1 Engineering Technical Report 129 ROEP Risk Assessment For Third Parties Using Equipment Connected To BT Lines 2006 Draft for Approval

2 2006 Energy Networks Association All rights reserved. No part of this publication may be reproduced, stored in retrieval or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written consent of Energy Networks Association. Specific enquiries concerning this document should be addressed to: Engineering Directorate Energy Networks Association 18 Stanhope Place Marble Arch London W2 2HH This document has been prepared for use by members of the Energy Networks Association to take account of the conditions which apply to them. Advice should be taken from an appropriately qualified engineer on the suitability of this document for any other purpose.

3 Page 3 CONTENTS Foreword Scope Definitions ROEP Magnitude Phase to Earth Faults Risk Assessment Procedure Calculations Telephone Telephone (without LVAC power supply) Telephone (with LVAC power supply) Public Telephone Kiosk Fax Machine Modem Miscellaneous Equipment Line Jack Unit Summary of Results Conclusions Recommendations Reassessment of ROEP contour distances Site Specific Risk Assessment Earthing System Modifications Line Isolation References Appendix A Risk Assessment Calculations Appendix B - Distribution System Fault Rates And Durations Introduction Fault Statistics NAFIRS DNO Fault Records (HV) Conclusions References... Error! Bookmark not defined. FIGURES Figure 1a Elevation Illustrating Transferred Potentiala... 5 Figure 1b Plan View of Hypothetical Substation Illustrating ROEP contours... 6 Figure Touch Potential Telephone (without LVAC power supply) Figure Touch Potential Telephone (with LVAC power supply) Figure Touch Potential Telephone Kiosk Figure 6.2 Touch Potential Fax Machine Figure 6.3 Touch Potential - Modem Figure B1 - Number of earth faults versus the percentage of theoretical maximum ROEP.. 27 TABLES Table 6.6 Individual Risk Levels Table 7 Consequences by ROEP level Table A Telephone (without LVAC power supply), domestic premises, ROEP = 1700V Table A a Public telephone kiosk ROEP=1150V Table A b Public telephone kiosk ROEP=1700V... 23

4 Page 4 Table A4 6.4 Miscellaneous Equipment (ROEP=1150V) Table A5 6.5 Line Jack Unit (ROEP =1150V)... 25

5 Page 5 ROEP RISK ASSESSMENT FOR THIRD PARTIES USING EQUIPMENT CONNECTED TO BT LINES FOREWORD This Report has been prepared by a joint working group of Accenture HR services on behalf of British Telecommunications (BT) and the Energy Networks Association (ENA). This report considers hazards to third parties close to electricity substations and/or generating stations. For the purposes of this report all such sites are referred to as substations. These hazards arise from potential differences (due to ROEP caused by an earth fault in the substation) between the third party property infrastructure and any BT line serving the property. The approach adopts the principles established in ITU-T K33 and is consistent with national health and safety legislation, in particular The Management of Health and Safety at Work Regulations This risk assessment is solely for use by members of the ENA and BT and no responsibility is accepted for its use by other parties. This document does not seek to address the costs and responsibilities involved with measures taken to mitigate ROEP hazards. Guidance on this aspect is provided in ENA ER S SCOPE This report considers hazards to third parties with BT services from transferred potentials in the ROEP zone of an electricity substation. Figure 1a illustrates how a transferred potential hazard can arise and Figure 1b illustrates ROEP contours at a hypothetical substation. NOTE The ROEP contours shown in Figure 1b should not be taken as representative of any particular substation. Figure 1a Elevation Illustrating Transferred Potentiala The assessment herein includes both fast fault clearance and slow fault clearance times.

6 Page 6 This report considers the hazard to persons arising from electric shock. Secondary risks associated with electric shock, i.e. falls are not considered. This risk assessment does not cover risks to BT operators working on services within the ROEP zone. These risks are addressed in a separate document. Figure 1b Plan View of Hypothetical Substation Illustrating ROEP contours

7 Page 7 2 DEFINITIONS Rise Of Earth Potential or ROEP The voltage set up between substation metalwork and true earth potential due to fault current ROEP Zone The zone within which the ROEP may exceed 650V (fast fault clearance) or 430V (slow fault clearance). Individual Risk Probability of fatality of an individual per annum Electricity Company Companies responsible for electricity transmission, distribution or generation at 33kV and above. Fast fault clearance <200ms on average Slow fault clearance >200ms and on average 500ms Third Party Any individual apart from those working for either BT or an Electricity Company. P FB Probability of heart fibrillation P E Probability of exposure P F Probability of an earth fault which gives rise to significant ROEP R s Source resistance (equal to 0 Ohms) R b Body resistance (equal to 650 Ohms to represent 95% of population) R be Resistance between body and earth R ib Resistance between body and source potential R t R s + R b + R be + R ib V B Circuit breakdown voltage

8 Page 8 I F Current flowing in exposure circuit D f Decrement factor

9 Page 9 3 ROEP MAGNITUDE ROEPs quoted are rms values. However, a maximum initial offset of 2.8 times the rms value will occur where the fault is initiated very close to current zero, and where the electrical system inductive reactance is very much greater than its resistance. Statistically, the likelihood of a fully offset waveform is therefore low. However, in this assessment, a maximum electrical system resistance/inductive reactance ratio (X/R) of 14 is used for this assessment. This corresponds to an initial offset current of 2.74 times the rms value, i.e. approaching the maximum value. Insulation breakdown voltages used in this assessment are rms values i.e. the peak withstand is 1.42 times the rms value. Therefore to allow for the offset the quoted breakdown voltages are reduced by a factor 2.74/1.42 = Since the probabilities of heart fibrillation are based on the energy content of a symmetrical current waveform, it is necessary to establish an equivalent rms value of the asymmetrical current waveform. IEEE 80 provides a means of calculating a decrement factor Df by which the rms value can be multiplied to account for asymmetry as follows: Df = Ta 1+ tf 2tf [ 1 e ] Ta where Ta is the offset time constant i.e. X/2πfR in seconds tf is the time duration of the fault in seconds For a fault duration of 200ms and an X/R ratio of 14, Df is approximately equal to 1.2. This factor is therefore taken into account in the determination of the probability of heart fibrillation.

10 Page 10 4 PHASE TO EARTH FAULTS For substations with equipment having fast clearance times, the probability of a fault (P F ) is estimated to be 0.5 faults per year for substations having fast fault clearance times and 1.0 fault per year for substations having slow fault clearance times. It is recognised that fault rates will vary depending on substation size, location, feeding arrangements etc. but it is considered sufficiently representative for the purposes of this assessment. It is also necessary to consider the average fault clearance time. It is estimated that for slow fault clearance the average clearance time is 500ms and for fast fault clearance the average clearance time is 200ms.

11 Page 11 5 RISK ASSESSMENT PROCEDURE A review of the types of equipment connected to BT lines was undertaken and an estimate of circuit resistances/breakdown voltages was made using data in [5]. The circuit current was determined by dividing the ROEP by the total circuit resistance (breakdown voltages were also taken into account). The probability of fibrillation (P FB ) was determined using IEC The activities of third parties using equipment connected to BT lines was considered and the probability of exposure (P E ) estimated. Using this information along with the probability of a fault (P F ) it was possible to estimate the level of individual risk to third party individuals. The calculations assume the worst case combination of potentials e.g. for an LVAC supplied telephone, the LVAC supply is assumed to be at ROEP. The intolerable risk threshold level used is 1 in 10,000 as advocated by HSE for members of the public.

12 Page 12 6 CALCULATIONS Equipment types, third party premises and activities have been considered as follows: 6.1 Telephone The risk assessment for telephone use considers the use of the handset only since time in contact with pushbuttons is assumed to be relatively small. The insulation level for the pushbuttons is considered to be no less than that for the handset, based on experimental data Telephone (without LVAC power supply) Exchange earth Telephone Metalwork at ROEP Figure Touch Potential Telephone (without LVAC power supply) The worst case scenario for use of telephone by a third party in domestic premises is considered to be within a high humidity environment e.g. a kitchen. Experimental data indicates a minimum telephone handset breakdown voltage of 3700V rms at 97% Relative Humidity (note that in a low humidity environment the breakdown voltage is in excess of 8000V rms). A value of 3330V rms is used for the assessment i.e. a safety factor of 10% is applied to the lowest test breakdown voltage. Application of the breakdown voltage factor of 1.93 from section 4 reduces this to approximately 1700V rms. This results in no current flow below 1700V rms and hence negligible individual risk. At 1700V and above the individual risk level is assessed in the upper tolerable region, see Appendix 1 Table A1(6.1.1). In addition, at 1700V rms and above there is a likelihood of damage to equipment and loss of service Telephone (with LVAC power supply) The LVAC supply is assumed to be at ROEP, since this represents the worst case condition for equipment failure and consequent loss of service (it is unlikely that the LVAC supply will have a different potential compared with exposed metalwork due to equipotential bonding in accordance with BS 7671). It is assumed that the telephone LVAC supply is insulated in accordance with IEC to class II insulation levels. This means that the supply is insulated to 2860V rms (application of the offset factor from section 4 reduces this to approximately 1480V rms) and that a protective earth connection is not supplied. Two equipment configurations are considered: A. That an earth connection is provided which is connected to ELV circuitry within the

13 Page 13 telephone to provide a signalling path e.g. subscribers private metering and B. No earth connection is provided. Exchange earth Telephone Metalwork at ROEP Earth connection (where fitted) L&N LVAC supply at ROEP Figure Touch Potential Telephone (with LVAC power supply) It is assumed that the telephone is manufactured in accordance with BS EN [2] and therefore has line isolation with minimum impulse withstand of 1500V. However, experimental data indicates a minimum breakdown voltage of 2500V rms. A value of 2250V rms is used for the assessment i.e. a safety factor of 10% is applied to the lowest test breakdown voltage. Application of the breakdown voltage factor of 1.93 from section 4 reduces this to approximately 1150V rms. Experimental data indicates a minimum telephone handset breakdown voltage of 3700V rms at 97% Relative Humidity (note that in a low humidity environment the breakdown voltage is in excess of 8000V rms). A value of 3330V rms is used for the assessment i.e. a safety factor of 10% is applied to the lowest test breakdown voltage. Application of the breakdown voltage factor of 1.93 from section 4 reduces this to approximately 1700V rms. For configurations A and B, for ROEP less than 1150V rms, breakdown should not occur and the risks are therefore assessed as negligible. For configuration B, breakdown may occur at 1480V, causing equipment damage and loss of service. For configuration A, breakdown may occur at 1150V, with the same consequences. At 1700V rms and above the resultant risks are considered the same as in

14 Page Public Telephone Kiosk Public telephone kiosk Exchange earth LVAC supply L & N only Local earth at ROEP Ground at ROEP Figure Touch Potential Telephone Kiosk It is assumed that an individual will be in contact with metallic enclosure of the telephone when in use through either resting a hand on the wall mounted unit or by holding the cord to the handset or by touching the kiosk metalwork. It is assumed that the wall mounted unit is electrically connected to the kiosk metalwork through its mountings. It is assumed that the telephone is LVAC supplied, but that the supply is insulated in accordance with IEC to class II insulation levels. This means that the supply is insulated to 2860V rms and a protective earth connection is not supplied. Application of the breakdown voltage factor of 1.93 from section 3 reduces this to approximately 1480V rms. A local earth is provided which is connected to ELV circuitry within the telephone to provide a signalling path for e.g. subscribers private metering. It is assumed that there is no insulation between the ELV circuitry earth and the metallic enclosure of the telephone. It is assumed that the telephone is manufactured in accordance with BS EN and therefore has line isolation with minimum impulse withstand of 1500V. However, experimental data indicates a minimum breakdown voltage of 2500V rms. A value of 2250V rms is used for the assessment i.e. a safety factor of 10% is applied to the lowest test breakdown voltage. Application of the breakdown voltage factor of 1.93 from section 4 reduces this to approximately 1150V rms. There is no current flow below 1150V rms and hence negligible individual risk. At 1150V rms and above (slow clearance) the individual risk level is assessed as unacceptable, see Appendix 1 Table A2 (6.1.3a). In addition, at 1150V rms and above there is a likelihood of damage to equipment and loss of service. For fast clearance times the threshold voltage for 0% chance of fibrillation is approximately 1700V. Above 1700V the individual risk level is within the upper tolerable region, see Appendix 1 Table A3 (6.1.3b).

15 Page Fax Machine Exchange earth Fax machine Ground at ROEP LVAC supply at ROEP Figure 6.2 Touch Potential Fax Machine The scenario of the fax machine is considered to be much the same as that of the LVAC supplied telephone in Where the fax machine has a handset the risks associated with using the handset are considered identical to those in Experimental data indicates a minimum push button breakdown voltage in excess of 5000V, but assuming this as the minimum value, application of a 10% safety factor and the breakdown voltage factor of 1.93 from section 4 reduces this to approximately 2300V rms. Since the assessment in indicates that mitigation is required at a lower voltage, analysis at 2300V is not worthwhile, and the outcome is considered the same as in Modem Exchange earth Modem PC Keyboard or mouse LVAC supply at ROEP LVAC supply at ROEP Ground at ROEP Figure 6.3 Touch Potential - Modem The scenario of the modem is considered to be similar to that of the LVAC supplied telephone in 6.1.2, other than that a keyboard or mouse is used instead of a handset.

16 Page 16 Experimental data indicates a minimum keyboard and mouse breakdown voltage in excess of 5000V, but assuming this as the minimum value, application of a 10% safety factor and the breakdown voltage factor of 1.93 from section 4 reduces this to approximately 2300V rms. Since the assessment in indicates that mitigation is required at a lower voltage, analysis at 2100V is not worthwhile, and the outcome is considered the same as in Miscellaneous Equipment Miscellaneous equipment includes television set top boxes, alarm systems etc, i.e. equipment which has a connection to the BT network, is LVAC powered but where manmachine contact is infrequent. It is assumed that the equipment may be connected to other associated equipment e.g. a television set in the case of a set top box. The scenario for miscellaneous equipment is considered to be similar to that of the LVAC supplied telephone in 6.1.2, other than for the man-machine contact medium e.g. pushbuttons, rotary control knobs etc. At 1150V and above there is a likelihood of power supply or line isolation breakdown i.e. damage to equipment and loss of service. Since this assessment covers a wide range of equipment, experimental data for the manmachine contact medium is not considered representative. Taking a pessimistic approach, breakdown voltage is neglected in which case the individual risk at voltages of 1150V and above is assessed as tolerable, see Appendix 1 Table A4 (6.4). For fast clearance times the threshold voltage for 0% chance of fibrillation is approximately 3500V. Above 3500V the individual risk level remains within the tolerable region. 6.5 Line Jack Unit A person could come into contact with the metallic connections in the LJU or metallic wires when for example fitting a telephone extension. For non-domestic premises it is assumed that the operator will disconnect from the BT network prior to making terminations, consequently eliminating the hazard. For domestic premises the hazard is assessed as negligible, for voltages of 1150V and above see Appendix 1 Table A5 (6.5). 6.6 Summary of Results All the risk level calculations are detailed in Appendix 1 and the results are summarised in Table 6.6.

17 Page 17 Scenario Telephone (without LVAC power supply) Telephone (with LVAC power supply) Public telephone kiosk Voltage contour (V rms) 0<ROEP< ROEP 0<ROEP< ROEP< ROEP 1150 ROEP< ROEP 6.2 Fax machine As Modem As Individual Risk Negligible Upper tolerable (fast clearance) Unacceptable (slow clearance) Negligible Negligible Upper tolerable Unacceptable (slow clearance) Negligible (fast clearance) Upper tolerable (fast clearance) Equipment risk Loss of equipment/ service possible Loss of equipment/ service possible Loss of equipment/ service possible Loss of equipment/ service possible Loss of equipment/ service possible 6.4 Miscellaneous equipment 0<ROEP< ROEP Negligible 6.5 Line Jack Unit (LJU) 1150 ROEP Negligible Lower tolerable (slow clearance) Loss of equipment/ service possible Table 6.6 Individual Risk Levels

18 Page 18 7 CONCLUSIONS The conclusions are summarised below in Table 7. ROEP 0<ROEP<1150 Consequence Individual None Equipment None 1150 ROEP< ROEP Unacceptable (slow clearance) Negligible (fast clearance) Unacceptable (slow clearance) Upper tolerable (fast clearance) Loss of equipment/service likely Loss of equipment/service likely Table 7 Consequences by ROEP level

19 Page 19 8 RECOMMENDATIONS It is recommended that BT and the ESI adopt the following thresholds for ROEP contours that could affect BT services within third party properties Volts (Slow clearance protection) 1700 Volts (Fast clearance protection) For ROEP voltages above these values mitigation measures should be considered that will reduce these risks. There are a number of options that can be used as noted below. 8.1 Reassessment of ROEP contour distances The accuracy with which ROEP contours are calculated varies with the methodology adopted. For example, the use of advanced software to model an earthing system may potentially produce a more accurate result than that by simple calculation. The simple methods tend to overestimate contour distances since safety factors are normally included to allow for inaccuracy. Therefore, by carrying out a more accurate assessment, the ROEP contour distances may justifiably be reduced. 8.2 Site Specific Risk Assessment The risk assessment undertaken in this document is generic in nature, intending to cover all reasonably foreseeable hazards. However, at some sites not all hazards will arise. For example, there are likely to be few sites where public telephone kiosks are affected by ROEP. Where there are no kiosks the associated risks do not arise, and this could significantly affect the outcome of the assessment. 8.3 Earthing System Modifications The design of an earthing system (along with fault current and ground resistivity) determines the resultant ROEP contour distances and profiles. For example, installing additional earthing on one side of an earthing system may result in the ROEP contour distances reducing on the opposite side. So, where third party property is only affected say on one side of a substation, and there is vacant land available on the opposite side, additional earthing may result in a reduced third party impact. However, care should be taken to determine that the land used for additional earthing is not likely to be subject to future development. 8.4 Line Isolation BT lines may be afforded suitable electrical isolation. By installing line isolation units at affected properties the electrical continuity to the remote (exchange) earth is broken, thereby eliminating any transferred potential hazard. However, this option would raise other issues; for example the need to give property owners advance warning of higher costs for telephone service. Note that these options are not set out in any particular order of preference and the option(s) actually adopted are likely to vary from site to site, taking due account of the most cost effective approach. It is noted that by implementing these recommendations there will be a residual risk of equipment damage at sites having 1150 ROEP<1700 where the ROEP is caused by a fault which would be cleared by high speed protection. However, this is considered acceptable bearing in mind the pessimistic nature of the assessment (e.g. the inclusion of voltage waveform offset from section 3) and the historically low known occurrence of equipment failure.

20 Page 20 9 REFERENCES ITU-T K33 Limits for people safety related to coupling into telecommunications system from ac electric power and ac electrified railway installations in fault conditions 1996 The Management of Health and Safety at Work Regulations 1999 ETR128, Risk Assessment for telecommunications operators working in a ROEP zone, Joint Working Group of Energy Networks Association and Accenture HR Services (on behalf of British Telecommunications). IEEE Standard 80 Guide for safety in AC substation grounding 2000 IEC Effects of current on human beings and livestock Reducing Risks, Protecting People, HSE BS 7671 Requirements for Electrical Installations 1992 IEC Insulation co-ordination for equipment within low voltage systems 2002 BS EN Specification for safety of information technology equipment, including electrical business equipment. Electricity Association Engineering Recommendation S36-1. Procedure to Identify and Record Hot Substations NGC document - Risk Assessment associated with Ground Potential Rise at National Grid Substation Sites, draft issue 2.

21 Page 21 APPENDIX A RISK ASSESSMENT CALCULATIONS Third Party Voltage Contour Map Reference P F Activity P E Circuit resistances R s, R b, R ib, R be, R T Details Telephone user 1700V N/A 0.5 (fast clearance) 1.0 (slow clearance) Using telephone in kitchen while simultaneously touching earthed metallic infrastructure e.g. central heating radiator x 0.1 x 0.1= R b =650 R ib = 30 R be = 0 R s = 0 R t = 680 Comments Use of phone = (20mins/day) Percentage of phone use in kitchen during high humidity est. 10% Percentage of time in contact with earthed metalwork est. 10% V B 1700V Includes breakdown factor 1.93 I F 1.2A P FB 1.0 Individual Risk 1 in 14,000 approx (fc) 1 in 7,000 approx (sc) Includes D f = 1.2 and heart current factor 0.4 Tolerable (upper) Unacceptable Table A Telephone (without LVAC power supply), domestic premises, ROEP = 1700V

22 Page 22 Third Party Voltage Contour Map Reference P F Activity Details Telephone user 1150V N/A 0.5 (fast clearance) 1.0 (slow clearance) Using telephone Comments It is assumed that third party uses the public telephone as their primary telephone P E 6.9E-3 x 0.5 = 3.47x10-3 Use of phone = 10 mins per day Time touching metalwork est. 50% Circuit resistances R s, R b, R ib, R be, R T R b =650 R ib = 0 R be = 5000 R s = 0 R t = 5650 Assume damp leather shoes on hard soil V B I F 0.24A Includes D f = 1.2 P FB Individual Risk ms 1 in ms Negligible Unacceptable Table A a Public telephone kiosk ROEP=1150V

23 Page 23 Third Party Voltage Contour Map Reference P F Activity Details Telephone user 1700V N/A 0.5 (fast clearance) Using telephone Comments It is assumed that third party uses the public telephone as their primary telephone P E 6.9E-3 x 0.5 = 3.47x10-3 Use of phone = 10 mins per day Time touching metalwork est 50% Circuit resistances R s, R b, R ib, R be, R T R b =650 R ib = 0 R be = 5000 R s = 0 R t = 5650 Assume damp leather shoes on hard soil V B I F 0.36A Includes D f = 1.2 P FB 200ms Individual Risk 1 in 11, ms Tolerable (upper) Table A b Public telephone kiosk ROEP=1700V

24 Page 24 Third Party Voltage Contour Map Reference P F Activity Details Misc. equipment user 1150V N/A 0.5 (fast clearance) 1.0 (slow clearance) Touching equipment (or other equipment connected to it) controls. Comments Direct contact usually obviated by use of remote controls P E 5.8x10-5 day estimated at 5 seconds Time in direct contact with equipment per Circuit resistances R s, R b, R ib, R be, R T R b =650 R ib = 0 R be = R s = 0 R t = 12,150 Assume bare feet and dry foam backed carpet and dry concrete floor (no DPC) V B 0 Assume zero since not known I F 0.11A Includes D f = 1.2 P FB Individual Risk 200ms 500ms 200ms 1 in 350, ms Negligible Tolerable (lower) Table A4 6.4 Miscellaneous Equipment (ROEP=1150V)

25 Page 25 Third Party Voltage Contour Map Reference P F Activity Details Person fitting extension to LJU in domestic premises 1150V N/A 0.5 (fast clearance) 1.0 (slow clearance) Touching metallic connections/wires Comments P E 1.9x10-6 per year estimated at 1 minute Time in direct contact with connections Circuit resistances R s, R b, R ib, R be, R T R b =650 R ib = 0 R be = R s = 0 R t = 12,150 Assume foam backed carpet and dry concrete floor (no DPC) V B I F 0.11A Includes D f = 1.2 P FB 200ms 500ms Individual Risk 1 in 10,000,000 Negligible Table A5 6.5 Line Jack Unit (ROEP =1150V)

26 Page 26 APPENDIX B - DISTRIBUTION SYSTEM FAULT RATES AND DURATIONS Introduction The analysis within this document and Engineering Technical Report 128 uses fault rates of 0.5 and 1.0 faults per year corresponding to fast and slow average fault clearance times of 200ms and 500ms respectively. It is recognised that the latter fault rate of 1.0 per year is not necessarily typical of UK Distibution Networks. It could therefore be argued that the resultant voltage thresholds for Rise of Earth Potential (ROEP) are not strictly applicable to DNO Distribution Systems. However, the following analysis provides justification that the threshold of 1150V determined within the ETRs can be applied to Distribution Networks to provide safe working for BT (Telecom) operatives and third parties using BT (Telecom) equipment to define safe working zones around substations. The rationale for this reasoning is as follows. Fault Statistics NAFIRS NAFIRS fault data shows the overhead line five year average fault rate up to 2003/2004 for all DNOs as HV (up to 11kV) = 8.2 Faults/100km/Year EHV (above 11kV) = 3.3 Faults/100km/Year Ofgem Information and Incentives (IIP) Benchmark Data shows that the average HV feeder length for the UK DNOs = 30km. This information is not available under IIP for EHV circuits but it is reasonable to use the Southern Electric figure which is = 20km. Per feeder this then equates to HV = 8.2x0.3 = 2.5 Faults/Year EHV = 3.3x0.2 = 0.66 Faults/Year We must also account for the possibility that these feeders will go through an auto-reclose sequence before lockout. If we assume on average 3 reclosures per fault the number of faults per feeder become HV = 4x2.5 = 10 Faults/Year EHV = 4x0.66 = 2.64 Faults/Year Of course not all faults will be to earth. DNO figures suggest that as many as 80% of overhead line faults are to earth and this means that the number of faults with possible ROEP impact are HV = 0.8x10 = 8 Faults/Year EHV = 0.8x2.64 = 2.11 Faults/Year For the total earth faults affecting an individual substation we must multiply this value by the average number of feeders connected to it. It is reasonable to assume there are on average 2 EHV Feeders and 3 HV Feeders connected. HV = 8x3 = 24 Faults/Year EHV = 2x2.11 = 4.22 Faults/Year

27 Page 27 DNO Fault Records (HV) A fault monitor at a typical DNO HV substation recorded 34 HV earth faults during a year, which is of the same order as the foregoing NAFIRS derived result. Analysis of these faults gave an average fault clearance time of 715ms. Although longer than the fault duration used in the analysis in the ETRs, it is not high enough to significantly affect the outcome. Figure B1 shows the number of earth faults versus the percentage of theoretical maximum ROEP. The theoretical maximum corresponds to that which would be calculated by the distribution company following an earthing assessment at the site. Note that in determining the ROEP at a particular substation, the earth resistance or impedance (found by measurement and/or modelling) is multiplied by the theoretical maximum earth return current (often with an additional safety factor). This calculated ROEP will be compared against the new 1150V recommended safety threshold voltage and mitigation applied where this is exceeded. The residual risk therefore arises from ROEP events having voltage magnitudes within a statistical fault distribution which cannot exceed 1150V. From figure B1 it can be seen that 94% (32 out of 34) of faults do not exceed 40% of the maximum theoretical value. The average percentage of the maximum theoretical ROEP is 26%, which corresponds to a 50% Probability of Heart Fibrillation in ETR 128 (see section ). This means that rather than using a 100% Probability of Fibrillation as pessimistically adopted in the ETR, it is justifiable to use 50% Number of Faults % of Theoretical Max ROEP Figure B1 - Number of earth faults versus the percentage of theoretical maximum ROEP Conclusions The risk analysis outcome in the body of this document is not significantly affected by the changes in fault frequency and duration contained herein.

28 Page 28 It is therefore concluded that the calculated threshold value of 1150 volts for fault clearance times greater than 200ms for the DNO Distribution Networks can be adopted in place of the current 430V threshold.

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

EDS FAULT LEVELS

EDS FAULT LEVELS Document Number: EDS 08-1110 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-1110 FAULT LEVELS This standard provides guidance on the calculation, application and availability of

More information

Appendix D Fault Levels

Appendix D Fault Levels Appendix D Fault Levels Page 1 Electricity Ten Year Statement November 2013 D.1 Short Circuit Currents Short Circuit Currents Three phase to earth and single phase to earth short circuit current analyses

More information

Identification and recording of 'hot' sites - joint procedure for Electricity Industry and Communications Network Providers

Identification and recording of 'hot' sites - joint procedure for Electricity Industry and Communications Network Providers PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation S36 Identification and recording of 'hot' sites - joint procedure for Electricity Industry and Communications

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D Electricity Ten Year Statement November 2017 01 Electricity Ten Year Statement November 2017 001 Appendix D 1 Short-circuit currents 02 2 Short-circuit current terminology 04 3 Data requirements 07 4 Fault

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System

Company Directive STANDARD TECHNIQUE: SD7F/2. Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Company Directive STANDARD TECHNIQUE: SD7F/2 Determination of Short Circuit Duty for Switchgear on the WPD Distribution System Policy Summary This document provides guidance on calculation of fault levels

More information

AC Voltage- Pipeline Safety and Corrosion MEA 2015

AC Voltage- Pipeline Safety and Corrosion MEA 2015 AC Voltage- Pipeline Safety and Corrosion MEA 2015 WHAT ARE THE CONCERNS ASSOCIATED WITH AC VOLTAGES ON PIPELINES? AC concerns Induced AC Faults Lightning Capacitive coupling Safety Code Induced AC Corrosion

More information

Engineering Recommendation M30 Issue Standard Electricity Network Operator Electricity Smart Meter Configurations

Engineering Recommendation M30 Issue Standard Electricity Network Operator Electricity Smart Meter Configurations PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation M30 Standard Electricity Network Operator Electricity Smart Meter s www.energynetworks.org PUBLISHING AND

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING. Rev. 01 SEC DISTRIBUTION GROUNDING STANDARD SDCS-03 Part-II Rev.01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-II) OVERHEAD NETWORK GROUNDING Rev. 01 This specification is property of SEC

More information

Industrial and Commercial Power Systems Topic 7 EARTHING

Industrial and Commercial Power Systems Topic 7 EARTHING The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 7 EARTHING 1 INTRODUCTION Advantages of earthing (grounding): Limitation

More information

Guidelines for the design, installation, testing and maintenance of main earthing systems in substations

Guidelines for the design, installation, testing and maintenance of main earthing systems in substations PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 41-24 Issue 2, November 2018 Guidelines for the design, installation, testing and maintenance of main earthing

More information

Company Directive STANDARD TECHNIQUE : TP21A/2. Relating to Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment

Company Directive STANDARD TECHNIQUE : TP21A/2. Relating to Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment Company Directive STANDARD TECHNIQUE : TP21A/2 Relating to Safety Limits for Touch and Step Voltages - Earthing System Design/Assessment Policy Summary This document defines safety limits for touch and

More information

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING

PRACTICAL PROBLEMS WITH SUBSTATION EARTHING 1 PRACTICAL PROBLEMS WITH SUBSTATION EARTHING Dr Hendri Geldenhuys Craig Clark Eskom Distribution Technology This paper considers the issues around substation sites where the soil resistivity is of particularly

More information

AC INTERFERENCE OF TRANSMISSION LINES ON RAILWAYS: INFLUENCE OF TRACK-CONNECTED EQUIPMENT I. ABSTRACT

AC INTERFERENCE OF TRANSMISSION LINES ON RAILWAYS: INFLUENCE OF TRACK-CONNECTED EQUIPMENT I. ABSTRACT AC INTERFERENCE OF TRANSMISSION LINES ON RAILWAYS: INFLUENCE OF TRACK-CONNECTED EQUIPMENT R. D. Southey, J. Liu, F. P. Dawalibi, Y. Li Safe Engineering Services & technologies ltd. 1544 Viel, Montreal,

More information

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS AS 2067 1984 Australian Standard Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv [Title allocated by Defence Cataloguing Authority: SWITCHGEAR ASSEMBLIES, ELECTRICAL AND

More information

Prepared by Mick Maytum

Prepared by Mick Maytum IEC Technical Committee 109: Standards on insulation co-ordination for low-voltage equipment Warning Prepared by Mick Maytum mjmaytum@gmail.com The document content is of a general nature only and is not

More information

Earthing of Electrical Devices and Safety

Earthing of Electrical Devices and Safety Earthing of Electrical Devices and Safety JOŽE PIHLER Faculty of Electrical Engineering and Computer Sciences University of Maribor Smetanova 17, 2000 Maribor SLOVENIA joze.pihler@um.si Abstract: - This

More information

Options to Improve the MEN System into the 21 st Century

Options to Improve the MEN System into the 21 st Century Options to Improve the MEN System into the 21 st Century Chris Halliday Electrical Consulting and Training Pty Ltd, Gladstone NSW, Australia. Email: chris@elect.com.au Web: www.elect.com.au Abstract Network

More information

25kV A.C. Electrified Lines - Traction Bonding

25kV A.C. Electrified Lines - Traction Bonding Date:MAR 94 25kV A.C. Electrified Lines - Traction Page 1 of 6 Part A Synopsis This is issued by the to define the Boards requirements for continuity bonding on railway systems. This will ensure a continuous

More information

GK/GN0653. Guidance on Control of Unwanted Voltages on Telecommunications. Equipment at Stations. Rail Industry Guidance Note for GK/RT0053

GK/GN0653. Guidance on Control of Unwanted Voltages on Telecommunications. Equipment at Stations. Rail Industry Guidance Note for GK/RT0053 GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited GK/GN0653 Telecommunications Equipment at Stations Issue One: December 2011

More information

Reference Number PDS 04 (RIC Standard: EP SP)

Reference Number PDS 04 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 04 (RIC Standard: EP 12 10 00 10 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it.

SPTS 1 - Ratings and General Requirements for Plant, Equipment and Apparatus for The ScottishPower System and Connection Points to it. 1. SCOPE The requirements of this document apply to all Plant, Equipment and Apparatus that are part of, or are Directly connected to, the Company network. Requirements contained herein may be modified

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE International Telecommunication Union ITU-T K.21 TELECOMMUNICTION STNDRDIZTION SECTOR OF ITU (11/2011) SERIES K: PROTECTION GINST INTERFERENCE Resistibility of telecommunication equipment installed in

More information

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES

LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES LONGITUDINAL INDUCTION VOLTAGE MEASUREMENT ON COMMUNICATION CABLES RUNNING PARALLEL TO OVERHEAD LINES IEEE PES Transmission and Distribution Conference_ Chicago April 2008 Dean Sharafi Introduction Electro-magnetic

More information

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01

SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING. Rev. 01 SDCS-03 DISTRIBUTION NETWORK GROUNDING CONSTRUCTION STANDARD (PART-I) UNDERGROUND NETWORK GROUNDING Rev. 01 This specification is property of SEC and subject to change or modification without any notice

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date

More information

ELECTRICAL POWER TRANSMISSION TRAINER

ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER ELECTRICAL POWER TRANSMISSION TRAINER This training system has been designed to provide the students with a fully comprehensive knowledge in Electrical Power Engineering

More information

SAFETY ASPECTS AND NOVEL TECHNICAL SOLUTIONS FOR EARTH FAULT MANAGEMENT IN MV ELECTRICITY DISTRIBUTION NETWORKS

SAFETY ASPECTS AND NOVEL TECHNICAL SOLUTIONS FOR EARTH FAULT MANAGEMENT IN MV ELECTRICITY DISTRIBUTION NETWORKS SAFETY ASPECTS AND NOVEL TECHNICAL SOLUTIONS FOR EARTH FAULT MANAGEMENT IN MV ELECTRICITY DISTRIBUTION NETWORKS A. Nikander*, P. Järventausta* *Tampere University of Technology, Finland, ari.nikander@tut.fi,

More information

PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION 1 Technical Specification 41-24 Issue 2017 Guidelines for the Design, Installation, Testing and Maintenance of Main Earthing Systems

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Distribution transformers Part 2 Ground mounted transformers not closecoupled

Distribution transformers Part 2 Ground mounted transformers not closecoupled PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Technical Specification 35-1 Distribution transformers Part 2 Ground mounted transformers not closecoupled www.energynetworks.org PUBLISHING

More information

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE INTERNTIONL TELECOMMUNICTION UNION TELECOMMUNICTION STNDRDIZTION SECTOR OF ITU K.21 (10/2000) SERIES K: PROTECTION GINST INTERFERENCE Resistibility of telecommunication equipment installed in customer

More information

ITU-T Study Group 5 Safety limits & Sharing responsibility

ITU-T Study Group 5 Safety limits & Sharing responsibility International Telecommunication Union ITU-T Safety limits & Sharing responsibility Hans-Göran Öhlin Rapporteur of Question 9/5 Telia AB Workshop on: EMC, safety and EMF effects in telecommunications o

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE International Telecommunication Union ITU-T K.21 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (04/2008) SERIES K: PROTECTION AGAINST INTERFERENCE Resistibility of telecommunication equipment installed

More information

Webinar: An Effective Arc Flash Safety Program

Webinar: An Effective Arc Flash Safety Program Webinar: An Effective Arc Flash Safety Program Daleep Mohla September 10 th, 2015: 2pm ET Agenda Arc Flash Defined and Quantified NFPA 70E / CSA Z 462 - Recent Updates What is the ANSI Z10 Hierarchy of

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T K.21 TELECOMMUNICTION STNDRDIZTION SECTOR OF ITU (07/2017) SERIES K: PROTECTION GINST INTERFERENCE Resistibility of telecommunication

More information

Technical Requirements for Resistibility of Telecommunications Equipment to. Overvoltage and Overcurrent

Technical Requirements for Resistibility of Telecommunications Equipment to. Overvoltage and Overcurrent Technical Requirements for Resistibility of Telecommunications Equipment to Overvoltage and Overcurrent TR NO.189001 Edition 3 1st, April, 2018 Nippon Telegraph and Telephone Corporation Notice This document

More information

VI 3 - i TABLE OF CONTENTS

VI 3 - i TABLE OF CONTENTS VI 3 - i TABLE OF CONTENTS 3 PROJECT SPECIFIC DATA... 1 3.1 DEFINITIONS... 1 3.1.1 Design Data, High and Medium Voltage... 1 3.1.2 Design Data, Low Voltage Equipment... 2 3.1.3 Phase Relationship... 3

More information

SAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING

SAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING SAFETY ISSUES RELATED TO THE CONNECTION OF MV AND HV GROUNDING Y. Rajotte J. Fortin G. Lessard Hydro-Québec, Canada Hydro-Québec, Canada Hydro-Québec, Canada e-mails: rajotte.yves@ireq.ca fortin.jacques@ireq.ca

More information

Suppliers' Information Note. BT Metallic Path Facility. Interface Description

Suppliers' Information Note. BT Metallic Path Facility. Interface Description SIN 349 Issue 2.5 August 2015 Suppliers' Information Note For The BT Network BT Metallic Path Facility Interface Description Each SIN is the copyright of British Telecommunications plc. Reproduction of

More information

AMENDMENT NO. 1 SEPTEMBER IS (Part 1) : 2001/IEC (1991) SURGE ARRESTORS

AMENDMENT NO. 1 SEPTEMBER IS (Part 1) : 2001/IEC (1991) SURGE ARRESTORS AMENDMENT NO. 1 SEPTEMBER 2011 TO IS 15086 (Part 1) : 2001/IEC 60099-1 (1991) SURGE ARRESTORS PART 1 NON-LINEAR RESISTOR TYPE GAPPED SURGE ARRESTORS FOR a.c. SYSTEMS (The Amendment was originally published

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books.

NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes or text books. City & Guilds Fundamental Inspection & Testing 30 Question Test Sheet (2392-10 Paper No1.) NOTE: This paper relates to a closed book exam & therefore candidates should attempt this exam paper with no study-notes

More information

EVALUATION OF DIFFERENT SOLUTIONS OF FAULTED PHASE EARTHING TECHNIQUE FOR AN EARTH FAULT CURRENT LIMITATION

EVALUATION OF DIFFERENT SOLUTIONS OF FAULTED PHASE EARTHING TECHNIQUE FOR AN EARTH FAULT CURRENT LIMITATION EVALUATION OF DIFFERENT SOLUTIONS OF FAULTED PHASE EARTHING TECHNIQUE FOR AN EARTH FAULT CURRENT LIMITATION David TOPOLANEK Petr TOMAN Michal PTACEK Jaromir DVORAK Brno University of Technology - Czech

More information

Analysis of transfer touch voltages in low-voltage electrical installations

Analysis of transfer touch voltages in low-voltage electrical installations Building Serv. Eng. Res. Technol. 31,1 (2010) pp. 27 38 Analysis of transfer touch voltages in low-voltage electrical installations M Barrett a BSc, K O Connell a BSc MSc CEng and ACM Sung b BSc MSc PhD

More information

Digital Clamp Meter (TRMS) Model : 2727

Digital Clamp Meter (TRMS) Model : 2727 Digital Clamp Meter (TRMS) Model : 2727 Instruction Manual 1. SPECIFICATIONS 1.1 General Specifications Display : 3 ¾ digit liquid crystal display (LCD) with a maximum reading of 3999. Polarity : Automatic,

More information

New Report Indicates AC Inductance/Electrodynamic Dust Detectors May Be Hazardous. Ron Dechene Auburn Systems, LLC Danvers MA 01923

New Report Indicates AC Inductance/Electrodynamic Dust Detectors May Be Hazardous. Ron Dechene Auburn Systems, LLC Danvers MA 01923 New Report Indicates AC Inductance/Electrodynamic Dust Detectors May Be Hazardous Ron Dechene Auburn Systems, LLC Danvers MA 01923 Summary An independent study has concluded that polymer jacketed, or coated,

More information

The Variable Threshold Neutral Isolator (VTNI)

The Variable Threshold Neutral Isolator (VTNI) The Variable Threshold Isolator (VTNI) Installation Instructions INTRODUCTION The is designed specifically for installation between the primary neutral of a power utility distribution system and the secondary

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60071-2 Third edition 1996-12 Insulation co-ordination Part 2: Application guide This English-language version is derived from the original bilingual publication by leaving out

More information

Technical Requirements for Resistibility of Telecommunications Equipment to. Overvoltage and Overcurrent

Technical Requirements for Resistibility of Telecommunications Equipment to. Overvoltage and Overcurrent Technical Requirements for Resistibility of Telecommunications Equipment to Overvoltage and Overcurrent TR NO.189001 Edition 2.1 1st, April, 2015 Nippon Telegraph and Telephone Corporation Notice This

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

EDS EARTHING DESIGN CRITERIA, DATA AND CALCULATIONS

EDS EARTHING DESIGN CRITERIA, DATA AND CALCULATIONS Document Number: EDS 06-0012 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 06-0012 EARTHING DESIGN CRITERIA, DATA AND CALCULATIONS EPN, LPN, SPN This standard is a companion document to the earthing

More information

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012

I P. /dt. di p V S+ Applications. Standards. 1) IEC ed1.0: 2007; IEC : ed1.0: 2012 Ref: ART-B22-D70, ART-B22-D125, ART-B22-D175 Flexible clip-around Rogowski coil for the electronic measurement of AC current with galvanic separation between the primary circuit (power) and the secondary

More information

Grounding for Power Quality

Grounding for Power Quality Presents Grounding for Power Quality Grounding for Power Quality NEC 250.53 states that ground resistance should be less than 25 ohms. Is this true? Grounding for Power Quality No! NEC 250.53 states

More information

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK LIMITS FOR TEMPORARY OEROLTAGES IN ENGLAND AND WALES NETWORK This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept

More information

Appendix B to Working on Exposed Energized Parts

Appendix B to Working on Exposed Energized Parts Working on Exposed Energized Parts. - 1910.269 App B Regulations (Standards - 29 CFR) - Table of Contents Part Number: 1910 Part Title: Occupational Safety and Health Standards Subpart: R Subpart Title:

More information

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM

ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM ON-LINE PARTIAL DISCHARGE TESTING OF SOME OF THE WORST PERFORMING CIRCUITS ON A UTILITY DISTRIBUTION SYSTEM D. Clark¹ R. Mackinlay² M. Seltzer-Grant² S. Goodfellow² Lee Renforth² Jamie McWilliam³ and Roger

More information

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards.

Field Instruction. Induced voltages can occur in overhead lines, underground cables, or in switchyards. 8.3 Induced Voltage Purpose The purpose of this instruction is to provide awareness of Electrostatic and Electromagnetic induced voltages and the method required to reduce or eliminate it. An induced voltage

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: All ENGINEERING COMMISSIONING PROCEDURE ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing of new and

More information

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages

Session Four: Practical Insulation Co-ordination for Lightning Induced Overvoltages Session Four: ractical Insulation Co-ordination Session Four: ractical Insulation Co-ordination for Lightning Induced Overvoltages Jason Mayer Technical Director, Energy Services, Aurecon Introduction

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary circuit and the secondary circuit.

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary circuit and the secondary circuit. Current Transducer CTSR 0.6-TP/SP2 I PRN = 600 ma For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary circuit and the secondary circuit. Features

More information

Power System Studies

Power System Studies Power System Studies Laois Ballyragget Cable Feasibility Study PE667-F4-R3-1-3 ESBI Engineering Solutions Stephen Court, 18/21 St Stephen s Green, Dublin 2, Ireland Telephone+353-1-73 8 Fax+353-1-661 66

More information

N. TEST TEST DESCRIPTION

N. TEST TEST DESCRIPTION Multi function system for testing substation equipment such as: current, voltage and power transformers, all type of protection relays, energy meters and transducers Primary injection testing capabilities

More information

ND1603:2003/04. Specification of the KCH Metallic Path Facility. Issue 2. NICC DSL Task Group

ND1603:2003/04. Specification of the KCH Metallic Path Facility. Issue 2. NICC DSL Task Group NICC Document Specification of the KCH Metallic Path Facility Network Interoperability Consultative Committee Oftel 50 Ludgate Hill London EC4M 7JJ UK http://www.oftel.gov.uk/ind_groups/nicc/ Page 2 of

More information

EPR Safety Mat Modelling & Field Testing Summary Report

EPR Safety Mat Modelling & Field Testing Summary Report EPR Safety Mat Modelling & Field Testing Summary Report 15 April 2014 1. Purpose This document present a summary of the calculations and field testing used to prove the efficacy of the new EPR Safety Mat

More information

ELECTRICITY ASSOCIATION SERVICES LIMITED 2001

ELECTRICITY ASSOCIATION SERVICES LIMITED 2001 ELECTRICITY ASSOCIATION SERVICES LIMITED 2001 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical,

More information

CMA-100. Counter Measures Amplifier. Owner s Guide

CMA-100. Counter Measures Amplifier. Owner s Guide CMA-100 Counter Measures Amplifier Owner s Guide INTRODUCTION: Thank you for purchasing the CMA-100 Countermeasures Amplifier. When doing a Counter-surveillance investigation, it is important to analyze

More information

StarSine Power Quality Products

StarSine Power Quality Products StarSine Power Quality Products Medium Voltage Static Voltage Regulator ( MV SVR ) MV SVR PROTECTS THE WHOLE FACILITY LOADS FROM VOLTAGE SAGS CAUSED BY UTILITY GRID FAULTS Voltage sags, whether due to

More information

Power System Neutral/Ground Voltages Causes, Safety Concerns and Mitigation

Power System Neutral/Ground Voltages Causes, Safety Concerns and Mitigation Power System Neutral/Ground Voltages Causes, Safety Concerns and Mitigation A. P. Sakis Meliopoulos Georgia Institute of Technology September 7, 2004 Tele-Seminar 2004 A. P. Sakis Meliopoulos 1 Power System

More information

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor

500 kva Dry-type Isolation Transformer V-Delta to 208Y/120V 3PH - NEMA 1/Indoor 500 kva Dry-type Isolation Transformer - 13200V-Delta to 208Y/120V 3PH - NEMA 1/Indoor Part #: MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Page: 1 The MT-DOE16-3P-13200D-500KVA-208Y.120-N1 Dry-type Isolation

More information

PLA-240. Small Room Loop Amplifier System. USER Manual MAN 211A

PLA-240. Small Room Loop Amplifier System. USER Manual MAN 211A PLA-240 Small Room Loop Amplifier System USER Manual MAN 211A Overview Thank you for purchasing the PLA 240 Small Room Loop Amplifier System. The PLA 240 Loop System provides a practical solution for hearing

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE International Telecommunication Union ITU-T K.45 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (04/2008) SERIES K: PROTECTION AGAINST INTERFERENCE Resistibility of telecommunication equipment installed

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE I n t e r n a t i o n a l T e l e c o m m u n i c a t i o n U n i o n ITU-T K.21 TELECOMMUNICTION STNDRDIZTION SECTOR OF ITU (12/2016) SERIES K: PROTECTION GINST INTERFERENCE Resistibility of telecommunication

More information

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment

T/3000 T/3000. Substation Maintenance and Commissioning Test Equipment T/3000 Substation Maintenance and Commissioning Test Equipment MULTI FUNCTION SYSTEM FOR TESTING SUBSTATION EQUIPMENT SUCH AS: CURRENT, VOLTAGE AND POWER TRANSFORMERS, ALL TYPE OF PROTECTION RELAYS, ENERGY

More information

CROSS-CONNECT CABINET

CROSS-CONNECT CABINET TELEPHONE EXCHANGE FEEDER CABLE CROSS-CONNECT CABINET DISTRIBUTION CABLE CUSTOMERS PREMISES 48Vdc 200 pairs 400 pairs 2000 pairs 50 pairs 15 pairs 7 pairs 1 } Chorus increasingly common roadside electronic

More information

IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations

IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations Version:- 3.0 Date of Issue:- January 2018 Page 1 of 70 IMP/010/011 Code of Practice for Earthing LV Networks and HV Distribution Substations 1. Purpose The purpose of this document is to ensure the company

More information

The Confusion Surrounding Stray Voltage

The Confusion Surrounding Stray Voltage The Confusion Surrounding Stray Voltage Jim Burke, InfraSource Inc., Fellow, IEEE Abstract While stray voltage has been a concern for farm livestock for many years, it is only within the past few years

More information

Protection from electromagnetic environment effects

Protection from electromagnetic environment effects ITU Regional Development Forum 2008 Bridging the ICT standardization gap in developing countries Protection from electromagnetic environment effects Roberto Pomponi, ITU-T SG 5 Chairman (Telecom Italia)

More information

WIRELESS INSULATOR POLLUTION MONITORING SYSTEM

WIRELESS INSULATOR POLLUTION MONITORING SYSTEM SYSTEM OVERVIEW Pollution monitoring of high voltage insulators in electrical power transmission and distribution systems, switchyards and substations is essential in order to minimise the risk of power

More information

ACCURATE SIMULATION OF AC INTERFERENCE CAUSED BY ELECTRICAL POWER LINES: A PARAMETRIC ANALYSIS

ACCURATE SIMULATION OF AC INTERFERENCE CAUSED BY ELECTRICAL POWER LINES: A PARAMETRIC ANALYSIS ACCURATE SIMULATION OF AC INTERFERENCE CAUSED BY ELECTRICAL POWER LINES: A PARAMETRIC ANALYSIS J. Liu and F. P. Dawalibi Safe Engineering Services & technologies ltd. 1544 Viel, Montreal, Quebec, Canada

More information

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE INTERNTIONL TELECOMMUNICTION UNION ITU-T K.20 TELECOMMUNICTION STNDRDIZTION SECTOR OF ITU (02/2000) SERIES K: PROTECTION GINST INTERFERENCE Resistibility of telecommunication equipment installed in a telecommunications

More information

Current Transducer CTSR 1-P = 1A

Current Transducer CTSR 1-P = 1A Current Transducer CTSR 1-P I PRN = 1A For the electronic measurement of current: DC, AC, pulsed..., with galvanic isolation between the primary (high power) and the secondary circuit (electronic circuit).

More information

Power Quality Summary

Power Quality Summary Power Quality Summary This article provides an overview of how voltage harmonic distortion is managed on the distribution network and focuses on the current at future issues surround the connection of

More information

HV Substation Earthing Design for Mines

HV Substation Earthing Design for Mines International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 4, Issue 6 (October 2012), PP. 100-107 HV Substation Earthing Design for Mines M.

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

Improving High Voltage Power System Performance. Using Arc Suppression Coils

Improving High Voltage Power System Performance. Using Arc Suppression Coils Improving High Voltage Power System Performance Using Arc Suppression Coils by Robert Thomas Burgess B Com MIEAust CPEng RPEQ A Dissertation Submitted in Fulfilment of the Requirements for the degree of

More information

ECP HV INSULATION TESTING

ECP HV INSULATION TESTING Document Number: ECP 11-0006 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE EPN, LPN, SPN ECP 11-0006 HV INSULATION TESTING This standard details the policy for the on-site insulation testing

More information

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017

I P. /dt. di p V S Applications. Standards 1) IEC : 2007; IEC : ) IEC : 2016; IEC : 2017 Ref: ART-B22-D70, ART-B22-D125, ART-B22-D175, ART-B22-D300 Flexible clip-around Rogowski coil for the electronic measurement of AC current with galvanic separation between the primary circuit (power) and

More information

Safety earthing. Sector Energy PTI NC. Copyright Siemens AG All rights reserved. Theodor Connor

Safety earthing. Sector Energy PTI NC. Copyright Siemens AG All rights reserved. Theodor Connor Safety earthing Sector Energy PTI NC Theodor Connor Copyright Siemens AG 2008. All rights reserved. Content Introduction Theoretical background Soil Analysis Design of earthing system Measurements on earthing

More information

CMA-100. User Manual. Counter Measures Amplifier

CMA-100. User Manual. Counter Measures Amplifier CMA-100 Counter Measures Amplifier User Manual Research Electronics International, LLC 455 Security Drive, Cookeville, TN 38506 U.S.A. (800) 824-3190 (US Only) +1 931-537-6032 www.reiusa.net Copyright

More information

IEC ED.1 Safety secondary circuits in series circuits General safety requirements. a new draft

IEC ED.1 Safety secondary circuits in series circuits General safety requirements. a new draft Helmut Schmidt Project leader of IEC /TC97 project team 62870 IEC 62870 ED.1 Safety secondary circuits in series circuits General safety requirements a new draft Schmidt Personal Safety IES ALC Conference

More information

Technical recommendation for the purchase of Real Time Thermal Rating for transformers

Technical recommendation for the purchase of Real Time Thermal Rating for transformers Version: 1.0 Date of Issue: December 2014 1 Technical recommendation for the purchase of Real Time Thermal Rating for transformers 1 Purpose The purpose of this document is to set out and describe the

More information

HAWK5000 Operators Manual

HAWK5000 Operators Manual HAWK5000 Operators Manual Keison Products P.O. Box 2124, Chelmsford CM1 3UP, England Tel: +44 (0) 1245 600560 Fax: +44 (0) 1245 600030 Email: sales@keison.co.uk www.keison.co.uk KANE INTERNATIONAL LIMITED

More information

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar Electrical Engineering department, Jabalpur Engineering College Jabalpur, India Abstract:

More information

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design

Company Directive POLICY DOCUMENT: SD4/7. Relating to 11kV and 6.6kV System Design Company Directive POLICY DOCUMENT: SD4/7 Relating to 11kV and 6.6kV System Design Policy Summary This document describes the standard requirements for the design of the 11kV and 6.6kV systems. Reference

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 60479.1:2010 IEC/TS 60479-1, Ed. 4.0 (2005) AS/NZS 60479.1:2010 Australian/New Zealand Standard Effects of current on human beings and livestock Part 1: General aspects AS/NZS 60479.1:2010 This