1 Table of contents Product specifications Step 1 : Surface preparation Installation guide Step : Method of installation Step 5 : Layout of tiles Step 6 : Installation of tiles on the side of the structure DECKO TILE Step 7: Alignment and installation of the first row of tiles Step 8: Installing the mouldings Guide to covering stairs DO NOT HESITATE TO CONTACT US TO BE GUIDE DURING THE INSTALLATION OF SQUAREDECKO PRODUCTS info@squaredecko.com or

2 GENERAL INFORMATION PRECAUTIONS and CAUTION : Do not use pressure wash to clean tiles. First row must be well align for proper installation. It is not recommended to install SquareDecko product below temperature of 0 C. DO NOT INSTALL DIRECTLY ON PLYWOOD. Regulated water accumulation on the surface before to cover it with product. Do not put a waterproof membrane on concrete. 0 and more Required tools : Level, square, measuring tape, circular saw, rotary hammer, countersink, hammer, and chalk line Note: The tiles can be cut and screwed with conventional tools as easily as wood. Dimension : A tile covers a surface of 16 1/4" x 16 1/4" (413 mm x 413 mm) or 1.83 ft 2 (.17m 2 ). Example: It takes 54.6 tiles to cover a surface of 100 ft 2 (9.3 m 2 ). One hundred (100) tiles are needed to cover 183 ft 2 (17 m 2 ) Milled screws 1 ¼ '' #8 for treated wood to screw on wooden deck. Milled screws 1 1/4'' x 3/16 tapcon or equivalent to screw in concrete. Milled screws 5/8 # 8 galvanized for mouldings 16 ¼ 16 ¼ Under tile

3 SURFACE PREPARATION Step 1 : Ramp Remove any ramp model screwed to the floor of the surface. For ramp models fixed to the structure, the tiles will be cut to the contour of the ramp posts. When the ramp comprises many balusters affixed to the outside of the floor structure, set the tiles leaving a ¼" (6mm) space between the tiles and the balusters to allow for installing the finishing L mouldings. Step 2 : Surface preparation Cut off excess flooring to match the contours of the existing floor of the structure. "Nosing" style mouldings will complete the finish after the tiles have been installed. Step 3 : Leveling the floor Screw down all protruding planks to obtain a level surface. If necessary, split the planks lengthwise and screw them into place, if they are not sufficiently tight against the structure. For concrete: Make sure the surface has a slope for water drainage. If there is a water accumulation, it must be set either through a hole in concrete or groove to the edge of the structure (to allow water to flow). Do not resurface with a layer of repair concrete mix (this risk will crumble when screwed into it).

4 TILE INSTALLATION Step 4 : Method of installation Install the first row of tiles perpendicular to the wall of the building, beginning on the left. After completing the first row, install the next row to the right of the first, and continue in this manner, moving from left to right. The tongue and groove design of the tiles requires that this method be followed. Step 5 : Layout of the tiles Determine the exact centre of the surface you plan to cover. Draw two perpendicular chalk lines meeting at the centre of the surface in such a way as to ensure an equal and symmetrical layout of tiles. Tapcon screw for concrete (in this case) Note : other methods can be used to customer choice. If, while laying down the tiles to either side of the chalk line, you are left with contour tiles of a width of less than 8" (20 cm), move the central axis to either side by 8" (20 cm). This will leave you with larger contour tiles. This method is used by ceramic [tile] setting specialists. If you install a mosaic, you must centre it at chosen spot (at the centre, in line with a door or other object, etc.). Then, install tiles starting from the centre position of the mosaic. Use only No. 8 (1 ¼ ) wood screws with ceramic coating (screws for pressure-treated wood). For the position of the screws, see picture. See picture for position of screws. The head of the screws must be level with the surface of the tile and not stick out. The finishing mouldings will later hide any visible screws. For corners, place tiles on top of each other as shown on the picture.

5 TILE INSTALLATION Step 6: Installation of tiles on the side of the structure (Facultative) Tiles must be set down from left to right. To see how to cut the tile, see positioning of the tile on the picture. Always cut the lower end of the tile and keep the upper part. The tile layout as described above indicates how to align each tile to either side of the structure to be covered. We thus know the width of the first tile to be installed. Cut the left side of the first tile and keep the right side. For the first and all those following, cut all tiles to width equal to the underside of the structure and level with the floor to be covered. You are now ready to screw the first tile onto the edge of the structure. Embout mâle Step 7: Alignment and installation of the first row of tiles Note: Use No. 8 (1 ½ ) wood screws with ceramic coating (screws for pressure-treated wood). Temporarily install a straight edge on the floor to align the first row of tiles as determined in Step 4. This will ensure the proper alignment of the tiles. Note : Important step to keep tiles alignment up to the end. Be careful! For the tile to be correctly set, you must move the ruler (straight edge) 1/2" (12.5 mm) to the right to adjust for the tongue (tongue & groove) of the tile.

6 TILE INSTALLATION 2 e 1 er Space of ¼ to insert Trim moulding House Cut the first tile to obtain the desired symmetry and begin setting. The tiles must cover the entire surface precisely up to the edge of the floor, except if you intend to install a ramp with balusters running along the contours of the structure. In which case, leave a 1/4" (6mm) space between the edge of the floor and the edge of the tiles to allow for the installation of the finishing L moulding. If you have installed tiles on the side of the structure, the floor tiles must cover the top edge of the side tiles, except if you intend to install a ramp with balusters running along the contours of the structure. In which case, leave a 1/4" (6mm) space between the outside edge of the floor tiles to allow for the installation of the finishing «L» moulding. If you have covered the side of the structure with tiles, the floor tiles must also perfectly cover the contour tile edges. It naturally follows that the screws for the tiles on the outer edge of the floor will be screwed into the top of the tiles covering the side of the structure. In order to do this, use 1 ½" no. 8 ceramic-coated flat-headed wood screws. To install tiles along a wall, leave a 1/4" (6mm) space between the tile and the wall. Fix in place using two screws placed at no more than 1/2" (12.5mm) from the edge. To finish, install L-mouldings to hide visible screws. Screw this tile starting with the initial hole in the tile. Two screws per side are required for all the peripheral tiles of the structure to ensure maintaining the correct alignment of the first row when the straightedged ruler screwed to the floor is removed. When not placing the screws in the existing pattern, make holes using a drill. The head of the screws must be level with the tile surface and not stick out. The screws must not move under the pressure exercised by the installation of the second row. When installation of the first row is complete, remove the straight-edge ruler. You can then install the second and subsequent row of tiles using the method described in Stage 4.

7 MOULDING INSTALLATION Each tile has a spacer ensuring the proper spacing between the tiles even with variations in temperature. Do not force fit the tiles during installation. The attachment-clips also ensure proper distance between tiles. Step 8 : Installing the mouldings Screw the mouldings on using number 8 - ½» galvanized wood screws in pre-drilled holes. This will prevent any expansion and retraction. Install the mouldings nosing first, followed by the L mouldings. The most aesthetic method of installing the L mouldings is by using the nosing method. After having screwed in all the mouldings, insert the screw cover with a hammer. For an exact fitting of the screw covers, first trace a line on the cover with an exacto knife, and then finish the cut using a chisel or scissors. For obstacles such as ramps, posts, columns, etc, always calculate a ¼ distance (6mm) between the tiles and any obstacle for the installation of the L mouldings. The Nosing moulding produces a professional finish along walls and staircases.

8 COVERING STAIRCASES (STEPS AND RISERS) (To be done before having completed covering the floor) Step 1: Covering the Stringer (optional) If you decide to cover the stringer, you must do so before covering the steps and risers. Cut any part of the steps and risers that stick out beyond the stringer on either side. It is highly recommended to cover all surfaces with a damp-proof Resisto base membrane. For each stringer to be covered, always start setting the tiles from left to right when facing the stringer. Cut the tongue of the part of the tile that is of equal size to the underside of the stringer. Cut the tiles so that they are level with the front of the riser and the surface of the step while positioning the bottom of the tile level with the underside of the stringer (tongue removed). Screw in the tiles following the contour of each cut tile at a maximum distance of 1/2" (12.5mm) from the edge. Use two screws per side. The finishing mouldings will cover all the screws, leaving none visible. Step 2: Staircase Risers and Steps Cut any part of the steps and risers that stick out beyond the stringer on either side (see photos of preceding Step). It is highly recommended to cover all step and riser surfaces up to the stringer with a damp-proof Resisto base membrane. Begin setting tiles for the first riser at the bottom of the stairs. To do so, cut the tongue off the bottom of the tile (See picture at Step 9).

9 COVERING STAIRS (suite) Then cut the tile to the height between the bottom of the first riser and the topside of the first step. To determine the length of the tiles, align the tiles with those already set on the floor. The end result will reveal a perfect alignment of the staircase tiles with those of the floor. Set the first and then the remaining riser tiles using two (2) screws per tile placing then at no more than 1/2" (12.5mm) from the edge. The finishing moulding will cover all the visible screws. To cover the first step at the bottom of the stairs, use the remaining tiles used for the first riser. This approach can be used for all the steps. Cut the tile so that it still has the manufacturer s hole and so that it covers the first step and the tile installed on the riser. Use this approach for all steps. Always set tiles from left to right for all surfaces of the project. Never add screws at the junction of the step and the riser, as there is no the finishing mouldings at this spot. The manufacturer s joint does the job. Step 3 : Installing mouldings Screw the mouldings on using number 8 ¼ galvanized wood screws in pre-drilled holes. This will prevent any expansion and retraction. Install the mouldings nosing first, followed by the L mouldings. The most aesthetic method of installing the L mouldings is by using the nosing method. After having screwed in all the mouldings, insert the screw cover with a hammer. For an exact fitting of the screw covers, first trace a line on the cover with an exacto knife, and then finish the cut using a chisel or scissors.

10 DAMP-PROOF MEMBRANE INSTALLATION NOTE: Optional: Installation of two layers of a dampproof membrane on the existing surface Important: It s required to cover plywood or fiberglass surface. Membrane installation :We recommend the use of Resisto brand "Basic Damp-Proof Membrane"( For proper installation of selfadhesive damp-proof membrane, follow the instructions of the manufacturer found: Choice of dimensions: 1m X 10m or 1m X 20m. ( The equivalent for damp-proof membrane is Damp-proof membrane from BlueSkin ) A SLOPE OF 1 EACH 8 feet IS REQUIRED TO DRAIN THE WATER EASILY. There are three (3) available options: A- When covering the surface of the floor but not the sides: Install the self-adhesive membrane to cover the entire surface of the floor right up to its outer edges. Do not fold the membrane over the edges. Where the membrane abuts a wall, ramp post or balusters, apply an elastomer sealer to waterproof the joint between the membrane and the wall, post or balusters. B-When covering the side of the structure with the same tiles as the floor: Install the self-adhesive membrane to cover the entire surface of the floor, folding the membrane over the edges but not beyond the underside of the flooring. Where the membrane abuts a wall, ramp post or balusters, apply an elastomer sealer to waterproof the joint between the membrane and the wall, post or balusters. 1 over aluminium C-When covering the surface of the floor with tiles and the side of the structure with aluminum siding: Cover the structure sides with the aluminum up to the upper edge of the flooring.install the self-adhesive membrane to cover the entire surface of the floor and let 1 over the aluminum frontage. Where the membrane abuts a wall, ramp post or balusters, apply an elastomer sealer to waterproof the joint between the membrane and the wall, post or balusters.

DECKING INSTALLATION GUIDE

DECKING INSTALLATION GUIDE STAIR TREAD INSTALLATION GUIDE Step 7: Install the Remaining Treads Repeat steps 2 to 6 for the remaining stair treads. Step 8: Install the Fascia 1. Measure the riser height. 2. Rip the fascia to the

More information

Balustrade Systems / Installation Instructions

Balustrade Systems / Installation Instructions A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories

INSTALLATION LAMTON INSTALLATION INSTRUCTIONS. Lamton Laminate Flooring with Underlay Attached Glueless Installation. Tools and Accessories Lamton quality laminate flooring is manufactured to exacting standards for long life and lasting beauty. Following these simple procedures for installation and it will ensure many years of pride and satisfaction.

More information

U. M. ARMY Texas Conference. Wheel Chair Ramp Manual

U. M. ARMY Texas Conference. Wheel Chair Ramp Manual U. M. ARMY Texas Conference Wheel Chair Ramp Manual June 2014 U. M. ARMY Texas Conference Building & Repair Tips Wheelchair Ramps Complete a site survey to determine the design and layout of the ramp.

More information

Balustrade System Installation - Cambridge & Huntington

Balustrade System Installation - Cambridge & Huntington A. PARTS AND SUPPLIES NEEDED FOR INSTALLATION Hardware included for each 10 section of rail: 2 3 x 1-1/2 L-brackets 4 1-3/4 x 3/16 Blue hex-head screws for anchoring the L-brackets to the newel cap, column

More information

INSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit

INSTALLATION GUIDE. Preparation. Subfloor Preparation. Installation of Vapour Barrier Paper (asphalt-free) Model repair and maintenance kit INSTALLATION GUIDE pg and model solid ing The investment that ing represents in the home is an important one and customers want their ing to last. In light of this fact, the importance of product quality

More information

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty

installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty installation care & maintenance instructions lifecycledecking.com 25-year limited residential warranty 20-year limited commercial warranty Installation Instructions As with any building project, use proper

More information

WaterWell Synthetic Skirting for Aluminum Coping Supplemental Guide Page 1 of 9

WaterWell Synthetic Skirting for Aluminum Coping Supplemental Guide Page 1 of 9 Page 1 of 9 Parts List Parts supplied by EPI (_) Sections of Insulated Skirting Panels (number depends on size of pool and sides of pool to be skirted) (_) 4 Wood Screws (number depends on size of pool

More information

DuraLife Porch Collection Installation Instructions

DuraLife Porch Collection Installation Instructions DuraLife Porch Collection Installation Instructions Updated: 1/11 www.gaf.com 1 Getting Started... ilation and Drainage Plan the design of the porch it is the beginning of a successful project. DuraLife

More information

Installation Manual 0318

Installation Manual 0318 Installation Manual 0318 DOUBLE 7 CEDAR SHINGLE INSTALLATION GUIDE General Information CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION / CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS

More information

Fireball Fab Welded Baluster Insert Panel System Installation Instructions

Fireball Fab Welded Baluster Insert Panel System Installation Instructions Fireball Fab Welded Baluster Insert Panel System Installation Instructions Prior to construction, check with your local regulatory agency for special code requirements in your area. Common railing height

More information

Installation Guide (888)

Installation Guide (888) BamDeck Installation Guide (888) 788-2254 The Collection Decking Systems BAMDECK 4G 5-7/16 Wide Plank Dims: 192 L x 5-7/16 W x 13/16 H BAMDECK 4G WIDE 8-1/4 Wide Plank Dims: 96 L x 8-1/4 W x 13/16 H BAMDECK

More information

Installation Guide (888)

Installation Guide (888) BamDeck Installation Guide (888) 788-2254 The Collection Decking Systems BAMDECK 3G 5-7/16 Wide Plank Dims: 96 L x 5-7/16 W x 13/16 H BAMDECK 3G 16FT. 5-7/16 Wide Plank Dims: 192 L x 5-1/2 W x 13/16 H

More information

The following instructions will guide you through the installation of your new vinyl railing.

The following instructions will guide you through the installation of your new vinyl railing. Installation Guide St. James Vinyl T-Rail Tools Required Protective eye glasses 3/8 x 3 Concrete Anchors/Fasteners (for Tape measure concrete installations) Variable speed drill/screwdriver Philips Driver

More information

INSTALLATION GUIDE. Preparation The environment

INSTALLATION GUIDE. Preparation The environment INSTALLATION GUIDE PG-MODEL HARDWOOD FLOORING The investment that ing represents in the home is an important one and customers want their ing to last. In light of this fact, the importance of product quality

More information

INSTALLATION GUIDE SOLID HARDWOOD FLOORING

INSTALLATION GUIDE SOLID HARDWOOD FLOORING Laurentian Hardwood Canadian Heritage Series INSTALLATION GUIDE SOLID HARDWOOD FLOORING The investment that flooring represents in the home is an important one. Customers want their flooring to last. In

More information

Tools needed. Supplies Needed

Tools needed. Supplies Needed Installation Guide Key System Components Main beam Cross tee Tools needed Chalk line Drill (cordless) ¼" drill bit Hammer Miter saw Pencil String line(s) Stud finder Tape measure ½" to 1" wood chisel Calculator

More information

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety.

INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety. INSTALLATION INSTRUCTIONS MILLENNIUM DECKING Before Installing Millennium Decking, please read these instructions in their entirety. Safety PRE-INSTALLATION Compliance with all applicable local, state

More information

Gambrel Barn Construction Manual 8x8 through 16x24 Units

Gambrel Barn Construction Manual 8x8 through 16x24 Units Gambrel Barn Construction Manual 8x8 through 16x24 Units Tools Needed: Cordless drill (12V or higher) #2 square drive bit Hammer 6 step ladder Tape measure Square utility knife w/ blade & hook blade Little

More information

Wall Installations. Chapter 16 Wall Installations 16. 1

Wall Installations. Chapter 16 Wall Installations 16. 1 16 Wall Installations Chapter 16 Wall Installations 16. 1 Alterna Premium Groutable Tile Create decorative backsplashes, accent walls, or other focal points with any size Alterna 16" x 16", 8" x 16", 8"

More information

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION

INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns

More information

COMPOSITE RAILING INSTALLATION

COMPOSITE RAILING INSTALLATION COMPOSITE RAILING INSTALLATION Tools All you ll need is a hammer and screw gun, circular saw (carbidetipped blade with fewer than 20 teeth is recommended), level, tape measure, rasp and blue chalk line.

More information

- Before You Begin - Standard Apex / Tall Apex Shed Kit Instructions IMPORTANT!

- Before You Begin - Standard Apex / Tall Apex Shed Kit Instructions IMPORTANT! Customer Service: (801)754-3334 810 W Utah Ave #8 Payson, Utah 84651 email: apexshedcompany@gmail.com Standard Apex / Tall Apex Shed Kit Instructions Tools Needed: Framing Hammer Tape Measure (25 ft.)

More information

TECHNICAL FILE FOR THE STIRLING ENGINE

TECHNICAL FILE FOR THE STIRLING ENGINE TECHNICAL FILE FOR THE STIRLING ENGINE FABRICATION RANGE ELEMENT: Support ring SET: Stirling engine RANGE: 1 SHEET: 1 of 1 DRAWING: N 11 MATERIAL: white NUMBER: 1 PVC N o PHASE, SUB-PHASE OR 10 MAKING

More information

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes

INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes INSTALLING YOUR UNICLIC FLOOR - Small planks / 3 sizes 1) General The panels must be rotated on both short and long edges to fit into one another. This can be performed by inserting either the tongue into

More information

Stair Parts Installation. Tricks

Stair Parts Installation. Tricks Stair Parts Installation Tips & Tricks Introduction Your DIY staircase guide Welcome to the Stairpart home installation guide. Your stairway is both a functional and focal point in your home, so keeping

More information

NewTech - CleverDeck Composite Decking Installation Guidelines

NewTech - CleverDeck Composite Decking Installation Guidelines NewTech - CleverDeck Composite Decking Installation Guidelines Composite decking has unique characteristics and requires specific fixing requirements that differ from timber. We strongly recommend that

More information

INSTALLATION GUIDE. Preparation

INSTALLATION GUIDE. Preparation INSTALLATION GUIDE The investment that flooring represents in the home is an important one and customers want their flooring to last. In light of this fact, the importance of product quality and the quality

More information

Installation Instructions for. Before You Begin TOOLS REQUIRED

Installation Instructions for. Before You Begin TOOLS REQUIRED Composite Railing System STEP-BY-STEP Installation Instructions for Spectrum Composite Railing Virtually maintenance free 20-year warranty EverNew Spectrum Railing system is designed to work with a number

More information

Vinyl Gazebo Instructions

Vinyl Gazebo Instructions P a g e 1 Vinyl Gazebo Instructions 10 Vinyl Gazebo Shown Thank you for the purchase of your New Gazebo. Depending on the size of your Gazebo, installation can usually be completed in 1 to 2 days. These

More information

How to fit an Internal Door

How to fit an Internal Door How to fit an Internal Door How to fit an Internal Door The following instructions are for installing a internal door only. If you have any queries please contact Cheshire Mouldings technical helpline

More information

Laminate Floor Installation Guide

Laminate Floor Installation Guide Laminate Floor Installation Guide Introduction This guide will take you through the necessary steps to install your Bel-Air Laminate Flooring. Make sure to carefully read through this guide so that you

More information

METAMORPHOSIS INSTALLATION GUIDE

METAMORPHOSIS INSTALLATION GUIDE METAMORPHOSIS INSTALLATION GUIDE THANK YOU FOR YOUR PURCHASE OF DUCHÂTEAU WALL COVERINGS. We recommend you hire an experienced finish carpenter or wood flooring installer to achieve quality results with

More information

TREX REVEAL RAILING Installation Instructions

TREX REVEAL RAILING Installation Instructions TREX REVEAL RAILING BRACKET HARDWARE STAIR APPLICATIONS (INCLUDING STAIR SWIVEL BRACKETS, STAIR CROSSOVER BRACKET, AND COMPOUND SWIVEL BRACKETS) FIXED BRACKET Stair HARDWARE AA. Bottom Stair Bracket and

More information

AquaGuard - Water Resistant Flooring Installation guidelines

AquaGuard - Water Resistant Flooring Installation guidelines AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important

More information

TRESSES INSTALLATION GUIDE

TRESSES INSTALLATION GUIDE TRESSES INSTALLATION GUIDE THANK YOU FOR YOUR PURCHASE OF DUCHÂTEAU WALL COVERINGS. We recommend you hire an experienced finish carpenter or wood flooring installer to achieve quality results with all

More information

Columbia Laminate Installation Instructions

Columbia Laminate Installation Instructions Columbia Laminate Installation Instructions 1. General Uniclic is a revolutionary system for installing laminated flooring without using glue. Uniclic uses an ingenious form of tongue and groove to click

More information

Phone: Installation Instructions

Phone: Installation Instructions Installation Instructions Multi-Function Step Light GEMINI 3000 SERIES _V1.1 The following instructions are general guidelines. Installation should be performed by a qualified electrician in accordance

More information

TREX TRANSCEND RAILING

TREX TRANSCEND RAILING RAILING NOTES:» RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED ON OUTSIDE OF RIM JOIST IS NOT ALLOWED.» All

More information

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15

PORCH RAIL INSTALLATION INSTRUCTIONS. Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15 PORCH RAIL INSTALLATION INSTRUCTIONS Level Rail... 2 Stair Rail... 8 Care & Maintenance, Finishing... 15 COMPONENT LIST LEVEL RAIL KIT Porch Rail was designed to meet the most stringent building codes.

More information

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings

TRIVERSA TRIVERSA ID. Triversa Triversa ID Installation Instructions. Remove the wall base and doorway trim. Always undercut wood door casings INSTALL ON ALL GRADE LEVELS Above Grade On Grade Below Grade by CONGOLEUM TRIVERSA TRIVERSA ID Triversa Triversa ID Installation Instructions GENERAL INFORMATION ATTENTION! READ BEFORE INSTALLING! Handle

More information

Repairs. Chapter 10 Repairs 10. 1

Repairs. Chapter 10 Repairs 10. 1 10 Repairs Chapter 10 Repairs 10. 1 Repairs As an installer, you will probably be called upon to repair damage to a resilient floor. Here are some of the most common problems and the recommended repairs

More information

Laminate goes Wall. Installation documentation for wall panelling with gekko-system and Extravagant from CLASSEN.

Laminate goes Wall. Installation documentation for wall panelling with gekko-system and Extravagant from CLASSEN. Laminate goes Wall The new panelling system for walls and ceilings from CLASSEN. Installation documentation for wall panelling with gekko-system and Extravagant from CLASSEN. Important information: Installing

More information

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck...

PAINT & MISC. Notes. Table of Contents. Front Handrail Posts Front Handrails Closet Shelving Exterior Deck... 118 PAINT & MISC. Table of Contents Front Handrail Posts... 119 Front Handrails... 122 Closet Shelving... 125 Exterior Deck... 127 Look for painter s tape on the hammer drill for where to set the depth.

More information

Exterra Installation Guide

Exterra Installation Guide Exterra Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time Monday

More information

INCEPTIV INSTALLATION GUIDELINES

INCEPTIV INSTALLATION GUIDELINES 3D WOOD WALL PANELS INCEPTIV INSTALLATION GUIDELINES We recommend you hire an experienced finish carpenter or floor installer to achieve quality results with all Duchateau Wall Coverings. The right tools

More information

Zenterra TM Installation Guide

Zenterra TM Installation Guide Zenterra TM Installation Guide Installing the foam padding Please review this installation guide before you begin installing the floor. If you have any questions, please call us at 800-428-5306 any time

More information

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels

Aluminum Railing Installation. Glass Railing Spindle Railings Intimacy Railings and Panels Aluminum Railing Installation Glass Railing Spindle Railings Intimacy Railings and Panels This information in this manual will help you to Better understand our product line. Give you guidelines for an

More information

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions

Extra Wide Heavy Duty Plastic Lockers Series Locker Installation Instructions Locker Installation Instructions Thank you for selecting Extra Wide Heavy Duty Plastic Lockers. We are confident that the quality and construction of the lockers will prove to be a good investment. These

More information

Solara Adjustable Patio Cover Installation Instructions

Solara Adjustable Patio Cover Installation Instructions Solara Adjustable Patio Cover Installation Instructions We divided the installation instructions in 6 major sections. Reference your project to the drawings below, this way you ll know you are on the right

More information

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013

CONTENTS TOOL LIST U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS. Revised: June 2013 U P S I D E I N N O V A T I O N S, L L C RAMP AND STEP SYSTEM ASSEMBLY INSTRUCTIONS TOOL LIST Required Tools: - Reciprocating Saw with Metal Cutting Blade - Drill - 7/16 Drill Bit for Metal Drilling -

More information

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar

Installation Guide. Shingles. Classical. Shingles. Warning. Storage. Cutting Shingles. Touch-Up. Eastern White Cedar Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. The Fastening Make shingle fastening simpler

More information

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD

HOW TO INSTALL HORIZONTAL ROD RAILING TREX SIGNATURE STANDARD HOW TO INSTALL HORIZONTAL ROD RAILING NOTES:» Adjust drill power to lowest setting that will drive screw. DO NOT OVER TORQUE 6 STAINLESS STEEL STAINLESS FASTENERS.» NEVER use impact tools on 6 Stainless

More information

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame

BUILDING THE BASIC SHED. Step A: Build the Foundation & Floor Frame BUILDING THE BASIC SHED Step A: Build the Foundation & Floor Frame 1. Excavate the building site and add a 4" layer of compactible gravel. If desired, add an extension to the base for the optional wood

More information

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS

STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS STACKING MULTI-SLIDE DOOR SYSTEM INSTALLATION INSTRUCTIONS 1290363 Revision 1 12/16 Page 1 Weather Shield Mfg., Inc. NOTICE CAUTION! Failure to install and maintain our product according to these instructions

More information

Assembly Instructions

Assembly Instructions 10' and 12' Octagon Cedar Gazebo Assembly Instructions Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 06/20/09 Cedar Gazebo Assembly Instructions

More information

Vivian Mansion Assembly Instruction By Laser Dollhouse Designs

Vivian Mansion Assembly Instruction By Laser Dollhouse Designs Vivian Mansion Assembly Instruction By Laser Dollhouse Designs NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also

More information

Installation Guide. Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation

Installation Guide.   Step 3. Valley Flashing. Step 7. Transition Flashings and Accessories. Step 6. Hip and Ridge Installation Step 7. Transition s and Accessories Step 3. Valley Step 6. Hip and Ridge Installation Step 2. Rake Trim Step 5. Installing the Shingles Step 1. Eave Starter Installation Step 4. Endwall s Installation

More information

Installation Guidelines

Installation Guidelines Page 1 Two inch () Porch Screening System Extruded Screen Walls Only Kit Installation Guidelines Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Chop saw with a metal

More information

The following instructions will guide you through the installation of your new vinyl railing stair kit.

The following instructions will guide you through the installation of your new vinyl railing stair kit. Installation Guide Vinyl Standard Stair Railing Tools Required Protective eye glasses Tape measure Variable speed drill/screwdriver Rotary hammer or hammer drill and masonry percussion bit recommended

More information

Chapter 16. Underlayment and Finish Stairs

Chapter 16. Underlayment and Finish Stairs Chapter 16. Underlayment and Finish Stairs 16.1 INSTALLING UNDERLAYMENT & DRICORE 16.2 FINISHING STAIRS Tools needed by volunteers: Hammer Nail apron Tape measure Tools and equipment needed: Extension

More information

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately

CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CXT PRO RAILING INSTALLATION INSTRUCTIONS For Installations Using Aluminum and Glass Balusters Sold Separately CCRR-0171 PFS AA-652 Drill/power screwdriver Assorted drill bits Hammer Miter or circular

More information

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation

Pacifica Pool House. Assembly Manual. Toll Free: Hours: 9-5 Monday-Friday EST. Package ships as shown. Suncast Corporation Pacifica Pool House Assembly Manual Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST Package ships as shown Simpson Hurricane Straps Double Insulated Raised-Panel Door in back wall (71 x71 Total opening)

More information

General Installation Instructions. Laminate Drop & Lock installation - 2G

General Installation Instructions. Laminate Drop & Lock installation - 2G General Installation Instructions Laminate Drop & Lock installation - 2G A. INTRODUCTION Laminates and other wooden material acts after the surrounding climate, the main factor is the relative humidity

More information

Installation Guide. Deckorum. Composite Decking

Installation Guide. Deckorum. Composite Decking Installation Guide Deckorum Composite Decking 1. Introduction Welcome to Deckorum Installation Guide Please fully read the installation guide before commencing any installation works. This will provide

More information

AZEK Porch Install Guide

AZEK Porch Install Guide TRIM MOULDING DECK PORCH RAIL PAVERS AZEK Porch Install Guide Installation Guidelines...2 Tools Required...2 Installation Preparation...3 Fasteners...4 Expansion and Contraction...4 Installation Instructions...5-6

More information

Dura-Lock Roof System

Dura-Lock Roof System DLR-14 Dura-Lock Roof System Assembly and Installation Instructions Read the instructions before starting the job. They explain the steps required to produce a finished product that will meet factory specifications.

More information

Keystone Garage Assembly Manual

Keystone Garage Assembly Manual Keystone Garage Assembly Manual 14x24 Garage Kit ships as shown Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST 13 8 deep AMISH ORIGINAL KEYSTONE 14x24 GARAGE s p e c i f i c a t i o n s Optional

More information

Build Outdoor Stairs. Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs:

Build Outdoor Stairs. Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs: Build Outdoor Stairs Stair Building Terms There are five basic design elements you'll need to consider when planning outdoor stairs: The Total Run (Fig. 1) is the total horizontal distance covered by the

More information

Office Installation Guidelines

Office Installation Guidelines UH Structures Inc. dba Ebtech Industrial 2241 Industrial Drive Connellsville, PA 15425-6181 Telephone: 724-628-6100 Fax: 1-412-774-2429 www.ebtechindustrial.com Office Installation Guidelines INTRODUCTION

More information

LAMINATE FLOORING INSTALLATION INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION.

LAMINATE FLOORING INSTALLATION INSTRUCTIONS READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION. If your starting wall is uneven, refer to Fig 11 to prevent having to uninstall rows. Taking measurements to ensure you will not have too small a final

More information

Chapter 17 - Porch Trim

Chapter 17 - Porch Trim Chapter 17 - Porch Trim Contents Chapter 17 - Porch Trim... 17-1 Timing & Prerequisites... 17-2 Trim on Porch Beams (Volunteer)... 17-4 Smart Trim on the Bottom of the Beam... 17-4 Smart Trim on the Inside

More information

installation care & maintenance instructions moistureshield.com limited lifetime warranty

installation care & maintenance instructions moistureshield.com limited lifetime warranty installation care & maintenance instructions 866.729.2378 moistureshield.com limited lifetime warranty It s comforting to know that you re about to build a deck that gives you every possible advantage.

More information

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%

Carpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10% EXAM INFORMATION Items 73 Points 73 Prerequisites NONE Course Length DESCRIPTION This is the first in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden

More information

2017 UPDATED INSTALLATION INSTRUCTIONS

2017 UPDATED INSTALLATION INSTRUCTIONS 2017 UPDATED INSTALLATION INSTRUCTIONS with square composite or round metal balusters Manufactured by fiberondecking.com 800.573.8841 Horizon Railing 6 ft. and 8 ft. Installation Instructions Required

More information

Installation guide. MS 14 Metal Siding

Installation guide. MS 14 Metal Siding Installation guide MS 14 Metal Siding 2 CAUTION: The material may have sharp edges. We recommend using protection equipment, including safety boots, helmet, goggles and gloves. WARRANTY FOR THE WARRANTY

More information

Panel Riser Kit Option 1. Installation Instructions 226BEE 0117CH

Panel Riser Kit Option 1. Installation Instructions 226BEE 0117CH Panel Riser Kit Option 1 Installation Instructions 226BEE 0117CH Before you Start Please read these instructions fully before starting. Although these instructions are comprehensive we always recommend

More information

woodworkersjournal.com MATERIAL LIST

woodworkersjournal.com MATERIAL LIST MATERIAL LIST T x W x L 1 Legs (2) 1 1 2" x 3 1 2" x 36 7 16" 2 End Uprights (2) 1 1 2" x 3 1 2" x 32 1 2" 3 Stringers (4) 1 1 2" x 3 1 2" x 42" 4 Top Cladding, Long (2) 3/4" x 7 1 4" x 65 3 4" 5 Side

More information

Customer Service: Installation, Care and Maintenance

Customer Service: Installation, Care and Maintenance Customer Service: 800-951-5117 Installation, Care and Maintenance Installation Instructions Easy step-by-step instructions for decking, railing and stairs. As with any building project, use proper eye

More information

Salter Industries Spiral Stair

Salter Industries Spiral Stair Salter Industries Spiral Stair The Leader in Spiral Staircases Continuous Sleeve Stair Installation Instructions TOOLS NEEDED: 1. Electric drill with hex chuck and Phillips bit 2. Drill bits 1/8", 1/4",

More information

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models

Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Octagon Vinyl Gazebo Assembly Instructions For 10 & 12 Models Toll Free: 866.768.8465 Hours: 9-5 Monday-Friday EST www.homeplacestructures.com Package ships as shown revised 04/29/09 Vinyl Gazebo Assembly

More information

AXXYS Stairparts Fitting Instructions

AXXYS Stairparts Fitting Instructions These Fitting Instructions are for use with the AXXYS range with metal balusters within B&Q These instructions are not for use with any other ranges outside the AXXYS range. If you are using our glass

More information

Installation Instructions for Engineered Wood Flooring

Installation Instructions for Engineered Wood Flooring Installation Instructions for Engineered Wood Flooring PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a natural product, hardwood

More information

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans

With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans 12 X 8 Shed Plans With Illustrations, Blueprints & Step By Step Details Brought To You By ShedPlansz.Com Click Here To Get More Shed Plans Blueprints And Diagrams Instructions For Building The Shed

More information

INSTALLATION GUIDE. StreamLine Linear Drain. Supply Drainage Support.

INSTALLATION GUIDE. StreamLine Linear Drain. Supply Drainage Support. INSTALLATION GUIDE TM StreamLine Linear Drain Supply Drainage Support www.siouxchief.com TM StreamLine Linear Drain Installation Instructions 823 SERIES StreamLine Linear Drain Includes: Pre-Strainers

More information

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans

With Illustrations, Drawings & Step By Step Details. Click Here To Download 12,000 Shed Plans. 1 P a g e Download 12,000 More Shed Plans With Illustrations, Drawings & Step By Step Details Click Here To Download 12,000 Shed Plans 1 P a g e Download 12,000 More Shed Plans Table of Contents OVERVIEW... 3 MATERIALS & CUTTING LISTS... 4 DRAWINGS,

More information

INCEPTIV INSTALLATION GUIDELINES

INCEPTIV INSTALLATION GUIDELINES 3D WOOD WALL PANELS INCEPTIV INSTALLATION GUIDELINES We recommend you hire an experienced finish carpenter or floor installer to achieve quality results with all Duchateau Wall Coverings. The right tools

More information

1Use the metal file to smooth

1Use the metal file to smooth Yamato: Step-by-step 85 Parts of the bridge and the hull a b c d e f a Part of the bridge b Part of the bridge c Part of the bridge d Radar x 2 e Part of the bridge x 2 f Wire Recommended tools and materials

More information

Installation Instructions for Viking Hearth Engineered Wood Flooring

Installation Instructions for Viking Hearth Engineered Wood Flooring Installation Instructions for Viking Hearth Engineered Wood Flooring 4.16.15 PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a

More information

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12

INSTALLATION INSTRUCTIONS. Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 INSTALLATION INSTRUCTIONS Level Rail With Cap: Page 2 Level Rail Without Cap: Page 8 Stair Rail: Page 12 LEVEL RAIL WITH CAP The testing was performed in accordance with procedures and methods referenced

More information

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501)

DeckRail A Product of DeckRite LLC 3912 East Progress North Little Rock, AR Phone: (501) Fax: (501) Disclaimer: Deck Rail Glass Railing Installation Guide This guide is not intended to replace a trained professional installer. The drawings and instructions contained within are for demonstration purposes

More information

A Step-by-Step How To Guide

A Step-by-Step How To Guide HOW TO REMODEL YOUR STAIR A Step-by-Step How To Guide Add new life to your staircase and achieve professional results. 1 Renovating your staircase is more than a remodel, it s a transformation of your

More information

Chapter 23. Garage Construction

Chapter 23. Garage Construction Chapter 23. Garage Construction 23.1 ESTABLISHING CHALK LINES 23.2 MEASURING AND CUTTING WALL PLATES 23.3 MARKING WINDOW & DOOR LOCATIONS ON EXTERIOR WALL PLATES 23.4 MARKING STUDS ON EXTERIOR WALL PLATES

More information

PVC Composite Railing & Stair Kit

PVC Composite Railing & Stair Kit FREEDOM-WEB PVC Composite Railing & Stair Kit INSTALLATION INSTRUCTIONS Read all instructions prior to installing product. Refer to manufacturers safety instructions when operating any tools. To register

More information

Installation Guidelines

Installation Guidelines Page 1 Tools You ll Need 4 ft. Carpenter s level Chalk line (to mark U channel locations) Cordless drill/nut driver Caulking gun Chop saw with a metal cutting blade on it (required to make accurate and

More information

RAILING R A IL ING 51

RAILING R A IL ING 51 RAILING RAILING 5 TREX TRANSCEND RAILING NOTES:» TREX TRANSCEND RAILINGS ARE DESIGNED TO BE INSTALLED OVER THE DECKING FRAME OR ON INSIDE OF RIM JOIST. NOTCHING OF PRESSURE-TREATED POSTS OR POSTS INSTALLED

More information

15mm Solid European Droploc Oak Fitting Guide & Warranty Information

15mm Solid European Droploc Oak Fitting Guide & Warranty Information 15mm Solid European Droploc Oak & Warranty Information Introduction Congratulations on your purchase of your brand new Timba Floor 15mm European Solid Oak Flooring. Prior to installation please examine

More information

Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products

Required Tools. Installation of Hook Plates & Discs. Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products Professional Installation Guidelines for Engineered Wood & Hardwood with LocPlate Products Required Tools Utility Knife Chalk Line Measuring Tape Conventional cutting tools for Engineered Wood and Solid

More information

The image above is intended to give you an idea of what the dovecote will look like when finished.

The image above is intended to give you an idea of what the dovecote will look like when finished. Thank you for buying my book, I hope it is useful and enjoyable in your quest to building your own dovecote. This book will give you step-by step instructions on how to build your own dovecote also included

More information

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE

Siding Systems NOVIKSTONETM DS DRY STACK STONE INSTALLATION GUIDE Siding Systems NOVIKSTONETM DS DRY STACK STONE GENERAL INFORMATION CAUTION: REMEMBER THAT POLYMER UNDERGOES EXPANSION/CONTRACTION DUE TO VARIATIONS IN TEMPERATURE. THE FOLLOWING INSTRUCTIONS WILL ALLOW

More information