1 RA Ref Number: 46 Revision: 3 Project/Job Number Reference Insert Job Number Approval Date: 30/03/2018 RA Description: Electrical Termination Pyro Next Review Date: 01/04/2019 Notes: Please refer to Safe Working Practices 46 for definitions of items in this assessment. Created by: Lee Davies Risk Assessment Method & Scoring The summary risk assessment is calculated as Likelihood x Consequence and categorised as follows; 1 to 6 = 7 to 16 = Medium Risk 17 to 25 = Issued by: Issue Date: Insert Name Insert Date TASK HAZARDS PERSONS AFFECTED INITIAL RISK LEVEL CONTROL MEASURES REVISED RISK LEVEL Stripping back of insulation on cable. Preparing cable for termination. Termination of Pyro to a distribution board. Cuts to hands / legs from sharp tools. Cuts from sharp conductor ends, sharp jacket edges. Electrician Likelihood 4 Total 12 Medium Risk Electrician Likelihood 4 Total 12 Medium Risk Electric shock. Electrician Likelihood 4 Electricians are trained in the use of hand tools. See RA 22 Hand Tools. Always use a knife so that the blade faces away from you. Always wear PPE as SWP. Never strip a cable on your leg. Always use a support surface when removing insulation. Always wear gloves as per SWP when handling sharp ends. Remove sharp ends with a file ASAP. Electricians are trained in the safe handling of cables. Only fully trained electricians work on distribution boards. Electricians never work on a live distribution board. Distribution boards are isolated at the main switch, locked off, and signs placed prior to DB work taking place. Always use the correct size Pyro glands and locking rings / nuts when making the connection. Total 3 Total 3 RA Number: 46 - Issue Revision: 3 Page 1 of 5
2 TASK HAZARDS PERSONS AFFECTED INITIAL RISK LEVEL CONTROL MEASURES REVISED RISK LEVEL Termination of Pyro to an adaptable box, other connection point on equipment. Making live a Pyro cable after termination. Electric shock. Electrician Likelihood 4 Electric shock. Explosion / fire caused by poor termination. Electrician Likelihood 4 Only fully trained electricians work on Pyro termination. Electricians never work on live equipment. Equipment is isolated at the main switch, locked off, and signs placed prior to work taking place. Only fully trained electricians work on Pyro termination. Circuits are always fully tested prior to making live. See RA / SWP 47 Electrical Testing. RA Number: 46 - Issue Revision: 3 Page 2 of 5
3 Safe Working Practice: 46 Electrical Termination Pyro. 1 PURPOSE: The purpose of this guide is to highlight safe working practices for: Electrical Termination Pyro. THIS MUST NOT BE TREATED AS A SUBSTITUTE FOR TRAINING. 2 PROTECTIVE CLOTHING AND EQUIPMENT Operators must wear Safety Boots/Shoes incorporating steel toe-caps CDI issued work wear Dust masks where appropriate Gloves 3 BEFORE WORK Remember that Pyro cable has no internal colour code; you will establish the polarity of the conductors by testing and identify them with wrap round labelling. Establish whether the cables are to the old colour code (red / black), or the new one (blue / brown). Where an installation contains both colour codes you must place signage as per current regs. Take extra care when working on a mixed colours installation, remember that black is a phase colour on new installs. Ensure that the cables you are to terminate are disconnected from any live source. This can be where cables are already terminated to a fuse board, or are part of any extended circuit. You can test the ends of the cable with a Stienel type tester to ensure they are dead. Visually check the cables for any damage. If damage is found that cannot be repaired the cable must be re-run. If you have not installed the cabling ensure that you understand any labels / markings on the cable so that you are sure of it s source / destination. If you are not sure of this, test the cables first to establish where they run from and to, then re mark / label them prior to final termination. Inspect the installed cable for any damage. Pyro jacket can be easily damaged by sharp edges etc, inspect it carefully; if any damage is found that is not repairable the cable will have to be re run. Where the cable has been left externally ensure that it has not become wet. If it has taken moisture in cut back the length that has got wet, and dispose of it, terminating the dry cores. 4 DURING WORK Note: For the sake of simplicity a back box is referred to here. The method of work is the same for any type of fitting or box. Where you are terminating to a back box, first test the 3.5mm faceplate pins to ensure they run smoothly, the box will need to be changed if there is a problem with these. Where the walls have been plastered around a flush box, cut back any plaster that is overhanging the box lips with a Stanley knife, and remove any detritus from the back box. First measure the length of cable you will need. It will be easier to terminate this cable with the back box you are terminating to unfixed. RA Number: 46 - Issue Revision: 3 Page 3 of 5
4 When you know how much cable you require mark the point where the cable enters the gland on the cable with a permanent maker. Now mark the fixings holes for the back box on the wall, drill them and fit the rawl plugs. Do not screw the box to the wall at this stage. Next fit a gland of the correct size to the back box. Typically this will be a 20mm gland with an inner lock nut. Make sure the lock nut is tight, and does not interfere with the 3.5mm faceplate pin on a back box. You can use a 20mm knock out hole for this, or drill a new hole with a 20mm tank cutter. First cut the end of the shroud with side cutters to just larger than the cable diameter, and pass the shroud over the cable. Next measure how much cable you need to strip, allow for the length you need plus 10%. Mark this point on the cable with a permanent marker pen. Next carefully cut the edge of the Pyro outer jacket down to the point of your mark. Use a Stanley knife-edge on for this, always cut away from yourself, and do not lean on your leg to do it. Strip away all of the outer jacket above this point, it should easily come away from the inner copper jacket once split. Next mark a point 25mm above the edge of the outer PVC jacket on the inner copper jacket. Use a ringing tool to score the copper around the diameter at this point. Next take the gland body and pass it down over the cable. Using a Pyro stripper tool, or bar, slice the end of the copper jacket, lift a piece of copper, and turning the tool remove the inner jacket till it splits off at the point of your score line. It may not be possible to do this all in one piece. At this point the mineral insulation will spill off the cable, make sure you have a sheet placed to collect it, and dispose of it straight away. It is not a hazardous substance. Separate the inner cores. Next take the pot and slide it over the cores till it sits on the top of the inner copper jacket. Turning the pot clockwise will cut a thread onto the jacket and fix it. It is very important to get this tight as this forms part of the earth connection on the cable, however do not over tighten as this can strip the thread. Next take the neoprene sealant, and squeeze a small amount into the pot till it is full. Next take the plastic pot cover, and pass the conductors through it, slide it down and sit it on the pot, neoprene will squeeze out at this point. Taking a pot crimp tool gently squeeze the pot lid cover into the pot. Wipe off any neoprene that has spilled out. The neoprene does not need to dry; you can carry straight on with the termination. Pull the gland body up until the pot sits flush inside it. Now cut lengths of black sleeve. Cut these the length of the conductor less 25mm. Slide the sleeves down over the conductors, till they sit flush with the pot lid. Pass the cable into the back box, tighten it into the box thread, or use a lock ring to fix it. At this point fix the back box to the wall. Bring up the shroud and pull it flush with the back box. Next decide which cores is to be which, mark each core with a coloured tape to denote, phase, neutral, earth, go to the other end of the cable, and using continuity testing determine which are which, and mark the conductors there. Next separate the inner conductors, the jacket edge at this point is very sharp, do not let this cut the insulation of the inner cores. Pass the inner cores through the separator, and pass this down so that it protects the inner core insulation, ensure it sits flush with the end of the outer insulation. Now pass the cable through the gland into the back box. When the end of the outer jacket is flush with the inner lip of the gland tighten the gland up until it grips the cable and will not move. Do not over tighten the gland so that it crushes the cable. RA Number: 46 - Issue Revision: 3 Page 4 of 5
5 At this point fix the back box to the wall. Now take the individual conductors and terminate them to current regulation practices. Establish the correct connections reqired with regard to polarity, and continuity, and working to current regulation practices make the final connections, ensuring that the conductors are crimped down tight, do not move, and cannot pull out of the connector. Push back the faceplate / cover, do not let the faceplate take the strain, hold it in your hand, and push it back firmly into place. Tighten up the faceplate pins, but do not let them take the strain. DO NOT OVERTIGHTEN. Ensure that no cables are crushed behind the faceplate. 5 AFTER WORK Remove all detritus from the area. Carry a scrap bag / box to collect scrap and dispose of it in the designated bin. Remember that cut off edges of outer jacket are sharp, and must be contained in a sharps container. Clean up all mineral powder straight away. Throw away unused neoprene at the end of the day; it is not a hazardous substance. Ensure that all tests are carried out before making live. SEE SWP 50B TESTING. CDI GROUP LTD PLACES GREAT IMPORTANCE ON EVERYONE'S SAFETY: FAILURE TO COMPLY WITH ANY OF THE ABOVE MAY RESULT IN DISCIPLINARY ACTION RA Number: 46 - Issue Revision: 3 Page 5 of 5
Risk Assessment & Safe Working Practice
RA Ref Number: 34b Revision: 3 Project/Job Number Reference Insert Job Number Approval Date: 30/03/2018 RA Description: Installing Conduit Next Review Date: 01/04/2019 Notes: Please refer to Safe Working
More informationRisk Assessment & Safe Working Practice
RA Ref Number: 34a Revision: 3 Project/Job Number Reference Insert Job Number Approval Date: 30/03/2018 RA Description: Installing Conduit - Flexible Next Review Date: 01/04/2019 Notes: Please refer to
More informationRisk Assessment & Safe Working Practice
RA Ref Number: 36 Revision: 3 Project/Job Number Reference Insert Job Number Approval Date: 30/03/2018 RA Description: Installing Trunking Next Review Date: 01/04/2019 Notes: Please refer to Safe Working
More informationCurium 19H Installation Instructions & Parts List
Curium 19H Installation Instructions & Parts List Illustration Curium 19H Right Hand Page 1 of 15 01/07/2016 Revision 2.1 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationCurium 19.4H Installation Instructions & Parts List
Curium 19.4H Installation Instructions & Parts List Illustration Curium 19.4H Right Hand Page 1 of 21 30/06/2016 Revision 1.0 IMPORTANT This shower screen / enclosure must be installed by suitably qualified
More informationSpiderbeam Balun Construction Guide
BALUN CONSTRUCTION GUIDE Ver. 1.0 1 The components of the Balun Kit are in a plastic bag. Most of the components are inside the plastic case of the balun. The aluminum U-profile and the RG-142 Teflon Coax
More informationReasons for reissue are in Section 6, REVISION SUMMARY.
Figure 1 This instruction sheet covers the application of OPTIMATE FSMA Fiber Optic Connector Types 905 and 906 for data and telecommunications applications. Base part numbers which apply to each type
More informationXenon 05 Installation Instructions & Parts List
Xenon 05 Installation Instructions & Parts List Illustration Xenon 05, H1 Handle Left Hand: Open Out 26/05/2016 Revision 2.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed by suitably
More informationGORE Aerospace Ethernet Cables
Termination Instructions The following procedures are based on Gore s best practices for terminating GORE Aerospace with the Carlisle Octax Connector System for both socket and plug versions. These procedures
More informationGallium 03 Installation Instructions & Parts List
Gallium 03 Installation Instructions & Parts List Illustration Gallium 03, H1 Handle Left Hand: Open Out 04/05/2016 Revision 1.1 Page 1 of 19 IMPORTANT This shower screen / enclosure must be installed
More informationMIL-STD B (SH) UPDATE
MIL-STD-2042-5B (SH) UPDATE Method 5A1 Insert Equipment and materials (to be added to table 5A1-I) Pliers 3.2.2.2 Cable and fiber preparation for Fiber Systems International backshells. Step 1: Ensure
More informationDubnium 11 Installation Instructions & Parts List
Dubnium 11 Installation Instructions & Parts List Illustration Dubnium, H1 Handle Right Hand: Open Out Page 1 of 25 IMPORTANT This shower screen / enclosure must be installed by suitably qualified individuals.
More informationWiring Techniques for Wiring a Lamp
Supplies and Tools that you will need: Provided in your kit: Polarized lamp plug, 9 of SPT-1 18 AWG parallel lamp cord, bushings and grommets Items that you will need to provide: Phillips screwdriver,
More informationDO35 MAINTENANCE INSTRUCTIONS
CUSTOMER INFORMATION SHEET NO. 038 DO35 MAINTENANCE INSTRUCTIONS (DO35 V3 LAUNCHED PRODUCTION JUNE 2017) Table of Contents 1.0 Replacing Spindle Bushes V3... 22 2.0 Replacing Locking Mechanism V3... 6
More informationRadon 07 Installation Instructions & Parts List
Radon 07 Installation Instructions & Parts List Illustration Radon 07, H1 Handle Right Hand: Open Out 14/06/2016 Revision 1.1 Page 1 of 21 IMPORTANT This shower screen / enclosure must be installed by
More informationx 36 Wood Lathe
Please dispose of packaging for the product in a responsible manner. It is suitable for recycling. Help to protect the environment, take the packaging to the local amenity tip and place into the appropriate
More informationUNCONTROLLED 3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES
3 STANDARD PROCEDURES FOR PREPARING 33KV CABLES 3.1 Single-Core Copper Wire Screened Polymeric Cables 3.1.1 Removing the Outer Sheath Clean and abrade the outer sheath with an approved abrasive paper for
More informationVARIABLE SPEED WOOD LATHE
MODEL MC1100B VARIABLE SPEED WOOD LATHE INSTRUCTION MANUAL Please read and fully understand the instructions in this manual before operation. Keep this manual safe for future reference. Version: 2015.02.02
More informationAssembling Instruction. S418 PV Connector M16 Cable Mount
Assembling Instruction S418 PV Connector M16 Cable Mount Electrical Rating: 1000V DC 30A Max. Operation Temperature Range: -40~+90 degree C Caution: 1. Connectors are to be used only to interconnect firmly
More informationPowersafe Termination Guide
Powersafe Termination Guide Contents Index 1. Introduction 2. Overview 3. Termination Methods 3.1 Set screw termination 3.2. Recommended Assembly Procedure for Panel Mounted Connectors 3.3. Crimp Termination
More informationMOTOR & BULK HEAD. A Manual for Repair and Maintenance Technicians
MOTOR & BULK HEAD A Manual for Repair and Maintenance Technicians CAUTION This manual is designed to help technicians who are already experienced in workshop procedures and know how to handle tools. Only
More informationPlease read these instructions before use and keep for future reference
Wardrobe Assembly Guide Allen Key Provided (if required) Philips Screwdriver Required Hammer Required Please read these instructions before use and keep for future reference Caution! Two Person Assembly
More informationSUPERSEDED. NOT the LATEST REVISION
Figure 1 OPTIMATE 2.5mm bayonet ceramic connector kits listed in Figure 1 are designed to be applied to fiber optic cable. Coupling Receptacle Kit 501381 1 is used to mate two bayonet connectors in free
More informationWoven Leather Chandelier Large Assembly and Installation Instructions
CAUTION: Woven Leather Chandelier Large Assembly and Installation Instructions BEFORE INSTALLING FIXTURE, MAKE SURE THE POWER TO THE CIRCUIT IS TURNED OFF AT THE MAIN FUSE BOX / CIRCUIT BREAKER UTILITY
More informationWater Level Meter: Op Instructions
Equipment Check 1. Turn sensitivity switch fully clockwise. Notes: 1. Clockwise rotation of sensitivity swsitch turns meter on and increases sensitivity. 2. Always set switch to highest sensitivity position,
More informationSTORAGE & SHELVING SYSTEM - INSTALLATION GUIDE
STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE If you have ordered storage drawers, shelving, hanging rails or shoe racks this guide will help you install your storage and shelving system, together with
More informationPow-R-Feed Systems Service Manual
Pow-R-Feed Systems Service Manual Important Safety Instructions Please read this manual carefully and follow its instructions. Improper use or failure to follow these instructions could result in serious
More informationArched Top Lantern Pendant Assembly and Installation Instructions. Country of Destination: US/CN UK/EU/AUS Middle East
CAUTION: Arched Top Lantern Pendant Assembly and Installation Instructions Country of Destination: US/CN UK/EU/AUS Middle East BEFORE INSTALLING FIXTURE, MAKE SURE THE POWER TO THE CIRCUIT IS TURNED OFF
More informationNash Chandelier Assembly and Installation Instructions
CAUTION: Nash Chandelier Assembly and Installation Instructions BEFORE INSTALLING FIXTURE, MAKE SURE THE POWER TO THE CIRCUIT IS TURNED OFF AT THE MAIN FUSE BOX / CIRCUIT BREAKER UTILITY BOX. Important
More informationCustom Pendant- Hardwire Assembly and Installation Instructions
Custom Pendant- Hardwire Assembly and Installation Instructions CAUTION: BEFORE INSTALLING FIXTURE, MAKE SURE THE POWER TO THE CIRCUIT IS TURNED OFF AT THE MAIN FUSE BOX / CIRCUIT BREAKER UTILITY BOX.
More informationAssembly Instructions: Bencher Skylark
Assembly Instructions: Bencher Skylark Tools Required: Pop Rivet Tool Tape Measure Hex Wrenches Screwdriver Several Disposable Rags Two Saw Horses Several boxes or bowls to hold fasteners and small parts
More informationTools Required For Servicing: Needle Nose Pliers
Danger Caution Danger of Life Do not attempt to perform service on a hot heat gun. Always allow unit to cool completely and disconnect from power source before performing any service on the heat gun. Fire
More informationInstallation Instructions
For Medium (15-18.5K) + Heavy duty (-8.5K) Air Conditioner READ BEFORE INSTALLING UNIT To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges
More informationInstallation Instructions
For Medium (15-18.5K) + Heavy duty (22-28.5K) Air Conditioner READ BEFORE INSTALLING UNIT To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp
More informationWater Line and Water Line Assembly Gasket
1 Preparation for Repair 1) Remove tip from scaler 2) Remove scaler from air supply 3) Remove gasket from back end of scaler. Examine gasket for obvious wear or disfigurement. Replace if necessary. 2 Remove
More informationx 43 Wood Lathe
Please dispose of packaging for the product in a responsible manner. It is suitable for recycling. Help to protect the environment, take the packaging to the local amenity tip and place into the appropriate
More informationThe Useless Machine. DIY Soldering Edition. Instruction Guide v0004
The Useless Machine DIY Soldering Edition Instruction Guide v0004 TM For the best outcome, follow each step in order. We recommend reading this guide entirely before you get started. Tools required: Soldering
More informationTHIS SHEET CONTAINS IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS.
LumeLEX 2026 SERIES INSTALLATION INSTRUCTIONS Important THIS SHEET CONTAINS IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS. Warning This product must be installed in accordance with National Electrical
More informationFIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V)
FIXTURE INSTALLATION GUIDE Model T21T (Low Voltage Pendant Set 120V) 21T, Rev.4 6-13 IMPORTANT: Before proceeding, retrieve the GLASS SHADE INSTALLATION GUIDE, which is included with the pendant cord set
More informationHawko Zhaga Systems Installation Instructions
Hawko Zhaga Systems Installation Instructions Contents Wire Suspension Installation 4 Recessed Brackets 6 Fixed Suspension Rods 8 Swivel Suspension Rods 10 Surface Mount Ceiling 12 Surface Mount Wall
More informationVARIABLE SPEED WOOD LATHE. Model DB900 INSTRUCTION MANUAL
VARIABLE SPEED WOOD LATHE Model DB900 INSTRUCTION MANUAL 1007 TABLE OF CONTENTS SECTION...PAGE Technical data.. 1 General safety rules....1-3 Specific safety rules for wood lathe.....3 Electrical information.4
More informationPAC-12 Kit Contents. Tools Needed Soldering iron Phillips screwdriver Wire stripper Wrenches, 7/16 and 1/2 Terminal crimp tool Pliers Solder
PAC-2 Kit Contents Part Quantity Screws: 8/32 x 3/8 Screws: 8-32 x 5/6 Screw: 8-32 x /4 #8 internal tooth washers #8 solder lug ring terminals Bolt: Aluminum, /4-20 x.5 /4 internal tooth washer Nut: Aluminum
More informationINSTALLATION AND CARE INSTRUCTIONS
INSTALLATION AND CARE INSTRUCTIONS Skylight Manually Operated Honeycomb Shades 20 C8-10-1806 2/15 1 INTRODUCTION Thank you for purchasing our product. Your new shade has been custom built for you from
More informationC-L-X ARMOR REMOVAL PROCEDURES
C-L-X ARMOR REMOVAL PROCEDURES USING THE KETT MODEL #KS-226 CABLE SAW The procedure listed below details Okonite s recommended method for removing C-L-X armor from large and small diameter cables. These
More informationInstallation Instructions
READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:
More informationOpenROV. Guide 3 - Electronics. We will now move to the assembly of the electronics that will control the ROV. Written By: OpenROV
OpenROV Guide 3 - Electronics We will now move to the assembly of the electronics that will control the ROV. Written By: OpenROV 2017 openrov.dozuki.com Page 1 of 33 INTRODUCTION We will introduce soldering
More informationInigo Sconce INSTALLATION INSTRUCTIONS P _2_A 1 of 5
P31321 1 of 5 Thank You For Choosing Kallista We appreciate your commitment to Kallista quality products. Please take a moment to review this manual before you install your Kallista product. If you encounter
More informationBMW E46 Coupe 3dr MP Bolt in (BMW Race Days Only) Roll Cage (B045) Fitting Instructions
BMW E46 Coupe 3dr MP Bolt in (BMW Race Days Only) Roll Cage (B045) Fitting Instructions Unwrap the mounting points/ends of the roll cage and unpack the individual fitting kits. Try to leave wrapping on
More informationTRUE TECHNICAL SERVICE MANUAL - ALL MODELS. DOORS/DRAWERS/LIDS
DOORS/DRAWERS/LIDS 55 56 NOTES DOORS/DRAWERS/LIDS Swing s 73 74 NOTES INSTALLATION OF A GDM-SWING DOOR Phillips Head Screwdriver (2) - 1/8" Drift Punches (forged) Top Bracket NOTE: It may be necessary
More informationPO Box 1879, 515 Tucker Ave. Friday Harbor, WA Phone: (360) Fax: (360)
Thermocouple Replacement The thermocouple in your RADAK furnace has been made, installed, and inspected with great care. The junction, which is formed by spot-welding, is subject to failure due to mechanical
More informationWiring Devices. Description. Lesson Outcomes. Assumptions. Electrician
Description Once a house has been roughed in and has passed an electrical inspection, it s time for the electricians to do the final job of wiring and installing devices. Most trades have a finishing process
More informationConstruction Standard No:
Page: 1 of 5 GENERAL * This Construction Standard governs trace wire installation on water mains. A 14 gauge or larger trace wire shall be installed on all water mains. Exception: Water mains as part of
More informationInstall the Housing. Installation Instructions for Entra Round or Square Type IC, Air-tight New Construction Adjustable LED Housing EN3_-LH9_ 1.
Installation Instructions for Entra Round or Square Type IC, Air-tight New Construction Adjustable LED Housing 90ENTRA EN_-LH9_. LED - ROUND/ SQUARE GENERAL PRODUCT I NFORMATION: This product is safety
More informationInventory (Figure 2)
MODEL T10130/T10126 6" & 8" SPIRAL CUTTERHEAD INSTRUCTIONS The Model T10126/T10130 indexable insert spiral cutterheads are designed to replace straightknife cutterheads from the Grizzly jointer Models
More informationProduct Manual MNX10050 / REV B MODELS:
VIBRATION ANALYSIS HARDWARE Product Manual MNX10050 / REV B MODELS: CC-AXX & JXX CC-C2X & C3X Field Installable Connector Kits Contents Section I Overview Introduction... 2 Description... 2 Section II
More informationK-Jetronic (CIS) Barb Insertion Tool Instructions
K-Jetronic (CIS) Barb Insertion Tool Instructions Rev. J Effective: 04-AUG-2018 Unobt ainium Supply Co. 523 Longley Rd Groton, MA 01450 978.448.2110 www.unobtainiumsupply.com Contents K-Jetronic (CIS)
More informationGeneral Installation Instructions
General Installation Instructions WARNING To reduce the risk of death, injury or property damage from fire, electric shock, cuts, abrasions, falling parts and other hazards: Service of the equipment must
More informationAUTOMATIC WIRE STRIPPER CABLE CUTTING PLIERS WIRE STRIPPERS & CUTTERS SA822, CCP SPECIFICATIONS SPECIFICATIONS
WIRE STRIPPERS & CUTTERS SA822, CCP AUTOMATIC WIRE STRIPPER Strip No. 8 to 22 AWG wire quickly and easily. Features jaws that grip and strip wire with a single squeeze of the handles before returning to
More informationUPC-LL Power Connection Kit
Installation Instructions UPC-LL Power Connection Kit for Series Long Line Heating Cables 1 PJ951 161-562681-020 July 2015 UPC-LL End Termination Kit Kit Contents Item Qty Description Item Qty Description
More informationGE Monogram. Installation. Instructions. 36" Vent Hood. Model ZV750. Call anywhere in the US and Canada -
at :: rangehoods. com GE Monogram Instructions Model ZV750 GE Monogram at:: rangehoods. com is a division of CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:
More informationBL-ER-P Ethernet Radio Unit for Pedestal Installation Guide
Assemble the Antenna Riser 1. Remove the antenna riser assembly and the antenna from its packaging. 2. Remove the plastic cap, the nut, and the lock washer from the stem of the antenna. 3. Put the stem
More informationStandard Kit #1 (5-way switch)
Standard Kit #1 (5-way switch) Please Read All Instructions Before Beginning. Tools you will need: Soldering Iron (35 watt preferably) Solder Wet Sponge Wire Clippers 3/8 Drill Bit 1/4 Drill Bit Variable
More informationProduct Manual MNX10050 / REV C MODELS:
VIBRATION ANALYSIS HARDWARE Product Manual MNX10050 / REV C MODELS: CC-AXX & JXX CC-C2X & C3X CC-V2R & V3R Field Installable Connector Kits Contents Section I Overview Introduction... 2 Description...
More informationQuick Set Dovetail Jig
Quick Set Dovetail Jig FOR HELP OR ADVISE ON THIS PRODUCT PLEASE CALL OUR CUSTOMER SERVICE HELP LINE : 01509 500359 THE MANUFACTURER RESERVES THE RIGHT TO ALTER THE DESIGN OR SPECIFICATION TO THIS PRODUCT
More informationEND MILL RE-SHARPENER EMG-413
END MILL RE-SHARPENER EMG-413 OPERATING INSTRUCTIONS -TABLE OF CONTENTS- A.SAFETY INSTRUCTIONS -------- 1 B.NAMES OF COMPONENTS ----- 2 C.OPERATIONS ------------------------ 3 D.REPLACING THE WHEEL --------
More informationInstruction Sheet Tool Kit [ ] (for SL Series 110 Jack Connectors)
Instruction Sheet Tool Kit 1725150 [ ] (for SL Series 110 Jack Connectors) 26 FEB 04 PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually powered hand tools.
More informationU.S. Rack, Inc Falcon Drive, Madera, CA APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK
U.S. Rack, Inc. 2850 Falcon Drive, Madera, CA 93637 15APR17 INSTALLATION AND USE INSTRUCTIONS for SIDE-MOUNT LADDER RACK WARNING: Do NOT attempt to install or use this rack without following all instructions.
More informationTerminal Replacement Procedures
HOW TO REPLACE CONNECTOR TERMINALS The terminal repair kits provide necessary tools and materials (terminals, wire seals, and splice connectors) to repair many damaged or faulty connector terminals. However,
More informationINSTALLATION GUIDE MICROWAVE OVEN UPMC3084ST. MFL _00
INSTALLATION GUIDE MICROWAVE OVEN UPMC3084ST MFL06208710_00 www.thesignaturekitchen.com YOUR SAFETY FIRST BEFORE YOU START Proper installation is the installer's responsibility! Proper installation by
More informationExplorer Wiring Kit (assembled)
Explorer Wiring Kit (assembled) For Vintage, Firestorm & Standard Series Please Read All Instructions Before Beginning. Tools you will need: Soldering Iron (35 watt preferably) Solder Wet Sponge Wire Clippers
More information> INSTRUCTIONS MANUAL < NEW ORDER TABLE. By STEFAN DIEZ HAY
> INSTRUCTIONS MANUAL < NEW ORDER TABLE By STEFAN DIEZ HAY 1 > INTRODUCTION < New Order is born of 100% industrial production, reflecting our ambition to create uncompromising and high-precision quality
More informationMODEL T " SPIRAL CUTTERHEAD INSTALLATION INSTRUCTIONS
MODEL T27449 8" SPIRAL CUTTERHEAD INSTALLATION INSTRUCTIONS The Model T27449 indexable insert spiral cutterhead is designed to replace the straightknife cutterhead on the Grizzly jointer Model G0490W/G0490XW
More informationYES 12 Charging Wall Cabinet for Mini-laptops
Built with Anthro-DNA Owner's Manual for YES 12 Charging Wall Cabinet for Mini-laptops Part # YESMLCGMPW Components at a Glance 7 1 9 8 2 4 5 11 6 10 3 Front of Cabinet (closed) 1. Locking front door to
More informationNOV 16 Rev L
Terminating Modules 856196-[ ] for Use with Modular Plug Dual Terminators 1320840-[ ] Instruction Sheet 408-9743 17 NOV 16 Rev L Modular Plug Dual Terminator Automatic Circuit Tester (Terminators 1320840-1
More informationSlide the stock rubber tank mount caps onto the ends of the CS-1 tank mount:
RYCA CS-1 BODY PARTS INSTALLATION GUIDE [The CS-1 installation guides should be used as supplements to the videos found on our Youtube Channel. There is no strict order to the build process, but it is
More informationStationary Panel Replacement
Stationary Panel Replacement Product Series: 200 Series Product Type: Hinged Inswing Patio Doors Read these instructions before starting procedure. For additional information visit www.andersenwindows.com.
More informationIMPORTANT!!! ASSEMBLY ASSEMBLY INSTRUCTIONS. (Internal Dimensions)
ASSEMBLY ASSEMBLY INSTRUCTIONS (Internal Dimensions) Ent Spec Edition Ltr v-0- Overall dimensions including base: 7. L x 9 W x 0 H cms 97.5" L x 7" W x 8.7" H IMPORTANT!!! Please read these instructions
More informationInstallation Instructions
READ BEFORE INSTALLING UNIT INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step as shown. Observe all local, state, and national electrical codes
More informationHotEnd. HotEnd docs.imade3d.com/ Page 1 of 19
HotEnd 2018 docs.imade3d.com/ Page 1 of 19 INTRODUCTION JellyBOX uses a genuine E3D-Lite6 HotEnd with our own heat block upgrade for faster and easier printing. Assembly of the hotend should take a quarter
More informationR2C Performance Products 7550 Industrial Drive Forest Park, IL Ph: (708)
Congratulations on your purchase of the finest Sprint Car Filter and stack sealing system available. This system has been designed for unparalleled ease of assembly, disassembly and cleaning while providing
More informationINSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION
INSTALLATION GUIDE SLIMLINE ROOF LANTERN 4 PANE CONFIGURATION SLIMLINE STEP-BY-STEP INSTALLATION GUIDE Thank you for choosing Roof Maker, we hope you are delighted with your new rooflight. Our roof lanterns
More informationTNC SERIES General... 4 Interface... 5 Characteristics...6-7
CONTENTS PAGE TNC SERIES General... 4 Interface... 5 Characteristics...6-7 TNC 50 Ω SERIES Plugs...8-9 Jacks...0- Jacks and receptacles... Receptacles...-4 Adapters... 5 Caps... 6 TNC 75 Ω SERIES Plugs...
More informationInstallation Instructions for Zip Suspension Downlight with Remote Power and 4" Square or Round Canopy
Doc # 90-ZS-SQ_0 W. Fullerton Chicago, IL 0 Ph:.0.9 Fax:.9. www.pureedgelighting.com info@pureedgelighting.com 0 PureEdge Lighting. All Rights Reserved. Installation Instructions for Zip Suspension Downlight
More informationYouth Explore Trades Skills
Youth Explore Trades Skills Connecting Wires Description All lights in a house must have proper wire connections in order to work. Residential electrical work requires electricians to join wires together
More informationHatchback Wing Riser Kit
Hatchback Wing Riser Kit 2015-06-11 Thank you for purchasing this PERRIN product for your car! Installation of this product should only be performed by persons experienced with installation of aftermarket
More informationSomerset Dining Table ASSEMBLY INSTRUCTIONS
Somerset Dining Table ASSEMBLY INSTRUCTIONS Date: 2014-APRIL-03 Customer Service 877.812.6235 www.williams-sonoma.com Page 1 of 6 Important Safety Instructions: Please read all instructions carefully before
More information+ - 1a. 1b. c. 1d. 1e. Runway Suspended / Surface Cont. Run Installation. 2.0mm DIL DIL Revision - M 23/11/2018 Page 1
230-240V / 50-60Hz IP20 IK00 + - 2.0mm WARNING - THIS LUMINAIRE MUST BE EARTHED This luminaire has been tested and is manufactured to comply with BS EN 60598 : specification for general requirements and
More informationHOSTESS TROLLEY U.K.
SERVICE MANUAL HOSTESS TROLLEY U.K. 0312 200 15110 - HL6200DB (Mahogany) 0312 200 15210 - HL6200LB (Teak) 0312 200 15227 - HL6200GO ( Golden Oak) Service Hints Technical Data Wiring Diagram Exploded Views
More informationInstallation Instructions
Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step as
More informationThe wick in your heater needs replacing if, after repeated cleanings, any of the following conditions still exist:
WICK REPLACEMENT The wick in your heater needs replacing if, after repeated cleanings, any of the following conditions still exist: Slow to light, hard movement of the wick adjuster knob, kerosene odor
More informationNemalux INSTALLATION INSTRUCTIONS APPLICATION 1-4
I N D U S T R I A L rev. A- INSTALLATION INSTRUCTIONS *PENDING* E77827 E77827 APPLICATION MR3 & MR6 Luminaires are suitable for use in the following areas as defined by the National Electrical Code (NEC)
More informationContainer Components Europe Limited The world lid specialist
FITTING INSTRUCTIONS Universal DuraFlex Repair Kit for Plastic Bins This kit has been designed to allow damaged plastic bins to be refurbished. New hinges are fitted along with a quality rotational moulded
More informationLeafy Greens Spinner Construction Manual
Leafy Greens Spinner Construction Manual University of Houston Conrad N. Hilton College Food Science Lab Materials list: Base and Armature Approximately 8-1 PVC cut into sections o 3-22.5 o 2-7 o 2-4 o
More informationCentral New York Rocket Team Challenge 2018 Rocket Assembly Instructions
Central New York Rocket Team Challenge 2018 Rocket Assembly Instructions Note: These instructions vary from those provided by the manufacturer of the rocket kits. There is also considerable varying discussion
More informationWiring Repair WIRING REPAIR
20-10-00 Wiring Repair WIRING REPAIR 1. GENERAL This section contains procedures applicable to the fabrication and repair of wire harness assemblies, cables, and wires. All wiring repairs of wire harness
More informationGREENHOUSE 6'x8' ASSEMBLY INSTRUCTIONS. (Internal Dimensions) Overall Dimensions (Approx.) L 193 W 200 H cms 97.5" L 76" W 78.
ASSEMBLY INSTRUCTIONS GREENHOUSE 'x8' (Internal Dimensions) Overall Dimensions (Approx.) 7. L 9 W 00 H cms 97." L 7" W 78.8" H 0 IMPORTANT You must read these instructions carefully before you start to
More informationPRODUCT: LOKI INSTALLATION INSTRUCTIONS. Product is covered by U.S. patents. For more information visit
R INSTALLATION INSTRUCTIONS PRODUCT: LOKI CONFIGURATION: SINGLE DOOR MOUNT: GLASS MOUNT Product is covered by U.S. patents. For more information visit www.krownlab.com . TOOLS + MATERIALS REQUIRED TOOLS
More informationIMPORTANT SAFETY INSTRUCTIONS:
PRODUCT NAME: Presley 4 Light Chandelier ITEM NUMBER: LC973 DIMENSIONS OF ITEM ASSEMBLED: 18 H x 18 W x 18 D IMPORTANT SAFETY INSTRUCTIONS: -We strongly recommend that a professional electrician install
More information7878 K940. Checkpoint Antenna. Kit Instructions. Issue B
7878 K940 Checkpoint Antenna Kit Instructions Issue B Revision Record Issue Date Remarks A July 7, 2009 First issue B Nov2013 Revised the Checkpoint installation procedures for 7878 and 7874 scanners Added
More informationSAFETY MANUAL CHAIN KNOCKERS SAFETY INFO WARNING! READ BEFORE USE OF TOOL
SAFETY MANUAL CHAIN KNOCKERS Jobsite Health & Safety is a first priority matter here at Renssi. To extend this priority to our customers and end-users, we have created this extensive Safety Manual for
More information