If the address on this form is different than the address of the building, submit a written explanation.

Size: px
Start display at page:

Download "If the address on this form is different than the address of the building, submit a written explanation."

Transcription

1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: SCHOOL NAME: Dirksen School ADDRESS OF SCHOOL: 8601 W Foster Avenue CITY: Chicago, IL, DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 2/13/2013 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLLOWING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 5/4/2016 ENROLLMENT 889 IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): IDPH MP LICENSE NUMBER: Roberto Rivera IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): Jigar Shah DESIGNATED PERSON (Please Print): Robert Christlieb PHONE: (773) /4/2016 Signature of Designated Person SECTION III Date PLEASE COMPLETE THE FOLLOWING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. Date: School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 10.03

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 Dirksen School 8601 W Foster Avenue Chicago, IL, Unit: Building ID: 2950 IDPH ID Number: REPORT DATE: Wednesday, May 04, 2016 Prepared for: Chicago Public Schools 125 S. Clark Street Chicago, IL Prepared by: 855 W. Adams St., Ste. 200 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 February 23, 2016 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Chicago Public Schools Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the Three-Year Reinspections and performed management plan updates for the Chicago Public Schools (CPS) facilities in Region 1,2,6 Elementary Schools. Please update your records with the following information. School District: 299 Unit: Region: 01 IDPH ID: School: Dirksen School Building ID: 2950 Address: 8601 W Foster Avenue Chicago, IL, Building Contact: Padilla, Steven Contact Phone: Current Building Owners: Chicago Public Schools Review Date: 03/24/2016 Inspector: Roberto Rivera Inspector IDPH License: Management Planner: Jigar Shah Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Jigar Shah

4 Environmental Notification to Occupants To: Faculty, Staff and Parents From: Chicago Public Schools Date: February 23, 2016 RE: Dirksen School, Unit W Foster Avenue Chicago, IL, Dear Faculty, Staff and Parents, This letter is to notify you that the 2016 asbestos three year re-inspection has been completed at Dirksen School, following the Federal Asbestos Hazard Emergency Response Act (AHERA), 40 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at Dirksen School, there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. III. IV. Executive Summary Methodology Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Appendix B: Appendix C: Appendix D: Appendix E: Assessment Sheets, Drawings and Photos Inspector and Management Planner Licenses Laboratory Accreditations Laboratory Results Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: Dirksen School Unit: Region: 01 Address: 8601 W Foster Avenue Chicago, IL, IDPH ID: Building ID: 2950 Contact: Padilla, Steven Phone: Description of Facility Original Construction: 1970 Additional Construction: 2000,2014,1971,2000,2000 Total Square Footage: No of Floors: 2 Current Occupancy: LEA Designated Person Contact: Robert Christlieb Phone: (773) Address: 125 South Clark Street, 17th Floor Chicago, IL Managing Environmental Consultant MEC: Contact: Arturo Saenz Address 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector Inspector Name: Roberto Rivera Signature: Inspector IDPH license # Date: 2/23/ Management Planner Management Planner Name: Jigar Shah Signature: Management Planner IDPH license # Date: 03/24/ Review Date: 03/24/ LEA Designated Person's Acknowledgement The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: Date: 5/4/2016 Name: Robert Christlieb Unit : Dirksen School Building: 2950

7 II. EXECUTIVE SUMMARY was retained by the Chicago Public Schools (CPS) to perform a threeyear asbestos reinspection of the Dirksen School. This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. Note: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building 2950: Unit: Dirksen School Building: 2950

8 B. The following new homogenous areas have been identified for Building 2950: X12 Off-white with tan specks VFT 108A 12X12 Off-white with tan specks VFT Mastic 109 2'X 2' Ceiling Tile 110 Drywall Systems 111 Vinyl Baseboard Mastic 112 Vinyl Flooring Mastic Unit: Dirksen School Building: 2950

9 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as Assumed: "x12" Crème w/ Brown Specks VFT 100A 12"x12" Crème w/ Brown Specks VFT Mastic "x12" Cream w/brown Specks VFT 103 A 12"x12" Cream w/brown Specks VFT Mastic 105 Terrazzo Flooring 106 Drywall joint compound with tape 107 Drywall Joint Compound with Tape X12 Off-white with tan specks VFT 108A 12X12 Off-white with tan specks VFT Mastic 109 2'X 2' Ceiling Tile 110 Drywall Systems 111 Vinyl Baseboard Mastic 112 Vinyl Flooring Mastic 20 MJP E/F/V on Fiberglass Pipe Insulation 33 12"x12" White w/ Beige Speckles VFT 35 2'x4' White w/ Grooved Ceiling Tile 36 12"x12" White w/ Tan Streaks VFT 37 2'x4' Ceiling Tile 38 2'x2' Ceiling Tile 39 Fire Doors 40 Fire Doors 41 Textured Plaster The following areas were deemed to be inaccessible: 08 Spray-on Fireproofing 20 MJP E/F/V on Fiberglass Pipe Insulation 21 MJP E/F/V on Fiberglass Pipe Insulation 35 2'x4' White w/ Grooved Ceiling Tile 37 2'x4' Ceiling Tile 38 2'x2' Ceiling Tile Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Roberto Rivera, IDPH License # The Management Plan was updated by Jigar Shah, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: Dirksen School Building: 2950

10 III. METHODOLOGY Tasks performed on-site included the following: 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or Assumed ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (30) days for inclusion into the management plan. IV. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The Dirksen School Building 2950 Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: Dirksen School Building: 2950

11 Table I Inspector's Reinspection Findings

12 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Material Quantity Material Units Material Location 08 Spray-on Fireproofing 4,500 SF 1st Floor Kitchen and Throughout Building Above The Ceiling Tiles and Drywall Bldg "x12" Crème w/ Brown Specks VFT 2,500 SF Throughout 99 Mobile Unit 100A 12"x12" Crème w/ Brown Specks VFT 2,500 SF Throughout 99 Mastic Mobile 101 2'x2' Ceiling Tile w/ Grooves Throughout Mobile 99 (Except Washrooms and the Janitor's Closet) 102 Vinyl Baseboard Throughout 99 Mobile 102A Vinyl Baseboard Mastic Throughout 99 Mobile "x12" Cream w/brown Specks VFT 120 SF E Corridor-Class Doorways 103 A 12"x12" Cream w/brown Specks VFT 120 SF E-Corridor-Class Mastic Doorways Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category CHR SURFACE Y NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage NO_ACBM NO_ACBM NO_ACBM ASSUMED MISC N NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage 104 Not Used UNDEFINE D 105 Terrazzo Flooring 400 SF Both Stairwells ASSUMED SURFACE N NONE 0 No ACBM with the leading to the 2nd potential for damage Floor Library Bldg. 106 Drywall joint compound with tape 5,000 SF Throughout the Ceiling Tiles in Building 1970 Bldg. 107 Drywall Joint Compound with Tape 2,000 SF Above Ceiling Tiles Throughout Bldg X12 Off-white with tan specks VFT 4,500 SF 2013 Mobile Unit: Rooms 401 & Storage; 402; Janitor Closet; 403 & Storage; 404; Electrical Room; Hallway; and N & S Entry Vestibules 108A 12X12 Off-white with tan specks VFT Mastic 4,500 SF 2013 Mobile Unit: Rooms 401 & ASSUMED MISC Y NONE 0 No ACBM with the potential for damage ASSUMED MISC Y NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage Damage Category Damage Reason Disturbance Potential LOW MODERATE LOW MODERATE LOW MODERATE LOW LOW MODERATE LOW

13 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Material Quantity Material Units Material Location Storage; 402; Janitor Closet; 403 & Storage; 404; Electrical Room; Hallway; and N & S Entry Vestibules 109 2'X 2' Ceiling Tile 4,900 SF 2013 Mobile Unit: Hallway N and S Entries; Rooms 401 & Storage; 402; 403 & Storage; 404; Boys, Girls and Unisex Toilets 110 Drywall Systems 10,000 SF Throughout 2013 Mobile Unit 111 Vinyl Baseboard Mastic 1,000 LF Rooms 401 and storage, 402, JC, 403 and storage, 404, Electrical Closet, Hallway Mobile Unit 112 Vinyl Flooring Mastic 400 SF Boys and Girls toilet and Unisex toilet Mobile Unit 14 12"x12' Beige w/speckles VFT 7,500 SF Main Corridor Bldg "x12" Tan w/ Dark Brown Streaks VFT 2,520 SF Rooms 118, 120, 124, 126, 128 and Bldg "x12" Beige w/ Specks VFT Mastic 7,500 SF Main Corridor Bldg "x12" Tan w/ Dark Brown Streaks VFT Mastic 2,520 SF Rooms 118, 120, 124, 126, 128 and Bldg. 20 MJP E/F/V on Fiberglass Pipe Insulation 150 LF Throughout Bldg. 21 MJP E/F/V on Fiberglass Pipe Insulation 60 LF 1st Floor - Refuse Room Bldg "x12" Orange w/ Specks VFT 1,200 SF Main Corridor Bldg. 22A 12"x12" Orange w/ Specks VFT Mastic 1,200 SF Main Corridor Bldg "x12" Yellow w/ Specks VFT 900 SF Room Bldg. Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category ASSUMED MISC Y NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage ASSUMED TSI Y NONE 0 No ACBM with the potential for damage CHR TSI Y NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage Damage Category Damage Reason Disturbance Potential LOW LOW LOW LOW MODERATE MODERATE LOW LOW LOW LOW MODERATE LOW MODERATE

14 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category 23A 12"x12" Yellow w/ Specks VFT Mastic 900 SF Room Bldg. CHR MISC N NONE 0 No ACBM with the potential for damage 24 12"x12" Light Brown VFT 400 SF Vault Bldg. CHR MISC N NONE 0 No ACBM with the potential for damage 24A 12"x12" Light Brown VFT Mastic 400 SF Vault Bldg. CHR MISC N NONE 0 No ACBM with the potential for damage 25 12"x12" Light Orange VFT 90 SF 102 & 104 Storage - CHR MISC N NONE 0 No ACBM with the 1970 Bldg. potential for damage 25A 12"x12" Light Orange VFT Mastic 90 SF 102 & 104 Storage - CHR MISC N NONE 0 No ACBM with the 1970 Bldg. potential for damage 26 12"x12" Beige w/ Light Green VFT 1,400 SF Lunchroom and CHR MISC N NONE 0 No ACBM with the Room potential for damage Bldg. 26A 12"x12" Beige w/ Light Green VFT Mastic 1,400 SF Lunchroom and Room Bldg "x12" Green w/ White VFT 2,000 SF Lunchroom, Rooms 102 and 107 and the Engineers Office Bldg. 27A 12"x12" Green w/ White VFT Mastic 2,000 SF Lunchroom, Rooms 102 and 107 and the Engineers Office Bldg "x12" Grey w/ Specks VFT 220 SF Lunchroom/Workro om and Teacher's Lounge Bldg. 28A 12"x12" Grey w/ Specks VFT Mastic 220 SF Lunchroom/Workro om and Teacher's Lounge Bldg "x12" Beige (Marble) VFT 3,500 SF Gym, Assistant Principal's Office, Room 201 and 201 Washroom, Room 204, Engineer's Storage Room and the SW Corner of the Library Bldg. 29A 12"x12" Beige (Marble) VFT Mastic 3,500 SF Gym, Assistant Principal's Office, Room 201 and 201 Washroom, Room 204, Engineer's Storage Room and CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage Damage Category Damage Reason Disturbance Potential LOW LOW LOW MODERATE LOW MODERATE LOW MODERATE LOW MODERATE LOW MODERATE LOW

15 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Material Quantity Material Units Material Location the SW Corner of the Library Bldg "x12" White VFT 1,600 SF Room 202 (Library), Engineer's Corridor and the Gym Stairwells Bldg. 30A 12"x12" White VFT Mastic 1,600 SF Room 202 (Library), Engineer's Corridor and the Gym Stairwells Bldg "x12" Tan w/ Small Specks VFT 7,500 SF Rooms 101, 103, 105, 109, 110, 111, 112, 113, 114, 115 and 201, the Principal's Office and the Main Office Bldg. 31A 12"x12" Tan w/ Small Specks VFT Mastic 7,500 SF Rooms 101, 103, 105, 109, 110, 111, 112, 113, 114 and 115, the Principal's Office and the Main Office Bldg "x12" White w/ Tan Streaks VFT Mastic 2,520 SF Corridor and Rooms 118, 120, 124, 126, 128 and Bldg "x12" White w/ Beige Speckles VFT 1,440 SF Rooms 119, 121, 122, 123 and Bldg. 33A 12"x12" White w/ Beige Streaks VFT Mastic 34 12"x12" Light Tan w/ Black & White Speckles VFT 34A 12"x12" Light Tan w/ Black & White Speckles VFT Mastic 1,440 SF Rooms 119, 121, 122, 123 and Bldg. 1,440 SF Rooms 119, 121, 122, 123 and Bldg. 1,440 SF Rooms 119, 121, 122, 123 and Bldg. Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage CHR MISC N NONE 0 No ACBM with the potential for damage Damage Category Damage Reason Disturbance Potential 35 2'x4' White w/ Grooved Ceiling Tile 9,000 SF Throughout ASSUMED MISC Y NONE 0 No ACBM with the LOW Bldg. potential for damage 36 12"x12" White w/ Tan Streaks VFT 2,520 SF Corridor and Rooms ASSUMED MISC N NONE 0 No ACBM with the MODERATE MODERATE LOW MODERATE LOW LOW MODERATE LOW MODERATE LOW

16 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Material Quantity Material Units Material Location 118, 120, 124, 126, 128 and Bldg. 37 2'x4' Ceiling Tile 7,000 SF Throughout Bldg. 38 2'x2' Ceiling Tile 3,250 SF Throughout Bldg. 39 Fire Doors 16 EA 1st Floor Electrical Room, 1st Floor MDF Room and the Custodial Locker Room Asbestos Type Material Category Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category Damage Reason Disturbance Potential potential for damage ASSUMED MISC Y NONE 0 No ACBM with the potential for damage ASSUMED MISC Y NONE 0 No ACBM with the potential for damage ASSUMED MISC N NONE 0 No ACBM with the potential for damage 40 Fire Doors 10 EA Mobile Unit ASSUMED MISC N NONE 0 No ACBM with the potential for damage 41 Textured Plaster 270 SF Men's and Women's ASSUMED SURFACE N NONE 0 No ACBM with the Washroom Ceilings potential for damage -Mobile Unit LOW LOW LOW LOW LOW

17 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 2/23/2016 Inspector Name Roberto Rivera /6/2017 Inspector's IDPH License Number / Expiration Date Inspector's Comments HA Number: A A A A Inspector Comments:

18 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 22 22A 23 23A 24 24A 25 25A 26 26A 27 27A 28 28A 29 29A 30 30A 31 31A A 34 34A Inspector Comments:

19 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: Inspector Comments:

20 Table II Management Planner's Review

21 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Chicago, IL, Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Material Description Material Material Material Location Asbestos Material Friable Damage Damage Damage Category Response Num Quantity Units Type Category Quantity Units 08 Spray-on Fireproofing 4,500 SF 1st Floor Kitchen and Throughout Chrysotile SURFACE Yes 0 SF 6 ACBM with the potential for damage Building Above The Ceiling Tiles and Drywall Bldg "x12" Crème w/ Brown Specks VFT 2,500 SF Throughout 99 Mobile Unit Assumed MISC No 0 SF 6 ACBM with the potential for damage 100A 12"x12" Crème w/ Brown Specks VFT Mastic 2,500 SF Throughout 99 Mobile Assumed MISC No 0 SF 6 ACBM with the potential for damage 101 2'x2' Ceiling Tile w/ Grooves Throughout Mobile 99 (Except No ACBM Washrooms and the Janitor's Closet) 102 Vinyl Baseboard Throughout 99 Mobile No ACBM 102A Vinyl Baseboard Mastic Throughout 99 Mobile No ACBM "x12" Cream w/brown Specks VFT 120 SF E Corridor-Class Doorways Assumed MISC No 0 SF 6 ACBM with the potential for damage 103 A 12"x12" Cream w/brown Specks VFT Mastic 120 SF E-Corridor-Class Doorways Assumed MISC No 0 SF 6 ACBM with the potential for damage 104 Not Used Undefined 105 Terrazzo Flooring 400 SF Both Stairwells leading to the 2nd Floor Assumed SURFACE No 0 SF 6 ACBM with the potential for damage Library Bldg. 106 Drywall joint compound with tape 5,000 SF Throughout the Ceiling Tiles in Building Assumed MISC Yes 0 SF 6 ACBM with the potential for damage 1970 Bldg. 107 Drywall Joint Compound with Tape 2,000 SF Above Ceiling Tiles Throughout Assumed MISC Yes 0 SF 6 ACBM with the potential for damage Bldg X12 Off-white with tan specks VFT 4,500 SF 2013 Mobile Unit: Rooms 401 & Assumed MISC No 0 SF 6 ACBM with the potential for damage Storage; 402; Janitor Closet; 403 & Storage; 404; Electrical Room; Hallway; and N & S Entry Vestibules 108A 12X12 Off-white with tan specks VFT Mastic 4,500 SF 2013 Mobile Unit: Rooms 401 & Assumed MISC No 0 SF 6 ACBM with the potential for damage Storage; 402; Janitor Closet; 403 & Storage; 404; Electrical Room; Hallway; and N & S Entry Vestibules 109 2'X 2' Ceiling Tile 4,900 SF 2013 Mobile Unit: Hallway N and S Assumed MISC Yes 0 SF 6 ACBM with the potential for damage Entries; Rooms 401 & Storage; 402; 403 & Storage; 404; Boys, Girls and Unisex Toilets 110 Drywall Systems 10,000 SF Throughout 2013 Mobile Unit Assumed MISC No 0 SF 6 ACBM with the potential for damage 111 Vinyl Baseboard Mastic 1,000 LF Rooms 401 and storage, 402, JC, 403 Assumed MISC No 0 LF 6 ACBM with the potential for damage and storage, 404, Electrical Closet, Hallway Mobile Unit 112 Vinyl Flooring Mastic 400 SF Boys and Girls toilet and Unisex toilet Mobile Unit Assumed MISC No 0 SF 6 ACBM with the potential for damage

22 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Chicago, IL, Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Material Description Material Material Material Location Asbestos Material Friable Damage Damage Damage Category Response Num Quantity Units Type Category Quantity Units 14 12"x12' Beige w/speckles VFT 7,500 SF Main Corridor Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 15 12"x12" Tan w/ Dark Brown Streaks VFT 2,520 SF Rooms 118, 120, 124, 126, 128 and Chrysotile MISC No 0 SF 6 ACBM with the potential for damage Bldg "x12" Beige w/ Specks VFT Mastic 7,500 SF Main Corridor Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 17 12"x12" Tan w/ Dark Brown Streaks VFT Mastic 2,520 SF Rooms 118, 120, 124, 126, 128 and Chrysotile MISC No 0 SF 6 ACBM with the potential for damage Bldg. 20 MJP E/F/V on Fiberglass Pipe Insulation 150 LF Throughout Bldg. Assumed TSI Yes 0 LF 6 ACBM with the potential for damage 21 MJP E/F/V on Fiberglass Pipe Insulation 60 LF 1st Floor - Refuse Room Bldg. Chrysotile TSI Yes 0 LF 6 ACBM with the potential for damage 22 12"x12" Orange w/ Specks VFT 1,200 SF Main Corridor Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 22A 12"x12" Orange w/ Specks VFT Mastic 1,200 SF Main Corridor Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 23 12"x12" Yellow w/ Specks VFT 900 SF Room Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 23A 12"x12" Yellow w/ Specks VFT Mastic 900 SF Room Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 24 12"x12" Light Brown VFT 400 SF Vault Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 24A 12"x12" Light Brown VFT Mastic 400 SF Vault Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 25 12"x12" Light Orange VFT 90 SF 102 & 104 Storage Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 25A 12"x12" Light Orange VFT Mastic 90 SF 102 & 104 Storage Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 26 12"x12" Beige w/ Light Green VFT 1,400 SF Lunchroom and Room Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 26A 12"x12" Beige w/ Light Green VFT Mastic 1,400 SF Lunchroom and Room Bldg. Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 27 12"x12" Green w/ White VFT 2,000 SF Lunchroom, Rooms 102 and 107 and Chrysotile MISC No 0 SF 6 ACBM with the potential for damage the Engineers Office Bldg. 27A 12"x12" Green w/ White VFT Mastic 2,000 SF Lunchroom, Rooms 102 and 107 and Chrysotile MISC No 0 SF 6 ACBM with the potential for damage the Engineers Office Bldg "x12" Grey w/ Specks VFT 220 SF Lunchroom/Workroom and Teacher's Chrysotile MISC No 0 SF 6 ACBM with the potential for damage Lounge Bldg. 28A 12"x12" Grey w/ Specks VFT Mastic 220 SF Lunchroom/Workroom and Teacher's Chrysotile MISC No 0 SF 6 ACBM with the potential for damage Lounge Bldg "x12" Beige (Marble) VFT 3,500 SF Gym, Assistant Principal's Office, Room Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 201 and 201 Washroom, Room 204, Engineer's Storage Room and the SW Corner of the Library Bldg. 29A 12"x12" Beige (Marble) VFT Mastic 3,500 SF Gym, Assistant Principal's Office, Room Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 201 and 201 Washroom, Room 204, Engineer's Storage Room and the SW Corner of the Library Bldg "x12" White VFT 1,600 SF Room 202 (Library), Engineer's Corridor and the Gym Stairwells Chrysotile MISC No 0 SF 6 ACBM with the potential for damage

23 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Chicago, IL, Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) HA Num Material Description Material Quantity Material Units Material Location 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Asbestos Type Management Planner's Comments Summarized at the End of the Report Material Category Friable Damage Quantity Damage Units Damage Category Bldg. 30A 12"x12" White VFT Mastic 1,600 SF Room 202 (Library), Engineer's Chrysotile MISC No 0 SF 6 ACBM with the potential for damage Corridor and the Gym Stairwells Bldg "x12" Tan w/ Small Specks VFT 7,500 SF Rooms 101, 103, 105, 109, 110, 111, Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 112, 113, 114, 115 and 201, the Principal's Office and the Main Office Bldg. 31A 12"x12" Tan w/ Small Specks VFT Mastic 7,500 SF Rooms 101, 103, 105, 109, 110, 111, Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 112, 113, 114 and 115, the Principal's Office and the Main Office Bldg "x12" White w/ Tan Streaks VFT Mastic 2,520 SF Corridor and Rooms 118, 120, 124, Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 126, 128 and Bldg "x12" White w/ Beige Speckles VFT 1,440 SF Rooms 119, 121, 122, 123 and Assumed MISC No 0 SF 6 ACBM with the potential for damage 1971 Bldg. 33A 12"x12" White w/ Beige Streaks VFT Mastic 1,440 SF Rooms 119, 121, 122, 123 and Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 1971 Bldg "x12" Light Tan w/ Black & White Speckles VFT 1,440 SF Rooms 119, 121, 122, 123 and Chrysotile MISC No 0 SF 6 ACBM with the potential for damage 1971 Bldg. 34A 12"x12" Light Tan w/ Black & White Speckles VFT 1,440 SF Rooms 119, 121, 122, 123 and Chrysotile MISC No 0 SF 6 ACBM with the potential for damage Mastic 1971 Bldg. 35 2'x4' White w/ Grooved Ceiling Tile 9,000 SF Throughout Bldg. Assumed MISC Yes 0 SF 6 ACBM with the potential for damage 36 12"x12" White w/ Tan Streaks VFT 2,520 SF Corridor and Rooms 118, 120, 124, Assumed MISC No 0 SF 6 ACBM with the potential for damage 126, 128 and Bldg. 37 2'x4' Ceiling Tile 7,000 SF Throughout Bldg. Assumed MISC Yes 0 SF 6 ACBM with the potential for damage 38 2'x2' Ceiling Tile 3,250 SF Throughout Bldg. Assumed MISC Yes 0 SF 6 ACBM with the potential for damage 39 Fire Doors 16 EA 1st Floor Electrical Room, 1st Floor Assumed MISC No 0 EA 6 ACBM with the potential for damage MDF Room and the Custodial Locker Room 40 Fire Doors 10 EA Mobile Unit Assumed MISC No 0 EA 6 ACBM with the potential for damage 41 Textured Plaster 270 SF Men's and Women's Washroom Ceilings -Mobile Unit Assumed SURFACE No 0 SF 6 ACBM with the potential for damage Response

24 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Chicago, IL, Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report Review Date 3/24/2016 Manager Planner Name Jigar Shah /19/2017 Manager IDPH License No/Expiration HA Number A A A 104 Management Comments

25 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Chicago, IL, Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) HA Number A A 23 23A 24 24A 25 25A 26 26A 27 27A Management Comments Management Planner's Comments Summarized at the End of the Report

26 School Dirksen School Unit Building ID 2950 Address 8601 W Foster Avenue Chicago, IL, Region 01 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 855 W. Adams St., Ste. 200 Phone: (312) Fax: (312) HA Number 28 28A 29 29A 30 30A 31 31A A 34 34A Management Comments Management Planner's Comments Summarized at the End of the Report

27 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: 08 HISTORICAL AHERA DAMAGE CATEGORY Spray-on Fireproofing 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Kitchen and Throughout Building Above The Ceiling Tiles and Drywall Bldg. MATERIAL QUANTITY: 4500 MATERIAL UNITS: SF DAMAGE QUANTITY: DAMAGE UNITS: SF COMMENTS: Inspector's Signature: Date: 02/23/2016

28 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: 08 Spray-on Fireproofing 1st Floor Kitchen and Throughout Building Above The Ceiling Tiles and Drywall Bldg. MATERIAL QUANTITY: 4500 MATERIAL UNITS: SF DAMAGE QUANTITY: 0 DAMAGE UNITS: SF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

29 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: 100 HISTORICAL AHERA DAMAGE CATEGORY 12"x12" Crème w/ Brown Specks VFT 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: MODERATE Throughout 99 Mobile Unit MATERIAL QUANTITY: 2500 MATERIAL UNITS: SF DAMAGE QUANTITY: DAMAGE UNITS: SF COMMENTS: Inspector's Signature: Date: 02/23/2016

30 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: "x12" Crème w/ Brown Specks VFT Throughout 99 Mobile Unit MATERIAL QUANTITY: 2500 MATERIAL UNITS: SF DAMAGE QUANTITY: 0 DAMAGE UNITS: SF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

31 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: HISTORICAL AHERA DAMAGE CATEGORY 100A 12"x12" Crème w/ Brown Specks VFT Mastic 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout 99 Mobile MATERIAL QUANTITY: 2500 MATERIAL UNITS: SF DAMAGE QUANTITY: DAMAGE UNITS: SF COMMENTS: Inspector's Signature: Date: 02/23/2016

32 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: 100A 12"x12" Crème w/ Brown Specks VFT Mastic Throughout 99 Mobile MATERIAL QUANTITY: 2500 MATERIAL UNITS: SF DAMAGE QUANTITY: 0 DAMAGE UNITS: SF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

33 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: 101 2'x2' Ceiling Tile w/ Grooves HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: MATERIAL QUANTITY: DAMAGE QUANTITY: Throughout Mobile 99 (Except Washrooms and the Janitor's Closet) MATERIAL UNITS: DAMAGE UNITS: COMMENTS: Inspector's Signature: Date: 02/23/2016

34 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: 101 MATERIAL QUANTITY: DAMAGE QUANTITY: 2'x2' Ceiling Tile w/ Grooves Throughout Mobile 99 (Except Washrooms and the Janitor's Closet) MATERIAL UNITS: DAMAGE UNITS: In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

35 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: 102 Vinyl Baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout 99 Mobile MATERIAL QUANTITY: DAMAGE QUANTITY: MATERIAL UNITS: DAMAGE UNITS: COMMENTS: Inspector's Signature: Date: 02/23/2016

36 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: 102 Vinyl Baseboard Throughout 99 Mobile MATERIAL QUANTITY: DAMAGE QUANTITY: MATERIAL UNITS: DAMAGE UNITS: In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

37 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: 102A Vinyl Baseboard Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout 99 Mobile MATERIAL QUANTITY: DAMAGE QUANTITY: MATERIAL UNITS: DAMAGE UNITS: COMMENTS: Inspector's Signature: Date: 02/23/2016

38 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: 102A Vinyl Baseboard Mastic Throughout 99 Mobile MATERIAL QUANTITY: DAMAGE QUANTITY: MATERIAL UNITS: DAMAGE UNITS: In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

39 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: 103 HISTORICAL AHERA DAMAGE CATEGORY 12"x12" Cream w/brown Specks VFT 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: MODERATE E Corridor-Class Doorways MATERIAL QUANTITY: 120 MATERIAL UNITS: SF DAMAGE QUANTITY: DAMAGE UNITS: SF COMMENTS: Inspector's Signature: Date: 02/23/2016

40 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: "x12" Cream w/brown Specks VFT E Corridor-Class Doorways MATERIAL QUANTITY: 120 MATERIAL UNITS: SF DAMAGE QUANTITY: 0 DAMAGE UNITS: SF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

41 Inspector Assessment Form (REASSESSMENT) CITY/STATE: Chicago, Illinois AHERA INSPECTOR: Roberto Rivera SCHOOL NAME: Dirksen School INSPECTION DATE: 2/23/2016 INFORMATION FROM PREVIOUS INSPECTION HOMOGENEOUS AREA: HISTORICAL AHERA DAMAGE CATEGORY 103 A 12"x12" Cream w/brown Specks VFT Mastic 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Assumed FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW E-Corridor-Class Doorways MATERIAL QUANTITY: 120 MATERIAL UNITS: SF DAMAGE QUANTITY: DAMAGE UNITS: SF COMMENTS: Inspector's Signature: Date: 02/23/2016

42 Management Planner Review Form CITY/STATE: Chicago, Illinois MANAGEMENT PLANNER: Jigar Shah SCHOOL NAME: Dirksen School REVIEW DATE: 3/24/2016 HOMOGENEOUS AREA: 103 A 12"x12" Cream w/brown Specks VFT Mastic E-Corridor-Class Doorways MATERIAL QUANTITY: 120 MATERIAL UNITS: SF DAMAGE QUANTITY: 0 DAMAGE UNITS: SF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: Date: 03/24/2016

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3743

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2160

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2311

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-1220

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2825

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2093

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2236

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0042

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2385

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2429

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-0037

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2017 - Fall School: Mary E Courtenay Elementary Language Arts Center Oracle Unit: 30141 Building ID: 6061 Address: 4425 N Magnolia Avenue Region: 01 Mail Room:

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2016 - Fall School: Chicago Military Academy - Bronzeville Oracle Unit: 70070 Building ID: 1800 Address: 3516 South Giles Avenue Region: 04 Mail Room: 41 Surveyor:

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Luis Munoz Marin Elementary School ULCS# 5680 Building

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Prince Hall Elementary School ULCS# 7490 Building #

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the New Kensington High School (CAPA) ULCS# 5520 Building

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2016 - Fall School: Instituto Health Sciences Career Academy Oracle Unit: 63131 Building ID: 55001 Address: 2520 Western Region: 03 Mail Room: Surveyor: DLPUSATERI

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2017 - Fall School: Instituto Health Sciences Career Academy Oracle Unit: 63131 Building ID: 55001 Address: 2520 Western Region: 03 Mail Room: 37 Surveyor: DLPUSATERI

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Benjamin Franklin Annex (Salvation Army) ULCS# 7281

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Francis Pastorius Mastery Charter School ULCS# 3426

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Thomas Holme Elementary School ULCS# 8270 Building #

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2015 - Fall School: UNO Charter School - PFC Omar E. Torres Campus Oracle Unit: 66396 Building ID: 3345 Address: 4248 W 47th St. Region: 04 Mail Room: 44 Surveyor:

More information

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the

THREE-YEAR RE-INSPECTION and ASBESTOS MANAGEMENT PLAN for the SCHOOL DISTRICT OF PHILADELPHIA Asbestos Hazard Emergency Response Act AHERA THREE-YEAR RE-INSPECTION 2015-2016 and ASBESTOS MANAGEMENT PLAN for the Motivation High School KIPP Turner West Middle School

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2015 - Fall School: UNO Charter School - SPC Daniel Zizumbo Campus Oracle Unit: 66395 Building ID: 3344 Address: 4248 W 47th St. Region: 04 Mail Room: 44 Surveyor:

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2015 - Fall School: YCCS - Truman Middle College HS Oracle Unit: 66625 Building ID: 1121W Address: 1145 W. Wilson Ave. (1121) Region: Mail Room: Surveyor: X

More information

ASBESTOS BUILDING SURVEY REPORT

ASBESTOS BUILDING SURVEY REPORT ASBESTOS BUILDING SURVEY REPORT Como Park Senior High School 740 West Rose Avenue St. Paul, MN July 16, 2004 Nova Client No.: STPAU006/Project No: H04-1983 ASBESTOS BUILDING SURVEY REPORT Como Park Senior

More information

SAINT PAUL PUBLIC SCHOOLS Six Month Periodic Surveillance Report for Riverview Elementary 271 Belvidere Street East Saint Paul, MN Key

SAINT PAUL PUBLIC SCHOOLS Six Month Periodic Surveillance Report for Riverview Elementary 271 Belvidere Street East Saint Paul, MN Key SAINT PAUL PUBLIC SCHOOLS Six Month Periodic Surveillance Report for Riverview Elementary Located at: 271 Belvidere Street East Saint Paul, MN 107 Key Conducted On: Conducted By: 8/20/2013 James Paulzine

More information

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 310 Oak Street Slinger, WI. Work Area: Pre-Renovation

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 310 Oak Street Slinger, WI. Work Area: Pre-Renovation PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT Stantec Site: Work Area: Pre-Renovation Inspection Date: February 22, 2016 Report Date: March 10, 2016 NorthStar No. 160-064 Submitted By: NorthStar Environmental

More information

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 308 Oak Street Slinger, WI. Work Area: Pre-Renovation

PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT. Stantec. Site: 308 Oak Street Slinger, WI. Work Area: Pre-Renovation PRE-RENOVATION INSPECTION: ASBESTOS & LEAD PAINT Stantec Site: Work Area: Pre-Renovation Inspection Date: February 22, 2016 Report Date: March 10, 2016 NorthStar No. 160-064 Submitted By: NorthStar Environmental

More information

November 30, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

November 30, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 November 30, 2016 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Abernethy Elementary School 2421 SE Orange

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 March 1, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Sunnyside School 3421 SE Salmon Street Portland,

More information

ASBESTOS OPERATIONS AND MAINTENANCE PROGRAM. Prepared for: FALMOUTH PUBLIC SCHOOLS FALMOUTH, MASSACHUSETTS. Prepared by:

ASBESTOS OPERATIONS AND MAINTENANCE PROGRAM. Prepared for: FALMOUTH PUBLIC SCHOOLS FALMOUTH, MASSACHUSETTS. Prepared by: ASBESTOS OPERATIONS AND MAINTENANCE PROGRAM Prepared for: FALMOUTH PUBLIC SCHOOLS FALMOUTH, MASSACHUSETTS Prepared by: American Environmental Consultants, Inc 841 Broad Street Weymouth, Massachusetts December

More information

CENTRAL MICHIGAN UNIVERSITY

CENTRAL MICHIGAN UNIVERSITY CENTRAL MICHIGAN UNIVERSITY LEAD INSPECTION REPORT FOR November 26, 2012 REVISED June 26, 2013 June 26, 2013 Mr. Daniel J. Lyons Environmental Administrator Central Michigan University Environmental &

More information

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643

Wendell E Green Elementary School 1150 W 96th St Chicago, IL 60643 11 W 9th St Chicago, IL 3 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1

IFB PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB 18-14 PAINTING AT HAYDON ELEMENTARY ADDENDUM #1 IFB MODIFICATIONS: BONDING REQUIREMENTS: Due to the complexity of the scope of work, MCPS is requiring bonding for this bid. The following bonds are

More information

Jackie Robinson Elementary School

Jackie Robinson Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

All bids must be submitted in a sealed envelope and plainly labeled on the outer most package RFP CDBG Housing

All bids must be submitted in a sealed envelope and plainly labeled on the outer most package RFP CDBG Housing BID Number: RFP 2015-0619 CDBG Housing WORK WRITE-UP BID SHEET CASE NUMBER: LCSS1203 BID OPENING DATE: June 19, 2015 TIME: 2:00 pm AT: Lincoln County C/O John Henry Purchasing Office Third Floor Citizens

More information

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type:

Address: South Elgin, IL Phone: ( ) - Fax: ( ) - Cell: ( ) - Contractor Type: Phone: ( ) - Fax: ( ) - Cell: ( ) - Contact Type: Community Development Department 10 N. Water Street Monday Friday 847 741 3894 8:30 a.m. 5:00 p.m. 847 741 3959 FAX www.southelgin.com BASEMENT REMODEL APPLICATION PROPERTY INFORMATION South Elgin, IL

More information

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620

Mahalia Jackson Elementary School 917 W 88th St Chicago, IL 60620 W 88th St Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

1001 Feehanville Drive Phone Mt. Prospect, IL Fax

1001 Feehanville Drive Phone Mt. Prospect, IL Fax NICHOLAS & ASSOCIATES, INC. 1001 Feehanville Drive Phone 847.394.6200 Mt. Prospect, IL 60056 Fax 847.394.6205 November 29, 2016 Community Unit School District 200 130 West Park Avenue Wheaton, IL 60189

More information

Marcus Moziah Garvey Elementary School

Marcus Moziah Garvey Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM:

THE FOLLOWING ITEMS WERE DISCUSSED: 1. HVAC SYSTEM: 4900 Lang Ave NE Albuquerque, NM 87109 505-348-4000 phone 505-348-4055 fax Meeting Minutes Project: Valley View Elementary School Owner: Valley View Public Schools / PSFA Albuquerque Colorado Springs Denver

More information

Central Michigan University

Central Michigan University Limited XRF Instrument Testing Report ( Purposes of RRP Rule Compliance) July 20, 2010 July 26, 2010 Mr. Daniel J. Lyons Environmental Administrator Central Michigan University Environmental & Safety Services

More information

SPARTAN DAY CAMP 4814 FREEDOM RING RD

SPARTAN DAY CAMP 4814 FREEDOM RING RD 484 FREEDOM RING RD PROJECT DATA GENERAL PROJECT NOTES: LOCATION:. DIMENSIONS ARE TO FACE OF STUD OR TO COLUMN CENTERLINE UNLESS NOTED OTHERWISE. VERIFY ALL EXISTING CONDITIONS AND ADJUST WALL DIMENSIONS

More information

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643

Marcus Moziah Garvey Elementary School S Morgan St Chicago, IL 60643 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

BUILDING REGISTER AND SUMMARY OF RESULTS

BUILDING REGISTER AND SUMMARY OF RESULTS Page of 5 Project Ref: A7698 Client : Cheshire County Council Site: 874 Redsands Childrens Centre, Nantwich Location Accessibilty Installation Approximate Asbestos Condition Surface A7698 / Ground Floor

More information

Harris Apartments 836 South 500 East Salt Lake City, Utah. May 1, Submitted to:

Harris Apartments 836 South 500 East Salt Lake City, Utah. May 1, Submitted to: LEAD-BASED PAINT FIELD SURVEY REPORT Harris Apartments 836 South 500 East Salt Lake City, Utah May 1, 2014 Submitted to: Mr. Jamie Victor Katilus Tavernier Capital Funding, LLC 181 Zoerb Avenue Cheektowaga,

More information

Commercial Infill Project Guide

Commercial Infill Project Guide Commercial Infill Project Guide City of Nixa PO Box 395 715 W. Mt. Vernon P (417)725-5850 F(417)724-5750 If you are moving your business into an existing building that is considered an infill and a permit

More information

CAPITAL IMPROVEMENT PROGRAM

CAPITAL IMPROVEMENT PROGRAM CAPITAL IMPROVEMENT PROGRAM Public Work Session No. 2 Project Narrative Submittal December 18, 2017 Prepared for: HALLSVILLE R-IV SCHOOL DISTRICT 421 East Highway 124 Hallsville, MO 65255 Prepared by:

More information

Limited Lead-based Paint Inspection City of Hermosa Beach Building Assessment Project Multiple Buildings Hermosa Beach, CA 90254

Limited Lead-based Paint Inspection City of Hermosa Beach Building Assessment Project Multiple Buildings Hermosa Beach, CA 90254 May 5, 2015 Jason Jazayeri CivilSource, Inc. 9890 Irvine Center Dr. Irvine, CA 92618 Re: Limited Lead-based Paint Inspection City of Hermosa Beach Building Assessment Project Multiple Buildings Hermosa

More information

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC.

ADDENDUM NO. 2. Germania Club Renovation Phase 2. Saginaw County Community Mental Health Authority WILLIAM A. KIBBE & ASSOCIATES, INC. ADDENDUM NO. 2 PROJECT: OWNER: ENGINEER / ARCHITECT: PROJECT LOCATION: Saginaw County Community Mental Health Authority Germania Club Renovation Phase 2 Saginaw County Community Mental Health Authority

More information

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609

Nathanael Greene Elementary School 3525 S Honore St Chicago, IL 60609 athanael Greene Elementary School 32 S Honore St Chicago, IL 009 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the

More information

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL

Oak Park and River Forest High School District North Scoville Avenue Oak Park, IL Oak Park and River Forest High School District 200 201 North Scoville Avenue Oak Park, IL 60302-2296 To: Board of Education From: Tod Altenburg, CSBO Phil Prale, ASCI Date: August 16, 2016 Re: Requested

More information

Everett McKinley Dirksen Elementary School

Everett McKinley Dirksen Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

Estimated Cost of Project Contractor License No. Contractor Qualifier No.

Estimated Cost of Project Contractor License No. Contractor Qualifier No. Building, Safety and Zoning Department COMMERCIAL Application for Building Permit Owners and/or Contractors: Please fill out all the information listed below and submit those documents needed for your

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL November 10, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

NEW LEBANON ELEMENTARY SCHOOL

NEW LEBANON ELEMENTARY SCHOOL NEW LEBANON ELEMENTARY SCHOOL EDUCATIONAL SPECIFICATIONS for the NEW LEBANON ELEMENTARY SCHOOL October 9, 2014 PETER GISOLFI ASSOCIATES Architects Landscape Architects, LLP NEW LEBANON ELEMENTARY SCHOOL

More information

INTERIOR SIGNAGE MANUAL

INTERIOR SIGNAGE MANUAL INTERIOR SIGNAGE MANUAL ➊ Purpose ➋ Procedures ➌ ADA Requirements INTERIOR SIGNAGE MANUAL ➍ Text, Braille, Pictograms and Color ➎ Families of Interior Signage ➏ Mounting Guidelines ➐ Signage Diagrams ➑

More information

ADDENDUM #2 September 12, 2018

ADDENDUM #2 September 12, 2018 Physical Plant Services Project Management 1000 Rim Drive Phone: (970) 247-7523 Fax: (970) 247-7555 Project No. 2007-130P18 Whalen Gymnasium Expansion and Renovation for Exercise Science Request for Qualifications

More information

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION PERMITS AND INSPECTIONS FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number of

More information

ADDENDUM TO RFP DOCUMENTS

ADDENDUM TO RFP DOCUMENTS Solano Community College District Project and RFP #8-00 ADDENDUM TO RFP DOCUMENTS ADDENDUM #0 Project: Solano Community College District Vacaville Center HVAC Upgrade Project Project #8 00 Date: February,

More information

CS2.0 COVER SHEET VOL. 2

CS2.0 COVER SHEET VOL. 2 ARCHITECT GEORGE CROMWELL ELEMENTARY SCHOOL REVITALIZATION 525 Wellham Avenue Glen Burnie, Maryland 21061 OWNER ANNE ARUNDEL COUNTY PUBLIC SCHOOLS 9034 FT. SMALLWOOD ROAD PASADENA, MARYLAND 21122 tel:

More information

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN

OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN KBE APPROVAL DATE: APRIL 2013 including Finding #1 g g OLDHAM COUNTY SCHOOL'S DISTRICT FACILITIES PLAN PLAN OF SCHOOL ORGANIZATION 1. Current Plan PS, K-5, 6-8, 9-12 2. Long Range Plan PS, K-5, 6-8, 9-12

More information

Subject: Water Testing for Lead Marquette Elementary/OʹKeeffe Middle School 1501 Jenifer St./510 Thornton Ave.

Subject: Water Testing for Lead Marquette Elementary/OʹKeeffe Middle School 1501 Jenifer St./510 Thornton Ave. April 6, 2017 Mr. Chad Wiese Madison Metropolitan School District Building Services 4711 Pflaum Road Madison, WI 53718 Subject: Water Testing for Lead Marquette Elementary/OʹKeeffe Middle School 1501 Jenifer

More information

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623

Josefa Ortiz De Dominguez Elementary School 3000 S Lawndale Ave Chicago, IL 60623 3000 S Lawndale Ave Chicago, IL 023 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This

More information

Continuing Education Credit

Continuing Education Credit BIM + CM-at-RISK = Saves You Time & $$$ Especially on Renovation Projects PeterMcElwain,AIA ArtCampbell,AIA Facilities/Planning RickScott,LEEDAP,CPC JohnCook.CPC CM-at-Risk/Construction JenniferS.Henrikson,AIA,LEEDAP

More information

Horace Mann Elementary

Horace Mann Elementary 2001 Eleanor Avenue Project Summary: Horace Mann is a neighborhood school filled with students who are excited to be here taught by teachers who transform excitement into achievement. Expectations are

More information

Amos Alonzo Stagg Elementary School

Amos Alonzo Stagg Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name

DEVELOPMENT REVIEW COMMENTS LAND DISTURBANCE PERMIT (LDP) CLEARING CLEARING & GRUBBING GRADING. Date Reviewed by. Project Name GWINNETT COUNTY Department of Planning and Development One Justice Square 446 West Crogan Street Suite 150 1 st Floor Lawrenceville, GA 30046 Phone: 678.518.6000 Fax: 678.518.6240 www.gwinnettcounty.com

More information

CERTIFIED MAIL: September 1, 2016

CERTIFIED MAIL: September 1, 2016 CERTIFIED MAIL: 91 7199 9991 7035 3561 8350 September 1, 2016 Mandy Eubanks, Apartment Manager The Villas on Cantrell 8101 Cantrell Rd Little Rock, AR 72227 RE: The Villas on Cantrell Inspection AFIN:

More information

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin.

PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD Deputy Superintendent. Marybeth Spadafino Committee Member: Admin. MEETING DATE: March 22, 2010 PROJECT: Bert Lynn Middle School Modernization Site Committee Meeting #5 HMC PROJECT #: 3203-037-000 PRESENT: Dr. George Mannon TUSD Superintendent Dr. Donald Stabler TUSD

More information

LEAD-BASED PAINT SCREENING REPORT

LEAD-BASED PAINT SCREENING REPORT LEAD-BASED PAINT SCREENING REPORT FOR: Radnor Elementary School 7000 Radnor Road Bethesda, MD 20817 Prepared For: Ms. Teressa Lloyd Environmental Specialist Montgomery County Public Schools Division of

More information

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622

A.N. Pritzker School 2009 W Schiller St Chicago, IL 60622 A.. Pritzker School 2009 W Schiller St Chicago, IL 022 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document

More information

TEST REPORT. Rendered to: SOLATUBE INTERNATIONAL, INC. VISTA, CALIFORNIA

TEST REPORT. Rendered to: SOLATUBE INTERNATIONAL, INC. VISTA, CALIFORNIA TEST REPORT Report No.: E7778.01-301-16 Rendered to: SOLATUBE INTERNATIONAL, INC. VISTA, CALIFORNIA PRODUCT TYPE: Tubular Daylight Device Self Flashing SERIES/MODEL: 330DS/750DS SPECIFICATION: Occupational

More information

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636

William Rainey Harper High School 6520 S Wood St Chicago, IL 60636 0 S Wood St Chicago, IL 03 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK

Thomas A Edison Regional Gifted Center ES 4929 N Sawyer Ave Chicago, IL Co-locating on this campus are EDISON and ALBANY PARK Facility Assessment Report 4929 Sawyer Ave Chicago, IL 025 Co-locating on this campus are EDISO and ALBA PARK This report contains a summary of the results from the facility assessment completed on the

More information

1818 New York Ave. NE, Ste 231, Washington, DC Telephone: (301)

1818 New York Ave. NE, Ste 231, Washington, DC Telephone: (301) Soil and Land Use Technology, Inc. 1818 New York Ave. NE, Ste 231, Washington, DC 20002 Telephone: (301) 595-3783 www.salutinc.com January 3, 2018 Howard County Public School System Harriet Tubman Building

More information

Langston Hughes Elementary School

Langston Hughes Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

29 LARAMIE COUNTY COMMUNITY COLLEGE UNIVERSITY STUDENT CENTER PAPPAS & PAPPAS ARCHITECTS, P.C. + DLR Group. sketches + drawings

29 LARAMIE COUNTY COMMUNITY COLLEGE UNIVERSITY STUDENT CENTER PAPPAS & PAPPAS ARCHITECTS, P.C. + DLR Group. sketches + drawings 29 LARAMIE COUNTY COMMUNITY COLLEGE UNIVERSITY STUDENT CENTER PAPPAS & PAPPAS ARCHITECTS, P.C. + DLR Group DEPARTMENT LEGEND BUILDING SUPPORT CENTRALIZED ASSESSMENT CENTER CIRCULATION COUNSELING & CAMPUS

More information

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS

COMPONENT FLOW CHART & SEQUENCING DIAGRAMS Oak Park and River Forest High School Master Facilities Plan COMPONENT FLOW CHART & SEQUENCING DIAGRAMS The following is a narrative intended to accompany the component flow chart and sequencing diagrams

More information

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON

ADDENDUM NOTICE INTERIOR RENOVATIONS AT THE BATHURST CLARK RESOURCE LIBRARY, 900 CLARK AVENUE WEST, VAUGHAN, ON The City of Vaughan Procurement Services Department 2141 Major Mackenzie Drive Vaughan, ON L6A 1T1 Tel (905) 832-8555 ADDENDUM NOTICE ADDENDUM NO. 3 Total of (5) page BID NO. T18-003 DESCRIPTION: INTERIOR

More information

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617

Charles P Caldwell Academy of Math & Science ES 8546 S Cregier Ave Chicago, IL 60617 S Cregier Ave Chicago, IL 0 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Philip Rogers Elementary School

Philip Rogers Elementary School Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

RECAPP Facility Evaluation Report

RECAPP Facility Evaluation Report RECAPP Facility Evaluation Report Edmonton School District No. 7 Garneau Elementary School B3123A Edmonton Report run on: April 7, 211 4:59 PM Building Name: Address: Location: Building Id: Gross Area

More information

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607

STEM Magnet Academy. Definitions EXTERIOR W Fillmore St Chicago, IL 60607 Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

WWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST.

WWRC, Inc W. 7th Clovis, NM (575) Fax (575) SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST. WWRC, Inc. 1716 W. 7th Clovis, NM 88101 (575)769-2618 Fax (575)742-3209 November 10, 2008 SIERRA MIDDLE SCHOOL ADDITION & RENOVATIONS ROSWELL INDEPENDENT SCHOOL DIST. MEETING MINUTES DATE OF MEETING: Tuesday

More information

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620

Paul Cuffe Math-Science Technology Academy ES 8324 S Racine Ave Chicago, IL 60620 82 S Racine Ave Chicago, IL 020 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report

More information

RFQ Question and Answer List State of Ohio Standard Forms and Documents

RFQ Question and Answer List State of Ohio Standard Forms and Documents RFQ Question and Answer List State of Ohio Standard Forms and Documents Project Name University Hall Renovation Project Number BGU-565 Project Location Bowling Green State University Date posted: June

More information

Morton School of Excellence

Morton School of Excellence Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design

ELECTRICAL GENERAL DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL Electrical/Telecommunications Design PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST

Permits (Submitted to Permit Counter) APPLICATION CHECKLIST Permits (Submitted to Permit Counter) APPLICATION CHECKLIST SUBMITTAL REQUIREMENTS: 1. Completed signed and notarized Development Services Department Permit Application, submit to Permit Counter. 2. Copy

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

George Washington Elementary School 3611 E 114th St Chicago, IL 60617

George Washington Elementary School 3611 E 114th St Chicago, IL 60617 3 E th St Chicago, IL Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up

More information

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623

Charles G Hammond Elementary School 2819 W 21st Pl Chicago, IL 60623 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will roll-up each assessed item

More information

VAR Generator Operation for Maintaining Network Voltage Schedules

VAR Generator Operation for Maintaining Network Voltage Schedules Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS

PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS Development Services Department, 3363 West Park Place, Pensacola, Fl 32505 (850) 595-3475 PRELIMINARY PLAT / CONSTRUCTION PLAN APPLICATION SUBMITTAL PACKAGE REQUIREMENTS All Preliminary Plat / Construction

More information

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts.

SECTION 58 PRECAST CONCRETE BOX CULVERT. This work consists of furnishing and installing Pre-cast Concrete Box Culverts. SECTION 58 PRECAST CONCRETE BOX CULVERT 58.1 DESCRIPTION A. General This work consists of furnishing and installing Pre-cast Concrete Box Culverts. B. Related Work Section 51 Section 52 Section 53 Section

More information