1 INTERNATIONAL JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY (IJEET) International Journal of Electrical Engineering and Technology (IJEET), ISSN (Print), ISSN (Print) ISSN (Online) Volume 5, Issue 7, July (2014), pp IAEME: Journal Impact Factor (2014): (Calculated by GISI) IJEET I A E M E UNGROUNDED GENERATOR OPERATION IN OFF-SHORE UTILITY PLANT PANKAJ KUMAR 1, PANKAJ RAI 2, NIRANJAN KUMAR 3 1 (Electrical Engg Department, BIT Sindri) 2 (Electrical Engg Department, BIT Sindri/VBU, Hazaribag, India) 3 (Electrical Engg Department, NIT, Jamshedpur, India) ABSTRACT In offshore oil & gas installation, the electrical power system consists of a large distribution network, generally operating in island mode i.e., without grid support. For reliability and a compact utility plate form, power system is designed with multiple gas turbine and diesel generators, directly connected to 11kV switchgear, without generator transformers. This kind of configuration, however introduces high capacitive charging current (Ico), which is more than the preferred high resistance grounding of generator neutral through 10A, 10sec resistor, to safeguard the generator iron core lamination from damage during an earth fault. In view of high Ico, some utility prefers to select low resistance grounding, to achieve more sensitivity for generator earth fault protection; however this cannot guarantee the core from damage during fault. Due to IP54 protection, 11kV neutral earthing resistor requires more space at utility plate form. So, other method is to select ungrounded generator neutral with low resistance earthing at 11kV switchgearend. Prior to synchronization or under complete load throw scenario, an earth fault in generator or evacuation system, create over-voltage or ferro-resonance conditions, stressing insulation of generator, bus-duct, voltage-transformer cubicle and generator circuit breaker. This paper presents the experience learned in designing neutral earthing scheme for off-shore utility plant in view of high capacitive charging current at 11kV voltage level, outlines impact on stator core damage, ungrounded generator operation, mitigation and conclusion. Keywords: GCB (Generator Circuit Breaker), GTG (Gas Turbine Generator), EDG (Emergency diesel Generator), NET (Neutral Earthing Transformer), NER (Neutral Earthing Resistor), Power Plant, LSC (Line Side Cubicle), NSC (Neutral side Cubicle). 1

2 I. INTRODUCTION Synchronous Generators are installed at Utility Plate form. They are driven by aeroderivative gas turbine (aircraft turbine derivative applied to industrial application) and/or industrial gas turbine & diesel engines to supply un-interrupted reliable power to different plate forms to meet process requirement, refer to a typical single line diagram in Fig-1. During normal operation, GTGs supply power to the entire complex while all other DGs are not kept in operation, except for periodical operational testing. VT and 67N are not shown on other generators for the sake of simplicity. Fig-1: Typical single line diagram with multiple ungrounded generators It is imperative for System design engineer to pay particular attention to applications of multiple generators connected directly to 11kV bus-bar without generator transformer (refer fig-1). Such a configuration introduces high capacitive charging current (Ico), more than the preferred high resistance grounding of generator neutral through 10A, 10sec NER, to safeguard the generator core from damage during an earth fault. Hence, some utility prefers to select low resistance grounding to limit the fault current above Ico and attempt to mitigate the risk of core damage by reducing earth fault protection clearing time. Due to IP54 protection, 11kV NER at generator neutral requires more space at utility plate form. So, other method is to unground generator neutral, supplemented with over-voltage protection (59N) in broken delta VT to detect earth fault indirectly and provide low resistance earthing at 11kV switchgear-end for normal operation, refer fig-1. 2

3 II. CAPACITIVE CHARGING CURRENT Generator transformer, approximately equal to generator rating, adds substantial footprint & weight. Necessary handling arrangement also needs to be added for maintenance. Thus, for a compact utility plate form design, GT is generally, not considered, unless technically required as per specification. This results into a power system where, multiple generators feed directly to 11kV Switchgear (Fig-1). Such configuration however, increases the capacitive charging current (Ico), which needs to be mitigated through equipment design and protection. At 11kV voltage level, there are equipments consisting of generators, motors, transformers, feeders and a large network of 11kV cables length, spread to various plate forms and towers, introducing significant capacitive charging current (Ico), could be of the order of 20A to 200A [1]. Thus, low resistance grounding option is considered for further analysis to limit the fault current in different configuration, refer fig-1 & fig-3. Multiple generators may operate with equal or unequal loading during parallel operation, however during unequal loading, with low resistance NER at generator neutral together with winding pitch contribute to increase in 3rd harmonics. The magnitude of generated third harmonic voltage is [2]. U3= (Ia/In) 2.72 (If/Ifn) Where U3 (%) is the measured third harmonic voltage, Ia (Amp)-Armature current In (Amp) Rated armature current, If is calculated field current Ifn is the calculated field current at rated output power In off-shore installation, space and weight of equipment are important for plate form design having sub-system arranged horizontally & vertically, unlike the onshore plant where horizontal placement of sub-system is not a concern. Industry always prefers a proven designed generator. Reducing the winding pitch to 2/3rd reduces 3rd harmonic, however rotor pole surface loss is increased by 6 times approx. and generator output reduced by 15%. Therefore for same output, generator size needs to be increased, which requires more space & weight at plate form i.e., having impact on overall plate form design. For a typical 32MVA generator with 5/6th winding pitch, the 3rd harmonic content is as follows Phase to neutral Voltage is 2.97% and Phase to phase voltage is 0.06%. Hence, for proven standard generator, the manufacturer offers an optimum designed generator with 5/6 th winding pitch. III. GENERATOR IRON CORE DAMAGE CURVE Manufacturer s damage curve of generator stator should always be referred for the magnitude and duration of allowable earth fault current, so that core is prevented from damage during fault through core. Core damage is considered more severe than winding damage [9]. Fig. 2 is a typical set of damage curves for generator, showing three regions where there is negligible, slight, and severe core burning area. The curves show that earth fault current could be limited to A, subject to protection clearance time is reduced to ms, to enable core to withstand higher fault current, in slight burning area. For 75A fault current, the earth fault protection clearance time could be set for 1000ms (1sec). 3

4 Fig.-2: Typical curve for arc burning on generator stator core lamination IV. SELECTION OF GROUNDING METHODS Higher the degree of protection of 11kV, 75A NER, higher is the size of NER, required more space in a compact utility plate form design. However, resistor (e.g., VT guard) on VT broken delta including VT can be easily accommodated in 11kV indoor switchgear panel. Usually, short time rating of NER is 10sec. with temperature rise of C [7]. In view of high temperature, it is essential to place NER in safe area, not in hazardous area. Thus, system design engineer should judiciously select both continuous & short-time rating and degree of protection of NER. There are different earthing schemes to detect earth faults in synchronous generator, found in various books, literature and papers. When selecting the earthing scheme, the dimension is important, to be considered from layout view point at utility plant. Selection of system earthing scheme should ensure that no circulating 3 rd harmonic current be allowed in the neutral circuits of the generators when they are operated in parallel. High-resistance grounding is a good choice for minimizing damage to a generator core, however, is not selected due to high capacitive charging current of 60A. Low resistance grounding through NER - Higher fault current is good for sensitive & selective relaying, limiting transient over-voltages to moderate values, and potential cost savings over other grounding methods. However, the main drawback is the possibility of significant burning of the generator stator core (Refer Fig-2). In addition, because of IP54 and generator core guarantee for 60A fault current, this scheme is found not suitable. Hybrid grounding is a good option, combining best features of both low resistance and high resistance grounding methods but it needs 3 no NER (HRG) & 3 no Earthing Transformer, which 4

5 means more space are required at plate form. Due to compact design, the other option is to unground the generator neutral with low resistance earthing at 11kV switchgear through 2 no NET, supplemented through protection. Fig-3(a) NET with loading resistor at 11kV switchgear Fig-3(b) Zig-Zag grounding transformer With the use of neutral earthing scheme as depicted in Fig-3a & Fig-3b at the 11kV switchgear bus sections, NERs at generator neutral is eliminated. Thus, generator neutral is ungrounded and impedances at generator neutral become infinite (very high in terms of Giga Ohm), because there are apparently no paths for zero sequence currents between the windings. This eliminate 3 rd harmonic circulating current flowing through the generators windings, however when GCB is opened during synchronization or under sudden load throw scenario, then generator operates in ungrounded condition. Adequate protection is provided to detect and discriminate the fault. Option at Fig-3a offers more compact and cost-effective solution than Fig-3b. Neutral earthing transformer shown in fig-3a is connected in star/broken delta. The primary winding is 5

6 solidly earthed and secondary in broken delta having loading resistor with Over-Voltage relay (59N). The loading resistor is designed to limit the zero-sequence current in secondary to limit the earth fault current to 75A. Earthing transformer/loading resistor is designed to withstanding the earth fault current for 10 sec (min). During earth fault in 11kV voltage, the loading resistor across the NET restricts the fault current and allows over-voltage protection 59N to detect the over-voltage due to earth fault and trip the faulty circuit. The non-linear loading resistor (VT guard) provides damping to over-voltage or Ferro-resonance during lightly loaded VT secondary. Generator and associated electrical system like, LSC & NSC, bus-duct, multiple VTs up to GCB operate in ungrounded condition during synchronization or when GCB tripped subsequent to protection operation or sudden load throw. Under this scenario, a single phase to earth fault can develop transient over-voltage, being discussed in subsequent section. V. UNGROUNDED GENERATOR OPERATION For those systems, where service continuity of process is of primary concern for productivity, the ungrounded system is sometimes, preferred than grounded system. There is a perception that ungrounded systems have higher service continuity which is based on the argument that the ground fault current is small [5] and hence will cause negligible damage i.e., burning or heating to generator, motor and other electrical system, even if the fault persists for some time, enabling plant operator to complete the critical process, before shutdown. Afterwards, line to ground fault is traced and cleared. Here, the basis of selection is due to high capacitive charging current & over specified IP54 Protection of 11kV NER. Hence, generator neutral made unearthed i.e., without NER as illustrated above, and low resistive grounding using NET (Refer fig-3a) is introduced. During synchronization or under load throw scenario, the generator operates in ungrounded condition. An earth fault in this scenario is analyzed below. Practically, a vast majority of faults start as low level arcing ground faults, except the bolted fault, So, when there is arcing ground faults, then following conditions may arise:- [1]. Multiple Ground Faults, [2] Resonant Conditions, [3] Transient Over voltages [1] MULTIPLE GROUNDS FAULTS Multiple ground faults can occur on ungrounded systems. While a ground fault on one phase of an ungrounded system does not cause an outage. That is why some critical process gets time for completion (e.g., rolling mill product is not cobbled, otherwise, is a substantial loss to productivity). Longer the ground fault allowed persisting in the electrical system, greater is the likelihood of a second ground fault occurring on another phase because the un-faulted phases have line-to-line voltage impressed on their line-to-ground insulation. In other words, the insulation is overstressed by 73 percent. If not isolated, then there is an accelerated degradation of the insulation system due to the collective overvoltage impinged upon it, through successive ground-faults over a period into years [4] [5]. [2] RESONANT GROUND Resonant conditions may result in ungrounded systems when one phase is grounded through an inductance, for example, a ground within the winding of a generator VT (Refer Fig-1, assuming a fault in VT winding). When this happens, the high circulating currents result in high voltages across the un-faulted phases [4] [5]. VTs are essentially connected to an ungrounded generator, so the possibility of Ferro-nonlinear resonance is almost a certainty. To suppress ferro-resonance, a non-linear resistance (VT guard) is connected across broken delta for damping (Refer Fig-1). Resistance loading equal to VT 6

7 thermal rating is required. To detect the ground faults, Over voltage relay (59N) is connected in parallel to resistor. Both resistor & (59N) are connected to broken delta. In normal operation, the summation of co-phasal zero sequence components 3Io are zero. However, during abnormal scenario, 3Io & 3Vo come into picture and activates the protection. To avoid coordination problems, it may be necessary to remove this supplementary protection when the unit is operated in normal mode. In addition, the resistance loading applied to suppress ferro-resonance should be removed when the generator is reconnected. [3] TRANSIENTS OVER-VOLTAGES DUE ARCING GROUND FAULTS In oil & gas installation, turbo-generator is, usually connected to 11kV indoor switchgear through short length cast resin encapsulated non-segregated bus-duct, connected at one end in line side cubicle (LSC) of generator and other end at 11kV switchgear. There are so many instrumentations involved in LSC, like current transformers, toroidal CT, Partial discharge coupler, surge arrester and/or NER & VT. So, practically the possibility of single phase to earth fault in bus duct is remote as compared to that in terminals. During ungrounded generator operation, an arcing ground fault on generator or evacuation system (which includes terminal box, bus duct, VT up to GCB) offer transient over voltages. This can be explained from zero-sequence circuit based on symmetrical components concept. The insulation of generator and evacuation system constitutes capacitance to ground, which forms a zero sequence reactance component. The positive and negative sequence reactance of generator is represented by equivalent impedances. The resistance of generator & bus-duct are much less compared to above reactance, hence are practically, not considered. For an arcing ground fault on R-Ø (say), the circuit diagram is shown as consisting of positive and negative sequence reactance of generator in series with the zero-sequence circuit (Refer Fig. 4). However, zero sequence reactance is always high as compared to positive and negative sequence reactance. Hence for all practical purpose, the approximate equivalent circuit is simplified as shown in Fig-5. Transient overvoltage due to restriking or intermittent ground faults develops substantial over voltages on ungrounded electrical systems with respect to ground. Fig-4 Fig-5 7

8 There have been many documented cases within industry e.g., failure of 2 no air cooled generator, 15625kVA, 13.8kV, Wye connected and grounded through its own 400A grounding resistor [3] [11]. Similarly, multiple equipment failures (e.g.-motors) over an entire 480V system have occurred while trying to find and locate a ground fault. Measured line-to-ground voltages of 1200V 1500V or higher in these instances are not that uncommon. In all instances, the cause has been traced to a low-level intermittent arcing ground fault on an ungrounded system [3] [4] [5]. The mechanism explaining how this occurs is explained from Fig-7. At instant A, prior to a ground fault, the generator neutral is at or near ground potential (i.e., 0 Volt) because of the electrostatic charge on the systems' shunt capacitance to ground (insulation, surge capacitors) under balanced load conditions. As soon as there is an earth fault to R-Ø, the system voltages are displaced as illustrated at point B. At the instant after the fault occurs, when the R-Ø capacitive charging current (Ioc) passes through zero, it is extinguished leaving a trapped charge on the shunt capacitance to ground on R-Ø. With no path to dissipate this trapped charge, (fixed electrostatic DC voltage) the generator & system tends to stay in the position shown at point B. So, neutral of generator is now shifted to new position at B. As the three AC sine wave phases continues to rotate on a 50 cycle basis. One-half cycle means (electrical degree) of phase rotation. Hence, R-Y-B Ø rotates to new position above ground at point C. Now, the instantaneous voltage across the R-Ø ground fault is twice the normal line-to-neutral crest voltage (2.0 PU) relative to ground potential. This voltage (2.0 PU) on R- Ø restrikes across the fault gap to ground and suddenly pulls R-Ø to ground potential. The nonlinearity of the arc (high frequency components) will tend to excite the inductance/capacitance of the system resulting in a high frequency oscillation between (+200%) and (-200%). When the arc extinguishes, the system voltage relationships will tend to remain in a new position with respect to ground potential as shown in the lower part of C, due to transient oscillation from positive maximum to negative maximum [11]. Since the arc current has been extinguished, a new trapped DC electrostatic charge on the R-Ø capacitance of (-200%) now applies [4]. In the next 1/2 cycle the AC sine wave will rotate the voltage vectors from point C to the lower part of D (-200% to -400%) at which time the arc restrikes, and the mechanism repeats itself between -400% and +400%. At this point in time the voltages to ground are shown at 6 per unit on the un-faulted phases. If the arc extinguishes, the mechanism will continue. Theoretically, the overvoltage could go on unlimited except for the fact that the insulation on the un-faulted phases will probably fail, creating a fault on a second phase. This will result is a phase-to-phase fault and most likely clearing of the fault through a fuse or breaker. From a practical standpoint, voltages in excess of 700% are rare since most insulation systems break down between 600% and 700%. Bear in mind that these over voltages are superimposed on the entire electrical system i.e., LSC & NSC, bus duct, SP/VT cubicle and up to GCB, thereby explaining accelerated insulation deterioration and increasing incidence of ground fault occurrences over time [4]. Fig-6: Capacitive current and system voltage 8

9 Fig-7: Transient Voltages at R-Phase restriking to ground fault Although fig. 7 shows a maximum deviation in just 3 arcs, it might take considerably longer to reach these levels since the arc may restrike before reaching maximum voltages on the AC sine wave. Also, if the fault becomes a bolted fault at any time during the process, the trapped DC electrostatic charges will be dissipated leaving the voltage relationships as shown at point B. VI. PSCAD SIMULATION A PSCAD Plot for ungrounded system with R-Ø fault is shown below. Fig-8a is a voltage plot, with R-Ø having ground fault and voltage of healthy Y & B- Ø raised to 3 times i.e., 15.5kV. Fig-8b showing arcing current for 200ms. Fig-9a is a voltage plot, with R-Ø having ground fault for fault duration of 0.1sec. Fig-9b showing arcing current strike at 200ms, restrike at 125ms and again re-striking after 100ms. Fig-10a is a voltage plot, with R-Ø having earth fault and voltage of healthy Y & B-Ø voltage reduced to 10kV by employing surge arrester with 85% compensation. Fig-10b showing arcing current with 85% compensation. Thus surge arrester is an option, which can be installed at generator neutral, in addition to phase. Fig-8a: Voltage Plot Fig-8b: Arcing current Plot 9

10 . Fig-9a: Voltage Plot Fig-9b: Arcing crrent Plot. Fig-10a: Voltage Plot Fig-10b: Current Plot VII. MITIGATION Ungrounded generator and associated electrical system operates only during synchronization, protection operation or under load throw scenario, which can develop transient over-voltage during single phase to earth-fault or ferro-resonanace through VT, lightly loaded. The over-voltage, as illustrated above can be reduced by using surge arrester at generator neutral & phase. Generator main terminal box (LSC & NSC separate or combined) can accommodate one no surge arrester at neutral and one each in phase side. The cost of surge arrester are insignificant, however is recommended to be finalized during pre-order engineering. To control ferro-resonance, VT guard (Resistor) in broken delta is used. Both VT & resistor can be easily accommodated in safe area in 11kV switchgear without having any space constraint as compared to NER. Over-voltage protection (59N) in broken delta, detect the over-voltage and trip the generator excitation through the lock out relay (86). Generator (> 20 MVA) may take 5 to 20 seconds to stop [3]. So, Generator protection through lock out relay trips both excitation and close the shut-off valve to cut of gas supply to gas turbine. To avoid coordination problems, it may be necessary to remove this supplementary protection when the generator is operated in connection with 11kV switchgear (i.e., normal mode). The supplier should also design the generator for ungrounded operation. 10

11 VIII. CONCLUSION Capacitive leakage current and degree of Protection should be judiciously calculated during basic engineering design. While selecting earthing scheme, layout of the utility plant in which generator & electrical system including NET with loading resistor are placed, must be considered. All VT should be installed in safe area at 11kV switchgear end. Earth Fault Protection clearing time should always be obtained from generator manufacturer supplied iron core lamination damage curve. NET with loading resistor should always be installed in Safe area (Non-hazardous area). During normal operation, one NET at 11kV bus is in service with bus-coupler closed otherwise both in operation. Surge arrester is recommended for installation at neutral and phase side to reduce the overvoltage during single phase to earth fault. To avoid coordination problems, it may be necessary to remove this supplementary protection when the generator is operated in connection with 11kV switchgear (i.e., normal mode). IX. REFERENCES [1] Handbook of Electrical Engineering: For Practitioners in the Oil, Gas and Petrochemical Industry - by Alan L. Sheldrake. [2] Earth fault protection for synchronous Machines, International Application Treaty under PCT, published on 13 May [3] Grounding and ground fault protection of multiple generator installations on medium voltage industrial and commercial power systems Part - 1 to 4, An IEEE/IAS working group Report. [4] System Grounding and Ground-Fault Protection in the Petrochemical Industry: A need for a Better Understanding, John P. Nelson, Fellow, IEEE Transaction on Industry on Industry Applications, Vol. 38, No. 6, November / December [5] State-of-the Art Medium Voltage Generator Grounding and Ground Fault Protection of Multiple Generator Installations, David Shipp, Eaton Electrical, Warrendale, Pennsylvania. [6] Compensation of Earth Faults in Ungrounded Systems, Tanu Rizvi, M.T Deshpande, International Journal of Emerging Technology and Advanced Engineering, published in August [7] IEEE Std-32: 1972 Requirements, Terminology & Test Procedures for Neutral Grounding Devices. [8] IEEE IEEE Recommended Practice for Grounding of Industrial and Commercial Power Systems. [9] IEEE 242-IEEE Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems. [10] Industrial Power System, Shoib Khan, CRC Press. [11] Protective Relaying Theory and Application, By Walter A Elmore, Mercer Dekker Inc. [12] Sumit Kumar and Prof.Dr.A.A Godbole, Performance Improvement of Synchronous Generator by Stator Winding Design, International Journal of Electrical Engineering & Technology (IJEET), Volume 4, Issue 3, 2013, pp , ISSN Print: , ISSN Online: [13] Archana Singh, Prof. D.S.Chauhan and Dr.K.G.Upadhyay, Effect of Reactive Power Valuation of Generators in Deregulated Electricity Markets, International Journal of Electrical Engineering & Technology (IJEET), Volume 3, Issue 1, 2012, pp , ISSN Print: , ISSN Online:

thepower to protect the power to protect i-gard LITERATURE Low and medium voltage

thepower to protect  the power to protect i-gard LITERATURE Low and medium voltage thepower to protect i-gard LITERATURE Low and medium voltage distribution systems Arc Flash Hazards and High Resistance Grounding Grounding of Standby and Emergency Power Systems Neutral Grounding Resistors

More information

Numbering System for Protective Devices, Control and Indication Devices for Power Systems

Numbering System for Protective Devices, Control and Indication Devices for Power Systems Appendix C Numbering System for Protective Devices, Control and Indication Devices for Power Systems C.1 APPLICATION OF PROTECTIVE RELAYS, CONTROL AND ALARM DEVICES FOR POWER SYSTEM CIRCUITS The requirements

More information

Upgrading Your Electrical Distribution System To Resistance Grounding

Upgrading Your Electrical Distribution System To Resistance Grounding Upgrading Your Electrical Distribution System To Resistance Grounding The term grounding is commonly used in the electrical industry to mean both equipment grounding and system grounding. Equipment grounding

More information

Webinar: An Effective Arc Flash Safety Program

Webinar: An Effective Arc Flash Safety Program Webinar: An Effective Arc Flash Safety Program Daleep Mohla September 10 th, 2015: 2pm ET Agenda Arc Flash Defined and Quantified NFPA 70E / CSA Z 462 - Recent Updates What is the ANSI Z10 Hierarchy of

More information

CONTENTS. 1. Introduction Generating Stations 9 40

CONTENTS. 1. Introduction Generating Stations 9 40 CONTENTS 1. Introduction 1 8 Importance of Electrical Energy Generation of Electrical Energy Sources of Energy Comparison of Energy Sources Units of Energy Relationship among Energy Units Efficiency Calorific

More information

2 Grounding of power supply system neutral

2 Grounding of power supply system neutral 2 Grounding of power supply system neutral 2.1 Introduction As we had seen in the previous chapter, grounding of supply system neutral fulfills two important functions. 1. It provides a reference for the

More information

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY

DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY DIFFERENCE BETWEEN SWITCHING OF MOTORS & GENERATORS WITH VACUUM TECHNOLOGY Dr. Karthik Reddy VENNA Hong URBANEK Nils ANGER Siemens AG Germany Siemens AG Germany Siemens AG Germany karthikreddy.venna@siemens.com

More information

A DUMMIES GUIDE TO GROUND FAULT PROTECTION

A DUMMIES GUIDE TO GROUND FAULT PROTECTION A DUMMIES GUIDE TO GROUND FAULT PROTECTION A DUMMIES GUIDE TO GROUND FAULT PROTECTION What is Grounding? The term grounding is commonly used in the electrical industry to mean both equipment grounding

More information

Grounding System Theory and Practice

Grounding System Theory and Practice Grounding System Theory and Practice Course No. E-3046 Credit: 3 PDH Grounding System Theory and Practice Velimir Lackovic, Electrical Engineer System grounding has been used since electrical power systems

More information

Safety through proper system Grounding and Ground Fault Protection

Safety through proper system Grounding and Ground Fault Protection Safety through proper system Grounding and Ground Fault Protection November 4 th, 2015 Presenter: Mr. John Nelson, PE, FIEEE, NEI Electric Power Engineering, Inc. Event to start shortly Scheduled time:

More information

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy

UProtection Requirements. Ufor a Large scale Wind Park. Shyam Musunuri Siemens Energy UProtection Requirements Ufor a Large scale Wind Park Shyam Musunuri Siemens Energy Abstract: In the past wind power plants typically had a small power rating when compared to the strength of the connected

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin

Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc GE Consumer & Industrial Multilin Protection Basics Presented by John S. Levine, P.E. Levine Lectronics and Lectric, Inc. 770 565-1556 John@L-3.com 1 Protection Fundamentals By John Levine 2 Introductions Tools Outline Enervista Launchpad

More information

Specialists in HV and MV test and diagnostics. Testing in Substations

Specialists in HV and MV test and diagnostics. Testing in Substations Specialists in HV and MV test and diagnostics Testing in Substations Testing in Substations Testing in Substations At 4fores we specialize in the diagnosis and measurement of all types of existing technologies

More information

ARC FLASH HAZARD ANALYSIS AND MITIGATION

ARC FLASH HAZARD ANALYSIS AND MITIGATION ARC FLASH HAZARD ANALYSIS AND MITIGATION J.C. Das IEEE PRESS SERIES 0N POWER ENGINEERING Mohamed E. El-Hawary, Series Editor IEEE IEEE PRESS WILEY A JOHN WILEY & SONS, INC., PUBLICATION CONTENTS Foreword

More information

ELECTRICAL POWER ENGINEERING

ELECTRICAL POWER ENGINEERING Introduction This trainer has been designed to provide students with a fully comprehensive knowledge in Electrical Power Engineering systems. The trainer is composed of a set of modules for the simulation

More information

TECHNICAL BULLETIN 004a Ferroresonance

TECHNICAL BULLETIN 004a Ferroresonance May 29, 2002 TECHNICAL BULLETIN 004a Ferroresonance Abstract - This paper describes the phenomenon of ferroresonance, the conditions under which it may appear in electric power systems, and some techniques

More information

HIGH VOLTAGE ENGINEERING(FEEE6402) LECTURER-24

HIGH VOLTAGE ENGINEERING(FEEE6402) LECTURER-24 LECTURER-24 GENERATION OF HIGH ALTERNATING VOLTAGES When test voltage requirements are less than about 300kV, a single transformer can be used for test purposes. The impedance of the transformer should

More information

System grounding of wind farm medium voltage cable grids

System grounding of wind farm medium voltage cable grids Downloaded from orbit.dtu.dk on: Apr 23, 2018 System grounding of wind farm medium voltage cable grids Hansen, Peter; Østergaard, Jacob; Christiansen, Jan S. Published in: NWPC 2007 Publication date: 2007

More information

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines

Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines Delayed Current Zero Crossing Phenomena during Switching of Shunt-Compensated Lines David K Olson Xcel Energy Minneapolis, MN Paul Nyombi Xcel Energy Minneapolis, MN Pratap G Mysore Pratap Consulting Services,

More information

Insulation Co-ordination For HVDC Station

Insulation Co-ordination For HVDC Station Insulation Co-ordination For HVDC Station Insulation Co-ordination Definitions As per IEC 60071 Insulation Coordination is defined as selection of dielectric strength of equipment in relation to the operating

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

UNIT 4 PRINCIPLES OF CIRCUIT BREAKERS SVCET

UNIT 4 PRINCIPLES OF CIRCUIT BREAKERS SVCET UNIT 4 PRINCIPLES OF CIRCUIT BREAKERS Introduction Where fuses are unsuitable or inadequate, protective relays and circuit breakers are used in combination to detect and isolate faults. Circuit breakers

More information

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21

Unit 3 Magnetism...21 Introduction The Natural Magnet Magnetic Polarities Magnetic Compass...21 Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...4 Negative Atomic Charge...4 Positive

More information

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945

More information

Protection of Electrical Networks. Christophe Prévé

Protection of Electrical Networks. Christophe Prévé Protection of Electrical Networks Christophe Prévé This Page Intentionally Left Blank Protection of Electrical Networks This Page Intentionally Left Blank Protection of Electrical Networks Christophe Prévé

More information

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D

Electricity Ten Year Statement November Electricity Ten Year Statement November Appendix D Electricity Ten Year Statement November 2017 01 Electricity Ten Year Statement November 2017 001 Appendix D 1 Short-circuit currents 02 2 Short-circuit current terminology 04 3 Data requirements 07 4 Fault

More information

Tab 2 Voltage Stresses Switching Transients

Tab 2 Voltage Stresses Switching Transients Tab 2 Voltage Stresses Switching Transients Distribution System Engineering Course Unit 10 2017 Industry, Inc. All rights reserved. Transient Overvoltages Decay with time, usually within one or two cycles

More information

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering)

R10. IV B.Tech I Semester Regular/Supplementary Examinations, Nov/Dec SWITCH GEAR AND PROTECTION. (Electrical and Electronics Engineering) R10 Set No. 1 Code No: R41023 1. a) Explain how arc is initiated and sustained in a circuit breaker when the CB controls separates. b) The following data refers to a 3-phase, 50 Hz generator: emf between

More information

Embedded Generation Connection Application Form

Embedded Generation Connection Application Form Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed

More information

Ferroresonance Conditions Associated With a 13 kv Voltage Regulator During Back-feed Conditions

Ferroresonance Conditions Associated With a 13 kv Voltage Regulator During Back-feed Conditions Ferroresonance Conditions Associated With a Voltage Regulator During Back-feed Conditions D. Shoup, J. Paserba, A. Mannarino Abstract-- This paper describes ferroresonance conditions for a feeder circuit

More information

Earth Fault Protection

Earth Fault Protection Earth Fault Protection Course No: E03-038 Credit: 3 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877) 322-4774

More information

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM

EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM EARTH FAULT PROTECTION VIS-A-VIS GENERATOR GROUNDING SYSTEM BY MR. H. C. MEHTA AT 1 ST INDIA DOBLE PROTECTION AND AUTOMATION CONFERENCE, NOV 2008 POWER-LINKER Wisdom is not Virtue but Necessity hcmehta@powerlinker.org

More information

Impact Assessment Generator Form

Impact Assessment Generator Form Impact Assessment Generator Form This connection impact assessment form provides information for the Connection Assessment and Connection Cost Estimate. Date: (dd/mm/yyyy) Consultant/Developer Name: Project

More information

Our Brands. Where we are?

Our Brands. Where we are? CATALOG 2019 Our Brands Aktif trade mark for Measuring, Protection, Automatic Meter Reading, Billing and Energy Management Software. by Aktif Aktif trade mark for Measuring, Protection, Control and Power

More information

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS

Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS Calculation of Transient Overvoltages by using EMTP software in a 2-Phase 132KV GIS M. Kondalu, Dr. P.S. Subramanyam Electrical & Electronics Engineering, JNT University. Hyderabad. Joginpally B.R. Engineering

More information

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS.

POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. POWER FACTOR CORRECTION. HARMONIC FILTERING. MEDIUM AND HIGH VOLTAGE SOLUTIONS. This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products

More information

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP

SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP SHORT CIRCUIT ANALYSIS OF 220/132 KV SUBSTATION BY USING ETAP Kiran V. Natkar 1, Naveen Kumar 2 1 Student, M.E., Electrical Power System, MSS CET/ Dr. B.A.M. University, (India) 2 Electrical Power System,

More information

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8]

3. (a) List out the advantages and disadvantages of HRC fuse (b) Explain fuse Characteristics in detail. [8+8] Code No: RR320205 Set No. 1 1. (a) Explain about Bewley s Lattice diagrams and also mention the uses of these diagrams. [6+2] (b) A line of surge impedance of 400 ohms is charged from a battery of constant

More information

Circuit Breaker Based Feeder Pillar

Circuit Breaker Based Feeder Pillar IJIRST International Journal for Innovative Research in Science & Technology Volume Issue 09 February 06 ISSN (online): 349-600 Circuit Breaker Based Feeder Pillar Neha A. Ninave Nikita M. Nimbulkar Minal

More information

FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI[" FGRCTVOGPV"QH"GNGEVTKECN"GPIKPGGTKPI" VGG"246"JKIJ"XQNVCIG"GPIKPGGTKPI

FGJTCFWPKPUVKVWVGQHVGEJPQNQI[ FGRCTVOGPVQHGNGEVTKECNGPIKPGGTKPI VGG246JKIJXQNVCIGGPIKPGGTKPI FGJTFWP"KPUKWG"QH"GEJPQNQI[" FGRTOGP"QH"GNGETKEN"GPIKPGGTKPI" GG"46"JKIJ"XQNIG"GPIKPGGTKPI Resonant Transformers: The fig. (b) shows the equivalent circuit of a high voltage testing transformer (shown

More information

Preface...x Chapter 1 Electrical Fundamentals

Preface...x Chapter 1 Electrical Fundamentals Preface...x Chapter 1 Electrical Fundamentals Unit 1 Matter...3 Introduction...3 1.1 Matter...3 1.2 Atomic Theory...3 1.3 Law of Electrical Charges...4 1.4 Law of Atomic Charges...5 Negative Atomic Charge...5

More information

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form)

IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) IDAHO PURPA GENERATOR INTERCONNECTION REQUEST (Application Form) Transmission Provider: IDAHO POWER COMPANY Designated Contact Person: Jeremiah Creason Address: 1221 W. Idaho Street, Boise ID 83702 Telephone

More information

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017

Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 Topic 6 Quiz, February 2017 Impedance and Fault Current Calculations For Radial Systems TLC ONLY!!!!! DUE DATE FOR TLC- February 14, 2017 NAME: LOCATION: 1. The primitive self-inductance per foot of length

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content

Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION. Course Content Course No: 1 13 (3 Days) FAULT CURRENT CALCULATION & RELAY SETTING & RELAY CO-ORDINATION Sr. No. Course Content 1.0 Fault Current Calculations 1.1 Introduction to per unit and percentage impedance 1.2

More information

Optimal neutral ground resistor rating of the medium voltage systems in power generating stations

Optimal neutral ground resistor rating of the medium voltage systems in power generating stations Journal of International Council on Electrical Engineering ISSN: (Print) 2234-8972 (Online) Journal homepage: http://www.tandfonline.com/loi/tjee20 Optimal neutral ground resistor rating of the medium

More information

Connection Impact Assessment Application

Connection Impact Assessment Application Connection Impact Assessment Application This form is for generators applying for Connection Impact Assessment (CIA) and for generators with a project size >10 kw. Please return the completed form by email,

More information

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services

Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Section 6: System Grounding Bill Brown, P.E., Square D Engineering Services Introduction The topic of system grounding is extremely important, as it affects the susceptibility of the system to voltage

More information

System Protection and Control Subcommittee

System Protection and Control Subcommittee Power Plant and Transmission System Protection Coordination Reverse Power (32), Negative Sequence Current (46), Inadvertent Energizing (50/27), Stator Ground Fault (59GN/27TH), Generator Differential (87G),

More information

SAFETY ASPECTS AND NOVEL TECHNICAL SOLUTIONS FOR EARTH FAULT MANAGEMENT IN MV ELECTRICITY DISTRIBUTION NETWORKS

SAFETY ASPECTS AND NOVEL TECHNICAL SOLUTIONS FOR EARTH FAULT MANAGEMENT IN MV ELECTRICITY DISTRIBUTION NETWORKS SAFETY ASPECTS AND NOVEL TECHNICAL SOLUTIONS FOR EARTH FAULT MANAGEMENT IN MV ELECTRICITY DISTRIBUTION NETWORKS A. Nikander*, P. Järventausta* *Tampere University of Technology, Finland, ari.nikander@tut.fi,

More information

1% Switchgear and Substations

1% Switchgear and Substations 1% Switchgear and Substations Switchgear and substations are not always matters of concern for transmitter designers, -because they are often part of the facilities of a typical installation. However,

More information

FERRORESONANCE SIMULATION STUDIES USING EMTP

FERRORESONANCE SIMULATION STUDIES USING EMTP FERRORESONANCE SIMULATION STUDIES USING EMTP Jaya Bharati, R. S. Gorayan Department of Electrical Engineering Institute of Technology, BHU Varanasi, India jbharatiele@gmail.com, rsgorayan.eee@itbhu.ac.in

More information

Generator Advanced Concepts

Generator Advanced Concepts Generator Advanced Concepts Common Topics, The Practical Side Machine Output Voltage Equation Pitch Harmonics Circulating Currents when Paralleling Reactances and Time Constants Three Generator Curves

More information

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network

Sequence Networks p. 26 Sequence Network Connections and Voltages p. 27 Network Connections for Fault and General Unbalances p. 28 Sequence Network Preface p. iii Introduction and General Philosophies p. 1 Introduction p. 1 Classification of Relays p. 1 Analog/Digital/Numerical p. 2 Protective Relaying Systems and Their Design p. 2 Design Criteria

More information

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation

Course ELEC Introduction to electric power and energy systems. Additional exercises with answers December reactive power compensation Course ELEC0014 - Introduction to electric power and energy systems Additional exercises with answers December 2017 Exercise A1 Consider the system represented in the figure below. The four transmission

More information

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY

10. DISTURBANCE VOLTAGE WITHSTAND CAPABILITY 9. INTRODUCTION Control Cabling The protection and control equipment in power plants and substations is influenced by various of environmental conditions. One of the most significant environmental factor

More information

Do Capacitor Switching Transients Still Cause Problems?

Do Capacitor Switching Transients Still Cause Problems? Do Capacitor Switching Transients Still Cause Problems? Mark McGranaghan We have been evaluating problems related to capacitor switching transients for many years. Capacitor banks have been used on distribution

More information

WHITE PAPER. Medium Voltage On-Site Generation Overview. BY MIKE KIRCHNER Technical Support Manager at Generac Power Systems

WHITE PAPER. Medium Voltage On-Site Generation Overview. BY MIKE KIRCHNER Technical Support Manager at Generac Power Systems WHITE PAPER Medium Voltage On-Site Generation Overview BY MIKE KIRCHNER Technical Support Manager at Generac Power Systems INTRODUCTION It seems that just about everyone is looking for more power. As our

More information

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS

CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS CHAPTER 2 ELECTRICAL POWER SYSTEM OVERCURRENTS 2-1. General but less than locked-rotor amperes and flows only Electrical power systems must be designed to serve in the normal circuit path. a variety of

More information

(2) New Standard IEEE P (3) Core : (4) Windings :

(2) New Standard IEEE P (3) Core : (4) Windings : (d) Electrical characteristics (such as short-circuit withstand, commutating reactance, more number of windings, etc); (e) Longer life expectancy; (f) Energy efficiency; (g) more demanding environment.

More information

PQ for Industrial Benchmarking with various methods to improve. Tushar Mogre.

PQ for Industrial Benchmarking with various methods to improve. Tushar Mogre. General PQ: Power Quality has multiple issues involved. Thus, need to have some benchmarking standards. Very little is spoken about the LT supply installation within an industry. There is need to understand

More information

2012 Grid of the Future Symposium. Impacts of the Decentralized Photovoltaic Energy Resources on the Grid

2012 Grid of the Future Symposium. Impacts of the Decentralized Photovoltaic Energy Resources on the Grid 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium Impacts of the Decentralized Photovoltaic Energy Resources on the Grid B. ENAYATI, C.

More information

EH2741 Communication and Control in Electric Power Systems Lecture 2

EH2741 Communication and Control in Electric Power Systems Lecture 2 KTH ROYAL INSTITUTE OF TECHNOLOGY EH2741 Communication and Control in Electric Power Systems Lecture 2 Lars Nordström larsno@kth.se Course map Outline Transmission Grids vs Distribution grids Primary Equipment

More information

COPYRIGHTED MATERIAL. Index

COPYRIGHTED MATERIAL. Index Index Note: Bold italic type refers to entries in the Table of Contents, refers to a Standard Title and Reference number and # refers to a specific standard within the buff book 91, 40, 48* 100, 8, 22*,

More information

Module 2 : Current and Voltage Transformers. Lecture 8 : Introduction to VT. Objectives. 8.1 Voltage Transformers 8.1.1Role of Tuning Reactor

Module 2 : Current and Voltage Transformers. Lecture 8 : Introduction to VT. Objectives. 8.1 Voltage Transformers 8.1.1Role of Tuning Reactor Module 2 : Current and Voltage Transformers Lecture 8 : Introduction to VT Objectives In this lecture we will learn the following: Derive the equivalent circuit of a CCVT. Application of CCVT in power

More information

Protecting Large Machines for Arcing Faults

Protecting Large Machines for Arcing Faults Protecting Large Machines for Arcing Faults March 2, 2010 INTRODUCTION Arcing faults occur due to dirty insulators or broken strands in the stator windings. Such faults if undetected can lead to overheating

More information

A Special Ferro-resonance Phenomena on 3-phase 66kV VT-generation of 20Hz zero sequence continuous voltage

A Special Ferro-resonance Phenomena on 3-phase 66kV VT-generation of 20Hz zero sequence continuous voltage A Special Ferro-resonance Phenomena on 3-phase 66kV VT-generation of Hz zero sequence continuous voltage S. Nishiwaki, T. Nakamura, Y.Miyazaki Abstract When an one line grounding fault in a transmission

More information

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS

OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS OPERATING, METERING AND EQUIPMENT PROTECTION REQUIREMENTS FOR PARALLEL OPERATION OF LARGE-SIZE GENERATING FACILITIES GREATER THAN 25,000 KILOWATTS AND MEDIUM-SIZE FACILITIES (5,000-25,000KW) CONNECTED

More information

A1-101 INFLUENCE OF SPECIAL SHORT CIRCUIT ON ELECTRICAL GENERATOR DESIGN. Ding Zhong MENG (HONG KONG, CHINA)

A1-101 INFLUENCE OF SPECIAL SHORT CIRCUIT ON ELECTRICAL GENERATOR DESIGN. Ding Zhong MENG (HONG KONG, CHINA) 1, rue d'artois, F-758 Paris http://www.cigre.org A1-11 Session 4 CIGRÉ INFLUENCE OF SPECIAL SHORT CIRCUIT ON ELECTRICAL GENERATOR DESIGN Ding Zhong MENG (HONG KONG, CHINA) SUMMARY Refer to the IEC Standard

More information

Transformer Protection

Transformer Protection Transformer Protection Transformer Protection Outline Fuses Protection Example Overcurrent Protection Differential Relaying Current Matching Phase Shift Compensation Tap Changing Under Load Magnetizing

More information

3Ø Short-Circuit Calculations

3Ø Short-Circuit Calculations 3Ø Short-Circuit Calculations Why Short-Circuit Calculations Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective

More information

Appendix D Fault Levels

Appendix D Fault Levels Appendix D Fault Levels Page 1 Electricity Ten Year Statement November 2013 D.1 Short Circuit Currents Short Circuit Currents Three phase to earth and single phase to earth short circuit current analyses

More information

Ground Fault Currents in Unit Generator-Transformer at Various NGR and Transformer Configurations

Ground Fault Currents in Unit Generator-Transformer at Various NGR and Transformer Configurations Ground Fault Currents in Unit Generator-Transformer at Various NGR and Transformer Configurations A.R. Sultan, M.W. Mustafa, M.Saini Faculty of Electrical Engineering Universiti Teknologi Malaysia (UTM)

More information

SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha

SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha SUBJECT CODE : EE6702 SUBJECT NAME: Protection & switchgear STAFF NAME : Ms.J.C.Vinitha EE2402 - PROTECTION & SWITCHGEAR SYLLABUS ELECTRIC POWER SYSTEM Electricity is generated at a power plant (1), voltage

More information

ISSN: X Impact factor: (Volume 3, Issue 6) Available online at Modeling and Analysis of Transformer

ISSN: X Impact factor: (Volume 3, Issue 6) Available online at   Modeling and Analysis of Transformer ISSN: 2454-132X Impact factor: 4.295 (Volume 3, Issue 6) Available online at www.ijariit.com Modeling and Analysis of Transformer Divyapradeepa.T Department of Electrical and Electronics, Rajalakshmi Engineering

More information

Coil Products Beginnings 1960 State of the Art. Customer partnership around the globe. Continuous innovation since 1900

Coil Products Beginnings 1960 State of the Art. Customer partnership around the globe. Continuous innovation since 1900 Coil Products Coil Products Customer partnership around the globe More than 250,000 coil products delivered to more than 170 countries. More than 60 years of operational experience. 35,000 in Europe 13,000

More information

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours)

Cork Institute of Technology. Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Cork Institute of Technology Bachelor of Science (Honours) in Electrical Power Systems - Award Instructions Answer FIVE questions. (EELPS_8_Y4) Autumn 2008 Electrical Energy Systems (Time: 3 Hours) Examiners:

More information

Single Line Diagram of Substations

Single Line Diagram of Substations Single Line Diagram of Substations Substations Electric power is produced at the power generating stations, which are generally located far away from the load centers. High voltage transmission lines are

More information

Conventional Paper-II-2011 Part-1A

Conventional Paper-II-2011 Part-1A Conventional Paper-II-2011 Part-1A 1(a) (b) (c) (d) (e) (f) (g) (h) The purpose of providing dummy coils in the armature of a DC machine is to: (A) Increase voltage induced (B) Decrease the armature resistance

More information

ACS 1000 Transformer Failure Investigation. Nathan Schachter, Peng

ACS 1000 Transformer Failure Investigation. Nathan Schachter, Peng Investigation Nathan Schachter, Peng Objectives Learn what happened Explain why it happened Discuss solutions Suggest remedies so it does not happen again Prevention is the key to success 2 ACS 1000 VFD

More information

MV network design & devices selection EXERCISE BOOK

MV network design & devices selection EXERCISE BOOK MV network design & devices selection EXERCISE BOOK EXERCISES 01 - MV substation architectures 02 - MV substation architectures 03 - Industrial C13-200 MV substation 04 - Max. distance between surge arrester

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

Problems connected with Commissioning of Power Transformers

Problems connected with Commissioning of Power Transformers Problems connected with Commissioning of Power Transformers ABSTRACT P Ramachandran ABB India Ltd, Vadodara, India While commissioning large Power Transformers, certain abnormal phenomena were noticed.

More information

2. Current interruption transients

2. Current interruption transients 1 2. Current interruption transients For circuit breakers or other switching facilities, transient voltages just after the current interruptions are of great concern with successful current breakings,

More information

Revision of TRV Requirements for the Application of Generator Circuit-Breakers

Revision of TRV Requirements for the Application of Generator Circuit-Breakers Revision of TRV Requirements for the Application of Generator Circuit-Breakers M. Palazzo, M. Popov, A. Marmolejo and M. Delfanti Abstract-- The requirements imposed on generator circuitbreakers greatly

More information

Volume I Issue VI 2012 September-2012 ISSN

Volume I Issue VI 2012 September-2012 ISSN A 24-pulse STATCOM Simulation model to improve voltage sag due to starting of 1 HP Induction-Motor Mr. Ajay Kumar Bansal 1 Mr. Govind Lal Suthar 2 Mr. Rohan Sharma 3 1 Associate Professor, Department of

More information

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System

ENGINEERING DATA SUBMITTAL For the Interconnection of Generation System WHO SHOULD FILE THIS SUBMITTAL: Anyone in the final stages of interconnecting a Generation System with Nodak Electric Cooperative, Inc. This submittal shall be completed and provided to Nodak Electric

More information

The Effect of Various Types of DG Interconnection Transformer on Ferroresonance

The Effect of Various Types of DG Interconnection Transformer on Ferroresonance The Effect of Various Types of DG Interconnection Transformer on Ferroresonance M. Esmaeili *, M. Rostami **, and G.B. Gharehpetian *** * MSc Student, Member, IEEE, Shahed University, Tehran, Iran, E mail:

More information

Effects of Harmonic Distortion I

Effects of Harmonic Distortion I Effects of Harmonic Distortion I Harmonic currents produced by nonlinear loads are injected back into the supply systems. These currents can interact adversely with a wide range of power system equipment,

More information

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages

Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Effects of Phase-Shifting Transformers, and Synchronous Condensers on Breaker Transient Recovery Voltages Waruna Chandrasena, Bruno Bisewski, and Jeff Carrara Abstract-- This paper describes several system

More information

The InterNational Electrical Testing Association Journal. BY STEVE TURNER, Beckwith Electric Company, Inc.

The InterNational Electrical Testing Association Journal. BY STEVE TURNER, Beckwith Electric Company, Inc. The InterNational Electrical Testing Association Journal FEATURE PROTECTION GUIDE 64S Theory, Application, and Commissioning of Generator 100 Percent Stator Ground Fault Protection Using Low Frequency

More information

Short Circuit Current Calculations

Short Circuit Current Calculations Introduction Several sections of the National Electrical Code relate to proper overcurrent protection. Safe and reliable application of overcurrent protective devices based on these sections mandate that

More information

Utility System Lightning Protection

Utility System Lightning Protection Utility System Lightning Protection Many power quality problems stem from lightning. Not only can the high-voltage impulses damage load equipment, but the temporary fault that follows a lightning strike

More information

Power Plant and Transmission System Protection Coordination Fundamentals

Power Plant and Transmission System Protection Coordination Fundamentals Power Plant and Transmission System Protection Coordination Fundamentals NERC Protection Coordination Webinar Series June 2, 2010 Jon Gardell Agenda 2 Objective Introduction to Protection Generator and

More information

HARMONICS CAUSES AND EFFECTS

HARMONICS CAUSES AND EFFECTS HARMONICS CAUSES AND EFFECTS What is Harmonics? Harmonics is defined as the content of the signal whose frequency is an integral multiple of the system frequency of the fundamentals. Harmonics current

More information

Power Factor. Power Factor Correction.

Power Factor. Power Factor Correction. Power Factor. Power factor is the ratio between the KW and the KVA drawn by an electrical load where the KW is the actual load power and the KVA is the apparent load power. It is a measure of how effectively

More information

In power system, transients have bad impact on its

In power system, transients have bad impact on its Analysis and Mitigation of Shunt Capacitor Bank Switching Transients on 132 kv Grid Station, Qasimabad Hyderabad SUNNY KATYARA*, ASHFAQUE AHMED HASHMANI**, AND BHAWANI SHANKAR CHOWDHRY*** RECEIVED ON 1811.2014

More information

Utility Interconnection and System Protection

Utility Interconnection and System Protection Utility Interconnection and System Protection Alex Steselboim President, Advanced Power Technologies, Inc. Utility paralleling vs. isolated operation. Isochronous kw load sharing Reactive power (VAR) sharing

More information