1 Optmzaton of Installaton of FACTS Devce n Power System Plannng by both Tabu Search and Nonlnear Programmng Methods Yutaka Matsuo and Akhko Yokoyama Department of Electrcal Engneerng, Unversty oftokyo 7-3-, Hongo, Bunkyo-ku, Tokyo, Japan matsuo@syl.t.u-tokyo.ac.jp, yokoyama@syl.t.u-tokyo.ac.jp Abstract: FACTS devces such as phase shfters and seres capactors enable us to control actve power ow and to avod thermal constrants on transmsson lnes, resultng n an ncrease of the network loadablty and a reducton of producton cost. However where to place these devces s an essental matter because ther eects consderably depend on the locaton. From an economc pont of vew, the nvestment cost must be taken nto account as well as the reducton of the producton cost. Therefore we maxmze return on nvestment(roi) by searchng not only the best locaton of FACTS devces but also the ratng of each devce. Ths problem s expressed as combnatoral optmzaton problem nested by nonlnear optmzaton problem. To solve ths problem, tabu search ncorporated wth nonlnear programmng method s used. Numercal results are shown for a 4-lne test system. Keywords: FACTS devce, OPF, phase shfter, seres capactor, tabu search, nonlnear programmng I. INTRODUCTION Nowadays, t s becomng more and more dcult to obtan the rght of way for buldng new transmsson lnes. Therefore FACTS devces, whch can control the power ows and mprove the transmsson capacty of the current transmsson network, has been consdered to be placed nto the network. Especally n a meshed network, congeston problem of actve power ow becomes so crtcal that the actve power ow control s requred n order to mprove the transmsson capacty. In ths paper, we focus on two knds of FACTS devces, such as phase shfter(ps) and seres capactor(sc) for the above purpose. Installng a phase shfter can make the ow on the bottleneck lne pass through other paths, resultng n the ncrease of transmsson capacty. Whle nstallng a seres capactor can change reactance of the lne to reduce the overloaded ow. Usng these devces we can ncrease power producton wth cheaper cost and decrease the total producton cost[][2]. On the other hand, we must take nto account nvestment cost to acheve the above-mentoned reducton of the producton cost. From an economc pont of vew, return on nvestment(roi) s an mportant gure. For power system planners, t can be of great use to seek the nvestment plan wth large ROI[3]. Here the am of our research s to nd how to place FACTS devces, that s to say the number, the locaton and the ratng of multple phase shfters and/or seres capactors that gve the maxmal ROI. It s mportant to nd a sub-optmal soluton n a practcal case snce ths problem conssts of combnatoral optmzaton problem. II. OPTIMIZATION PROBLEM In ths optmzaton problem, DC model s used for power ow, and (N-) rule s consdered for securty. In DC model a phase shfter can be treated as a voltage source nserted to the branch. We also regard a seres capactor as a voltage source nserted to the branch. The voltage dvded by the current (.e. the actve power n AC model ) on the branch ndcates the equvalent resster value of the seres capactor(.e. the reactance of the seres capactor). Snce the current s derent n each (N-) case, the varable for the voltage n each (N-) case must be prepared sub-
2 ject to equal constrant of the reactances of the seres capactors n all (N-) cases. [objectve functon] where Max: ROI = Investment = X 2B + X 2B Return Investment = C 0 0 C Investment u 0I+ 0 I2+I3 max v I4+I5 max f max 0f max 2 X X penalty C= cost P + pcost L 2ND G 2ND L () [suject to] (Krchho's current law) P f = P 0 L ( 2 N) j (Krchho's voltage law) j 0 = + 0 x f ( 2 B) (producton constrant) P mn P P max ( 2 ND G) (PS angle constrant) (SC capacty constrant) 0 max 0 max max ( 2 B) f max ( 2 B) Seres capactors can be operated both n capactor mode and n reactor mode. (thermal constrant) 0f max f f max ( 2 B) (penalty cost of outage loads) L penalty L demand 0 L ; L penalty 0 ( 2 ND L ) (constrant related to PS and SC settng) Pu =0or ; P v =0or 2B u + 2B v 0 max u max 0 max v max ( 2 B) ((N-)rule) In case,...,case N where one transmsson lne s trpped o, (Krchho's current law), (Krchho's voltage law) and (thermal constrant) are mposed. And the capacty of a seres capactor must be equal n all cases. (SC capacty equal constrant) where C 0,C: FACTS devces f case = =...= f f case 2 case N the producton cost before and after placng ND: the set of all nodesb: the set of all branches ND G ;ND L : the subset of all generator nodes, load nodes u : 0- varable that represents whether the phase shfter on branch s set or unset v : 0- varable that represents whether the seres capactor on branch s set or unset cost : the cost per unt producton of generator pcost : load the penalty cost per unt nterrupted actve power of P : the actve power producton of generator (P =0,when =2 ND G ) P mn ;P max : mnmal/maxmal producton of generator L : the actve power suppled to load ( L = 0 when =2 ND L ) L demand,l penalty : the actve power demanded by load the nterrupted actve power ; max : the phase shfter angle/maxmal angle on branch : the equvalent voltage of the seres capactor on branch max : the maxmal compensaton reactance of the seres capactor on branch f : the actve power on branch from to j f max : the maxmal admssble actve power ow on branch : the voltage phase of node x : the reactance of branch I;I2;I3;I4;I5: constants It should be noted that maxmzaton of ROI leads to mnmzaton of C because the varables such as productons of generators, the phase shfter angle and the seres capactor capacty are ndependent of the faclty varables such as FACTS devce set/unset, the maxmal phase shfter angle and the maxmal capacty of seres capactor. Therefore C represents the producton cost for the economc load dspatch. III. OPTIMIZATION OF RATING OF FACTS DEVICE Ths problem conssts of the combnatoral optmzaton problem that seeks where to place FACTS devces nested by nonlnear optmzaton problem that seeks the ratng of each FACTS devce. To begn wth, we refer to optmzaton of the ratng of the FACTS devces when the locaton of each devce s settled. If the locaton s gven, the problem turns to be a constraned nonlnear optmzaton. To solve ths problem, we use SQP (Successve Quadratc Programmng) method, that s sad to be an ecent method to solve a general constraned nonlnear optmzaton problem. As related chap.iv, to determne the locaton of each devce we employ tabu search, by whch a sub-optmal soluton can be reached n a gven teraton number. Therefore to reduce computng tme of SQP method s essental for practcal use. A. Lmtaton of (N-) Rule In a transmsson network t s requred to satsfy thermal constrants of all branches n all (N-) cases. Though the total number of thermal constrants would 2
3 be very large, the constrants necessary to get consstent solutons s a small part of all thermal constrants, that concerns the weakest part of the network n some specc (N-) cases. Even f the other constrants are gnored, the soluton to be obtaned doesn't change. Therefore the proper lmtaton of the thermal constrants seems to play an mportant role to reduce the computng tme. Here a dynamc lmtaton of (N-) cases and branches under consderaton s needed. The followng algorthm s proposed: Denote t ( =; 2; :::; N) as each (N-) case and T as the set of t. Denote s j as the thermal constrants of branch j n (N-) case t and S as the set of s j.. Gve T nt and S nt, that s the ntal set of T and S.Set T = T nt and S = S nt. 2. Solve the constraned nonlnear optmzaton problem consderng only (N-) cases of t 2 T and thermal constrants of branch s j 2 S ( = ;...;N) by SQP method. 3. If the obtaned soluton satses all the constrants ncludng constrants whch are not consdered at the prevous step 2, accept t. 4. Otherwse remove thes j 2 S whch s not actve from S.If S turns to be, remove t from T. 5. Among the set of the volated constrants not ncluded n S, choose the most greatly volated constrants s j and add t to S. If S turns not to be, add t to T. 6. If volated constrants don't exst anymore or the element number of S s more than a gven number, go to 2. Otherwse go to 5. Though ths algorthm seems not to be ecent due to necessty to apply SQP method repeatedly, the number of (N-) cases or branches under consderaton decrease so drastcally that the computng tme would be short enough to apply ths algorthm. In ths algorthm the optonal procedure to cope wth the cyclng must be mplemented. B. Local Optmum Ths nonlnear functon has no local optmum n case of consderng only phase shfters but has local optmum theoretcally n some cases consderng seres capactors. However because an ntal pont rarely aects the obtaned soluton as shown n chap.v, we regard the rst vsted local optmum as a global optmum. In a larger network, t s necessary to avod beng struck nto the local optmum. IV. SEARCH FOR THE LOCATION OF FACTS DEVICE The problem to seek the locaton of FACTS devces s a combnatoral optmzaton problem. Obvously FACTS devces must be placed to reduce the ow on the ntal bottleneck, that may make a new bottleneck. Another FACTS devce to cope wth the new bottleneck may make another bottleneck. The locatons of the FACTS devces by whch the bottlenecks can be elmnated are to some degree bounded near the bottlenecks. The good locaton of FACTS devces would be alke to the other good solutons and the neghbor of the good locaton (e.g. addng, elmnatng or movng the FACTS devce ) can be also a good one. For ths reason the neghborhood search whch proceeds from current pont to the neghbor s ecent. But a smple way such as greedy neghborhood search would cause the problem of beng struck n a local optmum. Another problem s that the only one soluton can be obtaned by the method. Our model employs some approxmatons and the optmal soluton n our model s not always optmal n practce. It s better to show some sub-optmal solutons. Here we employ tabu search, that s based on neghborhood search and has a mechansm to escape from the local optmum. A. Tabu Search Tabu search s one of modern heurstc search methods for combnatoral optmzaton problems, based on neghborhood search wth local optma avodance, whch models human memory processes. Usng a tabu lst, that retans attrbutes of moves of the solutons, specc moves are prohbted for a certan number of teratons to avod trappng nto a local mnmum. Ths helps to avod cyclng, and serves also to promote a dversed search of the solutons[4]. In our problem, the locaton of FACTS devce s expressed as a bt strng that has the length equal to the number of all lnes and mples that a FACTS devce on each branch s set or unset. Two bt strngs are needed for phase shfters and seres capactors. The neghbor of the current pont s dened as addton or elmnaton of one phase shfter or seres capactor, that s the reverse of one bt. And the reversal of the current move s dened as tabu. In each teraton, after the locaton s determned by the bt strngs, ROI s obtaned by optmzaton of ratng of each devce usng SQP method. 3
4 Fg. : Flowchart B. Lower Boundary of Return In our problem, ROI s n general larger when we set fewer FACTS devces than when we set a large number of FACTS devces. In practce, however, solutons whch produce greater returns and not the largest ROI are often desrable. Therefore we settle the lower lmt of return and maxmze the ROI as long as the return s greater than a gven value, Return mn. The followng constrant s added to the problem n chap.ii. C 0 0 C Return mn (2) However t sometmes happens that the locaton of FACTS devce determned by the bt strngs can't meet the constrant even f the ratng of the FACTS devce s properly settled. In ths case the search pont should move toward where the above constrant wll be satsed. Therefore after the locaton s determned by the bt strngs, we rst maxmze the return by SQP method and f the above constrants are satsed, we maxmze ROI, that becomes an objectve functon value. Otherwse return dvded by a large constant turns to be an objectve functon value. Ths makes the search pont shft to make the return greater untl the above constrant s satsed and after that s satsed, ROI s maxmzed. The whole algorthm s shown n Fg.. V. NUMERICAL RESULTS The model power system s shown n Fg. 2. Tabu length s set to 3, upper lmt of the maxmal angle of a phase shfter s set to 20 and the upper lmt Fg. 2: Intal load ow condton n model system of the compensaton reactance of a seres capactor s set to be 2.0 p.u. whch s equal to the reactance of branches except 3-C and A-C. The constant n the objectve functon s gven as I=I4=20500, I2=2.8, I3=4.7 and I5=0.4. The lower lmt of return s xed as 0, 20 or 40. Results are shown n Tables,2 and 3. Snce only one load pattern s used n ths study, the absolute value of the operatng angle of a phase shfter s equal to the maxmal angle of the phase shfter, so s a seres capactor. Therefore only the operatng angle/capacty s wrtten n the tables. Return and nvestment value s not the actual one, therefore the ROI doesn't havethe practcal meanng of how much year to take to collect the nvestment cost. In these tables, the branch wth multple lnes such as A-B means placng the FACTS devce on one of the multple lnes. For lack of space, only the case of Table s dscussed below: Computng tme was around 9 mnutes on Sun Ultra compatble wth Ultra SPARC 200MHz CPU. The number of teraton n tabu search was8 4
5 Table : The best 5 solutons (Return mn =0) (7.89) :236pu SC on A-C (2.5) :76 PS on A-C (2.5) :97 PS on (25.47) :26 PS on (37.69) 7873 :88 PS on 3-C 00:236pu SC on A-C Table 2: The best 5 solutons (Return mn =20) :97 PS on (25.47) :26 PS on (37.69) 7873 :88 PS on 3-C 00:236pu SC on A-C :26 PS on (37.85) :48 PS on 3-C :26 PS on (37.85) 7994 :99 PS on 3-C :76 PS on A-C :26 PS on (26.89) :00 PS on 3-C because the cyclng problem occurred. Totally 702 locatons of FACTS devces were tested, that s qute small because the total number of locatons of two or one FACTS devce s about 700 and that of three or less s about n ths 4-lne network. The obtaned solutons from st best to 4th best are valdated to be the same as the best 4 obtaned n the all search space to place two or one FACTS devces. Ths network has 4 (N-) cases and about 700 thermal constrants. By lmtaton of (N-) cases, the average number of (N-) cases and thermal constrants under consderaton was respectvely 6. and 6.4 for one teraton. In the ntal state of the network, the bottleneck lne s the energzed lnes of branch B-C wth one lne open of branch B-C. And FACTS devces make the ow on branch A-B,B-C go through branch A-C, resultng n the ncrease of transmsson capacty. Consequently branch A-C turns to be a bottleneck, and more ncrease of transmsson capacty through the left lower corrdor, that s branch 3-C, s requred. As a result the ow toward branch 3-C causes a new bottleneck on branch 9-0 wth branch 5-9 open or branch 0-3 wth branch 9-3 open. Therefore t s necessary to place FACTS devces around node 3 for the best use of branch 3-C. To nvestgate the local optmum n SQP method, Table 3: The best 5 solutons (Return mn =40) :79 PS on (40.47) : PS on 3-C :97pu SC on :59 PS on 3-C (42.37) 36 :34pu SC on 9-3 :34pu SC on :86 PS on (40.70) :38 PS on 9-3 6:5 PS on 3-C :85 PS on (42.89) :72 PS on 3-C 2:00pu SC on :24 PS on (40.70) :38 PS on 9-0 6:5 PS on 3-C we changed the ntal soluton of SQP method but the best 5 solutons n Table don't change. VI. CONCLUSION Ths paper has presented the optmzaton method based on tabu search and non-lnear programmng methods of the locaton and the ratng of the FACTS devces from an economc pont of vew. Where to set the FACTS devces and how much nvestment should be pad wll become an mportant matter because the eect of the FACTS devces would change drastcally due to the locaton. Our further work s to nvestgate for a larger-scale network and multple load condtons. VII. REFERENCES [] P.Patern, S.Vtet, A.Gard, M.Bena and A.Yokoyama, \Optmal Set of Phase Shfters for Avodng Thermal Constrants usng Genetc Algorthm", ICEE-97, A- 03, Matsue, Japan, July 28-August, 997 [2] P.Patern, S.Vtet, M.Bena and A.Yokoyama, \Optmal Locaton of Phase Shfters n the French Network by Genetc Algorthm", IEEE PES SM, PE- 078-PWRS , 998 [3] Y.Matsuo and A.Yokoyama, \Optmzaton Method of Phase Shfter Locaton n Power System Plannng ", Proc. of Annual Meetng n Power Energy Socety, IEE of Japan, No.88, 998 (n JAPANESE) [4] V.J.Rayward-Smth I.H.Osman, C.R.Reeves and G.D.Smth, MODERN HEURISTIC SEARCH METH- ODS: Wley, 996 5
Network Reconfiguration in Distribution Systems Using a Modified TS Algorithm
Network Reconfguraton n Dstrbuton Systems Usng a Modfed TS Algorthm ZHANG DONG,FU ZHENGCAI,ZHANG LIUCHUN,SONG ZHENGQIANG School of Electroncs, Informaton and Electrcal Engneerng Shangha Jaotong Unversty
More informationThe Effect Of Phase-Shifting Transformer On Total Consumers Payments
Australan Journal of Basc and Appled Scences 5(: 854-85 0 ISSN -88 The Effect Of Phase-Shftng Transformer On Total Consumers Payments R. Jahan Mostafa Nck 3 H. Chahkand Nejad Islamc Azad Unversty Brjand
More informationDynamic Optimization. Assignment 1. Sasanka Nagavalli January 29, 2013 Robotics Institute Carnegie Mellon University
Dynamc Optmzaton Assgnment 1 Sasanka Nagavall snagaval@andrew.cmu.edu 16-745 January 29, 213 Robotcs Insttute Carnege Mellon Unversty Table of Contents 1. Problem and Approach... 1 2. Optmzaton wthout
More informationEvolutionary Programming for Reactive Power Planning Using FACTS Devices
Bplab Bhattacharyya, kash Kumar Gupta,. Das Evolutonary Programmng for Reactve Power Plannng Usng Devces BIPLAB BHATTACHARYYA *, IKAH KUMAR GUPTA 2 AND.DA 3, 2, 3 Department of Electrcal Engneerng, Indan
More informationOptimal Choice and Allocation of FACTS Devices in Deregulated Electricity Market using Genetic Algorithms
Optmal Choce and Allocaton of FACTS Devces n Deregulated Electrcty Maret usng Genetc Algorthms L.J. Ca, Student Member IEEE, I. Erlch, Member IEEE and G.Stamtss, Member IEEE Abstract--Ths paper deals wth
More informationNETWORK 2001 Transportation Planning Under Multiple Objectives
NETWORK 200 Transportaton Plannng Under Multple Objectves Woodam Chung Graduate Research Assstant, Department of Forest Engneerng, Oregon State Unversty, Corvalls, OR9733, Tel: (54) 737-4952, Fax: (54)
More informationOptimum Allocation of Distributed Generations Based on Evolutionary Programming for Loss Reduction and Voltage Profile Correction
ISSN : 0976-8491(Onlne) ISSN : 2229-4333(rnt) Optmum Allocaton of Dstrbuted Generatons Based on Evolutonary rogrammng for Reducton and Voltage rofle Correcton 1 Mohammad Saleh Male, 2 Soodabeh Soleyman
More informationOptimal Allocation of Static VAr Compensator for Active Power Loss Reduction by Different Decision Variables
S. Aucharyamet and S. Srsumrannukul / GMSARN Internatonal Journal 4 (2010) 57-66 Optmal Allocaton of Statc VAr Compensator for Actve Power oss Reducton by Dfferent Decson Varables S. Aucharyamet and S.
More informationAllocation of capacitor banks in distribution systems using multi-objective function
Vol. 8(27), pp. 1282-1288, 18 July, 2013 DOI 10.5897/SRE2013.5554 ISSN 1992-2248 2013 Academc Journals http://www.academcjournals.org/sre Scentfc Research and Essays Full Length Research aper Allocaton
More informationFACTS Devices Allocation Using a Novel Dedicated Improved PSO for Optimal Operation of Power System
Journal of Operaton and Automaton n Power Engneerng Vol. 1, No., Summer & Fall 013, Pages: 14-135 http://journals.uma.ac.r/joape FACTS Devces Allocaton Usng a Novel Dedcated Improved PSO for Optmal Operaton
More informationNetwork Reconfiguration for Load Balancing in Distribution System with Distributed Generation and Capacitor Placement
World Academy of Scence, Engneerng and Technology nternatonal Journal of Electrcal and Computer Engneerng Networ Reconfguraton for Load Balancng n Dstrbuton System wth Dstrbuted Generaton and Capactor
More informationOptimal Sizing and Allocation of Residential Photovoltaic Panels in a Distribution Network for Ancillary Services Application
Optmal Szng and Allocaton of Resdental Photovoltac Panels n a Dstrbuton Networ for Ancllary Servces Applcaton Reza Ahmad Kordhel, Student Member, IEEE, S. Al Pourmousav, Student Member, IEEE, Jayarshnan
More informationantenna antenna (4.139)
.6.6 The Lmts of Usable Input Levels for LNAs The sgnal voltage level delvered to the nput of an LNA from the antenna may vary n a very wde nterval, from very weak sgnals comparable to the nose level,
More informationD-STATCOM Optimal Allocation Based On Investment Decision Theory
Internatonal Conference on Computer Engneerng, Informaton Scence & Applcaton Technology (ICCIA 2016) D-STATCOM Optmal Allocaton Based On Investment Decson Theory Yongjun Zhang1, a, Yfu Mo1, b and Huazhen
More informationVoltage security constrained reactive power optimization incorporating wind generation
Unversty of Wollongong Research Onlne Faculty of Engneerng and Informaton Scences - Papers: Part A Faculty of Engneerng and Informaton Scences 2012 Voltage securty constraned reactve power optmzaton ncorporatng
More informationLMP Based Zone Formation in Electricity Markets
8th WSEAS Internatonal Conference on POWER SYSTEMS (PS 2008), Santander, Cantabra, Span, September 23-25, 2008 LMP Based Zone Formaton n Electrcty Markets SAURABH CHANANA, ASHWANI KUMAR, RAHUL SRIVASTAVA
More informationA PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT
A PARTICLE SWARM OPTIMIZATION FOR REACTIVE POWER AND VOLTAGE CONTROL CONSIDERING VOLTAGE SECURITY ASSESSMENT Hrotaka Yoshda Kench Kawata IEEE Trans. on Power Systems, Vol.15, No.4, pp.1232-1239, November
More informationRadial Distribution System Reconfiguration in the Presence of Distributed Generators
4th Internatonal Conference on Coputer, Mechatroncs, Control and Electronc Engneerng (ICCMCEE 205) Radal Dstrbuton Syste Reconfguraton n the Presence of Dstrbuted Generators Xngquan J, a, Q Lu, GuoZheng
More informationControl Chart. Control Chart - history. Process in control. Developed in 1920 s. By Dr. Walter A. Shewhart
Control Chart - hstory Control Chart Developed n 920 s By Dr. Walter A. Shewhart 2 Process n control A phenomenon s sad to be controlled when, through the use of past experence, we can predct, at least
More informationOptimal Placement of PMU and RTU by Hybrid Genetic Algorithm and Simulated Annealing for Multiarea Power System State Estimation
T. Kerdchuen and W. Ongsakul / GMSARN Internatonal Journal (09) - Optmal Placement of and by Hybrd Genetc Algorthm and Smulated Annealng for Multarea Power System State Estmaton Thawatch Kerdchuen and
More informationHarmony Search and OPF Based Hybrid Approach for Optimal Placement of Multiple DG Units
Harmony Search and OPF Based Hybrd Approach for Optmal Placement of Multple Unts Sandeep Kaur Department of Electrcal Engneerng Indan Insttute of Rooree Rooree, Inda sandpsaroa@gmal.com. B. Kumbhar Department
More informationReal Power Loss Minimization and Voltage Stability Limit Enhancement by Using Shuffled Frog Leap Algorithm
IOSR Journal of Electrcal and Electroncs Engneerng (IOSR-JEEE) e-issn: 2278-1676,p-ISSN: 2320-3331, Volume 9, Issue 2 Ver. III (Mar Apr. 2014), PP 34-40 Real Power Loss Mnmzaton and Stablty Lmt Enhancement
More informationDigital Transmission
Dgtal Transmsson Most modern communcaton systems are dgtal, meanng that the transmtted normaton sgnal carres bts and symbols rather than an analog sgnal. The eect o C/N rato ncrease or decrease on dgtal
More informationOptimal Capacitor Placement in a Radial Distribution System using Plant Growth Simulation Algorithm
World Academy of Scence, Engneerng and Technology Internatonal Journal of Electrcal, omputer, Energetc, Electronc and ommuncaton Engneerng ol:, No:9, 8 Optmal apactor Placement n a Radal Dstrbuton System
More informationInvestigation of Hybrid Particle Swarm Optimization Methods for Solving Transient-Stability Constrained Optimal Power Flow Problems
Investgaton of Hybrd Partcle Swarm Optmzaton Methods for Solvng Transent-Stablty Constraned Optmal Power Flow Problems K. Y. Chan, G. T. Y. Pong and K. W. Chan Abstract In ths paper, hybrd partcle swarm
More informationA NSGA-II algorithm to solve a bi-objective optimization of the redundancy allocation problem for series-parallel systems
0 nd Internatonal Conference on Industral Technology and Management (ICITM 0) IPCSIT vol. 49 (0) (0) IACSIT Press, Sngapore DOI: 0.776/IPCSIT.0.V49.8 A NSGA-II algorthm to solve a b-obectve optmzaton of
More informationWalsh Function Based Synthesis Method of PWM Pattern for Full-Bridge Inverter
Walsh Functon Based Synthess Method of PWM Pattern for Full-Brdge Inverter Sej Kondo and Krt Choesa Nagaoka Unversty of Technology 63-, Kamtomoka-cho, Nagaoka 9-, JAPAN Fax: +8-58-7-95, Phone: +8-58-7-957
More informationThe Application of Tabu Search Algorithm on Power System Restoration
The Applcaton of Tabu Search Algorthm on Power System Restoraton FANG Xn-yan,CAI Xao-y, Jang Chuan-wen Dept.of Electrcal Eng.., Shangha Jaotong Unv., Shangha 200240, Chna Abstract:-The essay s just accordng
More informationDispatching Reactive Power Considering All Providers in Competitive Electricity Markets
IEEE-PES General Meetng, Mnneapols, July 2010 1 Dspatchng Reactve Power Consderng All Provders n Compettve Electrcty Markets Hossen Haghghat, Claudo Cañzares, Fellow IEEE, Kankar Bhattacharya, Senor Member,
More informationAdaptive Modulation for Multiple Antenna Channels
Adaptve Modulaton for Multple Antenna Channels June Chul Roh and Bhaskar D. Rao Department of Electrcal and Computer Engneerng Unversty of Calforna, San Dego La Jolla, CA 993-7 E-mal: jroh@ece.ucsd.edu,
More informationThe Spectrum Sharing in Cognitive Radio Networks Based on Competitive Price Game
8 Y. B. LI, R. YAG, Y. LI, F. YE, THE SPECTRUM SHARIG I COGITIVE RADIO ETWORKS BASED O COMPETITIVE The Spectrum Sharng n Cogntve Rado etworks Based on Compettve Prce Game Y-bng LI, Ru YAG., Yun LI, Fang
More informationDEGL BASED OPTIMIZATION FOR PRACTICAL CONSTRAINED ECONOMIC POWER DISPATCH PROBLEM
Journal of Electrcal Engneerng BASED OTIMIZATION FOR RACTICAL CONSTRAINED ECONOMIC OWER DISATCH ROBLEM B.ADMANABHAN (1) SIVAKUMAR R.S (2) (1) M.E (ower Sys Engg), Sardar Raja College of Engneerng, Alangulam,
More informationCOMPLEX NEURAL NETWORK APPROACH TO OPTIMAL LOCATION OF FACTS DEVICES FOR TRANSFER CAPABILITY ENHANCEMENT
ARPN Journal of Engneerng and Appled Scences 006-010 Asan Research Publshng Networ (ARPN). All rghts reserved. www.arpnournals.com COMPLEX NEURAL NETWORK APPROACH TO OPTIMAL LOCATION OF FACTS DEVICES FOR
More informationApplication of Intelligent Voltage Control System to Korean Power Systems
Applcaton of Intellgent Voltage Control System to Korean Power Systems WonKun Yu a,1 and HeungJae Lee b, *,2 a Department of Power System, Seol Unversty, South Korea. b Department of Power System, Kwangwoon
More informationECONOMIC DISPATCH BY USING DIFFERENT CROSSOVER OPERATORS OF GENETIC ALGORITHM
ISTABUL UIVERSITY JOURAL OF ELECTRICAL & ELECTROICS EIEERI YEAR VOLUME UMBER : 00 : 0 : (73-83) ECOOMIC DISATCH BY USI DIFFERET CROSSOVER OERATORS OF EETIC ALORITHM Serhat DUMA, Al ÖZTÜRK, M. Kenan DÖŞOĞLU
More informationVoltage Stability in Power System A Survey S.Jaisiva 1 S.Neelan 2 K.Arul Selvi 3 R.Vinoth 4
IJSRD - Internatonal Journal for Scentfc Research & Development Vol. 3, Issue 04, 2015 ISSN (onlne): 2321-0613 S.Jasva 1 S.Neelan 2 K.Arul Selv 3 R.Vnoth 4 1,2,4 Assstant Professor 3 Assocate Professor
More informationPSO based Congestion Management in Deregulated Power Systems using Optimal Allocation of TCSC
Internatonal Journal of Innovaton and Scentfc Research ISSN 2351-8014 ol. 25 No. 1 Jun. 2016, pp. 67-77 2015 Innovatve Space of Scentfc Research Journals http://www.sr.ssr-ournals.org/ PSO based Congeston
More informationVoltage Security Enhancement with Corrective Control Including Generator Ramp Rate Constraint
Voltage Securty Enhancement wth Correctve Control Includng Generator Ramp Rate Constrant 1 P.ARUNA JEYANTHY, 2 D.DEVERAJ, 3 J.D.DARWIN 1,2 Department of Electrcal and Electroncs Engneerng 3 Department
More informationChapter 2 Two-Degree-of-Freedom PID Controllers Structures
Chapter 2 Two-Degree-of-Freedom PID Controllers Structures As n most of the exstng ndustral process control applcatons, the desred value of the controlled varable, or set-pont, normally remans constant
More informationUnit 1. Current and Voltage U 1 VOLTAGE AND CURRENT. Circuit Basics KVL, KCL, Ohm's Law LED Outputs Buttons/Switch Inputs. Current / Voltage Analogy
..2 nt Crcut Bascs KVL, KCL, Ohm's Law LED Outputs Buttons/Swtch Inputs VOLTAGE AND CRRENT..4 Current and Voltage Current / Voltage Analogy Charge s measured n unts of Coulombs Current Amount of charge
More informationTo: Professor Avitabile Date: February 4, 2003 From: Mechanical Student Subject: Experiment #1 Numerical Methods Using Excel
To: Professor Avtable Date: February 4, 3 From: Mechancal Student Subject:.3 Experment # Numercal Methods Usng Excel Introducton Mcrosoft Excel s a spreadsheet program that can be used for data analyss,
More informationPrevention of Sequential Message Loss in CAN Systems
Preventon of Sequental Message Loss n CAN Systems Shengbng Jang Electrcal & Controls Integraton Lab GM R&D Center, MC: 480-106-390 30500 Mound Road, Warren, MI 48090 shengbng.jang@gm.com Ratnesh Kumar
More informationDefine Y = # of mobiles from M total mobiles that have an adequate link. Measure of average portion of mobiles allocated a link of adequate quality.
Wreless Communcatons Technologes 6::559 (Advanced Topcs n Communcatons) Lecture 5 (Aprl th ) and Lecture 6 (May st ) Instructor: Professor Narayan Mandayam Summarzed by: Steve Leung (leungs@ece.rutgers.edu)
More informationOptimal Coordination of Overcurrent Relays Based on Modified Bat Optimization Algorithm
Internatonal Electrcal Engneerng Journal (IEEJ) http://www.eejournal.com/ Optmal Coordnaton of Overcurrent Based on Modfed Bat Optmzaton Algorthm Reza Kherollah, Farhad Namdar Department of Power and Computer,
More informationPlacement of Fault Current Limiters in Power Systems by HFLS Sorting and HIGA Optimization Approach
Placement of Fault Current Lmters n Power Systems by HFLS Sortng and HIGA Optmzaton Approach Hong-Tzer Yang, Wen-Jun Tang, Conne Wang, Potr Lubck and Steve Wang Abstract-- As the number of new power plants
More informationOptimal Placement of TCSC Based on A Sensitivity Approach for Congestion Management
fteenth atonal Power Systems Conference (PSC), IIT Bombay, December 2008 Optmal Placement of Based on A Senstvty Approach for Congeston Management Srnvasa Rao Pud, S.C. Srvastava, Senor Member, IEEE Abstract
More informationOptimal Reconfiguration of Distribution System by PSO and GA using graph theory
Proceedngs of the 6th WSEAS Internatonal Conference on Applcatons of Electrcal Engneerng, Istanbul, Turkey, May 27-29, 2007 83 Optmal Reconfguraton of Dstrbuton System by PSO and GA usng graph theory Mehd
More informationVolume 3, Special Issue 3, March 2014
ISSN (Onlne) : 319-8753 ISSN (Prnt) : 347-6710 Internatonal Journal of Innovatve Research n Scence, Engneerng and Technology Volume 3, Specal Issue 3, March 014 014 Internatonal Conference on Innovatons
More informationReview: Our Approach 2. CSC310 Information Theory
CSC30 Informaton Theory Sam Rowes Lecture 3: Provng the Kraft-McMllan Inequaltes September 8, 6 Revew: Our Approach The study of both compresson and transmsson requres that we abstract data and messages
More informationEE 330 Lecture 22. Small Signal Analysis Small Signal Analysis of BJT Amplifier
EE Lecture Small Sgnal Analss Small Sgnal Analss o BJT Ampler Revew rom Last Lecture Comparson o Gans or MOSFET and BJT Crcuts N (t) A B BJT CC Q R EE OUT R CQ t DQ R = CQ R =, SS + T = -, t =5m R CQ A
More informationTECHNICAL NOTE TERMINATION FOR POINT- TO-POINT SYSTEMS TN TERMINATON FOR POINT-TO-POINT SYSTEMS. Zo = L C. ω - angular frequency = 2πf
TECHNICAL NOTE TERMINATION FOR POINT- TO-POINT SYSTEMS INTRODUCTION Because dgtal sgnal rates n computng systems are ncreasng at an astonshng rate, sgnal ntegrty ssues have become far more mportant to
More informationCapacitated set-covering model considering the distance objective and dependency of alternative facilities
IOP Conference Seres: Materals Scence and Engneerng PAPER OPEN ACCESS Capactated set-coverng model consderng the dstance obectve and dependency of alternatve facltes To cte ths artcle: I Wayan Suletra
More informationA Mathematical Model for Restoration Problem in Smart Grids Incorporating Load Shedding Concept
J. Appl. Envron. Bol. Sc., 5(1)20-27, 2015 2015, TextRoad Publcaton ISSN: 2090-4274 Journal of Appled Envronmental and Bologcal Scences www.textroad.com A Mathematcal Model for Restoraton Problem n Smart
More informationIndustrial Robots used in Forges Applications
Industral Robots used n Forges Applcatons Lvu Cuptu, Ivanescu Andre Nck 2 and Sorn Brotac 3 Department of Mechancal Engneerng and Mechatroncs, Poltehnca Unversty of Bucharest, Romana E-mal: lvu.cuptu@omtr.pub.ro
More informationA New Framework for Reactive Power Market Considering Power System Security
A New Framewor for Reactve Power Maret Consderng Power System Securty A. Rabee*, H. A. Shayanfar* and N. Amady** Downloaded from eee.ust.ac.r at 2:26 IRDT on Sunday August 19th 2018 Abstract: Ths paper
More informationLow Switching Frequency Active Harmonic Elimination in Multilevel Converters with Unequal DC Voltages
Low Swtchng Frequency Actve Harmonc Elmnaton n Multlevel Converters wth Unequal DC Voltages Zhong Du,, Leon M. Tolbert, John N. Chasson, Hu L The Unversty of Tennessee Electrcal and Computer Engneerng
More informationIntelligent Management of Distributed Generators Reactive Power for Loss Minimization and Voltage Control
Intellgent Management of Dstrbuted Generators Reactve Power for Loss Mnmzaton and Voltage Control Mohd Zamr Che Wank 1, Istvan Erlch, and Azah Mohamed 3 Department of Electrcal Power System, Unversty of
More informationElectricity Network Reliability Optimization
Electrcty Network Relablty Optmzaton Kavnesh Sngh Department of Engneerng Scence Unversty of Auckland New Zealand kav@hug.co.nz Abstract Electrcty dstrbuton networks are subject to random faults. On occurrence
More informationECE315 / ECE515 Lecture 5 Date:
Lecture 5 Date: 18.08.2016 Common Source Amplfer MOSFET Amplfer Dstorton Example 1 One Realstc CS Amplfer Crcut: C c1 : Couplng Capactor serves as perfect short crcut at all sgnal frequences whle blockng
More informationAutomatic Voltage Controllers for South Korean Power System
Automatc Voltage lers for South Korean Power System Xng Lu Vathanathan Man Venkatasubramanan Tae-Kyun Km Washngton State Unversty Korea Electrc Power Research nsttute Pullman, WA 9964-2752 Seoul, South
More informationTraffic balancing over licensed and unlicensed bands in heterogeneous networks
Correspondence letter Traffc balancng over lcensed and unlcensed bands n heterogeneous networks LI Zhen, CUI Qme, CUI Zhyan, ZHENG We Natonal Engneerng Laboratory for Moble Network Securty, Bejng Unversty
More informationA Novel Optimization of the Distance Source Routing (DSR) Protocol for the Mobile Ad Hoc Networks (MANET)
A Novel Optmzaton of the Dstance Source Routng (DSR) Protocol for the Moble Ad Hoc Networs (MANET) Syed S. Rzv 1, Majd A. Jafr, and Khaled Ellethy Computer Scence and Engneerng Department Unversty of Brdgeport
More informationBee Hive Algorithm to Optimize Multi Constrained Piecewise Non-Linear Economic Power Dispatch Problem in Thermal Units
Internatonal Journal on Electrcal Engneerng and Informatcs Volume 3, Number 1, 011 Bee Hve Algorthm to Optmze Mult Constraned ecewse Non-Lnear Economc ower Dspatch roblem n Thermal Unts B. admanabhan 1,
More informationIEE Electronics Letters, vol 34, no 17, August 1998, pp ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES
IEE Electroncs Letters, vol 34, no 17, August 1998, pp. 1622-1624. ESTIMATING STARTING POINT OF CONDUCTION OF CMOS GATES A. Chatzgeorgou, S. Nkolads 1 and I. Tsoukalas Computer Scence Department, 1 Department
More informationCS345a: Data Mining Jure Leskovec and Anand Rajaraman Stanford University
CS345a: Data Mnng Jure Leskovec and Anand Rajaraman Stanford Unversty HW3 s out Poster sesson s on last day of classes: Thu March 11 at 4:15 Reports are due March 14 Fnal s March 18 at 12:15 Open book,
More informationRejection of PSK Interference in DS-SS/PSK System Using Adaptive Transversal Filter with Conditional Response Recalculation
SERBIAN JOURNAL OF ELECTRICAL ENGINEERING Vol., No., November 23, 3-9 Rejecton of PSK Interference n DS-SS/PSK System Usng Adaptve Transversal Flter wth Condtonal Response Recalculaton Zorca Nkolć, Bojan
More informationParameter Free Iterative Decoding Metrics for Non-Coherent Orthogonal Modulation
1 Parameter Free Iteratve Decodng Metrcs for Non-Coherent Orthogonal Modulaton Albert Gullén Fàbregas and Alex Grant Abstract We study decoder metrcs suted for teratve decodng of non-coherently detected
More informationPriority based Dynamic Multiple Robot Path Planning
2nd Internatonal Conference on Autonomous obots and Agents Prorty based Dynamc Multple obot Path Plannng Abstract Taxong Zheng Department of Automaton Chongqng Unversty of Post and Telecommuncaton, Chna
More informationMTBF PREDICTION REPORT
MTBF PREDICTION REPORT PRODUCT NAME: BLE112-A-V2 Issued date: 01-23-2015 Rev:1.0 Copyrght@2015 Bluegga Technologes. All rghts reserved. 1 MTBF PREDICTION REPORT... 1 PRODUCT NAME: BLE112-A-V2... 1 1.0
More informationAn Interactive Fuzzy Satisfying Method based on Imperialist Competitive Algorithm for Multi-Objective Function in Reactive Power Market
Int'l Conf. Scentfc Computng CSC'17 113 An Interactve Fuzzy Satsfyng Method based on Imperalst Compettve Algorthm for Mult-Objectve Functon n Reactve Power Maret Hedaral Shayanfar 1*, Mehd Mehdnejad 1
More informationOptimal Network Reconfiguration with Distributed Generation Using NSGA II Algorithm
(IJARAI) Internatonal Journal of Advanced Research n Artfcal Intellgence, Optmal Network Reconfguraton wth Dstrbuted Generaton Usng NSGA II Algorthm Jasna Hvzefendć Faculty of Engneerng and Informaton
More informationA SURVEY ON REACTIVE POWER OPTIMIZATION AND VOLTAGE STABILITY IN POWER SYSTEMS
Internatonal Journal on Techncal and Physcal Problems of Engneerng (IJTPE) Publshed by Internatonal Organzaton of IOTPE ISSN 2077-3528 IJTPE Journal www.otpe.com jtpe@otpe.com March 2014 Issue 18 Volume
More informationAPPLICATION OF BINARY VERSION GSA FOR SHUNT CAPACITOR PLACEMENT IN RADIAL DISTRIBUTION SYSTEM
IJRET: Internatonal Journal of Research n Engneerng and Technology eissn: 39-63 pissn: 3-7308 APPLICATION OF BINARY ERSION GSA FOR SHUNT CAPACITOR PLACEMENT IN RADIAL DISTRIBUTION SYSTEM Nasm Al Khan,
More informationA Comparison of Two Equivalent Real Formulations for Complex-Valued Linear Systems Part 2: Results
AMERICAN JOURNAL OF UNDERGRADUATE RESEARCH VOL. 1 NO. () A Comparson of Two Equvalent Real Formulatons for Complex-Valued Lnear Systems Part : Results Abnta Munankarmy and Mchael A. Heroux Department of
More informationPower Distribution Strategy Considering Active Power Loss for DFIGs Wind Farm
Journal of Power and Energy Engneerng, 014,, 13-19 Publshed Onlne Aprl 014 n cres. http://www.scrp.org/journal/jpee http://dx.do.org/10.436/jpee.014.4030 Power Dstrbuton trategy Consderng Actve Power Loss
More informationAn Optimal Load Shedding Approach for Distribution Networks with DGs considering Capacity Deficiency Modelling of Bulked Power Supply
An Optmal Load Sheddng Approach for Dstrbuton Networks wth DGs consderng Capacty Defcency Modellng of Bulked ower Supply A. R. Malekpour, A.R. Sef, M. R. Hesamzadeh 2, Graduate Student Member, IEEE, and
More informationControl of Chaos in Positive Output Luo Converter by means of Time Delay Feedback
Control of Chaos n Postve Output Luo Converter by means of Tme Delay Feedback Nagulapat nkran.ped@gmal.com Abstract Faster development n Dc to Dc converter technques are undergong very drastc changes due
More informationHigh Speed ADC Sampling Transients
Hgh Speed ADC Samplng Transents Doug Stuetzle Hgh speed analog to dgtal converters (ADCs) are, at the analog sgnal nterface, track and hold devces. As such, they nclude samplng capactors and samplng swtches.
More informationDesign of Shunt Active Filter for Harmonic Compensation in a 3 Phase 3 Wire Distribution Network
Internatonal Journal of Research n Electrcal & Electroncs Engneerng olume 1, Issue 1, July-September, 2013, pp. 85-92, IASTER 2013 www.aster.com, Onlne: 2347-5439, Prnt: 2348-0025 Desgn of Shunt Actve
More informationEnhancing Throughput in Wireless Multi-Hop Network with Multiple Packet Reception
Enhancng Throughput n Wreless Mult-Hop Network wth Multple Packet Recepton Ja-lang Lu, Paulne Vandenhove, We Shu, Mn-You Wu Dept. of Computer Scence & Engneerng, Shangha JaoTong Unversty, Shangha, Chna
More informationComparative Analysis of Reuse 1 and 3 in Cellular Network Based On SIR Distribution and Rate
Comparatve Analyss of Reuse and 3 n ular Network Based On IR Dstrbuton and Rate Chandra Thapa M.Tech. II, DEC V College of Engneerng & Technology R.V.. Nagar, Chttoor-5727, A.P. Inda Emal: chandra2thapa@gmal.com
More informationResearch on Controller of Micro-hydro Power System Nan XIE 1,a, Dezhi QI 2,b,Weimin CHEN 2,c, Wei WANG 2,d
Advanced Materals Research Submtted: 2014-05-13 ISSN: 1662-8985, Vols. 986-987, pp 1121-1124 Accepted: 2014-05-19 do:10.4028/www.scentfc.net/amr.986-987.1121 Onlne: 2014-07-18 2014 Trans Tech Publcatons,
More informationPlanning Reconfigurable Reactive Control for Voltage Stability Limited Power Systems
Plannng Reconfgurable Reactve Control for Stablty Lmted Power Systems Hafeng Lu, Member, IEEE, Lcheng Jn, Member, IEEE, James D. McCalley, Fellow, IEEE, Ratnesh Kumar, Fellow, IEEE, Venkataramana Ajjarapu,
More informationResource Allocation Optimization for Device-to- Device Communication Underlaying Cellular Networks
Resource Allocaton Optmzaton for Devce-to- Devce Communcaton Underlayng Cellular Networks Bn Wang, L Chen, Xaohang Chen, Xn Zhang, and Dacheng Yang Wreless Theores and Technologes (WT&T) Bejng Unversty
More informationProbable Optimization of Reactive Power in distribution systems, in presence of distributed generation sources conjugated to network and islanding
IOSR Journal of Electrcal and Electroncs Engneerng (IOSR-JEEE) e-issn: 2278-1676,p-ISSN: 2320-3331, Volume 11, Issue 5 Ver. II (Sep - Oct 2016), PP 72-78 www.osrjournals.org Probable Optmzaton of Reactve
More informationTime-frequency Analysis Based State Diagnosis of Transformers Windings under the Short-Circuit Shock
Tme-frequency Analyss Based State Dagnoss of Transformers Wndngs under the Short-Crcut Shock YUYING SHAO, ZHUSHI RAO School of Mechancal Engneerng ZHIJIAN JIN Hgh Voltage Lab Shangha Jao Tong Unversty
More informationPower System State Estimation Using Phasor Measurement Units
Unversty of Kentucky UKnowledge Theses and Dssertatons--Electrcal and Computer Engneerng Electrcal and Computer Engneerng 213 Power System State Estmaton Usng Phasor Measurement Unts Jaxong Chen Unversty
More informationA MODIFIED DIFFERENTIAL EVOLUTION ALGORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS
A MODIFIED DIFFERENTIAL EVOLUTION ALORITHM IN SPARSE LINEAR ANTENNA ARRAY SYNTHESIS Kaml Dmller Department of Electrcal-Electroncs Engneerng rne Amercan Unversty North Cyprus, Mersn TURKEY kdmller@gau.edu.tr
More informationTransmission Congestion Management in Electricity Market Restructured and Increases the Social Welfare on the System IEEE 14-Bus
Australan Journal of Basc and Appled Scences, 5(): 744-75, ISSN 99-878 Transmsson Congeston Management n Electrcty Market Restructured and Increas the Socal Welfare on the System IEEE 4-Bus Masoud Mohammad
More informationAn Efficient Metaheuristic Algorithm for Optimal Capacitor Allocation in Electric Distribution Networks
2017 2nd Internatonal Conference on Software, Multmeda and Communcaton Engneerng (SMCE 2017) ISBN: 978-1-60595-458-5 An Effcent Metaheurstc Algorthm for Optmal Capactor Allocaton n Electrc Dstrbuton Networks
More informationPROC. BULK POWER SYSTEM VOLTAGE PHENOMENA{III SEMINAR, DAVOS, SWITZERLAND, AUGUST 1994, PP. 349{358.
PROC. BULK POWER SYSTEM VOLTAGE PHENOMENA{III SEMINAR, DAVOS, SWITZERLAND, AUGUST 99, PP. 9{58. IMPROVING CONTINUATION METHODS FOR TRACING BIFURCATION DIAGRAMS IN POWER SYSTEMS Claudo A. Ca~nzares Antono
More informationHarmonic Balance of Nonlinear RF Circuits
MICROWAE AND RF DESIGN Harmonc Balance of Nonlnear RF Crcuts Presented by Mchael Steer Readng: Chapter 19, Secton 19. Index: HB Based on materal n Mcrowave and RF Desgn: A Systems Approach, nd Edton, by
More informationPower loss and Reliability optimization in Distribution System with Network Reconfiguration and Capacitor placement
Internatonal Journal of Scentfc Research Engneerng & Technology (IJSRET), ISSN 2278 0882 692 Power loss and Relablty optmzaton n Dstrbuton System wth Network Reconfguraton and Capactor placement A.Manasa
More informationproblems palette of David Rock and Mary K. Porter 6. A local musician comes to your school to give a performance
palette of problems Davd Rock and Mary K. Porter 1. If n represents an nteger, whch of the followng expressons yelds the greatest value? n,, n, n, n n. A 60-watt lghtbulb s used for 95 hours before t burns
More informationHigh Speed, Low Power And Area Efficient Carry-Select Adder
Internatonal Journal of Scence, Engneerng and Technology Research (IJSETR), Volume 5, Issue 3, March 2016 Hgh Speed, Low Power And Area Effcent Carry-Select Adder Nelant Harsh M.tech.VLSI Desgn Electroncs
More informationA Preliminary Study on Targets Association Algorithm of Radar and AIS Using BP Neural Network
Avalable onlne at www.scencedrect.com Proceda Engneerng 5 (2 44 445 A Prelmnary Study on Targets Assocaton Algorthm of Radar and AIS Usng BP Neural Networ Hu Xaoru a, Ln Changchuan a a Navgaton Insttute
More informationQueen Bee genetic optimization of an heuristic based fuzzy control scheme for a mobile robot 1
Queen Bee genetc optmzaton of an heurstc based fuzzy control scheme for a moble robot 1 Rodrgo A. Carrasco Schmdt Pontfca Unversdad Católca de Chle Abstract Ths work presents both a novel control scheme
More informationNATIONAL RADIO ASTRONOMY OBSERVATORY Green Bank, West Virginia SPECTRAL PROCESSOR MEMO NO. 25. MEMORANDUM February 13, 1985
NATONAL RADO ASTRONOMY OBSERVATORY Green Bank, West Vrgna SPECTRAL PROCESSOR MEMO NO. 25 MEMORANDUM February 13, 1985 To: Spectral Processor Group From: R. Fsher Subj: Some Experments wth an nteger FFT
More informationA study of turbo codes for multilevel modulations in Gaussian and mobile channels
A study of turbo codes for multlevel modulatons n Gaussan and moble channels Lamne Sylla and Paul Forter (sylla, forter)@gel.ulaval.ca Department of Electrcal and Computer Engneerng Laval Unversty, Ste-Foy,
More informationOptimum Allocation of Distributed Generation using PSO: IEEE Test Case Studies Evaluation
Optmum Allocaton of Dstrbuted Generaton usng PSO: IEEE Test Case Studes Evaluaton 1 Taha Jabbar Sahb, 1 Mohd Ruddn Ab. Ghan*, Zanarah Jano, 3 Imad Hazm Mohamed 1 Faculty of Electrcal Engneerng (FKE) Center
More information