GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048

Size: px
Start display at page:

Download "GE/GN8648. Guidance on Positioning of Lineside Telephones. Rail Industry Guidance Note for GE/RT8048"

Transcription

1 GN This document contains one or more pages which contain colour. Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2013 Rail Safety and Standards Board Limited GE/GN8648 Issue One: September 2013 Rail Industry Guidance Note for GE/RT8048

2 Issue record Issue Date Comments One September 2013 Original document. Superseded documents Supply This document gives guidance on interpreting the requirements of Railway Group Standard GE/RT8048 issue two Positioning of Lineside Telephones. This Rail Industry Guidance Note does not supersede any other Railway Group documents. The authoritative version of this document is available at Uncontrolled copies of this document can be obtained from Communications,, Block 2, Angel Square, 1 Torrens Street, London EC1V 1NY, telephone or enquirydesk@rssb.co.uk. Other Standards and associated documents can also be viewed at Page 2 of 14 GE/GN8648 Issue: September 2013

3 Contents Section Description Page Part 1 Introduction 4 G 1.1 Purpose of this document 4 G 1.2 The structure of this document 4 G 1.3 Copyright 4 G 1.4 Approval and authorisation of this document 4 Part 2 Guidance on the Requirements for Signal Post and Operational Telephone Positioning 5 G 2.1 Guidance on the positioning of lineside telephones 5 G 2.2 Guidance on information labels 9 Part 3 Application of this Document Application - infrastructure managers Health and safety responsibilities 12 Definitions and Abbreviations 13 References 14 Figures Figure G 1 An example of the use of an additional SPT 8 Page 3 of 14

4 RIS-8048-CCS Guidance Iss 1 on with effect Positioning from 04/03/2017 of Lineside Telephones Part 1 G 1.1 G G 1.2 G G G G 1.3 G G G G 1.4 G Introduction Purpose of this document This document gives guidance on interpreting the requirements of Railway Group Standard GE/RT8048 issue two Positioning of Lineside Telephones. It does not constitute a recommended method of meeting any set of mandatory requirements. The structure of this document All requirements from Railway Group Standard GE/RT8048 are reproduced with a grey background in this document. Guidance is provided as a series of sequentially numbered clauses prefixed G immediately below the greyed text to which it relates. Specific responsibilities and compliance requirements are laid down in the Railway Group Standard itself. Copyright Copyright in the Railway Group documents is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group document (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group documents, Rail Safety and Standards Board Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from Railway Group Standards may be reproduced. Approval and authorisation of this document The content of this document was approved by Control Command and Signalling (CCS) Standards Committee on 13 June G This document was authorised by on 29 July Page 4 of 14

5 Part 2 G 2.1 Guidance on the Requirements for Signal Post and Operational Telephone Positioning Guidance on the positioning of lineside telephones Requirements for signal post and operational telephone positioning 2.1 Positioning criteria Telephones associated with a particular item of infrastructure shall be positioned such that the association is readily apparent. If necessary, signs shall be provided on or adjacent to the item of infrastructure to indicate where the associated telephone is located. G G G G G Rationale: Leaving the cab to use a Signal Post Telephone (SPT) brings the driver into the dangerous environment of the trackside. The introduction of the Global System for Mobile Communications Railway (GSM-R) radio system should avoid the need for the driver to leave the cab to communicate with a signaller, except during a failure of GSM-R communication. For the present, provision of SPTs continues to be required and consideration should be given to how the driver uses an SPT. Locating and accessing an SPT should be made as easy and safe as possible Where positioning the phone in accordance with is not possible, then it shall be positioned as close as reasonably practicable to the ideal position. Rationale: A person who uses a trackside telephone, especially in an emergency, should know where to expect that telephone to be located. Rationale: To avoid confusion between a telephone user and the signaller, all lineside telephones, including SPTs, should be located such that it is obvious to the user to which piece of lineside equipment the telephone applies The site assessment shall consider and record: a) The lateral and longitudinal position of the telephone (for example, in relation to the running edge of the nearest rail and the signal). b) The mounting arrangement. c) Requirements for accessing the phone. d) Whether conductor rail boarding is required. e) The vandal and environment proofing, and handset cord length required. f) The requirements for additional signs for SPTs. g) Any prohibition of handsignalman working. Rationale: These details should be recorded on the signal sighting form, to permit maintenance of the telephone and its environment throughout the life of the telephone. Without such information being recorded it may not be possible to understand why certain decisions have been made, especially such things as handset cord length. In the case of b) above, the method of mounting the telephone should be limited to whether the phone is mounted on the signal post or some other post either pre-existing or installed for the purpose. Page 5 of 14

6 RIS-8048-CCS Guidance Iss 1 on with effect Positioning from 04/03/2017 of Lineside Telephones G When considering the access to the phone the following should be taken into consideration: a) Any need for a safety barrier. b) Whether the ground needs to be made up or a platform provided. G G G G G G Telephones shall be positioned such that the user is in a position of safety, except where permitted by Where there is a risk that the user could move out of the position of safety while using the telephone, consideration shall be given to the provision of a physical barrier. Rationale: A user of a lineside telephone should be able to concentrate on the conversation they are having (especially if this is a safety-critical call) without being distracted by fears for their own safety It is permissible to place an SPT, such that the user is not in a position of safety, where it is not reasonably practicable to comply with the requirements set out in In this case the signal shall: a) Be fitted with a white diamond plate with a black X on it, and also a second plate with the controlling signal box telephone number. And b) The telephone label shall have a black X in the centre. Or c) Where the stopped train provides protection for the driver, the SPT shall be labelled with a limited clearance sign only. Rationale: Current practice is to provide an SPT at all signals in track circuit block areas, in which case some SPTs may be positioned where there is no place of safety for someone using them. The future introduction of GSM-R on the railway network should reduce or remove the need for SPTs. Further guidance on the provision of SPTs is set out in GO/GN3677. Items of operational railway equipment such as ground frames and lock-out devices may continue to require lineside telephones to be provided Telephones shall be located to permit the user to operate them while standing upright. Rationale: Standing upright is the most comfortable position to be in when using such telephones and reduces the potential for injury that might arise if the user stoops to use the telephone. However, there are some locations where deliberately placing the telephone such the user cannot stand up keeps the user in a safer position SPTs shall be positioned such that a person using the telephone can readily see all elements of the signal and associated identification plate or sign. Rationale: The user of the SPT may need to talk to the signaller at the same time as viewing the signal so that information can be passed back to the signaller, such as confirmation of the aspects displayed. Page 6 of 14

7 G The handset cord length shall be specified, if this is intended as a risk control measure. Rationale: If an SPT is to be provided at a location between two lines, it may be advantageous to fit the telephone with a handset cord of restricted length such that the user cannot move into a hazardous position during a telephone conversation. G See G All lineside telephones shall have an identification label and an information label, as set out in 2.2. G G G G G The assessment shall check that the position of SPTs is compatible with the stopping position of trains. Rationale: In order to reduce the potential for injury from slips, trips and falls while moving around the railway, the SPT should be positioned as near as reasonably practicable to the normal stopping positions of trains. Train drivers are instructed to bring their train to a stand on the approach side of the signal as part of each RU s defensive driving policies. The exact distance from the signal may vary between policies but is usually between 20 m and 25 m on the approach side of the signal The SPT shall either be: a) Positioned on the same side of the line as the associated signal. Rationale: Finding the safest location to put an SPT is part of the duty of care that should be applied when siting an SPT. The Signal Sighting Committee (SSC) should decide, as part of the site visit, where the safest location is for an SPT and whether any other protective measures are required. Or b) Positioned on the opposite side, if by doing so it reduces the risk to drivers using it. In this case a sign should be provided where the SPT would normally be, with an arrow sign indicating its actual position Where a platform starting signal is not located on the platform, consideration shall be given to providing a second telephone on the platform to avoid the need for the driver to use the cess to gain access to the SPT. Rationale: The provision of a second telephone on the station platform enables a person needing to use the SPT to do so while minimising the risks of trackside hazards such as slips, trips and falls or coming into contact with a moving train. Page 7 of 14

8 RIS-8048-CCS Guidance Iss 1 on with effect Positioning from 04/03/2017 of Lineside Telephones G G Where the driver cannot access the trackside due to the presence of a tunnel or viaduct wall, the assessment shall check that supplementary SPTs, provided to enable use from the driving cab, are positioned so that the driver can use the telephone when the train is stopped at the signal. Rationale: In the case of signals placed in tunnels or on viaducts and other bridge structures, there may not be sufficient clearance for the driver to alight from the cab. In these cases it is permissible to fit a supplementary telephone at cab window height such that the driver can use the telephone without leaving the cab. The use of an additional SPT, where it would be difficult for the driver to use the SPT in the conventional position, is shown in Figure G 1. An SPT should always be provided in the normal location for the use of staff working in the tunnel. Tunnel Additional SPT at Drivers window height and normal stopping point of a train Signal Normal place for SPT Figure G 1 An example of the use of an additional SPT G Consideration should to be given to the different maintenance and faulting requirements of the supplementary SPT and how this is to be managed, for example, working at height regulations An SPT need not be provided if all of the following conditions apply: a) The SPT is positioned between two lines, and the user is not in a position of safety relative to the line that the SPT does not apply to. b) Radio coverage for train radio systems is considered adequate. The assessment shall check that the availability of voice communication is compatible with train radio systems availability. c) Another fixed telephone is positioned nearby which can be used to contact the signaller in an emergency. Page 8 of 14

9 G G G G G G 2.2 G G Rationale: Rather than risk the safety of a driver or other user of an SPT which is not in a place of safety this clause permits that an SPT need not be fitted, provided that all the conditions set out in this clause are met. Rationale: Radio systems often have dead spots, most of which are known. However, when positioning a new signal, a check should be made that there is satisfactory radio reception at the proposed location, so that the driver of a train stopped at a signal is able to contact the signaller. This is safer than the driver leaving the cab to use the SPT and may save time. Where a signal is to be positioned in a dead spot it may be necessary to consider alterations to the radio system in order to improve reception in the area of the signal Where applies, the signal shall be fitted with a white diamond plate and also a second plate with the controlling signal box telephone number. Rationale: A white diamond sign indicates to the driver that the presence of the train is indicated in the signal box, and that the phone number is the controlling signaller s phone number Where a user is required to talk to the signaller while operating signalling equipment (for example, removing a token or pressing a plunger), the telephone shall be positioned such that the user can continue to speak and listen while carrying out the specific task required. Rationale: Telephones associated with lineside signalling equipment such as ground frames, lockouts and token instruments should be positioned as near as reasonably practicable to the equipment to be operated. Guidance on information labels Requirements for information labels 2.2 Information labels The information label shall provide: a) Instructions on how to use the telephone. b) The name of the control point (signal box). c) The signal number (for SPTs). d) The location reference, as set out in e) The phonetic alphabet. Rationale: The provision of information labels should ensure that someone using the telephone in an emergency can do so without prior instruction, know its location and identity, and who controls the signal or other infrastructure item. Provision of a copy of the phonetic alphabet should act as a prompt to proper telephone procedure. Instructions on how to use the telephone may seem superfluous, but there are a number of different SPT systems in use and the operation of some is not immediately obvious to the user. Page 9 of 14

10 RIS-8048-CCS Guidance Iss 1 on with effect Positioning from 04/03/2017 of Lineside Telephones G G G G G G G G G The Ordnance Survey (OS) grid reference of the telephone, accurate to within 100 m, shall be displayed on the information label unless an alternative location reference, agreed between the infrastructure manager (IM) and the emergency services, is provided. Rationale: The grid reference number is recognised by the emergency services as an accurate way of locating any place in the UK and therefore is included on the information label. Grid reference numbers give an accuracy down to 100 m. Rationale: The six number grid reference is used in preference to the twelve number reference sometimes used elsewhere, because although the twelve number reference is more accurate it is more likely to get misquoted, potentially sending the emergency services many miles from an incident. An example of where another location is agreed with the emergency services, rather than the grid number, would be a large location such as Waterloo Station which may cover multiple grid numbers. At such a location, stating a recognised name is more useful to the emergency services as they should know in advance details of road access and who to contact on site Where the driver is required to contact the signaller within a time period other than that which is laid down in GE/RT8000 Rule Book, the time period shall be included on the Signal Post Telephone sign. Rationale: At busy locations where trains are brought to a stand frequently, the signaller could become inundated with calls from drivers if they all complied with the requirement in the Rule Book to contact the signaller as soon as possible. Sections and permit an exception to the Rule Book requirements. Where it is decided that the driver need not contact the signaller immediately, then the IM, in consultation with the relevant RUs, shall establish how long the driver shall wait. The IM in consultation with the relevant RUs shall identify any signals where the driver of a waiting train need not contact the signaller immediately and shall establish how long the driver shall wait. Where a label is required to be fitted to the SPT indicating how much time a driver should wait before contacting the signaller, this should be noted on the signal sighting form along with the rest of the SPT information Lineside telephones other than SPTs that have a direct line to the signal box shall have a Lineside Telephone sign fitted. Rationale: In an emergency, somebody who is on the lineside should be able to identify a telephone easily and recognise what type of telephone they are about to use. Rationale: Users of the telephone should understand that a lineside telephone provides the signaller with knowledge of where a call is coming from, but no indication as to why, or who is calling (unlike an SPT where a signaller should be aware of trains standing at the signal); therefore proper telephone procedure should be followed. Page 10 of 14

11 Part 3 Application of this Document 3.1 Application - infrastructure managers Scope The requirements of this document apply to all work that affects the positioning of lineside telephones, whether new or alteration It is permissible for the infrastructure manager to designate specific infrastructure projects, at an advanced stage of development when this document comes into force, for which compliance with the requirements of this document applicable to the design, construction and commissioning of new or altered infrastructure is not mandatory. When designating such projects, the infrastructure manager shall consider: a) Its responsibilities under its current safety authorisation. b) The stage reached by the project at the time this document comes into force (for example, approval in principle). c) Whether compliance is necessary to ensure compatibility with other parts of the infrastructure. d) Whether compliance is necessary to facilitate the safe working of the railway system having regard to changes to related requirements mandated on another infrastructure manager or a railway undertaking. e) The economic impact of compliance, but subject to its current safety authorisation in relation to the infrastructure in question Where any designations are made for infrastructure projects, those projects shall continue to meet the equivalent requirements in the RGSs applying to the project before the designation Where it is known, or becomes known, that existing lineside telephones do not comply with the requirements of this document, action to bring them into compliance is required as follows: a) When a lineside telephone is modified. b) When a lineside telephone is renewed as a whole. c) When any major component of a lineside telephone is replaced Exclusions from scope There are no exclusions from the scope specified in for infrastructure managers General compliance date for infrastructure managers This Railway Group Standard comes into force and is to be complied with from 07 December After the compliance dates, or the date by which compliance is achieved if earlier, infrastructure managers are to maintain compliance with the requirements set out in this Railway Group Standard. Where it is considered not reasonably practicable to comply with the requirements, permission to comply with a specified alternative should be sought in accordance with the Railway Group Standards Code Exceptions to general compliance date There are no exceptions to the general compliance date specified in for infrastructure managers. Page 11 of 14

12 RIS-8048-CCS Guidance Iss 1 on with effect Positioning from 04/03/2017 of Lineside Telephones 3.2 Health and safety responsibilities Users of documents published by are reminded of the need to consider their own responsibilities to ensure health and safety at work and their own duties under health and safety legislation. does not warrant that compliance with all or any documents published by is sufficient in itself to ensure safe systems of work or operation or to satisfy such responsibilities or duties. No guidance is associated with Part 3. Page 12 of 14

13 Definitions and Abbreviations GSM-R Global System for Mobile Communications Railway. Network Rail s chosen train-toshore radio system being brought into use to replace both the National Radio Network (NRN) and Cab Secure Radio (CSR) and which will be the backbone of the European Train Control System (ETCS). IM Infrastructure manager. The company responsible for installation, operation and maintenance of the UK s mainline railway system, that is, Network Rail. Lineside telephone A telephone mounted near the railway line but not at a signal and therefore not a Signal Post Telephone (SPT). Such lineside telephones may be provided for the use of staff operating ground frames or lockout devices, or for the use of staff carrying out maintenance. RU Railway undertaking. Comprises passenger Train Operating Companies (TOCs) and Freight Train Operating Companies (FOCs). SPT Signal Post Telephone. A telephone mounted on or near to a signal, which gives the user direct communication with the controlling signaller. SSC Signal Sighting Committee. A group of people comprising staff from the IM and RUs, who have both operating and technical backgrounds and carry out signal sighting. The positioning of SPTs and other lineside telephones is part of their duties. Page 13 of 14

14 References The Catalogue of Railway Group Standards gives the current issue number and status of documents published by. This information is also available from RGSC 01 RGSC 02 Railway Group Standards Code Standards Manual Documents referenced in the text Railway Group Standards GE/RT8000 GE/RT8048 documents GO/GN3677 Rule Book Positioning of Lineside Telephones Guidance on Operational Criteria for the Provision of Lineside Telephony Following GSM-R Introduction Page 14 of 14

GK/GN0609. Guidance on Identification of Signalling and Related Equipment. Issue One June 2011 Rail Industry Guidance Note for GK/RT0009.

GK/GN0609. Guidance on Identification of Signalling and Related Equipment. Issue One June 2011 Rail Industry Guidance Note for GK/RT0009. GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited GK/GN0609 Issue One June 2011 Rail Industry Guidance Note for GK/RT0009 Issue

More information

GK/GN0653. Guidance on Control of Unwanted Voltages on Telecommunications. Equipment at Stations. Rail Industry Guidance Note for GK/RT0053

GK/GN0653. Guidance on Control of Unwanted Voltages on Telecommunications. Equipment at Stations. Rail Industry Guidance Note for GK/RT0053 GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2011 Rail Safety and Standards Board Limited GK/GN0653 Telecommunications Equipment at Stations Issue One: December 2011

More information

Signalling Layout and Signal Aspect Sequence Requirements

Signalling Layout and Signal Aspect Sequence Requirements Signalling Layout and Signal Aspect Sequence Requirements Synopsis This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.

More information

Requirements for GSM-R Voice Radio System

Requirements for GSM-R Voice Radio System Requirements for GSM-R Voice Radio System Signatures removed from electronic version Synopsis This document mandates requirements for the use of GSM-R systems, where these are available, to support operational

More information

Train Voice Radio Systems

Train Voice Radio Systems Train Voice Radio Systems Synopsis This document sets out the mandatory requirements for the application of train voice radio systems, specifically interface requirements for the infrastructure manager

More information

Lineside Signs. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Three Date July 1996

Lineside Signs. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Three Date July 1996 Railway Group Standard Date July 1996 Lineside Signs Signatures removed from electronic version Submitted by Philip Wiltshire Nominated Responsible Manager Approved by Synopsis This standard defines signs

More information

Electromagnetic Compatibility of Train Detection Infrastructure with Rail Vehicles

Electromagnetic Compatibility of Train Detection Infrastructure with Rail Vehicles Electromagnetic Compatibility of Train Detection Infrastructure with Rail Synopsis This document is a standard on immunity levels of infrastructure-based train detection systems, to provide electromagnetic

More information

Train Radio Systems for Voice and Related Messaging Communications

Train Radio Systems for Voice and Related Messaging Communications Uncontrolled When Printed Railway Group Standard Train Radio Systems for Voice and Related Messaging Communications Synopsis This document mandates the minimum requirements for radio systems that provide

More information

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013)

Absolute Block. Uncontrolled When Printed Document to be part superseded by GKRT0055 Iss 1 and GKRT0077 Iss 1 (published on 07/09/2013) Signatures removed from electronic version Submitted by... Richard Genner Nominated Responsible Manager Approved by... Philip Wiltshire Chairman, Train Control & Communications Subject Committee Approved

More information

Uncontrolled When Printed

Uncontrolled When Printed Briefing Note Document Title: GSM-R Train Radio Systems Document No: Issue: Issue 1 Issue 1 Subject Committee(s): The primary Subject Committees are Operations and Train Control & Communications. The Standards

More information

Interlocking Principles

Interlocking Principles Date June 2003 Interlocking Principles Synopsis This document mandates the principles of interlocking of signals, points and other parts of the signalling system so that the safe operation of trains is

More information

Track to Train RFID Compatibility

Track to Train RFID Compatibility Document supersedes Iss 1 with effect from 02/12/2017 Track to Train RFID Compatibility Synopsis This document sets out requirements for RFID compatibility between train and track, including management

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

Control Command & Signalling. Standards Brief Sept Professional Head [S&C] 11/11/2014

Control Command & Signalling. Standards Brief Sept Professional Head [S&C] 11/11/2014 Control Command & Signalling Standards Brief Sept 2014 Professional Head [S&C] 11/11/2014 1 General This presentation gives headline details of the September 2014 Signalling Standards Brief It contains

More information

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS

EDS LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS ENGINEERING DESIGN STANDARD EDS 08-2109 LV SUPPLIES TO MOBILE PHONE BASE STATIONS MOUNTED ON TRANSMISSION TOWERS Network(s): Summary: EPN, LPN, SPN This standard provides guidance on the installation of

More information

On-board Energy Metering for Billing Purposes

On-board Energy Metering for Billing Purposes On-board Energy Metering for Billing Purposes Synopsis This document sets out the energy metering requirements when electric traction units are fitted with an energy measuring system that provides data

More information

Provision of Telephones at Level Crossings

Provision of Telephones at Level Crossings Provision of Telephones at Level Crossings Submitted by Synopsis This standard describes the requirements for the provision of telephone facilities at level crossings.... Jon Melmoth Nominated Responsible

More information

Measurement of Signalling Distances

Measurement of Signalling Distances Division / Business Unit: Function: Document Type: Enterprise Services Signalling Standard Measurement of Signalling Distances Applicability ARTC Network Wide SMS Publication Requirement Internal / External

More information

(Non-legislative acts) DECISIONS

(Non-legislative acts) DECISIONS 4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 October 2014 Issue 2 September 2014 National Grid 2014 2014 Copyright owned by National Grid Electricity Transmission plc, all rights reserved. No part of this publication

More information

25kV A.C. Electrified Lines - Traction Bonding

25kV A.C. Electrified Lines - Traction Bonding Date:MAR 94 25kV A.C. Electrified Lines - Traction Page 1 of 6 Part A Synopsis This is issued by the to define the Boards requirements for continuity bonding on railway systems. This will ensure a continuous

More information

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences

Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement on variation of 900 MHz and 1800 MHz Wireless Telegraphy Act licences Statement Publication date: 06 January 2011 Contents Section Page 1 Executive summary 1 2 Introduction 2 3 Assessment of

More information

ISO 2575 INTERNATIONAL STANDARD. Road vehicles Symbols for controls, indicators and tell-tales

ISO 2575 INTERNATIONAL STANDARD. Road vehicles Symbols for controls, indicators and tell-tales INTERNATIONAL STANDARD ISO 2575 Sixth edition 2000-03-15 Road vehicles Symbols for controls, indicators and tell-tales Véhicules routiers Symboles pour les commandes, indicateurs et témoins Reference ISO

More information

GSM R Notes on certification

GSM R Notes on certification GSM R Notes on certification Workshop Warsaw, 30th of July 2013 ERA ERTMS Unit Content GSM R in CCS TSI Notes on certification & authorisation Radio communication part of Trackside Subsystem Radio communication

More information

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI)

Title Operating Work - Low Voltage Distribution System. Reference Number POP 06 - (RIC Standard: EP SI) Discipline Engineering Standard - NSW Category Electrical Title Operating Work - Low Voltage Distribution System Reference Number POP 06 - (RIC Standard: EP 95 30 00 03 SI) Document Control Status Date

More information

ACCESS TO HIGH VOLTAGE APPARATUS

ACCESS TO HIGH VOLTAGE APPARATUS CORPORATE PROCEDURE ACCESS TO HIGH VOLTAGE APPARATUS Approved By: Prepared By: Issue Date: 17/6/2011 Andrew Macrides Access to Apparatus Rules File No: Managing Director Committee QDOC2011/63 Status: Approved

More information

SYNCHRONISING AND VOLTAGE SELECTION

SYNCHRONISING AND VOLTAGE SELECTION SYNCHRONISING AND VOLTAGE SELECTION This document is for Relevant Electrical Standards document only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any

More information

TYPE APPROVAL PROCEDURE

TYPE APPROVAL PROCEDURE Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated

More information

RELEVANT ELECTRICAL STANDARDS

RELEVANT ELECTRICAL STANDARDS RELEVANT ELECTRICAL STANDARDS Issue 2 February 2014 National Grid 2014 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means electronic,

More information

Guidance Note: Signalling Control Centres

Guidance Note: Signalling Control Centres Guidance Note: Signalling Control Centres Synopsis This document provides guidance on meeting the requirements of Railway Group Standard GK/RT0025. Signatures removed from electronic version Submitted

More information

Status Date Prepared Reviewed Endorsed Approved

Status Date Prepared Reviewed Endorsed Approved Discipline Engineering Standard - NSW Category Signalling Title Power Supply Units for Signalling Equipment - DC Track Feeds Reference Number SPS 29 - (RIC Standard: SC 09 10 06 00 SP) Document Control

More information

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK LIMITS FOR TEMPORARY OEROLTAGES IN ENGLAND AND WALES NETWORK This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept

More information

DNVGL-CP-0338 Edition October 2015

DNVGL-CP-0338 Edition October 2015 CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class

More information

Notice from the Federal Ministry of Labour and Social Affairs of May 2011 IIIb

Notice from the Federal Ministry of Labour and Social Affairs of May 2011 IIIb The following text is a translation 1 of the interpretation of the term "assemblies of machinery" used in the Machinery Directive 2006/42/EC from 5 th May 2011 [ ] Federal Ministry of Labour and Social

More information

Guidance on Radio Electronic Token Block (RETB) Rail Industry Guidance Note

Guidance on Radio Electronic Token Block (RETB) Rail Industry Guidance Note GN This document contains one or more pages which contain colour. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2013 Rail Safety and Standards Board Limited GK/GN0554

More information

Policy guidance regarding authorisation for Earth Stations on Vessels (ESVs)

Policy guidance regarding authorisation for Earth Stations on Vessels (ESVs) Policy guidance regarding authorisation for Earth Stations on Vessels (ESVs) Publication date: September 2010 Earth Station on Vessels Contents Section Page 1 Policy Guidance regarding authorisation of

More information

Public Information and Disclosure RD/GD-99.3

Public Information and Disclosure RD/GD-99.3 Public Information and Disclosure RD/GD-99.3 March, 2012 Public Information and Disclosure Regulatory Document RD/GD-99.3 Minister of Public Works and Government Services Canada 2012 Catalogue number CC172-82/2012E-PDF

More information

SYSTEM MONITORING FAULT RECORDING

SYSTEM MONITORING FAULT RECORDING * SYSTEM MONITORING FAULT RECORDING Disclaimer NGG and NGET or their agents, servants or contractors do not accept any liability for any losses arising under or in connection with this information. This

More information

IMPORTANT NOTICE: PLEASE READ CAREFULLY BEFORE INSTALLING THE SOFTWARE: THIS LICENCE AGREEMENT (LICENCE) IS A LEGAL AGREEMENT BETWEEN

IMPORTANT NOTICE: PLEASE READ CAREFULLY BEFORE INSTALLING THE SOFTWARE: THIS LICENCE AGREEMENT (LICENCE) IS A LEGAL AGREEMENT BETWEEN Date: 1st April 2016 (1) Licensee (2) ICG Visual Imaging Limited Licence Agreement IMPORTANT NOTICE: PLEASE READ CAREFULLY BEFORE INSTALLING THE SOFTWARE: THIS LICENCE AGREEMENT (LICENCE) IS A LEGAL AGREEMENT

More information

ETSI EN V1.5.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.5.1 ( ) Harmonized European Standard (Telecommunications series) EN 300 330-2 V1.5.1 (2010-02) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Short Range Devices (SRD); Radio equipment in the

More information

Network Standard NS

Network Standard NS Network Standard NS 21-2006 Artwork on Western Power Assets Technical Requirements for application to South West Interconnected System (SWIS) DMS #1049174 NS 21-2006 Artwork on Western Power Assets REVISION

More information

Earthing Requirements for HV Transmission Structures

Earthing Requirements for HV Transmission Structures Engineering Standard Electrical MEST 000002-07 Earthing Requirements for Transmission Structures Version: 1 Issued: February 2015 Owner: Engineering Approved By: Patrick Kelly Head of Electrical Engineering

More information

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work;

-and- (the Artist ) maquette means the drawing or model, prepared by the Artist, of the proposed Art Work; THIS AGREEMENT made in triplicate this th day of, 200 BETWEEN: CITY OF OTTAWA (the City -and- (the Artist WHEREAS the Council of the former City of Ottawa, an old municipality as defined in the City of

More information

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance

National Grid UK Electricity Transmission plc. NATIONAL SAFETY INSTRUCTION and Guidance National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION and Guidance NSI 26 RAILWAY CONNECTION CIRCUITS Copyright National Grid plc 2016, all rights reserved. No part of this publication

More information

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate)

Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) API Manual of Petroleum Measurement Standards TR 2570 EI Hydrocarbon Management HM 56 Continuous On-line Measurement of Water Content in Petroleum (Crude Oil and Condensate) First Edition, October 2010

More information

THE UNIVERSITY OF AUCKLAND INTELLECTUAL PROPERTY CREATED BY STAFF AND STUDENTS POLICY Organisation & Governance

THE UNIVERSITY OF AUCKLAND INTELLECTUAL PROPERTY CREATED BY STAFF AND STUDENTS POLICY Organisation & Governance THE UNIVERSITY OF AUCKLAND INTELLECTUAL PROPERTY CREATED BY STAFF AND STUDENTS POLICY Organisation & Governance 1. INTRODUCTION AND OBJECTIVES 1.1 This policy seeks to establish a framework for managing

More information

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN

DESIGN PRACTICE NOTE DESIGN/REVIEW REQUIREMENTS FOR TRACTION BONDING PLAN Approval Amendment Record Approval Date Version Description 01/04/2014 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 7 Table of Contents

More information

INTERNATIONAL TELECOMMUNICATION UNION DATA COMMUNICATION NETWORK: INTERFACES

INTERNATIONAL TELECOMMUNICATION UNION DATA COMMUNICATION NETWORK: INTERFACES INTERNATIONAL TELECOMMUNICATION UNION CCITT X.21 THE INTERNATIONAL (09/92) TELEGRAPH AND TELEPHONE CONSULTATIVE COMMITTEE DATA COMMUNICATION NETWORK: INTERFACES INTERFACE BETWEEN DATA TERMINAL EQUIPMENT

More information

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.2.1 ( ) Harmonized European Standard (Telecommunications series) EN 300 086-2 V1.2.1 (2008-09) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Radio equipment with an internal

More information

Decision to make the Wireless Telegraphy (Vehicle Based Intelligent Transport Systems)(Exemption) Regulations 2009

Decision to make the Wireless Telegraphy (Vehicle Based Intelligent Transport Systems)(Exemption) Regulations 2009 Decision to make the Wireless Telegraphy (Vehicle Based Intelligent Transport Systems)(Exemption) Regulations 2009 Statement Publication date: 23 January 2009 Contents Section Page 1 Summary 1 2 Introduction

More information

Road signs Specifications

Road signs Specifications AS 1743:2018 AS 1743:2018 Road signs Specifications This Australian Standard was prepared by Committee MS-012, Road Signs and Traffic Signals. It was approved on behalf of the Council of Standards Australia

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE International Telecommunication Union ITU-T K.45 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (04/2008) SERIES K: PROTECTION AGAINST INTERFERENCE Resistibility of telecommunication equipment installed

More information

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1.

Contents EUROPEAN UNION AGENCY FOR RAILWAYS. Accompanying Report Practical arrangements for safety certification ERA-REC-126/ACR V 1. Contents 1. Executive summary... 3 2. Introduction... 4 2.1. Purpose and scope... 4 2.2. Background... 4 3. Workgroups... 5 4. Working method... 5 5. Content of the practical arrangements... 7 5.1. Objective...

More information

Table of contents Physical environmental conditions... 12

Table of contents Physical environmental conditions... 12 EN EN EN ANNEX to Recommendation N. ERA-REC-123-2015/REC on amending and recasting Commission Decision 2012/88/EU on the Technical Specification for Interoperability relating to the Control-Command and

More information

CDT. Service and Installation Manual. Manual Revision Oct 2014

CDT. Service and Installation Manual. Manual Revision Oct 2014 CDT Service and Installation Manual Manual Revision Oct 2014 2014 Cimarron Technologies Corp., Escondido, CA, USA. All rights reserved. No part of this manual may be reproduced in any way without the express

More information

the text Article 5(5) of Directive 2008/57/EC is replaced by the text Article 4(5) of

the text Article 5(5) of Directive 2008/57/EC is replaced by the text Article 4(5) of Chapter Chapter EUROPEAN UNION AGENCY FOR RAILWAYS Annex 1 O11REC1O28 Annex 1: Amendments to the technical specification for interoperability relating to the control-command and signalling subsystems of

More information

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP)

Title Substation Auxiliary Transformer from Rectifier Transformer Secondary. Reference Number PDS 01 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Substation Auxiliary Transformer from Rectifier Transformer Secondary Reference Number PDS 01 (RIC Standard: EP 05 00 00 01 SP) Document Control

More information

Provläsningsexemplar / Preview

Provläsningsexemplar / Preview Provläsningsexemplar / Preview SS-ISO 2575:2010 (E) Contents Page Foreword...iv 1 Scope...1 2 Normative references...1 3 Terms and definitions...1 4 General...2 5 Colour...3 6 Summary table of all symbols...3

More information

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17

EE Limited - Public Wireless Network Licence Company Registration no First Issued: 26/03/93 - Licence Number: Rev: 20-10/01/17 Office of Communications (Ofcom) Wireless Telegraphy Act 2006 EE Limited - Public Wireless Network Licence PUBLIC WIRELESS NETWORK LICENCE This Licence document replaces the version of the Licence issued

More information

Type Approval JANUARY The electronic pdf version of this document found through is the officially binding version

Type Approval JANUARY The electronic pdf version of this document found through  is the officially binding version STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service

More information

ETSI EN V1.3.1 ( )

ETSI EN V1.3.1 ( ) EN 300 422-2 V1.3.1 (2011-08) Harmonized European Standard Electromagnetic compatibility and Radio spectrum Matters (ERM); Wireless microphones in the 25 MHz to 3 GHz frequency range; Part 2: Harmonized

More information

Reference Number PDS 07 (RIC Standard: EP SP)

Reference Number PDS 07 (RIC Standard: EP SP) Discipline Engineering Standard NSW Category Electrical Title Reference Number PDS 07 (RIC Standard: EP 12 10 00 20 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Jan 05 Standards

More information

Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands MHz and MHz

Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands MHz and MHz Issue 7 September 2008 Spectrum Management and Telecommunications Standard Radio System Plan Technical Requirements for Cellular Radiotelephone Systems Operating in the Bands 824-849 MHz and 869-894 MHz

More information

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls

AWS J1.1M/J1.1:2013 An American National Standard. Specification for Resistance Welding Controls An American National Standard Specification for Resistance Welding Controls An American National Standard Approved by American National Standards Institute July 29, 2013 Specification for Resistance Welding

More information

AS/NZS 1200:2000 AS/NZS

AS/NZS 1200:2000 AS/NZS AS/NZS 1200:2015 Australian/New Zealand Standard Pressure equipment Superseding AS/NZS 1200:2000 AS/NZS 1200:2015 AS/NZS 1200:2015 This joint Australian/New Zealand standard was prepared by joint Technical

More information

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2)

THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) THIRD SCHEDULE Form of Application For A Revised Disability Access Certificate Article 20E(2) Building Control Acts 1990 and 2007 Application for a Revised Disability Access Certificate Building Control

More information

ETSI EN V1.2.1 ( ) Harmonized European Standard

ETSI EN V1.2.1 ( ) Harmonized European Standard EN 302 372-2 V1.2.1 (2011-02) Harmonized European Standard Electromagnetic compatibility and Radio spectrum Matters (ERM); Short Range Devices (SRD); Equipment for Detection and Movement; Tanks Level Probing

More information

SIGNAL SIGHTING - MINIMUM STANDARDS MINIMUM STANDARDS

SIGNAL SIGHTING - MINIMUM STANDARDS MINIMUM STANDARDS SIGNAL SIGHTING - MINIMUM STANDARDS All Signal Sighting Inspections must be carried out by nominated officers of the RTBU Locomotive Division (NSW). In most situations these will be nominated Sub-Divisional

More information

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS

Australian Standard. Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv AS AS 2067 1984 Australian Standard Switchgear assemblies and ancillary equipment for alternating voltages above 1 kv [Title allocated by Defence Cataloguing Authority: SWITCHGEAR ASSEMBLIES, ELECTRICAL AND

More information

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment

Siemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment Mobility and Logistics Traffic Solutions Sopers Lane Poole, Dorset BH17 7ER SYSTEM/PROJECT/PRODUCT: Traffic Controllers Siemens ST950 & ST900 Statement of Against TR 2513 Issue A, September 2005 Performance

More information

Suppliers' Information Note. Microconnect Distributed Antennas. Service & Interface Description

Suppliers' Information Note. Microconnect Distributed Antennas. Service & Interface Description SIN 398 Issue 1.2 April 2015 Suppliers' Information Note For The BT Network Microconnect Distributed Antennas Service & Interface Description Each SIN is the copyright of British Telecommunications plc.

More information

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 9: May 2013 National Grid National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London

More information

Centre for the Development Of Academic Skills (CeDAS) Royal Holloway Proofreading Scheme Handbook and Code of Practice

Centre for the Development Of Academic Skills (CeDAS) Royal Holloway Proofreading Scheme Handbook and Code of Practice Enquiries or visit CeDAS Reception at IN002 on the ground floor of the International Building For more information visit Centre for the Development Of Academic Skills (CeDAS) Royal Holloway Proofreading

More information

ETSI EN V1.2.3 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.2.3 ( ) Harmonized European Standard (Telecommunications series) EN 301 166-2 V1.2.3 (2009-11) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Land Mobile Service; Radio equipment for analogue

More information

Product Information Sheet

Product Information Sheet Product Information Sheet RETB Radio Electronic Token Block Park Signalling Limited 2015 Registered number 03895736 Page 1 of 8 Introduction Radio Electronic Token Block (RETB) is an economic radio based

More information

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to

1. The Office of Communications (Ofcom) grants this wireless telegraphy licence ( the Licence ) to Office of Communications (Ofcom) Wireless Telegraphy Act 2006 Telefónica UK Limited - Public Wireless Network Licence PUBLIC WIRELESS NETWORK LICENCE This Licence document replaces the version of the Licence

More information

IAB Europe Guidance THE DEFINITION OF PERSONAL DATA. IAB Europe GDPR Implementation Working Group WHITE PAPER

IAB Europe Guidance THE DEFINITION OF PERSONAL DATA. IAB Europe GDPR Implementation Working Group WHITE PAPER IAB Europe Guidance WHITE PAPER THE DEFINITION OF PERSONAL DATA Five Practical Steps to help companies comply with the E-Privacy Working Directive Paper 02/2017 IAB Europe GDPR Implementation Working Group

More information

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology

ISO INTERNATIONAL STANDARD. Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology INTERNATIONAL STANDARD ISO 12100-1 First edition 2003-11-01 Safety of machinery Basic concepts, general principles for design Part 1: Basic terminology, methodology Sécurité des machines Notions fondamentales,

More information

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS

THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS THE GRID CODE OC7.5 INTEGRAL EQUIPMENT TESTS GUIDANCE NOTES Issue 11: February 2018 National Grid Registered Office National Grid Electricity Transmission plc Registered Office: 1-3 Strand London WC2N

More information

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1

Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1 Public and Aboriginal Engagement Public Information and Disclosure REGDOC-3.2.1 May 2018 Public Information and Disclosure Regulatory document REGDOC-3.2.1 Canadian Nuclear Safety Commission (CNSC) 2018

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

Personal Independence Payment (PIP) assessments. How to make suggestions, comments and complaints

Personal Independence Payment (PIP) assessments. How to make suggestions, comments and complaints Personal Independence Payment (PIP) assessments How to make suggestions, comments and complaints Independent Assessment Services and your PIP claim We are Independent Assessment Services. We conduct Personal

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

Museum & Archives Access Policy

Museum & Archives Access Policy Museum & Archives Access Policy The access policy sets out how we will make the museum and archives collections accessible to a wide audience. Policy owner Executive Director of Communications & Engagement

More information

REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL)

REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL) CITY OF CARDIFF COUNCIL CYNGOR DINAS CAERDYDD CABINET MEETING: 14 JULY 2016 CARDIFF STATUE AND MONUMENT PROTOCOL REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY

More information

In practice, the question is frequently raised of what legislation applies to clamping devices that are intended to be used on machines.

In practice, the question is frequently raised of what legislation applies to clamping devices that are intended to be used on machines. VDMA Position Paper (Version from 22 nd June, 2017) Machine tools and manufacturing systems Precision Tools Clamping devices for use on machines This position paper is intended as information on how clamping

More information

INTERNATIONAL. Medical device software Software life cycle processes

INTERNATIONAL. Medical device software Software life cycle processes INTERNATIONAL STANDARD IEC 62304 First edition 2006-05 Medical device software Software life cycle processes This English-language version is derived from the original bilingual publication by leaving

More information

ISO Graphical symbols Safety colours and safety signs Part 3: Design principles for graphical symbols for use in safety signs

ISO Graphical symbols Safety colours and safety signs Part 3: Design principles for graphical symbols for use in safety signs INTERNATIONAL STANDARD ISO 3864-3 Second edition 2012-02-01 Graphical symbols Safety colours and safety signs Part 3: Design principles for graphical symbols for use in safety signs Symboles graphiques

More information

The BioBrick Public Agreement. DRAFT Version 1a. January For public distribution and comment

The BioBrick Public Agreement. DRAFT Version 1a. January For public distribution and comment The BioBrick Public Agreement DRAFT Version 1a January 2010 For public distribution and comment Please send any comments or feedback to Drew Endy & David Grewal c/o endy@biobricks.org grewal@biobricks.org

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE International Telecommunication Union ITU-T K.49 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (12/2005) SERIES K: PROTECTION AGAINST INTERFERENCE Test requirements and performance criteria for voice

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

ETSI EN V1.3.1 ( )

ETSI EN V1.3.1 ( ) EN 302 858-2 V1.3.1 (2013-11) Harmonized European Standard Electromagnetic compatibility and Radio spectrum Matters (ERM); Road Transport and Traffic Telematics (RTTT); Automotive radar equipment operating

More information

SERIES K: PROTECTION AGAINST INTERFERENCE

SERIES K: PROTECTION AGAINST INTERFERENCE International Telecommunication Union ITU-T K.21 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (04/2008) SERIES K: PROTECTION AGAINST INTERFERENCE Resistibility of telecommunication equipment installed

More information

Final draft ETSI EN V1.3.1 ( )

Final draft ETSI EN V1.3.1 ( ) Final draft EN 300 433-2 V1.3.1 (2011-05) Harmonized European Standard Electromagnetic compatibility and Radio spectrum Matters (ERM); Citizens' Band (CB) radio equipment; Part 2: Harmonized EN covering

More information

ETSI EN V1.3.2 ( ) Harmonized European Standard (Telecommunications series)

ETSI EN V1.3.2 ( ) Harmonized European Standard (Telecommunications series) EN 302 288-2 V1.3.2 (2009-01) Harmonized European Standard (Telecommunications series) Electromagnetic compatibility and Radio spectrum Matters (ERM); Short Range Devices; Road Transport and Traffic Telematics

More information

European Infrastructure Compatibility Standards. Maya Petkova 7 March 2014

European Infrastructure Compatibility Standards. Maya Petkova 7 March 2014 European Infrastructure Compatibility Standards Maya Petkova 7 March 2014 Technical Specifications for Interoperability Subsystem 1. Infrastructure 2. Energy 3. Control-Command and Signalling (onboard

More information

GUIDELINES FOR THE APPLICATION FOR PUBLIC RADIOCOMMUNICATIONS SERVICE (PRS) LICENCES

GUIDELINES FOR THE APPLICATION FOR PUBLIC RADIOCOMMUNICATIONS SERVICE (PRS) LICENCES GN-35/2012 GUIDELINES FOR THE APPLICATION FOR PUBLIC RADIOCOMMUNICATIONS SERVICE (PRS) LICENCES Office of the Communications Authority Hong Kong August 2012 CONTENTS SECTION 1 The regulatory framework

More information

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018

UK Broadband Ltd Spectrum Access Licence Licence Number: Rev: 4: 11 January 2018 Wireless Telegraphy Act 2006 Office of Communications (Ofcom) Licence Category: SPECTRUM ACCESS 3.6GHz This Licence replaces the licence issued by Ofcom on 05 April 2013 to UK Broadband Limited. Licence

More information

Drawing Standard for Plans Showing Horizontal Alignment

Drawing Standard for Plans Showing Horizontal Alignment Discipline: Engineering (Track & Civil) Category: Standard Drawing Standard for Plans Showing Horizontal Alignment ETD-00-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard

More information

Public and Aboriginal engagement Public Information and Disclosure REGDOC-3.2.1

Public and Aboriginal engagement Public Information and Disclosure REGDOC-3.2.1 Public and Aboriginal engagement Public Information and Disclosure REGDOC-3.2.1 August 2017 Public Information and Disclosure Regulatory document REGDOC-3.2.1 Canadian Nuclear Safety Commission (CNSC)

More information