STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: or

Size: px
Start display at page:

Download "STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: or"

Transcription

1 6778 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: or Our staff is ready to provide assistance April through October M-F 8:00 AM to 6:00 PM EST Saturday 8:0 AM to 4:0 PM EST November through March M - F 8:00 AM to 5:00 PM EST

2 (This page intentionally left blank.)

3 A Backyard Products Company 6778 ASSEMBLY MANUAL CLASSIC GENTRY GABLE ' x ' (65,8 x 65,8 cm) BUILDING SIZE ACTUAL FLOOR SIZE ' x ' (65,8 x 65,8 cm) ' x ' (65,8 x 65,8 cm) 0/8/ KEEP THIS MANUAL FOR FUTURE REFERENCE IMPORTANT! READ INSTRUCTIONS THOROUGHLY PRIOR TO NING ASSEMBLY. BEFORE YOU BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for speci c restrictions and/ or requirements before building. ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits. SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface. Recommended methods and materials to level your shed are listed on page 8. CHECK ALL PARTS Inventory all parts listed on pages 4-6. Contact our Customer Service Team if any parts are missing or damaged. ADDITIONAL MATERIALS You will need additional materials to complete your shed. See page for required and optional materials and quantities. - CUSTOMER SERVICE - Call: customerservice@backyardproductsllc.com

4 TOOLS Required Optional Phillips Screwdriver Utility Knife Shingle Blades Tool Belt/ Nail Pouch Drill / Driver /8" Drill Bit # Philips Drive Bit Caulk Gun Tin Snips (for drip edge) Hammer Paint Tools Chalk Line Level Nail Gun Pencil Safety Glasses gun nails Tape Measure Ladder WoodGlue Gloves Square or Sawsall Safety! Always use approved safety glasses during assembly. HELPFUL REMINDER SYMBOLS Look for these symbols for helpful reminders throughout this manual. = Assistance Required; two or more people. = Mark part with pencil. = Ensure squareness. = Beginning of steps for assembly or installation. = Important required step or operation. = You have nished the assembly or installation. = Helpful assembly hint. = Level ORIENT LUMBER AND TRIM FOR BEST APPEARANCE Framing lumber is graded for structural strength and not appearance. Exterior trim is graded for one good side. Always install the material leaving the best edge and best surface visible. Please remember that these blemishes in no way negatively affect the strength or integrity of our product. (See Fig. A, B, C.) A B C

5 ADDITIONAL MATERIALS COMPLETING YOUR SHED You will need these additional materials: -TAB SHINGLES (Bundles)... PAINT FOR SIDING (Gallons)... Use 00% acrylic latex exterior paint. () coats recommended. " GALVANIZED ROOFING NAILS(lbs)... For shingles. 7 PAINT FOR TRIM... Quart Use 00% acrylic latex exterior paint. WOOD GLUE... Exterior Rated CAULK... Tubes Use acrylic latex exterior caulk that is paintable. OPTIONAL MATERIALS DRIP EDGE (Feet)... #5 ROOFING FELT (Sq ft. to cover)... " GALVANIZED ROOFING NAILS(lbs)... For roo ng felt / lb. REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER S INSTRUCTIONS FOR INSTALLATION OF SHINGLES, DRIP EDGE AND FELT. FLOOR PANELS (Not Included) You will need oor panels and nails to complete your oor. Floor panel sizes and quantities are shown below. NOTE: Use a minimum of 5/8" (,6 cm) Oriented Strand Board (OSB) x 5/8" x 48" x96" (,6 x,9 x 4,8 cm) x 5/8" x 48" x48" (,6 x,9,9 cm) " (5, cm) lb. of " (5, cm) Hot Dipped Galvanized Box-Type Nails.

6 Double letter part identi cation is stamped on some parts. RS RS RS PARTS IDENTIFICATION AND SIZES WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size " x 4"...-/" x -/" (,8 x 8,9 cm) " x 4".../4" x -/" (,9 x 8,9 cm) " x "...-/" x -/" (,8 x 6, cm) " x ".../4" x -/" (,8 x 6, cm) Check these locations for part stamp. CLASSIC GENTRY GABLE ' X ' PARTS LIST INVENTORY YOUR PARTS before you begin. We suggest sorting parts by the category they are listed in. TRIM RAFTERS WALLS x7 x5 4 x6 x5 x5 4 x4 x4 x4 TP TJ AI UM AM F AV SP STL SG AJ AL ADA AF WYR WYL OO ZJ AHR AHL AH x 4 x 96" (5, x 0, x 4,8 cm) x 4 x 9-/" (5, x 0, x 5 cm) x 4 x 78-/" (5, x 0, x 99,4 cm) x 4 x 68" (5, x 0, x 7,7 cm) x 4 x 67" (5, x 0, x 70, cm) /8 x x 66" ( x 7,6 x 67,6 cm) x 4 x 60-/" (5, x 0, x 5,7 cm) x 4 x 48" (5, x 0, x,9 cm) x 4 x 44-/" (5, x 0, x cm) x 4 x 4" (5, x 0, x 86,4 cm) x 4 x -/" (5, x 0, x,8 cm) x 4 x 7" (5, x 0, x 7,8 cm) GAUGE BLOCK FOR /4" (,9 cm) MEASUREMENT. /4" (,9 cm) GAA " x " x 5" (,5 x 7,6 x,7 cm) x 4 x 77-5/6" (5, x 0, x 98 cm) x 4 x 8-/8" (5, x 0, x 46 cm) 6 x 4" OSB (5, x 6 cm) /8 x -/4 x 8-/" (4,4 x. x cm) /8 x -/4 x 8-/" x /8" (4,4 x 07 x cm) 9/ x 4 x 85-/6" (,5 x 0, x 6,4 cm) 9/ x 4 x 85-/6" (,5 x 0, x 6,4 cm) x x 69" (5, x 7,6 x 75, cm) 9/ x -/ x 7" (,5 x 6,4 x 8,9 cm) 9/ x x 6" (,5 x 7,6 x 57,5 cm) 9/ x x 6" (,5 x 7,6 x 57,5 cm) 9/ x -/ x 6 5/8" (,5 x 6,4 x 67,6 cm) 7/6 x 48 x 96" (, x,9 x 4,8 cm) OVERHANG VX AS x 6 x 96" (5, x 5, 7/6 x 4,8 x -/8 cm) x 96" (, x 58,7 x 4,8 cm) x 6 x 49-/" (5, x 5, x 5,7 cm) 4

7 PARTS IDENTIFICATION AND SIZES ROOF LOFT/ BENCH/ SHELF WINDOW LOFT/ BENCH/ SHELF x4 x4 x4 x6 x7 x7 x6 x4 TP KP BE PT SP WJ FO NK HYA AO PYA LR BG AC AZ DT BWR BWL DF x x 9" (5, x 7,6 x 48, cm) x 0" (5, x 7,6 x 5,4 cm) x 4 x 48" (5, x 0, x,9 cm) x 4 x 48" (,5 x 0, x,9 cm) x x 48" (,5 x 7,6 x,9 cm) x x 48" (5, x 7,6 x,9 cm) x 4 x -/" (5, x 0, x 57, cm) /8" x 4-/4 x -/" ( x 6, x 57, cm) x 4 x 9-/4" (5, x 0, x 50, cm) x 4 x -5/8" (5, x 0, x 9,5 cm) 9/ x x 0-/8" (,5 x 7,6 x 76,5 cm) 9/ x x 8-/8" (,5 x 7,6 x 7,4 cm) 9/ x x " (,5 x 7,6 x 5, cm) 9/ x x " (,5 x 7,6 x 5, cm) 9/ x x 8-/" (,5 x 7,6 x,6 cm) PANEL PARTS LIST x 4 x 96" (,5 x 0, x 4,8 cm) x x 96" (,5 x 7,6 x 4,8 cm) NOTE: Panel parts are not stamped with part identi cation. 7/6 x 6 x 96" (, x 9,4 x 4,8 cm) /4 x -7/8 x 96" (0,6 x 60,6 x 4,8 cm) Peg board 7/6 x 9-/ x 9-/" (, x 49,5 x 5 cm) x 4 x 44-/" (,5 x 0, x cm) 7/6 x -/ x 96" (, x, x 4,8 cm) 7/6 x 48 x 96" (, x,9 x 4,8 cm) 7/6 x 6-/ x 96" (, x 9,7 x 4,8 cm) x 4 x 96" (5, x 0, x 4,8 cm) x x 96" (5, x 7,6 x 4,8 cm) 7/6 x 6 x 40-7/8" (, x 9,4 x 0,8 cm) /4 x -7/8 x 48" (0,6 x 60,6 x,9 cm) Peg board 7/6 x 9-/ x 48" (, x 49,5 x,9 cm) 7/6 x -/ x 48" (, x, x,9 cm) 7/6 x 47-7/8 x 48" (, x,6,9 cm) 7/6 x 6-/ x 47-7/8" (, x 9,7 x,6 cm) 5

8 WALL PANELS /8 x 48 x 84" ( x,9 x,4 cm) x9 /8 x 48 x 84" ( x,9 x,4 cm) /8 x 48 x 84" ( x,9 x,4 cm) /8 x 48 x 84" ( x,9 x,4 cm) LEFT RIGHT FASTENER/HARDWARE BAG (Not Actual Size) 0 (5, cm) x9 (7,6 cm) 9 (5, cm) x64 8 x9 -/4 (, cm) (,5 cm) /4 (,9 cm) NAIL BOXES (Not Actual Size) x4 Boxes (7,6 cm) x6 Boxes (5, cm) Other HARDWARE (Not Actual Size) x4 /4 (,9 cm) 6" x 8" ( 40,6 x 0, cm) / (, cm) -/4" x 9-/4" (56,5 x 75,6 cm) -/ (,8 cm) 64 Metal Threshold /4 (9 mm) x6 x8 (,5 cm) 6

9 A CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below. Attach the sill plates on the foundation as shown, and continue on to page. Treated Sill Plate Caulk between sill plate and concrete. D C B D -/" (8,9 cm) 4" (0 cm) Sill plates MUST be treated lumber. Building Size Actual Floor Size A B C D 'x ' (65,8 x 65,8 cm) 'x ' (65,8 x 65,8 cm) 44" (65,8 cm) 7" (48 cm) 44" (65,8 cm) 0-5/8" (57, cm) ' x ' Building Requires: x 4 x '-5" (5, x 0, x 48 cm) x 4 x ' (5, x 0, x 65,8 cm) Caulk Allow new concrete slabs to cure for at least seven (7) days. A treated x 4" (5, x 0, cm) sill plate is required when installing your shed on concrete. Purchase full length treated lumber. Use a high quality exterior grade caulk beneath all sill plates. Fasten x 4" (5, x 0, cm) sill plates to slab using approved concrete anchors (fasteners not included). Check local code for concrete foundation requirements. 7

10 FLOOR LEVELING OPTIONS There are multiple ways to level your oor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. FOUNDATION OR FLOOR MATERIALS This shed does not include any oor or leveling materials. See the FLOOR LEVELING section on page 9 for recommended methods and suggested materials to properly level your oor, as this will vary depending on your speci c site. " Screw angled into 4x4. () at each point frame and 4x4 touch. PREFERRED METHOD - 4x4 TREATED RUNNERS 4x4 Runners (not included). " (0,5 cm) Measurements to centers of 4x4's. MATERIAL REQUIRED x 4" x 4" x ' (0, x 0, x 65,8 cm) Treated Lumber x4 " (0,5 cm) Fasteners for Frame to 4"x 4". (" Screws shown as one option.) Minimum " screws / exterior grade. Use only wood treated for ground contact and fasteners approved for use with treated wood. Always support frame seams. " Maximum between leveling material locations. 48" Shingle Level 4x4 Runner " Shingle Do not exceed 6". Gravel " Block Gravel 4" Block LEVELING METHODS x4 Treated Lumber 8" Block Level under 4x4 runners only. Locate leveling material " from ends of runners and no more than 48" apart. Asphalt shingles should be used between 4x4 runners and blocks or treated lumber. Never use shingles in direct contact with ground. For best results and aiding in water drainage use gravel under each concrete block. LEVELING MATERIALS Gravel Asphalt Shingles x4 Treated Lumber Solid Masonry Blocks in ", ", 4" or 8" thickness Leveling higher than 6" not recommended. 8

11 FLOOR FRAME LEVEL AND SQUARE FLOOR FRAME Before attaching oor decking, it is important to level and square the oor frame. A level and square oor frame is required to correctly construct your shed. See page 8 for the preferred oor leveling method. 4 Use level and check the frame is level before applying oor panels. Check for frame squareness by measuring diagonally across corners. If the measurements are the same, the frame is square. The diagonal measurement will be approximately 0-5/8" (57, cm). When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square (Fig. A). 5 Once the oor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners. First, secure at ends with one fastener. Fig. A 0-5/8" (57, cm) 0-5/8" (57, cm) Second, secure at ends with one fastener. 9

12 IMPORTANT! IMPORTANT! Check the oor frame is level after installing oor panels. Re-level if needed. The oor should be used as a level work surface for wall construction. HINT: Organize your wall sections during subassembly to avoid over-handling of the walls. BACKWALL SIDEWALL FRONTWALL SIDEWALL 0

13 PARTS REQUIRED: x4 4 x4 SP x 4 x 48" (5, x 0, x,9 cm) AI x 4 x 78-/" (5, x 0, x 99,4 cm) TP x 4 x 96" (5, x 0, x 4,8 cm) SIDE WALL FRAME x64 IMPORTANT! You will build two walls the same. Orient parts on edge on oor as shown. Nail using two " nails at each connection. HINT: 4" (6 cm) 48" (,9 cm) 7" (8,9 cm) 44" (65,8 cm) 0" (04,8 cm) 96" (4,8 cm) 96" (4,8 cm) TP SP Nails 78-/" (99,4 cm) AIx7 TP SP 96" (4,8 cm) 48" (,9 cm) Nails Nails

14 SIDE WALL PANELS PARTS REQUIRED: /8 x 48 x 84" ( x,9 x,4 cm) GAA /4" GAUGE BLOCK AL -/" GAUGE BLOCK 00 " (5, cm) Ensure your wall frame is square by installing one panel and squaring frame. Place LEFT panel onto wall frame with primed side up as shown. Locate the panel -/" above the top plate. Use AL as a gauge block for the -/" top overhang measurement. Use GAA as a gauge block to mark the /4" side measurement on the wall stud. Secure panel with two " nails in the corners (Fig. A). Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-to-side until you have a /4" measurement on the wall stud. Secure corner with two " nails (Fig. B). Nail the panel using " nails 6" apart on edges and " apart inside panel. Nails -/" (,8 cm) Overlap -/" (,8 cm) Overlap For squareness maintain /4" and -/" measurement along panel edge. /4" (,9 cm) /4" (,9 cm) -/" (,8 cm) 48" (,9 cm) AL HERE Fig. A Nails Fig. B /4" Gauge Block 6" (5, cm) " (0,5 cm) Primed side UP Lip Edge Square Edge /4" (,9 cm)

15 PARTS REQUIRED: x4 /8 x 48 x 84" ( x,9 x,4 cm ) SIDE WALL PANELS 00 AL -/" GAUGE BLOCK " (5, cm) 4 Place middle panel on frame as shown with primed side facing up ush with rst panel. Nail using " nails 6" apart on edges and " apart inside panel. 5 Repeat STEP 4 to secure right panel. 6 You have nished building your side wall. Repeat process to make second wall. /4" (,9 cm) Do not nail in groove. /4" (,9 cm) To draw panels tight at seams angle nail. AL 48" (,9 cm) 48" (,9 cm) -/" (,8 cm) " (0,5 cm) 6" (5, cm) Primed side UP Lip Edge Square Edge Lip Edge Square Edge

16 PARTS REQUIRED: F /8 x x 66" ( x 7,6 x 67,6 cm) AM x 4 x 67" (5, x 0, x 70, cm) FRONT WALL FRAME (Door Header) 8 Apply glue to parts as shown. Align parts on a at surface as shown. Assemble header with (7,6 cm) nails in a staggered pattern. Turn assembled header over and repeat staggered nail pattern. 4 You have nished building your door header. HINT: / (, cm) /4 (,6 cm) AM AM /4 (,6 cm) F / (, cm) F AM Glue Nails / (, cm) Nails 4

17 PARTS REQUIRED: x5 AJ x 4 x -/" (5, x 0, x,8 cm) STL x 4 x 44-/" (5, x 0, x cm) AV x 4 x 60-/" (5, x 0, x 5,7 cm) AI x 4 x 78-/" (5, x 0, x 99,4 cm) TJ x 4 x 9-/" (5, x 0, x 5 cm) FRONT WALL FRAME AO x 4 x -/" (5, x 0. x 57, cm) x0 Orient parts on edge on oor as shown. Nail using two " nails at each connection and four " nails at seam. DIMENSIONS ARE TO CENTER OF STUDS. 7 (48 cm) 6-/4 (,9 cm) HINT: 58-/4 (48 cm) 44-/ ( cm) 6-/8 (9,4 cm) 9-/ (5 cm) -/8 (,4 cm) TJ STL AO (4) Nails () Nails () Nails AI x5 AO 69-/4 (75,9 cm) MAINTAIN DIMENSION 67 (70, cm) 78-/ (99,4 cm) 8 (96,5 cm) -/ (,8 cm) -/ (,8 cm) -/8 (,4 cm) 60-/ (5,7 cm) AV 64 (6,6 cm) AJ -/ (,8 cm) 5

18 PARTS REQUIRED: x5 SG x 4 x 4" (5, x 0. x 86,4 cm) BG x 4 x -5/8" (5, x 0. x 9,5 cm) AL x 4 x 7" (5, x 0, x 7,8 cm) FRONT WALL FRAME x Pre - Assembled Header Orient the pre-assembled header, AL, BG and SG as shown. Secure using " nails at each connection as shown. HINT: DIMENSIONS ARE TO CENTER OF STUDS. AL x5 68-/ (74 cm) 44-/ ( cm) 0-/ (5,) cm 7 (7,8 cm) Header -5/8 (8,6 cm) 78-/ BG (99,4 cm) () Nails 4 (86,4 cm) SG MAINTAIN DIMENSION 67 (70, cm) 6

19 PARTS REQUIRED: UM x 4 x 68" (5, x 0, x 7,7 cm) FRONT WALL FRAME 4 Orient parts on edge on oor as shown. Secure using " nails as shown. You have nished your front wall frame. HINT: UM UM 68" (7,7 cm) MAINTAIN DIMENSION 64" (6,6 cm) () Nails 7

20 FRONT WALL PANELS PARTS REQUIRED: x50 " (5, cm) GAA /4" GAUGE BLOCK x4" TEMP. SPACER Place the left front wall panel onto wall frame as shown with primed side up. Use the gauge block to mark the /4" measurement on the wall stud. Locate the panel -/" from the top plate. Nail panels to frame with two " nails 6" apart on edges. 4 Proceed to attaching your other front panel. Do not nail in groove. /4" Gauge Block x 4" -/" (,8 cm) /4" (,9 cm) Lip Edge 6" (5, cm) 6" (5, cm) Primed side UP /4" (,9 cm) Square Edge MAINTAIN DIMENSION 64" (6,6 cm) /4" (,9 cm) 8

21 FRONT WALL PANELS PARTS REQUIRED: x64 " (5, cm) x4" TEMP. SPACER Place window panel onto wall frame as shown with primed side up. Use the measurement on the wall stud. Locate the panel -/" from the top plate. Nail panels to frame with two " nails 6" apart on edges. 4 Proceed to attaching your other panels. x 4" -/" (,8 cm) 6" (5, cm) 6" (5, cm) " (0,5 cm) 64" (6,6 cm) Square Edge Primed side UP Lip Edge /4" (,9 cm) Do not nail in groove. 9

22 PARTS REQUIRED: TP x 4 x 96" (5, x 0, x 4,8 cm) Temporary Support FRONT WALL PANELS x5 " (5, cm) Place right front wall panels onto frame with top of panels ush to previously installed panels. Nail panel to frame with " nails 6" apart on edges. Attach tempoary support TP using two " screws as shown. 4 Proceed to assembling your side wall frames. Square Edge -/" (,8 cm) Lip Edge 6" (5, cm) 64" (6,6 cm) Primed side UP Hint: Use part TP ( x 4 x 96") as a temporary support until wall is installed. " Screw " Screw 0

23 PARTS REQUIRED: x5 STL x 4 x 44-/" (5, x 0, x cm) TJ x 4 x 9-/" (5, x 0, x 5 cm) AI x 4 x 78-/" (5, x 0, x 99,4 cm) BACK WALL FRAME 4 Orient parts on edge on oor. Measure and mark from end of boards. Use two " nails at each connection and four " nails at seams. Repeat process to make second wall. Proceed to attach wall panels. HINT: 0-/ (5, cm) 44-/ ( cm) 7 (48 cm) 6-/ (95,9 cm) 9-/ (5 cm) 68-/ (74 cm) 9-/ (5 cm) STL (4) Nails () Nails TJ 78-/ (99,4 cm) AIx5 TJ STL 9-/ (5 cm) 44-/ ( cm) () Nails (4) Nails

24 BACK WALL PANELS PARTS REQUIRED: x5 " (5, cm) /8 x 48 x 84" ( x,9 x,4 cm) GAA /4" GAUGE BLOCK x4" TEMP. SPACER Ensure your wall frame is square by installing one panel and squaring frame. Place a 48" x 84" panel onto wall frame with primed side up as shown. Locate the panel -/" above the top plate. Use a x 4" as a gauge block for the -/" top overhang measurement. Use GAA as a gauge block to mark the /4" side measurement on the wall stud. Secure panel with two " nails in the corners (Fig. A). Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-to-side until you have a /4" measurement on the wall stud. Secure corner with two " nails (Fig. B). Nail the panel using " nails 6" apart on edges and " apart inside panel. For squareness maintain /4" and -/" measurement along panel edge. -/" (,8 cm) 48" (,9 cm) x 4" HERE Nails -/" (,8 cm) Overlap /4" (,9 cm) Fig. A -/" (,8 cm) Overlap /4" (,9 cm) Nails Fig. B /4" Gauge Block 6" (5, cm) " (0,5 cm) Primed side UP Lip Edge 6" (5, cm) Square Edge /4" (,9 cm)

25 BACK WALL PANELS PARTS REQUIRED: x85 " (5, cm) /8 x 48 x 84" ( x,9 x,4 cm) x4" TEMP. SPACER 4 Place middle 48" x 84" panel on frame as shown with primed side facing up ush with rst panel. Nail using " nails 6" apart on edges and " apart inside panel. 5 Place right 48" x 84"panel on frame as shown with primed side facing up ush with second panel. Nail using " nails 6" apart on edges and " apart inside panel. 6 You have nished building your back wall. Do not nail in groove. To draw panels tight at seams angle nail. 48" (,9 cm) x 4" 48" (,9 cm) -/" (,8 cm) 6" (5, cm) Primed side UP " (0,5 cm) /4" 6" (,9 cm) (5, cm) /4" (,9 cm) Lip Edge Square Edge Lip Edge Square Edge

26 PARTS REQUIRED: 4 x50 " (5, cm) SIDE WALL INSTALLATION x4 Center side wall assembly on the oor. Ensure -/" measurement is on top Use OO as a temporary brace. Secure with two " screws. 4 First, nail lower edge of panel to oor frame using " nails 6" apart. Angle nail to hit oor frame (Fig. A). Nail side wall bottom plate to oor using eight " nails. (Nail two " nails between each stud through bottom plate) 5 You have nished standing your side wall. Repeat steps -4 to attach second side wall. Do not nail in groove. -/" (,8 cm) 6" (5, cm) Nail Install " nails rst. Angle to nail into oor frame. OO CENTER ON FLOOR 44 (65,8 cm) " (5, cm) Nail Fig. A 4

27 PARTS REQUIRED: x55 " (5, cm) BACK WALL INSTALLATION x4 Stand backwall on oor. It is important to secure the back wall in the following order. Center back wall on oor between side walls. Nail the lower back wall corner to the side wall with one " nail (Fig. A). " (5, cm) Nail Fig. A CENTER Be sure the measurement between the panel edge and side wall is the same along the entire length. Then secure with one " nail in the upper corner (Fig. B). Nail along the panel edge using " nails spaced 6" apart into framing. " (5, cm) Nail Panel Same Measurement Fig. B 6" (5 cm) Nail along bottom of panel using " nails 6" apart. Angle nail to hit oor frame (Fig. C). " (5, cm) Nail Fig. C 6" (5 cm) Screws Secure framing using two screws. Remove temporary brace. Repeat process to secure back wall to other side wall. Fig. D Nail 5

28 PARTS REQUIRED: 0 x45 " (5, cm) FRONT WALL INSTALLATION x4 Stand frontwall on oor. It is important to secure the frontwall in the following order. Center frontwall on oor side-to-side. Nail the frontwall ush to the oor using " nails 6" apart. Angle nails to hit oor frame (Fig. A). Nail the lower sidewall corner to the frontwall with one " nail (Fig. B). " (5, cm) Nail Be sure the measurement between the panel edges are the same along the entire length. Then secure with one " nail in the upper corner (Fig. C). Nail along the panel edge into the trim using " nails spaced 6" apart. Remove tempoary support TP. Fig. B 6" (5 cm) " (5, cm) Nail TP 64" (6,6 cm) 6" (5, cm) CENTER 6" (5, cm) " (5, cm) Nail Panel " (5, cm) Nail Fig. A Same Measurement Fig. C 6" (5 cm) Screws Secure the frontwall frame to oor using two " nails (Fig. D). Secure framing using two " screws (Fig. E). Repeat process to secure the right side of the frontwall. Fig. E 6 Nail Fig. D

29 PARTS REQUIRED: SP x 4 x 48" (5, x 0, x,9 cm) TJ x 4 x 9-/" (5, x 0, x 5 cm) TP x 4 x 96" (5, x 0, x 4,8 cm) WALL DOUBLERS INSTALLATION STL x 4 x 44-/" (5, x 0, x cm) x64 6 Orient parts on top of wall frames. Measure and mark from end of boards. Secure from top using two " nails spaced every 4" (Fig. A). Secure from bottom using four " screws at each corner (Fig. B). 4 You have nished securing the wall doublers. 44-/ ( cm) 9-/ (5 cm) " (7,6) cm Nails Fig. A 48 (,9 cm) STL TJ SP TP 96 (8,8 cm) 96 (4,8 cm) Ensure all doubler seams are not-aligned over seams of wall top plates. " (7,6) cm Screws Fig. B TP TJ 9-/ (5 cm) Nail 4 (6cm) TYP. SP STL 44-/ ( cm) 48 (,9 cm) 7

30 RAFTERS PARTS REQUIRED: 4 OO x x 69" (5, x 7,6 x 75, cm) ADA x 4 x 5-/4" (5, x 0, x 5, cm) 6 x 4" (5, x 6 cm) 44 " (5, cm) Place two rafter-halves (ADA) in the corner of back and side walls. Rafters contact at peak. Assemble (5) Rafters with gussets on both sides. Assemble () Rafters with gussets on one side. 44 (65,8 cm) Fit base of rafters in corners of back wall. HINT: Use oor and walls to help assemble rafters! Temporary support (OO) Contact at peak Apply glue to rafters where gusset will t. Secure gusset to rafters using " (5, cm) Nails as shown. 4 Flip over rafter assembly and repeat STEPS -4 to attach second gusset to other side. 5 Repeat STEPS -5 to build additional assembles. Remove OO. 6 You have nished assembling your rafters. /4" gap (6 mm) GUSSET Center " (5, cm) Glue Contact at peak Glue 8

31 PARTS REQUIRED: RAFTER INSTALLATION 8 x5 Rafter Assemby gusset plates Rafter Assemby gusset plate Locate rafters directly over the wall studs. Check you have the measurements shown. Secure with two " screws angled at each end. You have nished installing your rafters. DIMENSIONS ARE FROM OUTSIDE OF WALL PANELS. DIMENSIONS ARE TO CENTER OF RAFTERS. 4-/8 (6,9 cm) 4 (6 cm) 4 (6 cm) 4 (6 cm) 4 (6 cm) 4-/8 (6,9 cm) Align over studs. to panel to panel Maintain the measurements between rafters. 9

32 PARTS REQUIRED: GABLE PANELS x4 AF -/" (,8cm) x 4 x 8-/8" (5, x 0, x 46 cm) Place center gable panel on AF primed side up as shown. Mark middle gable panel at center on primed side. Place left panel on AF ush to center gable panel and secure using three -/" nails. 4 Repeat STEP for right panel. 5 Repeat STEP -4 for front gable panels. 6 You have nished assembling your gable panels. -/" (8,9 cm) -/" (,8cm) 6" (5, cm) AF -/4" (4,4 cm) -/" (6,4 cm) " Nails (5, cm) 6" (5, cm) -/" (6,4 cm) Mark -/" (6,4 cm) 0

33 GABLE INSTALLATION PARTS REQUIRED: x8 4 " (5, cm) Pre - Assembled Center gable assembly on side wall and overlap side wall panels. Attach using " (5,cm) nails 6" (5, cm) apart. Secure uprights using two screws as shown. 4 Repeat steps - to secure the other side wall gable panels. 6" (5, cm) " Nails (5, cm) 6" (5, cm) Center Mark " Nails (7,6 cm)

34 ROOF PANELS PARTS REQUIRED: x8 " (5, cm) 7/6 x 48 x 96" (, x,9 x 4,8 cm) Roof panels may cause serious injury until securely fastened. You must square the roof by attaching one panel rst. You must use the panel's long edge as a lever to bring your roof into square. Commonly known as "racking". " Nails (5, cm) at peak Attach panel to end of rafter with rough side up (Primed grid-line side) /4" (,9 cm) from outside edge of rafter (Fig. A) and panel ush at peak (Fig. B ). Secure with two " nails at the corners. Fig. A Fig. B /4" (,9 cm) Roof Panel Fig. D at peak Truss Gabel Panel Move to the opposite end. Using the long edge of the panel as a lever, move the panel side-toside until the top corner is ush with the peak (Fig. C), and there is /" (, cm) measurement to the rafter (Fig. D). /" (, cm) Fig. C You may need to move your side wall to get the /" (, cm) measurement. Secure panel with two " Nails in the corners. " Nails (5, cm)

35 ROOF PANELS PARTS REQUIRED: 76 " (5, cm) 7/6 x 6-/ x 47-7/8" (, x 9,7 x,6 cm) 7/6 x 6-/ x 96" (, x 9,7 x 4,8 cm) 7/6 x 47-7/8 x 48" (, x,6,9 cm) Keep spacing between the center of each rafter at the lower edge of the panel and secure with one "nail into each rafter (Fig. E). 4-/4" (6,9 cm) NOTE: Measurements from outside of panels 4" (60,9 cm) 4" (60,9 cm) 4" (60,9 cm) 4" (60,9 cm) 4-/4" (6,9 cm) Move to the top of the panel and keep spacing between the center of the rafters. Secure with one " nail into each rafter (Fig. E). " Nail Fig. E Nail the roof panel using " nails 6" apart on edges and " apart inside panel. " (0,5 cm) apart 6" (5, cm) apart 4 Attach the lower roof panel ush to the upper panel, with the /" (, cm) measurement at the rafter (Fig. F). Nail the roof panel using " nails 6" apart on edges and " apart inside panel. 5 Repeat process to attach roof panels on the opposite side. 6" (5, cm) apart Fig. F at peak " (0,5 cm) apart 6" (5, cm) apart " (0,5 cm) apart Roof Panel Truss Gabel Panel Fig. G 48" (,9 cm) 96" (4,8 cm) 47-7/8" (,6 cm) 6-/" (9,7 cm)

36 PARTS REQUIRED: WYL WYR GABLE TRIM x56 9/ x 4 x 85-/6" (,5 x 0, x 6,4 cm) 9/ x 4 x 85-/6" (,5 x 0, x 6,4 cm) " (5, cm) Install left front gable trim WYL ush to top of panel and ush at peak (Fig. A) as shown. Secure to wall using " nish nails 7-/4" apart. Repeat steps - to attach right front gable trim. 4 Repeat steps - to secure the back wall gable trim. 5 You have nished installing your gable trim. Roof Panel Fig. A " Nails (5, cm) to top of panel 4

37 EAVE TRIM PARTS REQUIRED: VX x 6 x 96" (5, x 5, x 4,8 cm) AS x 6 x 49-/" (5, x 5, x 5,7 cm) x8 x60 -/4" (, cm) Orient AS between gable trim ush to edge of roof panel (Fig. A). Screw through roof panel into eave side overhang using -/4" screws approximately 7-/" apart as shown. Orient VX between AS and gable trim, ush to edge of roof panel. 4 Repeat process on opposite side. You have nished your eave trim. Fig. A AS (7,6 cm) Screw VX AS -/4 (, cm) Screws 7-/" (9, cm) apart approximately 49 /" (5,7 cm) 96" (4,9 cm) VX 5

38 PARTS REQUIRED: x4 x4 /8 x -/4 x 8-/" ( x 4,4 x 07 cm) /8 x -/4 x 8-/" ( x 4,4 x, cm) CORNER TRIM x64 " (5, cm) Secure 8-/" (, cm) corner trim under side eave trim. Attach with " nails as shown in (Fig. A). Secure 8-/" (07 cm) corner trim ush under gable panel. Attach with " nails as shown. Repeat on other side. 4 Proceed to installing your collar ties. Corner trim Fig. A Seam is ush. Caulk seam before painting trim. 8-/" (, cm) 8-/" (07 cm) 6

39 PARTS REQUIRED: TP x 4 x 96" (5, x 0, x 4,8 cm) COLLAR TIE x6 Locate collar tie TP on the rafter over the center of the door as shown. Check collar tie is level and ush to roof panel. Nail collar tie to the rafter with three " nails at each end. You have nished installing your collar tie. TP Nails HINT: For best appearance, install collar tie on back side of rafter. 7

40 PARTS REQUIRED: x4 x4 TP x 4 x 96" (5, x 0, x 4,8 cm) SP x 4 x 48" (5, x 0, x,9 cm) LOFT JOIST ASSEMBLY x48 Ensure parts TP and SP are aligned perfectly on a at surface. Spread glue across SP and TP as shown. Assemble joist with (7,6 cm) nails in a staggered pattern. Turn assembled joist over and repeat staggered nail pattern. 4 Repeat steps - to assemble second loft joist. SP Glue TP TP SP 8

41 PARTS REQUIRED: LOFT JOIST ASSEMBLY PT x x 96" (5, x 7,6 x 4,8 cm) NK x x 48" (5, x 7,6 x,9 cm) AO x 4 x -/" (5, x 0, x 57, cm) PYA x 4 x 9-/4" (5, x 0, x 50, cm) LOFT INSTALLATION 8 4 Locate NK and PT directly under the side wall top plates and secure with two " (7,6) nails at each backwall stud. Secure AO and PYA as shown with two " screws on each side. Secure with two " screws on each side. Position loft joists on top of AO and PYA as shown. Secure with " nails. Screws -/ (8,9 cm) NK PT -/ (8,9 cm) Screws AO LEVEL (7,6 cm) Nails PYA AO SIDE WALL -/ (8,9 cm) AO at wall panel. Nails Loft Joist Screws Window Screws 9

42 PARTS REQUIRED: x6 x7 /8 x 8 x -/" ( x 0, x,8 cm) LR x 9" (5, x 7,6 x 48, cm) BENCH ASSEMBLY x6 " (5, cm) Secure six LR to shelf panels using three " (5, cm) nails. Assemble 6 shelf supports as shown. Secure one LR to studs with two nails as shown. Secure shelf supports at shown heights with three " (5, cm) nails. " (5, cm) Nail x6 LR -5/8 9,5 cm Level 4-7/6 (, cm) 7/6 (, cm) Nail LR Refrence this height Corner stud LR Same dimension Level Floor " (5, cm) Nail 40

43 PARTS REQUIRED: BENCH PANELS 7/6 x 9-/ x 9-/" (, x 49,5 x 5 cm) x6 " (5, cm) 7/6 x 9-/ x 48" (, x 49,5 x,9 cm) /4 x -7/8 x 96" (0,6 x 60,6 x 4,8 cm) Peg board KP x 4 x 96" (,5 x 0, x 4,8 cm) HYA x 4 x 44-/" (,5 x 0, x cm) /4 x -7/8 x 48" (0,6 x 60,6 x,9 cm) Peg board Install shelf panels centered over shelf supports. Secure with three " (5, cm) nails at each support Secure HYA and KP with two " (5, cm) nails at each support and four " (5, cm) nails at seams. Secure the end of KP with a " nail as shown 4 Secure pegboard with three " (5, cm) nails at each support and (6) " (5, cm) nails at seams. Ensure pegboard is in contact with top of bench. 5 You have nished installing your shelves and pegboard. 9-/" (5 cm) 48" (,9 cm) (5, cm) Nails (5, cm) Nails HYA KP (7,6 cm) Nail 4

44 PARTS REQUIRED: x7 AC x 0" (5, x 7,6 x 5,4 cm) FO x x 48" (,5 x 7,6 x,9 cm) BE x x 96" (,5 x 7,6 x 4,8 cm) SHELF ASSEMBLY x7 " (5, cm) Secure AC to BE and FO using two " (5, cm) nails at each support and four " (5, cm) nails at each seam. Secure shelf support as shown with two " (5, cm) nails at each wall stud. 96" (4,8 cm) 7" (8,9 cm) 48" (,9 cm) 4" (6 cm) 0" (04,8 cm) 44" (65,8 cm) (5, cm) Nails BE AC x7 FO with top of pegboard (7,6 cm) Nails 4

45 PARTS REQUIRED: 7/6 x -/ x 48" (, x, x,9 cm) KP x 4 x 96" (,5 x 0, x 4,8 cm) WJ x 4 x 48" (,5 x 0, x,9 cm) 7/6 x -/ x 96" (, x, x 4,8 cm) SHELF PANELS x0 " (5, cm) 4 5 Install shelf panels centered over shelf supports. Secure with two " (5, cm) nails at each support Secure WJ and KP with two " (5, cm) nails at each support and three " (5, cm) nails at seams. Secure shelf from oustide of the front wall panel using -/" Nails at shown measurments. 6 You have nished installing your shelf. -/4 (, cm) Nails 4" (6 cm) -/ (,8 cm) Nails KP Level WJ (7,6 cm) Screw (7,6 cm) Nails 6" (57,5 cm) 4" (5,6 cm) 4

46 PARTS REQUIRED: 7/6 x 6 x 96" (, x 9,4 x 4,8 cm) LOFT PANELS x48 " (5, cm) 7/6 x 6 x 40-7/8" (, x 9,4 x 0,8 cm) Install loft panels centered over loft joists and ledger board. Secure with " (5, cm) nails 8" (0, cm) apart. NOTE: There will be a gap of approximately / on either side of installed deck panels. You have nished installing your Loft. 8 0, cm (5, cm) Nails 8 (0, cm) View of loft from above 44

47 S PARTS REQUIRED: OO x x 69" (5, x 6,5 x 75, cm) HINT: Look for /8" SPACER attached to doors. GAA x4 " (5, cm) -/4" ( cm) Left Door Right Door /4" GAUGE BLOCK Orient parts as shown on at surface. (right) and green (left) on hinge board. /8" offset is to top. Look for red Attach temporary supports OO with " screws in middle and at ends as shown. Tighten securely. Attach tempoary supports GAA with two -/4" screws. Tighten Securely. OFFSET /8" ( cm) GREEN Make sure spacer is attached. /8" ( cm) RED /8" OFFSET ( cm) -/" (59,5 cm) (4) Screws OO Tighten screws securely. () -/4" (, cm) Screws GAA -/" (59,5 cm) /8" ( cm) Bottom edges ush. 45

48 PARTS REQUIRED: OO x x 69" (5, x 7,6 x 75, cm) S Attach tempoart support OO as a ledger board ush under wall panels for doors to rest on, Using Screws (Fig A). to panel 64" (6,6 cm) OO OO Fig. A 4 5 Measure and mark center of door opening (Fig. A). Center doors on mark as shown (Fig. B). Screw hinge boards into wall supports and oor using eight " screws as shown. Make sure screws go into framing and oor (Fig. C, D). Remove temporary supports and check doors open properly. 6 You have nished installing your doors. Center /8" measurement on mark. Fig. B /8" ( cm) Fig. C Angle Screw Screws into the wall support and oor frame. Fig. D 46

49 WEATHERSTRIP PARTS REQUIRED: OO x x 69" (5, x 7,6 x 75 cm) 0 " (5, cm) With left door closed, center a weatherstrip OO vertically on the left door in the door opening (Fig. A). OO will offset the left door " OUT past the door trim " (Fig. B). Secure OO using " (5, cm) screws through outside trim into OO (Fig. B). 4 On right door center OO vertically in door opening (Fig. A). OO will offset the right door " IN from the door trim (Fig. C). Secure OO using ve " (5, cm) screws through outside trim into OO (Fig. C). 5 You have nished installing your door weatherstrips. " (,5 cm) OFFSET OO Center OO in door opening. Fig. A Fig. B " (,5 cm) Overhang Fig. C Screws " (5, cm) Screws " (5, cm) 0 4" (5,5 cm) Approximately 47

50 PARTS REQUIRED: AHR/AHL 9/ x x (,5 x 7,6 x 57,5 ZJ 9/ x x 7" (,5 x 7,6 x 8,9 cm) S AH 9/ x x 6 5/8" (,5 x 7,6 x 67,6 cm) x7 x66 " (5, cm) /4" (,9 cm) Reinforce the door trim using /4" (,9 cm) screws through door panel into trim (Fig. A). Locate screws as shown in Fig. B. Use two screws at seams. /4 (,9 cm) Screws 4" (5,6 cm) Approximately Two /4 (,9 cm) Screws 4 Fig. A Center trim ZJ over doors and secure using seven " nish nails into framing as shown. Center Remove /8" spacers from doors. Install AH and AHL/AHR as shown and secure from inside with eleven /4" (,9 cm) screws Fig. B (5, cm) Screws 5 You have nished securing your door and trim. ZJ /4 (,9 cm) Screws AH Level AH AHL AHR 48

51 S PARTS REQUIRED: 64" (6,6 cm) METAL THRESHOLD /4 (,9 cm) Coated screws x4 /4 (,9 cm) Center metal threshold between door opening. Secure Threshold using eleven /4" (,9 cm) coated screws into oor as shown. You have nished installing your door Threshold. /4 (,9 cm) Coated Screws Level decorative hinges in position as shown and secure with /4" (,9 cm) screws. /4 (,9 cm) Screws You have nished installing your decorative door hinges. 49

52 PARTS REQUIRED: HARDWARE x8 (,5 cm) /8" (0,9 cm) Drill Bit Place bolt onto OO in open position with bolt end /4" (0,6 cm) down from frame (Fig A), and /" (, cm) up from oor (Fig B). Bolt is open when loop is contacting base. Mark and pre-drill holes for screws. Install bolt with screws supplied and drill 5/6" (0,8 cm) hole deep enough for bolt to slide into. You have nished installing your door bolts. Fig. A LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD OVER FRAME 5/6" drill for bolt: " deep. OO x x 69" /4" with bolt in open position. LEFT x4 OPEN POSITION, Spring is loose. PRE-DRILL (4) HOLES Loop contacts base. Fig. B LOCATE AND PRE-DRILL HOLES TO AVOID SPLITTING WOOD HINT: With door closed extend bolt and tap hammer to leave a mark in wood for drilling. OO x x 69" OPEN POSITION, Spring is loose. x4 Loop contacts base. PRE-DRILL (4) HOLES /" with bolt in open position. FLOOR FRAME 5/6" drill for bolt: " deep. 50

53 PARTS REQUIRED: HARDWARE -/ (8 mm) /4" (0,6 cm) /" (, cm) Drill Bits Measure and mark position on right door as shown. Pre-drill /4" hole at mark. Finish hole with /" drill bit. Position hardware in hole and secure with screws as shown. -/" (,8 cm) TOP VIEW /", cm /4" Pre-drill and /" Drill-through. SIDE VIEW 5-/4" 90,8 cm -/",8 cm INSTALL ON RIGHT. Set Screw 4 You have nished mounting your door hardware. -/" (,8 cm) 5

54 WINDOW SHUTTERS PARTS REQUIRED: x6 AZ 9/ x x 0-/8" (,5 x 7,6 x 76,5 cm) BWR 9/ x x " (,5 x 7,6 x 5, cm) BWL 9/ x x " (,5 x 7,6 x 5, cm) x4 DF 9/ x x 8-/" (,5 x 7,6 x,6 cm) /8" (0,9 cm) Drill Bit 8 " (,5 cm) Position parts primed side-down on oor, as shown. You will build two shutters the same. Secure with " (,5 cm) screws as shown. Repeat steps to build your second shutter. 4 You have nished building your window shutters. Proceed to install your window. 8-/ (,6 cm) 0-/8 (76,5 cm) -/ (6,4 cm) -/ (6, cm) / (, cm) AZ x 6 -/ (6,4 cm) -/ (6,4 cm) DF x 4 BWR Install with primed side facing down. -/ (6,4 cm) BWL 5

55 WINDOW PARTS REQUIRED: DT 9/ x x 8-/8" (,5 x 7,6 x 7,4 cm) x8 x4 " (5, cm) -/4" (, cm) 8 /4" (,9 cm) Postion window in front gable as shown and secure with four -/4" (,) screws. Seal window with high-quality paintable exterior caulk Mark center of window frame as shown. CENTER " (5, cm) CENTER CENTER HINT: Claulk behind frame CENTER 4 Tack trim (DT) and shutters in place with " nish nails as shown. From the inside of the shed, use /4" screws to secure the shutter indicated at X. Center DT x -/" (6,4 cm) 5 You have nished mounting your window Center 0-/8" (76,5 cm) -/" (6,4 cm) 5-5/8" (4, cm) Center 0-/8" (76,5 cm) 5-5/8" (4, cm) 5

56 Vent Follow directions provided by manufacturer and these instructions. 6 x 8" ( 40,6 x 0, cm) / ( mm) Locate and mark for two vents in side walls as shown. () at top and () at bottom Cut out marked openings Caulk behind vent anges Secure using /" (, cm) screws You have nished installing your vents. 4" (5,6 cm) Caulk 6" (5, cm) "- 5" (7,6 -,7 cm) /" (, cm) 7"- 8" (7,8-0, cm) Caulk /" (, cm) 5" (,7 cm) 6" (5, cm) 4" (5,6 cm) 54

57 PAINT & CAULK - NOT INCLUDED - Use acrylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. Use a high quality exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: Bottom edge of all siding and trim Inside of doors and all 4 edges Note: Prime all un-primed exterior wood before painting. (Follow directions provided by manufacturer.) ROOF FELT - NOT INCLUDED - Install felt ush to all roof edges overlapping ". Use minimal amount of roo ng nails to hold in place. " OVERLAP OK to overlap at ridge. DRIP EDGE - NOT INCLUDED - Install drip edge over roof felt on gable side and under roof felt on eave side (Fig. A). Do not use nails on side of drip edge that hangs over side of building. Only nail top of drip edge as shown. Roof felt Drip edge Drip edge Fig. A Edge ush to trim. Snip bottom side of drip edge and bend over to other side of roof. (Follow directions provided by manufacturer.) 55

58 SHINGLES - NOT INCLUDED - Follow directions provided by manufacturer and these instructions. Familiarize yourself with a -Tab Shingle. Notch SHINGLE NAIL PATTERN Notch " (,5 cm) /" (, cm) Sealing Strip " (,5 cm) Half A Rain Slot Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS. Install rst starter row upside down and color up with a " overhang at back and bottom of roof panel. Use (4) nails per shingle. Starter row must be straight and level all the way across with lower edge of roof deck. NOTE: If you have installed drip edge install shingles ush to drip edge. FRONT OF SHED BACK OF SHED (4) Nails TABS UP " (,5 cm) overhang or ush with drip edge. Shingle overlaps roof decking. " (,5 cm) overhang past roof deck. 56

59 SHINGLES continued... Beginning at front of shed, install rst row of shingles with notch at " past roof edge or ush with drip edge. FRONT OF SHED " (,5 cm) Roof Deck BACK OF SHED Notch - or - with starter row. Drip Edge with starter row. Notch Install second row of shingles ush at top of rst row's rain slots. Ensure " overhang or ush to drip edge at front, stagger each row. FRONT OF SHED BACK OF SHED Bend in roof Notch " (,5 cm) with rain slots. with rain slots. 4 Continue installing rows of shingles by staggering at front. " (,5 cm) FRONT OF SHED Notch 57

60 SHINGLES continued... 5 Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below. If shingles overlap at ridge cut to peak with a utility knife. 5" (,7 cm) MAX. Cut Off. CUT Top of rain slot. 5" (,7 cm) or less. If more than 5" to rain slot you must install another row of shingles. 6 Repeat steps - 7 to shingle the opposite side of your roof. Trim shingles at ridge. 7 Once both sides are shingled you need to trim ends. Strike a chalk line " from edge. 8 Using your shingle hooked blade carefully cut shingles along chalk line. 9 You have nished shingling your roof. Proceed to capping the ridge. 58

61 SHINGLES - RIDGE CAP You will nish off the top of the roof with a ridge cap made from shingles. Cut shingles into THREE pieces. " (5, cm) " (5, cm) Hint: Use cut-off pieces rst. " (5, cm) " (5, cm) " (5, cm) " (5, cm) Score shingle, then snap-off angled cut. ' Weather Seal Top of slot. Note: You will need about 0 - cut pieces for ' x ' model Install rst ridge cap ush to shingles at front, as shown. 0 to Pieces () Nail per side through weather seal. Install second ridge cap 5" back, as shown. 5",7 cm () Nail per side through weather seal. FRONT OF SHED 59

62 SHINGLES - RIDGE CAP continued... 4 Continue installing ridge cap to back of roof. 5 Make sure there is 4" between the shingle-color and edge of shingles. 4" (0, cm) Trim cap off ush to shingles 6 When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot. Cap 7 Install ush to shingles. to shingles () Nails per side. 8 You have nished your ridge cap. 60

63 WARRANTY Backyard Storage Solutions, LLC warrants the following:. Every product is warranted from defects in workmanship and manufacturing for one year.. All hardware and metal components are warranted for two years.. Trim is warranted for 0 years. 4. Waferboard siding and sheathing is warranted for two years. 5. SmartSide siding is warranted for 0 years on all Marco series buildings and 5 years on all Premier Series buildings. 6. Timber series buildings siding and trim are warranted for 0 years. 7. Solar Shed windows are warranted for year. 8. Cedar lumber is warranted for 5 years. 9. Cedar doors and Cedar Garden Center are warranted for 0 years. 0. Metal roof is warranted for 5 years. Backyard Storage Solutions, LLC will repair, replace or pay for the affected part. In no event shall Backyard Storage Solutions, LLC pay the cost of labor or installation or any other costs related thereto. All warranties are from date of purchase. If a cash refund is paid on an affected part, it will be prorated from the date of purchase. CONDITIONS The warranty is effective only when:. The unit has been erected in accordance with the assembly instructions.. The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.. The failure occurs when the unit is owned by the original purchaser. 4. Backyard Storage Solutions, LLC has received the warranty registration card within thirty (0) days of purchase and notification of the failure in writing within the warranty period specified above. 5. Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to inspect and verify the failure prior to commencement of any repair work. REQUIREMENTS Storage Buildings & Playhouses To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or solid-colored stain the siding using 00% acrylic latex exterior product with a minimum of two () coats within thirty (0) days of assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors. Gazebos, Pergolas & Timber Buildings To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit. This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative, an exterior oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 0 days of assembly and as needed thereafter to maintain your warranty. Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement. The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches ( ½ ) from the ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for any labor costs incurred to construct your unit. This warranty gives you certain specific rights that vary from state to state. CLAIM PROCEDURE To make a claim under this warranty, you can either call or prepare a letter. Please have ready the information below when you call or include the information when writing:. The model and size of the product.. A list of the part(s) for which the claim is made.. Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice. 4. Run code, as listed on the yellow warranty card enclosed in the product package. Mail the above information to: Backyard Storage Solutions, LLC Attn: Customer Service 000 Ternes Monroe, MI 486 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A. IMPORTANT: This is your warranty certificate. Please complete and mail your warranty card to properly validate your warranty. Limited Conditional Warranty * 6

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: or

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: or 6778 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: -800-577-9663 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number:

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1677-N STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-888-87-9056 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number:

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 16785 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number:

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 16806 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-966 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16575 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@backyardproductsllc.com Our

More information

F 8:00 AM 7:00 PM EST 8:30 AM 4:30 PM EST

F 8:00 AM 7:00 PM EST 8:30 AM 4:30 PM EST 16646 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-800-696-7595 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16554-SH STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@yardline.net Our staff

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16632 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16580-R STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16011 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-966 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 1656 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-973 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16529 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: customerservice@heartlandind.com Our staff

More information

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number:

STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1615 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-966 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16940 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@yardline.net Our staff is

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16549 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16552 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@yardline.net Our staff is

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16660 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-966 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16810 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16644 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16549 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll free number: 1-800-844-9273 or email: customerservice@backyardproductsllc.com Our

More information

STOP! Call Us First! DO NOT RETURN TO STORE.

STOP! Call Us First! DO NOT RETURN TO STORE. 16712 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-800-577-9663 or email: customerservice@backyardproductsllc.com Our

More information

F 8:00 AM 7:00 PM EST 8:30 AM 4:30 PM EST

F 8:00 AM 7:00 PM EST 8:30 AM 4:30 PM EST 1671 STOP! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-800-577-966 or email: customerservice@backyardproductsllc.com Our

More information

Monterey. 10,12 and 14 Oval Gazebo Instructions

Monterey. 10,12 and 14 Oval Gazebo Instructions 1000 Ternes Drive Monroe, MI 48162 Toll Free 1-800-437-0784 - BEFORE YOU BEGIN - Always wear OSHA-APPROVED safety glasses throughout assembly process First... Read these instructions thoroughly before

More information

: - F 8:00 ESTA 7:00 P.M. EST 8:30 ESTA 4:30 P.M. EST

: - F 8:00 ESTA 7:00 P.M. EST 8:30 ESTA 4:30 P.M. EST 16695 STOP! PARADA! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-888-827-9056 or email: customerservice@backyardproductsllc.com

More information

8 x 12 with Double Doors

8 x 12 with Double Doors 8 x 12 with Double Doors Assembly Instructions Required Tools: Screwgun or Variable Speed Electric Drill Screwdriver Bit (Robertson #2) Hammer Handsaw Tape Measure Step Ladder Optional Tools: Square /

More information

8 x 12 Garden Shed. Assembly Instructions. Parts List on Next Page

8 x 12 Garden Shed. Assembly Instructions. Parts List on Next Page 8 x 12 Garden Shed Assembly Instructions 6 2 Required Tools: Screwgun or Variable Speed Electric Drill Screwdriver Bit (Robertson #2) Hammer Handsaw Tape Measure Step Ladder Optional Tools: Square / Level

More information

10 x 10 Garden Shed Assembly Instructions

10 x 10 Garden Shed Assembly Instructions READY TO ASSEMBLE KITS Kenex Manufacturing Ltd 27 Regan Road Brampton,ON L7A 1B2 www.gardendec.com 10 x 10 Garden Shed Assembly Instructions Item #: 5 1 4 Required Tools: Screwgun or Variable Speed Drill

More information

: - F 8:00 ESTA 7:00 P.M. EST 8:30 ESTA 4:30 P.M. EST

: - F 8:00 ESTA 7:00 P.M. EST 8:30 ESTA 4:30 P.M. EST 16691 STOP! PARADA! Call Us First! DO NOT RETURN TO STORE. For immediate help with assembly or product information call our toll-free number: 1-888-827-9056 or email: customerservice@backyardproductsllc.com

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 17, 2017 the Roanoke 16'x32' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 19, 2017 the Millcreek 12'x 20' Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted Under the

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x24' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x28' Building w/ full loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x20' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

Best Barns USA. the Danbury 8' x 12' Assembly Book. Revised February 17, 2017

Best Barns USA. the Danbury 8' x 12' Assembly Book. Revised February 17, 2017 Best Barns USA Assembly Book Revised February 17, 2017 the Danbury 8' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive, Greenville, PA 16125 This manual is copyrighted. Under the

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 19, 2016 the Meadowbrook-R 16' x 10' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised February 17, 2015 the Meadowbrook-R 12' x 10' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 12, 2017 the Easton 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised July 27, 2012 the North Dakota with pocket doors 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 19, 2016 the Meadowbrook-R 12' x 10' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is

More information

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017

Best Barns USA. Assembly Book. 12'x 16' the Millcreek. Revised September 19, 2017 Assembly Book Best Barns USA Revised September 19, 2017 the Millcreek 12'x 16' Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted Under the

More information

Assembly Book. the Brandon Building Size 12' x 20' Revised September 13, 2017

Assembly Book. the Brandon Building Size 12' x 20' Revised September 13, 2017 Assembly Book Revised September 13, 2017 the Brandon Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under the

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised August 15, 2017 the Richmond 16'x32' Building w/ Full Loft Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted

More information

the Greenbriar 12' x 16' Best Barns USA Assembly Book Revised June 4, 2013

the Greenbriar 12' x 16' Best Barns USA Assembly Book Revised June 4, 2013 Best Barns USA Assembly Book Revised June 4, 2013 the Greenbriar 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA. the Danbury - R 8' x 12' Assembly Book. Revised September 30, 2016

Best Barns USA. the Danbury - R 8' x 12' Assembly Book. Revised September 30, 2016 Best Barns USA Assembly Book Revised September 30, 2016 the Danbury - R 8' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016

Best Barns USA. the Brookhaven 10' x 16' Assembly Book. revised March 23, 2016 Best Barns USA Assembly Book revised March 23, 2016 the Brookhaven 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised February 4, 2016 the Millcreek-R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised October 11, 2018 the Woodville 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under

More information

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised May 31, 2013

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised May 31, 2013 Best Barns USA Assembly Book Revised May 31, 2013 the Greenbriar 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 13, 2017 the North Dakota with pocket doors 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 19, 2017 the Woodville 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised December 6, 2013 the Denver-R 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

8 x 12 Garden Shed. Assembly Instructions

8 x 12 Garden Shed. Assembly Instructions 8 x 12 Garden Shed Assembly Instructions Required Tools: Screwgun or Variable Speed Electric Drill Screwdriver Bit (Robertson #2) Hammer Handsaw Tape Measure Step Ladder Optional Tools: Square / Level

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 20, 2013 the Easton - R 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns. 10' x 16' the Elm R. Assembly Book. revised September 29, 2016

Best Barns. 10' x 16' the Elm R. Assembly Book. revised September 29, 2016 Best Barns Assembly Book revised September 29, 2016 the Elm R 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under the

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 12, 2017 the Denver 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted. Under the

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 13, 2017 the North Dakota with pocket doors Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 Building Size 12'x12'

More information

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April

the Greenbriar 12' x 20' Best Barns USA Assembly Book Revised April Best Barns USA Assembly Book Revised April 28 2015 the Greenbriar 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Precut Value Shed Manual Gambrel Barn

Precut Value Shed Manual Gambrel Barn Tools Needed: -Cordless Drill (12V or higher) -#2 Square Drive Bit -Hammer -6 Step Ladder -Tape Measure -Square utility knife w/ blade & hook blade -Speed Square Little Cottage Co. PO Box 455 Berlin, OH

More information

Assembly Book. the Brandon. Building Size 12'x12' or 12'x16' Revised September 13, 2017

Assembly Book. the Brandon. Building Size 12'x12' or 12'x16' Revised September 13, 2017 Assembly Book Revised September 13, 2017 the Brandon Building Size 12'x12' or 12'x16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017

Best Barns USA. Regency Deluxe. 8' x 12' Assembly Book. revised February 15, 2017 Best Barns USA Assembly Book revised February 15, 2017 Regency Deluxe 8' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive, Greenville, PA 16125 This manual is copyrighted. Under

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised February 4, 2016 the Millcreek-R 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised July 6, 2015 Garage Door by Owner Tahoe-R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual

More information

Best Barns. 10' x 12' the Elm R. Assembly Book. revised September 29, 2016

Best Barns. 10' x 12' the Elm R. Assembly Book. revised September 29, 2016 Best Barns Assembly Book revised September 29, 2016 the Elm R 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under the

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 12, 2017 the Arlington Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

Keystone Garage Assembly Manual

Keystone Garage Assembly Manual Keystone Garage Assembly Manual 14x24 Garage Kit ships as shown Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST 13 8 deep AMISH ORIGINAL KEYSTONE 14x24 GARAGE s p e c i f i c a t i o n s Optional

More information

Assembly Book. the Fairview. Building Size 12'x12' Revised July 25, 2012

Assembly Book. the Fairview. Building Size 12'x12' Revised July 25, 2012 Assembly Book Revised July 25, 2012 the Fairview Building Size 12'x12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Assembly Book. Northwood Deluxe. 14'x10' Revised on August 28, 2015

Assembly Book. Northwood Deluxe. 14'x10' Revised on August 28, 2015 Assembly Book Revised on August 28, 2015 Northwood Deluxe 14'x10' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 19, 2015 the Arlington-R Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This

More information

Manufactured by Reynolds Building Systems, Inc.

Manufactured by Reynolds Building Systems, Inc. up EZ Sheds Assembly Book the Ashbury January 19, 2008 8' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the

More information

Best Barns USA Assembly Book Revised October 24, 2017

Best Barns USA Assembly Book Revised October 24, 2017 Best Barns USA Assembly Book Revised October 24, 2017 Garage Door by Owner the Tahoe 12'x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

Best Barns USA Assembly Book Revised November 3, 2016

Best Barns USA Assembly Book Revised November 3, 2016 Best Barns USA Assembly Book Revised November 3, 2016 the Aspen II 12' x 8' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive, Greenville, PA 16125 This manual is copyrighted. Under the

More information

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014

Assembly Book. 10' x 16' the Cambridge II. revised July 15, 2014 Assembly Book revised July 15, 2014 the Cambridge II 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the

More information

Assembly Book. 10' x 12' the Cambridge II. revised June 13, 2014

Assembly Book. 10' x 12' the Cambridge II. revised June 13, 2014 Assembly Book revised June 13, 2014 the Cambridge II 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the

More information

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015

6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015 6x6 Maximizer Storage Shed Assembly Manual Version #9 Feb 26th, 2015 Thank you for purchasing a 6x6 Maximizer Storage Shed. Please take the time to identify all the parts prior to assembly. Please Note-

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 19, 2017 Garage Door by Owner the Tahoe 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

the Lakewood 12' x 24' Sentry Buildings Assembly Book November 22, 2017

the Lakewood 12' x 24' Sentry Buildings Assembly Book November 22, 2017 Sentry Buildings Assembly Book November 22, 2017 the Lakewood Manufactured by Reynolds Building Systems, Inc 205 Arlington Drive Greenville, PA 16125 12' x 24' This manual is copyrighted Under the copyright

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 12, 2017 the Arlington Building Size 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation Pacifica Pool House Assembly Manual Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST Package ships as shown Simpson Hurricane Straps Double Insulated Raised-Panel Door in back wall (71 x71 Total opening)

More information

Assembly Book. Northwood Deluxe. 10'x10' Revised on May 20, 2014

Assembly Book. Northwood Deluxe. 10'x10' Revised on May 20, 2014 Assembly Book Revised on May 20, 2014 Northwood Deluxe 10'x10' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted. Under the

More information

Best Barns. the Cypress R 10' x 16' Assembly Book. revised February 19, 2016

Best Barns. the Cypress R 10' x 16' Assembly Book. revised February 19, 2016 Best Barns Assembly Book revised February 19, 2016 the Cypress R 10' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised March 6, 2017 the Arlington Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.

More information

8x12 SpaceMaker Garden Shed Assembly Manual

8x12 SpaceMaker Garden Shed Assembly Manual 8x12 SpaceMaker Garden Shed Assembly Manual Version #6 Revised June / 2007 Thank you for purchasing a 8x12 SpaceMaker Garden Shed. Please take the time to identify all the parts prior to assembly. Safety

More information

HowtoPlans..org. DuraMax 8'x12 Garden Shed Plan

HowtoPlans..org. DuraMax 8'x12 Garden Shed Plan HowtoPlans.org DuraMax 8'x12 Garden Shed Plan Compare our Free vs. Premium Shed Plan This perfectly designed plan will guide you through the entire process of building your very own shed for any backyard

More information

Chapter 22. Shed Construction

Chapter 22. Shed Construction Chapter 22. Shed Construction 22.1 BUILDING SHED FLOOR 22.2 BUILDING SHED WALLS 22.3 BUILDING SHED ROOF 22.4 ASSEMBLING SHED Tools needed by volunteers: Hammer Nail apron Tape measure Square Utility knife

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 19, 2015 the Arlington-R Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This

More information

E-Z BUILD SHED BUILDING GUIDE 10' 10' 10' 12' 10' 14' 10' 16' 10' 20'

E-Z BUILD SHED BUILDING GUIDE 10' 10' 10' 12' 10' 14' 10' 16' 10' 20' E-Z BUILD SHED BUILDING GUIDE 12' 14' 16' 20' North American softwood dimensional lumber sizes: NOMINAL in in 1 4 1 6 2 4 2 6 ACTUAL in in ¾ 3½ ¾ 5½ 1½ 3½ 1½ 5½ Shown with rollup door Construct your own

More information

Best Barns. 10' x 12' the Cypress R. Assembly Book. revised September 29, 2016

Best Barns. 10' x 12' the Cypress R. Assembly Book. revised September 29, 2016 Best Barns Assembly Book revised September 29, 2016 the Cypress R 10' x 12' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted. Under

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 19, 2015 the Glenwood Building Size 12' x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual

More information

HowtoPlans..org. 12'x20' Garden Shed Plan

HowtoPlans..org. 12'x20' Garden Shed Plan HowtoPlans.org 12'x20' Garden Shed Plan Compare our Free vs. Premium Shed Plan This perfectly designed plan will guide you through the entire process of building your very own shed for any backyard or

More information

Cape Cod Manual. Little Cottage Co. PO Box 455 Berlin, OH Little Cottage Co.

Cape Cod Manual. Little Cottage Co. PO Box 455 Berlin, OH Little Cottage Co. Tools Needed: -Cordless Drill (12v or higher) -#2 Square drive bit -Hammer -6 Step Ladder -Tape Measure -Square utility knife with blade & hook blade -Speed Square Little Cottage Co. PO Box 455 Berlin,

More information

Gambrel Barn with Overhang Manual

Gambrel Barn with Overhang Manual Tools Needed: -Cordless Drill (12V or higher) -#2 Square Drive Bit -Hammer -6 Step Ladder -Tape Measure -Square utility knife w/ blade & hook blade -Speed Square Little Cottage Co. PO Box 455 Berlin, OH

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised June 14, 2017 the Glenwood Building Size 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised September 13, 2017 the Belmont Building Size 12' x 16' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 This manual is copyrighted.

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised June 14, 2017 the Glenwood Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.

More information

HowtoPlans..org. Skyline 10'x14' Garden Shed Plan

HowtoPlans..org. Skyline 10'x14' Garden Shed Plan HowtoPlans.org Skyline 10'x14' Garden Shed Plan Compare our Free vs. Premium Shed Plan This perfectly designed plan will guide you through the entire process of building your very own shed for any backyard

More information

8x8 Shed Plans and Building Guide

8x8 Shed Plans and Building Guide Page 1 Legal 2018 Zac Spade & Christopher D. Brown. All Rights Reserved For information about special discounts available for bulk purchases, sales promotions, fundraising and educational needs, contact

More information

HowtoPlans..org. 10'x10' Storage Shed Plan

HowtoPlans..org. 10'x10' Storage Shed Plan HowtoPlans.org 10'x10' Storage Shed Plan Disclaimer The information provided here will show you how to build a chicken coop. However, we at howtoplans.org do not claim that the recommended techniques are

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised June 14, 2017 the Belmont-R Building Size 12' x 24' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive - Greenville, PA 16125 This manual is copyrighted.

More information