Highway-Rail Preemption

Size: px
Start display at page:

Download "Highway-Rail Preemption"

Transcription

1 Highway-Rail Preemption Preemption can be defined as the transfer of normal operation of traffic signals to a special control mode through establishing wired connection between the traffic signal and the railroad control cabinets, also know as interconnect. Why preempt? Remember: the train always has the right of way; the preemption control operation is intended to clear vehicles on the approach that is crossing the tracks before the train arrives at the crossing. Failure results in severe consequences

2 Where to preempt & how? ADOT TGP 628 Use TXDOT procedure to calculate MUTCD: preemption warning time Within 200 feet of crossing, where the intersection is signalized. Over 200 feet; queuing analysis should be considered.

3 Currently there are 41 signalized intersections with RR Preemption. Some has two wire connection and others 8-wire. Nogales, along B19: 6 intersections will be converted to advance preemption (construction in progress). There are 35 more intersections to go Grand Ave & Bell Road: Grade Separation (Design Build in progress) I-10 at Ina Rd in Tucson: Grade Separation (Construction in progress)

4 Preemption zones, detection sensors and interconnect

5 8 - Wire Preemption Equipment In the traffic signal control cabinet 2 - Wire

6 The new interface

7 In the Railroad cabinet 1027 feet / 35 seconds =20 MPH (train speed)

8 Detector placement distance (D) The track circuit must be designed to provide a certain amount of warning time at the highway-rail crossing before the train enters the crossing D=WT x Maximum Train Speed WT: Warning Time

9 warning time is based on Speed and Distance MTCD: measured from STOP line, Warning Device or 12 perpendicular to the track centerline to 6 feet beyond tracks (select greatest value)

10 Minimum Warning Time (this is a railroad design element) MT (Minimum Time) = 20 S. CT (Clearance Time) = MT should be increase by one second added for every 10 feet of MTCD clearance distance greater than 35 ERT (Equipment Response Time), were known as adjusted time (AT) BT (Buffer Time) to account for any uncertainty such as train speed variation.

11 Traffic signals may require more time to terminate phases and clear any queued vehicles off the tracks Max. Preemption Time (MPT) (this is a traffic signal design element) It is determined, requested and paid for, by the owner of the traffic signal system

12 MPT = MT + CT + BT + ERT + APT Maximum Preemption Time is the amount of time needed following initiation of the preemption sequence for the highway traffic signals to complete the timing of right-of-way transfer time, queue clearance time, and separation time. MPT = RWTT + QCT + ST

13 The train could trigger preemption at any moment

14 RWTT: is the Maximum amount of time needed for the worst case condition to clear conflicting phases prior to display of track clearance green interval.

15 QCT: is the total amount of time required for a design vehicle to start up, move through & clear the Queue Start up Distance (L) How to compute QCT: If MTCD = 26, CSD = 38 & DVL=75 Find Queue Start up time (time before DV move)= 2 + L = = 5.2 Seconds. DV Clearance: time for DV to accelerate through DVCD (from figure 2 of Texas Guide) is 13.8 Seconds (DVCD=DVL+MTCD) QCT = = 19 Seconds Separation Time, ST: is a buffer between the departure of the last vehicle from the railroad crossing and arrival of the train. ST = 4 Seconds

16 MPT = RWTT + QCT + ST MPT = = 51.6 Seconds. Simultaneous Preemption: notification of an approaching train is sent to the traffic signal and railroad active warning devices at the same time MWT = MPT Advance Preemption: Notification of an approaching train is sent to the traffic signal for a period of time prior to activating the railroad active warning devices APT = MPT - 20

17 APT = 31.6 S MPT = 51.6 S MWT = 20 S Simultaneous =51.6 S

18

19 Interconnect The Agency is required to identify the desirable preemption manner and the circuits Advance Preemption? Or Simultaneous Preemption?

20 Interconnect Circuits Supervised Circuit Gate Down Circuit Active Crossing Circuit (XR) Traffic Signal Health Circuit

21 Interconnect Circuits Supervised Circuit Supervised Single Break Supervised Double Break

22

23 Interconnect Circuits Gate Down Circuit Prevents the traffic signal controller from terminating the track clearance green interval before the railroad active warning devices become active and automatic gates are lowered Gate Down Railroad Panel Energy + Traffic Signal Cabinet

24 Interconnect Circuits Crossing Active Circuit: To verify minimum APT provided by the railroad in a varying condition, such as when a train stops short of crossing. Once train remain stopped for about 20 seconds, the crossing warning devices will de-activate; hence the preemption request will be cancelled and the automatic gates will rise.

25 Preemption Interface Railroad Panels Advance Preemption Supervised APR Crossing Active Energy + XR Crossing Active Circuit

26 Interconnect Circuits Traffic Signal Health Circuit Informs the railroad controller about the condition of the traffic signal system APT = 31.6 S MWT = 20 S

27 Presignal

28 References Traffic Signal Operations Near Highway-Rail Grade Crossings. NCHRP Synthesis 271 Traffic Control For Railroad & Light Rail Grade Crossings, Part 8 of MUTCD Report No. FHWA/TX-01/ (Guide For Traffic Signal Preemption Near Railroad Grade Crossing) TXDOT, Guide for Determining Time Requirements for Traffic Tignal Preemption at Highway-Rail Grade Crossing CTC, x-rps Railroad Preemption System. CTC, Preemption Interconnect Circuits. FHWA, Railroad-Highway Grade Crossing Handbook. Preemption of Traffic Signals Near Railroad Crossings, Ite

800 RAIL GRADE CROSSINGS Traffic Engineering Manual

800 RAIL GRADE CROSSINGS Traffic Engineering Manual TABLE OF CONTENTS Part 8 - RAIL GRADE CROSSINGS 800 GENERAL...8-3 801 SIGNING...8-3 801-1 General...8-3 801-2 STOP Signs at Highway-Rail Grade Crossings... 8-3 801-2.1 General...... 8-3 801-2.2 Grade Crossings

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 919 RAILROAD PREEMPTION INTERFACE. January 15, 2016

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 919 RAILROAD PREEMPTION INTERFACE. January 15, 2016 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 919 RAILROAD PREEMPTION INTERFACE January 15, 2016 919.01 Traffic Signal Cabinet and Controller Unit General Requirements 919.02 Approved

More information

PREEMPTION STRATEGY FOR TRAFFIC SIGNALS AT INTERSECTIONS NEAR HIGHWAY-RAILROAD GRADE CROSSINGS

PREEMPTION STRATEGY FOR TRAFFIC SIGNALS AT INTERSECTIONS NEAR HIGHWAY-RAILROAD GRADE CROSSINGS PREEMPTION STRATEGY FOR TRAFFIC SIGNALS AT INTERSECTIONS NEAR HIGHWAY-RAILROAD GRADE CROSSINGS A Dissertation by HANSEON CHO Submitted to the Office of Graduate Studies of Texas A&M University in partial

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-05/0-4422-2 4. Title and Subtitle DEVELOPMENT OF A TRAFFIC SIGNAL PERFORMANCE MEASUREMENT SYSTEM (TSPMS) 2. Government Accession No. 3. Recipient's Catalog No. Technical Report Documentation

More information

PHASE ONE PROJECT REPORT

PHASE ONE PROJECT REPORT MOORHEAD AREA INTEGRATED TRAIN DETECTION AND TRAFFIC CONTROL SYSTEM PHASE ONE PROJECT REPORT December 2000 Prepared for: Minnesota Department of Transportation Office of Advanced Transportation Systems

More information

Preemption Versus Priority

Preemption Versus Priority Port 1 MMU Preemption Versus Priority BIU Why Interrupt a Signalized Intersection There are several reasons to interrupt a signalized intersection from the normal operation of assigning right-of-way. Some

More information

Testing Annual WT by Verification of Internal Equipment Parameters. Scott Fall and Pat Venneman

Testing Annual WT by Verification of Internal Equipment Parameters. Scott Fall and Pat Venneman Testing Annual WT by Verification of Internal Equipment Parameters Scott Fall and Pat Venneman AREMA 2010 Annual Conference Committee 36 - Highway-Rail Grade Crossings Warning Systems Communications and

More information

Just Announced! General Registration : Includes all three days of Technical Sessions, $150 for Florida Section Members / $300 for Nonmembers

Just Announced! General Registration : Includes all three days of Technical Sessions, $150 for Florida Section Members / $300 for Nonmembers Tuesday May 30th Wednesday May 31st Challenge Exams $200 Vendor Show 11:30-5 Traffic Signal II Classes $500 / $550 Reception Signs & Markings Level I Signal related Tech Sessions Day 1 Signal Inspection

More information

RHODES: a real-time traffic adaptive signal control system

RHODES: a real-time traffic adaptive signal control system RHODES: a real-time traffic adaptive signal control system 1 Contents Introduction of RHODES RHODES Architecture The prediction methods Control Algorithms Integrated Transit Priority and Rail/Emergency

More information

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Validation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell

More information

Constructing a Traffic Control Process Diagram

Constructing a Traffic Control Process Diagram 22 Constructing a Traffic Control Process Diagram The purpose of this assignment is to help you improve your understanding of the operation of an actuated traffic controller system by studying eight cases

More information

20. Security Classif.(of this page) Unclassified

20. Security Classif.(of this page) Unclassified 1. Report No. FHWA/TX-10/0-6029-1 4. Title and Subtitle IMPROVED INTERSECTION OPERATIONS DURING DETECTOR FAILURES Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog

More information

Georgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details

Georgia Department of Transportation. Automated Traffic Signal Performance Measures Reporting Details Georgia Department of Transportation Automated Traffic Signal Performance Measures Prepared for: Georgia Department of Transportation 600 West Peachtree Street, NW Atlanta, Georgia 30308 Prepared by: Atkins

More information

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates

Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Signal Patterns for Improving Light Rail Operation By Wintana Miller and Mark Madden DKS Associates Abstract This paper describes the follow up to a pilot project to coordinate traffic signals with light

More information

Office of Traffic Operations Signal Design Reference Packet

Office of Traffic Operations Signal Design Reference Packet Office of Traffic Operations Signal Design Reference Packet Rev-3 07/17/2015 Contents The purpose of this packet is to provide guidance on designing and reviewing traffic signal plans. The format, legends,

More information

Agenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority

Agenda. TS2 Cabinet Components and Operation. Understanding a Signal Plan Maccarone. Basic Preemption/Priority Morning Traffic Terminology TS2 Cabinet Components and Operation Traffic Signal Phasing Ring Structure Traffic Signal Timing Understanding a Signal Plan Maccarone Controller Programming Afternoon Basic

More information

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)

Appendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document) Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained

More information

Traffic Control Signal Design Manual

Traffic Control Signal Design Manual Traffic Control Signal Design Manual Connecticut Department of Transportation Bureau of Engineering and Construction Division of Traffic Engineering 2009 This manual presumes that a traffic engineering

More information

RECENT DEVELOPMENTS IN EMERGENCY VEHICLE TRAFFIC SIGNAL PREEMPTION AND COLLISION AVOIDANCE TECHNOLOGIES. Purdue Road School 2017 Dave Gross

RECENT DEVELOPMENTS IN EMERGENCY VEHICLE TRAFFIC SIGNAL PREEMPTION AND COLLISION AVOIDANCE TECHNOLOGIES. Purdue Road School 2017 Dave Gross RECENT DEVELOPMENTS IN EMERGENCY VEHICLE TRAFFIC SIGNAL PREEMPTION AND COLLISION AVOIDANCE TECHNOLOGIES Purdue Road School 2017 Dave Gross Preemption Technology Platform types Acoustic Optical GPS Radio

More information

2.0 TRAFFIC SIGNAL DESIGN GUIDELINES

2.0 TRAFFIC SIGNAL DESIGN GUIDELINES SECTION 2 2.0 TRAFFIC SIGNAL DESIGN GUIDELINES 2.1 SIGNAL DESIGN ELEMENTS Any traffic signal proposed for installation on City streets shall meet the minimum criteria as outlined in the Manual on Uniform

More information

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.

CHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14. 14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic

More information

1 of REV:0

1 of REV:0 1 of 5 683-10573-0418 This specification sets forth the minimum requirements for purchase and installation of an aboveground Radar Advance Detection Device (RADD) system for a real-time, advance vehicle-detection

More information

State Road A1A North Bridge over ICWW Bridge

State Road A1A North Bridge over ICWW Bridge Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida

More information

Traffic Controller Timing Processes

Traffic Controller Timing Processes 4 Actuated Traffic Controller Timing Processes In Chapter 4, you will learn about the timing processes that run an actuated traffic controller. Many transportation engineers begin their study of signalized

More information

San Antonio Wrong Way Driver Initiative

San Antonio Wrong Way Driver Initiative San Antonio Wrong Way Driver Initiative Brian G. Fariello, P.E. Traffic Management Engineer- TransGuide San Antonio District- TxDOT brian.fariello@txdot.gov The San Antonio Wrong Way Driver Task Force

More information

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS

IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS IMPROVEMENTS TO A QUEUE AND DELAY ESTIMATION ALGORITHM UTILIZED IN VIDEO IMAGING VEHICLE DETECTION SYSTEMS A Thesis Proposal By Marshall T. Cheek Submitted to the Office of Graduate Studies Texas A&M University

More information

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control

Methodology to Assess Traffic Signal Transition Strategies. Employed to Exit Preemption Control Methodology to Assess Traffic Signal Transition Strategies Employed to Exit Preemption Control Jon T. Obenberger Dissertation submitted to the faculty of the Virginia Polytechnic Institute and State University

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

Route-based Dynamic Preemption of Traffic Signals for Emergency Vehicle Operations

Route-based Dynamic Preemption of Traffic Signals for Emergency Vehicle Operations Route-based Dynamic Preemption of Traffic Signals for Emergency Vehicle Operations Eil Kwon, Ph.D. Center for Transportation Studies, University of Minnesota 511 Washington Ave. S.E., Minneapolis, MN 55455

More information

Guidelines on the Use of Portable Traffic Signals (PTS)

Guidelines on the Use of Portable Traffic Signals (PTS) Technical Circular T-04/07 Date: August 3, 2007 To: All HQ Directors: Operations, Planning and Major Projects All Regional Directors All Regional Traffic Engineers All District Managers, Transportation

More information

Industrial Area Crossing Signal System

Industrial Area Crossing Signal System The Industrial Area Crossing Signal System is designed to offer full railroad crossing signaling for single or multiple crossings at a plant or complex. The systems are factory built, fully tested, then

More information

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154

True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 1 Smart Information for a Sustainable World True Adaptive Signal Control A Comparison of Alternatives Technical Paper #1154 Presentation to the 18 th World Congress on Intelligent Transport Systems Technical

More information

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007

Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007 Guidelines for the Preparation of Traffic Signal & Intelligent Transportation System Plans on Design-Build Projects August 2007 INTRODUCTION Use the following Guidelines in conjunction with the Traffic

More information

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES

CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES CITY OF PINE CITY SMALL WIRELESS FACILITY DESIGN GUIDELINES I. PURPOSE AND COMPLIANCE In implementing City Code, Chapter 8, Section 815, the City Council of the City of Pine City (the City ) finds that

More information

Area Traffic Control System (ATCS)

Area Traffic Control System (ATCS) Area Traffic Control System (ATCS) 1. Introduction: Area Traffic Control System is an indigenous solution for Indian Road Traffic, which optimizes traffic signal, covering a set of roads for an area in

More information

Draft. Not Yet Approved. American Railway Engineering and Maintenance of Way Association Letter Ballot. 1. Committee and Subcommittee: 36

Draft. Not Yet Approved. American Railway Engineering and Maintenance of Way Association Letter Ballot. 1. Committee and Subcommittee: 36 American Railway Engineering and Maintenance of Way Association Letter allot 1. Committee and Subcommittee: 36 2. Letter allot umber: 36-18-1:16.30.11 3. Assignment: 4. allot Item: MP 16.30.11: Recommended

More information

Figures. Tables. Comparison of Interchange Control Methods...25

Figures. Tables. Comparison of Interchange Control Methods...25 Signal Timing Contents Signal Timing Introduction... 1 Controller Types... 1 Pretimed Signal Control... 2 Traffic Actuated Signal Control... 2 Controller Unit Elements... 3 Cycle Length... 3 Vehicle Green

More information

SIGNAL TIMING MANUAL. NCHRP Report 812. Second Edition

SIGNAL TIMING MANUAL. NCHRP Report 812. Second Edition SIGNAL TIMING MANUAL Second Edition Slides Courtesy of the Transportation Research Board, National Acknowledgments Team Members & Panel Members Tom Urbanik, Kittelson & Associates, Inc. Alison Tanaka,

More information

Next Generation of Adaptive Traffic Signal Control

Next Generation of Adaptive Traffic Signal Control Next Generation of Adaptive Traffic Signal Control Pitu Mirchandani ATLAS Research Laboratory Arizona State University NSF Workshop Rutgers, New Brunswick, NJ June 7, 2010 Acknowledgements: FHWA, ADOT,

More information

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms

Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms Guidelines for the Preparation of ITS & Signal Plans by Private Engineering Firms INTRODUCTION Use the following Guidelines in conjunction with the ITS & Signals Scope of work provided in the Project Scoping

More information

Jointing Rural Intersections

Jointing Rural Intersections Design Manual Chapter 5 - Roadway Design 5G - PCC Pavement Joints 5G-4 Jointing Rural Intersections This section describes how to joint rural intersections by following the guidelines outlined in Iowa

More information

An Application for Driving Simulator Technology: An Evaluation of Traffic Signal Displays for Protected-Permissive Left-Turn Control

An Application for Driving Simulator Technology: An Evaluation of Traffic Signal Displays for Protected-Permissive Left-Turn Control An Application for Driving Simulator Technology: An Evaluation of Traffic Signal Displays for Protected-Permissive Left-Turn Control By Michael A. Knodler Jr. University of Massachusetts Amherst 214C Marston

More information

Agenda. Morning. TS2 Cabinet Components and Operation. Traffic Signal Ring Structure. Afternoon. Basic Preemption/Priority

Agenda. Morning. TS2 Cabinet Components and Operation. Traffic Signal Ring Structure. Afternoon. Basic Preemption/Priority Agenda Morning Traffic Terminology TS2 Cabinet Components and Operation Traffic Signal Phasing Traffic Signal Ring Structure Understanding a Signal Plan Controller Programming Afternoon Basic Coordination

More information

PUBLICATION 213. Think Safety First

PUBLICATION 213. Think Safety First PUBLICATION 213 (67 PA CODE, CHAPTER 212) Think Safety First Pub 213 (02-08) Appendix Appendix A - Temporary/Portable

More information

20. Security Classif.(of this page) Unclassified

20. Security Classif.(of this page) Unclassified 1. Report No. FHWA/TX-10/5-5113-01-P1 4. Title and Subtitle FIELD MANUAL FOR THE OPERATION OF ADVANCE WARNING OF END OF GREEN SYSTEM (AWEGS) 2. Government Accession No. 3. Recipient's Catalog No. 5. Report

More information

Input-Output and Hybrid Techniques for Real- Time Prediction of Delay and Maximum Queue Length at Signalized Intersections

Input-Output and Hybrid Techniques for Real- Time Prediction of Delay and Maximum Queue Length at Signalized Intersections University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 2007 Input-Output and Hybrid Techniques for Real- Time Prediction

More information

Chapter 39. Vehicle Actuated Signals Introduction Vehicle-Actuated Signals Basic Principles

Chapter 39. Vehicle Actuated Signals Introduction Vehicle-Actuated Signals Basic Principles Chapter 39 Vehicle Actuated Signals 39.1 Introduction Now-a-days, controlling traffic congestion relies on having an efficient and well-managed traffic signal control policy. Traffic signals operate in

More information

M-0418 REV:0

M-0418 REV:0 1 of 5 This specification sets forth the minimum requirements for purchase and installation of an aboveground Radar Detection Device (RDD) system for a real-time, stop bar vehicle-detection system that

More information

Keywords- Fuzzy Logic, Fuzzy Variables, Traffic Control, Membership Functions and Fuzzy Rule Base.

Keywords- Fuzzy Logic, Fuzzy Variables, Traffic Control, Membership Functions and Fuzzy Rule Base. Volume 6, Issue 12, December 2016 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Fuzzy Logic

More information

Crash Event Modeling Approach for Dynamic Traffic Assignment

Crash Event Modeling Approach for Dynamic Traffic Assignment Crash Event Modeling Approach for Dynamic Traffic Assignment Jay Przybyla Jeffrey Taylor Dr. Xuesong Zhou Dr. Richard Porter 4th Transportation Research Board Conference on Innovations in Travel Modeling

More information

OREGON DEPARTMENT OF TRANSPORTATION

OREGON DEPARTMENT OF TRANSPORTATION OREGON DEPARTMENT OF TRANSPORTATION TRAFFIC SIGNAL DESIGN MANUAL The material contained herein is for information purposes only and may be used to aid new employees, and those unfamiliar with ODOT Traffic

More information

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Louisiana Transportation Conference Traffic Engineering Session 2 February 27, 2018, Baton Rouge, Louisiana UTAH S EXPERIENCE WITH AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Mark Taylor, P.E., PTOE

More information

Draft. Not yet Approved

Draft. Not yet Approved Recommended Table of Signal and Interlocking Units and Interpretations Revised 6 (7 8 Pages) A. Purpose This Manual Part recommends relative Signal and Interlocking unit values used for division of costs

More information

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned

Arterial Connected Vehicle Test Bed Deployment and Lessons Learned ARIZONA CONNECTED VEHICLE PROGRAM Arterial Connected Vehicle Test Bed Deployment and Lessons Learned Faisal Saleem ITS Branch Manager & SMARTDrive Program Manager Maricopa County Department of Transportation

More information

Design Guidelines for Deploying Closed Loop Systems

Design Guidelines for Deploying Closed Loop Systems Final Report FHWA/IN/JTRP-2001/11 Design Guidelines for Deploying Closed Loop Systems By Andrew Nichols Graduate Research Assistant Darcy Bullock Associate Professor School of Civil Engineering Purdue

More information

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level)

Currently 2 vacant engineer positions (1 Engineer level, 1 Managing Engineer level) INDOT Agency Factoids (System/Comm.) Number of signalized intersections- 2570 200 connected by fiber 300 connected by radio 0 connected by twisted pair 225 connected by cellular 1500 not connected to communication

More information

MODULE 10: INTELLIGENT TRANSPORTATION SYSTEMS: SMART WORK ZONES LESSON 1: WORK ZONE SAFETY

MODULE 10: INTELLIGENT TRANSPORTATION SYSTEMS: SMART WORK ZONES LESSON 1: WORK ZONE SAFETY MODULE 10: INTELLIGENT TRANSPORTATION SYSTEMS: SMART WORK ZONES LESSON 1: WORK ZONE SAFETY Connected vehicle (CV) safety applications are designed to increase awareness of what is happening in the environment

More information

Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS

Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS PORTABLE TEMPORARY TRAFFIC SIGNALS Item No. Special Provision No. 799F07 September 2011 CONSTRUCTION SPECIFICATION FOR PORTABLE TEMPORARY TRAFFIC SIGNALS TABLE OF CONTENTS 1.0 SCOPE 2.0 REFERENCES 3.0

More information

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition

Work Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing

More information

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES

UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES UDOT AUTOMATED TRAFFIC SIGNAL PERFORMANCE MEASURES Jamie Mackey, P.E., PTOE Utah Department of Transportation Statewide Signal Engineer jamiemackey@utah.gov NOCoE Webinar Are Your Traffic Signals Ready

More information

ITS USE CASE. Disclaimer

ITS USE CASE. Disclaimer ITS USE CASE Use Case Title: Green Light Optimal Speed Advisory (GLOSA) Project Name: Standaardisatie Tafel (NL) Source: Amsterdam Group (AG), EcoAT, ISO-19091, ETSI-TS103301, SAE-J2735 Date: 2015-11-25

More information

Long Green Times and Cycles at Congested Traffic Signals

Long Green Times and Cycles at Congested Traffic Signals 2009 D. GRANT MICKLE AWARD: Outstanding Paper in Operations and Maintenance Long Green Times and Cycles at Congested Traffic Signals Richard W. Denney, Jr., Eddie Curtis, and Larry Head Field data were

More information

AEIJST - January Vol 4 - Issue 1 ISSN Automatic Railway Gate Controller by Using AT89C51

AEIJST - January Vol 4 - Issue 1 ISSN Automatic Railway Gate Controller by Using AT89C51 Automatic Railway Gate Controller by Using AT89C51 * Prof. Ms. Sunita P Aware ** Dr. Chetan M Sedani * ETC Dept. MSSCET, Jalna, (Dr. BAMU Aurangabad), MS, India ** Mech. Dept. M SSCET, Jalna, (Dr. BAMU

More information

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established. SIGNAL PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,

More information

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST

BOSTON EVERETT HORIZON WAY BROADWAY ALFORD ST BOW ST BOSTON CITY LINE EVERETT CITY LINE DEXTER ST MYSTIC ST COURTLAND ST LYNDE ST THORNDIKE ST BOSTON HORIZON WAY ALFORD ST BROADWAY BOSTON CITY LINE CITY LINE MANHOLE #101 (STA 5+00) BOW ST DEXTER ST ST LYNDE ST THORNDIKE ST COURTLAND ST RIVER PROP (TYP) ROBIN ST BETTY ST 50 500 1. BASELINE STATIONING

More information

DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION

DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION DESIGN OF VEHICLE ACTUATED SIGNAL FOR A MAJOR CORRIDOR IN CHENNAI USING SIMULATION Presented by, R.NITHYANANTHAN S. KALAANIDHI Authors S.NITHYA R.NITHYANANTHAN D.SENTHURKUMAR K.GUNASEKARAN Introduction

More information

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road)

Adaptive Signal System Mt. Juliet, TN. SR-171 (Mt. Juliet Road) Adaptive Signal System Mt. Juliet, TN SR-171 (Mt. Juliet Road) Project Background Project Location Mt. Juliet, TN: 2015 Census: 28,159 Doubled since 2000 Immediately east of Metro Nashville Mt. Juliet

More information

Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection

Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection Deployment and Testing of Optimized Autonomous and Connected Vehicle Trajectories at a Closed- Course Signalized Intersection Clark Letter*, Lily Elefteriadou, Mahmoud Pourmehrab, Aschkan Omidvar Civil

More information

INTRO TRAFFIC 101. What is the purpose of a traffic signal? What are the parts that make it work? How do we time a traffic signal?

INTRO TRAFFIC 101. What is the purpose of a traffic signal? What are the parts that make it work? How do we time a traffic signal? INTRO TRAFFIC 101 What is the purpose of a traffic signal? What are the parts that make it work? How do we time a traffic signal? How do we maintain a traffic signal? What is the purpose of a traffic signal?

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

LMD8000 PROGRAMMING GUIDE

LMD8000 PROGRAMMING GUIDE LMD8 PROGRAMMING GUIDE Electrical Engineering Centre Volume 1 June 1999 LMD 8 PROGRAMMING GUIDE VOL.1.TABLE OF CONTENTS LMD8 PROGRAMMING GUIDE INTRODUCTION...vii 1 PROGRAMMING DATA ACCESS FROM LM-SYSTEM...

More information

Universal Control For Motorola Systems with Brake module

Universal Control For Motorola Systems with Brake module Universal Control For Motorola Systems with Brake module Technical Operating Manual The basis of this technical operations manual is the description of simple control operations which the device affords.

More information

AUTOMATIC LEVEL CROSSING WITH REAL SOUND FOR 2 GATES/BARRIERS LCS6B

AUTOMATIC LEVEL CROSSING WITH REAL SOUND FOR 2 GATES/BARRIERS LCS6B AUTOMATIC LEVEL CROSSING WITH REAL SOUND FOR 2 GATES/BARRIERS LCS6B Fully Flexible Controller with Sound and Servo Motors for Barriers or Gates Automatically detects traction current drawn by scale model

More information

Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology

Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology Lessons Learned from 10-Years of Operating Transit Signal Priority on Howard Street, in Baltimore, Maryland: It s Not Just About the Technology Keith Riniker Director of Traffic Engineering & ITS Sabra,

More information

Signal Performance Metrics Charlie Wetzel, PE, PTOE

Signal Performance Metrics Charlie Wetzel, PE, PTOE Signal Performance Metrics Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 1 Who is Seminole County? Small County located just north of Orange County and the City of Orlando Population:

More information

Guide Sign Policy for Secondary State Highways Edition

Guide Sign Policy for Secondary State Highways Edition Massachusetts Highway Department, Ten Park Plaza, Boston, MA 02116-3973 ` Guide Sign Policy for Secondary State Highways 2005 Edition Revised September 2005 1. PURPOSE The Massachusetts Highway Department

More information

Event-Based Data Collection for Generating Actuated Controller Performance Measures

Event-Based Data Collection for Generating Actuated Controller Performance Measures University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Civil Engineering Faculty Publications Civil Engineering 2007 Event-Based Data Collection for Generating Actuated Controller

More information

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE

ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE ON USING PERFECT SIGNAL PROGRESSION AS THE BASIS FOR ARTERIAL DESIGN: A NEW PERSPECTIVE Samuel J. Leckrone, P.E., Corresponding Author Virginia Department of Transportation Commerce Rd., Staunton, VA,

More information

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control

Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Getting Through the Green: Smarter Traffic Management with Adaptive Signal Control Presented by: C. William (Bill) Kingsland, Assistant Commissioner, Transportation Systems Management Outline 1. What is

More information

Texas Transportation Institute The Texas A&M University System College Station, Texas

Texas Transportation Institute The Texas A&M University System College Station, Texas 1. Report No. FHWA/TX-01/1439-10 4. Title and Subtitle DEVELOPMENT OF AN ACTUATED TRAFFIC CONTROL PROCESS UTILIZING REAL-TIME ESTIMATED VOLUME FEEDBACK 7. Author(s) Michael J. Pacelli, Carroll J. Messer

More information

Frequently Asked Questions

Frequently Asked Questions The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions

More information

Vehicle speed and volume measurement using V2I communication

Vehicle speed and volume measurement using V2I communication Vehicle speed and volume measurement using VI communication Quoc Chuyen DOAN IRSEEM-ESIGELEC ITS division Saint Etienne du Rouvray 76801 - FRANCE doan@esigelec.fr Tahar BERRADIA IRSEEM-ESIGELEC ITS division

More information

AN INTERSECTION TRAFFIC DATA COLLECTION DEVICE UTILIZING LOGGING CAPABILITIES OF TRAFFIC CONTROLLERS AND CURRENT TRAFFIC SENSORS.

AN INTERSECTION TRAFFIC DATA COLLECTION DEVICE UTILIZING LOGGING CAPABILITIES OF TRAFFIC CONTROLLERS AND CURRENT TRAFFIC SENSORS. AN INTERSECTION TRAFFIC DATA COLLECTION DEVICE UTILIZING LOGGING CAPABILITIES OF TRAFFIC CONTROLLERS AND CURRENT TRAFFIC SENSORS Final Report November 2008 UI Budget KLK134 NIATT Report Number N08-13 Prepared

More information

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review

HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.

More information

The analysis and optimization of methods for determining traffic signal settings

The analysis and optimization of methods for determining traffic signal settings MASTER The analysis and optimization of methods for determining traffic signal settings Schutte, M. Award date: 2011 Link to publication Disclaimer This document contains a student thesis (bachelor's or

More information

PROBE DATA FROM CONSUMER GPS NAVIGATION DEVICES FOR THE ANALYSIS OF CONTROLLED INTERSECTIONS

PROBE DATA FROM CONSUMER GPS NAVIGATION DEVICES FOR THE ANALYSIS OF CONTROLLED INTERSECTIONS PROBE DATA FROM CONSUMER GPS NAVIGATION DEVICES FOR THE ANALYSIS OF CONTROLLED INTERSECTIONS Arnold Meijer (corresponding author) Business Development Specialist, TomTom International P.O Box 16597, 1001

More information

Connected Vehicles and Maintenance Operations

Connected Vehicles and Maintenance Operations Connected Vehicles and Maintenance Operations Presentation to AASHTO SCOM Dean Deeter Athey Creek Consultants Topics Connected Vehicle Priorities Survey Results Connected Vehicle Applications Related to

More information

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District

0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS. TxDOT Houston District 0-6920: PROACTIVE TRAFFIC SIGNAL TIMING AND COORDINATION FOR CONGESTION MITIGATION ON ARTERIAL ROADS TxDOT Houston District October 10, 2017 PI: XING WU, PHD, PE CO-PI: HAO YANG, PHD DEPT. OF CIVIL & ENVIRONMENTAL

More information

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS

INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS INNOVATIVE DEPLOYMENT OF DYNAMIC MESSAGE SIGNS IN SAFETY APPLICATIONS L.A. Griffin Director of Expressway Operations, Orlando-Orange County Expressway Authority 4974 ORL Tower Road Orlando, FL 32807 (407)

More information

Eliminator TM. Where Science & Safety Intersect Distributed exclusively in Indiana by MGI Traffic SCIENCE SAFETY. Eliminator Equipped

Eliminator TM. Where Science & Safety Intersect Distributed exclusively in Indiana by MGI Traffic SCIENCE SAFETY. Eliminator Equipped Eliminator TM SCIENCE SAFETY Eliminator Equipped Where Science & Safety Intersect Distributed exclusively in Indiana by MGI Traffic 317-835-9212 Two technologies, one platform: same price Preemption Occurs

More information

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL

CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL CHAPTER 28 ACTIVATING/DEACTIVATING A SIGNAL ACTIVATING/DEACTIVATING A SIGNAL Activating a traffic control signal requires careful planning and coordination between the project engineer, the contractor

More information

400 TRAFFIC SIGNALS Traffic Engineering Manual

400 TRAFFIC SIGNALS Traffic Engineering Manual TABLE OF CONTENTS Part 4 - SIGNALS 400 GENERAL... 4-9 400-1 Introduction... 4-9 400-2 Construction Projects... 4-9 400-3 Force Account (ODOT Operations) Work... 4-9 401 TRAFFIC CONTROL SIGNALS - GENERAL...

More information

Single Point Urban Interchange (SPUI) with Signals

Single Point Urban Interchange (SPUI) with Signals 1 Single Point Urban Interchange (SPUI) with Signals Allows for concurrent left turns on Wurzbach Parkway and on NW Military Traffic Signal added on NW Military Hwy at Fairfield Bend/ Turnberry Way Large

More information

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE

MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE MOBILITY RESEARCH NEEDS FROM THE GOVERNMENT PERSPECTIVE First Annual 2018 National Mobility Summit of US DOT University Transportation Centers (UTC) April 12, 2018 Washington, DC Research Areas Cooperative

More information

COMPARISON OF METHODS FOR DETERMINING ADVISORY SPEEDS ON HORIZONTAL CURVES

COMPARISON OF METHODS FOR DETERMINING ADVISORY SPEEDS ON HORIZONTAL CURVES COMPARISON OF METHODS FOR DETERMINING ADVISORY SPEEDS ON HORIZONTAL CURVES By Eric R. Green Corresponding Author Transportation Research Engineer Kentucky Transportation Center University of Kentucky 0

More information

Rack Mounted Traffic Controller

Rack Mounted Traffic Controller Rack Mounted Traffic Controller This specification is fully met by the following Safetran models: Cobalt-RM Fully Actuated Controller 1 of 39 Table of Contents 1. INTRODUCTION... 4 2. HARDWARE... 4 2.1.

More information

Development and Testing of a Radar-Based Non-Embedded Vehicle Detection System for Four Quadrant Gate Warning Systems and Blocked Crossing Detection

Development and Testing of a Radar-Based Non-Embedded Vehicle Detection System for Four Quadrant Gate Warning Systems and Blocked Crossing Detection Development and Testing of a Radar-Based Non-Embedded Vehicle Detection System for Four Quadrant Gate Warning Systems and Blocked Crossing Detection Thomas N. Hilleary, ByStep, LLC Randy St. John, Wavetronix,

More information

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP

I-85 Integrated Corridor Management. Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP Jennifer Portanova, PE, CPM Sreekanth Sunny Nandagiri, PE, PMP SDITE Meeting, Columbia, SC March 2017 Agenda The I-85 ICM project in Charlotte will serve as a model to deploy similar strategies throughout

More information

CTS Directional Rumble Strips for Reducing Wrong-Way-Driving Freeway Entries. Human-centered solutions to advanced roadway safety

CTS Directional Rumble Strips for Reducing Wrong-Way-Driving Freeway Entries. Human-centered solutions to advanced roadway safety Human-centered solutions to advanced roadway safety Directional Rumble Strips for Reducing Wrong-Way-Driving Freeway Entries Huaguo Zhou Chennan Xue Lingling Yang Department of Civil Engineering Auburn