1 Installation of MagFloor 100 Prior to any placement of MagFloor panels, ensure the joists are sound, secure, level and clean from any loose dust or debris. This will ensure good adhesion between the underside of panel and top of joist using the structural glue adhesive. Ensure safety is maintained at all times prior to the first run of panels being laid. It is recommended to place a stringline from the start point to the other side of the floor to ensure the panels will be laid in a straight line, and square to any adjoining walls. For ease of installation, and safety, we recommend that flooring panels be laid out, as a walk way platform. Ensure they are laid outside the installation zone. The floor is now ready for commencing installation.

2 All associated screws and glues will be available from the distributor. We recommend on the following fixings for use with the MagFloor system. Fuller Max Bond Pro: Is used to adhere the box spline joiners inside the main panel. Fuller Max Bond Pro Cleaner: This is used to clean the gun applicator Fuller Max Bond: A 5mm bead (min) is applied to the top of the joists. Ensure the surface is free of coatings and loose material that may inhibit bond. Fasteners: Collated screw strips are highly recommended for accurate and fast installation mm class 3 galv or powder coated coarse thread screws. Using a Makita screw gun or similar, ensure the depth gauge of the screw is 1-2mm below the surface of the panel. These screws are used to join box Spline into the main panel. Screw off at 200mm apart around the Perimeter of the panel. The large x mm class 3 galv or powder coated Batten screw is used to secure the flooring panel to the joists. Follow the fixing guidelines for placement of screws.

3 A 5mm bead (min) is applied to the top of the joists. Ensure the surface is free of coatings and loose material that may inhibit bond. Have the first panel already in a vertical position to be lowered onto the joist. This will avoid the adhesive from skinning over. Once a bead has been applied to each joist, slowly lower the panel down into position. Secure the panel down with the large batten bugle screws. Next step is to install a box joiner. It is recommended to have joiners pre-cut and ready to install. Whilst only long joiners will be sent to site, the installer is required to cut joiners to suit the shorter end of the panel. Cut enough lengths to get started. Place a 5mm bead of Max Bond Pro on the bottom lip of the floor panel, and a bead along the top of the joiner. Carefully align the joiner with the rebate opening in the floor panel and tap in. If a tight fit, we advise the use of a rubber mallet and gently tap the joiner into position. Once complete, you are ready to install the next panel across and so on. Once 2 panels are installed and secured down, using the collated screw gun, screw the box joiner to the panel.

4 Once an entire run is installed, you are ready to install the longer box joiners. Go through and install along entire run, this will speed the process with main panel. The next row is now ready for a repeat process. Applying adhesive to the joist. If a good sized off cut has occurred from the first run, it can be used to start the next row, ensuring the floor panels are laid in a stretcher bond fashion, this way the floor creates a strong interlocking surface, but also minimises the waste of material.

5 As each run is installed, there will be a requirement to cut panels to fit either at the end of a run or as to approach a wall, corner or edge of floor joists. Because MagFloor is easy to cut, all you require is a circular saw blade with a standard timber carbide blade. If a long rip cut is required, use either the saw s guide or secure a straight edge to the panel with clamps at each end for a straight and uniformed clean cut.

6 Once the floor is complete, sweep out any debris And dust. If the floor has been applied in a wet area or balcony application, the surface will need to be water proofed prior to tile installation. We recommend to seek further advise and follow the instructions of the product to choose to apply to the floor. If the panels are installed in an enclosed situation, the floor at the end of construction is ready for it s coverings, whether it be carpet, floating timber floors or tiles. Ensure all surfaces are clean prior to applying any further adhesives, to maximise bonding to the MagRoc sheeting. If any penetrations are required through the panel, using a hole saw drill set you will be easily able to cut through. Ensure you do not cut through the floor joist below and cause any structural damage to the supporting structure below. A pilot hole is recommended if it is unknown where joist locations are below.

7 When MagFloor is being used on a project and load bearing walls are being applied above, it is recommended that a 70x45mm CCA timber be inserted into the side of the panel. This most times will occur around the perimeter of the building where a wall frame will be constructed above and roof load applied. Please seek further advise from the project engineer to determine what loads are being applied to the floor from upper wall and roof loads. Any internal, non load bearing walls can be directly placed on top of the MagFloor without any concerns. Wall frames can be secured down by using either 100mm batten bugle screws or 100mm roofing screws. The project engineer will be able to determine joist spacing, and any special tie down fixings by cross referencing to load and span tables associated with MagFloor test results. The use of MagFloor in your project will ensure you a very strong and highly thermally efficient floor. Compared to AAC or concrete floors, Magfloor places less stress on lower wall frames, but maximises the latest in innovative thermal technology! MagFloor It doesn't disappoint.

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges

Installation Instructions Palladium Wall Panels - Demountable Factory Finished Edges and Field Cut Edges Please read all instructions before installing Palladium Wall Panel System. 1. Before installation: a. Acclimate Palladium Panels, reveals, adhesives and wall substrates to room temperature 24 hours before

More information

General Installation Guidelines

General Installation Guidelines g e n e r a l i n s t a l l a t i o n g u i d e l i n e s General Installation Guidelines Although Nutec Building Planks do not contain asbestos fibres, it is nevertheless recommended that when working

More information

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL

TOLL FREE:(888) FAX:(941) ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL ASSEMBLY of ProTEC CONCRETE STRUCTURAL INSULATED PANEL The ProTEC panels are manufactured with grooves on all four sides to accept the steel components. This grooving applies to the regular panel whose

More information

Office Installation Guidelines

Office Installation Guidelines UH Structures Inc. dba Ebtech Industrial 2241 Industrial Drive Connellsville, PA 15425-6181 Telephone: 724-628-6100 Fax: 1-412-774-2429 www.ebtechindustrial.com Office Installation Guidelines INTRODUCTION

More information

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials...

Installation Guide. Please read before installing SIPs Kit. 1 Method Statement for the erection of a SIPS Industries Kit Materials... 30a Renewable Chase Bibra Lake WA 6163 Tel: (08) 9494 2211 Fax: (08) 9494 2202 Email: info@sipsindustries.com.au Web: www.sipsindustries.com.au Installation Guide Please read before installing SIPs Kit.

More information

DECKING INSTALLATION GUIDE

DECKING INSTALLATION GUIDE STAIR TREAD INSTALLATION GUIDE Step 7: Install the Remaining Treads Repeat steps 2 to 6 for the remaining stair treads. Step 8: Install the Fascia 1. Measure the riser height. 2. Rip the fascia to the

More information

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety. INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety. Safety PRE-INSTALLATION Compliance with all applicable local, state

More information

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CCRR-0171 PFS AA-652 Drill/power screwdriver Assorted drill bits Hammer Miter or circular

More information

DESIGN TO BUILD = BUILD TO DESIGN

DESIGN TO BUILD = BUILD TO DESIGN DESIGN TO BUILD = BUILD TO DESIGN The following represents five days of work from demolition through layout of new flooring and wall frame and cabinetry Paul C. King, RA Associate Professor Department

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.

More information

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2 Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details

More information

Installation Guide 1

Installation Guide 1 1 2 Contents Before you begin Storage & preparation Tools & materials you may need Getting started Sink & cooktop cut-outs Cabinet Joins for 20mm benchtops Joining & installation of 20mm benchtops Joining

More information

UCO Vistabord Fixing Manual

UCO Vistabord Fixing Manual UCO Vistabord Fixing Manual UCO Multiflex UCO Flexabord Fibre Cement Board WALLS & CEILINGS Ceiling soffit using Vistabord at Suria KLCC, Malaysia. UAC BERHAD (5149-H) his sign endorses that the product

More information

TREX TRANSCEND RAILING

TREX TRANSCEND RAILING RAILING NOTES:» RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED.» All

More information

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General

WOODWORKS. Linear Solid Panels. Installation Instructions CEILING SYSTEMS. 1. General CEILING SYSTEMS Between us, ideas become reality WOODWORKS Installation Instructions Linear Solid Panels 1. General 1.1 Product Description WoodWorks Linear features a solid wood ceiling system in 1' x

More information

UPPER FLOORS TIMBER AND CONCRETE

UPPER FLOORS TIMBER AND CONCRETE UPPER FLOORS TIMBER AND CONCRETE FUNCTIONS OF AN UPPER FLOOR Functions: Support imposed loads Not deflect under load Strength and stability Provide restraint for external walls Fire resistance (30 minutes)

More information

B A T H R O O M G L A S S

B A T H R O O M G L A S S mistley B A T H R O O M G L A S S vaug16 Page 2 Thank you for purchasing this Trinity shower screen. Please study these instructions carefully before assembly and installation and check all supplied parts

More information

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español

3 Simple Steps to a Beautiful Tile Surface. Tec Skill Set How-To Project Guide Floor Tile 1. PREPARE THE SURFACE 2. SET THE TILE. Reverso en español Reverso en español Tec Skill Set How-To Project Guide Floor Tile 3 Simple Steps to a Beautiful Tile Surface 1. PREPARE THE SURFACE 2. SET THE TILE 3. Grout AND CAULK H.B. Fuller Construction Products Inc.

More information

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM

AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM AQUAGARD EPDM FLAT ROOFING SYSTEMS INSTALLATION GUIDE THE MECHANICALLY FIXED SYSTEM The following guide covers the technique for the Mechanically Fixed System. This system is best employed when an overlay

More information

Repairs. Chapter 10 Repairs 10. 1

Repairs. Chapter 10 Repairs 10. 1 10 Repairs Chapter 10 Repairs 10. 1 Repairs As an installer, you will probably be called upon to repair damage to a resilient floor. Here are some of the most common problems and the recommended repairs

More information

Life* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone)

Life* Installation Instructions & User Care Instructions. (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone) Installation Instructions & User Care Instructions Trimmable Formers (381kg) (60stone) (840lbs) (254kg) (40stone) (560lbs) (100kg) (220lb) (15stone) i Installer- please read all instructions carefully

More information

WOOD COUNTERTOP INSTALLATION INSTRUCTIONS

WOOD COUNTERTOP INSTALLATION INSTRUCTIONS 1209 Logan Circle, Atlanta, Georgia 30318 www.craft-art.com (404)352-5625 WOOD COUNTERTOP INSTALLATION INSTRUCTIONS Required Tools and Supplies Cordless Drill Belt Sander with 60 and 80 grit belts. Shur-form

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS Tools required for the installation. A. Core Drill 87mm Drill bit B. Tape measure C. Spirit Level D. Marking pen E. Caulking gun F. Cutting Pliers G. Cordless Drill and Philips head bit, 5mm Drill bit.

More information

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF

SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF SteelChief Installation Instructions for pre-assembled panel form sheds GABLE ROOF Please read fully before commencing work...any queries will be promptly answered, contact theboss@steelchief.com.aui MPORTANT

More information

Curium 19H Installation Instructions & Parts List

Curium 19H Installation Instructions & Parts List Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

Site Installation Guide

Site Installation Guide Site Installation Guide Site Checklist Stop and read this now. Tick box when checked. Floor Joist Layout If a floor joist design/layout was done, was a site copy of the layout provided with the joists,

More information

SlipGrip Data Sheet & Installation Guide

SlipGrip Data Sheet & Installation Guide SlipGrip Data Sheet & Installation Guide Stair Treads Landing Covers Flat Sheets 9/2015 SlipGrip Technical Data Description SlipGrip products are high performance safety stair treads, landing covers and

More information

Engineered Hardwood Flooring Installation Instructions

Engineered Hardwood Flooring Installation Instructions Engineered Hardwood Flooring Installation Instructions 1 Important Information before You Begin 1.1 Installer/Owner Responsibility Carefully inspect all materials before installation. Materials installed

More information

SecuAnch Roof Anchor System

SecuAnch Roof Anchor System Height Safety Products Email: marketing@fallprotec.com SecuAnch Roof Anchor System 1 Presentation The SecuAnch lifeline is designed to be permanently installed on buildings and other structures where maintenance

More information

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion. ASSEMBLY INSTRUCTIONS SYSTEM 4 BI (Built-In) Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship

More information

Vinyl Gazebo Instructions

Vinyl Gazebo Instructions P a g e 1 Vinyl Gazebo Instructions 10 Vinyl Gazebo Shown Thank you for the purchase of your New Gazebo. Depending on the size of your Gazebo, installation can usually be completed in 1 to 2 days. These

More information

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns

More information

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper

More information

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails

Handrail H Series. Product Installation. Instructions. Installation Instructions For. Wall Mounted and Freestanding Round Handrails Product Installation Installation Instructions For Instructions Handrail H Series Installation Instructions for Wall Mounted and Freestanding Round Handrails Step Nosing F Series Concrete and Timber Step

More information

Build your own Drawer unit. D3 / D4

Build your own Drawer unit. D3 / D4 Page1 Build your own Drawer unit. D3 / D4 1: Introduction. This guide will give you the plans, materials and how to information to build your own drawer unit. The dimensions given will fit a D3 or D4,

More information

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING

FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING FITTING INSTRUCTIONS FOR OFD SOLID OAK FLOORING SECTION 1 Installers Responsibility Pre-Installation SECTION 2 Glue Down (Solid & Engineered Flooring) SECTION 3 Secret Nailing (Solid & Engineered Flooring)

More information

RAILING R A IL ING 51

RAILING R A IL ING 51 RAILING RAILING 5 TREX TRANSCEND RAILING NOTES:» TREX TRANSCEND RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED

More information

AquaGuard - Water Resistant Flooring Installation guidelines

AquaGuard - Water Resistant Flooring Installation guidelines AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important

More information

Steel Sound Enclosure

Steel Sound Enclosure Steel Sound Enclosure INSTALLATION MANUAL List of tools recommended for use during installation: vise grips c clamp ladder electric drill drill bits / taps as req d screw drivers hammer rubber mallet pipe

More information

SLIM TRIM MOULDING INSTALLATION METHODS

SLIM TRIM MOULDING INSTALLATION METHODS Slim Trim as a reducer Use SlimTrack (Metal Track) for up to 4 mm floors. Up to 4 mm Floors 3/8 *If the flooring manufacturer suggests/permits the use of underlayments you may need to shim the track to

More information

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 6 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 6 Stainless

More information

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ

PRO CYC PRO CYC, INC. SYSTEM SUPER 1.5 EZ ASSEMBLY INSTRUCTIONS SYSTEM SUPER 1.5 EZ Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your

More information

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion.

2. Sanding the Modules Sand the entire surface of each cyc module with 60-grit sandpaper. This will provide for better paint adhesion. ASSEMBLY INSTRUCTIONS SYSTEM SUPER 2.5 EZ Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your

More information

SCULL HANDLES AND GRIPS INSTRUCTION BOOKLET

SCULL HANDLES AND GRIPS INSTRUCTION BOOKLET SCULL HANDLES AND GRIPS INSTRUCTION BOOKLET Contents Section I: Scull Grip Replacement: Fixed Handle or 10 cm Length Adjustment System Refer to this section if you need to replace the grips on your fixed

More information

Assembly Instructions

Assembly Instructions 10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions

More information

Curium 19.4H Installation Instructions & Parts List

Curium 19.4H Installation Instructions & Parts List Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified

More information

WoodWORKS Channeled Plank

WoodWORKS Channeled Plank CEILING&WALL SYSTEMS Between us, ideas become reality WoodWORKS Channeled Plank Assembly and Installation Instructions 1. General 1.1 Product Description WoodWorks Channeled acoustical ceiling and wall

More information

Installation Manual. This installation is for the Odyssey H1800 Series Ventilation System.

Installation Manual. This installation is for the Odyssey H1800 Series Ventilation System. Installation Manual This installation is for the Odyssey H1800 Series Ventilation System. This installation is limited to roofs with pitches between 3 and 35. This instruction assumes that there is a power

More information

Installation Guide. Step-by-Step Guide

Installation Guide. Step-by-Step Guide Installation Guide Step-by-Step Guide Thank you for choosing one of our quality products. We are the industry leaders in designer panel fencing. This product will provide you with years of trouble free

More information

Potting Store Assembly Instructions

Potting Store Assembly Instructions Before assembly We recommend that time is taken to read the instructions before starting assembly, then follow the easy step by step guide. The instruction sheet is only a guide to the assembly. Certain

More information

Pristine Precise Perfection

Pristine Precise Perfection Pristine Precise Perfection EB TY Premium Hidden Deck Fastening System For Premium Timber Deck Applications Stainless Steel Reinforced EB- GUIDE EB-TY Premium Hidden Deck-Fastening System Optimise Your

More information

METALWORKS TARTAN PANELS General Installation Instructions

METALWORKS TARTAN PANELS General Installation Instructions CEILING SYSTEMS METALWORKS TARTAN PANELS General Installation Instructions 1. GENERAL 1.1. Product Description MetalWorks Tartan system is a combination of metal ceiling panels available in a range of

More information

installation guide TASMANIAN HARDWOOD OVERLAY FLOORING

installation guide TASMANIAN HARDWOOD OVERLAY FLOORING TASMANIAN HARDWOOD OVERLAY FLOORING installation guide These instructions apply to quality Tasmanian strip flooring used as an overlay on a structural substrate in residential applications. nail glue SHEET

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

Mach Wall Installation Instructions

Mach Wall Installation Instructions Mach Wall Installation Instructions Planning the Job Since Mach Wall is an innovative product that accomplishes 3 tasks at the same time (frame, insulate and drywall) and it replaces traditional framing,

More information

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS

PRO CYCTM PRO CYC, INC. SYSTEM 1.5 FS ASSEMBLY INSTRUCTIONS Congratulations on your decision to use the world s most advanced and user-friendly cyclorama system. We have taken a great deal of care to create and ship your cyc, so please take

More information

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual

Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE. Patterson Sauna Installation & Owner s Manual Almost Heaven Saunas THE AUTHENTIC SAUNA EXPERIENCE Patterson Sauna Installation & Owner s Manual Read this entire manual through to the end before proceeding with the assembly. ELECTRICAL REQUIREMENTS

More information

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail

SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail SHADOWBOX INSTALLATION FOR: Standard 6 H x 8 W Shadowbox Fence 5 x 5 Routed Posts Dog Ear or Straight-Edge Pickets 1.75 x 3.5 Rail Storage and Handling Fence Preparation and Layout Locate and Set Posts

More information

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES

MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES TECHNICAL BULLETIN No.: 090509-1405 Subject: Issue Date: September 4, 2009 Issue No.: II MAGNUM BOARD INTERIOR INSTALLATION GUIDELINES 1. CUTTING MAGNUM BOARD You can easily cut Magnum Board with carbide

More information

JOIST DETAILS Plate nail, 16d (0.15" x 1 ") at 1 on-center Blocking panel: 1 1 8" TJ Rim Board, 1 1 TimberStrand SL or TJI joist Toe nail, 10d (0.11" x ") at on-center A1 CS BEAM DETAILS L1 eb stiffener

More information

COMPOSITE SIDING INSTALLATION GUIDE

COMPOSITE SIDING INSTALLATION GUIDE CENTURY HOME LIVING COMPOSITE SIDING INSTALLATION GUIDE Read all instructions prior to installing any siding product. Failure to install and finish this product in accordance with all local building codes,

More information

Radon 07 Installation Instructions & Parts List

Radon 07 Installation Instructions & Parts List Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by

More information

rondo exangle drywall finishing sections

rondo exangle drywall finishing sections rondo exangle drywall finishing sections SUMMARY The EXANGLE range of building board finishing profiles are designed to give plasterers a clean, defined edge on straight or curved details for internal

More information

Installation Guide. Bi-fold Doors

Installation Guide. Bi-fold Doors Installation Guide Bi-fold Doors Installation Guide Components box 1. 6. 2. 3. 7. 5. 4. 8. Contents 1. Fixing plugs 2. Wedge gasket 3. Bottom trolley 4. Top trolley 5. Magnetic keep (x 2 if door height

More information

Installation Instructions for Viking Hearth Engineered Wood Flooring

Installation Instructions for Viking Hearth Engineered Wood Flooring Installation Instructions for Viking Hearth Engineered Wood Flooring 4.16.15 PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a

More information

Installation Site Preparation - Site Preparation

Installation Site Preparation - Site Preparation S c u l p t u r e s Bespoke Single Door / Bespoke Frameless Hinged Door + Inline Panel Instruction Manual Truelife Consumer Guarantee Please make sure the purchaser/end user completes and returns the Guarantee

More information

OUTLOK Portable Dance Floor laying instructions *Pictures show Florlok but instructions written for Outlok

OUTLOK Portable Dance Floor laying instructions *Pictures show Florlok but instructions written for Outlok *Pictures show Florlok but instructions written for Outlok The OUTLOK portable dance floor consists of FULL and HALF panels which are set up in a brickwork fashion which in turn gives the floor its strength

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

Zenterra TM Installation Guide

Zenterra TM Installation Guide Zenterra TM Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time

More information

Dubnium 11 Installation Instructions & Parts List

Dubnium 11 Installation Instructions & Parts List Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.

More information

woodworkersjournal.com MATERIAL LIST

woodworkersjournal.com MATERIAL LIST MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 5-in x 84-in x 3/8-in 12.7 cm x 213.36 cm x 9.525 mm 10 planks 29 sq.ft. IMPORTANT INFORMATION Open cartons 2-3 days prior to the install and allow material to adjust to the relative

More information

Solara Adjustable Patio Cover Installation Instructions

Solara Adjustable Patio Cover Installation Instructions Solara Adjustable Patio Cover Installation Instructions We divided the installation instructions in 6 major sections. Reference your project to the drawings below, this way you ll know you are on the right

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS 5-in x 84-in x 3/8-in 12.7 cm x 213.36 cm x 9.525 mm 10 planks 29 sq.ft. IMPORTANT INFORMATION Open cartons 2 3 days prior to the install and allow material to adjust to the relative

More information

Chief s Shop: Simple Woodworking Bench

Chief s Shop: Simple Woodworking Bench Chief s Shop: Simple Woodworking Bench Be sure to read the instructions and review the illustrations and accompanying video for this project BEFORE you start. Follow ALL SAFETY GUIDELINES AND RECOMMENDATIONS

More information

WHY YOU SHOULD USE TUFFLOOR. components

WHY YOU SHOULD USE TUFFLOOR. components Tuffloor DESIGN GUIDE WHY YOU SHOULD USE TUFFLOOR Strong and Easily Installed Tuffloor is a steel floor framing system designed for strength and ease of installation, and is an easy and economical alternative

More information

NEW equinox INSTALLATION GUIDE Issue

NEW equinox INSTALLATION GUIDE Issue NEW equinox INSTALLATION GUIDE Issue 1 CONTENTS If in doubt at any stage 1. Preparing the ring beam 2 2. Installing the framework 3 3. Insulation and waterproofing 7 4. Tile application: Steel tiles 9

More information

Gallium 03 Installation Instructions & Parts List

Gallium 03 Installation Instructions & Parts List Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed

More information

NewTech - CleverDeck Composite Decking Installation Guidelines

NewTech - CleverDeck Composite Decking Installation Guidelines NewTech - CleverDeck Composite Decking Installation Guidelines Composite decking has unique characteristics and requires specific fixing requirements that differ from timber. We strongly recommend that

More information

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25

Contents. Stage 1. Preparation of the aperture 9. Interior finishing 25 Installation Manual Pitchglaze Roof Window Contents Contents and introduction 2 Delivery 3 Pre Installation 4 Installation 8 Stage 1. Preparation of the aperture 9 Stage 2. Fitting the Pitchglaze 11 Stage

More information

Laminate Cabinet Installation Instructions

Laminate Cabinet Installation Instructions Laminate Cabinet Installation Instructions www.easygaragestorage.com/installation How To Use These Instructions Thank you for your purchase! Please read each step of this manual thoroughly to ensure proper

More information

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

DURACRYL WALL INDEX INTRODUCTION TOOLS AND MATERIALS REQUIRED FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL DURACRYL WALL FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL INSTALLATION GUIDE INDEX PAGES Introduction 1 Tools and materials 1 Construction requirements - timber

More information

LOG CABIN 70 ASSEMBLY INSTRUCTIONS

LOG CABIN 70 ASSEMBLY INSTRUCTIONS LOG CABIN 70 ASSEMBLY INSTRUCTIONS 400 mm x 400 mm Canopy 500 mm Veranda depth 500 mm Wall thickness 45 mm Nordic region spruce wall logs 45 mm x 35 mm Dimensions of base 3900 mm x 5400 mm including terrace

More information

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 INSTALLATION INSTRUCTIONS Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 LEVEL RAIL WITH CAP The testing was performed in accordance with procedures and methods referenced

More information

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 36 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 36 Stainless

More information

Sauna & Steam. Traditional Sauna Installation Instruction Manual

Sauna & Steam. Traditional Sauna Installation Instruction Manual Traditional Sauna Installation Instruction Manual Oceanic Ltd, Pountney Street, Wolverhampton, WV2 4HX Phone: 01902 450 550 sales@oceanic-saunas.co.uk www.oceanic-saunas.co.uk Contents 1.Introduction................................................

More information

Balustrade Systems / Installation Instructions

Balustrade Systems / Installation Instructions A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

Installation Instructions for easy to install Texture Plus faux wall panels

Installation Instructions for easy to install Texture Plus faux wall panels Installation Instructions for easy to install Texture Plus faux wall panels Questions? Web chat, phone or email us. Easy Instructions For Use We make easy to install faux wall panels that look amazingly

More information

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL

DURACRYL WALL INDEX INTRODUCTION. TOOLS AND MATERIALS REQUIRED. FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL DURACRYL WALL FLAT SHOWER WALL SIDE CONTOUR SHOWER WALL CORNER CONTOUR SHOWER WALL FLAT BATH WALL INSTALLATION GUIDE INDEX PAGES Introduction 1 Tools and materials 1-2 Construction requirements - timber

More information

MUSTEE FIBERGLASS SHOWERWALL

MUSTEE FIBERGLASS SHOWERWALL MUSTEE FIBERGLASS SHOWERWALL Before you assemble and install your MODEL 736 three-piece Molded Fiberglass Shower Wall unit you will have to prepare the rough-in area, determine which side wall will have

More information

8x12 SpaceMaker Garden Shed Assembly Manual

8x12 SpaceMaker Garden Shed Assembly Manual 8x12 SpaceMaker Garden Shed Assembly Manual Version #6 Revised June / 2007 Thank you for purchasing a 8x12 SpaceMaker Garden Shed. Please take the time to identify all the parts prior to assembly. Safety

More information

IMPORTANT: Read all sections before you start

IMPORTANT: Read all sections before you start 1 IMPORTANT: Read all sections before you start For the most up to date information please visit our website @ www.newtechwood.com Prior to installing the railing, please consult local zoning laws in regards

More information

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS

INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS INSTALLATION INSTRUCTIONS PRAVOL DURA-SHIELD COMPOSITE DECK RAILINGS Important: Read all sections before you start Prior to installing railing, please consult local zoning laws in regards to load requirements

More information

Liniar Window. installation guide

Liniar Window. installation guide Liniar Window installation guide This installation guide is designed to show you the best way to fit Liniar windows, and covers all styles of window made from Liniar s lead-free 70mm PVCu profile. Not

More information

Walk-in Configurations

Walk-in Configurations Walk-in Configurations Includes Wall-to-Open, Corners, and Corner Rounder Bars INSTALLATION INSTRUCTIONS Tools needed: Tape measure, level, pencil, #2 Phillips head screw driver or power drill with a 6"

More information

Before you Begin... 3 Storage and preparation... 3 Tools & Materials You may Need... 4

Before you Begin... 3 Storage and preparation... 3 Tools & Materials You may Need... 4 Installation Guide Installation Guide Contents INTRODUCTION... 2 Before you Begin... 3 Storage and preparation... 3 Tools & Materials You may Need... 4 Adhering your Think Solid benchtop to your cabinets

More information

Exterra Installation Guide

Exterra Installation Guide Exterra Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time Monday

More information

Installation Instructions

Installation Instructions Installation Instructions The instructions below are recommendations from Deziner Panels on how to install our Recycled Timber mosaic tiles and interlocking panels. Deziner Panels would like to recommend

More information

Industrial Contractors Supplies, Inc.

Industrial Contractors Supplies, Inc. Industrial Contractors Supplies, Inc. - Dust Director Division - 15061 Route 30, N. Huntingdon, PA 15642 Phone: 412. 824. 6933 Fax: 412. 824. 4704 www.dustdirector.com 5" & 7" SURFACE DUST GUARDS MANUAL

More information

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS

TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS TYPHOON ASSEMBLY AND INSTALLATION INSTRUCTIONS CORPORATE HEADQUARTERS WESTERN SALES AND MANUFACTURING PLANT P.O. Box 400 1017 SW Berg Parkway Canby, Oregon 97013 Phone: (503) 266-2231 Fax: (503) 266-4334

More information