions IMPORTANT: Please read before you begin. Weather Shield HR175 Sash Replacement Kits Important: Thoroughly read and follow these instructions, failure

More information

STEEL FRAMING WEATHERBOARD SYSTEM

STEEL FRAMING WEATHERBOARD SYSTEM T A R A NAK IPINE STEEL FRAMING WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz T A R ANAKIPINE

More information

Playaway Swiss Cottage Assembly Instructions

Playaway Swiss Cottage Assembly Instructions Playaway Swiss Cottage Assembly Instructions English SS288C IMPORTANT SAFETY INFORMATION Adult assembly is required. Checks and maintenance needs to be carried out on the main parts (fixings etc.) at regular

More information

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February

LUX INSTALLATION GUIDE. LUX Panel V Groove Installation. Installation Guide. February LUX Panel V Groove Installation Installation Guide February 2017 www.luxpanel.ca LUX Panel V Groove Installation LUX panel steel cladding is designed to be installed vertically, horizontally, diagonally

More information

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4.

Ulltraclad Aluminium Cladding. Contents. 1.0 General Information Design Information Installation Information 7. 4. Ulltraclad Aluminium Cladding Contents 1.0 General Information 2 2.0 Design Information 4 3.0 Installation Information 7 4.0 Maintenance 10 5.0 Health & Safety 10 1 1.0 General Information 1.1 Introduction

More information

Installation instructions: Elements Vulcan+ Newport Hector Cladding

Installation instructions: Elements Vulcan+ Newport Hector Cladding Technical Data Wood Species Thermally Modified Softwood (Pinus Radiata) Images Profile Newport Hector - Light Band Sawn face - Secret fix 5.4 6.0 8.5 3.0 25.0 3.0 111.0 3.0 12.0 R 3.0 7.0 7.0 123.0 15.0

More information

DurasheetTM Fibre Cement

DurasheetTM Fibre Cement DurasheetTM Fibre Cement fibre cement sheets Durasheet TM - tough and durable Build it better with BGC Australian Owned & Manufactured www.bgc.com.au/fibrecement History & Mission BGC Fibre Cement and

More information

Cablelink Plus Flush Technical

Cablelink Plus Flush Technical Cablelink Plus Flush Technical 107 technical hotline +44 (0)1268 563720 screeded floor systems is designed to provide power and data distribution highways in screeded floors. The robust system offers a

More information

Installation Guide. ExoTec TM Facade Panel And Fixing System COMMERCIAL

Installation Guide. ExoTec TM Facade Panel And Fixing System COMMERCIAL Installation Guide ExoTec TM Facade Panel And Fixing System COMMERCIAL Certificate CM40221 Australia April 2018 Make sure your information is up to date. When specifying or installing James Hardie products,

More information

Effective February, 2015

Effective February, 2015 Effective February, 2015 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning

More information

Installation guide for 20/20

Installation guide for 20/20 Introduction The following installation instructions are recommended minimum requirements for the 20/20. The designer and fixer should ensure that tiles are installed in accordance with BS 5534; The British

More information

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales

Installation Guide. Guardian Slate Roof System. England, Scotland & Wales Installation Guide Guardian Slate Roof System England, Scotland & Wales March 2016 Product Information Construction: Manufactured from resin bonded crushed limestone Size (slate): 445 x 294mm (ridgecap):

More information

Terrabella Shake & Shingle Znap Ver. 2.0

Terrabella Shake & Shingle Znap Ver. 2.0 Terrabella Shake Znap Actual length = 52.6 Actual Width = 16.33 Coverage length = 49.7 Coverage width = 14 Terrabella Shingle Znap Actual Length = 52.375 Actual Width = 15.25 Coverage Length = 49.375 Coverage

More information

Vanity Installation Instructions

Vanity Installation Instructions Vanity Installation Instructions Segments of these instructions will relate to your vanity. Please read these instructions thoroughly and ensure the appropriate instructions are used during the installation

More information

HeatBoard Joisted Floor System

HeatBoard Joisted Floor System Design HeatBoard Joisted Floor System The Floor Heating Warehouse Underfloor Heating using Heatboard Slotted and Turning Boards is intended for installation on standard wood joist floors of a max. 600mm

More information

RhinoArt Decor Polystyrene Mouldings

RhinoArt Decor Polystyrene Mouldings C Art 12/8/08 2:31 PM Page 2 RhinoArt Decor Polystyrene Mouldings CORNICES Made of high density POLYSTYRENE for a perfectly smooth surface. RhinoArt Decor adhesive covers 8-10 linear metres per kg. 62

More information

Series Sloped glazed Curtain wall. Installation Instructions

Series Sloped glazed Curtain wall. Installation Instructions Series 5600 Sloped glazed Curtain wall Installation Instructions Part NO. Y308 February 2013 SECTION TABLE OF CONTENTS PAGE I. General Notes & Guidelines. 3-4 II. Gutter and Mullion Assembly.. 5 III. End

More information

Rockfon System OlympiaPlus A Impact 1A

Rockfon System OlympiaPlus A Impact 1A System description Rockfon System OlympiaPlus A Impact 1A Ceiling systems for special applications Impact resistance SYSTE GRP WAR YEARS IT LIM ED E very single tile is demountable for easy and fast access

More information

Flashing Materials. Rough Opening Preparation

Flashing Materials. Rough Opening Preparation Installation Instructions for CertainTeed New Construction Windows Handling vinyl windows CAUTION: Always store vinyl windows and doors in an upright position on a slight angle. Never lay them flat or

More information

Access Hatch. Installation Instructions and Operators Manual. PS DOORS Contact Information. Model AH-710 Standard High Neck Radius Cut

Access Hatch. Installation Instructions and Operators Manual. PS DOORS Contact Information. Model AH-710 Standard High Neck Radius Cut Access Hatch Installation Instructions and Operators Manual Standard Low Profile Frame Model AH-710 Standard High Neck Radius Cut High Neck Frame for special applications. Table of Contents Warranty Information...2

More information

DESIGN AND INSTALLATION GUIDE

DESIGN AND INSTALLATION GUIDE DESIGN AND INSTALLATION GUIDE EXTERNAL CLADDING & EAVES LINING Residential External Cladding System 2 EXTERNAL CLADDING & EAVES LINING CONTENTS DESCRIPTION 2 APPLICATIONS 2 ADVANTAGES 2 MATERIAL PROPERTIES

More information

Install Like the Pros

Install Like the Pros CertainTeed Install Like the Pros Drywall Installation Guide GETTING STARTED RIGHT Use the right products For the best, lasting results choose the right CertainTeed gypsum board for the job you re planning.

More information

CI/SfB. October RockLink Integra. Installation system

CI/SfB. October RockLink Integra. Installation system CI/SfB (35) Xh2 October 2008 RockLink Integra Installation system RockLink Integra 1 6 Rockfon tiles with the E15 straight edge detail are suitable for installation using this system. 6 2 6 The following

More information

pacific build supply ltd

pacific build supply ltd Product Information ETERPAN is a medium density fibre cement sheet that is used for external cladding, plastered finish, base for stone and brick slips, rigid air barrier, weatherboards, soffits, louvres,

More information

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions

REDLAND DRY VALLEY. Installation Instructions for Redland Dry Valley. Version: 6. Date: May Redland Technical Solutions REDLAND DRY VALLEY Installation Instructions for Redland Dry Valley Version: 6 Date: May 2013 Author: Department: Redland Technical Solutions Redland Technical Solutions 1 Introduction 1.1 TECHNICAL DATA

More information

Rondo exangle. Drywall Finishing Sections. for interior applications only revised: april 2008

Rondo exangle. Drywall Finishing Sections. for interior applications only revised: april 2008 Rondo exangle Drywall Finishing Sections for interior applications only revised: april 2008 design considerations general information The Rondo exangle range of finishing sections for building board applications

More information

TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines

TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines TruGrain 6 and 4 Flat Board Siding System Assembly Installation Guidelines NOTE: Proper planning of the siding layout is essential for ease of installation of siding boards and siding components. Thoroughly

More information

3M Impact Protection Profile Installation System Instructions

3M Impact Protection Profile Installation System Instructions 3M Impact Protection Profile Installation System Instructions IMPORTANT: READ INSTRUCTIONS FOR USE BEFORE OPERATING Intended Use: The 3M Impact Protection Profile Installation System is for installing

More information

Installation Guide. Tools Recommended:

Installation Guide. Tools Recommended: Installation Guide GenStone products are designed to provide a realistic look of stone or rock at a fraction of the installed cost. To achieve this, we have engineered the time and hassle out of installation

More information

General Instructions 03WES0808-V1. Please retain product label and instructions for future reference

General Instructions 03WES0808-V1. Please retain product label and instructions for future reference General Instructions Please retain product label and instructions for future reference 03WES0808-V1 x2 All building s should be erected by two adults Winter = High Moisture = Expansion Summer = Low Moisture

More information

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1.

.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. PAGE 1 PART 1 GENERAL 1.1 REFERENCE.1 Comply with the General Conditions of the Contract, Supplementary General Conditions and the requirements of Division 1. 1.2 RELATED WORK SPECIFIED ELSEWHERE.1 Installation

More information

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system.

Installation Guidelines for all Quaker products with nail fins New Construction nail fin installation with a Zip sheathing system. www.quakerwindows.com www.quakercommercialwindows.com PO Box 128 504 Highway 63 South Freeburg, MO 65035 800-347-0438 573-469-4151 (fax) Installation Guidelines for all Quaker products with nail fins New

More information

LAP SIDING INSTALLATION GUIDE

LAP SIDING INSTALLATION GUIDE MaxiPLANK TM LAP SIDING INSTALLATION GUIDE and MAXITILE We suggest that you read these instructions at least twice. MaxiPLANK TM designs: Classic, Colonial and Provenzal. MaxiPLANK TM is 12 in length with

More information

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE

SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE SHIPLOCK CLADDING PRODUCT GUIDE INSTALLATION TECHNICAL SPECIFICATIONS CARE & MAINTENANCE SHIPLOCK CLADDING CN-04E / CN-04W / CN-W008 Prior to the installation of any form of Cladding, it is recommended

More information

KS SERIES - VERTICAL INSTALLATION

KS SERIES - VERTICAL INSTALLATION CS-DS-01-KSV CS DISCLAIMER CS-PJ-01-KSV KS42SL EXPANDED PANEL JOINT CS-PJ-02-KSV KS42SL ENGAGED PANEL JOINT CS-PJ-03-KSV KS45SL EXPANDED PANEL JOINT CS-PJ-04-KSV KS45 FLAT ENGAGED PANEL JOINT CS-PJ-05-KSV

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

The Passive Fire Protection Handbook

The Passive Fire Protection Handbook Uniclass L5:P:N3 CI/SfB Rf9 EPIC E:X:Y41 (K)+(K3) December 003 NBSPlus The Passive Fire Protection Handbook VICUCLAD VICUCLAD Applications Fire protection of metal ducts Construction of smoke extract ducts

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS Roof Fastener System CrossHook 2G GB Table of contents TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY

More information

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door

Installation Guide. for E-Series/Eagle Clad Hinged Inswing French Door Installation Guide for E-Series/Eagle Clad Hinged Inswing French Door Thank you for choosing Andersen. Instructions are for typical, new wood-framed wall construction with weather protection in place.

More information

Column and Beam Fire Protection SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337

Column and Beam Fire Protection SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337 SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337 PLASTERBOARD LAYOUT 337 PLASTERBOARD FIXING 337 CONSTRUCTION DETAILS 341 Column and Beam Fire Protection Column and beam protection systems

More information

Effective April 1, 2013

Effective April 1, 2013 Effective April 1, 2013 Table of Contents Ensuring System Performance 1 Components 2 Frequently Asked Questions 3 List of Tools 3 Before you Begin Preparation 3 Quality Tips 4 Cold Weather Tips 4 Cleaning

More information

EASY INSTALLATION GUIDE WPC DECKING.

EASY INSTALLATION GUIDE WPC DECKING. EASY INSTALLATION GUIDE WPC DECKING www.eva-last.com EASY INSTALLATION GUIDE Condensed / Quick glance Installation Instructions Thank you for your interest in our Eva-tech WPC product range. Whether you

More information

ATOMIC. ASM Panel Brochure ARCHITECTURAL SHEET METAL,

ATOMIC. ASM Panel Brochure ARCHITECTURAL SHEET METAL, ATOMIC ARCHITECTURAL SHEET METAL, INC. ASM Panel Brochure 3207 Labore Road Vadnais Heights, MN 55110 Phone: 651-646-1706 Fax: 651-646-1684 atomic@atomicsheetmetal.com 1 of 1Page 0 of 0 ARCHITECTURAL SHEET

More information

Installation Instructions for Standard Lap and Self-Aligning Lap Siding

Installation Instructions for Standard Lap and Self-Aligning Lap Siding Installation Instructions for Standard Lap and Self-Aligning Lap Siding 7/16 in. Standard Laps Include: All Old Mill Widths, Cedar Shake Lap and Smooth Lap 1/2 in. Self-Aligning Include: 8 in. and 12 in.

More information

MAXISHINGLE LAP SIDING INSTALLATION GUIDE

MAXISHINGLE LAP SIDING INSTALLATION GUIDE MAXISHINGLE LAP SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes, regulations

More information

USG Boral Fiberock Interior Linings Installation Guide

USG Boral Fiberock Interior Linings Installation Guide USG Boral Fiberock Interior Linings Installation Guide Health and Safety Under normal conditions of use, USG Boral Fiberock interior linings present no known health hazard. Knives used for scoring and

More information

INSTALLATION GUIDE DECKING.

INSTALLATION GUIDE DECKING. INSTALLATION GUIDE DECKING www.ttp-online.de/resysta CONTENT LATEST TEST RESULT Classification C, DIN 51097: Features, made by, best skid-resistance properties and is eminently suitable for wet barefoot

More information

KuraStone TM Installation Guide

KuraStone TM Installation Guide Installation Guide Read these installation guidelines completely and thoroughly before beginning installation. Construction Requirements KuraStone pieces can be installed on braced wood or steel stud (18

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY

SECTION PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY SECTION 07312 PVC THATCH SHINGLE ROOFING SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This Section Includes the following: 1. Endureed Dominica PVC thatch shingles. 2. Self- adhering sheet underlayment. B. Related

More information

WHY YOU SHOULD USE TUFFLOOR. components

WHY YOU SHOULD USE TUFFLOOR. components Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative

More information

Global Roofing Solutions Klip-Tite

Global Roofing Solutions Klip-Tite GRS Klip-Tite Global Roofing Solutions Klip-Tite www.globalroofs.co.za marketing@globalroofs.co.za GRS Klip-Tite GRS Klip-Tite 09/18 Typical Specification Materials The roofing shall be Klip-Tite profile,

More information

Installation Instructions for Panel Siding and Soffit

Installation Instructions for Panel Siding and Soffit Installation Instructions for Panel Siding and Soffit 7/16 in. Panels Include: Sturdy Panel, Square Edge, 3/4 in. Channel and Reverse Board and Batten (RB&B) 1/2 in. Panels Include: Adobe Shiplap and 808

More information

Au. di VoglFuge data sheet

Au. di VoglFuge data sheet Head Office 17 19 David Lee Road Hallam Victoria 3803 PO Box 1143 Narre Warren MDC 3805 T 03 9796 3333 WA/SA Region PO Box 710 Joondalup DC 6919 T 08 6323 5662 atkar.com.au TM Au. di VoglFuge data sheet

More information

General Installation Instructions

General Installation Instructions General Installation Instructions Good web sites to check out that may assist you are: For gluing engineered boards over timber chipboard/particle board/ yellow tongue: https://www.youtube.com/watch?v=bpyfr373tl8

More information

INSTALLATION MANUAL STORAGE

INSTALLATION MANUAL STORAGE IMVersion 1.1 INSTALLATION MANUAL GENERAL GUIDE: The information in this IM is intended to serve as a general guide to proper installation with no warranties intended or implied. Prime Panels assumes no

More information

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Installation Guide.   Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation Step 7. Transition s and Accessories Step 3. Valley Step 6. Hip and Ridge Installation Step 2. Rake Trim Step 5. Installing the Shingles Step 1. Eave Starter Installation Step 4. Endwall s Installation

More information