1 ELECTRICAL TESTING PLANS AND PROCEDURES FOR TRANSFORMERS-DRY TYPE, AIR-COOLED Bergelectric to test transformer feeder circuits with leads disconnected. o Visually inspection of all wiring and cabling, numbering and tagging will take place while continuity testing is performed. Perform continuity test to insure proper cable connections. o Compare equipment nameplates with the contract documents. o Continuity testing will require two electricians, a calibrated multimeter or a set of phones or a tone and probe kit. This process will require approximately 3 minutes per cable. o Insulation resistance (Megger) testing of feeders will require two electricians, a calibrated megger and require approximately 3 minutes per cable. Testing shall be for one minute using 1000 Vdc. After the above forms have been filled out and sign-off by a representative from OCSD, Bergelectric will visual inspect nameplate information, inspect for physical damage, and check for proper grounding. o Bergelectric / OCSD will provide needed temporary circuits of 480vAC - 100A, 240vAC 50A and a 120vAC 20A for the required NETA testing by Power Testing and Energization. o All cables will be terminated per the manufactures recommendation and recorded on a torque test field report. This process will require one electrician, a calibrated torque wrench and approximately 10 minutes per cable.
2 Power Testing and Energization will provide NETA testing per plans and spec. Power Testing and Energization shall perform all inspection and test, including all optional tests, listed in sections or of NETA on all dry type transformers. TRANSFORMERS-DRY TYPE, AIR-COOLED, LARGE (Larger than 100 kva single-phase or 300 kva three-phase) Visual and Mechanical Inspection o Compare equipment nameplate information with single-line diagram. o Inspect impact recorder prior to unloading transformer if applicable. o Verify removal of any shipping bracing after final placement. o Verify proper auxiliary device operation. o Perform specific inspections and mechanical tests as recommended by manufacturer. o Verify proper equipment grounding. Electrical Tests o Perform insulation-resistance tests, winding-to-winding, and windings-to-ground, utilizing a megohmmeter with test voltage output. Test duration shall be for 10 minutes with resistance s tabulated at 30 seconds, 1 minute, and 10 minutes. Calculate dielectric absorption ratio and polarization index. o Perform a turns-ratio test between windings at all tap positions. The final tap setting is to be determined by the owner/user's electrical engineer and set by the testing firm. o Perform insulation power-factor tests or dissipation-factor tests on all windings and bushings. Determine overall dielectricloss and power factor (CH, CL, and CHL). Test voltages
3 should be limited to the line-to-ground voltage rating of the transformer winding. o Perform individual excitation current tests on each phase. o Perform winding-resistance tests on each winding in final tap position. o Perform tests and adjustments on fan controls and alarm functions. o Verify proper secondary voltage phase-to-phase and phase-toneutral after energization and prior to loading. TRANSFORMERS, DRY TYPE, AIR-COOLED, LOW VOLTAGE, SMALL (NOTE: This category consists of power transformers with windings rated 600 volts or less and sizes equal to or less than 167 kva single-phase or 500 kva three-phase). Visual and Mechanical Inspection o Compare equipment nameplate information with single-line diagram. o Verify removal of any shipping bracing after final placement. o Verify proper auxiliary device operation. o Perform specific inspections and mechanical tests as recommended by manufacturer. o Verify proper equipment grounding. Electrical Tests o Perform insulation-resistance tests, winding-to-winding, and windings-to-ground, utilizing a megohmmeter with test
4 voltage output. Test duration shall be for 10 minutes with resistance s tabulated at 30 seconds, 1 minute, and 10 minutes. Calculate dielectric absorption ratio and polarization index. o Perform a turns-ratio test between windings at all tap positions. The final tap setting is to be determined by the owner/user's electrical engineer and set by the testing firm. o Verify proper secondary voltage phase-to-phase and phaseto-neutral after energization and prior to loading. Attached is a list of Bergelectric testing equipment that is calibrated prior to arriving on the job site.
5
Transformer Testing & Maintenance Fundamentals. AVO Training Institute, Inc. 2018
Transformer Testing & Maintenance Fundamentals 1 AVO Training Institute, Inc. 2018 Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the
More information7. INSPECTION AND TEST PROCEDURES
7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect
More informationSubstation Preventive Maintenance
Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS
More informationSINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL
SINGLE PHASE INSTRUCTION MANUAL DIAGRAM D This manual applies to all single-phase buck & boost transformers sold by Larson Electronics. Please refer to the connection diagram on pages 4-6 for properly
More informationBrown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS
SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600
More informationUnderstanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON
Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser - OMICRON Transformers Diagnostic Testing - OVERALL DGA Oil Screen Power Factor / Capacitance Exciting Current Transformer
More informationFIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC.
Regional Technical Seminar FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC. Field Electrical Testing Applications Key Purposes of Field Electrical Testing: Receiving inspection Acceptance testing/commissioning
More informationUnderstanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA
Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,
More informationBack to the Basics Current Transformer (CT) Testing
Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of
More informationIndustrial Electrician Level 3
Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide
More informationMGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide
MGM Transformer Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Company 5701 Smithway Street Commerce, CA 90040 www.mgmtransformer.com Phone: 323.726.0888
More informationNUMC Bid # MC Specification for Electrical Switchgear Services & Maintenance Program
NUMC Bid # MC59-03101-5011 Specification for Electrical Switchgear Services & Maintenance Program OBJECTIVE The Electrical Switchgear Services and Maintenance Program is designed to: A. Repair or replace
More informationSection L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES
Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load
More informationPRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer
PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer
More informationThe Basics of Insulation Testing
The Basics of Insulation Testing Feature by Jim Gregorec IDEAL Industries, Inc. What Is Insulation Testing? In a perfect world, all the electrical current sent along a conductive wire would reach its intended
More informationTransformer Factory Testing
Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification
More informationKNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers
KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.
More informationNSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation
Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance
More informationNEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :
NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE
More informationExercise 2: Ohm s Law Circuit Current
Exercise 2: Circuit Current EXERCISE OBJECTIVE When you have completed this exercise, you will be able to determine current by using Ohm s law. You will verify your results with a multimeter. DISCUSSION
More informationINSTALLATION, OPERATION AND MAINTENANCE GUIDE
INSTALLATION, OPERATION AND MAINTENANCE GUIDE FOR INDOOR/OUTDOOR SINGLE PHASE ENCAPSULATED TRANSFORMERS Indoor/Outdoor Encapsulated Transformers The pictures used in this guide are only a representation
More informationTesar s.r.l. Installation and maintenance manual. Installation, use and maintenance. Manual. Page :1\20
Installation, use and maintenance Manual Page :1\20 1. INTRODUCTION 1.1. Reference Standards 1.2. Outline of the transformers and the accessories 2. RECEPTION, HANDLING, STORAGE 2.1. Reception 2.2. Transport
More informationSINGLE-PHASE VSV SWITCH
Revision: September 2009 Supersedes: August 2007 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...3 IV. Maintenance...5
More informationSingle-Phase Transformation Review
Single-Phase Transformation Review S T U D E N T M A N U A L March 2, 2005 2 STUDENT TRAINING MANUAL Prerequisites: None Objectives: Given the Construction Standards manual and a formula sheet, you will
More informationWESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)
WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices
More informationSingle-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL
Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Issued by: Approved by: Engineering Department Energy+ Inc. September 2016 Shawn Jackson, P.Eng. Approval is given in accordance with
More informationA1000 ALPHA and A1200 ALPHA Meter Installation Instructions. General. Installation. For A1000 ALPHA Type R, A1000 ALPHA Type C, and A1200 ALPHA Meters
January 003 IL4-401B A1000 ALPHA and A100 ALPHA Meter Installation Instructions For A1000 ALPHA Type R, A1000 ALPHA Type C, and A100 ALPHA Meters General This leaflet contains general installation instructions
More informationTesting Potential Transformers
Testing Potential Transformers By Les Warner (PCA Valence) and Chris Werstiuk ( LLC) Potential transformers (PTs) are necessary to a power system for metering and protective relaying to convert higher
More informationPower Measurements and Basic Electrical Diagnostic Tests
Power Measurements and Basic Electrical Diagnostic Tests Instrument Basics Burden VA Sources V and I Meters V and I KVL and KCL Kelvin Connection KVL and KCL Kelvin Connection 4-Wire Technique Exclude
More informationCONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI
GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers
More informationInsulation Resistance Testing
Testing Application Note Introduction detailed information on leakage resistance testers can currents and resistance tests see be used to determine the integ- the following sections: What Is & Leakrity
More informationInstallation, use and maintenance manual
Installation, use and maintenance manual Installation, use and maintenance manual TABLE OF CONTENTS 1. Introduction 1.1. Reference Standards pag. 4 1.2. Outline of the transformers and the accessories
More informationSECTION TRANSFORMERS
SECTION 16460 - TRANSFORMERS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Section
More informationCourse 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC)
Name: Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC) 1. T F In three-phase four-wire delta systems rated 240/120 volts, sometimes
More informationSection 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General
Section 16621A - AUTOMATIC TRANSFER SWITCH Part 1 General 1.01 One 600 Amp, 3 Phase, 480 Volt Automatic Transfer Switch (ATS) shall be provided with gasketed enclosure. The ATS shall consist of an inherently
More information~=E.i!=h. Pre-certification Transformers
7 Transformers Section 26 of the electrical code governs the use and installations of transformers. A transformer is a static device used to transfer energy from one alternating current circuit to another.
More informationMD-5060 DIGITAL MEGOHMMETER
DIGITAL MEGOHMMETER ( M98126501-03 / 04A ) TECHNICAL SPECIFICATIONS OPERATING INSTRUCTIONS DESCRIPTION The CIRCUTOR model MD-5060 digital electronic ohmmeter is a versatile, robust and easy-to-use equipment.
More informationIMPORTANCE OF INSULATION RESISTANCE
IMPORTANCE OF INSULATION RESISTANCE What is Good Insulation? Every electric wire in your plant whether it s in a motor, generator, cable, switch, transformer, etc., is carefully covered with some form
More informationSECTION 16322B SUBSTATION TRANSFORMERS DRY-TYPE
SUBSTATION TRANSFORMERS DRY-TYPE PART 1 GENERAL 1.01 1.02 1.03 1.04 SCOPE The Contractor shall furnish and install the primary and/or secondary substation transformers as specified herein and as shown
More informationTABLE OF CONTENT
Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES
More informationProvisional Specifications
Provisional Specifications Category: ELECTRICITY Provisional Specification: PS-E-15 Page: 1 of 7 of Type of Electricity Meters, Instrument Transformers and Auxiliary Devices, Provisional Specifications
More informationDMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)
DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date
More informationUnderstanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques
Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Charles Sweetser, Services Manager, PRIM Engineering, Waltham, Mass. Topics of Discussion
More informationElectronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards
Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards The Solo, Select and Sync PWM boards provide a pulse-width modulated (PWM) signal to the EC motor to control fan speed.
More informationINTELLIMETER REGISTER
INTELLIMETER REGISTER MODEL RG2 INSTALLATION AND CONNECTIONS INSTALLATION MANUAL WARNING: Any work on or near energized metering equipment can present a danger of electrical shock. All work on these products
More informationUsing a True RMS Voltmeter
The meter and probe combination can be purchased at wholesale distributors in most cities and can vary in cost from $400 to $500. While that may seem like a steep investment, the cost is relatively small
More informationSECTION DISTRIBUTION SWITCHBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 11 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // -- // if not applicable to project. Also delete any other item or paragraph
More informationTRANSFORMERS INTRODUCTION
Tyco Electronics Corporation Crompton Instruments 1610 Cobb International Parkway, Unit #4 Kennesaw, GA 30152 Tel. 770-425-8903 Fax. 770-423-7194 TRANSFORMERS INTRODUCTION A transformer is a device that
More informationSAUDI STANDARD NO. SASO IEC : 2007 SWITCHES FOR HOUSEHOLD AND SIMILAR FIXED ELECTRICAL INSTALLATIONS
SAUDI STANDARD NO. SASO IEC 60669-2-2: 2007 SWITCHES FOR HOUSEHOLD AND SIMILAR FIXED ELECTRICAL INSTALLATIONS Part 2-2: Particular requirements Electromagnetic remote-control switches (RCS) SAUDI ARABIAN
More informationService Information System
Quick Notes Page 1 Service Information System Thursday, September 01, 2016 7:22 AM Troubleshooting C32 Marine Auxiliary Engines Media Number -KENR6846-04 Publication Date -01/07/2011 Date Updated -15/07/2011
More informationServo Amplifier - Troubleshooting Guide
Haas Technical Documentation Servo Amplifier - Troubleshooting Guide Scan code to get the latest version of this document Translation Available There are four versions of Haas amplifiers. 30A [1], 45A
More informationMV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer
PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with
More informationTesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis
feature By brandon dupuis An Introduction to Electrical diagnostic TesTIng of Power Transformers 38 Transformers are the largest, most expensive, and highly critical components of most utility substations.
More informationDM-45 Digital Multimeter
INSTRUCTION MANUAL DM-45 Digital Multimeter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Description The Greenlee DM-45 Digital
More informationQUICK TESTER FOR TRANSFORMERS AND CAPACITORS
n 8505 QUICK TESTER FOR TRANSFORMERS AND CAPACITORS E N G L I S H User Manual Table of Contents 1. INTRODUCTION... 3 1.1 Receiving Your Shipment...3 1.2 Ordering Information...3 1.2.1 Replacement Parts...3
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems
More informationUNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1
GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers
More informationDTS ISOLATION TRANSFORMER SPECIFICATIONS
1.1 Scope of Work: DTS ISOLATION TRANSFORMER SPECIFICATIONS The DTS transformers shall be designed to supply isolated power to sensitive computer based equipment. The DTS units will meet or exceed the
More informationSERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT
SERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT Page TABLE OF CONTENTS POWER SYSTEM STUDY: 5 DATA COLLECTION AND NETWORK MODELLING 5 LOAD FLOW STUDY 5 SHORT CIRCUIT
More informationECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE
More informationSINGLE-PHASE VSV SWITCH
May 2006 Supercedes: March 2006 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...2 IV. Maintenance...4 V. VSV Power
More informationPacific Crest Transformers
April 2013 Multi-voltage Testing Transformers Anyone familiar with Pacific Crest Transformers is aware that the company offers a wide range of specialty transformers to suit a host of load applications.
More informationDM-III MULTITEST Power Quality Recorder
DM-III MULTITEST Power Quality Recorder Amprobe s full-featured Three-Phase Power Quality Recorders provide the essential functions and capabilities required to operate accurately and effectively in today
More informationGENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW
GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW Electric Utility Contact Information DTE Energy Interconnection Coordinator One Energy Plaza, SB
More informationInsulation resistance testing. A complete solution for every application.
Insulation resistance testing A complete solution for every application. Why perform insulation testing? Safety The most important reason for testing insulation is to ensure public and personal safety.
More informationDM-III Multitest & DM-III Multitest F Power Quality Recorders
DM-III Multitest & DM-III Multitest F Power Quality Recorders CAT 600V TRUE RMSz Amprobe s full-featured Three-Phase Power Quality Recorders provide the essential functions and capabilities required to
More informationwhich is used to shift the phase angle between the two sets of coils to produce torque.
KLF-1 SCOPE This test procedure covers the testing and maintenance of the ABB KLF-1 loss of excitation relay. The Westinghouse Protective Relay Division was purchased by ABB, and new relays carry the ABB
More informationTraining Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.
Training Title POWER TRANSFORMERS Training Duration 5 days Training Venue and Dates Power transformers 5 20-24 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue will be informed soon. Training
More informationTransformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications
The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of
More informationDATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO
PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %
More informationSECTION PANELBOARDS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section
More informationMcPherson Voltage Regulators 4501 NW 27 Ave Miami FL
McPherson Voltage Regulators 4501 NW 27 Ave Miami FL 33142 305-634-1511 To avoid of possible personal injury or equipment damage read and understand this manual before installation. (A.V.R) 208 / 380 /
More informationTRANSFORMER OPERATIONAL PRINCIPLES, SELECTION & TROUBLESHOOTING
Training Title TRANSFORMER OPERATIONAL PRINCIPLES, SELECTION & TROUBLESHOOTING Training Duration 5 days Training Date Transformer Operational Principles, Selection & Troubleshooting 5 15 19 Nov $4,250
More informationUBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS
More informationRECEIVING, HANDLING AND STORING
Fig INSTRUCTIONS Current Transformers BUSHING AND CABLE TYPES l Typical current transformer mounting (viewed with cover upside down) INTRODUCTION Current (CT's) are employed in power as a source of current
More informationGENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW
GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945
More informationSECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL
PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.
More informationBC145 SIGNAL ISOLATOR BOARD
BC145 SIGNAL ISOLATOR BOARD 4/17 Installation & Operating Manual MN1373 Any trademarks used in this manual are the property of their respective owners. Important: Be sure to check www.baldor.com to download
More informationPower Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.
Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the
More informationServo Amplifier - Troubleshooting Guide
Haas Technical Documentation Servo Amplifier - Troubleshooting Guide Scan code to get the latest version of this document Translation Available There are four versions of Haas amplifiers. 30A [1], 45A
More informationSubstation Testing and Commissioning: Power Transformer Through Fault Test
1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of
More informationPower Transformer Ratings' Calculation and Analysis - IEEE C
Power Transformer Ratings' Calculation and Analysis - IEEE C57.91-1995 Course No. E-3058 Credit: 3 PDH 2017 Decatur Professional Development, LLC. All rights reserved. Power Transformer Ratings Calculation
More informationInsulation Testing. Distributor Training Program
Testing Distributor Training Program Testing Leaking current can cause a range of problems. Find out if poor insulation is the cause. resistance testers can be used to determine the integrity of windings
More informationEA SA G U I D E EASA AR200 ELECTRICAL APPARATUS SERVICE ASSOCIATION, INC. FOR THE REPAIR OF POWER AND DISTRIBUTION TRANSFORMERS.
ELECTRICAL APPARATUS SERVICE ASSOCIATION, INC. INTERNATIONAL HEADQUARTERS Phone: 314-993-2220 1331 Baur Blvd., St. Louis, MO 63132 Fax: 314-993-1269 www.easa.com EASA AR200 G U I D E FOR THE REPAIR OF
More informationSeries NRX with PXR - Instructions for Neutral Current Sensor Type NF
Supersedes March 2016 Series NR Series NR with PR - Instructions for Neutral Current Sensor Type NF Instructions apply to: UL1066/ANSI, UL489 series NR NF frame IEC IZM16 WARNING (1) ONLY QUALIFIED ELECTRICAL
More informationBLD75-1. Bilevel Step Motor Driver. User s Guide. #L010125
BLD75-1 Bilevel Step Motor Driver User s Guide A N A H E I M A U T O M A T I O N #L010125 1 Features Unipolar Operation 10 Amps per Phase Operating Current (Kick Current) 7 Amps per Phase Standstill Current
More informationAnalog Voltage Detector 0-40kV Operating Instructions VDA040CTM
Analog Voltage Detector 0-40kV Operating Instructions VDA040CTM CONTENTS Limitation of Warranty and Liability 2 Product Safety Information 3 Design and Function 4 Voltage Detection in the C Position 5-6
More informationConstruction Electrician Level 3
Level 3 Rev. September 2008 Unit: C1 Electrical Code III Level: Three Duration: 60 hours Theory: Practical: 60 hours 0 hours Overview: This unit of instruction is designed to provide the Electrician apprentice
More informationEE188: Transformer Design, Construction, Testing & Maintenance
EE188: Transformer Design, Construction, Testing & Maintenance EE188 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This intensive training covers the design, theory, operation, maintenance
More informationINSPECTION 1. Take the cover off the relay, taking care to not shake or jar the relay or other relays around it.
CEH51A SCOPE This test procedure covers the testing and maintenance of the GE CEH51A loss of excitation relay. Refer to IL GEK-27887 for testing support information and component level identification.
More informationECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE
Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for
More informationISSN: [IDSTM-18] Impact Factor: 5.164
IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY A REVIEW OF ROUTINE TESTING ON DISTRIBUTION TRANSFORMER Sukhbir Singh 1, Parul Jangra 2, Anoop Bhagat 3, Vipin Saini 4 1 Assistant
More informationMultimeter Definition
Multimeter Definition A multimeter is a devise used to measure voltage, resistance and current in electronics & electrical equipment It is also used to test continuity between to 2 points to verify if
More informationOIL TRANSFORMER HV/LV
Rev.02 - Pag. 1/23 Installation, use and maintenance Manual OIL TRANSFORMER Rev.02 - Pag. 2/23 TABLE OF CONTENTS 1 INTRODUCTION... 4 1.1 Reference standard... 4 1.2 Electromagnetic compatibility... 4 1.3
More informationExperiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE
Experiment 45 Three-Phase Circuits OBJECTIVE To study the relationship between voltage and current in three-phase circuits. To learn how to make delta and wye connections. To calculate the power in three-phase
More informationvacon 100 industrial vacon 100 flow vacon 100 hvac vacon 100 x ac drives du/dt filter technical guide
vacon 100 industrial vacon 100 flow vacon 100 hvac vacon 100 x ac drives du/dt filter technical guide vacon 1 TABLE OF CONTENTS Document code: DPD01929A Date: 12.1.2017 1. Introduction... 2 1.1 Intended
More informationINSTRUCTION MANUAL. Type SWF. Sine Wave Filters 690 Volts, 50Hz
POWER QUALITY INSTRUCTION MANUAL Type SWF Sine Wave Filters 690 Volts, 50Hz Page 2 of 24 Contents 1. Introduction & SAFETY 2. Theory of operation 3. Typical results of the Sine Wave Filters 4. Transportation,
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 60076-21 Edition 2.0 2018-12 IEEE Std C57.15 Power transformers Part 21: Standard requirements, terminology, and test code for step-voltage regulators INTERNATIONAL ELECTROTECHNICAL
More informationPower Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL
Power Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL 1.01 SUMMARY: The following technical specification describes the requirements of the high accuracy standalone 3 phase Power