Distributed two-hop proportional fair resource allocation in Long Term Evolution Advanced networks

Size: px
Start display at page:

Download "Distributed two-hop proportional fair resource allocation in Long Term Evolution Advanced networks"

Transcription

1 WIRELESS COMMUNICATIONS AND MOBILE COMPUTING Wirel. Commun. Mob. Comput. 2016; 16: Published online 12 August 2014 in Wiley Online Librry (wileyonlinelibrry.com) RESEARCH ARTICLE Distributed two-hop proportionl fir resource lloction in Long Term Evolution Advnced networs Chen Sun 1, Weidong Wng 2, Yinghi Zhng 2 nd iojun Wng 1 * 1 School of Electronic Engineering, Dublin City University, Dublin, Irelnd 2 Key Lbortory of Universl Wireless Communiction, Ministry of Eduction, Beijing University of Posts nd Telecommunictions, Beijing, , Chin ABSTRACT In Long Term Evolution Advnced networs with Type I in-bnd hlf-duplex decode-nd-forwrd rely nodes, proportionl fir (PF) resource lloction is iming t gurnteeing two-hop mtch nd optimising globl proportionl firness. The twohop mtch is defined s equl dt rtes in the ccess lins nd the corresponding bchul lins. The globl proportionl firness is between ll the user equipments served by the evolved nodes B nd the rely nodes. Existing centrlised schemes chieve these trgets t the cost of enormous chnnel stte informtion (CSI) exchnge. Existing distributed schemes focus on resource prtitioning nd employ trditionl single-hop PF scheduling lgorithm in ccess lins, with less CSI exchnge. The trditionl PF scheduling lgorithm mximises single-hop proportionl firness between the dt rtes in the ccess lins rther thn two-hop proportionl firness between the end-to-end dt rtes in the two hops. In order to reduce CSI exchnge nd t the sme time to mximise the two-hop proportionl firness, distributed two-hop PF resource lloction scheme is proposed. The proposed scheme includes two-hop PF resource scheduling lgorithms nd dptive resource prtitioning lgorithms, pplied in different two-hop trnsmission protocols. Simultion results demonstrte the proposed scheme is better thn the existing distributed schemes in obtining better proportionl firness nd lrger celledge user equipment throughputs. Copyright 2014 John Wiley & Sons, Ltd. KEYWORDS LTE-dvnced; rely; proportionl fir; resource lloction *Correspondence iojun Wng, School of Electronic Engineering, Dublin City University, Dublin, Irelnd. E-mil: xiojun.wng@dcu.ie 1. INTRODUCTION In the 3rd Genertion Prtnership Project (3GPP) stndrds, Long Term Evolution (LTE) Relese 10 [1], LTE- Advnced is specified, dopting Orthogonl Frequency Division Multiple Access (OFDMA) in downlin nd relying technology for cpcity increment nd coverge extension. Type 1 in-bnd hlf-duplex decode-nd-forwrd rely node (RN), defined in the stndrds, ppers to user equipments (UEs) s n evolved node B (enb) nd performs independent scheduling. In LTE-Advnced networs with RNs, the UEs re served either directly by the enbs (direct UEs) or ttched to the RNs (rely UEs). There exist three types of lins: direct lins between the enbs nd their direct UEs, ccess lins between the RNs nd their rely UEs nd bchul lins between the RNs nd their donor enbs. In order to support in-bnd relying, time-domin multiplexing between the ccess nd bchul lins is defined in the stndrds. All subfrmes in rdio frme re grouped into bchul subfrmes nd ccess subfrmes. The bchul lins cn only occupy the resources in the bchul subfrmes, nd the rest of resources cn be llocted to the direct UEs. Besides, the direct nd ccess lins will shre or reuse the resources in the ccess subfrmes ccording to different two-hop trnsmission protocols. As n effective compromise between throughput nd firness, proportionl fir (PF) resource lloction hs been widely studied in conventionl single-hop cellulr networs [2,3], OFDMA networs [4] nd LTE networs [5]. In recent yers, the reserches on PF resource lloction in rely enhnced OFDMA networs hve been emerging, which nturlly comprise two phses: resource prtitioning phse, which ssigns resources to different types of lins, nd resource scheduling phse, which commits resources of ech lin between the UEs. There re two commonly ccepted objectives: first, gurnteeing two-hop mtch, which mens equl dt rtes of bchul lins nd their corresponding ccess lins; second, mximising 264 Copyright 2014 John Wiley & Sons, Ltd.

2 globl end-to-end proportionl firness of both the direct UEs nd the rely UEs. Note tht in this pper, we minly refer to the literture in two-hop in-bnd non-coopertive fixed rely enhnced OFDMA networs, which cn be esily implemented in LTE-Advnced networs with Type I RNs. A simple thought of processing two PF resource lloction phses is to pply centrlised rchitecture, in which the resource prtitioning nd the resource scheduling re executed together by the donor enbs. During the resource scheduling of ccess lins, their chnnel stte informtion (CSI) ought to be collected nd fed bc by the RNs. Single-hop resource scheduling lgorithms coupled with dptive subfrme division re utilised in the studies in [6,7]. In [8 10], two-hop resource scheduling lgorithms using the sttic hlf-to-hlf subfrme structure re proposed. An dptive power lloction nd resource scheduling scheme is designed in [11]. However, the dptive power lloction mechnism will increse the complexity of RN trnsmitters. In [12], the uthors te the two-hop proportionl firness, the dptive time division nd different reuse scenrios into considertion. Although multi-subchnnel diversity nd multi-user diversity cn be exploited using the centrlised rchitecture, enormous CSI exchnge between the enbs nd the RNs will bring hevy burden to the uplin signlling chnnels. In order to reduce CSI exchnge, some PF resource lloction schemes dopt distributed rchitecture, in which two resource lloction phses re processed by different types of serving nodes. Prticulrly, the resource scheduling of the ccess lins is executed t ech RN, which is supported by Type I rely in LTE-Advnced networs, nd the resource prtitioning is determined by the donor enbs. In the existing distributed PF resource lloction schemes, gret ttentions re pid to designing resource prtitioning lgorithms. A sttic equl resource prtitioning scheme is used in [13], resulting in the two-hop mismtch. A two-hop mtch fctor in the resource prtitioning between bchul lins nd direct lins is considered in [14] to reduce the two-hop mismtch; however, the resource prtitioning between direct lins nd ccess lins is still fixed. In [15], the two-hop mismtch is llevited by djusting the trnsmitting power of donor enb nd RNs under sttic resource prtitioning scheme. The uthors in [16] proposed n dptive resource prtitioning lgorithm bsed on the rel-time throughput nd gve setchy fixed initil pttern. An optimised initil pttern is given in [17]. However, the frequent-vrying resource prtitioning will bring burden to the decentrlised rchitecture. Therefore, two semi-sttic PF-bsed resource prtitioning lgorithms bsed on the time-verge dt rtes re designed for the orthogonl reuse pttern in [18] nd the full reuse (FR) pttern in [19] through formulting the generlised PF (GPF) problem nd solving it by the Lgrnge multiplier lgorithm. There re more centrlised nd distributed resource lloction schemes proposed in recent yers. Reference [20] proposed centrlised resource lloction scheme to ensure the proportionl firness between the dt rtes of two-hop lins. This centrlised resource lloction scheme is conducted in the time-frequency domin, while the time domin is considered in [12]. In [21], problem to jointly optimise subfrme, resource nd power lloction is formulted nd solved by centrlised optiml joint lloction lgorithm. A distributed resource lloction scheme is proposed in [22] to increse the throughput of the UEs with worst chnnel conditions. The optiml resource prtitioning in the prtil reuse (PR) pttern is determined by the rtios of the verge spectrl efficiencies in this study. Weighted PF schedulers re proposed in [23] to consider the impct of bchul lin on performnce in the FR pttern. However, these schedulers re not proposed to solve the PF resource lloction problem. The uthors in [24] proposed distributed resource lloction scheme in order to provide high cell throughput nd low outge probbility, but proportionl firness is not considered. Two-hop PF scheduling lgorithms re used in centrlised resource lloction schemes, such s [12,20,21]. The conventionl single-hop PF scheduling lgorithm proposed in [5] is commonly utilised to gurntee the proportionl firness between the dt rtes of the rely UEs in the ccess lins, which is not n optiml choice for the distributed PF resource lloction schemes. To ensure two-hop mtch, the virtul resource scheduling in bchul lins is dependent on the resource scheduling in the ccess lins. Furthermore, the PF resource lloction in the ccess lins my led to unfir distribution of the resources in the corresponding bchul lin. This is becuse the unblnced two-hop chnnel condition, tht is, unequl chnnel conditions in the ccess lins nd equl chnnel conditions in the bchul lins. Therefore, the two-hop proportionl firness between the rely UEs cnnot be mximised, becuse the proportionl firness in the bchul lins is not mximised. As it cn be found, the centrlised PF resource lloction schemes using the centrlised two-hop scheduling lgorithms cn chieve the PF resource lloction trgets but with lrge CSI exchnge, nd the distributed schemes cn decrese the CSI exchnge but cnnot mximise two-hop proportionl firness in the ccess lins using the conventionl PF resource scheduling lgorithm. Besides, the centrlised two-hop resource scheduling lgorithms cnnot be directly incorported in the distributed resource lloction schemes, becuse of the constrints of the resource prtitioning results. In this pper, distributed two-hop resource lloction scheme is proposed to ddress this problem, nd the following contributions re mde: A GPF problem is formulted nd decomposed into two interdependent sub-problems, tht is, resource prtitioning sub-problem ccording to resource scheduling results nd resource scheduling sub-problem subject to resource prtitioning. In ddition, two different two-hop trnsmission protocols re considered in the formultion. Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd. 265

3 Abbrevition 3GPP ARP CDFs CRS CSI DF enb FR GPF KKT LTE OFDMA OR OTH PF PR PRB RN SN STH UE Tble I. List of bbrevitions. Full nme The 3rd genertion prtnership project Adptive resource prtitioning Cumultive distribution function Conventionl resource scheduling Chnnel stte informtion Decode nd Forwrd Evolved Node B Full reuse Generlised proportionl firness Krush Kuhn Tucer Lone Term Evolution Orthogonl frequency division multiple ccess Orthogonl reuse Orthogonl two-hop Proportionl fir Prtil reuse Physicl resource bloc Rely node Serving node Simultneous two-hop User equipment The resource scheduling sub-problem is solved by two-hop PF resource scheduling lgorithms in timefrequency domin through the Lgrnge multiplier lgorithm. Ech lgorithm is designed for two-hop trnsmission protocol under the constrints of the corresponding resource prtitioning. The resource prtitioning sub-problem in the twohop trnsmission protocols is solved by djusting the existing dptive resource prtitioning lgorithms in [18,19] bsed on the requirements of LTE-Advnced stndrds. In order to me this pper more redble, we provide list of bbrevitions in Tble I. n ccess PRB subset N for ccess lins nd bchul PRB subset N b for bchul lins. Note tht N nd N b need to be integers, where jjmens the crdinlity of set, nd the bchul PRB size N b 0 is defined s 0 for the donor enb. The reltionship between the ccess PRBs nd the bchul PRBs cn be given by N \ N b D;, N [ N b D N, 8N 2 N, 8N b 2 N 2.2. Chnnel model ssumptions In direct lins nd ccess lins, we ssume ll UEs hve independent multipth frequency-selective Ryleigh fding chnnels, nd their instntneous chnnel gins re flt over ech PRB. In ddition, bsed on the clcultion given in [25], the Doppler time-selective Ryleigh fding chnnels result in flt chnnel gins within rdio frme, when the speeds of UEs re under 60 m/h. For bchul lins, flt fding chnnels re ssumed under the fixed line-of-sight condition, nd the instntneous dt rtes re constnt over ll PRBs. A multi-cell scenrio is considered in this pper. Through PRB pre-ssignments in subfrmes, the inter-cell interference is predictble in order to mintin stble interference environment nd me the problem formultion fesible. In ddition, fixed trnsmitting power per PRB is ssumed for ll the lins to reduce the complexity of trnsmitters. (1) 2. SYSTEM MODEL 2.1. Networ model In this pper, we consider the downlin trnsmission of n LTE-Advnced networ with Type I RNs. In the cell of interest, there re set of serving nodes (SNs) K, including donor enb nd multiple RNs. The SN. 2 K/ denotes the enb when D 0ornRNotherwise.TheRNsre connected to the donor enb vi wireless bchul lins. A set of UEs M cn be either served by the donor enb directly or vi n RN through two hops. We ssume tht ll the dt in the wireless bchul lins re decoded nd forwrded by the RNs to the rely UEs in the ccess lins, becuse the RNs re incpble of buffering excess dt. The UEs ssociting with SN crete subset M of M. Multiple SN connection nd coopertive trnsmission re not considered in this pper. Physicl resource bloc (PRB) is bsic OFDMA resource lloction unit, comprising of constnt number of subcrriers nd OFDM symbols. Assume tht there is set of PRBs N for dt trnsmission in ech rdio frme. With certin resource prtitioning pttern, SN cn obtin PRB subset N, which is further divided into Figure 1. Two-hop trnsmission protocols. 266 Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd.

4 2.3. Two-hop trnsmission protocols Two typicl two-hop trnsmission protocols re considered in this pper, orthogonl two-hop (OTH) trnsmission protocol nd simultneous two-hop (STH) trnsmission protocol, which re illustrted in Figure 1. In the twohop trnsmission protocols, ech rdio frme is divided into bchul subfrmes nd ccess subfrmes. The ccess PRBs in the ccess subfrmes nd the bchul PRBs in the bchul subfrmes re llocted to the two-hop rely UEs. For the single-hop direct UEs, the reminder of the bchul subfrmes cn be used. The PRBs in the ccess subfrmes re reused or not reused by the two-hop rely UEs nd the single-hop direct UEs ccording to different two-hop trnsmission protocols. In the OTH trnsmission protocol, the single-hop direct UEs nd the two-hop rely UEs shre ll the PRBs in the ccess subfrmes without ny overlpping. No intr-cell interference is generted. An orthogonl reuse (OR) pttern in the ccess subfrmes is used. The min inter-cell interference experienced by the rely UEs is from the RNs in the djcent cells, nd the min inter-cell interference received by the direct UEs is from the surrounding enbs. The OR pttern deployed in different sectors of mcro cell is shown in Figure 2. Using the STH trnsmission protocol, FR pttern nd two PR ptterns re considered s shown in Figure 3. In the FR pttern, the whole PRBs in the ccess subfrmes re vilble for the direct lins nd the ccess lins. The intr-cell nd inter-cell interference suffered by the UEs is consistent from ll the unttched SNs. In the 2/3 PR pttern, the ccess lins re llowed to reuse 2/3 of the resources for the direct lins. In the 1/3 PR pttern, the ccess lins re llowed to reuse 1/3 of the resources for the direct lins. Thus, the intr-cell nd inter-cell interference is reduced, nd the vilble resources of the rely UEs for the ccess lins re lso diminished, compred with the FR pttern. These three ptterns deployed in different sectors of mcro cell re presented in Figure 3. The reltionship of the ccess PRBs, bchul PRBs nd direct PRBs in different two-hop trnsmission protocols cn be summrised by in the OTH protocol, in the STH protocol, K[ N D N (2) D0 K[ N b C N 0 D N D1 N 0 N 0 (3) where indictes 1, 2/3 nd 1/3 in the FR, 2/3 PR, nd 1/3 PR ptterns, respectively. 3. PROBLEM FORMULATION Without loss of generlity, we consider the trnsmission frme-by-frme. The PF resource lloction problem with dptive resource prtitioning in LTE-Advnced networs with Type I RNs is formulted s the equivlence of mximising the following utility function [26]: mx log R m (4) m2m where R m is the dt rte of UE m within rdio frme. Becuse the UE ssocition reltionship hs been decided by certin route selection lgorithm, the dt rte of UE m served by SN in rdio frme cn be expressed s R m D m,n r,m,n (5) where m,n is the binry resource lloction vrible, nd r,m,n is the instntneous dt rte chieved by UE m connected to SN on PRB n. IfPRBn is llocted to UE m ssociting with SN,then m,n D 1; otherwise, m,n D 0. Note tht only the throughputs finlly received by the UEs in the ccess PRBs should be included in the expression. Considering time multiplexing nd two-hop mtch required in the LTE-Advnced stndrds, the GPF problem in the OTH protocol cn be formulted s mx log m,n r,m,n (6) 2K m2m Figure 2. An orthogonl reuse pttern in the orthogonl protocol. Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd. 267

5 Figure 3. Full reuse, 2/3 prtil reuse nd 1/3 prtil reuse ptterns in the simultneous protocol. subject to C1 : m2m C2 :N 0 jn j m,n r,m,n D N b r 0,, 8 2 K, 0 2K, 0 N 2K, 0 N b nd the GPF problem in the STH protocol cn be formulted s mx log m,n r,m,n (7) 2K m2m subject to c1 : n2m c2 :N 0 jn j m,n r,m,n D N b r 0,, 8 2 K, 0 2K, 0 N b In different reuse ptterns, constrints C1 nd c1 re the sme, which imply the two-hop mtch. Additionlly, the constrints C2 nd c2 show how to segment the entire PRBs in rdio frme. The GPF problems (6) nd (7) re not convex optimistion problems, becuse UE s dt rtes R is not convex set with the binry vribles 2 Œ0, 1. In order to me the GPF problem trctble, the binry vribles re llowed to te ny vlue between 0 nd 1, 2 Œ0, 1,sothtR is convex set nd the GPF problems (6) nd (7) become convex [27]. The method of Lgrnge multipliers cn be used to solve the GPF problems. 4. DISTRIBUTED TWO-HOP PROPORTIONAL FAIR RESOURCE ALLOCATION SCHEME IN LONG TERM EVOLUTION ADVANCED NETWORKS In this section, our im is to solve the formulted GPF problem in different two-hop trnsmission protocols. 268 Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd.

6 Using distributed rchitecture, the GPF problem cn be decomposed into two sub-problems, tht is, resource portioning problem with given scheduling results nd resource scheduling problem considering the nown twohop resource segments Adptive proportionl fir resource prtitioning with given resource scheduling results According to the findings in [2,4] nd the system model defined in this pper, the throughput of UE m in PF scheduler cn be pproximted by its verge dt rte per PRB, the verge llocted PRB number nd PF scheduling gin G m, compred with the round-robin scheduling. R m G m, jn j jm j Nr m, (8) where G m, depends on the chnnel sttes of ll the UEs in the scheduler nd is irrelevnt of the PRB number to be scheduled. In [18,19], the resource prtitioning problems in the OTH nd STH trnsmission protocols re simplified into PRB number-relted logrithmic sum mximistion function through substituting Eqution (8) into Equtions (6) nd (7) mx jm j log N (9) 2K Besides, the reltionship between the bchul PRB numbers nd the ccess PRB numbers cn be derived by substituting Eqution (8) to constrint C1 or c1. A bchul -to-ccess rtio is defined for every RN s D P N b m2m N D G m, Nr m, (10) jm jr 0, where indictes the rtio of the dt rtes per PRB of the bchul lin to the ggregte ccess lins of RN. Note tht the bchul-to-ccess rtios cn be estimted by the previous verge dt rtes. Two dptive resource prtitioning lgorithms in the OTH nd STH protocols hve been proposed in [18,19]. However, these lgorithms re bsed on the OFDMA networs without considering the integrted subfrme division, which is not prcticl for rely enhnced LTE- Advnced networs. In wht follows, these dptive resource prtitioning lgorithms re djusted for the LTE- Advnced networs, considering the integrted subfrme division indictor with only slight increse in complexity. In the orthogonl two-hop protocol The dptive PF resource prtitioning lgorithm in the OTH protocol is described in the following steps. Step 1: By only considering constrint C2 nd solving (9) by the Lgrnge multiplier lgorithm, perfect resource prtitioning results in the OTH protocol cn be redily derived [18]. N 0 D jm 0 jjn j N D jm jjn j.1 C / D N b, 8 2 K, 0 (11) Step 2: The bchul subfrme number is determined by the minimum integer, which fulfil ll the requirements of bchul PRB D 1, jm jt A 6 1 C 2K, 0 7 (12) where T is the subfrme number in rdio frme nd de mens rounding up to the nerest integer. Step 3: The ccess subfrme number is ensured by clculting. P N 2K, 0 D 1, 8 2 K, 0 (13) 1 T jn j If the is below 1, the lgorithm ends with perfect resource prtitioning results. Otherwise, the imperfect resource prtitioning results will be obtined s N N new D N, b N b D, 8 2 K, 0 new N0 new DjNj.1 C / N 2K, 0 (14) This lgorithm hs low computtion complexity of O.K/, the sme s the lgorithm in [18]. It needs t most 2K bsic resource prtitioning opertions, when there re excessively lrge number of rely UEs occurs, s described in Eqution (13). In the simultneous two-hop protocol Through the following steps, the dptive PF resource prtitioning lgorithm in the STH protocol is described s follows: Step 1: Considering constrint c2 nd function (9), the perfect results cn be redily obtined using the Lgrnge multiplier lgorithm [19] s N 0 D jm 0 jjn j N jm jjn j D D N b, 8 2 K, 0 (15) Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd. 269

7 Step 2: The bchul subfrme number is clculted s the minimum integrted vlue to stisfy the requirements of bchul PRB D 1, T jm j A 6 (16) 2K, 0 7 where de mens rounding up to the nerest integer. Step 3: In order to stisfy the PRB requirements of ccess lins, is clculted s N D, 8 2 K, 0 (17) 1 T jn j where is 1 in the FR pttern, 2/3 in the 2/3 PR pttern nd 1/3 in the 1/3 PR pttern. If of some RNs re more thn, their ccess PRB numbers re fixed t 1 T jn j nd the bchul PRB num- jn j. Then, these bers re clculted s 1 T RNs nd their bchul PRBs re excluded from the SN set K nd the bchul PRB set N b, respectively. Accordingly, the remining PRB number jn j nd the remining UE number re renewed. Step 4: Repet steps 1 nd 3 by substituting the new PRB number jn j nd the new UE number into Eqution (15), until ll the remining RNs fulfil the requirement (17). Therefore, we cn obtin the ccess PRB numbers nd bchul PRB numbers of ll SNs, N nd N b. Compred with the lgorithms in [19], our lgorithm pplies more prcticl subfrme division nd hs the sme mximum complexity. Besides, potentil shorter opertion time cn be chieved by the proposed lgorithm, becuse multiple RNs cn be delt with in prllel in Step 3. Integrl resource segments In the rel LTE-Advnced systems, the ctul PRB number should be integers. Some simple rounding opertions re required. ON D N, 8 2 K ON b D (18) N, 8 2 K, 0 where Πdenotes rounding to the nerest integers no less thn Two-hop proportionl fir resource scheduling problem with given resource segments After hving obtined resource prtitioning results, the resource scheduling sub-problem t ech SN cn be deduced from the GPF problem. Becuse the resource scheduling problem t donor enb cn be solved by the conventionl resource scheduling lgorithm [5], we focus on the resource scheduling problem t RNs, which cn be formulted s mx m2m log n2n m,n r,m,n (19) which is m,n -relted 0-1 integer progrmming problem with certin PRBs. Becuse the ccess PRBs re ssumed to be identicl for the RNs in chnnel fding chrcteristics, the problem is subject to the ccess PRB numbers, which re obtined by the resource prtitioning lgorithms. Becuse the bchul-to-ccess rtios re the vlues determined by the resource scheduling itself, no ccess PRB sizes including cn be directly used to solve the problem. In order to obtin low-complexity resource scheduling lgorithms for the OTH protocol nd the STH protocol, we solve the resource scheduling problem in PRB-by-PRB mnner. In the orthogonl two-hop protocol The two-hop PF resource scheduling problem in the OTH protocol cn be formulted s mx subject to log m,n r,m,n (20) m2m N jm jjn j N b D.1 C / D (21) m,n 1, 8n 2 N (22) m2m m,n 0, 8n 2 N, 8m 2 M (23) The ccess PRB number nd bchul PRB number of ech RN re given in Equtions (11). Both of them re relted with the bchul-to-ccess rtio nd cnnot be directly used in getting the scheduling results. It cn be observed tht the sum of the number of the ccess PRBs nd the number of the bchul PRBs is constnt without ny reltion to. Therefore, constrint bsed on two-hop resources is considered insted of Eqution (21), which is m2m m,n C m,n r,m,n r 0, jm 0jjN j (24) 270 Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd.

8 For the solution of the problem (20) with constrints, Lgrngin function is written s follows: L.,,, / D log m,n r,m,n m2m 2 C 4 jm 0jjN j 3 r,m,n m,n C m,n 5 r m2m 0, 2 3 C n 41 m,n 5 m2m C m,n m,n (25) m2m where,, nd re the Lgrngin multipliers nd nonnegtive numbers to stisfy the KrushKuhnTucer (KKT) conditions. By letting the differentition of L with regrd to m,n equl 0, the following eqution cn be obtined for ech m,n. We cn m,n r,m,n D Pn2N 1 C r,m,n m,nr,m,n r 0, n C m,n D 0 n m,n D 1 C r,m,n r 0, r,m,n r 0, r,m,n Cr 0, P n2n m,nr,m,n! (26) (27) We use,m,n nd,m,n to simplify the forementioned eqution. n m,n D.1 C,m,n /.,m,n / (28),m,n,m,n D r,m,n r 0, (29) D r,m,n 1C,m,n P n2n m,nr,m,n (30) Considering the KKT conditions for the Lgrngin function (25), if the m,n is chosen more thn 0, m,n should be chosen s 0. Unless only one UE is chosen in PRB n with m,n D 1, n should be chosen s 0. For different,m,n, the following expression of m,n cn be derived. 0, if,m,n < m,n D.0, 1, if,m,n (31) In order to round m,n to 0 or 1 nd to gurntee there is only one UE selected for the PRB n, the sub-optiml greedy solution in ech PRB n should be the UE m with the following mximum vlue: m D rg mx M r,m,n r 0, r,m,n Cr 0, P n2n n,mr,m,n (32) By replcing P n,mr,m,n with the history dt rte NR m,.t 1/ of UE m ssocited with RN, distributed two-hop resource scheduling lgorithm for the OTH protocol is proposed s m D rg mx M r,m,n r 0, r,m,n Cr 0, NR m,.t 1/, 8n 2 N (33) After ech time intervl, NR m,.t 1/ is updted s NR m,.t/ D 1 1 NR m,.t 1/C W 1 (34) n,m r,m,n W where W is the verge filter window length. Using the proposed resource scheduling lgorithm, the proportionl firness of end-to-end dt rtes is supposed to be mximised. Thus, bsed on the findings in [2,4], the end-to-end dt rte of ech rely UE cn be pproximted s R m G m, N C N b jm j Nr m, r 0, Nr m, C r 0, (35) where G m, is the scheduling gin of the proposed lgorithm compred with the round-robin scheduling. It cn be seen from the pproximtion in Eqution (35) tht the difference between the end-to-end dt rtes of rely UEs cn be reduced compred with the conventionl single-hop PF scheduling lgorithm. In the simultneous two-hop protocol Bsed on the dptive resource prtitioning in the STH protocol, the two-hop resource scheduling problem for the STH protocol is subject to two independent constrints: mx subject to log m,n r,m,n (36) m2m N 1 jn j (37) T N b jm jjn j (38) m,n D 1, 8n 2 N (39) m2m m,n 1, 8n 2 N, 8m 2 M (40) Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd. 271

9 In order to solve this resource scheduling problem, we consider the Lgrngin function with the KKT conditions L.,,, / D log m,n r,m,n m2m 2 3 C 4 1 jn j m,n 5 T m2m 2 3 C 4 jm 0jjN j r,m,n m,n 5 r m2m 0, 2 3 C n 41 m,n 5 m2m C m,n m,n m2m (41) where,,, nd re the Lgrngin multipliers nd non-negtive numbers to stisfy the KKT conditions. By letting the differentition of L with regrd to m,n equl 0, the following eqution cn be obtined for ech m,n r P,m,n r,m,n n C m,n D 0 m,nr,m,n r 0, (42) If the constrint (38) is not stisfied, cn be ny number no less thn 0. We hve! n m,n D r,m,n r 0, r 0, Pn2N n,mr,m,n (43) Similr to the solution of the resource scheduling problem in the OTH protocol, the chosen UE should mximise the following vlue. r 0, m D rg mx M Pn2N (44) n,mr,m,n If the constrint (38) is stisfied, should be 0 to stisfy the KKT condition. Therefore, the UE should be chosen ccording to the following metric. m D rg mx M r,m,n Pn2N n,mr,m,n (45) In order to solve the PF scheduling problem with two constrints, two-hop schedule-nd-confirm lgorithm with two stges is proposed. Stge 1: The initil scheduling results ccounting for constrint (37) cn be obtined esily through similr procedure in the OTH protocol. As for PRB n, it is scheduled to UE m with the highest rtio of the current dt rte to the history dt rte. m D rg mx M D rg mx M r P,m,n m,n r,m,n r,m,n NR,m.t 1/ (46) nd the preliminry vrible O m,n is set to 1. For those UEs tht re not chosen, O m,n is 0. Stge 2: After ll the ccess PRBs hve been scheduled ccording to (46), they should be confirmed by the scheduling of the bchul PRBs. Becuse of constrint (38) nd.c1/, the ccess PRB n llocted to UE m is confirmed by r 0, m D rg mx P M b n,m r 0, b r (47) D rg mx P 0, M m,n r,m,n where b n,m is the resource lloction vrible in the bchul lins. If the ccess PRB scheduling is confirmed, the finl resource lloction vrible m,n nd the corresponding b n,m re set to 1; otherwise, the confirmtion of the next ccess PRB will begin. Stge 2 repets until the scheduling of ll ccess PRBs re confirmed, or ll the bchul PRBs re scheduled. After ech time intervl, NR m,.t 1/ is updted s NR m,.t/ D 1 1 NR m,.t 1/C W 1 (48) n,m r,m,n W where W is the verge filter window length. Becuse the PF resource scheduling problem in the STH protocol is constrined by the resources of both hops, the end-to-end dt rtes of rely UEs re between two vlues, R Access m nd R Bchul m R Access m, for the two hops. R Bchul m N G m, jm j Nr m, N b jm j r 0, (49) where G m, is the scheduling gin of the conventionl PF scheduling lgorithm compred with the round-robin scheduling lgorithm. The end-to-end dt rtes re closer to which vlue depends on which constrint is stricter. 272 Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd.

10 Figure 4. Cellulr networ lyout nd rely node deployment. Chnnel stte informtion exchnge nlysis By using the distributed resource lloction scheme proposed in this pper, the CSI exchnge between the donor enbs nd the RNs cn be reduced significntly. In the centrlised resource lloction schemes, the chnnel informtion of the rely UEs in ll the PRBs should be trnsmitted to the donor enb periodiclly by ech RN, nd the resource scheduling decision of rely UEs in the ssigned PRBs is trnsmitted to ech RN by the donor enb. In the proposed scheme, only the sum of dt rtes of the ttched rely UEs in the ccess lins should be trnsmitted by ech RN, nd the donor enbs inform the RNs bout the PRBs prtitioned for them. Thus, the occupied resources in the control chnnels of bchul lins by the CSI exchnge using the centrlised scheme re jm j jn j times tht for the proposed distributed scheme. 5. SIMULATION RESULTS According to LTE self-evlution methodology [1], semi-sttic system-level Mtlb simultion pltform is developed to evlute downlin performnce. Using the wrp-round technique, seven 3-sectored mcro cells re generted with fixed numbers of UEs rndomly dropped in them. In ech cell, fixed number of RNs re locted t the cell edge with the sme distnce of hlf of the inter-site distnce from the enb. The simulted networ is illustrted in Figure 4. The detils of simultion prmeters re listed in Tble II. The end-to-end optiml routing strtegy [28] is utilised in this simultion. Ech UE m is connected to SN with the mximum end-to-end dt rte per PRB. SE0, SE,m D rg mx SE0,m, SE0, C SE,m (50) where SE,m represents the estimted verge dt rte per PRB between SN nd UE m, nd SE0, denotes the bchul dt rte per PRB of RN. The OR pttern in the OTH protocol nd the FR, 2/3 PR nd 1/3 PR ptterns in the STH protocol re considered s the scenrios of the performnce evlutions. Although these ptterns hve been mentioned in the previous sections, more detils bout the PRB ssignment in different sectors of mcro cell re illustrted in Figures 2 nd 3. In the OR pttern, the ccess PRBs re ssigned firstly in different sectors to void more inter-cell Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd. 273

11 Tble II. Simultion prmeters. Prmeters Vlues Crrier/bndwidth Subfrme number PRB number UE number Inter-site distnce Trnsmitting power Antenn configurtion Therml noise density Noise figure 2 GHz/FDD 10 MHz 10/rdio frme 50/subfrme 30/sector 500 m enb: 46 dbm RN: 30 dbm enb: 14 dbi, 70 directionl RN: 5 dbi, omni UE: 0 dbi, omni 174 dbm/hz 9 db t UE, 5 db t RN Chnnel model 3GPP cse 1 for rely [1] Log-norml distribution enb-rn: 6 db Shdowing stndrd devitions enb-ue: 8 db RN-UE: 10 db Fst fding model SUI-5 chnnel [29] Trffic model Full buffer AMC scheme 15 levels ccording to [30] PRB, physicl resource bloc; UE, user equipment; AMC, Adptive Modultion nd Coding. interference from the enbs in the djcent cells. In the 2/3 PR nd 1/3 PR ptterns, the ccess PRBs in different sectors re reusing different prts of the whole PRBs to reduce inter-cell interference s well s intr-cell interference. The proposed resource lloction scheme in ech reuse pttern includes two lgorithms: n dptive PF resource prtitioning lgorithm nd n end-to-end proportionl firness bsed resource scheduling lgorithm. Aprt from the PF scheduling scheme without rely, distributed PF resource lloction scheme ws considered for comprison. The distributed PF-bsed dptive resource prtitioning nd the conventionl resource scheduling (ARP + CRS) scheme used in [18,19] is the most vluble benchmr of the proposed scheme. In the ARP + CRS scheme, the resource prtitioning is similr to the proposed scheme, nd the resource scheduling lgorithm of ccess lins is given by m D rg mx M r,m,n NR m,.t 1/, 8n 2 N (51) NR m,.t/ D 1 1 NR m,.t 1/C W 1 (52) n,m r,m,n W where r,m,n is the dt rte in the ccess lins nd W is the verge filter window length. In this simultion, the performnce of ll the UEs in the mcro cell is evluted. The performnce of the rely UEs ttched to the RNs is lso ssessed. Mcro UEs re defined s the UEs in the mcro cell, including the direct UEs nd the rely UEs in the sme mcro cell. The metrics of the evlution include the GPF fctor, the verge UE throughput nd the 5% worst UE throughput. Besides the GPF fctor is required to show the effectiveness of the solutions to the GPF problem in 4, it is commonly used metric [2] to show the trde-off between verge throughput nd Figure 5. Generlised proportionl firness fctor (mcro user equipments) versus rely node number per cell. firness, which is expressed s GPF fctor D 1 m2m log R m (53) The 5% worst UE throughput is the lrgest throughput of the 5% UEs with worst throughputs, s defined in 3GPP stndrd [1]. This metric is lso used to indicte the celledge performnce. Figure 5 shows the GPF fctors using different schemes versus the RN number in the OR, FR, 2/3 PR nd 1/3 PR ptterns. When the number of RNs per cell is 12, the mximum GPF fctor chieved in the OR pttern is lrger thn tht without rely by 0.3 nd by less thn 0.1 in the FR pttern, which is equivlent to gins of 30% nd 10%, respectively. The GPF fctors in the 2/3 PR nd 1/3 PR ptterns re between the fctors in the OR nd FR ptterns. Reduced intr-cell interference leds to lrger GPF fctors in the 1/3 PR pttern thn in the FR pttern. However, less resources for the ccess lins imply less GPF fctor in the 1/3 PR pttern thn in the 2/3 PR pttern, when the RN number per cell is lrge nd mny UEs re ssocited with RNs. In ll ptterns, the proposed scheme outperforms the ARP + CRS scheme in getting better trde-off between throughput nd firness. It lso cn be noticed tht when the resources for the ccess lins re getting less in the 2/3 PR nd 1/3 PR ptterns, the GPF fctor improvement obtined by the proposed scheme is getting less, compred with the FR pttern. This is becuse stricter resource constrints of the ccess lins me the proposed resource scheduling lgorithm in the STH protocol closer to the conventionl PF scheduling lgorithm. In Figure 6, it is illustrted tht long with RN number in ech cell, most of the verge UE throughputs using different schemes rise except the sitution when the number of RN goes up from 9 to 12 per cell in the FR pttern. In the OR pttern, the benchmr scheme cn obtin lrger verge throughput for the UEs thn the proposed scheme. The throughputs chieved by the two schemes cn hrdly be differentited in the FR, 2/3 PR nd 1/3 PR ptterns, 274 Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd.

12 Figure 6. Averge mcro user equipment throughput versus rely node number per cell. Figure 7. 5% worst mcro user equipment throughput versus rely node number per cell. becuse the throughputs of rely UEs re constrined by the bchul PRB numbers ssigned by the common dptive resource prtitioning lgorithm of these two schemes. When the number of RNs in cell is 3, the throughput of the 2/3 PR pttern is lmost the sme s tht in the 1/3 PR pttern. When the number of RNs in cell is 12, the throughput of the 2/3 PR ptter is much lrger thn tht in the 1/3 PR pttern. The throughputs in the 2/3 PR nd 1/3 PR ptterns re significntly more thn those in the FR with ny numbers of RN per cell, becuse of less intr-cell interference between direct lins nd ccess lins. The 5% worst throughputs of Mcro UEs re demonstrted in Figure 7. In the OR pttern, the rpidly incresing 5% worst throughput chieved by the proposed scheme obtins mgnificent gin compred with the vlue chieved by the ARP + CRS scheme, which is lower thn tht of LTE-Advnced networs without rely when the RN number is below 9 per cell. The 5% worst throughputs in the FR pttern re ll less thn tht using the PF scheduling lgorithm without RN, in which the proposed scheme is performing mrginlly better thn the ARP + CRS scheme. The reson of this sitution is tht ll the UEs in the mcro cell re fully reusing ll the PRBs in the ccess subfrmes nd thus re experiencing severe intr-cell interference from the enb nd the RNs. With llevited intr-cell interference in the 2/3 PR nd 1/3 PR ptterns, the 5% worst throughputs re lrger thn the single-hop networs without rely. It cn be observed tht the difference between the proposed scheme nd the ARP + CRS scheme is the smllest in the 1/3 PR pttern. For some UEs ttched to the RNs, their performnce differs from the UEs in the mcro cell. As is displyed in Figure 8, the GPF fctors in the FR pttern re lrger thn those in the OR pttern. The proposed scheme cn chieve more GPF fctors of rely UEs thn the benchmr scheme in both ptterns, nd their difference in the FR pttern is bigger thn tht in the OR pttern. When the RN number is no less thn 12 per cell, the rely UE GPF fctor drops becuse of the ggrvting inter-rn interference brought by the incresing number of RNs. With only 1/3 resources Figure 8. Generlised proportionl firness fctor (rely user equipments) versus rely node number per cell. in the 1/3 PR pttern, the rely UE GPF fctors re less thn those in the FR nd 2/3 PR ptterns, the rely UE GPF fctor gins chieved by the proposed scheme re lso less thn those in the FR nd 2/3 PR ptterns. However, the rely UE GPF fctors re incresed significntly when the RN number per cell grows from 9 to 12, becuse of less intr-cell interference. It cn be observed from Figure 9 tht the verge rely UE throughputs chieved by the proposed scheme nd the ARP + CRS scheme in the FR, 2/3 PR nd 1/3 PR ptterns re lmost identicl nd exceed those in the OR pttern except the 1/3 PR pttern. In the OR pttern, the benchmr hs slightly lrger men rely UE throughput thn the proposed scheme. When the number of RNs is 12 per cell in the FR pttern, the verge UE throughputs fll owing to the sme reson for the GPF fctors. Figure 10 depicts the 5% worst throughput of rely UEs ginst different RN numbers. The 5% worst throughputs increse with more RNs per cell. They re rised shrply in the OR pttern nd slowly in the FR pttern. With more RNs in cell, cell-edge UEs with bd chnnel conditions hve more chnces of choosing one of multiple RNs to Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd. 275

13 Figure 9. Averge rely user equipment throughput versus rely node number per cell. Figure 11. Cumultive distribution function of rely user equipment throughput. lins nd ccess lins in the FR pttern. However, the performnce of rely UEs is better in the FR pttern thn in the OR pttern. With less intr-cell interference nd less resources for the ccess lins in the 1/3 PR pttern, the performnce is better thn tht in the FR pttern using the proposed scheme nd the benchmr scheme. The performnce gin chieved by the proposed scheme compred with the benchmr scheme is smll. As the compromise between the FR nd 1/3 PR ptterns, the 2/3 PR pttern cn chieve better performnce nd significnt performnce gin using the proposed scheme. Figure 10. 5% worst rely user equipment throughput versus rely node number per cell. improve their performnce. However, in the FR pttern, incresing intr-cell interference cused by multiple RNs weens the diversity gin of routing between multiple RNs. When the intr-cell interference decreses, the 5% worst throughputs using the ARP + CRS scheme re better in the 2/3 PR nd 1/3 PR ptterns thn in the FR pttern with smll RN number per cell. Using the proposed scheme with 12 RNs per cell, the 5% worst throughput in the FR pttern is lrger tht in the 2/3 PR nd 1/3 PR ptterns. The cumultive distribution functions of rely UE throughputs with six RNs per cell in the OR nd FR ptterns re shown in Figure 11. For the 40% rely UEs with worst throughputs, they cn chieve better throughputs in the proposed scheme. For the rely UEs with top 20% throughput, the ARP + CRS scheme performs significntly better thn the proposed scheme in the OR pttern but hs no dvntge in the FR pttern. In summry, the proposed resource lloction scheme hs better GPF fctors nd better 5% worst UE throughputs, in different RN numbers for ll the reuse ptterns. The performnce of mcro UEs in the OR pttern is better thn tht in the FR pttern, becuse extr intr-cell interference is generted by reusing the sme PRB in direct 6. CONCLUSIONS The existing distributed PF resource lloction schemes, using the conventionl single-hop PF scheduling lgorithm t RNs, fil to ensure the two-hop end-to-end proportionl firness of rely UEs. This pper proposes distributed resource lloction scheme tht cn chieve better two-hop end-to-end proportionl firness in LTE-Advnced networs with Type I RNs. Our contributions re tht the GPF problem is formulted nd decomposed into two relted sub-problems, tht is, resource prtitioning nd resource scheduling; orthogonl nd STH trnsmission protocols re considered in solving the sub-problems; the existing dptive resource prtitioning lgorithms re djusted for LTE-Advnced networs; nd two lgorithms re proposed for two-hop resource scheduling subject to different resource prtitioning constrints. The simultion results show tht the proposed resource lloction scheme hs better compromise between throughput nd firness. REFERENCES 1. 3GPP TR Evolved Universl Terrestril Rdio Access(E-UTRA) Further dvncements for E-UTRA physicl lyer spects. 276 Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd.

14 2. Borst S. User-level performnce of chnnel-wre scheduling lgorithms in wireless dt networs. IEEE/ACM Trnsctions on Networing 2005; 13(3): Choi JG, Bh S. Cell-throughput nlysis of the proportionl fir scheduler in the single-cell environment. IEEE Trnsctions on Vehiculr Technology 2007; 56(2): Lei L, Lin C, Ci J, Shen. Flow-level performnce of opportunistic OFDM-TDMA nd OFDMA networs. IEEE Trnsctions on Wireless Communictions 2008; 7(12): Kwn R, Leung C, Zhng J. Proportionl fir multiuser scheduling in LTE. IEEE Signl Processing Letters 2009; 16(6): Wng L, Ji Y, Liu F. A semi-distributed resource lloction scheme for OFDMA rely-enhnced downlin systems. In 2008 IEEE Globecom Worshops, New Orlens, LO, 2008; Hn JA, Jeon WS. Proportionl fir scheduling combined with djustment of two hop trnsmission time for rely-ided OFDMA systems. In WCSP Interntionl Conference on Wireless Communictions & Signl Processing, 2009, Nnjing, 2009; Hung L, Rong M, Wng L, ue Y, Schulz E. Resource scheduling for OFDMA/TDD bsed rely enhnced cellulr networs. In WCNC IEEE Wireless Communictions nd Networing Conference, 2007, Kowloon, 2007; Ying W, Tong W, Jing H, Cho S, inmin Y, Ping Z. Adptive rdio resource lloction with novel priority strtegy considering resource firness in OFDM-rely system. In 2007 IEEE 66th Vehiculr Technology Conference, VTC-2007 Fll, Bltimore, MD, 2007; Wng L, Ji Y, Liu F. A novel centrlized resource scheduling scheme in OFDMA-bsed two-hop relyenhnced cellulr systems. In IEEE Interntionl Conference on Wireless nd Mobile Computing Networing nd Communictions, WIMOB 08, Avignon, 2008; Liu C, Qin, Zhng S, Zhou W. Proportionl-fir downlin resource lloction in OFDMA-bsed rely networs. Journl of Communictions nd Networs 2011; 13(6): Sundresn K, Rngrjn S. Adptive resource scheduling in wireless OFDMA rely networs. In 2012 Proceedings IEEE INFOCOM, Orlndo, FL, 2012; Ahn WG, Kim HM. Proportionl fir scheduling in rely enhnced cellulr OFDMA systems. In IEEE 19th Interntionl Symposium on Personl, Indoor nd Mobile Rdio Communictions, PIMRC 2008, Cnnes, 2008; io L, Cuthbert L. A two-hop proportionl firness scheduling lgorithm for rely bsed OFDMA systems. In 4th Interntionl Conference on Wireless Communictions, Networing nd Mobile Computing, WICOM 08, Dlin, 2008; io L, Zhng T, Zhu Y, Cuthbert L. Two-hop subchnnel scheduling nd power lloction for firness in OFDMA rely networs. In Fifth Interntionl Conference on Wireless nd Mobile Communictions, ICWMC 09, Cnnes, L Bocc, 2009; Kneo M, Popovsi P, Hyshi K. Throughputgurnteed resource-lloction lgorithms for relyided cellulr OFDMA system. IEEE Trnsctions on Vehiculr Technology 2009; 58(4): Wng W, Liu J, Li D, u Y. Throughput-bsed dptive resource-lloction lgorithm for OFDMA cellulr system with rely sttions. In 2011 IEEE Globl Telecommunictions Conference (GLOBECOM 2011), Houston, T, USA, 2011; M Z, ing W, Long H, Wng W. Proportionl fir-bsed in-cell routing for rely-enhnced cellulr networs. In 2011 IEEE Wireless Communictions nd Networing Conference (WCNC), Cncun, Quintn Roo, 2011; Wng J, M Z, Lv Z, Sheng Y, ing W. Firnesswre resource prtition nd routing in rely-enhnced orthogonl-frequency-divisionmultiple-ccessing cellulr networs. IET Communictions 2012; 6(16): Li Q, Hu RQ, Qin Y, Wu G. A proportionl fir rdio resource lloction for heterogeneous cellulr networs with relys. In 2012 IEEE Globl Communictions Conference (GLOBECOM), Anheim, CA, 2012; Ju H, Ling B, Li J, Yng. Dynmic joint resource optimiztion for LTE-Advnced rely networs. IEEE Trnsctions on Wireless Communictions 2013; 12(11): Zho Z, Wng J, Redn S, Rf B. Downlin resource lloction for LTE-Advnced networs with Type 1 rely nodes. In 2012 IEEE Vehiculr Technology Conference (VTC Fll), Quebec City, QC, 2012; Arnold P, Rocevic V, Rmos O, Hbermnn J. Algorithms for dptive rdio resource mngement in rely-ssisted LTE-A networs. In 2013 IEEE 77th Vehiculr Technology Conference (VTC Spring),Dresden, 2013; Jeon W, Hn J, Jeong D. Distributed resource lloction for multi-cell rely-ided OFDMA systems. IEEE Trnsctions on Mobile Computing 2013; PP(99): 1 1. Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd. 277

15 25. Rppport TS. Wireless Communictions: Principles nd Prctice (2nd ed.) Prentice Hll PTR: Upper Sddle River, N.J, Kelly FP. Chrging nd rte control for elstic trffic. Europen Trnsctions on Telecommunictions 1997; 8: Wong CY, Cheng RS, Ltief KB, Murch RD. Multiuser OFDM with dptive subcrrier, bit, nd power lloction. IEEE Journl on Selected Ares in Communictions 1999; 17(10): Pr WH, Bh S. Resource mngement policies for fixed relys in cellulr networs. Computer Communictions 2009; 32(4): Erceg V, Hri KVS, Smith MS. Chnnel models for fixed wireless pplictions. Technicl Report, IEEE c-01/29r Iuno JC, Wrulich M, Rupp M. System level simultion of LTE networs. In 2010 IEEE 71st Vehiculr Technology Conference (VTC 2010-Spring), Tipei, 2010;1 5. AUTHORS BIOGRAPHIES Chen Sun ws born on 24 My He received his BEng from Beijing University of Posts nd Telecommunictions (BUPT) in 2006 nd his MEng in 2009 lso from BUPT. He is now studying for his PhD degree under the supervision of Dr. iojun Wng in the School of Electronic Engineering of Dublin City University from His reserch interests include rdio resource mngement, rely nd heterogeneous networ. Weidong Wng ws born on 23 Mrch He got his PhD degree from Beijing University of Posts nd Telecommunictions in He is now the professor nd deputy director of Informtion nd Electronics Technology Lb in Beijing University of Posts nd Telecommunictions. He tes the role of expert of Ntionl Nturl Science Foundtion nd member of Chin Assocition of Communiction. His reserch focuses on Rdio Resource Mngement in Telecommuniction System, Internet of Things, Intelligent Trnsporttion, Cognitive Rdio nd Mobile Terminls. Yinghi Zhng got his PhD degree from Beijing University of Posts nd Telecommunictions in He is now full professor of Beijing University of Posts nd Telecommunictions. He lso tes the role of Chirmn of the Acdemic Committee of BUPT. His reserch res include Mobile/Wireless communictions, Communiction networs nd Internet of Things. He hs been engged in plenty of Ntionl nd Interntionl projects nd hs published more thn 40 cdemic ppers nd five cdemic boos. He ws honored to be the Chirmn of ICCTA2009 nd ICCTA2011 funded by IEEE nd IET. iojun Wng received his BEng in Computer nd Communictions from Beijing University of Posts nd Telecommunictions (BUPT) in Chin in 1984 nd his MEng in computer pplictions in 1987 lso from BUPT. iojun ws employed s ssistnt lecturer/lecturer in BUPT from 1987 to He received his PhD from Stffordshire University in 1993 for reserch in the re of high level logic synthesis. He joined the School of Electronic Engineering of Dublin City University s n ssistnt lecturer in November 1992, becme permnent stff in 1995 nd is now senior lecturer. He is the hed of the Networ Innovtions Center in the Rince Institute. Dr. Wng is interested in the following reserch res: Energy efficient ICT, rdio resource mngement, informtion nd networ security nd FPGA hrdwre ccelertion. 278 Wirel. Commun. Mob. Comput. 2016; 16: John Wiley & Sons, Ltd.

Multi-beam antennas in a broadband wireless access system

Multi-beam antennas in a broadband wireless access system Multi-em ntenns in rodnd wireless ccess system Ulrik Engström, Mrtin Johnsson, nders Derneryd nd jörn Johnnisson ntenn Reserch Center Ericsson Reserch Ericsson SE-4 84 Mölndl Sweden E-mil: ulrik.engstrom@ericsson.com,

More information

Interference Cancellation Method without Feedback Amount for Three Users Interference Channel

Interference Cancellation Method without Feedback Amount for Three Users Interference Channel Open Access Librry Journl 07, Volume, e57 ISSN Online: -97 ISSN Print: -9705 Interference Cncelltion Method without Feedbc Amount for Three Users Interference Chnnel Xini Tin, otin Zhng, Wenie Ji School

More information

Study on SLT calibration method of 2-port waveguide DUT

Study on SLT calibration method of 2-port waveguide DUT Interntionl Conference on Advnced Electronic cience nd Technology (AET 206) tudy on LT clibrtion method of 2-port wveguide DUT Wenqing Luo, Anyong Hu, Ki Liu nd Xi Chen chool of Electronics nd Informtion

More information

Y9.ET1.3 Implementation of Secure Energy Management against Cyber/physical Attacks for FREEDM System

Y9.ET1.3 Implementation of Secure Energy Management against Cyber/physical Attacks for FREEDM System Y9.ET1.3 Implementtion of Secure Energy ngement ginst Cyber/physicl Attcks for FREED System Project Leder: Fculty: Students: Dr. Bruce cillin Dr. o-yuen Chow Jie Dun 1. Project Gols Develop resilient cyber-physicl

More information

MAXIMUM FLOWS IN FUZZY NETWORKS WITH FUNNEL-SHAPED NODES

MAXIMUM FLOWS IN FUZZY NETWORKS WITH FUNNEL-SHAPED NODES MAXIMUM FLOWS IN FUZZY NETWORKS WITH FUNNEL-SHAPED NODES Romn V. Tyshchuk Informtion Systems Deprtment, AMI corportion, Donetsk, Ukrine E-mil: rt_science@hotmil.com 1 INTRODUCTION During the considertion

More information

CHAPTER 2 LITERATURE STUDY

CHAPTER 2 LITERATURE STUDY CHAPTER LITERATURE STUDY. Introduction Multipliction involves two bsic opertions: the genertion of the prtil products nd their ccumultion. Therefore, there re two possible wys to speed up the multipliction:

More information

METHOD OF LOCATION USING SIGNALS OF UNKNOWN ORIGIN. Inventor: Brian L. Baskin

METHOD OF LOCATION USING SIGNALS OF UNKNOWN ORIGIN. Inventor: Brian L. Baskin METHOD OF LOCATION USING SIGNALS OF UNKNOWN ORIGIN Inventor: Brin L. Bskin 1 ABSTRACT The present invention encompsses method of loction comprising: using plurlity of signl trnsceivers to receive one or

More information

High-speed Simulation of the GPRS Link Layer

High-speed Simulation of the GPRS Link Layer 989 High-speed Simultion of the GPRS Link Lyer J Gozlvez nd J Dunlop Deprtment of Electronic nd Electricl Engineering, University of Strthclyde 204 George St, Glsgow G-lXW, Scotlnd Tel: +44 4 548 206,

More information

Synchronous Machine Parameter Measurement

Synchronous Machine Parameter Measurement Synchronous Mchine Prmeter Mesurement 1 Synchronous Mchine Prmeter Mesurement Introduction Wound field synchronous mchines re mostly used for power genertion but lso re well suited for motor pplictions

More information

Energy Harvesting Two-Way Channels With Decoding and Processing Costs

Energy Harvesting Two-Way Channels With Decoding and Processing Costs IEEE TRANSACTIONS ON GREEN COMMUNICATIONS AND NETWORKING, VOL., NO., MARCH 07 3 Energy Hrvesting Two-Wy Chnnels With Decoding nd Processing Costs Ahmed Arf, Student Member, IEEE, Abdulrhmn Bknin, Student

More information

Synchronous Machine Parameter Measurement

Synchronous Machine Parameter Measurement Synchronous Mchine Prmeter Mesurement 1 Synchronous Mchine Prmeter Mesurement Introduction Wound field synchronous mchines re mostly used for power genertion but lso re well suited for motor pplictions

More information

A Slot-Asynchronous MAC Protocol Design for Blind Rendezvous in Cognitive Radio Networks

A Slot-Asynchronous MAC Protocol Design for Blind Rendezvous in Cognitive Radio Networks Globecom 04 - Wireless Networking Symposium A Slot-Asynchronous MAC Protocol Design for Blind Rendezvous in Cognitive Rdio Networks Xingy Liu nd Jing Xie Deprtment of Electricl nd Computer Engineering

More information

Address for Correspondence

Address for Correspondence Mrndn et l., Interntionl Journl of Advnced Engineering Technology E-ISSN 0976-3945 Reserch Pper A LATTICE REDUCTION-AIDED INFORMATION PRECODER FOR MULTIUSER COMMUNICATION SYSTEM S. Mrndn, N. Venteswrn

More information

Temporal Secondary Access Opportunities for WLAN in Radar Bands

Temporal Secondary Access Opportunities for WLAN in Radar Bands The 4th Interntionl Symposium on Wireless Personl Multimedi Communictions WPMC'), Temporl Secondry Access Opportunities for WLAN in Rdr Bnds Miurel Tercero, Ki Won Sung, nd Jens Znder Wireless@KTH, Royl

More information

A Cluster-based TDMA System for Inter-Vehicle Communications *

A Cluster-based TDMA System for Inter-Vehicle Communications * JOURNAL OF INFORMATION SCIENCE AND ENGINEERING 30, 213-231 (2014) A Cluster-bsed TDMA System for Inter-Vehicle Communictions * Deprtment of Electricl Engineering Ntionl Sun Yt-Sen University Kohsiung,

More information

4110 IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, VOL. 66, NO. 5, MAY 2017

4110 IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, VOL. 66, NO. 5, MAY 2017 40 IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, VOL. 66, NO. 5, MAY 07 Trnsmit Power Control for DD-Underlid Cellulr Networs Bsed on Sttisticl Fetures Peng Sun, Kng G. Shin, Life Fellow, IEEE, Hilin Zhng,

More information

Algorithms for Memory Hierarchies Lecture 14

Algorithms for Memory Hierarchies Lecture 14 Algorithms for emory Hierrchies Lecture 4 Lecturer: Nodri Sitchinv Scribe: ichel Hmnn Prllelism nd Cche Obliviousness The combintion of prllelism nd cche obliviousness is n ongoing topic of reserch, in

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 4 Bttery Chrging Methods EXERCISE OBJECTIVE When you hve completed this exercise, you will be fmilir with the different chrging methods nd chrge-control techniques commonly used when chrging Ni-MI

More information

A Novel Back EMF Zero Crossing Detection of Brushless DC Motor Based on PWM

A Novel Back EMF Zero Crossing Detection of Brushless DC Motor Based on PWM A ovel Bck EMF Zero Crossing Detection of Brushless DC Motor Bsed on PWM Zhu Bo-peng Wei Hi-feng School of Electricl nd Informtion, Jingsu niversity of Science nd Technology, Zhenjing 1003 Chin) Abstrct:

More information

On the Prediction of EPON Traffic Using Polynomial Fitting in Optical Network Units

On the Prediction of EPON Traffic Using Polynomial Fitting in Optical Network Units On the Prediction of EP Trffic Using Polynomil Fitting in Opticl Networ Units I. Mmounis (1),(3), K. Yinnopoulos (2), G. Ppdimitriou (4), E. Vrvrigos (1),(3) (1) Computer Technology Institute nd Press

More information

Distance dependent Call Blocking Probability, and Area Erlang Efficiency of Cellular Networks

Distance dependent Call Blocking Probability, and Area Erlang Efficiency of Cellular Networks Distnce dependent Cll Blocking Probbility, nd Are Erlng Efficiency of Cellulr Networks Subhendu Btbyl 1, Suvr Sekhr Ds 1,2 1 G.S.Snyl School of Telecommuniction, Indin Institute of Technology Khrgpur,

More information

Exercise 1-1. The Sine Wave EXERCISE OBJECTIVE DISCUSSION OUTLINE. Relationship between a rotating phasor and a sine wave DISCUSSION

Exercise 1-1. The Sine Wave EXERCISE OBJECTIVE DISCUSSION OUTLINE. Relationship between a rotating phasor and a sine wave DISCUSSION Exercise 1-1 The Sine Wve EXERCISE OBJECTIVE When you hve completed this exercise, you will be fmilir with the notion of sine wve nd how it cn be expressed s phsor rotting round the center of circle. You

More information

Simulation of Transformer Based Z-Source Inverter to Obtain High Voltage Boost Ability

Simulation of Transformer Based Z-Source Inverter to Obtain High Voltage Boost Ability Interntionl Journl of cience, Engineering nd Technology Reserch (IJETR), olume 4, Issue 1, October 15 imultion of Trnsformer Bsed Z-ource Inverter to Obtin High oltge Boost Ability A.hnmugpriy 1, M.Ishwry

More information

Soft-decision Viterbi Decoding with Diversity Combining. T.Sakai, K.Kobayashi, S.Kubota, M.Morikura, S.Kato

Soft-decision Viterbi Decoding with Diversity Combining. T.Sakai, K.Kobayashi, S.Kubota, M.Morikura, S.Kato Softdecision Viterbi Decoding with Diversity Combining T.Ski, K.Kobyshi, S.Kubot, M.Morikur, S.Kto NTT Rdio Communiction Systems Lbortories 2356 Tke, Yokosukshi, Kngw, 2383 Jpn ABSTRACT Diversity combining

More information

Engineer-to-Engineer Note

Engineer-to-Engineer Note Engineer-to-Engineer Note EE-297 Technicl notes on using Anlog Devices DSPs, processors nd development tools Visit our Web resources http://www.nlog.com/ee-notes nd http://www.nlog.com/processors or e-mil

More information

Network-coded Cooperation for Multi-unicast with Non-Ideal Source-Relay Channels

Network-coded Cooperation for Multi-unicast with Non-Ideal Source-Relay Channels This full text pper ws peer reviewed t the direction of IEEE Communictions Society suject mtter experts for puliction in the IEEE ICC 2010 proceedings Network-coded Coopertion for Multi-unicst with Non-Idel

More information

Adaptive Network Coding for Wireless Access Networks

Adaptive Network Coding for Wireless Access Networks Adptive Network Coding for Wireless Access Networks Tun Trn School of Electricl Engineering nd Computer Science Oregon Stte University, Corvllis, Oregon 9733 Emil: trntu@eecs.orst.edu Thinh Nguyen School

More information

Information-Coupled Turbo Codes for LTE Systems

Information-Coupled Turbo Codes for LTE Systems Informtion-Coupled Turbo Codes for LTE Systems Lei Yng, Yixun Xie, Xiowei Wu, Jinhong Yun, Xingqing Cheng nd Lei Wn rxiv:709.06774v [cs.it] 20 Sep 207 Abstrct We propose new clss of informtion-coupled

More information

ABB STOTZ-KONTAKT. ABB i-bus EIB Current Module SM/S Intelligent Installation Systems. User Manual SM/S In = 16 A AC Un = 230 V AC

ABB STOTZ-KONTAKT. ABB i-bus EIB Current Module SM/S Intelligent Installation Systems. User Manual SM/S In = 16 A AC Un = 230 V AC User Mnul ntelligent nstlltion Systems A B 1 2 3 4 5 6 7 8 30 ma 30 ma n = AC Un = 230 V AC 30 ma 9 10 11 12 C ABB STOTZ-KONTAKT Appliction Softwre Current Vlue Threshold/1 Contents Pge 1 Device Chrcteristics...

More information

To provide data transmission in indoor

To provide data transmission in indoor Hittite Journl of Science nd Engineering, 2018, 5 (1) 25-29 ISSN NUMBER: 2148-4171 DOI: 10.17350/HJSE19030000074 A New Demodultor For Inverse Pulse Position Modultion Technique Mehmet Sönmez Osmniye Korkut

More information

Fuzzy Logic Controller for Three Phase PWM AC-DC Converter

Fuzzy Logic Controller for Three Phase PWM AC-DC Converter Journl of Electrotechnology, Electricl Engineering nd Mngement (2017) Vol. 1, Number 1 Clusius Scientific Press, Cnd Fuzzy Logic Controller for Three Phse PWM AC-DC Converter Min Muhmmd Kml1,, Husn Ali2,b

More information

Mixed CMOS PTL Adders

Mixed CMOS PTL Adders Anis do XXVI Congresso d SBC WCOMPA l I Workshop de Computção e Aplicções 14 20 de julho de 2006 Cmpo Grnde, MS Mixed CMOS PTL Adders Déor Mott, Reginldo d N. Tvres Engenhri em Sistems Digitis Universidde

More information

Robustness Analysis of Pulse Width Modulation Control of Motor Speed

Robustness Analysis of Pulse Width Modulation Control of Motor Speed Proceedings of the World Congress on Engineering nd Computer Science 2007 WCECS 2007, October 24-26, 2007, Sn Frncisco, USA obustness Anlysis of Pulse Width Modultion Control of Motor Speed Wei Zhn Abstrct

More information

Solutions to exercise 1 in ETS052 Computer Communication

Solutions to exercise 1 in ETS052 Computer Communication Solutions to exercise in TS52 Computer Communiction 23 Septemer, 23 If it occupies millisecond = 3 seconds, then second is occupied y 3 = 3 its = kps. kps If it occupies 2 microseconds = 2 6 seconds, then

More information

DESIGN OF CONTINUOUS LAG COMPENSATORS

DESIGN OF CONTINUOUS LAG COMPENSATORS DESIGN OF CONTINUOUS LAG COMPENSATORS J. Pulusová, L. Körösi, M. Dúbrvská Institute of Robotics nd Cybernetics, Slovk University of Technology, Fculty of Electricl Engineering nd Informtion Technology

More information

DYE SOLUBILITY IN SUPERCRITICAL CARBON DIOXIDE FLUID

DYE SOLUBILITY IN SUPERCRITICAL CARBON DIOXIDE FLUID THERMAL SCIENCE, Yer 2015, Vol. 19, No. 4, pp. 1311-1315 1311 DYE SOLUBILITY IN SUPERCRITICAL CARBON DIOXIDE FLUID by Jun YAN, Li-Jiu ZHENG *, Bing DU, Yong-Fng QIAN, nd Fng YE Lioning Provincil Key Lbortory

More information

THE explosive traffic demand is challenging current cellular. MmWave Massive MIMO Based Wireless Backhaul for 5G Ultra-Dense Network

THE explosive traffic demand is challenging current cellular. MmWave Massive MIMO Based Wireless Backhaul for 5G Ultra-Dense Network MmWve Mssive MIMO Bsed Wireless Bchul for 5G Ultr-Dense Networ Zhen Go, Linglong Di, De Mi, Zhocheng Wng, Muhmmd Ali Imrn, nd Muhmmd Zeeshn Shir rxiv:508.03940v3 [cs.it] 27 Nov 205 Abstrct Ultr-dense networ

More information

Joanna Towler, Roading Engineer, Professional Services, NZTA National Office Dave Bates, Operations Manager, NZTA National Office

Joanna Towler, Roading Engineer, Professional Services, NZTA National Office Dave Bates, Operations Manager, NZTA National Office . TECHNICA MEMOANDM To Cc repred By Endorsed By NZTA Network Mngement Consultnts nd Contrctors NZTA egionl Opertions Mngers nd Are Mngers Dve Btes, Opertions Mnger, NZTA Ntionl Office Jonn Towler, oding

More information

Experiment 3: Non-Ideal Operational Amplifiers

Experiment 3: Non-Ideal Operational Amplifiers Experiment 3: Non-Idel Opertionl Amplifiers Fll 2009 Equivlent Circuits The bsic ssumptions for n idel opertionl mplifier re n infinite differentil gin ( d ), n infinite input resistnce (R i ), zero output

More information

Signaling-Embedded Preamble Design for Flexible Optical Transport Networks

Signaling-Embedded Preamble Design for Flexible Optical Transport Networks Signling-Embedded Premble Design for Flexible Opticl Trnsport Networks Linglong Di nd Zhocheng Wng Tsinghu Ntionl Lbortory for Informtion Science nd Technology, Deprtment of Electronic Engineering, Tsinghu

More information

Understanding Basic Analog Ideal Op Amps

Understanding Basic Analog Ideal Op Amps Appliction Report SLAA068A - April 2000 Understnding Bsic Anlog Idel Op Amps Ron Mncini Mixed Signl Products ABSTRACT This ppliction report develops the equtions for the idel opertionl mplifier (op mp).

More information

2016 2Q Wireless Communication Engineering. #10 Spread Spectrum & Code Division Multiple Access (CDMA)

2016 2Q Wireless Communication Engineering. #10 Spread Spectrum & Code Division Multiple Access (CDMA) 16 Q Wireless Communiction Engineering #1 Spred Spectrum & Code Division Multiple Access (CDMA Kei Skguchi skguchi@mobile.ee. July 9, 16 Course Schedule ( Dte ext Contents #7 July 15 4.6 Error correction

More information

Section 2.2 PWM converter driven DC motor drives

Section 2.2 PWM converter driven DC motor drives Section 2.2 PWM converter driven DC motor drives 2.2.1 Introduction Controlled power supply for electric drives re obtined mostly by converting the mins AC supply. Power electronic converter circuits employing

More information

Application of Wavelet De-noising in Vibration Torque Measurement

Application of Wavelet De-noising in Vibration Torque Measurement IJCSI Interntionl Journl of Computer Science Issues, Vol. 9, Issue 5, No 3, September 01 www.ijcsi.org 9 Appliction of Wvelet De-noising in Vibrtion orque Mesurement Ho Zho 1 1 Jixing University, Jixing,

More information

Network Sharing and its Energy Benefits: a Study of European Mobile Network Operators

Network Sharing and its Energy Benefits: a Study of European Mobile Network Operators Network Shring nd its Energy Benefits: Study of Europen Mobile Network Opertors Mrco Ajmone Mrsn Electronics nd Telecommunictions Dept Politecnico di Torino, nd Institute IMDEA Networks, mrco.jmone@polito.it

More information

CSI-SF: Estimating Wireless Channel State Using CSI Sampling & Fusion

CSI-SF: Estimating Wireless Channel State Using CSI Sampling & Fusion CSI-SF: Estimting Wireless Chnnel Stte Using CSI Smpling & Fusion Riccrdo Crepldi, Jeongkeun Lee, Rul Etkin, Sung-Ju Lee, Robin Krvets University of Illinois t Urbn-Chmpign Hewlett-Pckrd Lbortories Emil:{rcrepl,rhk}@illinoisedu,

More information

Module 9. DC Machines. Version 2 EE IIT, Kharagpur

Module 9. DC Machines. Version 2 EE IIT, Kharagpur Module 9 DC Mchines Version EE IIT, Khrgpur esson 40 osses, Efficiency nd Testing of D.C. Mchines Version EE IIT, Khrgpur Contents 40 osses, efficiency nd testing of D.C. mchines (esson-40) 4 40.1 Gols

More information

Kirchhoff s Rules. Kirchhoff s Laws. Kirchhoff s Rules. Kirchhoff s Laws. Practice. Understanding SPH4UW. Kirchhoff s Voltage Rule (KVR):

Kirchhoff s Rules. Kirchhoff s Laws. Kirchhoff s Rules. Kirchhoff s Laws. Practice. Understanding SPH4UW. Kirchhoff s Voltage Rule (KVR): SPH4UW Kirchhoff s ules Kirchhoff s oltge ule (K): Sum of voltge drops round loop is zero. Kirchhoff s Lws Kirchhoff s Current ule (KC): Current going in equls current coming out. Kirchhoff s ules etween

More information

Experiment 3: Non-Ideal Operational Amplifiers

Experiment 3: Non-Ideal Operational Amplifiers Experiment 3: Non-Idel Opertionl Amplifiers 9/11/06 Equivlent Circuits The bsic ssumptions for n idel opertionl mplifier re n infinite differentil gin ( d ), n infinite input resistnce (R i ), zero output

More information

Information Caching Strategy for Cyber Social Computing Based Wireless Networks

Information Caching Strategy for Cyber Social Computing Based Wireless Networks Received 4 December 26; revised 23 Februry 27; ccepted 2 April 27. Dte of publiction 28 April 27; dte of current version 6 September 27. Digitl Object Identifier.9/TETC.27.2699695 Informtion Cching Strtegy

More information

Improving synchronized transfers in public transit networks using real-time tactics

Improving synchronized transfers in public transit networks using real-time tactics Improving synchronized trnsfers in public trnsit networks using rel-time tctics Zhongjun Wu 1,2,3, Grhm Currie 3, Wei Wng 1,2 1 Jingsu Key Lbortory of Urbn ITS, Si Pi Lou 2#, Nnjing, 210096, Chin 2 School

More information

Postprint. This is the accepted version of a paper presented at IEEE PES General Meeting.

Postprint.   This is the accepted version of a paper presented at IEEE PES General Meeting. http://www.div-portl.org Postprint This is the ccepted version of pper presented t IEEE PES Generl Meeting. Cittion for the originl published pper: Mhmood, F., Hooshyr, H., Vnfretti, L. (217) Sensitivity

More information

Redundancy Data Elimination Scheme Based on Stitching Technique in Image Senor Networks

Redundancy Data Elimination Scheme Based on Stitching Technique in Image Senor Networks Sensors & Trnsducers 204 by IFSA Publishing, S. L. http://www.sensorsportl.com Redundncy Dt Elimintion Scheme Bsed on Stitching Technique in Imge Senor Networks hunling Tng hongqing Technology nd Business

More information

A Development of Earthing-Resistance-Estimation Instrument

A Development of Earthing-Resistance-Estimation Instrument A Development of Erthing-Resistnce-Estimtion Instrument HITOSHI KIJIMA Abstrct: - Whenever erth construction work is done, the implnted number nd depth of electrodes hve to be estimted in order to obtin

More information

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad

INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigal, Hyderabad Hll Ticket No Question Pper Code: AEC009 INSTITUTE OF AERONAUTICAL ENGINEERING (Autonomous) Dundigl, Hyderd - 500 043 MODEL QUESTION PAPER Four Yer B.Tech V Semester End Exmintions, Novemer - 2018 Regultions:

More information

EET 438a Automatic Control Systems Technology Laboratory 5 Control of a Separately Excited DC Machine

EET 438a Automatic Control Systems Technology Laboratory 5 Control of a Separately Excited DC Machine EE 438 Automtic Control Systems echnology bortory 5 Control of Seprtely Excited DC Mchine Objective: Apply proportionl controller to n electromechnicl system nd observe the effects tht feedbck control

More information

Jamming-Resistant Collaborative Broadcast In Wireless Networks, Part II: Multihop Networks

Jamming-Resistant Collaborative Broadcast In Wireless Networks, Part II: Multihop Networks Jmming-Resistnt ollbortive Brodcst In Wireless Networks, Prt II: Multihop Networks Ling Xio Ximen University, hin 361005 Emil: lxio@xmu.edu.cn Huiyu Di N Stte University, Rleigh, N 27695 Emil: huiyu di@ncsu.edu

More information

BP-P2P: Belief Propagation-Based Trust and Reputation Management for P2P Networks

BP-P2P: Belief Propagation-Based Trust and Reputation Management for P2P Networks BP-PP: Belief Propgtion-Bsed Trust nd Reputtion Mngement for PP Networs Ermn Aydy School of Electricl nd Comp. Eng. Georgi Institute of Technology Atlnt, GA 333, USA Emil: eydy@gtech.edu Frmrz Feri School

More information

Compared to generators DC MOTORS. Back e.m.f. Back e.m.f. Example. Example. The construction of a d.c. motor is the same as a d.c. generator.

Compared to generators DC MOTORS. Back e.m.f. Back e.m.f. Example. Example. The construction of a d.c. motor is the same as a d.c. generator. Compred to genertors DC MOTORS Prepred by Engr. JP Timol Reference: Electricl nd Electronic Principles nd Technology The construction of d.c. motor is the sme s d.c. genertor. the generted e.m.f. is less

More information

Three-Phase Synchronous Machines The synchronous machine can be used to operate as: 1. Synchronous motors 2. Synchronous generators (Alternator)

Three-Phase Synchronous Machines The synchronous machine can be used to operate as: 1. Synchronous motors 2. Synchronous generators (Alternator) Three-Phse Synchronous Mchines The synchronous mchine cn be used to operte s: 1. Synchronous motors 2. Synchronous genertors (Alterntor) Synchronous genertor is lso referred to s lterntor since it genertes

More information

Synchronous Generator Line Synchronization

Synchronous Generator Line Synchronization Synchronous Genertor Line Synchroniztion 1 Synchronous Genertor Line Synchroniztion Introduction One issue in power genertion is synchronous genertor strting. Typiclly, synchronous genertor is connected

More information

(CATALYST GROUP) B"sic Electric"l Engineering

(CATALYST GROUP) Bsic Electricl Engineering (CATALYST GROUP) B"sic Electric"l Engineering 1. Kirchhoff s current l"w st"tes th"t (") net current flow "t the junction is positive (b) Hebr"ic sum of the currents meeting "t the junction is zero (c)

More information

CDMA One. International summer students courses: "Plugged In: Modern Networks and Services in Telecommunication"

CDMA One. International summer students courses: Plugged In: Modern Networks and Services in Telecommunication INTRAROM S.A. ROMANIAN TELECOMMUNICATIONS AND ELECTRONICS INDUSTRY ROMANIA, Buchrest, 17 Fbric de Glucoz St., Sector 2 Cod 72322, Tel:(+40 1) 2040600 Fx:(+40 1) 2040611 http://www.intrrom.ro Interntionl

More information

g Lehrstuhl für KommunikationsTechnik, Lehrst

g Lehrstuhl für KommunikationsTechnik,  Lehrst g Lehrstuhl für Kommunitions, www.kommunitions.org Lehrst R&D@KT Kommunitions Univ.-Prof. Dr.-Ing. hbil. Peter Jung Dr.-Ing. Guido H. Bruc Lehrstuhl für Kommunitions Universität Duisburg-Essen, 47048 Duisburg,

More information

Demand response for aggregated residential consumers with energy storage sharing

Demand response for aggregated residential consumers with energy storage sharing 21 IEEE 4th Annul Conference on Decision nd Control (CDC December 1-18, 21. Os, Jpn Demnd response for ggregted residentil consumers with energy storge shring Kveh Pridri, Alessndr Prisio, Henri Sndberg

More information

BP-P2P: Belief Propagation-Based Trust and Reputation Management for P2P Networks

BP-P2P: Belief Propagation-Based Trust and Reputation Management for P2P Networks 1 9th Annul IEEE Communictions Society Conference on Sensor, Mesh nd Ad Hoc Communictions nd Networs (SECON) BP-PP: Belief Propgtion-Bsed Trust nd Reputtion Mngement for PP Networs Ermn Aydy School of

More information

Lecture 16: Four Quadrant operation of DC Drive (or) TYPE E Four Quadrant chopper Fed Drive: Operation

Lecture 16: Four Quadrant operation of DC Drive (or) TYPE E Four Quadrant chopper Fed Drive: Operation Lecture 16: Four Qudrnt opertion of DC Drive (or) TYPE E Four Qudrnt chopper Fed Drive: Opertion The rmture current I is either positive or negtive (flow in to or wy from rmture) the rmture voltge is lso

More information

2-5-2 Calibration of Dipole Antennas

2-5-2 Calibration of Dipole Antennas 2 Reserch nd Development of Clibrtion Technology 2-5-2 Clibrtion of Dipole Antenns Iwo NISHIYAMA, Kojiro SAKAI, Tsutomu SUGIYAMA, Kouichi SBATA, nd Ktsumi FUJII This pper describes clibrtion method of

More information

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /iet-com.2017.

University of Bristol - Explore Bristol Research. Peer reviewed version. Link to published version (if available): /iet-com.2017. Ameen, A. S., Berrki, D., Doufexi, A., & Nix, A. R. (2018). LTE-Advnced network inter-cell interference nlysis nd mitigtion using 3D nlogue emforming. IET Communictions, 12(13), 1563-1572. DOI: 10.1049/ietcom.2017.0765

More information

Development of an Energy Estimation Algorithm for LTE Mobile Access Networks

Development of an Energy Estimation Algorithm for LTE Mobile Access Networks Development of n Energy Estimtion Algorithm for LTE Mobile Access Networks 1 E. Obi, 2 S. Grb nd 2 S. M. Sni Deprtment of Electricl nd Computer Engineering, Ahmdu Bello University, Zri. Abstrct - This

More information

CS 135: Computer Architecture I. Boolean Algebra. Basic Logic Gates

CS 135: Computer Architecture I. Boolean Algebra. Basic Logic Gates Bsic Logic Gtes : Computer Architecture I Boolen Algebr Instructor: Prof. Bhgi Nrhri Dept. of Computer Science Course URL: www.ses.gwu.edu/~bhgiweb/cs35/ Digitl Logic Circuits We sw how we cn build the

More information

Multipath Mitigation for Bridge Deformation Monitoring

Multipath Mitigation for Bridge Deformation Monitoring Journl of Globl Positioning Systems (22) Vol. 1, No. 1: 25-33 Multipth Mitigtion for Bridge Deformtion Monitoring G. W. Roberts, X. Meng, A. H. Dodson, E. Cosser Institute of Engineering Surveying nd Spce

More information

Soft switched DC-DC PWM Converters

Soft switched DC-DC PWM Converters Soft switched DC-DC PWM Converters Mr.M. Prthp Rju (), Dr. A. Jy Lkshmi () Abstrct This pper presents n upgrded soft switching technique- zero current trnsition (ZCT), which gives better turn off chrcteristics

More information

Energy-efficient scheduling and hybrid communication architecture for underwater littoral surveillance

Energy-efficient scheduling and hybrid communication architecture for underwater littoral surveillance Computer Communictions xxx (26) xxx xxx www.elsevier.com/locte/comcom Energy-efficient scheduling nd hybrid communiction rchitecture for underwter littorl surveillnce Mihel Crdei * Deprtment of Computer

More information

Aggregate Interference from Secondary Users with Heterogeneous Density

Aggregate Interference from Secondary Users with Heterogeneous Density 22nd IEEE Personl Indoor Mobile Rdio Communictions Aggregte Interference from Secondry Users with Heterogeneous Density Miurel Tercero, Ki Won Sung, nd Jens Znder Wireless@KTH, Royl Institute of Technology(KTH),

More information

Kyushu Institute of Technology

Kyushu Institute of Technology Title: Integrted Rescue Service Stellite (IRS-St) Primry Point of Contct (POC): Mohmed Ibrhim Co-uthors: Btsuren Amglnbt, Puline Fure, Kevin Chou Orgniztion:, 1-1 Sensui, Tobt, Kitkyushu 804-8550, Jpn

More information

Design and Modeling of Substrate Integrated Waveguide based Antenna to Study the Effect of Different Dielectric Materials

Design and Modeling of Substrate Integrated Waveguide based Antenna to Study the Effect of Different Dielectric Materials Design nd Modeling of Substrte Integrted Wveguide bsed Antenn to Study the Effect of Different Dielectric Mterils Jgmeet Kour 1, Gurpdm Singh 1, Sndeep Ary 2 1Deprtment of Electronics nd Communiction Engineering,

More information

University of North Carolina-Charlotte Department of Electrical and Computer Engineering ECGR 4143/5195 Electrical Machinery Fall 2009

University of North Carolina-Charlotte Department of Electrical and Computer Engineering ECGR 4143/5195 Electrical Machinery Fall 2009 Problem 1: Using DC Mchine University o North Crolin-Chrlotte Deprtment o Electricl nd Computer Engineering ECGR 4143/5195 Electricl Mchinery Fll 2009 Problem Set 4 Due: Thursdy October 8 Suggested Reding:

More information

MEASURE THE CHARACTERISTIC CURVES RELEVANT TO AN NPN TRANSISTOR

MEASURE THE CHARACTERISTIC CURVES RELEVANT TO AN NPN TRANSISTOR Electricity Electronics Bipolr Trnsistors MEASURE THE HARATERISTI URVES RELEVANT TO AN NPN TRANSISTOR Mesure the input chrcteristic, i.e. the bse current IB s function of the bse emitter voltge UBE. Mesure

More information

Controlling Aggregate Interference under Adjacent Channel Interference Constraint in TV White Space

Controlling Aggregate Interference under Adjacent Channel Interference Constraint in TV White Space Controlling Aggregte Interference under Adjcent Chnnel Interference Constrint in TV White Spce Lei Shi, Ki Won Sung, nd Jens Znder KTH Royl Institute of Technology, Wireless@KTH, Stockholm, Sweden E-mil:

More information

RSS based Localization of Sensor Nodes by Learning Movement Model

RSS based Localization of Sensor Nodes by Learning Movement Model RSS bsed Locliztion of Sensor Nodes by Lerning Movement Model 1 R.ARTHI, 2 P.DEVARAJ, 1 K.MURUGAN 1 Rmnujn Computing Centre, Ann University, Guindy, Chenni, Indi 2 Deprtment of Mthemtics, College of Engineering,

More information

Adaptive VoIP Smoothing of Pareto Traffic Based on Optimal E-Model Quality

Adaptive VoIP Smoothing of Pareto Traffic Based on Optimal E-Model Quality Adptive VoIP Smoothing of Preto Trffic Bsed on Optiml E-Model Qulity Shyh-Fng Hung 1, Eric Hsio-Kung Wu 2, nd Po-Chi Chng 3 1 Deprtment of Electricl Engineering, Ntionl Centrl University, Tiwn hsf@vplb.ee.ncu.edu.tw

More information

Engineer-to-Engineer Note

Engineer-to-Engineer Note Engineer-to-Engineer Note EE-236 Technicl notes on using Anlog Devices DSPs, processors nd development tools Contct our technicl support t dsp.support@nlog.com nd t dsptools.support@nlog.com Or visit our

More information

A Stochastic Geometry Approach to the Modeling of DSRC for Vehicular Safety Communication

A Stochastic Geometry Approach to the Modeling of DSRC for Vehicular Safety Communication A Stochstic Geometry Approch to the Modeling of DSRC for Vehiculr Sfety Communiction Zhen Tong, Student Member, IEEE, Hongsheng Lu 2, Mrtin Henggi, Fellow, IEEE, nd Christin Poellbuer 2, Senior Member,

More information

Domination and Independence on Square Chessboard

Domination and Independence on Square Chessboard Engineering nd Technology Journl Vol. 5, Prt, No. 1, 017 A.A. Omrn Deprtment of Mthemtics, College of Eduction for Pure Science, University of bylon, bylon, Irq pure.hmed.omrn@uobby lon.edu.iq Domintion

More information

CHAPTER 3 AMPLIFIER DESIGN TECHNIQUES

CHAPTER 3 AMPLIFIER DESIGN TECHNIQUES CHAPTER 3 AMPLIFIER DEIGN TECHNIQUE 3.0 Introduction olid-stte microwve mplifiers ply n importnt role in communiction where it hs different pplictions, including low noise, high gin, nd high power mplifiers.

More information

High Speed On-Chip Interconnects: Trade offs in Passive Termination

High Speed On-Chip Interconnects: Trade offs in Passive Termination High Speed On-Chip Interconnects: Trde offs in Pssive Termintion Rj Prihr University of Rochester, NY, USA prihr@ece.rochester.edu Abstrct In this pper, severl pssive termintion schemes for high speed

More information

ISSCC 2006 / SESSION 21 / ADVANCED CLOCKING, LOGIC AND SIGNALING TECHNIQUES / 21.5

ISSCC 2006 / SESSION 21 / ADVANCED CLOCKING, LOGIC AND SIGNALING TECHNIQUES / 21.5 21.5 A 1.1GHz Chrge-Recovery Logic Visvesh Sthe, Jung-Ying Chueh, Mrios Ppefthymiou University of Michign, Ann Aror, MI Boost Logic is chrge-recovery circuit fmily cple of operting t GHz-clss frequencies

More information

Foot-Pedal: Haptic Feedback Human Interface Bridging Sensational Gap between Remote Places

Foot-Pedal: Haptic Feedback Human Interface Bridging Sensational Gap between Remote Places Foot-Pedl: Hptic Feedbck Humn Interfce Bridging Senstionl Gp between Remote Plces Mincheol Kim 1, De-Keun Yoon 2, Shin-Young Kim 1, Ji-Hi Cho 1, Kwng-Kyu Lee 1, Bum-Je You 1,3 1 Center of Humn-centered

More information

9.4. ; 65. A family of curves has polar equations. ; 66. The astronomer Giovanni Cassini ( ) studied the family of curves with polar equations

9.4. ; 65. A family of curves has polar equations. ; 66. The astronomer Giovanni Cassini ( ) studied the family of curves with polar equations 54 CHAPTER 9 PARAMETRIC EQUATINS AND PLAR CRDINATES 49. r, 5. r sin 3, 5 54 Find the points on the given curve where the tngent line is horizontl or verticl. 5. r 3 cos 5. r e 53. r cos 54. r sin 55. Show

More information

Open Access A Novel Parallel Current-sharing Control Method of Switch Power Supply

Open Access A Novel Parallel Current-sharing Control Method of Switch Power Supply Send Orders for Reprints to reprints@enthmscience.e 170 The Open Electricl & Electronic Engineering Journl, 2014, 8, 170-177 Open Access A Novel Prllel Current-shring Control Method of Switch Power Supply

More information

First Round Solutions Grades 4, 5, and 6

First Round Solutions Grades 4, 5, and 6 First Round Solutions Grdes 4, 5, nd 1) There re four bsic rectngles not mde up of smller ones There re three more rectngles mde up of two smller ones ech, two rectngles mde up of three smller ones ech,

More information

Implementation of Different Architectures of Forward 4x4 Integer DCT For H.264/AVC Encoder

Implementation of Different Architectures of Forward 4x4 Integer DCT For H.264/AVC Encoder Implementtion of Different Architectures of Forwrd 4x4 Integer DCT For H.64/AVC Encoder Bunji Antoinette Ringnyu, Ali Tngel, Emre Krulut 3 Koceli University, Institute of Science nd Technology, Koceli,

More information

Investigation of Ground Frequency Characteristics

Investigation of Ground Frequency Characteristics Journl of Electromgnetic Anlysis nd Applictions, 03, 5, 3-37 http://dx.doi.org/0.436/jem.03.58050 Published Online August 03 (http://www.scirp.org/journl/jem) Mohmed Nyel Electricl Engineering Deprtment,

More information

A New Algorithm to Compute Alternate Paths in Reliable OSPF (ROSPF)

A New Algorithm to Compute Alternate Paths in Reliable OSPF (ROSPF) A New Algorithm to Compute Alternte Pths in Relile OSPF (ROSPF) Jin Pu *, Eric Mnning, Gholmli C. Shoj, Annd Srinivsn ** PANDA Group, Computer Science Deprtment University of Victori Victori, BC, Cnd Astrct

More information

Research on Local Mean Decomposition Algorithms in Harmonic and Voltage Flicker Detection of Microgrid

Research on Local Mean Decomposition Algorithms in Harmonic and Voltage Flicker Detection of Microgrid Sensors & Trnsducers 23 by IFSA http://www.sensorsportl.com Reserch on Locl Men Decomposition Algorithms in Hrmonic nd Voltge Flicer Detection of Microgrid Wensi CAO, Linfei LIU School of Electric Power,

More information

Electronic Circuits I - Tutorial 03 Diode Applications I

Electronic Circuits I - Tutorial 03 Diode Applications I Electronic Circuits I - Tutoril 03 Diode Applictions I -1 / 9 - T & F # Question 1 A diode cn conduct current in two directions with equl ese. F 2 When reverse-bised, diode idelly ppers s short. F 3 A

More information

10.4 AREAS AND LENGTHS IN POLAR COORDINATES

10.4 AREAS AND LENGTHS IN POLAR COORDINATES 65 CHAPTER PARAMETRIC EQUATINS AND PLAR CRDINATES.4 AREAS AND LENGTHS IN PLAR CRDINATES In this section we develop the formul for the re of region whose oundry is given y polr eqution. We need to use the

More information

This is a repository copy of Effect of power state on absorption cross section of personal computer components.

This is a repository copy of Effect of power state on absorption cross section of personal computer components. This is repository copy of Effect of power stte on bsorption cross section of personl computer components. White Rose Reserch Online URL for this pper: http://eprints.whiterose.c.uk/10547/ Version: Accepted

More information

Section Thyristor converter driven DC motor drive

Section Thyristor converter driven DC motor drive Section.3 - Thyristor converter driven DC motor drive.3.1 Introduction Controllble AC-DC converters using thyristors re perhps the most efficient nd most robust power converters for use in DC motor drives.

More information