SAINT PAUL PUBLIC SCHOOLS Six Month Periodic Surveillance Report for Riverview Elementary 271 Belvidere Street East Saint Paul, MN Key
|
|
- Caitlin Chapman
- 5 years ago
- Views:
Transcription
1 SAINT PAUL PUBLIC SCHOOLS Six Month Periodic Surveillance Report for Riverview Elementary Located at: 271 Belvidere Street East Saint Paul, MN 107 Key Conducted On: Conducted By: 8/20/2013 James Paulzine % of Asbestos CH Chrysotile AM Amosite CR Crocidolite ACT Actinolite TR Tremolite ANT Anthophyllite Assumed Suspect materials that have not been tested None Detected s that have been tested and have been found to not contain asbestos. NSM Nonsuspect material NEW installed since original AHERA inspection (1988/ 1989). Tracked for clients' benefit for inventory purposes. Assessment 1 = d or significantly damaged TSI ACM. 2 = d friable surfacing ACM. 3 = Significantly damaged friable surfacing ACM. 4 = d or significantly damaged friable miscellaneous ACM. = ACBM with potential for damage. 6 = ACBM with potential for significant damage. 7 = Remaining friable ACBM or friable suspect ACBM. A = Cleanup ACM debris. B = Encapsulate slight damage on TSI. C = Patch TSI and/or repair ACM cover. D = Enclose or protect accessible sections with protective barrier. E = Remove section of damaged ACM. F = Remove ACM and replace with non ACM. G = Isolate area until repaired/removed. H = Encapsulate slight damage. I = Remove and replace damaged or loose tile section(s). J = Monitor condition of material(s). 1 I3B 2' x 4' Ceiling Tile THROUGHOUT BUILDING Sq. Ft. NONE DETECTED 2' x 2' Look MV 07 2 I3A 2' x 4' Ceiling Tile THROUGHOUT BUILDING 8000 Sq. Ft. NONE DETECTED Dents & Pin Holes In Concentric Pattern (1999) MV 06 3 R0C Baseboard/Mopboard Adhesive THROUGHOUT BUILDING 1200 Sq. Ft. NONE DETECTED Brown Baseboard XX 21B 4 Q0B Carpet Adhesive THROUGHOUT BUILDING 1000 Sq. Ft. NEW Brown Carpet (2011) V0B Sink Undercoating THROUGHOUT BUILDING 100 Sq. Ft. NEW Smooth Black (2010) APPROXIMATELY TWENTY (20) SINKS. 6 R0E Baseboard/Mopboard Adhesive THROUGHOUT BUILDING 00 Sq. Ft. NEW 4" Black Baseboard (2011) Riverview Elementary Page 1
2 7 R0F Baseboard/Mopboard Adhesive THROUGHOUT BUILDING 100 Sq. Ft. NEW 4" Blue Baseboard (2011) 8 P0A Fire Door BOILER ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Composite 1 Hr Rating (Weyerhaeuser) TWO (2) DOORS. TAGS MISSING. 9 D2B Interior Boiler Insulation BOILER ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Box Refractory 10 L0A Flexible Duct Connector BOILER ROOM Sq. Ft. NONE DETECTED Dark Green THREE (3) JOINTS J1 11 X0A Miscellaneous TUNNEL 0102B OFF SOUTHEAST CORNER OF Tar on Fiberboard BOILER ROOM 80 Sq. Ft. NONE DETECTED J13 12 P0A Fire Door CUSTODIAL OFFICE Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Composite 1 Hr Rating (Weyerhaeuser) 13 M0A Plaster THROUGHOUT 193 ORIGINAL BUILDING 4000 Sq. Ft. NONE DETECTED 193 Original Building MV 1,19,22; 10 S2; 1 02,13 14 J3A Miscellaneous Cementitious THROUGHOUT 193 ORIGINAL BUILDING 600 Sq. Ft. NONE DETECTED Slate Window Sills (193) 1 03,08 1 K2J 12" x 12" Vinyl Floor Tile & Mastic 1ST FLOOR HALLWAYS & NORTH STAIRWELL 3200 Sq. Ft. NONE DETECTED White w/gray & Black Flecks MV W1AA 1' x 1' Ceiling Tile Adhesive HALLWAY 1400 OUTSIDE ROOMS 1401 & Sq. Ft. NONE DETECTED Tan Adhesive ABOVE CEILING. MOST MATERIAL REMOVED. RESIDUAL ADHESIVE MV X0B Miscellaneous KINDERGARTEN WING TUNNEL 480 Sq. Ft. NONE DETECTED Tar on Walls ACCESS THROUGH FLOOR GRATE AT WEST END OF HALLWAY K2K 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW Beige Mottle (2011) Riverview Elementary Page 2
3 19 X0C Miscellaneous ROOM 1402 Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 20 B2A Millboard Pipe Insulation ROOMS 1401 & 1402 PIPE CHASE 20 Lin. Ft. 0 Lin. Ft. N CH 193 Original Building INACCESSIBLE IN RESTROOM WALL & WALL BEHIND SINKS J7 21 A2A Mudded Pipe Joints on Millboard Insulation ROOMS 1401 & 1402 PIPE CHASE 10 Joints 0 Joints N 20 CH, AM 193 Original Building INACCESSIBLE IN RESTROOM WALL & BEHIND SINKS J14 22 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 23 X0C Miscellaneous ROOM 1401 Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 24 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 2 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW INCLUDES SERVER & RESTROOM 26 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 27 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 28 I3D 2' x 4' Ceiling Tile RESTROOM 1113A 3 Sq. Ft. NSM Fiberglass 29 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 30 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) Riverview Elementary Page 3
4 31 K1B Sheet Vinyl Flooring & Adhesive RESTROOM 1111A 3 Sq. Ft. NEW Tan & White (2010) 32 I3E 2' x 4' Ceiling Tile RESTROOM 1111A 3 Sq. Ft. NSM Vinyl Coated Cellulose (2011) 33 X0C Miscellaneous ROOM 1106 Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 34 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 3 K2M 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW White w/black Smears (2011) 36 X0D Miscellaneous ROOM 100 (NURSE) 10 Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 37 K2L 12" x 12" Vinyl Floor Tile & Mastic RESTROOM 100B 20 Sq. Ft. NEW 38 K2F 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NONE DETECTED Gray w/mauve & White Mottle (1997) GRAY FILLER AND 9" TILE MASTIC (K0D) UNDERNEATH AT SAMPLE LOCATION. MAY BE 9" TILE IN ROOM AS WELL MV K0D 9" x 9" Vinyl Floor Tile & Mastic ROOM Sq. Ft. 0 Sq. Ft. N 12 CH (TILE) Tan w/brown & Beige Streaks ASSUMED PRESENT UNDER 12" TILES. ONLY GRAY FILLER AND BLACK MASTIC IDENTIFIED AT SAMPLE LOCATION MV 16; K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 41 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 42 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) Riverview Elementary Page 4
5 43 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 44 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 4 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 46 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 47 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 48 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 49 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 0 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 1 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 2 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) LOOSE PANEL. 3 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 4 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) Riverview Elementary Page
6 K2M 12" x 12" Vinyl Floor Tile & Mastic 1997 ELEVATOR ADDITION 100 Sq. Ft. NEW White w/black Smears (2011) 6 I2A 2' x 2' Acoustical Ceiling Tile 1997 ELEVATOR ADDITION 100 Sq. Ft. NONE DETECTED Dents & Pin Holes (1997) MV 11 7 N0B Drywall/Joint Compound 1997 ELEVATOR ADDITION 400 Sq. Ft. NONE DETECTED 1997 Addition MV 13 8 K2M 12" x 12" Vinyl Floor Tile & Mastic GYMNASIUM Sq. Ft. NEW White w/black Smears (2011) 9 I1A 1' x 1' Acoustical Ceiling Tile GYMNASIUM Sq. Ft. NONE DETECTED Large & Small Random Holes 206E 9A 60 W1A 1' x 1' Ceiling Tile Adhesive GYMNASIUM Sq. Ft. 0 Sq. Ft. N CH Associated w/i1a RECOMMEND SAMPLING IN THIS AREA TO CONFIRM ACM T0A Light Cord Insulation GYMNASIUM Lin. Ft. 0 Lin. Ft. N ASSUMED Spotlights FOUR (4) LIGHTS NEAR STAGE. INACCESSIBLE DUE TO HEIGHT. 62 S0A Wood Floor Felt / Vapor Barrier STAGE Sq. Ft. 0 Sq. Ft. N ASSUMED 193 Original Building (Elevated) 63 K0C 9" x 9" Vinyl Floor Tile & Mastic UNDER STAGE Sq. Ft. 0 Sq. Ft. N 12 CH (TILE) Green w/beige Streaks UNDER WOOD 2" X 4"S. ONLY 1 SF OF TILE REMAINS. MOSTLY MASTIC MV 01; L0A Flexible Duct Connector MECHANICAL ROOM 1203 BY GYMNASIUM 3 Sq. Ft. NONE DETECTED Dark Green ONE (1) JOINT L0B Flexible Duct Connector MECHANICAL ROOM 1203 BY GYMNASIUM 1 Sq. Ft. NONE DETECTED Black Vinyl THREE (3) JOINTS K2G 12" x 12" Vinyl Floor Tile & Mastic THROUGHOUT 1999 ADDITION 2000 Sq. Ft. NONE DETECTED Light Green Mottle (1999) MV 02 Riverview Elementary Page 6
7 67 K2H 12" x 12" Vinyl Floor Tile & Mastic THROUGHOUT 1999 ADDITION 100 Sq. Ft. NONE DETECTED Dark Green Mottle (1999) MV K2I 12" x 12" Vinyl Floor Tile & Mastic THROUGHOUT 1999 ADDITION 100 Sq. Ft. NONE DETECTED Yellow Mottle (1999) MV R0D Baseboard/Mopboard Adhesive THROUGHOUT 1999 ADDITION 400 Sq. Ft. NONE DETECTED Green Baseboard (1999) MV 0 70 V0A Sink Undercoating THROUGHOUT 1999 ADDITION 40 Sq. Ft. NONE DETECTED Rough Gray (1999) EIGHT (8) SINKS MV I3C 2' x 4' Ceiling Tile KITCHEN Sq. Ft. NSM Vinyl coated Gypsum 72 K2J 12" x 12" Vinyl Floor Tile & Mastic 2ND FLOOR HALLWAY Sq. Ft. NONE DETECTED White w/gray & Black Flecks 73 K2M 12" x 12" Vinyl Floor Tile & Mastic 2ND FLOOR HALLWAY Sq. Ft. NEW White w/black Smears (2011) SOUTH END BY ELEVATOR. 74 K2M 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW White w/black Smears (2011) 7 N0A Drywall/Joint Compound ROOMS 2103 & Sq. Ft. NONE DETECTED Renovation COMMON WALL K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 77 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) DT 2 78 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW Riverview Elementary Page 7
8 79 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 80 X0C Miscellaneous ROOM 2106 Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 81 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 82 X0C Miscellaneous ROOM 2108 Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 83 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 84 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 8 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 86 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 87 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 88 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 89 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 90 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) Riverview Elementary Page 8
9 91 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 92 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 93 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 94 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 9 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 96 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 97 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 98 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW 99 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 100 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 101 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) 102 K2L 12" x 12" Vinyl Floor Tile & Mastic ROOM Sq. Ft. NEW Riverview Elementary Page 9
10 103 X0C Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Chalkboard (193) 104 X0D Miscellaneous ROOM Sq. Ft. 0 Sq. Ft. N ASSUMED Wood Frame Corkboard (193) 10 J1A Cementitious Panels ROOM Sq. Ft. 0 Sq. Ft. N 60 CH Radiator Shields (193) Riverview Elementary Page 10
If the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2311
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2236
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0042
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2093
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2429
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2160
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2016 - Fall School: Instituto Health Sciences Career Academy Oracle Unit: 63131 Building ID: 55001 Address: 2520 Western Region: 03 Mail Room: Surveyor: DLPUSATERI
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2017 - Fall School: Instituto Health Sciences Career Academy Oracle Unit: 63131 Building ID: 55001 Address: 2520 Western Region: 03 Mail Room: 37 Surveyor: DLPUSATERI
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2603
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-1220
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0037
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2825
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2385
More informationTHREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the
SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Benjamin Franklin Annex (Salvation Army) ULCS# 7281
More informationTHREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the
SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Francis Pastorius Mastery Charter School ULCS# 3426
More informationASBESTOS BUILDING SURVEY REPORT
ASBESTOS BUILDING SURVEY REPORT Como Park Senior High School 740 West Rose Avenue St. Paul, MN July 16, 2004 Nova Client No.: STPAU006/Project No: H04-1983 ASBESTOS BUILDING SURVEY REPORT Como Park Senior
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2016 - Fall School: Chicago Military Academy - Bronzeville Oracle Unit: 70070 Building ID: 1800 Address: 3516 South Giles Avenue Region: 04 Mail Room: 41 Surveyor:
More informationTHREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the
SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Motivation High School KIPP Turner West Middle School
More informationPRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 310 Oak Street Slinger, WI. Work Area: Pre-Renovation
PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT Stantec Site: Work Area: Pre-Renovation Inspection Date: February 22, 2016 Report Date: March 10, 2016 NorthStar No. 160-064 Submitted By: NorthStar Environmental
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2017 - Fall School: Mary E Courtenay Elementary Language Arts Center Oracle Unit: 30141 Building ID: 6061 Address: 4425 N Magnolia Avenue Region: 01 Mail Room:
More informationTHREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the
SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Prince Hall Elementary School ULCS# 7490 Building #
More informationTHREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the
SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Luis Munoz Marin Elementary School ULCS# 5680 Building
More informationTHREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the
SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Thomas Holme Elementary School ULCS# 8270 Building #
More informationIf the address on this form is different than the address of the building, submit a written explanation.
ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3743
More informationTHREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the
SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the New Kensington High School (CAPA) ULCS# 5520 Building
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2015 - Fall School: UNO Charter School - SPC Daniel Zizumbo Campus Oracle Unit: 66395 Building ID: 3344 Address: 4248 W 47th St. Region: 04 Mail Room: 44 Surveyor:
More informationPRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 308 Oak Street Slinger, WI. Work Area: Pre-Renovation
PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT Stantec Site: Work Area: Pre-Renovation Inspection Date: February 22, 2016 Report Date: March 10, 2016 NorthStar No. 160-064 Submitted By: NorthStar Environmental
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2015 - Fall School: YCCS - Truman Middle College HS Oracle Unit: 66625 Building ID: 1121W Address: 1145 W. Wilson Ave. (1121) Region: Mail Room: Surveyor: X
More informationChicago Public Schools 6 Month Asbestos Surveillance Fall
Chicago Public Schools 6 Month Surveillance 2015 - Fall School: UNO Charter School - PFC Omar E. Torres Campus Oracle Unit: 66396 Building ID: 3345 Address: 4248 W 47th St. Region: 04 Mail Room: 44 Surveyor:
More informationTHE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' STOREHOUSE THE CHURCH OF OF LATTER-DAY SAINTS HOME STORAGE CENTER BISHOPS' STOREHOUSE
231 THE CHURCH OF J ESUS CHRIST OF LATTER-DAY SAINTS BISHOPS' THE CHURCH OF BISHOPS' HOURS Monday-Friday P.M. - X:00 A.M. X:00 Saturday P.M. - X:00 A.M. X:00 J ESUS CHRIST OF LATTER-DAY SAINTS HOME STORAGE
More informationMarch 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227
March 1, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Sunnyside School 3421 SE Salmon Street Portland,
More informationBUILDING REGISTER AND SUMMARY OF RESULTS
Page of 5 Project Ref: A7698 Client : Cheshire County Council Site: 874 Redsands Childrens Centre, Nantwich Location Accessibilty Installation Approximate Asbestos Condition Surface A7698 / Ground Floor
More informationNovember 30, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227
November 30, 2016 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Abernethy Elementary School 2421 SE Orange
More informationADDENDUM NO. 1 November 10, 2016
COUER D ALENE CITY HALL PROJECT NO. 2016-009 REMODEL AND ADDITION COEUR D ALENE, IDAHO ADDENDUM NO. 1 November 10, 2016 This addendum is hereby incorporated into and is an integral part of the bidding
More informationChapter 14. Wall Sheetrock
Chapter 14. Wall Sheetrock 14.1 PREPARATION 14.2 PLANNING 14.3 GENERAL INSTALLATION RULES 14.4 INSTALLING WALL SHEETROCK 14.5 FINISHING AND CLEANUP Tools needed by volunteers: Nail apron Tape measure Utility
More informationChapter 14. Wall Sheetrock
Chapter 14. Wall Sheetrock 14.1 PREPARATION 14.2 PLANNING 14.3 GENERAL INSTALLATION RULES 14.4 INSTALLING WALL SHEETROCK 14.5 FINISHING AND CLEANUP Tools needed by volunteers: Nail apron Tape measure Utility
More informationInstallation Instructions for Viking Hearth Engineered Wood Flooring
Installation Instructions for Viking Hearth Engineered Wood Flooring 4.16.15 PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a
More informationInstall Like the Pros
CertainTeed Install Like the Pros Drywall Installation Guide GETTING STARTED RIGHT Use the right products For the best, lasting results choose the right CertainTeed gypsum board for the job you re planning.
More informationCabinet Planning Guide
Cabinet Planning Guide After all the thinking, dreaming and planning, the time has come to get started. The following workbook will assist you with the information you need to start the process. Complete
More informationVERTICAL STILE ABOVE HORIZONTAL TRIM VERTICAL STILE BELOW COVE BASE ADHESIVE. 1" [25.4mm] BASE DETAIL
Please Read All sheet will be provided in stock sizes for field cutting. All trims will be provided in 8-0 stock lengths for field cutting. CEILING TRIM 1" [25.4mm] Acrovyn Interiors vinyl acrylic wall
More informationRECAPP Facility Evaluation Report
RECAPP Facility Evaluation Report Edmonton School District No. 7 Garneau Elementary School B3123A Edmonton Report run on: April 7, 211 4:59 PM Building Name: Address: Location: Building Id: Gross Area
More informationINSTALLATION. GlUElEss CliCK BamBoo installation GUidE. Introduction. Tips for a successful installation
GlUElEss CliCK BamBoo installation GUidE Introduction Thank you for purchasing a Yanchi Bamboo Floor! Our flooring combines superior technology and the highest quality materials available so that your
More informationPower Inductor SCD Series
RoHS Compliant Halogen Free REACH Compliant Part Numbering SCD 321 T - 1R M - AU Series Name Dimensions Code Inductance Internal Code (mm) (uh) Tolerance 321 3.3x3.x2.1 R47.47 K ±1% 43 4.5x4.x3.2 1R 1.
More informationInstallation Instructions for Engineered Wood Flooring
Installation Instructions for Engineered Wood Flooring PLEASE READ THESE INSTRUCTIONS IN THEIR ENTIERTY BEFORE BEGINNING THE INSTALLATION. Installer s / Owners Responsibility As a natural product, hardwood
More informationSpecifications: Other: sign in sheet
To: All Vendors Bidding on The College of New Jersey Nursing Simulation Lab Fit-Out Project From: Roselle Horodeski Finance & Business Services Date: July 29, 2015 ADDENDUM NO. 1 ISSUE DATE: July 29, 2015
More informationThe URBAN CHIC Tiny Home. Designer: Hannah Nail
The URBAN CHIC Tiny Home Designer: Hannah Nail Tiny Homes Tiny houses are about 100 to 400 square feet. Tiny houses are also becoming more popular because of environmental concerns. It also allows for
More informationSNAGGING REPORT TERLINGS AVENUE, GILSTON HERTFORDSHIRE
SNAGGING REPORT TERLINGS AVENUE, GILSTON HERTFORDSHIRE Table of Contents Contents Property Details 1 Description 1 First Floor 1 Master Bedroom (Bed 1) 1 Bedroom 1 En-suite 2 Airing Cupboard 3 Landing
More informationPressure Transducer FP2000
Pressure Transducer FP2000 Datasheet FPG FPA FPB FPV (Series FP2000) Pressure Transducers for Gauge, Absolute, Barometric and Vacuum Pressure Measurement from 0... 35 mbar up to 0... 700 bar Pressure Types:
More informationCSI Section DMI Light Gage Structural Steel Framing Systems. Blocking Fire Rated Pre-cut (Proprietary) Furring Wall Preservative Treated
DMI Database CCF5IF9HGLPD-QB (4,88) $14,775.00 CSI Section 05400 DMI Light Gage Structural Steel Framing Systems Angle Framing Bridging Channel Flat Strapping Furring Clip Angle Soffit/Fascia/Deck Framing
More informationASBESTOS OPERATIONS AND MAINTENANCE PROGRAM. Prepared for: FALMOUTH PUBLIC SCHOOLS FALMOUTH, MASSACHUSETTS. Prepared by:
ASBESTOS OPERATIONS AND MAINTENANCE PROGRAM Prepared for: FALMOUTH PUBLIC SCHOOLS FALMOUTH, MASSACHUSETTS Prepared by: American Environmental Consultants, Inc 841 Broad Street Weymouth, Massachusetts December
More informationCentral Michigan University
Limited XRF Instrument Testing Report ( Purposes of RRP Rule Compliance) July 20, 2010 July 26, 2010 Mr. Daniel J. Lyons Environmental Administrator Central Michigan University Environmental & Safety Services
More informationIFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1
IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are
More informationVINYL REPLACEMENT WINDOW INSTALLATION STANDARDS
VINYL REPLACEMENT WINDOW INSTALLATION STANDARDS BEFORE you start to remove the existing windows Place clean drop cloths in all work areas. Re-measure the opening to ensure the new window will fit. Remove
More informationExample Report Ref: 5642 REPORT. Snagging Survey/ Investigation and Report
Example Report Ref: 5642 Example Report Date: xx/xx/xxxx Example Report Example Report REPORT Snagging Survey/ Investigation and Report Client: xxxx xxxxxx Site Location: Address Address Address Address
More informationPT7M CL/CH /NL Voltage Detector
PT7M6218-6250CL/CH /NL Features Highly precision: ±1.5% (25 C); ±2.5%(-40 C to +85 C ); Low power consumption: 1.0μA @ 3.6V Vcc Detect voltage range: 1.8 to 5V in 100mV increments Operating voltage range:
More informationSERIES 300 SINGLE HUNG WINDOW INSTALLATION
IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS
More informationInstall Like The Pros
CertainTeed Install Like The Pros Installing Gypsum Board Like The Pros CertainTeed Install Like The Pros GETTING STARTED RIGHT Use the right products For the best, lasting results choose the right CertainTeed
More informationINSTALLATION SHOP DRAWINGS FOR MINNEAPOLIS, MN
MINNEAPOLIS, MN 2-0- 2-- General Notes Abbreviations Deviations from Architectural Specifications Deviations from Architectural Drawings ALUM. = ALUMINUM B.O. = BY OTHERS CONT. = CONTINUOUS. = CLEARANCE
More informationHow to Install Elite Bayside Beadboard
How to Install Elite Bayside Beadboard Beadboard will give a room a warm and comfortable feeling. Its beauty lies in its simplicity. It is one of the easiest to install out of all wainscoting, regardless
More informationMammoth Inc. 320 West College Ave. Pleasant Gap PA EIN PA Contractor Licsense - PA PH-(814) Fax- (814)
1 Insured: Property: Mullen,Kevin 1991 Fairwood ln State College, PA Contractor: Cellular: (814) 470-5742 Company: E-mail: scott@mammothrestoration. com Business: Pleasant Gap, PA 16823 Claim Number: Policy
More informationVisions 2000 Single Hung Tilt Window Parts Reference Catalog
Visions 2000 Single Hung Tilt Window Parts Reference Catalog (Includes Parts and Information for Single Hung Tilt Picture and Basement and Miscellaneous Parts for Single Hung Tilt Oriel and Single Hung
More informationWendell E Green Elementary School 1150 W 96th St Chicago, IL 60643
11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationPunch List Checklist EXTERIOR LANDSCAPING. COMMON LIVING SPACES and HALLS
EXTERIOR o Exterior body paint touch up complete o Fascia and eves termite damage repaired o Fascia and eves paint touch up complete o Fence gates open and close properly without sticking or rubbing o
More informationAmveco Toroidal Solutions. Acme Electric s class leading toroidal magnetics is the perfect solution for the most challenging applications.
Amveco Toroidal Solutions Acme Electric s class leading toroidal magnetics is the perfect solution for the most challenging applications. AMVECO TOROIDAL SOLUTIONS Acme Electric s Amveco brand specializes
More informationDocument # Logos: Purch-11B Purchasing Use ONLY: How to Change a Vendor in Logos Original Author Karrie Revolinski Date 5/10/13 Updated Author Date
Original Author Karrie Revolinski Date 5/10/13 Updated Author Date Scope Adding or changing a vendor is done by the Purchasing staff. Departments request changes to vendors by filling out a New Vendor/Change
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.
More informationNEW from kwb. All-rounder/multi-tool accessories. suitable accessories for sawing, milling, grating, scraping, grinding
NEW from kwb. All-rounder/multi-tool accessories suitable accessories for sawing, milling, grating, scraping, grinding CRV plunge-cut saw blade for wood Cuts wood up to 28 mm (10 mm), 48 mm (22 mm, 34
More informationDuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions
DuChâteau Vinyl DeLuxe Grand Collection LuxCor Click Installation Instructions General Information Intended for indoor residential and commercial use only, DuChâteau Vinyl DeLuxe Grand Collection - Luxcor
More informationinstallation manual m y w a l l a r t. c o m
installation manual Step 1 Step 2 Acclimate panels for 48 hours in the environment and temperature they will be installed in. Step 3 Install over relatively smooth flat surfaces, all major holes or major
More informationLoose Lay Luxury Vinyl Plank
Loose Lay Luxury Vinyl Plank FLEX COLLECTION Installation & maintenance * PLEASE READ CAREFULLY * Installation, maintenance & warranty guideline for loose lay luxury vinyl products. Adherence to This guideline
More informationICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450)
ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JEROME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) 565-6336 FAX: (450)565-6519 www.icc-rsf.com INSTALLATION AND OPERATION INSTRUCTIONS "Model VIP" CHIMNEY TYPE: FACTORY BUILT
More information214 Wilshire Blvd., Suite 102 Santa Monica California 90401
Wilshire Blvd., Suite 0 Santa Monica California 900 7 W a l l a c e P l. C a l i f o r n i a 9 8 t e l : 0 7 7 N ND COURT PROPERTY LINE 0.00' THE RENOVATION AND CHANGE OF USE OF AN EXISTING BOOK STORE
More informationAndrew Morrison s Straw Bale Special Reports. Installing Toe Ups. Structural, interior toe up ready for installation
Andrew Morrison s Straw Bale Special Reports Installing Toe Ups Structural, interior toe up ready for installation Toe ups are the wood members that hold the bales off of the floor, and I strongly recommend
More information13 Colonies 4 th of July Special Event
13 Colonies 4 th of July Special Event Summary Information Developed by Ken Villone, KU2US (central New York) Last year (2009) was first time for the event Very Successful, over 12,000 QSOs in 2009 PART
More informationSections & Details VOCABULARY
1 Sections & Details VOCABULARY 1 ROOF FRAMING DETAIL RIDGE BOARD SHEATHING SHINGLES WEB FASCIA RAFTER (chord) SOFFIT SHEATHING STUD INSULATION DOUBLE TOP PLATE CEILING JOIST 2 FOUNDATION DETAIL STUD SHEATHING
More informationFINDINGS. May 2, Courtney Wilton Portland Public Schools 501 North Dixon Portland, Oregon 97227
May 2, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, Oregon 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Da Vinci Arts Middle School 2508 NE Everett
More informationTHE TOUGHEST ROUGHEST. most dependable. products ON THE MARKET M O V I N G & S T O R A G E C A T A L O G
THE TOUGHEST ROUGHEST most dependable products ON THE MARKET M O V I N G & S T O R A G E C A T A L O G contents p3 packing material p4 Flooring & p rotective r olls p8 g loves p9 r ags, t owels & wipers
More informationAquaGuard - Water Resistant Flooring Installation guidelines
AquaGuard - Water Resistant Flooring Installation guidelines Before You Start: Please read all the instructions before you begin the installation. Improper installation will void the warranty. Important
More informationLaminate Flooring Alternative to Hardwood Flooring
Laminate Flooring Alternative to Hardwood Flooring Laminate flooring is moderately expensive, with a cost generally between that of vinyl and hardwood flooring. It's easier to install than hardwood and
More informationB. Shop Drawings: Include elevations, door edge details, frame profiles, metal thicknesses, preparations for hardware, and other details.
SECTION 081113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standard hollow metal doors and frames. 1.2 SUBMITTALS A. Product Data: For each type of product indicated.
More informationHandcrafted Excellence TIMBER FRAME HOMES
Handcrafted Excellence TIMBER FRAME HOMES Craftsmanship Just like the masters of old, true perfection comes not through machines and automation but through sweat and toil of human hands, spurred onward
More informationNew Braunfels ISD. Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018
New Braunfels ISD Comprehensive and Strategic Facilities Planning Committee Meeting Tuesday, March 27, 2018 Facilities Committee Bond Proposal! Total Projected Bond Proposal = $84,000,000*! New Middle
More informationAMSTEL FOLDING GRILLES
AMSTEL FOLDING GRILLES Instructions for installation and maintenance of Amstel Folding Grilles Models: Vista, Air Vista, Solid Vista, Guardian, Sentry and Classic 126 IMPORTANT: 1. These instructions are
More informationSERIES 300 SINGLE HUNG WITH FIN WINDOW INSTALLATION
IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS
More informationChapter 25 - Flooring
Chapter 25 - Flooring Contents Chapter 25 - Flooring... 25-1 Timing & Prerequisites... 25-2 Preparation... 25-3 Clean Up the Job Site... 25-3 Clean and Sand the Sub-Flooring... 25-3 Check the Gap under
More informationU1500E Gas Fireplace
Model U1500E-NG U1500E-LP Fuel Type Natural Gas Propane Minimum Supply Pressure 5 W.C. (1.25 kpa) 11 W.C. (2.73 kpa) Manifold Pressure - High 3.5 W.C. (0.87 kpa) 10 W.C. (2.48 kpa) Manifold Pressure -
More informationInstallation Instructions
GENERAL INSTALLATION INFORMATION To ensure maximum performance from your A 2 bath fixture, please read and follow the instructions and cautions. Carefully inspect the new fixture for any shipping damage.
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2017
SECTION 23 0553 - MECHANICAL SYSTEMS IDENTIFICATION GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION MECHANICAL IDENTIFICATION
Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationPart VIII Electrical GENERAL REQUIREMENTS CHAPTER 33
Part VIII Electrical CHAPTER 33 GENERAL REQUIREMENTS < SECTION E3301 GENERAL E3301.1 Scope. The installation of electrical systems, equipment and components indoors and outdoors that are within the scope
More informationFlash Coving. Chapter 8 Flash Coving 8. 1
8 Flash Coving Chapter 8 Flash Coving 8. 1 Flash Coving A. TOOLS In addition to the normal tools (knives, dividers, recess scribers, straightedges, rollers, trowels, etc.), other tools are also needed
More informationArticles of Stone, Plaster, Cement, Asbestos, Mica or similar Materials; Ceramic Products; Glass and Glassware
Section XIII Articles of Stone, Plaster, Cement, Asbestos, Mica or similar Materials; Ceramic Products; Glass and Glassware Chapter 68 Articles of Stone, Plaster, Cement, Asbestos, Mica or similar Materials
More informationA. Product Data: For each electrical identification product indicated.
SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationTools You Will Need: Pencil Chalk Line Level Rubber J-Roller Miter Saw (either hand saw or electric) Utility Knife Black Dot Stickers (provided)
How-To Timberchic is designed to be used by any DIYer. However, there are different levels of DIYers. Some won t need our instructions, some will read our instructions and say easy enough and others will
More informationHardwood and Laminate Installer Assessment Worksheet
Contact customer to schedule assessment within two business days and return this form within one day of assessment completion. Assessment Date: Installers: Please fax all completed forms with barcode page
More informationNEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS FIBRE CEMENT CLADDING
NEW HOME WARRANTY A REFERENCE GUIDE FOR TYPICAL WALL AND WINDOW DETAILS (RAINSCREEN SYSTEM) SHOWN AS Reference Guide 0.1 GENERAL 0.1 Reference Guide 0.2 Index 0.3 Disclaimer & Limitations 0.4 General Notes
More informationICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JÉRÔME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) FAX: (450) INSTALLATION AND OPERATION INSTRUCTIONS
ICC INDUSTRIAL CHIMNEY COMPANY INC. ST-JÉRÔME, QUÉBEC, CANADA, J7Y 4B7 TEL: (450) 565-6336 FAX: (450)565-6519 INSTALLATION AND OPERATION INSTRUCTIONS "IS" CHIMNEY TYPE: SIZE: FACTORY BUILT CHIMNEY FOR
More informationNever fill any required clearance space with insulation or any other building materials surrounding the chimney.
INSTALLATION AND MAINTENANCE INSTRUCTIONS 1700ºF Air-Cooled Temp/Guard Chimney Sizes 8-16 Listing No. MH8251 Tested to UL103/ULC-S604 A MAJOR CAUSE OF RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCE
More informationCarpentry. EXAM INFORMATION Items. Points. Prerequisites. Course Length. Career Cluster EXAM BLUEPRINT. 1- Materials, Fasteners & Adhesives 10%
EXAM INFORMATION Items 73 Points 73 Prerequisites NONE Course Length DESCRIPTION This is the first in a sequence of courses that prepares individuals to layout, fabricate, erect, install, and repair wooden
More information