R/V L ATALANTE D SHEET METAL WORKS SHIP REPAIRS In your fixed prices, you shall include the paint treatment after sheet metal works.

Size: px
Start display at page:

Download "R/V L ATALANTE D SHEET METAL WORKS SHIP REPAIRS In your fixed prices, you shall include the paint treatment after sheet metal works."

Transcription

1 R/V L ATALANTE D SHEET METAL WORKS SHIP REPAIRS 2014 In your fixed prices, you shall include the paint treatment after sheet metal works. 1. DECK THREADED HOLES OF THE AFT WORKING DECK SWL: 2,5 T Repair of the threaded holes, the thread of which (M 30) is damaged. At the beginning of the work, the location of the deck threaded holes concerned will be presented to the shipyard. A location plan will be given to the shipyard. Two actions are possible: 1.1 Complete replacement of the threaded hole - Removal of the threaded hole, cutting of underlying stiffeners. - Chamfering of the deck sheet metal. - Check of positioning between-centres of the threaded hole. It is imperative to be sure of the thread defined in the transversal and longitudinal directions. Unless there is another definition on the plan the following holes threads shall be observed : - Transversal thread: 800 mm. - Longitudinal thread: 1100 mm. - Upper welding in several passes. - Grinding of the welding in order to be flush on deck. - Rewarding of under-deck stiffeners (gussets, flats, carlings) and welding under the deck of the threaded hole. - Inspection of the wildings with dye penetration test.. Chapter D D - 1

2 1.2 Repair by insert - By a carefully centred magnetic pillar drill, drilling from one side of threaded hole to the other to the suited diameter, - Via 2 taps supplied by owner, tapping of the drilled hole at thread M 50 x 1.5 Taps: Brand: TITEX PLUS M 50 x 1.5 B 218 No. 1 and no. 3 - Installation of the insert supplied by owner Insert: Material: a.c.42 Outside threading: M 50 x 1.5 Inside threading: ISO M 30 - Braking of the insert by strong thread brake Loctite. - The upper surface of the insert shall be flush on deck or lightly recessed.. General note for the 2 options: - The threaded holes and inserts are supplied by owner. - At the request of the Bureau Veritas inspector: - Some welds can be X-rayed. - Some threaded holes can be tested at SWL of 2.5 tons. - Removing and refitting ceiling panels under the decks may be necessary as shall be work in state control. - For option 1 Welding the approach work under the decks (remove / refit of pipes, etc.) shall be included. Chapter D D - 2

3 2. ULTRASONIC THICKNESS MEASUREMENT OF SHEETS See BV rules and table on the next page (age>15). Note: commissioning of the vessel is Following plans will be read on board before measurement : CM 0/1 B : structure générale - planche CM 0/2 B : structure générale - planche CM 0/3 A : coupes d échantillonnage milieu - planche CM 0/4 A : coupes transversales d échantillonnage - planche CM 2/1 C : développement de bordé Before survey, a meeting will be carry out with Bureau Veritas inspector, the superintendent and society responsible of measurement thickness. Your prices include an expert report, in 3 copies and 1 computerized copy with the requirements of Bureau Veritas and IACS. Each point must be in tables with localization, type of structure, reading thickness and origin thickness. Thickness measurement shall be carrying out by an Bureau Veritas agreed society. To eventually carrying out quickly the replacement of sheet, a handwritten report will be given to the superintendent. FIXED PRICE per measure: Number of point < 500: Number of point > 500 and < 1000:.. Number of point > 1000 and < 2000:. Number of point > 2000:.. Note: in addition of requirements of Bureau Veritas, thickness measures will be carrying out in following rooms: - Bow thruster room floor - Tube hole floor - Midship store floor Chapter D D - 3

4 Chapter D D-4

5 3. MIDSHIP STORE FRESH AIR VENTILATOR FLAP VALVE Position: Deck C, Starboard of aft working deck - Removal of the flap valve - Supply and installation of an identical flap valve (with paint treatment) 4. STEERING GEAR ROOM USED AIR VENTILATOR FLAP VALVE Position: Deck C, starboard of the working deck - Removal of these flap valve, - Flaps condition check, protective paint. - Scrapping, picking, protective painting of ventilator flap valve, - Replacement of ball if necessary, - Refit. Chapter D D - 5

6 5. CONTAINER HANDLING Position: deck C, starboard passageway Number: 2 - Welding of brackets aft and fore of each eyebolt, - Test under 3 tons - Paint repair 6. STARBOARD DAVIT FRAME Location: deck C, starboard passageway under deck D floor. - Removal corroded plates, - Welding new plates with same origin thickness Chapter D D - 6

7 7. SEA WATER BALLAST N 7 Surface: 3 m² - Removal floor plate of the hold around manholes (starboard and port side) of sea water ballast n 7, - Weld a new plate and a new flush manholes (two), - Cut the sea water ballast n 7 air discharge pipe inside DO ballast n 10 - Paint treatment inside ballast and outside include Chapter D D - 7

8 8. TUBES HOLD To contain sea water on the front of the hold: - Gas freeing of DO ballast n 11, - Confection and weld a steel plate of height 100 mm just forward of a man hole across the width of the hold, - Confection of a pipe DN 40 until the drip tray of the hatch cover to the drain hole. 9. BULKHEAD PASSAGEWAYS Concern 3 cables passageways: - One located on deck G, on aft port side : diameter 110 mm Chapter D D - 8

9 - One located on deck E, aft starboard side: diameter 140 mm - One located on deck D, aft starboard side: diameter 140 mm - One located on aft deck F (removal the ceiling in the master cabin) For each cable passageway: - Cut the old part, - Refit a new part including the lock system Chapter D D - 9

10 10. AFT ROLLER FAIRLEADS - Removal rollers, - Cut the base of fairleads - Confection of a new base, - Refit rollers. 11. HAWSE HOLE ROLLERS See plan 278-AC-0/2 - Removal rollers - Sand blasting rollers - Paint treatment, - Refit rollers. Chapter D D - 10

11 12. FOLDING FLOOR FOR CONTAINER ACCESS Number: 2 Located deck E port and starboard side Dimensions: 2080 x 600 Thickness: 5 mm with bent edge of 60 mm - Removal of folding floors, - Confection of new folding floors, - Refit. 13. DECK HATCH Concern 2 deck hatches: - Hatch to access scientist control room: deck F - Hatch to access aft bridge Work to do: - Removal of hatch, - Cut corroded parts (flanged edge) and refection, - Paint treatment - Set a new gasket - Refit on board, - Tightness test. Chapter D D - 11

12 14. DOOR TO ACCESS AFT BRIDGE Located port side deck F. - Removal the door, - Removal ceiling inside, - Removal upper hinge, - Cut the support plate, - Refection hinge, - Weld the support plate, - Paint treatment, - Refit the door, - Tightness test. Chapter D D - 12

13 15. TECHNIC ROOM PORTHOLE Location: Deck F Dimension of porthole: 600 x 400 mm - Removal porthole - Replacement of hinges and axes, - Refit - Tightness test Chapter D D - 13

14 16. FREON CIRCUIT ON DECK G - Removal ceiling under the hole in the bridge (just above the ladder) - Removal protection of Freon circuit on deck G - Cut bracket mounting clamps, - Weld a double plate at level of the hole (dimensions: 200 x 200), - Weld plates (50 x 50 mm) on bracket mounting clamps, - Glue plates on deck with TEROMIX 6700 (supply by owner), - Paint treatment. 17. AFT CRANE - Total refection of the hydraulic unit box. - Paint treatment Chapter D D - 14

15 18. PORTHOLES (RECTANGULAR SECTION) WATERTIGHTNESS WORK Concerns the portholes (rectangular section) of deck F and deck E Deck F Fore wheelhouse: 14 portholes (13 fixed and 1 opening) Aft wheelhouse: 8 portholes (7 fixed and 1 opening). Deck E 4 portholes on the front. Dimensions of a porthole: 600 mm x 400 mm For each porthole: - Removal, - Replacement of seals (seal between glazing and frame if necessary) supplied by vessel. - Sanding, grinding and surfacing of the mating faces. - Replacement of hinges on the deadlight if necessary (for deck E), - Lubrication of hinges (for opening portholes). - Refit. - Inspection of the mating faces with chalk (for opening portholes). - Water tightness checks using a fire hose. FIXED PRICE by porthole... Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. The painting work shall be work in state control. 19. PORTHOLES (CIRCULAR SECTION) WATERTIGHTNESS WORK Concerns the portholes (circular section) of decks B and C on the hull side Number of portholes: 35 as follows: 10 fixed and 25 opening. For each porthole: - Removal. - Replacement of seals supplied by vessel. - Sanding, grinding and surfacing of the mating faces. - Lubrication of hinges (for opening portholes). - Refit. - Inspection of the mating faces with chalk (for opening portholes). - Water tightness checks using a fire hose. FIXED PRICE by porthole... Chapter D D - 15

16 20. DOOR OF BATTERIES ROOM Location: Deck E on port side - Replacement of the door supplied by owner. 21. TRANSOM PLATE - Removal all Delta fenders, - Grinding of the part located under fenders, - Ultrasonic thickness measurement of the sheet, - Paint treatment, - Refit fenders. Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. Chapter D D - 16

17 22. ACCESS LADDER FOR PILOT LADDER Currently, this ladder is not removable: - Cut pipes welded on the main rail, - Weld a tube on the main rail as shown on the scheme below - Refection of upper tubes on the access lader. Chapter D D - 17

18 23. SAFETY GUARD - Confection of four elements to close the aft part of the ship. - Material: aluminium - Dimensions: see scheme below Chapter D D - 18

19 24. AFT PORT SIDE SHELL PLATE Location: frame n 3 - Cut the frame around the deformation over a height of 800 mm, - Cut the shell plate of 300 mm either side of the deformation - Reconstitution of the shell plate (thickness: 8,5 mm) and the frame. - Paint treatment after work. 25. PORT GENAVIR LOGO - Removal the logo, - Cut stainless steel plates, - Weld steel plates - Paint treatment - Refit the logo. Chapter D D - 19

20 26. MAGNETOMETER WINCH - Removal winch (electric connexion by the crew), - Removal stanchions and footbridge, - After eventually sheet metal works and paint treatment, refit stanchions, footbridge and winch. Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. The painting work shall be work in state control. 27. AFT ENGINE ROOM BLOWER DUCT Location: at port side, under the aft crane. - Cut the grid and the end of the blower duct (50 mm as shown below on picture), - Refection of the air duct, - Confection of a new grid that will be fixed by screw on the air duct, - Confection of a new plug, articulations, and locked system, - Paint treatment. Area to cut Chapter D D - 20

21 28. ADJUSTABLE PROJECTOR - Removal the direction system of the projector (axe and wheel) - Refection of the deck passageway - Refit axe end wheel, - Water tightness test. 29. NAVIGATION LIGHTS BOXES Number: 2 Location: on deck F - Removal lights and cables, - Removal boxes - Confection and fit new boxes, - Paint treatment, - Refit cables and lights. Chapter D D - 21

22 30. PROVISION CRANE FRAME Location: on fore deck E - Cut the upper forward part of the frame, - Identical refection, - Paint treatment. 31. SCIENTIST ROOMS BLOWER DUCT GRID - Removal of the grid, - Confection of a new grid - Paint treatment, - Refit the new grid. Chapter D D - 22

23 32. 50% AIR HANDLING UNIT - Removal the air register, - Cut the elbow of air duct to adapt the new air register, - Fit the new air register supplied by owner. Elbow to cut Air register to change Chapter D D - 23

24 33. PLATES UNDER DELTA FENDERS DECK D AND E Number: 8 Removal delta fenders, Removal ceiling inside at deck E (no ceiling deck D) Thickness measurement of the plate, Replacement of plate if necessary, Welding new screws Note: If metal sheet work is necessary, this will be subject to an additional submission of prices. The painting work shall be work in state control. Chapter D D - 24

25 34. CTD CONTROL UNIT BOXES Number: 2 Actual dimensions: 400 x 300 x 160 mm (without cover) - Removal cables and connexion, - Removal all equipment inside, - Confection of new boxes (in stainless steel) with dimensions: 450 x 370 x 210 mm (without cover), - Refit all equipment in the new boxes, - Cabling and trials. 35. GALLEY EXTRACTION DUCT Cleaning and degreasing of the duct. To be done while the duct extraction fan is being overhauled by the electrical team (avoid removing the fan). Area to clean and degrease: From the galley hood included to the extraction box on deck D starboard outside passageway. This corresponds, other than the hood and extraction unit, with the following duct segments marked on the attached plans: - 19, 18, 17 (section: 900 x 400 mm.) : length = 3600 mm. - 39, 40, 41, 42, 43 : length = 4000 mm. - 38, 37, 36, 35, 34, 33, 32 : length = 3500 mm. - 31, 30, 29, 28, 27, 26 : length = 4500 mm. Chapter D D - 25

26 36. SERVICE BOAT CRADLE - Confection a cradle for the service boat. - The size will be imperatively as a 20 container. - The three brackets in wood will be adapted to the shape of boat keel. Chapter D D - 26

27 37. EMERGENCY STOP FOR WILDEN PUMP - Confection of 3 bulkhead passageways for a cable of 16 mm, - Confection of a chipping on air pipe. Diameter of pipe: 22 mm Chapter D D - 27

28 38. DECK THREADED HOLES OF THE 800MM INSTRUMENTS WELL The 8 threads (M16) used to support the instruments are corroded and need to be drilled to the upper size (M18). See plans below. The work requested is, for each of the 8 threads : - Cleaning - Drilling to 18mm - Threading to M18 - Providing a brass cap to protect the new thread from further corrosion The 4 holes from the supporting structure must also be enlarged to 18mm, and appropriate screws must be provided (for example, FHC 18 x 30 stainless steel A4). Once done, the system will be tested by the crew to ensure proper operation.. Chapter D D - 28

29 39. WEIGHT 1 TONNE - Replacement of lifting rings, - Sandblasting - Paint treatment of two coats of anti-corrosive epoxy. 40. GALLEY FRIDGE - Removal the double plate on the bottom of the fridge, - Confection of a new double plate in stainless steel (without fixation to clean), - Dimensions of the bottom: 700 x 1280 mm. Chapter D D - 29

30 41. WORK IN STATE CONTROL Normal hourly rate:... Additional hourly rate (indicating the corresponding hourly slots): Hourly rate for Saturday and Sunday:... (Idem) Hourly rate for public holidays:... (Idem) Enclose your special tool rates. NOTE: A statement of work, clearance, wear, replacement parts will be returned at board at the end of the technical stop: - 3 copies «paper», - 1 copy in digital format Are included in the visited items: cleaning units recovered, and removal of foreign matters in the bilge after works. When this is indicated, «paint treatment» includes: - 2 coats of anti-corrosive epoxy : 2 x 140 µm - 2 finishing coats : 2 x 50 µm - Paint is provided by Genavir. Chapter D D - 30

Kiosk Solution W1000. Installation and Assembly Instructions July 2015 Edition

Kiosk Solution W1000. Installation and Assembly Instructions July 2015 Edition Kiosk Solution W1000 Installation and Assembly Instructions July 2015 Edition All product names mentioned in this document are the trademarks, brands or registered trademarks of their respective owner.

More information

Table of Contents. Prime Industries, Inc.

Table of Contents. Prime Industries, Inc. MARINE HARDWARE Table of Contents Deck Cleats...1-2 Chocks...2 Deck Fills...3 Top Fittings... 4-6 Pull Pins & Accessories...6-7 Noise Reduction Top Fittings... NEW!...7 Snap Hooks & Additional Hardware...8

More information

More Storage Space Under Yacht Bed

More Storage Space Under Yacht Bed More Storage Space Under Yacht Bed Open up storage space under your bed! Convert your bed deck to a Lifting Hatch with Gas Spring assist! Many bed decks on boats and RV s have two or three pieces of plywood

More information

T3500 #131 Sole Repair & Re-setting. Adding Access to the Hidden Bilge

T3500 #131 Sole Repair & Re-setting. Adding Access to the Hidden Bilge Purpose: 1. To repair a damaged portion of the holly/teak veneered plywood sole by the mast base and provide ventilation and drainage between the sole and the fiberglass sub sole. 2. To install a new hatch

More information

SE5a Instrument Board part 2 - rev 1.1

SE5a Instrument Board part 2 - rev 1.1 SE5a Instrument Board part 2 - rev 1.1 Fuel (Petrol) Valve This valve uses two circular name plates, eight brass screws, one black plastic base, copper wire and two black plastic risers. You can pick any

More information

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel INSTALLATION INSTRUCTIONS Frame Reinforcement Kit 11100 (Patent Pending) 1968-72 GM A-Body Coupe/Sedan Read Instructions FULLY before starting Installation Important Note Installation of this kit requires

More information

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel

Important Note. Tools Required: Welder capable of fully welding 10 GA.135 steel INSTALLATION INSTRUCTIONS Frame Reinforcement Kit 11102 (Patent Pending) 1964-67 GM A-Body Coupe/2dr Sedan Read Instructions FULLY before starting Installation Important Note Installation of this kit requires

More information

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS

Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS Assmann Corporation of America TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS General Information Assmann polyethylene storage tanks are manufactured to give you the toughest, most reliable

More information

installation guide 1 GUIDE#: pwb-assault-004

installation guide 1 GUIDE#: pwb-assault-004 assault WAKEBOARD tower installation guide INSTALLATION SUPPORT 1 important information This Aerial wakeboard tower fits motor boats with 76-108 inch wide beam widths. This measurement is taken from the

More information

Design Guide for Hot Dip Galvanizing best practice for venting and draining

Design Guide for Hot Dip Galvanizing best practice for venting and draining Design Guide for Hot Dip Galvanizing best practice for venting and draining Contents Introduction 3 Handrails/ 25 Balustrades Importance 4 of Venting and Draining Purpose Safety Quality Aesthetics General

More information

535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

535A. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A. Pipe and Bolt Threading Machine A Main Components 0 Screw, Button Head /" - 0 x /" () Washer, Flat /" ()" Top Cover 0 Base Bottom Cover Screw, Pan Head # - x " () Carriage Assembly 0 Front Support Bar

More information

HYDRAULIC CONTROL DETAILS PARTS LIST

HYDRAULIC CONTROL DETAILS PARTS LIST Always give model number, serial number and part number when ordering repair parts. HYDRAULIC CONTROL DETAILS PARTS LIST REF NO. PART NUMBER DESCRIPTION 1 101939 Hydraulic Tank 2 101940 Hydraulic Tank

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS SELF LEVELING RADAR ANTENNA MOUNT MODEL 400G QUESTUS MARINE, INC. PO BOX 9 MARBLEHEAD, MA 01945 1-800-RADAR66 TEL 781.639.1900 FAX 781.639.1905 www.questusmarine.com INSTALLATION

More information

HAPPY HUNTER BUILD LOG

HAPPY HUNTER BUILD LOG HAPPY HUNTER BUILD LOG After finishing a Billings model of the Calypso in January, 2012, I decided to build a model of the Happy Hunter, a Robbe kit I had stashed 3036 3037 3038 3039 from an earlier purchase.

More information

FORWARD FUSELAGE SIDES & REAR TOP SKINS

FORWARD FUSELAGE SIDES & REAR TOP SKINS FORWARD FUSELAGE SIDES & REAR TOP SKINS WORK REPORT Step No. Check Parts / Tools Qty Preparations. 1 [ ] 6F5-3 Upper Front Longerons 2 2 [ ] 6F5-5 Heel Support 1 3 [ ] 6F5-2 Front Floor Skin 1 3 [ ] Firewall

More information

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter

TIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 TIRE RACK INSTALLATION INSTRUCTIONS 07-11 Dodge Sprinter Please read before beginning Stainless steel hardware may bind together

More information

Precision Steel Car s 100 T Steel Coil Car

Precision Steel Car s 100 T Steel Coil Car Precision Steel Car s 100 T Steel Coil Car Precision Steel Car www.precisionsteelcar.com info@precisionsteelcar.com Paul Vernon: (513) 571-5739 Revised 4/30/2009 Contents of Kit Main Tube Side Frame 2

More information

STANDARD CANOPY WORK REPORT B-1

STANDARD CANOPY WORK REPORT B-1 STANDARD CANOPY WORK REPORT B-1 No. Check Parts / Tools Qty _ Canopy Lock 1 [ ] 6E2-3 Canopy Hinge Block 1 2 [ ] 6E4-5 Canopy Side Frame 2 2 [ ] 6E2-1 Canopy Lock Assembly 1L + 1R 3 [ ] 6E2-4 Rear Lock

More information

NAVSEA STANDARD ITEM

NAVSEA STANDARD ITEM NAVSEA STANDARD ITEM FY-19 DATE: 01 OCT 2017 CATEGORY: I 1. SCOPE: 1.1 Title: Threaded Fastener Requirements; accomplish 2. REFERENCES: 2.1 Standard Items 2.2 S9086-CJ-STM-010/075, Fasteners 3. REQUIREMENTS:

More information

Building Instructions Diva cabin boat

Building Instructions Diva cabin boat Building Instructions Diva cabin boat Order no. 3093/00 aero-naut Modellbau Stuttgarterstr. 18-22 D-72766 Reutlingen / Germany http://www.aero-naut.com 1 For pictured building instructions please see the

More information

BEFORE YOU BEGIN Read these instructions completely and carefully.

BEFORE YOU BEGIN Read these instructions completely and carefully. Installation Instructions Above the Cooktop Oven Model JVM2052 Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: GEAppliances.com BEFORE YOU BEGIN Read these instructions completely

More information

Main Drive Components

Main Drive Components Pipe and Bolt Threading Machine Main Drive Components 0 0 Rear Centering Head Centering Jaw Set Spiral Pins () 00 Centering Scroll Retaining Ring 0 Rear Bearing 0 Oil Ball Valve () # - x / Screw Motor

More information

Heavy and Medium Duty Fire Doors

Heavy and Medium Duty Fire Doors Heavy and Medium Duty Fire Doors 10 06.06.2011 Add. Section 1.4. JES VK 09 14.12.2009 New doc. Frontpage JES VK 08 29.11.2006 Page 8 and 13 revised JES VK 07 08.11.2006 Page 15 revised JES VK 06 08.03.2005

More information

Introduction: The model should be assembled following the sequence of the stages of construction described in these instructions.

Introduction: The model should be assembled following the sequence of the stages of construction described in these instructions. Victoria Bestell-Nr. 3082/00 Introduction: The model should be assembled following the sequence of the stages of construction described in these instructions. The laser-cut components are individually

More information

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger

INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger INSTALLATION INSTRUCTIONS FOR FRONT CASTING DECK RAIL Ranger TOOLS REQUIRED FOR INSTALLATION: Drill motor, (1) 5/16 inch drill bit, (1) 13/64 drill bit, (1) 3/16 inch hex wrench (1) 3/32 inch hex wrench.

More information

installation guide 1 GUIDE#: pwb-assault-001

installation guide 1 GUIDE#: pwb-assault-001 assault WAKEBOARD tower installation guide INSTALLATION SUPPORT 1 important information This Aerial wakeboard tower fits motor boats with 76-108 inch wide beam widths. This measurement is taken from the

More information

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure NAVSEA STANDARD ITEM ITEM NO: 009-05 DATE: 18 JUL 2014 CATEGORY: I 1. SCOPE: 1.1 Title: Temporary Accesses; provide 2. REFERENCES: 2.1 Standard Items 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection

More information

Building a Gas Forge Some New Thoughts on Gas Forges

Building a Gas Forge Some New Thoughts on Gas Forges Building a Gas Forge Some New Thoughts on Gas Forges by Dan Jennings Knowledge is just a placeholder until there is better knowledge. Mark Aspery Teaching in a blacksmithing lab with a flow meter on a

More information

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent.

Inspection. Assembly Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 6010-34 Inspection 3. Install the springs. 1. Discard the 0-rings. 2. Clean all parts in cleaning solvent. 3. If spring test equipment is available, check the tension of each spring according to the specifications

More information

FINNEY7 4500G May17 SR 4500G TENDER. Fig 1. Original Appearance. Side raves Sanding gear Front water fillers TIA Water treatment system

FINNEY7 4500G May17 SR 4500G TENDER. Fig 1. Original Appearance. Side raves Sanding gear Front water fillers TIA Water treatment system Fig 1. Original Appearance Side raves Sanding gear Front water fillers TIA Water treatment system 4500G - 3 Fig 2. Rebuilt Condition Cut down side raves with fire iron tunnels# TIA removed and replaced

More information

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure

NAVSEA STANDARD ITEM. 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection of Ships Structure NAVSEA STANDARD ITEM ITEM NO: 009-05 DATE: 18 NOV 2016 CATEGORY: II 1. SCOPE: 1.1 Title: Temporary Access; accomplish 2. REFERENCES: 2.1 Standard Items 2.2 MIL-STD-1689, Fabrication, Welding, and Inspection

More information

TECHNICAL SPECIFICATION FOR STEEL DRY CARGO CONTAINER 6'x1960mmx1920mm TYPE

TECHNICAL SPECIFICATION FOR STEEL DRY CARGO CONTAINER 6'x1960mmx1920mm TYPE TECHNICAL SPECIFICATION FOR STEEL DRY CARGO CONTAINER 6'x1960mmx1920mm TYPE 1. General 1.1 Scope This specification will cover the design, construction, materials, testing and inspection performances of

More information

ALFRA PRESS. Made in Germany by ALFRA

ALFRA PRESS. Made in Germany by ALFRA 52 ALFRA PRESS Made in Germany by ALFRA 53 ALFRA PRESS Overview ALFRA PRESS AP 250 ALFRA PRESS AP 400 Page 56 Page 58 Control cabinet housing, control cabinet doors, mounting plates Control cabinet housing,

More information

ITB-48 - Industrial Tool Box (48") 2 x Gas Struts

ITB-48 - Industrial Tool Box (48) 2 x Gas Struts ITB-48 - Industrial Tool Box (48") 2 x Gas Struts (1220 x 615 x 720mm) Ex GST Inc GST $400.00 $440.00 ORDER CODE: MODEL: Material Thickness (mm): Gas Struts (No.): Box Dimensions (L x D x H) (mm): Nett

More information

How to Build Your Custom Teardrop Camper. 5 x 10 Trailer. 5 Tall Cabin

How to Build Your Custom Teardrop Camper. 5 x 10 Trailer. 5 Tall Cabin How to Build Your Custom Teardrop Camper 5 x 10 Trailer 5 Tall Cabin Contact: hennesseystealth@bigteardrop.com http://www.bigteardrop.com ebay Seller ID: hennesseystealth1957 United States Copyright TXu

More information

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard

Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard Engineering Data Single Reduction Parts List Item # Description Basic Single Reduction Unit 1. Gear Housing 2. Pipe Plug 3. Vent Plug 4. Splash Guard 5. Input Cover 6. O-Ring 7. Hex Head Cap Screw 8. Input

More information

BUILDING A SHIP S STOVE

BUILDING A SHIP S STOVE BUILDING A SHIP S STOVE Allan Yedlinsky A fun project and good practice in the minutiae that comes in building a ship model is building the galley stove. The British stoves were very similar from vessel

More information

BMW E46 Coupe 3dr MP Bolt in (BMW Race Days Only) Roll Cage (B045) Fitting Instructions

BMW E46 Coupe 3dr MP Bolt in (BMW Race Days Only) Roll Cage (B045) Fitting Instructions BMW E46 Coupe 3dr MP Bolt in (BMW Race Days Only) Roll Cage (B045) Fitting Instructions Unwrap the mounting points/ends of the roll cage and unpack the individual fitting kits. Try to leave wrapping on

More information

Body Repair. Collision Repair. Specification. Fastener Specifications Fastener Specifications. Blind Rivet. Flow Drill Screw (FDS) Torque FDS

Body Repair. Collision Repair. Specification. Fastener Specifications Fastener Specifications. Blind Rivet. Flow Drill Screw (FDS) Torque FDS Body Repair Collision Repair Specifications Fastener Specifications Fastener Specifications Application Specification Metric English Cross-Car Brace Mounting Bolts 25 Y 18 lb ft Windshield Frame Mounting

More information

LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD

LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD LAN84207 Installation Instructions Single Point Hydraulic Kit for 50 Series STS Combines. 270 West Park Avenue Huron, SD 57350 866-526-5682 1 Numerical Parts List Part Numbers Description Quantity LANH201368

More information

March weeks. surcharge for

March weeks. surcharge for March weeks valid until 31.03.2012 all quoted prices are incl. 19% VAT for deliveries in the EU countries to customers with a valid VAT-no. and for deliveries in not EU member countries the VAT is not

More information

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System

INS T A L L A TIO N INS T R U C TIO N S. Ceiling Mount Track System Ceiling Mount Track System 10.26.2016 Specifications Ceiling Post: Unassembled 2-7/8 Assembled 1-11/16 7/8 7-9/16 5-7/8 3/8 2 Tubes 1/2 2-3/8 5 Parts and Tools Tools Needed Tape Measure Pencil Drill with

More information

RESolution V2 Manual

RESolution V2 Manual RESolution V2 Manual Note for the German Manual: Yellow Bottle thick CA Pink Bottle Med CA Blue tube 5 minute Epoxy Green tube 90 Minute Epoxy Construction of the Fuselage Step 1: Cover the plan with a

More information

no mm no Dividers with scriber 150 mm NEW Square wedge-shaped knife edges on the length side

no mm no Dividers with scriber 150 mm NEW Square wedge-shaped knife edges on the length side Summer Promotion valid until 30.06.2013 all quoted prices are incl. VAT for deliveries to EU countries to customers with valid VAT-no. and for deliveries in non EU member countries the VAT is not applicable

More information

San Felipe: Step by Step Pack 6

San Felipe: Step by Step Pack 6 Pack 6 Your parts Framing Tools and equipment Glue Knife Sandpaper Superglue Tweezers Clear varnish a Retrieve the grating that you assembled on Page 100. Cut two pieces of 2 x 3 mm wooden strip to fit

More information

EMB MANUFACTURING INC.

EMB MANUFACTURING INC. TRAILER WOOD PROCESSOR MODELS WP865, WP835, WP635 ASSEMBLY INSTRUCTION MANUAL Please review and understand the operators manual before attempting to operate this machinery. EMB MANUFACTURING INC. 4144

More information

Privacy Wall Glass Selections - Polished Edge Slider Door

Privacy Wall Glass Selections - Polished Edge Slider Door Privacy Wall Glass Selections - Polished Edge Slider Door 3/6" HEX BIT PUTTY KNIFE #2 ACR BIT SUCTION CUP HOLDERS DOOR LEAF: Satin Tempered Clear Tempered LOCTITE 425 SIDE LIGHT ETCHED GLASS STYLES: Satin

More information

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B

YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual. Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B YOUR LIFE. YOUR FIRE. Ortal Curved & Islands Fireplaces Installation Manual Ortal USA - Version: 1.3 November, 2017 SKU: KPMANCIRISLUS17B [THIS ISTALLATION MANUAL INCLUDES ASSEMBLY INSTRUCTIONS FOR THESE

More information

BEFORE YOU BEGIN Read these instructions completely and carefully.

BEFORE YOU BEGIN Read these instructions completely and carefully. Installation Instructions Over the Range Oven BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT Save these instructions for local inspector s use. IMPORTANT Observe all governing

More information

Over the Range Microwave Oven

Over the Range Microwave Oven Over the Range Microwave Oven BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT Save these instructions for local inspector s use. IMPORTANT and ordinances. Observe all governing

More information

Stand Alone Rudder Angle Indicator System

Stand Alone Rudder Angle Indicator System ComNav Marine Ltd. Phone: 604-207-1600 #15-13511 Crestwood Place Fax: 604-207-8008 Richmond, BC E-mail: sales@comnav.com Canada V6V 2G1 Web: www.comnavmarine.com Stand Alone Rudder Angle Indicator System

More information

MSR/MSB Mechanical Setting Tool

MSR/MSB Mechanical Setting Tool Tech Unit No: 0620000004 Revision: B Approved By: Quality Engineer Date: 2014-12-16 MSR/MSB Mechanical Setting Tool FEATURES: Special designed Bow Spring provides positive control and allows one size Mechanical

More information

PERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE

PERFORM WITH PRECISION MAGNETIC PRODUCTS FOR PRECASTING CONCRETE CONSTRUCTION SOLUTIONS BROCHURE MAGNETIC PRODUCTS FOR PRECASTING PERFORM WITH PRECISION CONCRETE CONSTRUCTION SOLUTIONS BROCHURE Form Magnets ON/OFF MAGNETS Strong adhesion and shear capacity -650# to 2500# adhesion Easy to turn on or

More information

MUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS. Note, drawing not to scale Bob DeRoeck May 31, 05

MUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS. Note, drawing not to scale Bob DeRoeck May 31, 05 MUTINEER AND BUCCANEER TOP-MOUNTED CENTERBOARD HANGERS Note, drawing not to scale Bob DeRoeck May 31, 05 Holes for #10 selftapping SS screws (pan head). 5.75 1 Bend line Aluminum plate, series 5000 or

More information

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL

18000 HDL FOUR POST LIFT LB CAPACITY INSTALLATION AND OWNER'S MANUAL 18000 HDL FOUR POST LIFT 18000 LB CAPACITY INSTALLATION AND OWNER'S MANUAL WARNING! Do not raise a vehicle unless the front stops are in place, the parking brake is set, and the wheels are chocked. Stay

More information

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS

400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS 12/11/07 PAGE 1 OF 12 400A 40113V, 401A 40120V, & 401AL 40120VL ALUMINUM VERTICAL 4000 LB LIFT INCLUDES SCREW LEG ASSEMBLY INSTRUCTIONS Thank you for purchasing our product! *Please read these instructions

More information

Insertion Transducer On-line Install Instruction

Insertion Transducer On-line Install Instruction LOGO Insertion Transducer On-line Install Instruction Shanghai Dynameters Co., Ltd www.dynameters.com Insertion Transducer Installation Manual Installation steps 1. Locate Installing point 2. Weld mounting

More information

INSTRUCTION MANUAL Q-HYDRAULIC

INSTRUCTION MANUAL Q-HYDRAULIC Dat: 15.04.02 No: 94-BA 5039E/1b TABLE OF CONTENTS Part III 3.0 Type code explanation 3.1 Service connections 3.2 Impeller clearance adjustment 3.2.1 Wear of wearing parts 3.2.2 General notes to adjustment

More information

Feed Drawer Rebuild, for Models, 22HF, 16HF, 1600 machines

Feed Drawer Rebuild, for Models, 22HF, 16HF, 1600 machines Knowledge Base Article Type: Instructions Feed Drawer Rebuild, for Models, 22HF, 16HF, 1600 machines Description: Instructions on How to properly remove and rebuild a Feed Drawer. WARNING Never work on,

More information

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below

Continue gluing the remaining top parts ensuring the angled piece is glued well. Set aside and let dry. See photo below Radiator rev 1.1 The SE5a s radiator is one of the most recognized radiators in WW1. It is one of the components that defines the SE5a. The original SE5a has seen multiple radiator designs used during

More information

STC-COMBI - Industrial Storage & Tooling Cabinet Package Deal

STC-COMBI - Industrial Storage & Tooling Cabinet Package Deal STC-COMBI - Industrial Storage & Tooling Cabinet Package Deal 900 x 450 x 1800mm 150kg Shelf Load & 75kg per Drawer Load Capacity Ex GST Inc GST $1,060.00 $1,166.00 ORDER CODE: MODEL: Shelf Load Capacity

More information

Hunter 34 Compression Post Repair

Hunter 34 Compression Post Repair Hunter 34 Compression Post Repair Claude L.-Auger This is probably what it looks like, to a greater or lesser degree. The post is offset from center of boat, therefore not exactly under the mast. To make

More information

installation guide 1 GUIDE#: PWB-wwpontoon-pol-004

installation guide 1 GUIDE#: PWB-wwpontoon-pol-004 f250 pontoon WAKEBOARD tower installation guide INSTALLATION SUPPORT 1 important information This WakeWorks tower fits Pontoon boats with 96 to 102 inch wide beam widths. This measurement is taken from

More information

Ford F150 Front Bumper

Ford F150 Front Bumper 2009-2011 Ford F150 Front Bumper Warning! Read the instructions completely before beginning the installation. Before tightening bolts, drilling or cutting where required, check to make sure that there

More information

Manufacturing Process:

Manufacturing Process: Manufacturing Process: This document is an operations manual describing the steps taken in order to build the 12442 Haitian stove. Included is a list of materials and tools needed to complete the construction

More information

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket.

Fig Remove chain cover plate bolts. Fig Remove hammer member. Fig Loosen set screws at base of 12-tooth sprocket. Fig. 17.2. Remove chain cover plate bolts. Fig. 17.1. Remove hammer member. Fig. 17.3. Remove chain cover plate. Fig. 17.4. Loosen set screws at base of 12-tooth sprocket. Page 61 Fig. 17.5. Remove socket

More information

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS

N. 15th Street, Middlesboro, KY FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS 1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP DUMP BODY INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Dump Body tarping system. With tarping systems

More information

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS

FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS 1-800-248-7717 1002 N. 15th Street, Middlesboro, KY 40965 FLIP TARP SINGLE & DOUBLE UNDERBODY TRAILERS INSTALLATION INSTRUCTIONS Congratulations on your purchase of a Mountain Flip Tarp Trailer system.

More information

SECTION COMMON WORK RESULTS FOR HVAC

SECTION COMMON WORK RESULTS FOR HVAC SECTION 23 05 00 COMMON WORK RESULTS FOR HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Ball Valve. 2. Hangers and Supports. 3. Identification Tags and Sleeves. 1.2 INCLUDED SECTIONS A. Section

More information

Owner s Manual #TSGUARD

Owner s Manual #TSGUARD Owner s Manual #TSGUARD PSI Table Saw Dust Collection Guard The ideal solution for table saw dust control. Version 3, 02/04 2004 PSI Woodworking Products 9900 Global Rd., Philadelphia, PA 19115 WARRANTY

More information

DX450 Red-D-Arc PARTS LIST FOR RETURN TO MAIN INDEX

DX450 Red-D-Arc PARTS LIST FOR RETURN TO MAIN INDEX Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies P-582 RETURN TO MAIN INDEX PARTS LIST FOR DX450 Red-D-Arc P-582 Index of Sub

More information

WTC Industrial Mobile Tooling Cabinet Workstation

WTC Industrial Mobile Tooling Cabinet Workstation WTC-1450 - Industrial Mobile Tooling Cabinet Workstation 1170 x 580 x 1450mm 100kg per Drawer Ex GST Inc GST $1,050.00 $1,155.00 ORDER CODE: MODEL: T773 WTC-1450 Number of Drawers (No.): 5 Drawer Load

More information

CS3 represents manufacturers of products for use in the municipal waterworks industry.

CS3 represents manufacturers of products for use in the municipal waterworks industry. Brian Drexel & Rob Grier WWW.CS3WATERWORKS.COM Established in 2000, CS3 Waterworks is a Florida Based company with offices in Orange Springs Florida and Savannah Georgia. CS3 represents manufacturers of

More information

BP Brine Pro Brine Maker. Parts List. This Parts List is for BP-2000 brine makers with serial numbers beginning with and higher.

BP Brine Pro Brine Maker. Parts List. This Parts List is for BP-2000 brine makers with serial numbers beginning with and higher. November, 0 Lit. No., Rev. 0 BP-000 Brine Pro Brine Maker Parts List This Parts List is for BP-000 brine makers with serial numbers beginning with 00 and higher. A DIVISION OF DOUGLAS DYNAMICS, LLC FRAME

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Trans4mer Gen II Mount System For 2008 Ford Super Duty Kit 80140 (Large Frame Black) and Kit 80150 (Mid Frame Black) and Kit 80155 (Mid Frame Stainless) Your safety, and the safety

More information

BEFORE YOU BEGIN Read these instructions completely and carefully.

BEFORE YOU BEGIN Read these instructions completely and carefully. Installation Instructions Over the Range Microwave Oven Questions? Call 1.800.561.3344 or Visit our Website at: GEAppliances.ca BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT

More information

Cabins and Hatchways. Bluenose II Part 5

Cabins and Hatchways. Bluenose II Part 5 With the hull fully prepared, we can now add the deck furniture and other fittings. Unfortunately, this is where things begin to go badly wrong with this kit. If you compare the AL plans to the plans in

More information

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC

D. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,

More information

SELF-PROPELLED SCISSOR LIFTS PARTS MANUAL. ( For JCPT0807HD / JCPT0807DC ) WARNING

SELF-PROPELLED SCISSOR LIFTS PARTS MANUAL. ( For JCPT0807HD / JCPT0807DC ) WARNING SELF-PROPELLED SCISSOR LIFTS PARTS MANUAL ( For JCPT0807HD / JCPT0807DC ) WARNING THE MANUFACTURER SHALL NOT BE HELD LIABLE IN CASE OF FAULTS OR ACCIDENTS DUE TO NEGLIGENCE, INCAPACITY, INSTALLATION BY

More information

Factory Assistance: Phone: Fax: Page 1

Factory Assistance: Phone: Fax: Page 1 CABLE RUNWAY ACCESSORIES Radius Drop / Stringer Drop Provides 3 bend radius Radius drop fits 6, 12 and 18 runway made from 1-1/2 x 3/8 tubing Steel construction Includes (3) cable spools, (1) bolt, (1)

More information

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY

EmagiKit. Privacy Pod Plus. Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY EmagiKit Privacy Pod Plus Quiet. Easy. Affordable. INSTRUCTIONS ASSEMBLY DIMENSIONS AND COMPONENTS 47 47 Ceiling Unit 2-B 2-L 2-R Glass Door Corner Trim Door Handle 90 Adjustable Height Work Surface 1-B

More information

D300K 3+3 SE KUBOTA PARTS LIST FOR RETURN TO MAIN INDEX

D300K 3+3 SE KUBOTA PARTS LIST FOR RETURN TO MAIN INDEX Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies Illustration of Sub Assemblies P-737 P-737 RETURN TO MAIN INDEX PARTS LIST FOR P-737-A P-737-A ILLUSTRATION

More information

10. Vents, Baffle Guard and Blocking

10. Vents, Baffle Guard and Blocking 10. Vents, Baffle Guard and Blocking 10.1 INSTALLING BATH FAN AND END CAP 10.2 INSTALLING RANGE PLENUM AND END CAP 10.3 INSTALLING PROPER VENTS 10.4 INSTALLING WIND WASHING BAFFLE GUARD 10.5 INSTALLING

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher

Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher Operating, Servicing, and Safety Manual Model # 100 Standard Hydraulic Tubing Notcher Model #100-U Heavy Duty Hydraulic Tubing Notcher Model # 100 Standard Model #100-U Heavy Duty CAUTION: Read and Understand

More information

Bateau.com PH18 CNC kit notes 1/5

Bateau.com PH18 CNC kit notes 1/5 Bateau.com PH18 CNC kit notes 1/5 These building notes must be used in conjunction with the standard building notes included in the plans package for this boat. The PH18 kit is assembled as described in

More information

CHIP AND DUST EXTRACTION SYSTEMS

CHIP AND DUST EXTRACTION SYSTEMS CHIP AND DUST EXTRACTION SYSTEMS For connecting to all wood processing machines Healthy air at the workplace: Clean air clean work High suction output Mobile use, easy to connect Large range of accessories

More information

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A.

535-Manual. Main Components. Pipe and Bolt Threading Machine. Printed in U.S.A. Ridge Tool Company/Elyria, Ohio, U.S.A. Pipe and Bolt Threading Machine -Manual Main Components 0 Screw, Button Head /" - 0 x /" () Washer, Flat /" ()" Top Cover 0 0 Cutter Assembly Stop Pin 0 Pin Reamer Assembly Carriage Assembly 0 Stop Screw

More information

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM).

SECTION SITE FURNISHINGS FOR CFCRT. 1. American Society for Testing and Materials (ASTM). PART 1 - GENERAL 1.1 SECTION INCLUDES A. Benches. B. Trash receptacles. C. Bike storage. 1.2 REFERENCE STANDARDS A. Including but not limited to: 1. American Society for Testing and Materials (ASTM). 1.3

More information

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens

INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INSTALLATION MANUAL Sluice Gates, Stop-logs & Screens INTRODUCTION During manufacture and assembly of equipment great care is taken to ensure accuracy in mating the sealing faces on frame and doors, especially

More information

Liner Replacement (Stainless Steel Internal Components)

Liner Replacement (Stainless Steel Internal Components) Page 1 of 15 WARNING The stainless steel edges, especially around the propeller cylinder, are very sharp. Use extreme caution when working in and around the front housing. WARNING Be sure to disconnect

More information

M-1 CORE RIG PARTS LIST. July 6, Part #

M-1 CORE RIG PARTS LIST. July 6, Part # M- CORE RIG PARTS LIST July, 0 Part # 800 Table of Contents Pictorial Page Index Angle Complete Combination Stand without Motor... Pictorial Page Index Standard Complete Anchor Stand without Motor...

More information

Merloni Elettrodomestici. Technical Fitting Manual FRIDGE. Language Issue/Edition Page GB /

Merloni Elettrodomestici. Technical Fitting Manual FRIDGE. Language Issue/Edition Page GB / GB 99-11-03/01 1-38 Index 1 CONFORMITY OF APPLIANCE 3 2 MAIN ASSEMBLY TYPES 3 2.1 Under worktop 3 2.2 Double door 10 2.3 Combined 14 2.4 Single door Fridge or single door Freezer 19 2.5 Combined free-standing

More information

1. Underframe/Tank Bottom

1. Underframe/Tank Bottom 1. Underframe/Tank Bottom The construction process for the Class X tank cars is a little different as there is no true underframe. Instead we will use the tank bottom as part of the underframe, attaching

More information

Spring Loaded All Season Roll-Up Doors

Spring Loaded All Season Roll-Up Doors Spring Loaded All Season Roll-Up Doors STAND-OFF MOUNTING METHOD INSTALLATION INSTRUCTIONS READ THIS FIRST Carefully examine the crate(s) for damage before opening. If the carton is damaged, immediately

More information

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM3010A RM315-R2 RM323-R2 RM329 RM451 RM457 RM3020A RM316 RM324-R2

More information

Installation and Maintenance Manual IM 770-1

Installation and Maintenance Manual IM 770-1 Installation and Maintenance Manual IM 770-1 Group: Applied Air Systems Part Number: IM 770 Date: March 2014 Skyline Outdoor Air Handler Roof Curb Table of Contents General Description... 3 Curb-Ready

More information

Installation Instructions Student 101 Fume Cupboard

Installation Instructions Student 101 Fume Cupboard Installation Instructions Student 101 Fume Cupboard Refer drawing on next page 0. If your fume cupboard is supplied with a flatpack bench frame, see step1. If your fume cupboard will be mounted on an existing

More information

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS

TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS TURBOTWISTER TM ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503)

More information

PARTS LIST COMMANDER 20 VAC-TRAC COMMANDER 27 VAC-TRAC FH 541V

PARTS LIST COMMANDER 20 VAC-TRAC COMMANDER 27 VAC-TRAC FH 541V PARTS LIST COMMANDER 20 VAC-TRAC COMMANDER 27 VAC-TRAC FH 541V UPPER ASSEMBLY 101 6190481 THROTTLE CABLE FOR MODELS WITH ADDITIONAL CHOKE CABLE 1 101 6190751 THROTTLE CABLE FOR MODELS WITH OUT ADDITIONAL

More information