1 Low Voltage Products Third Harmonic Filter and star System components for assembly and retrofitting Catalogue SGB _ SCCC

2 System components for assembly and retrofitting star, installation in the transformer star point The third harmonic filter star is both economical and compact solution to be used in highly concentrated third harmonic currents. The filter is mitigating third harmonic current and emission voltage towards the line side. The filter can be installed near the transformer station in universal outdoor enclosure, in empty field of the transformer station, in main switchboard or as a separate unit. The third harmonic filter star is installed in the neutral or conductor between the non-earthed transformer star point and the neutral busbar of the main switchboard. DIMESIOIG: According to the supply transformer. PROTECTIO: The protection unit S_ shall be used, when the thermal unbalance current exceeds the -rating and when the T-S-system needs to be monitored. SA L L L (), installation in T-S system in the neutral conduction of the distribution panel The third harmonic filter or star is designed for mitigating third harmonic current and emission voltage towards the line side of the common coupling or group in the T-S-system. The filter is installed in the outgoing group of T-Ssystem, in the outgoing neutral conductor of an UPS-device or in the lighting panel in centralised compensation. The filter is installed in the neutral conductor, while the measuring transformer is installed to the -conductor. Prior to the installation, the purity of T-S-system in the group needs to be measured. The and -conductor of the outgoing group shall not be connected. This condition shall always be monitored. In T-S-system we recommend to assemble the star filter between the transformer star point and and neutral conductor. In this case there is no Hz voltage between neutral and -conductor. DIMESIOIG: According to the supply transformer or fuse. PROTECTIO: The protection unit S_ shall be used, when the thermal unbalance current exceeds the -rating and when the T-S- system needs to be monitored. SA L L L Low Voltage Products

3 I O Versatile assembly options The filter can be installed near the transformer station in universal outdoor enclosure, in empty field of the transformer station, in main switchboard or as a separate unit. The filters are suitable for assembly and retrofitting. MS FILTER BYBASS O OFF Transformer station assembly or retrofitting. Outdoor mounting in cable pillar box. Indoor mounting in modular switchboards. Benfits of the new star filter: More effective mitigation Smaller resistance and fundamental impedance Higher short-circuit capacity % smaller size resulting in halved space need More economical Easy to install Less maintenance work Flexible component assembly Accomodating in narrow series succession or flat pack Only three frame sizes cover area from A...kVA Check star filters Installation and commissioning: The installation of star is in theory easy but in practice certain points have to be checked : Ensure by measurement that there is no parallel current path to the filter Check up also the possible influence of parallel transformers or generators Ensure that the filter is installed in the right location. The neutral conductor from the star point of the transformer is the recommended place. Check up that the current measurement is right. The CT shall always measure the sum of all neutral and earth currents of the network. Check up the relay setting of the protection unit. Check up that there is no largely dimmer loads. Read mounting instruction S Low Voltage Products

4 Auto KORE KORE O l Auto Easy to install OK ByPass Flat combination /Hz /Hz Error /Hz /Hz Error Test R Reset Test Strömberg (+) I OUT SA V~ /Hz SM V~ /Hz SM A A A A A A OK ByPass EASY TO ISTALL: in - out Current transformer in the right place Auxiliary voltage supply simple or redundant IMPORTAT: Eliminate any parallel current path /Hz Error Test R Reset Test /Hz /Hz /Hz Error See Mounting Instructions and S and check list. O OFF I O OUT I (+) A S arrow combination Low Voltage Products

5 Selection and dimensioning of the product range Third harmonic filters star and The size of the -filters is selected according to the supply transformer or back up fuses. The protection unit needs to be used, in case the dimensioning exceeds the thermal rating of the filter. The basis of dimensioning is that the filter withstands the Hz voltage and the fundamental neutral current generated by the phase unbalance. The star filters are tested according to the highest possible short circuit current or back up fuse. The filter is not suitable for applications including largely dimmer loads. Please consult with us. The filter is not suitable for applications including largely dimmer loads. Please consult with us. SA L L L () SA L L L Installation to the transformer star point, enclosed filters and system components,star The new generation third harmonic filter star is designed for small size and economical solutions to places, which are especially exposed by third harmonic currents. The filter can be installed outdoor in vicinity of transformer stations, as retrofitting to existing transformer station or as additional field of main switchboard. It is recommended to install the filter star in -conductor, whenever possible, equipped with appropriate protection unit S_. DIMESIOIG: According to the supply transformer PROTECTIO: Protection unit S_S, Hz and Hz measurement according to the mounting instruction etwork Rated current Transformer Enclosed Units System Input-Output Internal of the size components cable/ busbar connection to T-C, T-S transformer kva Indoor Outdoor IP the filter A IP IP ) SUS SA Acc. to phase % of phase SS SU + _S conductors conductor SA L L L () SA Acc. to phase % of phase SS SU + _S conductors conductor SA Acc. to phase % of phase SS SU + _S conductors conductor SSx SUx SAx Acc. to phase % of phase conductors conductor ote: System components in brochure S GB Installation for distribution boards in T-S-system, enclosed filter and system components, filters are designed in T-S-systems to provide selective mitigation of isolated groups with local or central compensation. The is normally installed in the load side neutral output of UPS-devise. is dimensioned according to the group fuses. In case the dimensioning is below % it is recommended to use additional protection unit. The filter types...v include guard units to keep track of the -current in the area of... A. DIMESIOIG: According to the group fuse- rated current = rated current of the fuse link PROTECTIO: Guard unit (_V), Hz measurement from -conductor of the group etwork Rated current Enclosed Units System Cross-section Internal parallel of the components Input-Output connection to T-S group fuse Indoor IP IP cable the filter A mm mm V B L L L V B V B x V B x LV + B x SA ote: System components in brochure S GB Low Voltage Products

6 I O Technical data Technical charasteristics of the star third harmonic filters Type SA SA SA System voltage V / / / Rated continuous thermal current Ith of the filter Resistance R mohm,,, Impedance Z Hz mohm Impedance Z Hz ohm,, Power loss with % phase balance - lamp load/w Power loss with % phase balance - PC-loadv Power loss with % inbalance current - lamp load/w Power loss with % inbalance current - PC-load/W Power loss worst case unbalance current - lamp load/w Power loss worst case unbalance current - PC-load/W VALUES WITH PROTECTIO UIT Transformer size with protection unit kva Rated current of transformer A Max harmonis voltage / V Hz V Max incoming fuse in phase at ka prospective short circuit A Max duration of short circuit s,,, Protection unit S_ S_ S_ Current transformer KOREF-/ KOREF-/ KOREF-/ VALUES WITHOUT PROTECTIO UIT ) Max incoming fuse in phase A Transformer size with kva ) Tested with worst case overcurrent, time A fuse by h Specification of harmonic filter Example star Type: S S Rated voltage: V Dimensioning according to the transformer size: kva. Removes the third harmonic current from the phase and neutral conductor. Dimensioning current/ Max continuous current: A/ A. Dimensioning voltage: V Hz. The filter allows subsequent increasing of the harmonic load without retrofitting. Short circuit dimensioning according to max. available short circuit of transformer. The filter is stand along type and not influencing on the power factor compensation. The filter is not influencing on carrier- wave-line. Main incoming breaker: Max. time delay:, s Terminations: Max six cables of mm The filter is equipped with by-pass switch for commisoning. Stand along enclosure: indoor use IP outdoor use IP Accommodation: In the vicinity of transformer station Retrofitting to the transformer station In the main switchboard SA FILTER BYBASS O OFF MS The star removes typically % of the third harmonic current from the whole network from line and load side independent of the magnitude of the third harmonic current. For example the neutral current reduces from A down to A and in the phase conductors from A to A. The same mitigation prevails in the whole network from the transformer windings to the lamps and computers. The magnetic field from the construction and earthing wiring reduces typically by % due to mitigation of the vagabonding currents (% of magnetic field usually of Hz origin). The iron, copper and resistance losses reduce the temperature and noise level of the supply transformer doubling the lifetime of the transformer by every degrees C. The filter reduces the resistance losses (I R). For example: before (A) x, Ω = W, filter installed (A) x, Ω =, W (other losses not included). The filter include protection unit, which limit the Hz unbalance current and Hz fault current. Low Voltage Products

7 Auto A A A A A A V~ /Hz SM V~ /Hz SM protective units The purpose of a protective unit is to limit a Hz voltage drop to the desired level to prevent overload of filter to protect the network if the unit is damaged SA Protective I > K Types of protective units:. Enclosed type, S - Complete type includes Amp-meter, all pilot lights and TEST-switch installed in an IP enclosure. - Contactor K and current transformer T must be ordered and connected separately. See connecting diagrams, page. /Hz Error Test R Reset OK ByPass /Hz /Hz /Hz Error. on-enclosed module, BS - The pilot lights, TEST-switch, RESET-pushbutton and Amp-meter must be ordered and connected separately as well as contactor K and current transformer T. See connecting diagrams, page. SA Test SA Strömberg Amp-meter (Included in enclosed type S) The Amp-meter is connected to the secondary circuit of the T current transformer. It is equipped with a %-scale where % indication corresponds to the nominal primary current of the T Current transformer. When the -filter is connected, the meter primarily indicates the Hz unbalance current which runs in the / wire. When the -filter is bypassed, the meter primarily indicates the third harmonic current. The pilot light functions Pilot light OK Test By Pass / / Error Error Hz Hz /Hz /Hz Description and the protective unit are O.K. The setting value of the /Hz unbalance current exceeded - by-passed The setting value of the. harmonic current exceeded - by-passed SA 'OK' -pilot light blown - switched O and protective unit is working A fuse in a protective unit is blown - switched O and a protective unit is not working Light is O Light is OFF Low Voltage Products

8 Connecting diagrams / Enclosed protective unit S L L L ~ V + + T S S () (L) () X K A A V~ F A K. K. K. K. K. K. K. K. K. K. K.A K. K.A X Protective unit S SA W x, W x, W x, ote: Connection of loads shall be between L-L and -conductors shall be made after installing point of the Third Harmonic Filter (). L L Redundant duplex supply of auxiliary voltage. SA O K K O Low Voltage Products

9 Connecting diagrams / Open type protective unit BS L L L ~ V + + H...H X V T S S X X P. X. x, X P. X. Door BY PASS OK X. X. X. P A H H X. H. X. ERROR /Hz /Hz ERROR /Hz /Hz X. X. X. X. H H H H H. RESET TEST X. X. S H S AUTO TEST S. S. X. X. X. X. X. X. X. X. X. Protective unit BS H. S. H. S. H. S. H. S. S. S. S. S. H. H. H. F A K V~ () (L) () K. K. K. K. K. K. K. K. K. K. K.A K. K.A X A A H. SA W x, W x, W x, ote: When mounting Amp-meter P, the connection between X. and X. must be disconnected. The connection of loads shall be between L-L and -conductors shall be made after installing point of the Third Harmonic Filter (). L L Redundant duplex supply of auxiliary voltage. SA O K K O Low Voltage Products

10 KORE I Auto A A A A A A V~ /Hz SM V~ /Hz SM V~ /Hz A A A A A A Third harmonic filters star and Ordering information Technical information Third harmonic filters star Components for installation to transformer star point. S Indoor use IP. Cabling from bottom or top Transformer size Dimensions Dimensions Type Order Weight [kva] [A] arrow combination Flat combination Code B x D x H [mm] B x D x H [mm] [kg] x x x x S A x x x x S A x x x x S A x x x x x x S Ax x H Third harmonic filters B D Installation in T-S system in the neutral conduction of the distribution panel SA SA THB V~ /Hz SM V~ /Hz SM Size of Connecting Dimensions Type Order Weight feeding cable (Cu) Code [A] [mm ] B x D x H [mm] [kg] Basic module (without a by-pass contactor K, see a table below), technical data at V x x B THBSMS Protection unit Back up Terminals Dimensions Protection Type Order Weight fuse [mm ] / B x D x H degree Code Cu [mm] [kg] Open type A. x x IP BS SCAR. x x BSMS SCAR. SA Enclosed A. x x IP S SCAR (Sheet steel) BS OK ByPass Other system components SA S /Hz Error Test R Reset Test /Hz /Hz /Hz Error Strömberg Transformer size Rated current Transformer By-pass contactor By-pass switch kva In/A/V KOREF / A OETLK KOREF / A OETLK KOREF / A OETLK KOREF / A OETLK KOREF / A OETLK KOREF / AF OETLK KOREF / AF OETLK KOREF / AF OETLK KOREF / AF OETLK SA KORE_ SA A_ V~ /Hz SA O O OFF l O SA OETL_ B Low Voltage Products

11 Installation examples T-S-system, where the original cabling to the transformer star point need to be displaced to fundamentally same position in the -conductor of the main switchboard. star installation. Transformer X L L L -S S Main switchboard L L L X SB Main earthing busbar Earthing electrode Concrete iron fitting Water meter T-C-S system Alternative installation examples when using star with protection unit(_s) or with guard unit(_v). Transformer L L L -S S Main switchboard L L L L L L ) -S S/ Distribution switchboard L L L SB -V -V Earthing busbar of transformer station Main earthing busbar Distribution swtichboard Earthing electrode Concrete iron fitting Water meter T-S system Alternative installation example when using star with protection unit(_s) or with guard unit(_v). Transformer L L L -S S Main switchboard LL L L L L ) -S S/ Distribution switchboard L L L SB -V -V Earthing busbar of transformer station Main earthing busbar Distribution swtichboard ) In this installation model, the current transformer need to measure both - and -current, unless additional guard unit is used. Earthing electrode Concrete iron fitting Water meter SA S Low Voltage Products

12 Installation examples Installation of on starpoint of a transformer SA A B L,L,L For the third harmonic current, -unit disconnects the -conductor. Bypassing of the third harmonic current through other routes should be avoided. Installation rules:. is intended for installation between points A and B. Earthing is allowed only after point B.. To ensure that no other earthing exists between point A and the starpoint, the insulation resistance Re between points A and B must be measured.. Re > kω (usually Re > MΩ). If there is a thin earthing wire between points A and the starpoint, all third harmonic currents in the -conductor without, (e.g. A) go through this wire. Risk of fire! Transformer and generator connected parallel D GE. Installation rules:. One is intended for installation between points A and B, and the other between points A and B. Earthing is allowed only after points B and B. Re > kω ( MΩ) between A-B and A-B Installation of the on a UPS-network SUPPLY ETWORK BATTERY Installation of the on UPS-network ~ = UPS L ~ = A B A B STATIC BYPASS SWITCH SA ote Generator with open pole rotor generates third harmonic current UPS ETWORK SA MAUAL BYPASS SWITCH L Installation of on starpoints of parallel connected transformers A B A B Installation rules:. One is intended for installation between points A and B, and the other unit between points A and B. Earthing is allowed only after points B and B. Re > kω ( MΩ) between points A-B and A-B. The protection unit should bypass both -units at the same time. The filter is not suitable for applications including largely dimmer loads. Please consult with us. Installation of one single on starpoint of parallel connected transformers A Installation rules:. is intended for installation between points A and B. Earthing is allowed only after point B. Re > kω ( MΩ) between points A and B SA SA B The filter is not suitable for applications including largely dimmer loads. Please consult with us. Low Voltage Products

13 Enclosed third harmonic filters star Dimensions SA arrow combination SA Flat combination SA SA Low Voltage Products

14 Enclosed third harmonic filters star Dimensions SA arrow combination SA SA SA Flat combination Low Voltage Products

15 Enclosed third harmonic filters star Dimensions SA arrow Combination SA SA SA Flat combination Low Voltage Products

16 The technical data and dimensions are valid at the time of printing. We reserve the right to subsequent alterations. Brochure SGB _ SCCC Oy Waasa Graphics, Vaasa ABB Oy Low Voltage Products P.O. Box FI- VAASA, Finland Telephone + Telefax + The operations of the manufacturing plant have been certified.

Low Voltage Products. Enclosed Third Harmonic Filter THF and THF star Enclosed units. Brochure THFS1GB 03_04 1SCC330003C0201

Low Voltage Products. Enclosed Third Harmonic Filter THF and THF star Enclosed units. Brochure THFS1GB 03_04 1SCC330003C0201 Low Voltage Products Enclosed Third Harmonic Filter and star Enclosed units Brochure S1GB 3_4 1SCC333C21 The Third Harmonic - a Growing Problem Today's electrical networks and plants are under much more

More information

Electrical Description

Electrical Description History of this Document Rev. no.: Date: Description of change 0 First edition 2 2003-10-08 Section 3: The rated power of the transformer can be increased by 40% if they are equipped with 6 fans for forced

More information

Fault indicator. Application. SPEF 3A2 C 1MRS MBG Issued: April 1999 Status: Updated Version: B/ Data subject to change without notice

Fault indicator. Application. SPEF 3A2 C 1MRS MBG Issued: April 1999 Status: Updated Version: B/ Data subject to change without notice Issued: April 1999 Status: Updated Version: B/08.11.200 Data subject to change without notice Features Versatile, multifunction line fault indicator for distribution networks Overcurrent, earth-fault and

More information

SPAD 346 C Stabilized differential relay

SPAD 346 C Stabilized differential relay SPAD 346 C Stabilized differential relay Stabilized Differential Relay Type SPAD 346 C Features Integrated three-phase differential relay, three-phase overcurrent relay and multiconfigurable earth-fault

More information

SRA 2250/6 RESISTOR ARS-01 RESISTOR AUTOMATICS

SRA 2250/6 RESISTOR ARS-01 RESISTOR AUTOMATICS ELECTRICAL ENGINEERING DIVISION Distribution Network Department SRA 2250/6 RESISTOR ARS-01 RESISTOR AUTOMATICS ELA T150.2 en SRA 2250/6 Resistor specification The SRA 2250/6 Resistor is intended to increase

More information

ELECTRICAL POWER TRANSMISSION TRAINER

ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER This training system has been designed to provide the students with a fully comprehensive knowledge in Electrical Power Engineering

More information

Tuningintobetter power quality

Tuningintobetter power quality Technology Review Third harmonic filters Tuningintobetter power quality Jouko Jaakkola Your PC screen flickers, stops flickering, starts again... Irritating to be sure, and perhaps the first visible sign

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

REK 510 Current injection device for earth-fault protection of a synchronous machine rotor. User s Manual

REK 510 Current injection device for earth-fault protection of a synchronous machine rotor. User s Manual REK 50 protection of a synchronous machine User s Manual REK 50 X 0 9 8 7 6 5 4 0 V 00 V 0 V 5 6 7 Ordering No: REK 50-AA Uau = 00/0 Vac Un = 48 V Serial No: fn = 50/60 Hz Uec = ma 600 Vdc MRS 75587-MUM

More information

Power IT LV Active Filters PQFI PQFM PQFK. The ABB comprehensive solution for active filtering of harmonics

Power IT LV Active Filters PQFI PQFM PQFK. The ABB comprehensive solution for active filtering of harmonics Power IT LV Active Filters PQFI PQFM PQFK The ABB comprehensive solution for active filtering of harmonics Harmonics and Power Quality Power Quality relates to the amplitude, frequency and distortion of

More information

ET 40 - Electrician Theory Examination Marking Schedule

ET 40 - Electrician Theory Examination Marking Schedule ET 40 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker

More information

High-Tech Range. IRI1-ER- Stablized Earth Fault Current Relay. C&S Protection & Control Ltd.

High-Tech Range. IRI1-ER- Stablized Earth Fault Current Relay. C&S Protection & Control Ltd. High-Tech Range IRI1-ER- Stablized Earth Fault Current Relay C&S Protection & Control Ltd. Contents 1. Summary 7. Housing 2. Applications 3. Characteristics and features 4. Design 7.1 Individual housing

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

Transformer Trainer. Electrical Power Systems PSL20. Learning Outcomes. Key Features. Key Specifications

Transformer Trainer. Electrical Power Systems PSL20. Learning Outcomes. Key Features. Key Specifications Electrical Power Systems PSL2 Investigates the principles and operating characteristics of single-phase and three-phase power and distribution transformers Key Features Educational transformers with fully

More information

Series P. Applications

Series P. Applications Ratings 25 800 VA Voltage Primary 230 / 400 / 460 V range Secondary 6 / 12 V 12 / 24 V 24 / 48 V 115 / 230 V Voltage selection by means of metal connection bridges, offering the full rated power at any

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

General Requirements. Technical Specification LVAC Systems

General Requirements. Technical Specification LVAC Systems Islamic Republic of Iran Vice Presidency for Strategic Planning and Supervision General Technical Specification and Execution Procedures for Transmission and Subtransmission Networks LVAC Systems NO: 423-1

More information

IRI1-ER - Stabilized Earth Fault Current Relay

IRI1-ER - Stabilized Earth Fault Current Relay IRI1-ER - Stabilized Earth Fault Current Relay TB IRI1-ER 02.97 E 1 Contents 1. Summary 2. Applications 3. Characteristics and features 4. Design 4.1 Connections 4.1.1 Analog inputs 4.1.2 Output relays

More information

FAQ ON EARTHING STANDARDS 16/08/2018

FAQ ON EARTHING STANDARDS 16/08/2018 FAQ ON EARTHING STANDARDS 16/08/2018 This document has been updated to include changes made to substation earthing layouts that have been made necessary due to copper theft. The main changes to be aware

More information

Residual Current Operated Circuit-Breakers (RCCBs)

Residual Current Operated Circuit-Breakers (RCCBs) Product Overview Residual Current Operated Circuit-Breakers (RCCBs) Residual current operated circuit-breakers Number of poles Rated current A Rated residual current ma MW Auxiliary contacts can be mounted

More information

Switching power supplies CP range, Linear power supplies CP-L range. Content

Switching power supplies CP range, Linear power supplies CP-L range. Content CP range, Linear power supplies CP-L range Content Switching power supplies, primary switch mode, CP range Benefits and advantages... 136 Approvals... 137 Ordering details... 138 Technical data... 11 Dimensional

More information

2kVA EARTH TESTING CURRENT INJECTION SYSTEM 4046 / 4047 DATASHEET REDPHASE INSTRUMENTS

2kVA EARTH TESTING CURRENT INJECTION SYSTEM 4046 / 4047 DATASHEET REDPHASE INSTRUMENTS 2kVA EARTH TESTING CURRENT INJECTION SYSTEM 4046 / 4047 DATASHEET REDPHASE INSTRUMENTS Contents Section Brief Description... 1 Where and why it is used... 1.1 Induced Measureable Parameters... 1.2 Hardware

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

Miniature circuit-breakers S 280 UC series. System pro M. Technical data

Miniature circuit-breakers S 280 UC series. System pro M. Technical data Technical data 11 Robbie Rd. / Avon, MA 02322 T:(508)513-1000 F:(508)513-1100 70 Ernest St. / Providence, RI 02905 T:(401)781-7100 www.controllerservice.com System pro M Prior to connection of aluminum

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information

Technical catalogue. Emax Low voltage air circuit-breakers. Hotline:

Technical catalogue. Emax Low voltage air circuit-breakers.   Hotline: Technical catalogue Emax Low voltage air circuit-breakers www.alobitanbd.com Hotline: 01711548558 PAGE : 02 The new Emax have received innumerable international certifications and approval by the major

More information

Magtech Voltage Booster MVB

Magtech Voltage Booster MVB Model overview MVB 27.03.08 EG.doc Magtech Voltage Booster Voltage fluctuations caused by unbalanced load in Y-ground grid? Low voltage part of the day due to high load? Quick and profitable solution with

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit.

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit. Current transducer ITC 2000-S/SP2 N = 2000 A For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit. Features Bipolar and insulated

More information

Magtech Voltage Booster MVB

Magtech Voltage Booster MVB Model overview MVB 30.04.09 EG.doc Magtech Voltage Booster Voltage fluctuations caused by unbalanced load in Y-ground grid? Low voltage part of the day due to high load? Quick and profitable solution with

More information

Functional Range. IWE - Earth Fault Relay. C&S Protection & Control Ltd.

Functional Range. IWE - Earth Fault Relay. C&S Protection & Control Ltd. Functional Range - Earth Fault Relay C&S Protection & Control Ltd. 2 Contents Page No. 1. Application 2. Operating Principle. Current Transformer Connections 5. Connections, Contact Arrangement and Setting

More information

Sensor Technology. Applications for medium voltage

Sensor Technology. Applications for medium voltage Sensor Technology Applications for medium voltage Contents Introduction to sensor technology... 3 Sensors versus instrument transformers... 6 Advantages for builders and users of switchgear... 7 The impact

More information

Enhanced Quality with a Touch of Style

Enhanced Quality with a Touch of Style Rudolf Current Transformer Enhanced Quality with a Touch of Style Current Transformer Enhanced Quality with a Touch of Style New Products Rudolf launched our new encapsulated current transformer. Portraying

More information

Stabilized Differential Relay SPAD 346. Product Guide

Stabilized Differential Relay SPAD 346. Product Guide Issued: July 1998 Status: Updated Version: D/21.03.2006 Data subject to change without notice Features Integrated three-phase differential relay, three-phase overcurrent relay and multiconfigurable earth-fault

More information

Current / residual current and voltage transformers. Current / residual current and voltage transformers

Current / residual current and voltage transformers. Current / residual current and voltage transformers Current / residual current and voltage transformers Current / residual current and voltage transformers 1 Overview Current transformer overview DIN rail current transformer with fuse Current transformer...

More information

IRI1-ER - Stabilized Earth Fault Current Relay. Manual IRI1-ER (Revision A)

IRI1-ER - Stabilized Earth Fault Current Relay. Manual IRI1-ER (Revision A) IRI1-ER - Stabilized Earth Fault Current Relay Manual IRI1-ER (Revision A) Woodward Manual IRI-ER GB Woodward Governor Company reserves the right to update any portion of this publication at any time.

More information

K Factor Power Transformers

K Factor Power Transformers Ashley-Edison AsiaElectricTransformers (UK) K Factor Power Transformers DTKF series Low Voltage Dry Type K Factor Power Transformers AET-DTKF-2004-01: Page 1 Asia Electric Transformers, Entrepreneur Business

More information

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing

Advanced Test Equipment Rentals ATEC (2832) CP RC. Resonance circuit for GIS testing Established 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) CP RC Resonance circuit for GIS testing A new approach to testing gas-insulated switchgear Testing gas-insulated switchgear

More information

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This

More information

SPAD 346 C. Stabilized Differential Relay. User s manual and Technical description SPAD 346 C V ~ V. f n SPCD 3D53 SPCJ 4D28

SPAD 346 C. Stabilized Differential Relay. User s manual and Technical description SPAD 346 C V ~ V. f n SPCD 3D53 SPCJ 4D28 SPAD 6 C Stabilized Differential Relay User s manual and Technical description f n = 50Hz 60Hz I n = A 5A ( I ) I n = A 5A ( I ) I n = A 5A ( I 0 ) I n = A 5A ( I 0 ) 5 I I d L L I L I > IRF I 0 > I 0

More information

TOSHIBA International Corp

TOSHIBA International Corp TOSHIBA International Corp GUIDE SPECIFICATIONS THREE PHASE UNINTERRUPTIBLE POWER SYSTEM TOSHIBA 4200FA 30 kva CT Internal Battery UPS GUIDE SPECIFICATIONS 1 (30 kva CT) 1.0 SCOPE 1.1 System This specification

More information

Substation applications

Substation applications Substation applications To make it easy to choose the right for a protection application, the most typical applications are presented with the type of for them. Each sample application is presented by:

More information

AC CURRENT GENERATOR POC-6000 (current from 0 to 1000 ARMS)

AC CURRENT GENERATOR POC-6000 (current from 0 to 1000 ARMS) AC CURRENT GENERATOR PERFORMANCES Wide range of current 50 db dynamic range Signal-to-noise ratio: 80 db open loop protection Stability < 0,1% Very low THD distortion < 0,3% External synchronization Build-up

More information

3 - Protection components Circuit-breakers

3 - Protection components Circuit-breakers Contents - Protection components Circuit-breakers for the motor protection Selection guide..............................................page /2 Thermal-magnetic motor circuit-breakers Selection guide..............................................page

More information

ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET

ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET Candidate Code No. ET37 For Board Use Only Result Date Int Result Date Int ELECTRICIAN S THEORY EXAMINATION 20 November 2010 QUESTION AND ANSWER BOOKLET INSTRUCTIONS READ CAREFULLY Time Allowed: Three

More information

Power System Protection Manual

Power System Protection Manual Power System Protection Manual Note: This manual is in the formative stage. Not all the experiments have been covered here though they are operational in the laboratory. When the full manual is ready,

More information

Differential Protection with REF 542plus Feeder Terminal

Differential Protection with REF 542plus Feeder Terminal Differential Protection with REF 542plus Application and Setting Guide kansikuva_bw 1MRS 756281 Issued: 09.01.2007 Version: A Differential Protection with REF 542plus Application and Setting Guide Contents:

More information

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations

C&G Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations C&G 2395-01 Level 3 Award in the Periodic Inspection, Testing and Certification of Electrical Installations Phase rotation and verification of voltage drop 1 Outcomes of this Session describe how to assess

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

ZUCCHINI MS - LOW TO MEDIUM POWER BUSBAR

ZUCCHINI MS - LOW TO MEDIUM POWER BUSBAR ZUCCHINI MS - LOW TO MEDIUM POWER BUSBAR The flexibility of the Zucchini MS range during planning and installation makes it ideal for frequently changing requirements in small to medium sized commercial

More information

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS

PURCHASE SPECIFICATIONS 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS PURCHASE SPECIFICATIONS OF 500KVA DRY TYPE TRANSFORMER FOR OIL RIG APPLICATIONS SPECIFICATION NO. : OR12423 REVISION NO. : Rev 00 DATE : 01.03.2011 DISTRIBUTION : PI - 4 copies O/C - 1 copy PREPARED BY

More information

ET 61 - Electrician Theory Examination Marking Schedule

ET 61 - Electrician Theory Examination Marking Schedule ET 61 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker

More information

Current Transformer Requirements for VA TECH Reyrolle ACP Relays. PREPARED BY:- A Allen... APPROVED :- B Watson...

Current Transformer Requirements for VA TECH Reyrolle ACP Relays. PREPARED BY:- A Allen... APPROVED :- B Watson... TECHNICAL REPORT APPLICATION GUIDE TITLE: Current Transformer Requirements for VA TECH Reyrolle ACP Relays PREPARED BY:- A Allen... APPROVED :- B Watson... REPORT NO:- 990/TIR/005/02 DATE :- 24 Jan 2000

More information

Powered by technology...driven by service CURRENT TRANSFORMERS. Multifunction Meters. Transducers & Isolators. Temperature Controllers

Powered by technology...driven by service CURRENT TRANSFORMERS. Multifunction Meters. Transducers & Isolators. Temperature Controllers Multifunction Meters Transducers & Isolators Temperature Controllers Converters & Recorders Digital Panel Meters CURRENT TRANSFORMERS Current Transformers Analogue Panel Meters Shunts Digital Multimeters

More information

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER

ELECTRICAL NETWORKS SPECIFICATION TECHNICAL SPECIFICATION FOR A 230V/110V AND 400V/110V TRANSFORMER Approval Amendment Record Approval Date Version Description 03/05/2017 1 Initial issue PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 13 Table of Contents 1. Purpose...

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

Residual Current Operated Circuit-Breakers (RCCBs)

Residual Current Operated Circuit-Breakers (RCCBs) Product overview Residual Current Operated C ircuit-breakers (RCCBs) Number of poles Rated fault current I n ma Rated current I n A MW Auxiliary switches can be mounted (Type A) (Type B) 5SM1and 5SM3 RCCBs

More information

Automatic capacitor banks with detuned filters

Automatic capacitor banks with detuned filters Power factor correction and harmonic filtering 5 R. /6 Automatic capacitor banks with detuned filters R. 5 /6 Automatic capacitor banks with detuned filters Introduction R5/6-3 R.5 - Automatic capacitor

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

ET 51 - Electrician Theory Examination Marking Schedule

ET 51 - Electrician Theory Examination Marking Schedule ET 51 - Electrician Theory Examination Marking Schedule Notes:1. means that the preceding statement/answer earns 1 mark. 2. This schedule sets out the accepted answers to the examination questions. A marker

More information

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions

Company Directive STANDARD TECHNIQUE: TP6F/1. Power Measurement Conventions Company Directive STANDARD TECHNIQUE: TP6F/1 Power Measurement Conventions Summary This document specifies the conventions that are used for the direction of Power Flow within Western Power Distribution

More information

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control

More information

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation

2394 EXAM PAPER. 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2394 EXAM PAPER 1. State THREE circumstances that would require a periodic inspection and test to be carried out on an installation 2. There are various documents that are relevant to the Inspection and

More information

Residual Current-operated Circuit Breakers (RCCBs) F 360 and F 370 Range

Residual Current-operated Circuit Breakers (RCCBs) F 360 and F 370 Range Technical data System pro M Residual Current-operated Circuit Breakers (RCCBs) System pro M 1 When connecting aluminium conductors ensure that the contact surfaces of the conductors are cleaned, brushed

More information

PFCC-1000 series. Powerful Flexibility Durability - Quality. Medium Voltage Metal Enclose 5,15,25,35kV Power Factor Correction & Harmonic Filter

PFCC-1000 series. Powerful Flexibility Durability - Quality. Medium Voltage Metal Enclose 5,15,25,35kV Power Factor Correction & Harmonic Filter PFCC-1000 series Medium Voltage Metal Enclose 5,15,25,35kV Power Factor Correction & Harmonic Filter Powerful Flexibility Durability - Quality email.us.at:.quotes@tanddproducts.com www.tanddproducts.com

More information

Medium Voltage Products. KECA 80 C85 Indoor current sensor

Medium Voltage Products. KECA 80 C85 Indoor current sensor Medium Voltage Products KECA 80 C85 Indoor current sensor Parameters for Application Value Rated primary current of application up to 2 500 A Sensor Parameters Value Highest voltage for equipment, U m

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy meters and transducers Primary injection testing capabilities

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES

OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES OPEN-PHASE DETECTION TECHNIQUES FOR CRITICAL STANDBY SUPPLIES U AJMAL, GE Grid Solutions UK Ltd, usman.ajmal@ge.com S SUBRAMANIAN, GE Grid Solutions UK Ltd, sankara.subramanian@ge.com H Ha GE Grid Solutions

More information

Catalogue 1SFC en, Edition 3 November 2003 Supersedes Catalogue 1SFC en, Edition 2 November Arc Guard System TVOC

Catalogue 1SFC en, Edition 3 November 2003 Supersedes Catalogue 1SFC en, Edition 2 November Arc Guard System TVOC Catalogue 1SFC 266006-en, Edition 3 November 2003 Supersedes Catalogue 1SFC 266006-en, Edition 2 November 2000 Arc Guard System TVOC System units The two units of the are used as below: Approvals 1. with

More information

Catalog 200 Contactors up to 115 A Motor Starters up to 55 kw 03/2009

Catalog 200 Contactors up to 115 A Motor Starters up to 55 kw 03/2009 Catalog 00 Contactors up to 5 A Motor Starters up to 55 kw 03/009 Kraus & Naimer The development of the Blue Line rotary switch, contactor and motor starter product ranges is based on more than hundred

More information

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5 Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction

More information

Variable Transformers Product Design & Engineering Data

Variable Transformers Product Design & Engineering Data Variable Transformers Product Design & Engineering Data Product Design & Engineering Data Type 1010B Cutaway General Information STACO ENERGY PRODUCTS CO. is a leading manufacturer of variable transformers,

More information

TECHNICAL DESCRIPTION

TECHNICAL DESCRIPTION TECHNICAL DESCRIPTION A.M. BROADCAST TRANSMITTER SENDER AM 3000 SS June 2001-1- Rev. B TRANSMITTER CHARACTERISTICS 1. BASIC OFFER The basic offer includes: One AM3000SS A.M. Medium Wave Solid State Broadcast

More information

SPAE 010, 011 High Impedance Protection Relay

SPAE 010, 011 High Impedance Protection Relay SPAE 010, 011 High Impedance Protection Relay User s manual and Technical description f n = 50/60 Hz U n = 50 / 100 / 200 V 2 5 U REF > SPAE 010 0.8 U aux 0.6 1.0 RESET OK x 80... 265 V ~ _ 0.4 U > U n

More information

TeSys circuit-breakers Thermal-magnetic motor circuit-breakers types GV2, GV3 and GV7

TeSys circuit-breakers Thermal-magnetic motor circuit-breakers types GV2, GV3 and GV7 Presentation Thermal-magnetic motor circuit-breakers types GV, GV and GV7 GV-ME, GV-P, GV-ME and GV7-R motor circuit-breakers are -pole thermal-magnetic circuit-breakers specifically designed for the control

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, over-current protection relays, energy meters and transducers Primary injection testing capabilities

More information

I -limiter The world s fastest switching device

I -limiter The world s fastest switching device I S -limiter 2 I S -limiter The world s fastest switching device Reduces substation cost Solves short-circuit problems in new substations and substation extensions Optimum solution for interconnection

More information

PRODUCT FOR HIGH VOLTAGE APPLICATION. Current transformers for Gasinsulated. Instructions for installation, use and maintenance

PRODUCT FOR HIGH VOLTAGE APPLICATION. Current transformers for Gasinsulated. Instructions for installation, use and maintenance PRODUCT FOR HIGH VOLTAGE APPLICATION Current transformers for Gasinsulated switchgear type ELK Instructions for installation, use and maintenance 2 CURRENT TRANSFORMERS FOR GAS-INSULATED SWITCHGEAR TYPE

More information

TN, TT & IT Earthing Arrangements

TN, TT & IT Earthing Arrangements TN, TT & IT Earthing Arrangements In IT and TN-C networks, residual current devices are far less likely to detect an insulation fault. In a TN-C system, they would also be very vulnerable to unwanted triggering

More information

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment T/3000 Substation Maintenance and Commissioning Test Equipment MULTI FUNCTION SYSTEM FOR TESTING SUBSTATION EQUIPMENT SUCH AS: CURRENT, VOLTAGE AND POWER TRANSFORMERS, ALL TYPE OF PROTECTION RELAYS, ENERGY

More information

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220 Table K. Input/ Ratings & External Wiring Requirements for the 9390-/ Units Rating 50/0 Hz Basic Unit Rating at 0.9 lagging pf load Input and Bypass Input Rectifier (0.98 min. pf) plus Recharge Current

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge

More information

Electronic Circuit Breaker ESS1 for System SVS1

Electronic Circuit Breaker ESS1 for System SVS1 Electronic Circuit Breaker for System SVS Description The electronic circuit breaker is designed to ensure selective disconnection of individual s in industrial systems which are powered by a DC 24 V switch

More information

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER. Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the

More information

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION SECTION 16715 COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION PART 1 - GENERAL 1.01 SECTION DESCRIPTION AND BASIC REQUIREMENTS A. The Electrical Power Distribution System provides power distribution from

More information

Contents. Measurement and checking equipment for transformation centers Micro-ohmmeter MH-10 Page 3. Indirect earth contact simulator TL-5 Page 5

Contents. Measurement and checking equipment for transformation centers Micro-ohmmeter MH-10 Page 3. Indirect earth contact simulator TL-5 Page 5 Measuring and testing equipments P 6 P.6.01 GB for substations Micro-ohmmeter MH-10 Page 3 Mega-ohmmeter MI (5, 10, 15, 20 kv) Page 4 MD (5 kv) Page 4 Indirect earth contact simulator TL-5 Page 5 Indirect

More information

AGN 124 AVR Power Supplies

AGN 124 AVR Power Supplies Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 124 AVR Power Supplies DESCRIPTION The simplest way to provide a power supply for an AVR is to take power directly

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

NT & NQ CLASS II TRANSFORMERS FOR SIGNALLING SYSTEMS. A Balfour Beatty and Alstom Company

NT & NQ CLASS II TRANSFORMERS FOR SIGNALLING SYSTEMS. A Balfour Beatty and Alstom Company NT & NQ CLASS II TRANSFORMERS FOR SIGNALLING SYSTEMS A Balfour Beatty and Alstom Company NT Transformers CLASS II DOUBLE INSULATED HYBRID TRANSFORMERS / LOW POWER-T/J COMBINED UNITS FOR RELAY AND SSI SIGNALLING

More information

AGN 124 AVR Power Supplies

AGN 124 AVR Power Supplies Application Guidance Notes: Technical Information from Cummins Generator Technologies AGN 124 AVR Power Supplies DESCRIPTION The simplest way to provide a power supply for an AVR is to take power directly

More information

Data Sheet. Hall effect transducers, current and voltage

Data Sheet. Hall effect transducers, current and voltage Data Pack E Issued March 200 232-20 Data Sheet Hall effect transducers, current and voltage This data sheet covers the following products: RS stock no. Type of transducer 28-3 Multi-range current, PCB

More information

OBICON. Perfect Harmony. Short overview. ROBICON Perfect Harmony. System Overview. The Topology. The System. ProToPS. Motors.

OBICON. Perfect Harmony. Short overview. ROBICON Perfect Harmony. System Overview. The Topology. The System. ProToPS. Motors. and Drives Control R Interface OBICON Perfect Harmony Short overview 14.03.2007 1 System overview Product features Truly Scaleable Technology 300 kw to 30 MW (Single Channel) Large Number of Framesizes

More information

SPAJ 111 C. Sensitive earth-fault relay SPAJ 111 C. User s manual and Technical description. U aux V ~ V. f n. n ( I o>> SPCJ 1C7

SPAJ 111 C. Sensitive earth-fault relay SPAJ 111 C. User s manual and Technical description. U aux V ~ V. f n. n ( I o>> SPCJ 1C7 SPAJ 111 C Sensitive earth-fault relay User s manual and Technical description I n = 1A 5A ( I ) f n = 50Hz 60Hz 2 5 B I o I IRF SPAJ 111 C 80...265V ~ 18...80V U aux STEP I o > [%] I n 1.0 6.0 10 STEP

More information

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

TECHNICAL NEWS CABLE CONSIDERATIONS [ISSUE 46] DECEMBER 05 FEATURES:

TECHNICAL NEWS CABLE CONSIDERATIONS [ISSUE 46] DECEMBER 05 FEATURES: [ISSUE 46] DECEMBER 05 TECHNICAL NEWS INDUSTRIAL SWITCHGEAR & AUTOMATION SPECIALISTS CABLE CONSIDERATIONS By Application Engineering, Sydney. Size Matters: The size (csa) and the length of a cable run

More information

MV network design & devices selection EXERCISE BOOK

MV network design & devices selection EXERCISE BOOK MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester