Column and Beam Fire Protection SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337
|
|
- Malcolm Hicks
- 6 years ago
- Views:
Transcription
1 SYSTEMS 335 INSTALLATION 337 GENERAL REQUIREMENTS 337 FRAMING 337 PLASTERBOARD LAYOUT 337 PLASTERBOARD FIXING 337 CONSTRUCTION DETAILS 341 Column and Beam Fire Protection Column and beam protection systems consist of FireShield and ShaftLiner layers protecting structural timber, steel or concrete. This enables the structural members to maintain their load carrying capacity in the event of a fire. This section details the most common methods to encase timber, steel or concrete columns and beams to achieve a structural fire resistance level. The FRL (Fire Resistance Level) for structural protection systems do not require the Integrity and Insulation ratings. They are expressed with only first number for structural adequacy and two dashes, for example 90/ /. [For more information, refer to Section 2.3 Fire Resistance] 334 Technical Advice knaufmetal.com.au
2 COLUMN AND BEAM FIRE PROTECTION Systems KSFP1-KSFP9 STRUCTURAL FRAME: Steel column or beam encased in either FireShield or ShaftLiner PLASTERBOARD FRAME: [Option 1] Furring channel track with Encasement Clips at 600mm max centres friction fitted to structural frame flanges [Option 2] Plasterboard directly fixed to structural steel [13mm FireShield can be substituted with 13mm TruRock] [16mm FireShield can be substituted with 16mm TruRock] FRL System Plasterboard Lining Plasterboard Thickness (mm) 30/ / KSFP1 1 layer of 13mm FireShield 13 Fire Report FAR / / Fire Report FAR / / 60/ / 90/ / Fire Report FAR / / Fire Report FAR / / 180/ / Fire Report FAR / / KSFP2 1 layer of 16mm FireShield 16 KSFP3 2 layers of 13mm FireShield 26 KSFP4 1 layer of 25mm ShaftLiner 25 KSFP5 2 layers of 16mm FireShield 32 KSFP6 3 layers of 13mm FireShield 39 KSFP7 1 layer of 13mm FireShield plus 1 layer of 25mm ShaftLiner 38 KSFP8* 4 layers of 16mm FireShield 64 KSFP9* 1 layer of 13mm FireShield plus 2 layers of 25mm ShaftLiner 63 * KSFP8 and KSFP9 can be installed as walls or bulkheads up to 1200mm wide with an FRL of 180/180/180. Fire Report FAR KSFP10-KSFP16 STRUCTURAL FRAME: Timber column or beam (minimum dimension 92mm x 92mm) encased in either FireShield or ShaftLiner [13mm FireShield can be substituted with 13mm TruRock] [16mm FireShield can be substituted with 16mm TruRock] FRL System Plasterboard Lining Plasterboard Thickness (mm) 30/ / KSFP10 1 layer of 13mm FireShield 13 Fire Report FAR / / Fire Report FAR / / 90/ / Fire Report FAR / / 120/ / Fire Report FAR / / Fire Report FAR 1718 KSFP11 2 layers of 13mm FireShield 26 KSFP12 1 layer of 25mm ShaftLiner 25 KSFP13 3 layers of 13mm FireShield 39 KSFP14 1 layer of 13mm FireShield plus 1 layer of 25mm ShaftLiner 38 KSFP15 3 layers of 16mm FireShield 48 KSFP16 4 layers of 16mm FireShield 64 Technical Advice knaufplasterboard.com.au 335
3 3.6.3 Systems COLUMN AND BEAM FIRE PROTECTION KSFP20-KSFP24 STRUCTURAL FRAME: Concrete column encased in FireShield PLASTERBOARD FRAME: [Option 1] Plasterboard fixed to furring channels at 600mm max spacing [Option 2] Plasterboard fixed to concrete directly with tapcon countersunk head screws [13mm FireShield can be substituted with 13mm TruRock] [16mm FireShield can be substituted with 16mm TruRock] FRL System Plasterboard Lining Plasterboard Thickness (mm) Concrete Structural Adequacy + 30/ / Fire Report FAR 3221 Concrete Structural Adequacy + 60/ / Fire Report FAR 3221 Concrete Structural Adequacy + 90/ / Fire Report FAR 3221 Concrete Structural Adequacy + 120/ / Fire Report FAR 3221 Concrete Structural Adequacy + 180/ / Fire Report FAR 3221 KSFP20 1 layer of 13mm FireShield 13 KSFP21 1 layer of 16mm FireShield 16 KSFP22 2 layers of 16mm FireShield 32 KSFP23 3 layers of 13mm FireShield 39 KSFP24 4 layers of 16mm FireShield Technical Advice knaufmetal.com.au
4 COLUMN AND BEAM FIRE PROTECTION General Requirements, Framing, Plasterboard Layout and Fixing Installation General Requirements Only joint the face layer. As a minimum to achieve the FRL, only use paper tape and: Two coats of MastaBase/MastaLongset, or Three coats of MastaLite. Fire Rated Use approved fire rated penetration details. Fire penetrations may require fire collars or other devices to maintain fire performance. Use fire sealant on all gaps and around perimeter, vermiculite plaster is not permitted. Check the BCA C1.8 for additional requirements for columns such as filling with concrete or surrounding column with steel casing up to 1.2m high. Framing Fire Rated Install framing at maximum 450mm centres. Install furring channel track at each end of the column/beam and behind first layer butt joints. FURRING CHANNEL ANCHOR SPACING Framing Member 13mm AccuCeil FC Recessed 18mm AccuCeil Furring Channel FC18 28mm AccuCeil Furring Channel FC28 Columns 900mm 900mm 900mm Anchors for furring channel must also be fixed 100mm max from ends. Plasterboard Layout Fire Rated Stagger butt joints by 300mm minimum on adjoining sheets and between layers. Stagger recessed edges by 300mm minimum between layers. Minimise butt joints by using long sheets. Plasterboard Fixing Use the Screw Only Method. Stud adhesive is not permitted. Fire Rated Drive screws to just below the sheet surface, taking care not to break the paper linerboard. Laminating screws can be used to fix butt joints in the second, third and fourth layers. Technical Advice knaufplasterboard.com.au 337
5 3.6.3 Installation COLUMN AND BEAM FIRE PROTECTION Plasterboard Fixing SCREW TYPE AND MINIMUM SIZE FOR THE INSTALLATION OF PLASTERBOARD TO STEEL Plasterboard Thickness 1st Layer 2nd Layer 3rd Layer 4th Layer 13mm 25mm screw 40mm screw 16mm 30mm screw 45mm screw 25mm 40mm screw 13mm + 25mm + 25mm 25mm screw 50mm screw For steel 0.75mm BMT minimum 6g fine thread needle point screws. For steel 0.75mm BMT minimum 6g fine thread drill point screws. * Laminating screws may be used as detailed in installation diagrams. FASTENER TYPE AND MINIMUM SIZE FOR THE INSTALLATION OF PLASTERBOARD TO TIMBER Plasterboard Thickness 1st Layer 2nd Layer 3rd Layer 4th Layer 13mm 30mm screw 41mm screw 16mm 32mm screw 50mm screw 25mm 45mm screw 13mm + 25mm 30mm screw 60mm screw Use minimum 6g needle point screws. * Laminating screws may be used as detailed in installation diagrams. SCREW TYPE AND MINIMUM SIZE FOR THE INSTALLATION OF PLASTERBOARD TO CONCRETE Plasterboard Thickness 1st Layer 2nd Layer 3rd Layer 13mm 32mm 10g tapcon screw 45mm 10g tapcon screw 16mm 32mm 10g tapcon screw 45mm 10g tapcon screw For concrete use tapcon screws with countersunk head. 338 Technical Advice knaufmetal.com.au
6 COLUMN AND BEAM FIRE PROTECTION Plasterboard Fixing Installation FIGURE 1 Steel Column/Beam Universal Column/Beam Fixing Fasteners Screw Only Method All screws 50mm max from sheet edges Universal Encasement Clips at 600mm max centres and 100mm max from ends. Edges along length All layers: Fix at 300mm max centres. 3rd layer: Either screw to furring channel track or use. 4th layer: Use 38mm -10g. 300mm max 1st layer Stagger butt joints by 300mm min between layers Furring channel track. (AT18 or AT28) Butt joints Single Layer System: Install furring channel track behind sheet joints and fix at 200mm max centres. Multiple Layer Systems: Laminate to previous layer at 200mm max centres. Stagger butt joints by 300mm min between layers. 300mm max 2nd layer Laminate butt joints to previous layer at 200mm max centres 400mm max 400mm max 3rd layer Use for the 3rd and 4th layer. Offset screws in the 4th layer by 200mm 4th layer FIGURE 2 Timber Column/Beam Timber Column/Beam Fixing Fasteners Screw Only Method All screws 75mm max from sheet edges. Beam 100mm max Column 200mm max 75mm max 1st layer Stagger butt joints by 300mm min between layers Beam Edges Along Length Column - Edges Along Length All layers: Fix at 100mm max centres. Also fix at 450mm max centres in the centreline of the sheet for all layers. 3rd layer: Either screw to timber beam or use. 4th layer: Use 38mm -10g laminating screws. All layers: Fix at 200mm max centres. 3rd layer: Either screw to timber column or use. 4th layer: Use 38mm -10g laminating screws. Beam 100mm max Column 200mm max 2nd layer Fix butt joints to previous layer at 100mm max centres for beams, and 200mm max for columns Butt Joints Either screw to column/beam or laminate to previous layer at 200mm max centres. Stagger butt joints by 300mm min between layers. 400mm max 3rd layer 400mm max Fix at 400mm max centres in both directions using 4th layer Technical Advice knaufplasterboard.com.au 339
7 3.6.3 Installation COLUMN AND BEAM FIRE PROTECTION Plasterboard Fixing FIGURE 3 Concrete Column Concrete Column/Beam Fixing Screw Only Method Fasteners All screws 75mm max from sheet edges. Edges along length All layers: Fix at 300mm max centres. 3rd layer: Either screw to concrete or use 38mm -10g. 75mm max 300mm max 1st layer Stagger butt joints by 300mm min between layers [Refer to Figure 1 for installation instructions for concrete columns with furring channel framing] Butt joints Single Layer System: Fix at 200mm max centres. Multiple Layer Systems: Either screw to concrete or use 38mm -10g laminating screws at 200mm max centres to previous layer. Stagger butt joints by 300mm min between layers. 300mm max 2nd layer Butt joints 200mm max centres 300mm max 3rd layer Laminate butt joints to previous layer at 200mm max centres 340 Technical Advice knaufmetal.com.au
8 COLUMN AND BEAM FIRE PROTECTION Construction Details Details FIRE FIRE RATED RATED DETAILS COLUMN FOR AND STEEL BEAM COLUMN FIRE PROTECTION AND BEAM FIRE STEEL PROTECTION Knauf fire rated plasterboard Universal column/beam Furring channel track 10mm clearance to plasterboard. Fire sealant required to maintain fire integrity Encasement Clips (AC.ENCAS) at 600mm max centres and 150mm max from ends Fire rated plasterboard Universal beam 50x50x0.7mm BMT steel angle Furring channel track Suitable masonry fasteners at 600mm max centres and 100mm max from angle ends FIGURE 4 4 Sided Protection For I-Beam/Column Plan or Section FIGURE 5 3 Sided Protection For I-Beam Section When SHS/RHS is below 2mm thick Use drill-point screws FIGURE 6 4 Sided Protection for SHS/RHS Plan or Section Drill Point screws at 600mm max centres and 100 max from ends Universal beam 50x50x0.7 mm BMT steel angles Laminating screws for 4th layer When SHS/RHS is above 2mm thick Use suitable fixings at 600mm max centres and 100mm max from ends Furring channel track Fix at 600mm max centres and 100mm max from each end Overlap sheet edges at corners Furring channel track FIGURE 7 3 Sided Protection for I-Beam to Ceiling Section For internal and external corners, fill gaps with either Knauf Bindex Fire and Acoustic sealant or Mastabase jointing compound. Fill any other gaps with Knauf Bindex sealant to maintain integrity. FIGURE 8 4 Sided Protection For SHS/RHS Plan or Section Technical Advice knaufplasterboard.com.au 341
9 3.6.3 COLUMN AND BEAM FIRE PROTECTION Details Construction Details FIRE FIRE RATED RATED DETAILS FOR TIMBER COLUMN AND BEAM FIRE PROTECTION COLUMN AND BEAM FIRE PROTECTION TIMBER Timber joist Timber joist Timber beam Timber beam 50x50x0.7mm BMT steel angle Overlap sheet edges at corners 50x50x0.7mm BMT steel angle FIGURE 9 3 Sided Protection Timber Beam Section FIGURE 10 3 Sided Protection Timber Beam Section Laminating screws for 4th layer Timber column/beam Knauf fire rated plasterboard FIGURE 11 4 Sided Protection Timber Column/Beam Plan or Section 342 Technical Advice knaufmetal.com.au
10 FIRE RATED DETAILS FOR CONCRETE COLUMN AND BEAM FIRE PROTECTION FIRE RATED COLUMN AND BEAM FIRE PROTECTION CONCRETE COLUMN AND BEAM FIRE PROTECTION Construction Details Details Laminating screws for 3rd layer Tapcon screws Concrete column/beam Knauf fire rated plasterboard FIGURE 12 4 Sided Protection Concrete Column Plan Laminating screws for 3rd layer Furring channel or Centre fix batten at 600mm max spacing Concrete column/beam Knauf fire rated plasterboard FIGURE 13 4 Sided Protection Concrete Column Plan Technical Advice knaufplasterboard.com.au 343
Shaft Wall SYSTEMS 210 INSTALLATION 211. Shaft Wall systems are fire rated non-load bearing walls used for shafts and service ducts.
SYSTEMS 210 INSTALLATION 211 GENERAL REQUIREMENTS 211 FRAMING 212 PLASTERBOARD LAYOUT 213 PLASTERBOARD FIXING 214 CONSTRUCTION DETAILS 217 Shaft Wall Shaft Wall systems are fire rated non-load bearing
More informationHorizontal Shaft Wall
SYSTEMS 317 INSTALLATION 319 GENERAL REQUIREMENTS 319 FRAMING 319 PLASTERBOARD LAYOUT 320 PLASTERBOARD FIXING 320 CONSTRUCTION DETAILS 321 Horizontal Shaft Wall Horizontal Shaft Wall is constructed in
More informationPlasterboard Ceiling Systems
Plasterboard Ceiling Systems 400C Issue 1 2 Plasterboard Ceiling Systems Contents Standard Ceilings Design...3-7 Introduction... 3 Fire Ratings... 3 Systems Mass... 3 Decoration... 3 General Construction
More informationFinishing Plasterboard
Finishing Plasterboard 4.1 Levels of Finish 346 Australian Standard Requirements 346 Level 3 Finish 347 Level 4 Finish 347 Level 5 Finish 347 4.2 Back-Blocking 348 Back-Blocking Requirements 349 Back-Blocking
More informationWALL TO FABRICATED FLOOR
WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN
More informationGlasRoc Sheathing Type X
Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity
More informationSuperFOIL Insulation. Solutions Guide. Pitched Roof - Under Rafter
SuperFOIL Insulation Solutions Guide Pitched Roof - Under Rafter SF19+ Pitched Roof Under Rafter Solutions CONSTRUCTION THICKNESS R -VALUE EXTERNAL SURFACE - 0.040 TILES / SLATES 10mm - BATTEN CAVITY 25mm
More informationADGV_001_FASTPOS. Date Jan 2013 Detail. Profile. Fastener Positioning Scale 1:20 Detail No. ADGV_ mm from top edge. 600mm MAX CTRS TIMBER STUDS
ADGV_001_FASTPOS Panel Timber Frame 12mm from top edge 600mm MAX CTRS TIMBER STUDS 200 mm MAX CTRS 50mm from corner Fastener Positioning Scale 1:20 No. ADGV_001 ADGV_003_SHTEDGEPOS Centre line of Timber
More informationUCO Vistabord Fixing Manual
UCO Vistabord Fixing Manual UCO Multiflex UCO Flexabord Fibre Cement Board WALLS & CEILINGS Ceiling soffit using Vistabord at Suria KLCC, Malaysia. UAC BERHAD (5149-H) his sign endorses that the product
More informationCEILINGS INSTALLATION GUIDE
Your partner in building solutions CEILINGS INSTALLATION GUIDE Your partner in building solutions General remarks on Eterpan Ceilings This installation guide is to be used in conjunction with: Pacific
More informationINTERNAL LININGS INSTALLATION GUIDE
Your partner in building solutions INTERNAL LININGS INSTALLATION GUIDE General remarks on This installation guide is to be used in conjunction with: specifications Architects specific details Pacific Build
More informationFixings. Products - Fixings.
Fixings Our range of fixing products cater for every drywall need, ensuring simple yet secure fixing of plasterboard and metal framing. The range includes Gyproc screws, engineered for board-to-metal,
More informationINTUBATT FLOOR/CEILING SYSTEM & BOXOUT SYSTEM FOR FRL 120/120/120 RISF 120 INSTALLATION GUIDE
INTUBATT FLOOR/CEILING SYSTEM & BOXOUT SYSTEM FOR FRL 120/120/120 RISF 120 INSTALLATION GUIDE Intubatt Floor/Ceiling System Installation For sales and technical support please go to: www.tbafirefly.com.au
More informationOUR VISION... All you require is:
OUR VISION... Everyone should have the opportunity to enjoy our little piece of the Aussie Dream. Designed and manufactured to the Building Code and suitable for domestic and commercial use less than 1
More informationAcceptable Standards of Domestic Construction
Truss or Rafter Roof Batten Triple grip fastener (for roof trusses) Foil lined Insulation blanket Top plate Sprocket Brick tie Top plate strapping at 1200mm max. cts. Note: Holding down straps should be
More informationGUIDE. Elephant INSTALLATION. Elephant Plasterboard Installation Guide August
Elephant Plasterboard Installation Guide August 2015 Elephant INSTALLATION GUIDE www.elephantplasterboard.co.nz Elephant Plasterboard Installation Guide Publications These publications are continuously
More informationINSTALLATION MANUAL STORAGE
IMVersion 1.1 INSTALLATION MANUAL GENERAL GUIDE: The information in this IM is intended to serve as a general guide to proper installation with no warranties intended or implied. Prime Panels assumes no
More informationAugust 2008: Issue 1. Non - Residential New Build Pitched Roofs - Rafter Level
Non - Residential New Build 4.2.3 Pitched Roofs - Rafter Level August 2008: Issue 1 Non-residential new build 4.0 Non-residential New Build Pitched Roof - Rafter Level Contents Introduction find online
More informationrondo exangle drywall finishing sections
rondo exangle drywall finishing sections SUMMARY The EXANGLE range of building board finishing profiles are designed to give plasterers a clean, defined edge on straight or curved details for internal
More information4.0 GENERAL WALL AND CEILING INSTALLATION
4.0 GENERAL WALL AND CEILING INSTALLATION This section covers the installation of GIB plasterboard in walls and ceilings. Installation guidance is also provided for speciality systems; GIB EzyBrace and
More informationJune Residential Refurbishment Pitched roofs - rafter level
June 2010 Residential Refurbishment 3.2.2 Pitched roofs - rafter level Residential refurbishment 3.0 Residential Refurbishment Pitched Roof - Rafter Level Contents Introduction find online page Solution
More informationJune Non - Residential Refurbishment Pitched roofs - rafter level
June 2010 Non - Residential Refurbishment 5.2.3 Pitched roofs - rafter level Non-residential refurbishment 5.0 Non-residential Refurbishment Pitched Roof - Rafter Level Contents Introduction find online
More informationPosi-Joist Installation Guide. A guide for storage, handling and installation of the MiTek Posi-Joist floor system
Posi-Joist Installation Guide A guide for storage, handling and installation of the MiTek Posi-Joist floor system Posi-Joist Installation Details A B C D F E A Masonry Wall Connection Details Blockwork
More informationFireCase. Frameless structural steel encasement system. FireCase.
FireCase FireCase Frameless structural steel encasement system FireCase frameless encasement system provides a high quality cladding to structural steel, and offers high levels of fire protection. The
More informationSound insulating floor system
GypFloor SILENT GypFloor SILENT Sound insulating floor system GypFloor SILENT is specified in residential conversion or improvement work to upgrade an existing timber joist floor. It is also used in new-build
More informationNORMAL WEIGHT CONCRETE TOTAL-LEWIS-DECK GYPSUM BOARD 2 OR 3-PLY COMPOSITE TOTALJOIST TOP CHORD CONNECTION
GENERAL DETAILS 100 TYPICAL FLOOR CONSTRUCTION NORMAL WEIGHT CONCRETE WELDED WIRE MESH FIBERGLASS BATT INSULATION (OPTIONAL) 18 GAUGE TIE WIRE 7/8" RESILIENT CHANNEL NOTE: CEILING MAY ALSO BE SUSPENDED
More informationFeature T&G Timber Floor Installation and Finishing Recommendations
Feature T&G Timber Floor Installation and Finishing Recommendations DATA SHEET 3 RECOMMENDED INSTALLATION PRACTICES Version 1 October 2005 3.0 Introduction This data sheet outlines the recommended practices
More informationPRIMED STRAND REVERSIBLE SHAKE
PRIMED STRAND REVERSIBLE SHAKE PRIOR TO INSTALLATION Inspect product for any issues before installing (breakage, surface defects, foreign objects). Do not install questionable product. Report any problems
More information14 Intex Price Guide. Suitable for use in Fire Rated Wall Systems
14 Intex Price Guide Suitable for use in Fire Rated Wall Systems O.50-0.55mm BMT W A L L T R A C K 0. 5 5 M M B M T A standard wall or floor track section which provides a friction fit for studs to fit
More informationTimber joist. Timber joist ceilings and separating / compartment floors. Timber joist.
ceilings and separating / compartment floors Ceilings to timber joist floors are an established form of ceiling construction, widely used in both new housing and refurbishment. Separating / compartment
More informationPitched roofs rafter level
Pitched Roofs - Rafter Level Pitched roofs rafter level Insulation at rafter level design Rafter level insulation Insulation between the rafters can be designed in two ways: Breathing roof with Low Resistance
More informationDura-Lock Roof System
DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.
More informationMECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA
MECHANICAL BACK FASTENED SYSTEMS INSTALLATION DATA 7/16 PETRARCH ARCHITECTURAL WALL PANELS APPLIED OVER A STUDWALL BY MEANS OF A FIELD ASSEMBLED BACK FASTENED SYSTEM DESIGN CONCEPT 7/16 panels may be installed
More informationGyproc Proflex Access Panels - Installation Guidance Notes
Gyproc Proflex ccess Panels - Installation Guidance Notes The following notes are intended as guidance only, depicting the basic sequence of installation. In practice, consideration should be given to
More informationSteel Sound Enclosure
Steel Sound Enclosure INSTALLATION MANUAL List of tools recommended for use during installation: vise grips c clamp ladder electric drill drill bits / taps as req d screw drivers hammer rubber mallet pipe
More informationPlasterboard & Cornice
& Cornice installation manual & Cornice Australian Owned & Manufactured ww.bgc.com.au/plasterboard History & Mission BGC Fibre Cement and is a proud Australian owned manufacturer of fibre cement and plasterboard
More informationDrywall, Wood and Truss Uplift
Drywall, Wood and Truss Uplift Drywall (gypsum board) has to: provide rigidity provide aesthetics provide fire protection not leak air Concerns Wood moves. Drywall does not move. Interesting problem. The
More informationThe Firestone QuickSeam Reinforced Perimeter Fastening Strip needs to be installed with appropriate fasteners at maximum centres of 300 mm.
3.3 Base Tie-in 3.3.1 Base Tie-in General In order to account for structural movement of the substrate, stresses inherent in the handling and production of elastomeric sheets and thermal variations, the
More informationmethod of build Komfire-75 partitioning system 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims KOMFORT
821 811 342 821 835 853 863 840 12.5mm Plasterboard 837 75mm Steel Stud & Plasterboard Partitioning System with Square Aluminium Cover Trims Note: For clarity the cavity infill has not been shown 854 342
More informationSound insulating floor system
Sound insulating floor system is specified in residential conversion or improvement work to upgrade an existing timber joist floor. It is also used in new-build to meet the acoustic requirements of national
More informationENGINEERED BUILDING PRODUCTS. SplitHanger. mitek.com.au
ENGINEERED BUILDING PRODUCTS SplitHanger mitek.com.au S p l i t H a n g e r SUITABLE FOR VARIOUS WIDTHS OF TIMBER BEAM APPLICATION: SplitHangers are versatile hangers that provide a heavy duty connection
More informationA Shell construction
A Shell construction A 4/2012 Content 1 BASE AND WALL ANCHORING 1.1 Base with mortar bed 1.2 Base with sill plate 1.3 Base with raised sill plate 1.4 Concrete base (mortar bed) 1.5 Concrete base (sill
More informationFASTENERS BUILDING DEPARTMENT
FASTENERS BUILDING DEPARTMENT 952-446-1660 WWW.CITYOFMINNETRISTA.COM This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances, and
More informationSECTION ROUGH CARPENTRY
SECTION 06100 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide Rough Carpentry as shown and detailed on the Drawings and
More informationBXUV.V470. Fire Resistance Ratings - ANSI/UL 263. Design/System/Construction/Assembly Usage Disclaimer. Fire Resistance Ratings - ANSI/UL 263
Page Bottom BXUV.V470 Fire Resistance Ratings - ANSI/UL 263 Design/System/Construction/Assembly Usage Disclaimer Authorities Having Jurisdiction should be consulted in all cases as to the particular requirements
More informationEzyBrace For Light Steel Frame Systems
EzyBrace For Light Steel Frame Systems Systems for use with light steel framing have been updated in March 2017 to offer improved simplicity and efficiency. Key changes include: CORNER FASTENER PATTERNS
More informationHow to repair a wall or ceiling FREE
How to repair a wall or ceiling FREE How to repair a wall or ceiling This guide shows how to repair walls and ceilings throughout the guide we only refer to walls but the same principles apply to ceiling
More informationYOW 225 TU Window System
ThermaBond Plus Poured & Debridged Technology YOW 225 TU SYSTEM DESCRIPTION YOW 225 TU PERFORMANCE FEATURES 2-1/4 Overall Depth ThermaBond Plus Poured & Debridged Thermal Break Variations: Casement, Projected
More informationChapter 1. Beam and Sill Plates
Chapter 1. Beam and Sill Plates 1.1 ESTABLISHING SQUARE SILL PLATE CHALK LINES 1.2 INSTALLING TREATED SILL PLATES 1.3 INSTALLING LAMINATE BEAM Tools needed by volunteers: Hammer Nail apron Tape measure
More informationButt Two pieces of wood meeting with flat sides adjoining usually at right angles. Some type of connector is needed to prevent movement.
Wood Connections There are basically five different types of connectors: Interlocking (carpentry joints), Dowel, Metal Connectors, Special Formed Connectors and Adhesives. I Interlocking (Carpentry Joints)
More informationTOPSPAN 22 / 40 LYSAGHT TOPSPAN 22 / 40. Steel roof and ceiling battens for non cyclonic applications
TOPSPAN 22 / 40 LYSAGHT TOPSPAN 22 / 40 Steel roof and ceiling battens for non cyclonic applications Our TOPSPAN 22 ceiling batten and TOPSPAN 40 roof battens are the economical alternative to timber battens.
More informationInstallation instructions: Elements Vulcan+ Newport Hector Cladding
Technical Data Wood Species Thermally Modified Softwood (Pinus Radiata) Images Profile Newport Hector - Light Band Sawn face - Secret fix 5.4 6.0 8.5 3.0 25.0 3.0 111.0 3.0 12.0 R 3.0 7.0 7.0 123.0 15.0
More informationThe better way to build TM. Installation Manual ROOF SIPs
The better way to build TM Installation Manual ROOF SIPs August 2017 ROOF SIPs Installation Manual Table of Contents Topics General Requirements.................................... 3 Materials..............................................
More informationGeneral Installation Guidelines
g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working
More informationInstallation guide. Step-by-step instructions
Installation guide Step-by-step instructions Contents Tools Required to Install p1 Screws & Fixings p2 Injection Moulded Solid Components p3 Components p4 Georgian Hips & Ancillaries p5 Fixing Eaves Beam
More informationBest Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications.
Best Materials LLC distributes backer rod, caulking and sealants for all types of EIFS joints and penetration sealing applications. EXTERIOR INSULATION & FINISH SYSTEM CONSTRUCTION Data Published Courtesy
More informationWeatherboard & PLANK
CEMINTEL FIBRE CEMENT SYSTEMS & PLANK FC:123 EXTERNAL CLADDING SYSTEMS MAY 2006 s are strong, durable fibre cement products for residential cladding. Available in a range of profiles and textures, they
More information4256HM JAMES HARDIE MONOLITHIC CLADDING
4256HM JAMES HARDIE MONOLITHIC CLADDING 1. GENERAL This section relates to the supply and fixing of fibre cement flush finish cladding: - James Hardie Monotek Sheet for textured coating systems - James
More informationAWNING / PATIO COVER INSTALLATION INSTRUCTIONS
AWNING / PATIO COVER INSTALLATION INSTRUCTIONS Before You Begin Read the installation instructions thoroughly before beginning the installation procedure. Perspective In the Awning Instructions, Back means
More informationInstallation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges
Please read all instructions before installing Palladium Wall Panel System. 1. Before installation: a. Acclimate Palladium Panels, reveals, adhesives and wall substrates to room temperature 24 hours before
More informationTechnical Manual. ceiling - Seamless
Technical Manual 1. Introduction 1.1 General flex - Ceiling is an autoclave cellulose fibre reinforcement cement ceiling board manufactured by Hume Cemboard Industries Sdn Bhd, an ISO9001 and ISO14001
More informationINSTALLATION INSTRUCTIONS FOR FLUSH MOUNT FIXTURES
Kurt Versen Company Point Source Lighting 10 Charles Street Westwood, New Jersey Models with Square or Rectangular Apertures 1 PLEASE READ THIS ENTIRE INSTRUCTION SHEET BEFORE INSTALLATION. 2 DISCONNECT
More informationJOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener
More informationTips for Professional Ceiling Installers
Tips for Professional Ceiling Installers Over the years, Armstrong installation instructors and professional installers have solved many ceiling installation problems. Here is a compilation of their solutions...
More informationEMAC 001 ACCESS PANEL
EMAC 001 ACCESS PANEL 900 x 600* 1200 x 600* Picture covers uneven edges Beaded can be taped and jointed for skimming Ensure the structural opening (panel size +10mm) is lined with timber or steel section.
More informationLinda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE
Linda Barker Collection Heritage Collection Classic Collection INSTALLATION GUIDE Ruler Pencil Masking tape Measuring tape Silicone sealant & silicone gun Power drill & screwdriver High-grab adhesive Jig
More informationInstallation Instructions
Installation Instructions For Models: Model Number / Description File Name 1540 Classic Series P-Lam Toilet Partitions 1540.pdf 1 INSTALLATION INSTRUCTIONS LAMINATED PLASTIC TOILET PARTITIONS 1540 Classic
More informationInstallation Guide. Versilux Lining INTERIORS
Installation Guide Versilux Lining INTERIORS Australia June 2018 Make sure your information is up to date. When specifying or installing James Hardie products, ensure that you have the current technical
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 9/29/2017 Installation Guideline Disclaimer This document contains general installation
More informationGENERAL INSTALLATION GUIDELINES
1551 MT. ROSE AVENUE YORK PA 17403-2909 (717) 849-8100 GENERAL INSTALLATION GUIDELINES For Receptor Systems Approved 08/31/2018 Installation Guideline Disclaimer This document contains general installation
More informationSTEEL FRAMING WEATHERBOARD SYSTEM
T A R A NAK IPINE STEEL FRAMING WEATHERBOARD SYSTEM Installation information and technical drawings TIMBER WEATHERBOARDS NATURALLY BETTER FOR MORE THAN A CENTURY www.taranakipine.co.nz T A R ANAKIPINE
More informationThe Leka System Installation Guide
Installation Guide The Leka System Installation Guide The following guide has been created to assist in the fabrication and installation of the Leka System. Please note that each roof is individual and
More informationStratco Sanctuary INSTALLATION BEFORE YOU START TOOLS REQUIRED GUIDE
INSTALLATION GUIDE Stratco Sanctuary Verandahs, Patios and Carports BEFORE YOU START It is important to check with your Local Government Authority prior to the installation of your new Stratco Sanctuary
More informationLE7000 Provincial Built-in (Zero Clearance) Kit Instructions.
LE7000 Provincial Built-in (Zero Clearance) Kit Instructions. LE7000 Provincial ZC Kit contains: Part No. Quantity Description Picture 503259 4 Self Threading Screw 13mm 503459 6 Self Threading Screw Timbertites
More informationINSTALLATION INSTRUCTIONS FOR FLUSH MOUNT FIXTURES
Kurt Versen Company Point Source Lighting Models with Round Apertures 10 Charles Street Westwood, New Jersey 1 PLEASE READ THIS ENTIRE INSTRUCTION SHEET BEFORE INSTALLATION. 2 DISCONNECT ELECTRICAL POWER
More informationShapes Siding. Perfection Shingles. Chalk Line
Snap a Chalk Line Shapes Siding Perfection Shingles Chalk Line To establish a straight reference line to guide the positioning of the starter strip and the first course of siding, snap a chalk line. starter
More informationPanel Installation Instructions
EXTREMELY IMPORTANT INFORMATION PLEASE READ ENTIRE PACKET! Warranty Is Void If Panels Not Installed According to Instructions 1. WARNINGS & SPECIAL NOTES 1.1 Keep panels 24 from Heaters and shield Radiant
More informationHolemaking Products & Accessories
Holemaking Products & Holemaking Products & Made of top-of-the-line materials for longer lasting performance, Klein's diverse line of drill bits and holemaking products and accessories provide accuracy
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS SOLID PHENOLIC TOILET PARTITIONS 1080 DuraLine Series 1180 DuraLine Series Class-A Fire Rated IMPORTANT: Review these instructions thoroughly prior to installation. FLOOR ANCHORED
More informationDUTCH GABLE FREESTANDING CARPORT
DUTCH GABLE FREESTANDING CARPORT STRATCO OUTBACK ASSEMBLY INSTRUCTIONS. Your complete guide to building a FREESTANDING Outback DUTCH GABLE CARPORT BEFORE YOU START Carefully read these instructions. If
More informationDowel-type fasteners. Timber Connections. Academic resources. Introduction. Deferent types of dowel-type fasteners. Version 1
Academic resources Timber Connections Dowel-type fasteners Version 1 This unit covers the following topics: Deferent types of dowel-type fasteners Introduction There are four criteria designers should
More informationDESIGN AND INSTALLATION GUIDE
DESIGN AND INSTALLATION GUIDE EXTERNAL CLADDING & EAVES LINING Residential External Cladding System 2 EXTERNAL CLADDING & EAVES LINING CONTENTS DESCRIPTION 2 APPLICATIONS 2 ADVANTAGES 2 MATERIAL PROPERTIES
More informationInstallation Instructions and Ordering Information
The Flush Finish Door Jamb System Installation Instructions and Ordering Information Installation Instructions Step 1 Step 2 Ensure that the stud opening is square and level and measures: Single Door width
More informationMethod of Build 1. General
Method of Build 1 General GLAZED ELEVATIONS Viso Double Glazed in glazed form differs from many other systems as the vertical joints can have Viso dry joints or the unique HIDDEN mullion post between glazed
More informationSERIES 4070-T GENERAL ASSEMBLY AND INSTALLATION INSTRUCTIONS
Table of Contents I. Care and Maintenance... 2 II. Tools / Materials, Sealant Requirements, & Anchor Instructions... 2 III. Structure Verification & Sub-Sillpan Installation... 3 1. Opening Verification...3
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS HIGH PRESSUE LAMINATE (HPL) TOILET PARTITIONS 1030 TrimLineSeries 1040 DesignerSeries Includes continuous hardware option.65. IMPORTANT: Storage and Handling Information on last
More informationEzyBrace Systems. Specification and installation manual CBI 5113
EzyBrace Systems Specification and installation manual CBI 5113 NATIONAL SUPPORT VISIT: Winstone Wallboards Limited 37 Felix Street, Penrose, Auckland 1061, New Zealand POST: PO Box 12 256, Penrose 1642,
More informationCLASSIC RANGE PLUS RANGE CREATE RANGE - PHOTO WALL
CLASSIC RANGE PLUS RANGE CREATE RANGE - PHOTO WALL The following is an installation guide for fitting Multipanel CLASSIC RANGE, PLUS RANGE, CREATE RANGE AND PHOTO WALL Jig saw or Hand saw Measuring Tape
More informationISSUE Erection Manual
Erection Manual The details and information in this book are for guidance of the erection of panels and flooring only. They are not site specific. Refer to the relevant panel drawings for the site, which
More informationInstallation Guide. Villaboard Lining INTERIORS
Installation Guide Villaboard Lining INTERIORS Australia June 2018 Make sure your information is up to date. When specifying or installing James Hardie products, ensure that you have the current technical
More informationIMPORTANT: installation. FLOOR ANCHORED CEILING HUNG OVERHEAD BRACED FLOOR-TO- CEILING ANCHORED
INSTALLATION INSTRUCTIONS MAXIMUM PRIVACY COMPACT LAMINATE TOILET PARTITIONS 2080 DuraLineSeries 2180 DuraLineSeries Class-A Fire Rated Includes Institutional Hardware Option.67 IMPORTANT: Storage and
More information4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile
4 Position the Suntile to the x tile s position and mark the felt around the square box flange. Then remove the Suntile 5 Using a sharp bladed knife, cut through the felt from corner to corner in an x
More informationSIM. Mass Loaded Vinyl
Mass Loaded Vinyl SIM Soundproofing INSTALLATION Manual When building sound isolated walls, floors and ceilings, we want to introduce significant non-resonant mass. MLV is an excellent source for this
More informationSECTION SHEET METAL FLASHING AND TRIM
SECTION 07620 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Formed roof drainage sheet metal fabrications. 2. Formed low-slope roof sheet metal fabrications. 1.2 SUBMITTALS A. Shop Drawings: Show
More informationInstallation Instructions
TEL: 09 579-8895 FAX: 09 579-2933 EMAIL: sales@nzfiredoors.co.nz NZ Fire Doors Ltd, 89 Gavin Street, Ellerslie, PO Box 12709, Penrose 1642, Auckland, New Zealand. www.nzfiredoors.co.nz Installation Instructions
More informationCall (770) STEP 6: Caulk bolt hole within the bracket for protection from the elements.
Call (770) 777 7007 Structural Deck Support System: Product Numbers: H1-GQ, H2-GCL (Also applies to H1-GK and H2-GCR) STEP 1: Following the spacing guidelines per the deck design and joist layout, mark
More informationCCC Project Manual WEDGE RAMPS
CCC Project Manual WEDGE RAMPS Project Components & How-To s Wedge Ramp Components Dimensions Length: Make wedge ramps 4 long (half sheet of plywood) when possible. Any shorter and the ramp may too steep.
More informationWHY YOU SHOULD USE TUFFLOOR. components
Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative
More informationTimber to Timber - Timber to Concrete - Timber to Steel
01/2017 TIMBER CONNECTORS NOT TO BE USED IN EXTERIOR SITUATIONS Stainless Steel alternatives are available where stated Timber to Timber - Timber to Concrete - Timber to Steel MiTek manufactures and markets
More informationLightplane 3.5 Recessed
INSTALLATION INSTRUCTIONS Lightplane 3.5 Recessed LP3.5R Recessed Ceiling IMPORTANT SAFETY INSTRUCTIONS When installing or using this fixtures basic safety precautions must be followed. Read all instructions
More information