1 ELECTRICAL TESTING PLANS AND PROCEDURES FOR TRANSFORMERS-DRY TYPE, AIR-COOLED Bergelectric to test transformer feeder circuits with leads disconnected. o Visually inspection of all wiring and cabling, numbering and tagging will take place while continuity testing is performed. Perform continuity test to insure proper cable connections. o Compare equipment nameplates with the contract documents. o Continuity testing will require two electricians, a calibrated multimeter or a set of phones or a tone and probe kit. This process will require approximately 3 minutes per cable. o Insulation resistance (Megger) testing of feeders will require two electricians, a calibrated megger and require approximately 3 minutes per cable. Testing shall be for one minute using 1000 Vdc. After the above forms have been filled out and sign-off by a representative from OCSD, Bergelectric will visual inspect nameplate information, inspect for physical damage, and check for proper grounding. o Bergelectric / OCSD will provide needed temporary circuits of 480vAC - 100A, 240vAC 50A and a 120vAC 20A for the required NETA testing by Power Testing and Energization. o All cables will be terminated per the manufactures recommendation and recorded on a torque test field report. This process will require one electrician, a calibrated torque wrench and approximately 10 minutes per cable.

2 Power Testing and Energization will provide NETA testing per plans and spec. Power Testing and Energization shall perform all inspection and test, including all optional tests, listed in sections or of NETA on all dry type transformers. TRANSFORMERS-DRY TYPE, AIR-COOLED, LARGE (Larger than 100 kva single-phase or 300 kva three-phase) Visual and Mechanical Inspection o Compare equipment nameplate information with single-line diagram. o Inspect impact recorder prior to unloading transformer if applicable. o Verify removal of any shipping bracing after final placement. o Verify proper auxiliary device operation. o Perform specific inspections and mechanical tests as recommended by manufacturer. o Verify proper equipment grounding. Electrical Tests o Perform insulation-resistance tests, winding-to-winding, and windings-to-ground, utilizing a megohmmeter with test voltage output. Test duration shall be for 10 minutes with resistance s tabulated at 30 seconds, 1 minute, and 10 minutes. Calculate dielectric absorption ratio and polarization index. o Perform a turns-ratio test between windings at all tap positions. The final tap setting is to be determined by the owner/user's electrical engineer and set by the testing firm. o Perform insulation power-factor tests or dissipation-factor tests on all windings and bushings. Determine overall dielectricloss and power factor (CH, CL, and CHL). Test voltages

3 should be limited to the line-to-ground voltage rating of the transformer winding. o Perform individual excitation current tests on each phase. o Perform winding-resistance tests on each winding in final tap position. o Perform tests and adjustments on fan controls and alarm functions. o Verify proper secondary voltage phase-to-phase and phase-toneutral after energization and prior to loading. TRANSFORMERS, DRY TYPE, AIR-COOLED, LOW VOLTAGE, SMALL (NOTE: This category consists of power transformers with windings rated 600 volts or less and sizes equal to or less than 167 kva single-phase or 500 kva three-phase). Visual and Mechanical Inspection o Compare equipment nameplate information with single-line diagram. o Verify removal of any shipping bracing after final placement. o Verify proper auxiliary device operation. o Perform specific inspections and mechanical tests as recommended by manufacturer. o Verify proper equipment grounding. Electrical Tests o Perform insulation-resistance tests, winding-to-winding, and windings-to-ground, utilizing a megohmmeter with test

4 voltage output. Test duration shall be for 10 minutes with resistance s tabulated at 30 seconds, 1 minute, and 10 minutes. Calculate dielectric absorption ratio and polarization index. o Perform a turns-ratio test between windings at all tap positions. The final tap setting is to be determined by the owner/user's electrical engineer and set by the testing firm. o Verify proper secondary voltage phase-to-phase and phaseto-neutral after energization and prior to loading. Attached is a list of Bergelectric testing equipment that is calibrated prior to arriving on the job site.

5

Transformer Testing & Maintenance Fundamentals. AVO Training Institute, Inc. 2018

Transformer Testing & Maintenance Fundamentals. AVO Training Institute, Inc. 2018 Transformer Testing & Maintenance Fundamentals 1 AVO Training Institute, Inc. 2018 Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

Substation Preventive Maintenance

Substation Preventive Maintenance Substation Preventive Maintenance PROVINCIAL ELECTRICITY AUTHORITY 1 Presentation Contents 1) A kind of substation 2) Electrical equipment details of AIS substation 3) Electrical equipment details of GIS

More information

SINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL

SINGLE PHASE BUCK & BOOST TRANSFORMERS INSTRUCTION MANUAL SINGLE PHASE INSTRUCTION MANUAL DIAGRAM D This manual applies to all single-phase buck & boost transformers sold by Larson Electronics. Please refer to the connection diagram on pages 4-6 for properly

More information

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS

Brown University Revised 2/1/2006 Facilities Design & Construction Requirements SECTION 16461C - DRY TYPE TRANSFORMERS SECTION 16461C - DRY TYPE TRANSFORMERS PART 1 - GENERAL 1.1 This section includes design and performance requirements for dry-type transformers rated for use on secondary distribution systems rated 600

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser - OMICRON Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser - OMICRON Transformers Diagnostic Testing - OVERALL DGA Oil Screen Power Factor / Capacitance Exciting Current Transformer

More information

FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC.

FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC. Regional Technical Seminar FIELD ELECTRICAL TESTING SPX TRANSFORMER SOLUTIONS, INC. Field Electrical Testing Applications Key Purposes of Field Electrical Testing: Receiving inspection Acceptance testing/commissioning

More information

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA

Understanding the Value of Electrical Testing for Power Transformers. Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser, OMICRON electronics Corp. USA Understanding the Value of Electrical Testing for Power Transformers Charles Sweetser,

More information

Back to the Basics Current Transformer (CT) Testing

Back to the Basics Current Transformer (CT) Testing Back to the Basics Current Transformer (CT) Testing As test equipment becomes more sophisticated with better features and accuracy, we risk turning our field personnel into test set operators instead of

More information

Industrial Electrician Level 3

Industrial Electrician Level 3 Industrial Electrician Level 3 Industrial Electrician Unit: C1 Industrial Electrical Code I Level: Three Duration: 77 hours Theory: Practical: 77 hours 0 hours Overview: This unit is designed to provide

More information

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide

MGM Transformer. Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Vacuum Pressure Impregnated (VPI) Dry-Type Substation Transformer Specification Guide MGM Transformer Company 5701 Smithway Street Commerce, CA 90040 www.mgmtransformer.com Phone: 323.726.0888

More information

NUMC Bid # MC Specification for Electrical Switchgear Services & Maintenance Program

NUMC Bid # MC Specification for Electrical Switchgear Services & Maintenance Program NUMC Bid # MC59-03101-5011 Specification for Electrical Switchgear Services & Maintenance Program OBJECTIVE The Electrical Switchgear Services and Maintenance Program is designed to: A. Repair or replace

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer

More information

The Basics of Insulation Testing

The Basics of Insulation Testing The Basics of Insulation Testing Feature by Jim Gregorec IDEAL Industries, Inc. What Is Insulation Testing? In a perfect world, all the electrical current sent along a conductive wire would reach its intended

More information

Transformer Factory Testing

Transformer Factory Testing Transformer Factory Testing John J. Foschia Test Engineer John.Foschia@spx.com September 2018 Reasons for Testing Compliance with user specifications Assessment of quality and reliability Verification

More information

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers

KNOW MORE ABOUT THE TRANSFORMERS. Glossary Transformers KNOW MORE ABOUT THE TRANSFORMERS Glossary Transformers Ambient temperature The existing temperature of the atmosphere surrounding a transformer installation. Ampere The practical unit of electric current.

More information

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation

NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation Version:- 1.0 of Issue:- March 2016 Page 1 of 7 NSP/ 007 / 006 Guidance on Substation Design: Transformer Transport, Delivery and Installation 1. Purpose The purpose of this document is to provide guidance

More information

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax :

NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata , Tel : ; Fax : NEO TELE-TRONIX PVT. LTD. 6/7 Bijoygarh, Kolkata - 700 032, Tel : 033 2477 3126; Fax : 033 2477 2403 www.ntplindia.com SPECIFICATION NTPL MAKE MICRO-CONTROLLER BASED AUTOMATIC 50KV/10A AC HIGH VOLTAGE

More information

Exercise 2: Ohm s Law Circuit Current

Exercise 2: Ohm s Law Circuit Current Exercise 2: Circuit Current EXERCISE OBJECTIVE When you have completed this exercise, you will be able to determine current by using Ohm s law. You will verify your results with a multimeter. DISCUSSION

More information

INSTALLATION, OPERATION AND MAINTENANCE GUIDE

INSTALLATION, OPERATION AND MAINTENANCE GUIDE INSTALLATION, OPERATION AND MAINTENANCE GUIDE FOR INDOOR/OUTDOOR SINGLE PHASE ENCAPSULATED TRANSFORMERS Indoor/Outdoor Encapsulated Transformers The pictures used in this guide are only a representation

More information

Tesar s.r.l. Installation and maintenance manual. Installation, use and maintenance. Manual. Page :1\20

Tesar s.r.l. Installation and maintenance manual. Installation, use and maintenance. Manual. Page :1\20 Installation, use and maintenance Manual Page :1\20 1. INTRODUCTION 1.1. Reference Standards 1.2. Outline of the transformers and the accessories 2. RECEPTION, HANDLING, STORAGE 2.1. Reception 2.2. Transport

More information

SINGLE-PHASE VSV SWITCH

SINGLE-PHASE VSV SWITCH Revision: September 2009 Supersedes: August 2007 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...3 IV. Maintenance...5

More information

Single-Phase Transformation Review

Single-Phase Transformation Review Single-Phase Transformation Review S T U D E N T M A N U A L March 2, 2005 2 STUDENT TRAINING MANUAL Prerequisites: None Objectives: Given the Construction Standards manual and a formula sheet, you will

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL

Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Single-Phase Mini Pad-Mounted Transformer Specification: Energy+ MPDL Issued by: Approved by: Engineering Department Energy+ Inc. September 2016 Shawn Jackson, P.Eng. Approval is given in accordance with

More information

A1000 ALPHA and A1200 ALPHA Meter Installation Instructions. General. Installation. For A1000 ALPHA Type R, A1000 ALPHA Type C, and A1200 ALPHA Meters

A1000 ALPHA and A1200 ALPHA Meter Installation Instructions. General. Installation. For A1000 ALPHA Type R, A1000 ALPHA Type C, and A1200 ALPHA Meters January 003 IL4-401B A1000 ALPHA and A100 ALPHA Meter Installation Instructions For A1000 ALPHA Type R, A1000 ALPHA Type C, and A100 ALPHA Meters General This leaflet contains general installation instructions

More information

Testing Potential Transformers

Testing Potential Transformers Testing Potential Transformers By Les Warner (PCA Valence) and Chris Werstiuk ( LLC) Potential transformers (PTs) are necessary to a power system for metering and protective relaying to convert higher

More information

Power Measurements and Basic Electrical Diagnostic Tests

Power Measurements and Basic Electrical Diagnostic Tests Power Measurements and Basic Electrical Diagnostic Tests Instrument Basics Burden VA Sources V and I Meters V and I KVL and KCL Kelvin Connection KVL and KCL Kelvin Connection 4-Wire Technique Exclude

More information

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

Insulation Resistance Testing

Insulation Resistance Testing Testing Application Note Introduction detailed information on leakage resistance testers can currents and resistance tests see be used to determine the integ- the following sections: What Is & Leakrity

More information

Installation, use and maintenance manual

Installation, use and maintenance manual Installation, use and maintenance manual Installation, use and maintenance manual TABLE OF CONTENTS 1. Introduction 1.1. Reference Standards pag. 4 1.2. Outline of the transformers and the accessories

More information

SECTION TRANSFORMERS

SECTION TRANSFORMERS SECTION 16460 - TRANSFORMERS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Section

More information

Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC)

Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC) Name: Course 11 Distribution Transformer Applications Instructor: David R. Smith, PE Due: April 24, 2017 (EV), April 25, 2017 (LC) 1. T F In three-phase four-wire delta systems rated 240/120 volts, sometimes

More information

Section 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General

Section 16621A - AUTOMATIC TRANSFER SWITCH. Part 1 General Section 16621A - AUTOMATIC TRANSFER SWITCH Part 1 General 1.01 One 600 Amp, 3 Phase, 480 Volt Automatic Transfer Switch (ATS) shall be provided with gasketed enclosure. The ATS shall consist of an inherently

More information

~=E.i!=h. Pre-certification Transformers

~=E.i!=h. Pre-certification Transformers 7 Transformers Section 26 of the electrical code governs the use and installations of transformers. A transformer is a static device used to transfer energy from one alternating current circuit to another.

More information

MD-5060 DIGITAL MEGOHMMETER

MD-5060 DIGITAL MEGOHMMETER DIGITAL MEGOHMMETER ( M98126501-03 / 04A ) TECHNICAL SPECIFICATIONS OPERATING INSTRUCTIONS DESCRIPTION The CIRCUTOR model MD-5060 digital electronic ohmmeter is a versatile, robust and easy-to-use equipment.

More information

IMPORTANCE OF INSULATION RESISTANCE

IMPORTANCE OF INSULATION RESISTANCE IMPORTANCE OF INSULATION RESISTANCE What is Good Insulation? Every electric wire in your plant whether it s in a motor, generator, cable, switch, transformer, etc., is carefully covered with some form

More information

SECTION 16322B SUBSTATION TRANSFORMERS DRY-TYPE

SECTION 16322B SUBSTATION TRANSFORMERS DRY-TYPE SUBSTATION TRANSFORMERS DRY-TYPE PART 1 GENERAL 1.01 1.02 1.03 1.04 SCOPE The Contractor shall furnish and install the primary and/or secondary substation transformers as specified herein and as shown

More information

TABLE OF CONTENT

TABLE OF CONTENT Page : 1 of 34 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 REFERENCES

More information

Provisional Specifications

Provisional Specifications Provisional Specifications Category: ELECTRICITY Provisional Specification: PS-E-15 Page: 1 of 7 of Type of Electricity Meters, Instrument Transformers and Auxiliary Devices, Provisional Specifications

More information

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW)

DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) DELHI METRO RAIL CORPORATION LIMITED DMRC ELECTRICAL STANDARDS & DESIGN WING (DESDW) SPECIFICATION NO. DMES- 0005/ DMRC-E-TR-TRANSF-05 SPECIFICATIONS FOR THREE PHASE 33 kv/415 V AUXILIARY Issued on: Date

More information

Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques

Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Understanding and Extracting Valuable Information from Basic and Advanced Power Transformer Testing Techniques Charles Sweetser, Services Manager, PRIM Engineering, Waltham, Mass. Topics of Discussion

More information

Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards

Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards Electronically Commutated (EC) Motor Control with Solo, Select and Sync PWM Boards The Solo, Select and Sync PWM boards provide a pulse-width modulated (PWM) signal to the EC motor to control fan speed.

More information

INTELLIMETER REGISTER

INTELLIMETER REGISTER INTELLIMETER REGISTER MODEL RG2 INSTALLATION AND CONNECTIONS INSTALLATION MANUAL WARNING: Any work on or near energized metering equipment can present a danger of electrical shock. All work on these products

More information

Using a True RMS Voltmeter

Using a True RMS Voltmeter The meter and probe combination can be purchased at wholesale distributors in most cities and can vary in cost from $400 to $500. While that may seem like a steep investment, the cost is relatively small

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 11 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // -- // if not applicable to project. Also delete any other item or paragraph

More information

TRANSFORMERS INTRODUCTION

TRANSFORMERS INTRODUCTION Tyco Electronics Corporation Crompton Instruments 1610 Cobb International Parkway, Unit #4 Kennesaw, GA 30152 Tel. 770-425-8903 Fax. 770-423-7194 TRANSFORMERS INTRODUCTION A transformer is a device that

More information

SAUDI STANDARD NO. SASO IEC : 2007 SWITCHES FOR HOUSEHOLD AND SIMILAR FIXED ELECTRICAL INSTALLATIONS

SAUDI STANDARD NO. SASO IEC : 2007 SWITCHES FOR HOUSEHOLD AND SIMILAR FIXED ELECTRICAL INSTALLATIONS SAUDI STANDARD NO. SASO IEC 60669-2-2: 2007 SWITCHES FOR HOUSEHOLD AND SIMILAR FIXED ELECTRICAL INSTALLATIONS Part 2-2: Particular requirements Electromagnetic remote-control switches (RCS) SAUDI ARABIAN

More information

Service Information System

Service Information System Quick Notes Page 1 Service Information System Thursday, September 01, 2016 7:22 AM Troubleshooting C32 Marine Auxiliary Engines Media Number -KENR6846-04 Publication Date -01/07/2011 Date Updated -15/07/2011

More information

Servo Amplifier - Troubleshooting Guide

Servo Amplifier - Troubleshooting Guide Haas Technical Documentation Servo Amplifier - Troubleshooting Guide Scan code to get the latest version of this document Translation Available There are four versions of Haas amplifiers. 30A [1], 45A

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis

TesTIng of Power. Transformers are the largest, most. feature. By brandon dupuis feature By brandon dupuis An Introduction to Electrical diagnostic TesTIng of Power Transformers 38 Transformers are the largest, most expensive, and highly critical components of most utility substations.

More information

DM-45 Digital Multimeter

DM-45 Digital Multimeter INSTRUCTION MANUAL DM-45 Digital Multimeter Read and understand all of the instructions and safety information in this manual before operating or servicing this tool. Description The Greenlee DM-45 Digital

More information

QUICK TESTER FOR TRANSFORMERS AND CAPACITORS

QUICK TESTER FOR TRANSFORMERS AND CAPACITORS n 8505 QUICK TESTER FOR TRANSFORMERS AND CAPACITORS E N G L I S H User Manual Table of Contents 1. INTRODUCTION... 3 1.1 Receiving Your Shipment...3 1.2 Ordering Information...3 1.2.1 Replacement Parts...3

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

DTS ISOLATION TRANSFORMER SPECIFICATIONS

DTS ISOLATION TRANSFORMER SPECIFICATIONS 1.1 Scope of Work: DTS ISOLATION TRANSFORMER SPECIFICATIONS The DTS transformers shall be designed to supply isolated power to sensitive computer based equipment. The DTS units will meet or exceed the

More information

SERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT

SERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT SERVICE OFFERINGS FOR POWER SYSTEM STUDY & CONDITION MONITORING FOR STATIC EQUIPMENT Page TABLE OF CONTENTS POWER SYSTEM STUDY: 5 DATA COLLECTION AND NETWORK MODELLING 5 LOAD FLOW STUDY 5 SHORT CIRCUIT

More information

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE

ECP HV METERING EQUIPMENT COMMISSIONING PROCEDURE THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE Document Number: ECP 11-0515 ENGINEERING COMMISSIONING PROCEDURE ECP 11-0515 HV METERING EQUIPMENT COMMISSIONING PROCEDURE

More information

SINGLE-PHASE VSV SWITCH

SINGLE-PHASE VSV SWITCH May 2006 Supercedes: March 2006 SINGLE-PHASE VSV SWITCH INSTALLATION AND OPERATING MANUAL Table of Content: Page I. General...2 II. Specifications...2 III. Installation...2 IV. Maintenance...4 V. VSV Power

More information

Pacific Crest Transformers

Pacific Crest Transformers April 2013 Multi-voltage Testing Transformers Anyone familiar with Pacific Crest Transformers is aware that the company offers a wide range of specialty transformers to suit a host of load applications.

More information

DM-III MULTITEST Power Quality Recorder

DM-III MULTITEST Power Quality Recorder DM-III MULTITEST Power Quality Recorder Amprobe s full-featured Three-Phase Power Quality Recorders provide the essential functions and capabilities required to operate accurately and effectively in today

More information

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW

GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 2 MW Electric Utility Contact Information DTE Energy Interconnection Coordinator One Energy Plaza, SB

More information

Insulation resistance testing. A complete solution for every application.

Insulation resistance testing. A complete solution for every application. Insulation resistance testing A complete solution for every application. Why perform insulation testing? Safety The most important reason for testing insulation is to ensure public and personal safety.

More information

DM-III Multitest & DM-III Multitest F Power Quality Recorders

DM-III Multitest & DM-III Multitest F Power Quality Recorders DM-III Multitest & DM-III Multitest F Power Quality Recorders CAT 600V TRUE RMSz Amprobe s full-featured Three-Phase Power Quality Recorders provide the essential functions and capabilities required to

More information

which is used to shift the phase angle between the two sets of coils to produce torque.

which is used to shift the phase angle between the two sets of coils to produce torque. KLF-1 SCOPE This test procedure covers the testing and maintenance of the ABB KLF-1 loss of excitation relay. The Westinghouse Protective Relay Division was purchased by ABB, and new relays carry the ABB

More information

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch.

Training Fees 3,300$ per participant including Materials/Handouts, Tea/Coffee Refreshments & International Buffet Lunch. Training Title POWER TRANSFORMERS Training Duration 5 days Training Venue and Dates Power transformers 5 20-24 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue will be informed soon. Training

More information

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications

Transformer Winding Design. The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications The Design and Performance of Circular Disc, Helical and Layer Windings for Power Transformer Applications Minnesota Power Systems Conference November 3 5, 2009 Earl Brown Heritage Center University of

More information

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO

DATA SHEET FOR LIGHTING TRANSFORMER APPD. BY VDV PROJECT NO PART - A : SPECIFIC REQUIREMENTS THIS DATA SHEET IS APPLICABLE FOR IN BOILER A CLIMATIC CONDITIONS PACKAGE 1 DESIGN AMBIENT TEMPERATURE 45 C 2 ALTITUDE ( ABOVE MSL ) 6.71 MTRS. 3 RELATIVE HUMIDITY 74 %

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

McPherson Voltage Regulators 4501 NW 27 Ave Miami FL

McPherson Voltage Regulators 4501 NW 27 Ave Miami FL McPherson Voltage Regulators 4501 NW 27 Ave Miami FL 33142 305-634-1511 To avoid of possible personal injury or equipment damage read and understand this manual before installation. (A.V.R) 208 / 380 /

More information

TRANSFORMER OPERATIONAL PRINCIPLES, SELECTION & TROUBLESHOOTING

TRANSFORMER OPERATIONAL PRINCIPLES, SELECTION & TROUBLESHOOTING Training Title TRANSFORMER OPERATIONAL PRINCIPLES, SELECTION & TROUBLESHOOTING Training Duration 5 days Training Date Transformer Operational Principles, Selection & Troubleshooting 5 15 19 Nov $4,250

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

RECEIVING, HANDLING AND STORING

RECEIVING, HANDLING AND STORING Fig INSTRUCTIONS Current Transformers BUSHING AND CABLE TYPES l Typical current transformer mounting (viewed with cover upside down) INTRODUCTION Current (CT's) are employed in power as a source of current

More information

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW

GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW GENERATOR INTERCONNECTION APPLICATION Category 5 For All Projects with Aggregate Generator Output of More Than 2 MW ELECTRIC UTILITY CONTACT INFORMATION Consumers Energy Interconnection Coordinator 1945

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

BC145 SIGNAL ISOLATOR BOARD

BC145 SIGNAL ISOLATOR BOARD BC145 SIGNAL ISOLATOR BOARD 4/17 Installation & Operating Manual MN1373 Any trademarks used in this manual are the property of their respective owners. Important: Be sure to check www.baldor.com to download

More information

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER. Power Voltage Transformers for Air Insulated Substations THE PROVEN POWER. Introduction Trench Power Voltage Transformers (Power VTs) combine the attributes of an inductive voltage transformer with the

More information

Servo Amplifier - Troubleshooting Guide

Servo Amplifier - Troubleshooting Guide Haas Technical Documentation Servo Amplifier - Troubleshooting Guide Scan code to get the latest version of this document Translation Available There are four versions of Haas amplifiers. 30A [1], 45A

More information

Substation Testing and Commissioning: Power Transformer Through Fault Test

Substation Testing and Commissioning: Power Transformer Through Fault Test 1 Substation Testing and Commissioning: Power Transformer Through Fault Test M. Talebi, Member, IEEE, Power Grid Engineering Y. Unludag Electric Power System Abstract This paper reviews the advantage of

More information

Power Transformer Ratings' Calculation and Analysis - IEEE C

Power Transformer Ratings' Calculation and Analysis - IEEE C Power Transformer Ratings' Calculation and Analysis - IEEE C57.91-1995 Course No. E-3058 Credit: 3 PDH 2017 Decatur Professional Development, LLC. All rights reserved. Power Transformer Ratings Calculation

More information

Insulation Testing. Distributor Training Program

Insulation Testing. Distributor Training Program Testing Distributor Training Program Testing Leaking current can cause a range of problems. Find out if poor insulation is the cause. resistance testers can be used to determine the integrity of windings

More information

EA SA G U I D E EASA AR200 ELECTRICAL APPARATUS SERVICE ASSOCIATION, INC. FOR THE REPAIR OF POWER AND DISTRIBUTION TRANSFORMERS.

EA SA G U I D E EASA AR200 ELECTRICAL APPARATUS SERVICE ASSOCIATION, INC. FOR THE REPAIR OF POWER AND DISTRIBUTION TRANSFORMERS. ELECTRICAL APPARATUS SERVICE ASSOCIATION, INC. INTERNATIONAL HEADQUARTERS Phone: 314-993-2220 1331 Baur Blvd., St. Louis, MO 63132 Fax: 314-993-1269 www.easa.com EASA AR200 G U I D E FOR THE REPAIR OF

More information

Series NRX with PXR - Instructions for Neutral Current Sensor Type NF

Series NRX with PXR - Instructions for Neutral Current Sensor Type NF Supersedes March 2016 Series NR Series NR with PR - Instructions for Neutral Current Sensor Type NF Instructions apply to: UL1066/ANSI, UL489 series NR NF frame IEC IZM16 WARNING (1) ONLY QUALIFIED ELECTRICAL

More information

BLD75-1. Bilevel Step Motor Driver. User s Guide. #L010125

BLD75-1. Bilevel Step Motor Driver. User s Guide.   #L010125 BLD75-1 Bilevel Step Motor Driver User s Guide A N A H E I M A U T O M A T I O N #L010125 1 Features Unipolar Operation 10 Amps per Phase Operating Current (Kick Current) 7 Amps per Phase Standstill Current

More information

Analog Voltage Detector 0-40kV Operating Instructions VDA040CTM

Analog Voltage Detector 0-40kV Operating Instructions VDA040CTM Analog Voltage Detector 0-40kV Operating Instructions VDA040CTM CONTENTS Limitation of Warranty and Liability 2 Product Safety Information 3 Design and Function 4 Voltage Detection in the C Position 5-6

More information

Construction Electrician Level 3

Construction Electrician Level 3 Level 3 Rev. September 2008 Unit: C1 Electrical Code III Level: Three Duration: 60 hours Theory: Practical: 60 hours 0 hours Overview: This unit of instruction is designed to provide the Electrician apprentice

More information

EE188: Transformer Design, Construction, Testing & Maintenance

EE188: Transformer Design, Construction, Testing & Maintenance EE188: Transformer Design, Construction, Testing & Maintenance EE188 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This intensive training covers the design, theory, operation, maintenance

More information

INSPECTION 1. Take the cover off the relay, taking care to not shake or jar the relay or other relays around it.

INSPECTION 1. Take the cover off the relay, taking care to not shake or jar the relay or other relays around it. CEH51A SCOPE This test procedure covers the testing and maintenance of the GE CEH51A loss of excitation relay. Refer to IL GEK-27887 for testing support information and component level identification.

More information

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE

ECP COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0507 COMPACT AND MICRO SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the testing and commissioning procedures for

More information

ISSN: [IDSTM-18] Impact Factor: 5.164

ISSN: [IDSTM-18] Impact Factor: 5.164 IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY A REVIEW OF ROUTINE TESTING ON DISTRIBUTION TRANSFORMER Sukhbir Singh 1, Parul Jangra 2, Anoop Bhagat 3, Vipin Saini 4 1 Assistant

More information

Multimeter Definition

Multimeter Definition Multimeter Definition A multimeter is a devise used to measure voltage, resistance and current in electronics & electrical equipment It is also used to test continuity between to 2 points to verify if

More information

OIL TRANSFORMER HV/LV

OIL TRANSFORMER HV/LV Rev.02 - Pag. 1/23 Installation, use and maintenance Manual OIL TRANSFORMER Rev.02 - Pag. 2/23 TABLE OF CONTENTS 1 INTRODUCTION... 4 1.1 Reference standard... 4 1.2 Electromagnetic compatibility... 4 1.3

More information

Experiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE

Experiment 45. Three-Phase Circuits. G 1. a. Using your Power Supply and AC Voltmeter connect the circuit shown OBJECTIVE Experiment 45 Three-Phase Circuits OBJECTIVE To study the relationship between voltage and current in three-phase circuits. To learn how to make delta and wye connections. To calculate the power in three-phase

More information

vacon 100 industrial vacon 100 flow vacon 100 hvac vacon 100 x ac drives du/dt filter technical guide

vacon 100 industrial vacon 100 flow vacon 100 hvac vacon 100 x ac drives du/dt filter technical guide vacon 100 industrial vacon 100 flow vacon 100 hvac vacon 100 x ac drives du/dt filter technical guide vacon 1 TABLE OF CONTENTS Document code: DPD01929A Date: 12.1.2017 1. Introduction... 2 1.1 Intended

More information

INSTRUCTION MANUAL. Type SWF. Sine Wave Filters 690 Volts, 50Hz

INSTRUCTION MANUAL. Type SWF. Sine Wave Filters 690 Volts, 50Hz POWER QUALITY INSTRUCTION MANUAL Type SWF Sine Wave Filters 690 Volts, 50Hz Page 2 of 24 Contents 1. Introduction & SAFETY 2. Theory of operation 3. Typical results of the Sine Wave Filters 4. Transportation,

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60076-21 Edition 2.0 2018-12 IEEE Std C57.15 Power transformers Part 21: Standard requirements, terminology, and test code for step-voltage regulators INTERNATIONAL ELECTROTECHNICAL

More information

Power Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL

Power Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL Power Meter PQM (EnerSure Enkapsis) Guide Form Specification PART 1: GENERAL 1.01 SUMMARY: The following technical specification describes the requirements of the high accuracy standalone 3 phase Power

More information