Date of occurrence Location name Telciu-Cosbuc Local time 17:48 Latitude 47:24:17 North Railway vehicle movement events Train derailment

Size: px
Start display at page:

Download "Date of occurrence Location name Telciu-Cosbuc Local time 17:48 Latitude 47:24:17 North Railway vehicle movement events Train derailment"

Transcription

1 -5101 Occurrence Summary What Location Date of occurrence Location name Telciu-Cosbuc Local time 17:48 Latitude 47:24:17 North Event type Railway vehicle movement events Train derailment Longitude 24:23:16 East Description Direct Cause descrip two wagons loaded with logs from the freight train no derailed in open line between railway stations Telciu and Cosbuc Direct cause: The direct cause of this railway accident is the loss of the horizontal stability of the group rail-sleepers under the action of the dynamic forces sent by the rolling stock during the train running, it leading to the overclimbing of the active shoulder of the rail head, corresponding to the outside rail of the curve, by the flange of the wheel no.5 from the right side of the first axle from the second bogie, in the running direction, of the wagon no (the 31st one of the train), followed by the fall of the left wheel of the same axle between the rails. Contributing factors: - high values of the temperature registered in the rails, taking into account that : the derailment happened in an area with mixed cross section, it leading to the keeping of high temperatures registered in the air and in the rails; when the derailment happened, the temperature registered in rails was between 460C-480C (when the derailment happened it was of about 460C); - the non-welded track at the derailment site was not formed in accordance with the instructions, that is the joints were not on square because for the track construction at the derailment site one used rails of different lengths, and the number of joints from the outside rail of the curve was different from the number of joints from the inside rail of the curve (on the outside rail of the curve there were 6 joints and on the inside one there were 4 joints); - the sizes of the expansion joints, whose values in operation were under the values of the joints accepted in operation; - the shape of the broken stone track bed, that did not comply with the geometry of the broken stone track bed for the current line, route in curve, non-welded track fitted on wooden sleepers; - existence at the derailment site of some track sections with insufficient broken stone; Final Report Other Attachments Nam Desc Type Size Last Orga Repo Nam Desc Type Size Last Orga Repo 0 ERAIL-REP PUBLIC 1 Monday, March 11, 2019

2 -5101 What Title Train derailment, , Telciu-Cosbuc (Romania) Occurrence type Railway vehicle movement events Train derailment Occurrence Class Accident Date of occurrence Local time 17:48 Events Railway vehicle movement events - Train derailment Descriptions Language English Translation provider Information providers own translation Description two wagons loaded with logs from the freight train no derailed in open line between railway stations Telciu and Cosbuc Location name Telciu-Cosbuc Railway System type Railway Country Romania Location type Line Border Country Line type Single track Line number Allowed line speed Km number Latitude 47:24:17 North Longitude 24:23:16 East Location description open line between telciu and cosbuc railway station Additional location in in the north of Roamanian railway network, on the Cluj railway county Location type details Plain track Fixed installations Occurrence details Railway vehicles Movement type Freight train Train number RU Romania Wagons overturned No National Company for Freight Railway Transport "CFR-Marfa" S.A. Train speed at mom Passengers onboard No Vehicle description Eacs type wagons Other objects involved in the occurrence Other objects ERAIL-REP PUBLIC 2 Monday, March 11, 2019

3 -5101 Parties involved IM Involved Romania - National Railway Company "CFR" S.A. RU Romania - National Company for Freight Railway Transport "CFR-Marfa" S.A. Passengers Staff Level crossing users Unauthorised persons Others Total Material consequences Material Damage Damage description Fatalities Serious injuries Minor injuries Infrastructure Estimated total mate < Rolling stock one oghie from a wagon derailed and one wheelset from s wagon derailed Images Name Description Type Size Last modified Organization Repository 0 Causation Causes Language English Translation provider Information providers own translation Direct Cause description ERAIL-REP PUBLIC 3 Monday, March 11, 2019

4 -5101 Direct cause: The direct cause of this railway accident is the loss of the horizontal stability of the group rail-sleepers under the action of the dynamic forces sent by the rolling stock during the train running, it leading to the overclimbing of the active shoulder of the rail head, corresponding to the outside rail of the curve, by the flange of the wheel no.5 from the right side of the first axle from the second bogie, in the running direction, of the wagon no (the 31st one of the train), followed by the fall of the left wheel of the same axle between the rails. Contributing factors: - high values of the temperature registered in the rails, taking into account that : the derailment happened in an area with mixed cross section, it leading to the keeping of high temperatures registered in the air and in the rails; when the derailment happened, the temperature registered in rails was between 460C-480C (when the derailment happened it was of about 460C); - the non-welded track at the derailment site was not formed in accordance with the instructions, that is the joints were not on square because for the track construction at the derailment site one used rails of different lengths, and the number of joints from the outside rail of the curve was different from the number of joints from the inside rail of the curve (on the outside rail of the curve there were 6 joints and on the inside one there were 4 joints); - the sizes of the expansion joints, whose values in operation were under the values of the joints accepted in operation; - the shape of the broken stone track bed, that did not comply with the geometry of the broken stone track bed for the current line, route in curve, non-welded track fitted on wooden sleepers; - existence at the derailment site of some track sections with insufficient broken stone; Underlying and root causes description Underlying causes: - infringement of the provisions of art.10, point B.2 from Instruction of norms and tolerances for the track construction and maintenance - no.314/1989, concerning the expansion joints, that have to be from size point of view as uniform as possible; - infringement of the provisions from the point 4 from Chapter 4 Norms of manpower and material consumption, of Instruction for the line maintenance - no.300/1982 concerning the ensuring of the norm of manpower for the current manual maintenance. - infringement of the provisions of art.14.2 from Instruction of norms and tolerances for the track construction and maintenance - no.314/1989 concerning the shape of the broken stone track bed and its sizes. Root causes: - non-application of the provisions from the Instruction for the track maintenance no.300/1982, document associated to the operational procedure code PO SMS Compliance with the technical specifications, standards and requirements relevant for the whole lifetime of the lines in the maintenance process, part of the safety management system of CNCF CFR SA, concerning the sizing of the staff from the sub-units for the line maintenance, in relation to the work quantity; - non-identification of the dangers generated by the insufficient supply with some materials necessary in the maintenance process, in order to make track panel from normal wooden sleepers and rails. Language Romanian Translation provider Original version Direct Cause description ERAIL-REP PUBLIC 4 Monday, March 11, 2019

5 -5101 Cauza directa: Cauza directa a producerii acestui accident feroviar o constituie pierderea stabilita?ii în plan orizontal al cadrului?ine traverse sub ac?iunea for?elor dinamice transmise de materialul rulant în timpul circula?iei trenului, fapt ce a condus la escaladarea flancului activ al ciupercii?inei, corespunzatoare firului exterior al curbei, de catre buza ro?ii nr.5 de pe partea dreapta a primei osii a celui de-al doilea boghiu, în sensul de mers, al vagonului nr (al 31-lea din compunerea trenului), urmata de caderea ro?ii din partea stânga a aceleia?i osii între firele caii. Factori care au contribuit: - valorile mari ale temperaturii înregistrate în?ine,?inând cont de faptul ca: deraierea s-a produs într-o zona în care profilul transversal al caii este mixt, fapt care are ca efect men?inerea temperaturilor ridicate înregistrate în aer?i în?ine; la data producerii deraierii temperatura înregistrata în?ine a fost cuprinsa între 460C-480C (la ora producerii deraierii aceasta era de aproximativ 460C); - alcatuirea neinstruc?ionala a caii cu joante în zona producerii deraierii în sensul ca joantele nu erau la echer datorita faptului ca pentru construc?ia caii în zona producerii deraierii au fost folosite?ine de lungimi diferite, iar numarul joantelor de pe firul exterior al curbei era diferit de numarul joantelor de pe firul interior al curbei (pe firul exterior al curbei erau 6 joante, iar pe firul interior al curbei erau 4 joante); - dimensiunile rosturilor de dilata?ie, ale caror valori în exploatare erau mai mici decât valorile rosturilor admise în exploatare; - forma prismei de piatra sparta, care nu respecta geometria prismei de piatra sparta pentru linie curenta, traseu în curba, cale cu joante montata pe traverse de lemn; - existen?a în zona producerii deraierii a unor por?iuni de linie cu piatra sparta insuficienta; Underlying and root causes description Cauze subiacente: - nerespectarea prevederilor art.10, pct.b.2 din Instruc?ia de norme?i toleran?e pentru construc?ia?i între?inerea caii - nr.314/1989, referitoare la rosturile de dilata?ie, rosturi care trebuie sa fie cât mai uniforme ca marime; - nerespectarea prevederilor pct.4 din Cap. 4 Norme de manopera?i de consum de materiale, al Instruc?iei de între?inere a liniilor ferate - nr.300/1982 referitoare la asigurarea normei de manopera la între?inerea curenta în execu?ie manuala. - nerespectarea prevederilor art.14.2 din Instruc?ia de norme?i toleran?e pentru construc?ia?i între?inerea caii - nr.314/1989 referitoare la forma prismei de piatra sparta?i dimensiunile acesteia. Cauze primare: - neaplicarea prevederilor Instruc?iei de între?inere a caii nr.300/1982, document asociat al procedurii opera?ionale cod PO SMS Respectarea specifica?iilor tehnice, standardelor?i cerin?elor relevante pe întreg ciclul de via?a a liniilor în procesul de între?inere, parte a sistemului de management al siguran?ei al CNCF CFR SA, referitoare la dimensionarea personalului subunita?ilor de între?inere linii, în raport cu volumul de lucrari; - neidentificarea pericolelor generate de aprovizionarea insuficienta cu unele materiale necesare în procesul de mentenan?a pentru realizarea de panouri din traverse normale de lemn?i?ine Causation classification Railway vehicle movement events - Train derailment 1 - Plain line track ERAIL-REP PUBLIC 5 Monday, March 11, 2019

6 Maintenance of infrastructure 1 - Risk assessment ERAIL-REP PUBLIC 6 Monday, March 11, 2019

7 -5101 Recommendations Causation links Railway vehicle movement events - Train derailment Subsystem - Infrastructure - Plain line track Causal factors - Maintenance - Maintenance of infrastructure Systemic factors - Risk assessment Investigation details Legal Basis Other reason descrip National rules imposed by implementing of the Safety Directive 2004/49/EC - in light of Article 19, 2 of SD - (a) the seriousness of the accident or incident National investigatio 207 Occurrence creation :07:12 Investigator in charge Decision to investigate Declaration date Date of IM/RU notific Report Type Final report Workflow Status Validated Report Version 2 Investigation Status Closed Other Attachments Name Descriptio Type Size Last Organizati Repositor 0 Final Report Name Descriptio Type Size Last Organizati Repositor Microsoft PDF File /26/2017 Word - RI 9:24:42 Telciu AM Cosbuc CR transmis.p df ERAIL-REP PUBLIC 7 Monday, March 11, 2019

European Infrastructure Compatibility Standards. Maya Petkova 7 March 2014

European Infrastructure Compatibility Standards. Maya Petkova 7 March 2014 European Infrastructure Compatibility Standards Maya Petkova 7 March 2014 Technical Specifications for Interoperability Subsystem 1. Infrastructure 2. Energy 3. Control-Command and Signalling (onboard

More information

GUIDELINES FOR THE APPROVAL OF HIGH SPEED LINES

GUIDELINES FOR THE APPROVAL OF HIGH SPEED LINES GUIDELINES FOR THE APPROVAL OF HIGH SPEED LINES by ir Hugo Goossens ir H. Goossens San Sebastian 2004, June 10th Purpose of these guidelines Assisting in the understanding and application of the general

More information

Automating Track Inspection through the use of Automatic Machine Vision Systems

Automating Track Inspection through the use of Automatic Machine Vision Systems Presented by: Russell E. Taylor President & CEO MERMEC, Inc. September 1, 2010 Automating Track Inspection through the use of Automatic Machine Vision Systems SBB Lotschberg Case Study The Lötschberg Base

More information

Table of contents Physical environmental conditions... 12

Table of contents Physical environmental conditions... 12 EN EN EN ANNEX to Recommendation N. ERA-REC-123-2015/REC on amending and recasting Commission Decision 2012/88/EU on the Technical Specification for Interoperability relating to the Control-Command and

More information

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS EUROPEAN RAILWAY AGENCY ERTMS Unit ERTMS/ETCS UNIT Reference: ERA/ERTMS/033281 Document type: Version : 2.0 T Date : 12/05/2014 Edited by Quality review Approved by Name Angelo Chiappini Pio Guido Position

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

Railway Interoperability and Safety Committee. Working document

Railway Interoperability and Safety Committee. Working document 08/57-DV75 RISC 70 Version EN02 Annex Origin EN 30.06.2014 Status: A Railway Interoperability and Safety Committee Working document Draft Annex to the Commission Implementing Decision on the common specifications

More information

Subiecte Clasa a VI-a

Subiecte Clasa a VI-a (40 de intrebari) Puteti folosi spatiile goale ca ciorna. Nu este de ajuns sa alegeti raspunsul corect pe brosura de subiecte, ele trebuie completate pe foaia de raspuns in dreptul numarului intrebarii

More information

Titlul lucrării propuse pentru participarea la concursul pe tema securității informatice

Titlul lucrării propuse pentru participarea la concursul pe tema securității informatice Titlul lucrării propuse pentru participarea la concursul pe tema securității informatice "Îmbunătăţirea proceselor şi activităţilor educaţionale în cadrul programelor de licenţă şi masterat în domeniul

More information

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS EUROPEAN RAILWAY AGENCY.

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS EUROPEAN RAILWAY AGENCY. EUROPEAN RAILWAY AGENCY ERTMS Unit ERTMS/ETCS UNIT Reference: ERA/ERTMS/033281 Document type: Version : 1.2 5 T Date : 15/11/201214/03/2013 Edited by Quality review Approved by Name Position Date & Signature

More information

S.C. Apă Canal S.A. Sibiu Regional Operator for Sibiu County- South Area and Făgăraș Municipality

S.C. Apă Canal S.A. Sibiu Regional Operator for Sibiu County- South Area and Făgăraș Municipality S.C. Apă Canal S.A. Sibiu Regional Operator for Sibiu County- South Area and Făgăraș Municipality Vasile Maier Technical Manager S.C. Apă-Canal S.A. Sibiu The history of S.C. Apă Canal S.A. Sibiu goes

More information

INFORMAȚII DESPRE PRODUS. FLEXIMARK Stainless steel FCC. Informații Included in FLEXIMARK sample bag (article no. M )

INFORMAȚII DESPRE PRODUS. FLEXIMARK Stainless steel FCC. Informații Included in FLEXIMARK sample bag (article no. M ) FLEXIMARK FCC din oțel inoxidabil este un sistem de marcare personalizată în relief pentru cabluri și componente, pentru medii dure, fiind rezistent la acizi și la coroziune. Informații Included in FLEXIMARK

More information

SOME PARTICULARITIES OF STANDARD GROOVED RAIL TURNOUT USED ON ROMANIAN TRAMWAY NETWORKS

SOME PARTICULARITIES OF STANDARD GROOVED RAIL TURNOUT USED ON ROMANIAN TRAMWAY NETWORKS Bulletin of the Transilvania University of Braşov CIBv 2014 Vol. 7 (56) Special Issue No. 1-2014 SOME PARTICULARITIES OF STANDARD GROOVED RAIL TURNOUT USED ON ROMANIAN TRAMWAY NETWORKS S. ZVENIGORODSCHI

More information

DIN EN 15302: (E)

DIN EN 15302: (E) DIN EN 15302:2011-01 (E) Railway applications - Method for determining the equivalent conicity (includes Amendment A1:2010) Contents Page Foreword...9 Introduction... 10 1 Scope... 13 2 Normative references...

More information

the text Article 5(5) of Directive 2008/57/EC is replaced by the text Article 4(5) of

the text Article 5(5) of Directive 2008/57/EC is replaced by the text Article 4(5) of Chapter Chapter EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 O11REC1O28 Annex 1: Amendments to the technical specification for interoperability relating to the control-command and signalling subsystems of

More information

(Text with EEA relevance)

(Text with EEA relevance) L 149/16 14.6.2018 COMMISSION IMPLEMTING REGULATION (EU) 2018/868 of 13 June 2018 amending Regulation (EU) No 1301/2014 and Regulation (EU) No 1302/2014 as regards provisions on energy measuring system

More information

Broken wheelsets on freight wagons

Broken wheelsets on freight wagons Broken wheelsets on freight wagons Outline of the state of play (EBA, DB AG, DB Schenker Rail, VPI, VAP, VDV, Netzwerk Pb.) Extraordinary NSA meeting, 29 July 2009 Chart 1 Contents 1. Findings dating from

More information

DESIGN OF THE ASPHALT LAYER ON HIGH SPEED LINES

DESIGN OF THE ASPHALT LAYER ON HIGH SPEED LINES DESIGN OF THE ASPHALT LAYER ON HIGH SPEED LINES SNCF/PSIGT Lines, Track, Environment Department Coordination, Innovation and research Division Division Head 6 avenue François Mitterrand 93574 La Plaine

More information

IVM INNOVATIVE VIBRATION MONITORING DIAGNOSTIC SYSTEMS FOR RAILWAY AND TRAIN MAINTENANCE. PO W E RVE Portable s cale for trai n s

IVM INNOVATIVE VIBRATION MONITORING DIAGNOSTIC SYSTEMS FOR RAILWAY AND TRAIN MAINTENANCE. PO W E RVE Portable s cale for trai n s IVM INNOVATIVE VIBRATION MONITORING DIAGNOSTIC SYSTEMS FOR RAILWAY AND TRAIN MAINTENANCE Wh e e l / R a il I n te ra c tio n 1 W E IGHT D IS TRIBU TIO N WHE E L C OND ITION RAIL S MO NITO RING PO W E RVE

More information

Implementation of rail roughness control: how to deal with a non-ideal world

Implementation of rail roughness control: how to deal with a non-ideal world Implementation of rail roughness control: how to deal with a non-ideal world Ard KUIJPERS 1 ; Wout SCHWANEN 1 ; Chiel ROOVERS 2 1 M+P - Consulting Engineers, Netherlands 2 ProRail, Netherlands ABSTRACT

More information

EN teava vopsita cu capete canelate tip VICTAULIC

EN teava vopsita cu capete canelate tip VICTAULIC ArcelorMittal Tubular Products Iasi SA EN 10217-1 teava vopsita cu capete canelate tip VICTAULIC Page 1 ( 4 ) 1. Scop Documentul specifica cerintele tehnice de livrare pentru tevi EN 10217-1 cu capete

More information

TEST METHOD 221. School Bus Body Joint Strength. (Ce document est aussi disponible en français) Revised: Issued: October 20, 2000R December 15, 1977

TEST METHOD 221. School Bus Body Joint Strength. (Ce document est aussi disponible en français) Revised: Issued: October 20, 2000R December 15, 1977 TEST METHOD 221 School Bus Body Joint Strength Revised: Issued: October 20, 2000R December 15, 1977 (Ce document est aussi disponible en français) Table of Content 1 Introduction... 1 2 Definition... 1

More information

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS

ERTMS/ETCS UNIT INTERFACES BETWEEN CONTROL-COMMAND AND SIGNALLING TRACKSIDE AND OTHER SUBSYSTEMS EUROPEAN RAILWAY AGENCY ERTMS Unit ERTMS/ETCS UNIT Reference: ERA/ERTMS/033281 Document type: Version : 4.0 T Date : 20/09/2018 Edited by Quality review Approved by Name Martin Schroeder Benoit Debuschere

More information

Safety Research Laboratory, Research and Development Center of JR East Group

Safety Research Laboratory, Research and Development Center of JR East Group History of the Safety Research Laboratory Over the Past 25 Years Hiroshi Fukuyama Safety Research Laboratory, Research and Development Center of JR East Group The Safety Research Laboratory was established

More information

Operating Manuel. High Speed Screw Jack G1-G3. Model N/V/R. NEFF-High Speed Screw Jacks G1-G3. Version N/V/R

Operating Manuel. High Speed Screw Jack G1-G3. Model N/V/R. NEFF-High Speed Screw Jacks G1-G3. Version N/V/R Operating Manuel High Speed Screw Jack G1-G3 NEFF-High Speed Screw Jacks G1-G3 Model N/V/R Version N/V/R Contents 1 Important Information... 2 1.1 Instructions on Documentation... 2 1.2 Safekeeping of

More information

Metrici LPR interfatare cu Barix Barionet 50 -

Metrici LPR interfatare cu Barix Barionet 50 - Metrici LPR interfatare cu Barix Barionet 50 - Barionet 50 este un lan controller produs de Barix, care poate fi folosit in combinatie cu Metrici LPR, pentru a deschide bariera atunci cand un numar de

More information

GSM R Notes on certification

GSM R Notes on certification GSM R Notes on certification Workshop Warsaw, 30th of July 2013 ERA ERTMS Unit Content GSM R in CCS TSI Notes on certification & authorisation Radio communication part of Trackside Subsystem Radio communication

More information

RESOLUTION MSC.278(85) (adopted on 1 December 2008) ADOPTION OF THE NEW MANDATORY SHIP REPORTING SYSTEM "OFF THE COAST OF PORTUGAL - COPREP"

RESOLUTION MSC.278(85) (adopted on 1 December 2008) ADOPTION OF THE NEW MANDATORY SHIP REPORTING SYSTEM OFF THE COAST OF PORTUGAL - COPREP MSC 85/26/Add.1 RESOLUTION MSC.278(85) SYSTEM OFF THE COAST OF PORTUGAL COPREP THE MARITIME SAFETY COMMITTEE, RECALLING Article 28 of the Convention on the International Maritime Organization concerning

More information

Virtual Testing at Knorr-Bremse

Virtual Testing at Knorr-Bremse Virtual Testing at Knorr-Bremse Dr. Frank Günther Martin Kotouc 15. Deutsches LS-Dyna Forum October 16, 2018 Right here, 14 yrs, 2 days, 1 hr ago Virtual Testing at Knorr-Bremse Agenda Boundary conditions

More information

AVIZ. Bucureşti, 6 mai Avizez favorabil Director Dr. ing. Vasile BELIBOU

AVIZ. Bucureşti, 6 mai Avizez favorabil Director Dr. ing. Vasile BELIBOU AVIZ În cazul accidentului produs la data de 22.05.2015 la ora 03:40, pe raza de activitate a Sucursalei Regionale de Căi Ferate Craiova, în stația CFR Caracal, prin deraierea vagonului nr. 33877917047-5

More information

ISRAEL RAILWAYS LTD. INFRASTRUCTURE DIVISION TRACK AND RIGHT OF WAY DEPARTMENT. for

ISRAEL RAILWAYS LTD. INFRASTRUCTURE DIVISION TRACK AND RIGHT OF WAY DEPARTMENT. for . INFRASTRUCTURE DIVISION TRACK AND RIGHT OF WAY DEPARTMENT Technical Specification for ELECTRIC AND SOLAR TRACKSIDE RAILS LUBRICATOR for Various Types of Rails No. E-01-0032.1 February 2017 1 AMENDMENTS:

More information

LAnd Rover defender TDI & TD5 Gullwing WINDOW Box. You will need to have installed a Gullwing Door before installing the Window Box.

LAnd Rover defender TDI & TD5 Gullwing WINDOW Box. You will need to have installed a Gullwing Door before installing the Window Box. LAnd Rover defender TDI & TD5 Gullwing WINDOW Box GWLD008 INSTALL TIME: 2 Hours You will need to have installed a Gullwing Door before installing the Window Box. IMPORTANT WARNING! IT IS CRITICAL THAT

More information

THE MEASUREMENT OF MAGNETIC FIELD IN TWO POWER DISTRIBUTION SUBSTATIONS

THE MEASUREMENT OF MAGNETIC FIELD IN TWO POWER DISTRIBUTION SUBSTATIONS BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI Publicat de Universitatea Tehnică Gheorghe Asachi din Iaşi Volumul 62 (66), Numărul 4, 2016 Secţia ELECTROTEHNICĂ. ENERGETICĂ. ELECTRONICĂ THE MEASUREMENT OF

More information

Automated System Design for Metro Train Using Wireless Sensor Network

Automated System Design for Metro Train Using Wireless Sensor Network Automated System Design for Metro Train Using Wireless Sensor Network A.Sundar Raj 1, M. Neinar Shareef 2, J. Mohammed Ali 3, C. Muthukrishnan 4 Assistant Professor, Dept. of ECE, E.G.S. Pillay Engineering

More information

Interoperability. Register of Infrastructure. Principles. Date: September Version 3.9. Technical Network Access, DB Netz AG

Interoperability. Register of Infrastructure. Principles. Date: September Version 3.9. Technical Network Access, DB Netz AG Interoperability Register of Infrastructure Principles Date: September 2013 Version 3.9 Technical Network Access, DB Netz AG INDEX 1 General Information 1 1.1 Introduction 1 1.2 Objectives 1 1.3 Scope

More information

Electromagnetic Compatibility of Train Detection Infrastructure with Rail Vehicles

Electromagnetic Compatibility of Train Detection Infrastructure with Rail Vehicles Electromagnetic Compatibility of Train Detection Infrastructure with Rail Synopsis This document is a standard on immunity levels of infrastructure-based train detection systems, to provide electromagnetic

More information

Pow-R-Feed Systems Service Manual

Pow-R-Feed Systems Service Manual Pow-R-Feed Systems Service Manual Important Safety Instructions Please read this manual carefully and follow its instructions. Improper use or failure to follow these instructions could result in serious

More information

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section

RS/2/C/003MR Published August RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section RATING STANDARD for the certification of Rigid Metallic Ductwork Systems with Rectangular Cross-section Editing (date): Marie-Clémence DEGALLAIX (30/05/2016) Checking (date): Jean FOURCROY (02/06/2016)

More information

Auditul financiar la IMM-uri: de la limitare la oportunitate

Auditul financiar la IMM-uri: de la limitare la oportunitate Auditul financiar la IMM-uri: de la limitare la oportunitate 3 noiembrie 2017 Clemente Kiss KPMG in Romania Agenda Ce este un audit la un IMM? Comparatie: audit/revizuire/compilare Diferente: audit/revizuire/compilare

More information

The role of investigation - before and after the accident

The role of investigation - before and after the accident The role of investigation - before and after the accident IOSH Railway Group Conference 27 November 2014 1 Simon French, Deputy Chief Inspector Potters Bar, May 2002 Cause: points failure Outcome: derailment

More information

CAIETUL DE SARCINI Organizare evenimente. VS/2014/0442 Euro network supporting innovation for green jobs GREENET

CAIETUL DE SARCINI Organizare evenimente. VS/2014/0442 Euro network supporting innovation for green jobs GREENET CAIETUL DE SARCINI Organizare evenimente VS/2014/0442 Euro network supporting innovation for green jobs GREENET Str. Dem. I. Dobrescu, nr. 2-4, Sector 1, CAIET DE SARCINI Obiectul licitaţiei: Kick off,

More information

Characterization of Train-Track Interactions based on Axle Box Acceleration Measurements for Normal Track and Turnout Passages

Characterization of Train-Track Interactions based on Axle Box Acceleration Measurements for Normal Track and Turnout Passages Porto, Portugal, 30 June - 2 July 2014 A. Cunha, E. Caetano, P. Ribeiro, G. Müller (eds.) ISSN: 2311-9020; ISBN: 978-972-752-165-4 Characterization of Train-Track Interactions based on Axle Box Acceleration

More information

Evoluția pieței de capital din România. 09 iunie 2018

Evoluția pieței de capital din România. 09 iunie 2018 Evoluția pieței de capital din România 09 iunie 2018 Realizări recente Realizări recente IPO-uri realizate în 2017 și 2018 IPO în valoare de EUR 312.2 mn IPO pe Piața Principală, derulat în perioada 24

More information

CERERI SELECT PE O TABELA

CERERI SELECT PE O TABELA SQL - 1 CERERI SELECT PE O TABELA 1 STUD MATR NUME AN GRUPA DATAN LOC TUTOR PUNCTAJ CODS ---- ------- -- ------ --------- ---------- ----- ------- ---- 1456 GEORGE 4 1141A 12-MAR-82 BUCURESTI 2890 11 1325

More information

Track laying. Education Program Basic Skills Series Module Five

Track laying. Education Program Basic Skills Series Module Five Education Program Basic Skills Series Module Five Track laying The following pages introduce the essential elements of track laying Tools Fundamentals of track laying Sectional track Flexible track Point

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard NSW Category Signalling Title Reference Number SDS 17 (RIC Standard: SC 00 13 01 17 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048

GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048 GN This document contains one or more pages which contain colour. Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2013 Rail Safety and Standards Board Limited GE/GN8648 Issue

More information

Concepts and effectiveness of Derailment Detection Devices

Concepts and effectiveness of Derailment Detection Devices Concepts and effectiveness of Derailment Detection Devices ITALIAN NATIONAL INVESTIGATION BODY (NIB-IT) Copenhagen, november 21 th 2013 Derailment Detection Devices DDD allow to detect anomalous position

More information

AN ALGORITHM FOR THE ADAPTIVE CONTROL OF ANTI HAIL MISSILE LAUNCH RAMPS

AN ALGORITHM FOR THE ADAPTIVE CONTROL OF ANTI HAIL MISSILE LAUNCH RAMPS BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI Publicat de Universitatea Tehnică Gheorghe Asachi din Iaşi Volumul 64 (68), Numărul 2, 2018 Secţia ELECTROTEHNICĂ. ENERGETICĂ. ELECTRONICĂ AN ALGORITHM FOR THE

More information

Mods euro truck simulator 2 harta romaniei by elyxir. Mods euro truck simulator 2 harta romaniei by elyxir.zip

Mods euro truck simulator 2 harta romaniei by elyxir. Mods euro truck simulator 2 harta romaniei by elyxir.zip Mods euro truck simulator 2 harta romaniei by elyxir Mods euro truck simulator 2 harta romaniei by elyxir.zip 26/07/2015 Download mods euro truck simulator 2 harta Harta Romaniei pentru Euro Truck Simulator

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

A Practical Continuous Operating Rail Break Detection System Using Guided Waves

A Practical Continuous Operating Rail Break Detection System Using Guided Waves 18th World Conference on Non-destructive Testing, 16-20 April 2012, Durban, South Africa A Practical Continuous Operating Rail Break Detection System Using Guided Waves Francois A. Burger Institute for

More information

Automatic Block Signaling Installation Failure Diagnosis with LCOBla

Automatic Block Signaling Installation Failure Diagnosis with LCOBla Automatic Block Signaling Installation Failure Diagnosis with LCOBla Elisabeta SPUNEI, Ion PIROI, Cristian MUSCAI Department of Electrical Engineering and Informatics Eftimie Murgu University of Reşiţa,

More information

Aspecte controversate în Procedura Insolvenţei şi posibile soluţii

Aspecte controversate în Procedura Insolvenţei şi posibile soluţii www.pwc.com/ro Aspecte controversate în Procedura Insolvenţei şi posibile soluţii 1 Perioada de observaţie - Vânzarea de stocuri aduse în garanţie, în cursul normal al activității - Tratamentul leasingului

More information

PROCEDURA PRIVIND DECONTURILE. 2. Domeniu de aplicare Procedura se aplică în cadrul Universităţii Tehnice Cluj-Napoca

PROCEDURA PRIVIND DECONTURILE. 2. Domeniu de aplicare Procedura se aplică în cadrul Universităţii Tehnice Cluj-Napoca PROCEDURA PRIVIND DECONTURILE 1. Scpul: Descrie structura si mdul de elabrare si prezentare a prcedurii privind dcumentele care trebuie intcmite si cursul acestra, atunci cind persana efectueaza un decnt.

More information

SIMEAS-T. Operating Instructions Transducer without auxiliary power. 7KG6111 and 7KG6101. Operating Instructions

SIMEAS-T. Operating Instructions Transducer without auxiliary power. 7KG6111 and 7KG6101. Operating Instructions Operating Instructions SIMEAS-T s Operating Instructions Transducer without auxiliary power for alternating current for alternating voltage for alternating voltage with expanded end range 7KG6111 and 7KG6101

More information

The IRIS 320 High speed Measurement Train set

The IRIS 320 High speed Measurement Train set Fast track to Sustainable Mobility 6E - Innovations and interface between Rolling stock and Infrastructure The IRIS 320 High speed Measurement Train set 1 IRIS 320 is a measurement train set dedicated

More information

SWITCH STAND Switch Stand Assembly Connecting Rod Target Assembly (when required) TURNOUT ACCESSORIES Standard Tie Plates Rail Anchors Joints

SWITCH STAND Switch Stand Assembly Connecting Rod Target Assembly (when required) TURNOUT ACCESSORIES Standard Tie Plates Rail Anchors Joints Turnouts A turnout is an arrangement of a switch, a frog and closure rails, which diverts rolling stock from one track to another. Because industrial trackwork often handles lighter loads at slower speeds

More information

Layout Planning. Education Program Basic Skills Series Module Three

Layout Planning. Education Program Basic Skills Series Module Three Education Program Basic Skills Series Module Three Layout Planning The following pages introduce the essential elements of planning for your model railway What do I want to model? Practical considerations

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

Analysis and Examination in wayside equipment failures of High speed line Train control system

Analysis and Examination in wayside equipment failures of High speed line Train control system Analysis and Examination in wayside equipment failures of High speed line Train control system Yong-Kyu KIM 1, Jong-Hyun BAEK 1, Yong-Ki YOON 1, and Ducko SHIN 1 1 Train Control Research Team, Signaling

More information

Patent-map Analysis of Gauge-changeable Systems. Korea Railroad Research Institute (KRRI), Uiwang-City, Korea 1,2

Patent-map Analysis of Gauge-changeable Systems. Korea Railroad Research Institute (KRRI), Uiwang-City, Korea 1,2 Patent-map Analysis of Gauge-changeable Systems 1 Seung-Ho Jang, 2 Hee-Seung Na Korea Railroad Research Institute (KRRI), Uiwang-City, Korea 1,2 Abstract Gauge-changeable systems can be used for the fast

More information

Glass Systems. Technical Information on Pilkington Profilit Profiled Glass with System. - English Edition - Pilkington Profilit

Glass Systems. Technical Information on Pilkington Profilit Profiled Glass with System. - English Edition - Pilkington Profilit Glass Systems Technical Information on Profiled Glass with System - English Edition - The - Delivery Programme Glass thickness 6 mm, flange height mm 6 7 0 K 3 8 K//7 3 6 7 6 6 6 6 6 6 50 39 486 K5 6 K3

More information

Ghid identificare versiune AWP, instalare AWP şi verificare importare certificat în Store-ul de Windows

Ghid identificare versiune AWP, instalare AWP şi verificare importare certificat în Store-ul de Windows Ghid identificare versiune AWP, instalare AWP 4.5.4 şi verificare importare certificat în Store-ul de Windows Data: 28.11.14 Versiune: V1.1 Nume fişiser: Ghid identificare versiune AWP, instalare AWP 4-5-4

More information

Abstract. Vibroacustic Problems in High SpeedmTrains. Felix Sorribe Palmer, Gustavo Alonso Rodrigo, Angel Pedro Snaz Andres

Abstract. Vibroacustic Problems in High SpeedmTrains. Felix Sorribe Palmer, Gustavo Alonso Rodrigo, Angel Pedro Snaz Andres Vibroacustic Problems in High SpeedmTrains Felix Sorribe Palmer, Gustavo Alonso Rodrigo, Angel Pedro Snaz Andres Abstract Passengers comfort in terms of acoustic noise levels is a key train design parameter,

More information

Double Bar Plate Dowels for Saw-Cut Contraction Joints

Double Bar Plate Dowels for Saw-Cut Contraction Joints Double Bar Plate Dowels for Saw-Cut Contraction Joints Designed to Deliver More Serviceable Slabs Concrete slabs-on-ground must be able to withstand the repetitious, concentrated loads and abrasion of

More information

Measurement of Signalling Distances

Measurement of Signalling Distances Division / Business Unit: Function: Document Type: Enterprise Services Signalling Standard Measurement of Signalling Distances Applicability ARTC Network Wide SMS Publication Requirement Internal / External

More information

A Die-Linked Sequence of Dacian Denarii

A Die-Linked Sequence of Dacian Denarii PHILLIP DAVIS A Die-Linked Sequence of Dacian Denarii Sometime prior to mid-january 2002, probably but not certainly in 2001, a large coin hoard was found in Romania. This consisted of approximately 5000

More information

ANTICOLLISION ALGORITHM FOR V2V AUTONOMUOS AGRICULTURAL MACHINES ALGORITM ANTICOLIZIUNE PENTRU MASINI AGRICOLE AUTONOME TIP V2V (VEHICLE-TO-VEHICLE)

ANTICOLLISION ALGORITHM FOR V2V AUTONOMUOS AGRICULTURAL MACHINES ALGORITM ANTICOLIZIUNE PENTRU MASINI AGRICOLE AUTONOME TIP V2V (VEHICLE-TO-VEHICLE) ANTICOLLISION ALGORITHM FOR VV AUTONOMUOS AGRICULTURAL MACHINES ALGORITM ANTICOLIZIUNE PENTRU MASINI AGRICOLE AUTONOME TIP VV (VEHICLE-TO-VEHICLE) 457 Florin MARIAŞIU*, T. EAC* *The Technical University

More information

INTERNATIONAL. Medical device software Software life cycle processes

INTERNATIONAL. Medical device software Software life cycle processes INTERNATIONAL STANDARD IEC 62304 First edition 2006-05 Medical device software Software life cycle processes This English-language version is derived from the original bilingual publication by leaving

More information

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing of fusionwelded

ISO INTERNATIONAL STANDARD. Non-destructive testing of welds Radiographic testing of fusionwelded INTERNATIONAL STANDARD ISO 17636 First edition 2003-09-15 Non-destructive testing of welds Radiographic testing of fusionwelded joints Contrôle non destructif des assemblages soudés Contrôle par radiographie

More information

SERIES 300 SINGLE HUNG WINDOW INSTALLATION

SERIES 300 SINGLE HUNG WINDOW INSTALLATION IMPORTANT INFORMATION: WHETHER IT BE LOCATION OR INSTALLATION TYPE, NOT ALL WINDOW TYPES CAN BE INSTALLED IN ALL AREAS OR WALL CONDITIONS. CONSULT YOUR LOCAL BUILDING CODE DEPARTMENT FOR ANY REGULATIONS

More information

Uncontrolled When Printed

Uncontrolled When Printed Briefing Note Document Title: GSM-R Train Radio Systems Document No: Issue: Issue 1 Issue 1 Subject Committee(s): The primary Subject Committees are Operations and Train Control & Communications. The Standards

More information

PROBAD. Code-based Strength calculations of Pressure parts. PROBAD Release January 2018 New Features and Improvements

PROBAD. Code-based Strength calculations of Pressure parts. PROBAD Release January 2018 New Features and Improvements PROBAD Code-based Strength calculations of Pressure parts PROBAD Release January 2018 New Features and Improvements The program system PROBAD is checked and modified continuously within the scope of the

More information

Rail Grinding Best Practice For Committee 4, Sub-Committee 9.

Rail Grinding Best Practice For Committee 4, Sub-Committee 9. DRAFT 04:3001103 Rail Grinding Best Practice For Committee 4, Sub-Committee 9. By Peter Sroba Principal Engineer National Research Council of Canada Submitted November 30 th, 2003 1 Index 1.0 Reason for

More information

Signalling Layout and Signal Aspect Sequence Requirements

Signalling Layout and Signal Aspect Sequence Requirements Signalling Layout and Signal Aspect Sequence Requirements Synopsis This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.

More information

From beyond gold to Vision Zero ISSA Construction Section

From beyond gold to Vision Zero ISSA Construction Section ILO/ISSA International Safety and Health Conference, Challenges and Solutions in a Global Economy Global action for prevention Düsseldorf, Germany, 28-29 October 2015 Beyond Gold Best practices during

More information

Position Transmitter TGS 40 (RAM)

Position Transmitter TGS 40 (RAM) Operating Instructions 42/14-50 EN Position Transmitter TGS 40 (RAM) Position Transmitter TGS 40 (RAM) Operating Instructions Document no. 42/14-50 EN Date of issue: 05.2006 Revision: B Manufacturer: ABB

More information

APG TM-APG WARNING. CUT GROOVING/BEVELING TOOL FOR 4 12-inch/ mm AQUAMINE PIPE

APG TM-APG WARNING. CUT GROOVING/BEVELING TOOL FOR 4 12-inch/ mm AQUAMINE PIPE APG CUT GROOVING/BEVELING TOOL FOR 4 12-inch/114.3 323.9-mm AQUAMINE PIPE warning WARNING Failure to follow instructions and warnings could result in serious personal injury, property damage, and/or product

More information

We are one of the leading manufacturers and Suppliers of a wide range of Precision Engineering Products. Due to their dimensional accuracy, easy installation and low maintenance, these products are highly

More information

Virtual Prototyping for Safer Product Development: integrated marine propulsion and steering system example

Virtual Prototyping for Safer Product Development: integrated marine propulsion and steering system example 12 th International LS-DYNA Users Conference Simulation(2) Virtual Prototyping for Safer Product Development: integrated marine propulsion and steering system example Marco Perillo a, Daniele Schiavazzi

More information

Technology: Lighting Units

Technology: Lighting Units Triple E Register Eligibility Criteria Category: Lighting Technology: Lighting Units Lighting units are products that are specifically designed to provide high efficiency interior or exterior illumination.

More information

Essential requirements for a spectrum monitoring system for developing countries

Essential requirements for a spectrum monitoring system for developing countries Recommendation ITU-R SM.1392-2 (02/2011) Essential requirements for a spectrum monitoring system for developing countries SM Series Spectrum management ii Rec. ITU-R SM.1392-2 Foreword The role of the

More information

LINEAR CURRENT-TO-FREQUENCY CONVERTER WITH WIDE OUTPUT RANGE

LINEAR CURRENT-TO-FREQUENCY CONVERTER WITH WIDE OUTPUT RANGE BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI Publicat de Universitatea Tehnică Gheorghe Asachi din Iaşi Volumul 62 (66), Numărul 1, 2016 Secţia ELECTROTEHNICĂ. ENERGETICĂ. ELECTRONICĂ LINEAR CURRENT-TO-FREQUENCY

More information

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment.

Please read BOTH these Installation Instructions and the General Instructions prior to installing or operating this equipment. Attachment Tab Height: 24-3/4 Attachment Tab Width: 21 Serial Number Please read BOTH these and the General Instructions prior to installing or operating this equipment. 1. Blue Ox towing products and

More information

EMC in the railway environment Hans Bängtsson

EMC in the railway environment Hans Bängtsson EMC in the railway environment 2018-05-17 Hans Bängtsson Aspects of EMC in the railway environment LEGAL radio-, TV- and tele communications must not be interfered SAFETY The railway signaling ( red and

More information

EU-Guide Machinery Directive

EU-Guide Machinery Directive EU-Guide Machinery Directive Interpretation? 2006/42/EC Legal update? EU-Guide Machinery Directive Machinery Days Cologne 2017 25 th October 2017 Maritim Hotel Cologne Edition 2.1 July 2017 (Update of

More information

D în această ordine a.î. AB 4 cm, AC 10 cm, BD 15cm

D în această ordine a.î. AB 4 cm, AC 10 cm, BD 15cm Preparatory Problems 1Se dau punctele coliniare A, B, C, D în această ordine aî AB 4 cm, AC cm, BD 15cm a) calculați lungimile segmentelor BC, CD, AD b) determinați distanța dintre mijloacele segmentelor

More information

Mecanismul de decontare a cererilor de plata

Mecanismul de decontare a cererilor de plata Mecanismul de decontare a cererilor de plata Autoritatea de Management pentru Programul Operaţional Sectorial Creşterea Competitivităţii Economice (POS CCE) Ministerul Fondurilor Europene - Iunie - iulie

More information

IÉ Safety Approval of FFU material

IÉ Safety Approval of FFU material Process followed IM-SMS-014 Safety Approval of Changes in Plant, Equipment, Infrastructure and Operations (PEIO). New PEIO shall be subject to: robust process of risk assessment and safety approval prior

More information

Prima. Evadare. Ac9vity Report. The biggest MTB marathon from Eastern Europe. 7th edi9on

Prima. Evadare. Ac9vity Report. The biggest MTB marathon from Eastern Europe. 7th edi9on Prima Evadare Ac9vity Report 2015 The biggest MTB marathon from Eastern Europe 7th edi9on Prima Evadare in numbers Par%cipants subscribed 3.228, 2.733 started the race and 2.400 finished the race 40 Photographers

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 12 July 2012 English only Economic Commission for Europe Inland Transport Committee World Forum for Harmonization of Vehicle Regulations Working

More information

VIBROACOUSTIC MEASURMENT FOR BEARING FAULT DETECTION ON HIGH SPEED TRAINS

VIBROACOUSTIC MEASURMENT FOR BEARING FAULT DETECTION ON HIGH SPEED TRAINS VIBROACOUSTIC MEASURMENT FOR BEARING FAULT DETECTION ON HIGH SPEED TRAINS S. BELLAJ (1), A.POUZET (2), C.MELLET (3), R.VIONNET (4), D.CHAVANCE (5) (1) SNCF, Test Department, 21 Avenue du Président Salvador

More information

Knife grinding machine K3 H/K

Knife grinding machine K3 H/K Knife grinding machine K3 H/K 01.11.2010 GS-Schleiftechnik, Leyher Str. 61 a, D-90431 Nürnberg Phone 0049/9193/4404, Fax 0049/9193/4391 e-mail: info@gs-de.eu 1 Table of Contents A. SAFETY... 3 A.1 THE

More information

TB/T Translated English of Chinese Standard: TB/T RAILWAY INDUSTRY STANDARD

TB/T Translated English of Chinese Standard: TB/T RAILWAY INDUSTRY STANDARD Translated English of Chinese Standard: TB/T 1618-2001 www.chinesestandard.net Sales@ChineseStandard.net RAILWAY INDUSTRY STANDARD TB OF THE PEOPLE S REPUBLIC OF CHINA TB/T 1618-2001 eqv ISO 5948:1994

More information

Rev Disc (DP-8)

Rev Disc (DP-8) 4 Disc (DP-8) NO. Description QTY. Spare P/N 1 Top Swivel Bracket 2 60003 2 Main Bearing Carrier 2 60004 3 Main Axle 2 6000 4 Full Spindle 2 60006 Large Dia. Spindle 6 60007 6 Small Dia. Spindle 4 60008

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

Rail Line Radio Systems

Rail Line Radio Systems Rail Line Radio Systems 1 Basic and substitute rail line connection Annex F 1.1 Radio equipment units 1 ) on the railway infrastructure operated by are used for basic or substitute rail line radio connection

More information

ELECTROSTATIC DISCHARGE E-FIELD SPECTRUM ANALYSIS AND GRAPHICAL INTERPRETATION

ELECTROSTATIC DISCHARGE E-FIELD SPECTRUM ANALYSIS AND GRAPHICAL INTERPRETATION BULETINUL INSTITUTULUI POLITEHNIC DIN IAŞI Publicat de Universitatea Tehnică Gheorghe Asachi din Iaşi Tomul LII (LXI), Fasc. 4, 2011 SecŃia ELECTROTEHNICĂ. ENERGETICĂ. ELECTRONICĂ ELECTROSTATIC DISCHARGE

More information

Preparing for the new Regulations for healthcare providers

Preparing for the new Regulations for healthcare providers Preparing for the new Regulations for healthcare providers Cathal Brennan, Medical Device Assessor HPRA Information Day on Medical Devices 23 rd October 2014 Brussels, 26.9.2012 COM(2012) 542 final 2012/0266

More information