1 The development of the SA grid code on Power Quality emission Dr. Gerhard Botha 2017/08/08

2 Overview What is the Grid Code? What is Power Quality? Power Quality Management Principles Differences Challenges

3 What is the Grid Code? The Grid Code is intended to establish the reciprocal obligations of industry participants around the use of the TS and operation of the interconnected power system (IPS). The Grid Code shall ensure the following: That accountabilities of all parties are defined for the provision of open access to the TS That minimum technical requirements Obligations defined relevant information cost drivers and pricing principles are transparent The Grid Code defines what is understood by non-discrimination through the definition of consistent and transparent principles, criteria and procedures.

4 And the Distribution Code To set the basic rules of connecting to the Distribution System. To ensure that all users of the Distribution System are treated in a nondiscriminatory manner. To specify the technical requirements to ensure the safety and reliability of the Distribution System.

5 What is Power Quality? Any deviation of the voltage waveform from a perfect sinusoid at unity magnitude Voltage regulation Flicker Harmonics Voltage dips Interruptions RVC Three-phase waveforms must be of equal magnitude and separated by 120 Voltage unbalance

6 Background Compatibility between electrical system and equipment NRS 048-series Limits for harmonics, flicker and unbalance, RVCs Dips, interruptions managed 95% of the time at 95% of sites Based on IEC series EN Point of Common Coupling (PCC) Point of Connection (POC)

7 Background continued Apportionment System wide compatibility principles

8 Power Quality Management Utilities Managed through license conditions NRS Power Quality Directive Draft (March 2002) Governance code Responsibilities Processes Customers

9 Management Principles Utility to manage the quality of its product: Limits Planning levels Specify emission limits Communication Customers to manage both their Immunity to QOS deviations Emissions as specified by Utility Immunity and Emissions management applies to Generators/IPPs as well NRS048-2 NRS048-4 IEC /7/13 Contracts / Meetings Equipment manufacturers to provide appropriate equipment

10 Differences What is the difference? Both customers of the wires business Treat the same As far as possible Planning principles

11 Key Requirements 9. Power Quality (1) The following requirements shall apply to all categories of RPPs. (2) Power quality and voltage regulation impact shall be monitored at the POC and shall include an assessment of the impact on power quality from the RPP concerning the following disturbances at the POC: (a) voltage fluctuations: (i) rapid voltage changes (ii) flicker (b) high-frequency currents and voltages: (i) harmonics (ii) inter-harmonics (iii) disturbances greater than 2 khz. (c) unbalanced currents and voltages: (i) deviation in magnitude between three phases (ii) deviation in angle separation from 120 between three phases. (d) RPP will generally follow the supply network frequency: (i) Any attempt by the RPP to change the supply frequency may result in severe distortion of the voltage at the POC, PCC and other points in the network.

12 Key Requirements (3) Power quality and voltage regulation impact shall be monitored at the POC. (4) Voltage and current quality distortion levels emitted by the RPP at the POC shall not exceed the apportioned limits as determined by the relevant NSP. The calculation of these emission levels shall be based on international and local specifications. The allocation shall be fair and transparent. (5) The RPP generator shall ensure that the RPP is designed, configured and implemented in such a way that the specified emission limit values are not exceeded. (6) The maximum allowable voltage change at the POC after a switching operation by the RPP (e.g. of a compensation devices) shall not be greater than 2%. (7) The RPP can assume that the network harmonic impedance at the POC will be less than 3 times the base harmonic impedance for the range of reference fault levels at the POC, i.e. the network harmonic impedance shall not exceed a harmonic impedance of: Z h = 3 V ll 2 S sc h where h is the harmonic number, V is the nominal voltage in kv, and S is the fault level in MVA.

13 Challenges Major differences between South African and European networks Base load generation location Transmission line lengths Overhead vs. underground Use of shunt capacitors Interconnections to other countries Weak networks where significant generators want to connect SCR

14 Differences Commercial Agreements Performance levels Utility to manage risk(s), e.g. impedance envelope Current performance vs. Future performance Apportioning RPP emission limits slightly smaller due to additional capacity created by generator IEC series Emissions Expect more emissions at higher frequencies, especially due to typical generator power electronic equipment.

15 Challenges QOS is not an exact science Based on statistically derived values (historic from e.g. Europe) Statistical analysis for comparison Simulation models lack detail Process for temporary exemptions Principles agreed upon Automatic provided no significant risk to NSP

16 Impedance [Ω] Illustration of Three-Times Impedance Clause 6 Where k = 3 Z b = k V ll 2 S sc Three times applies at harmonics Not at fundamental Also see NRS048-4 Double-edged Frequency [Hz] Zb 3*Zb

17 Impedance 95 th Percentile (Busbars V < 132kV, simulated, base case files) Zb (1x) Zb x3 Z_env (proposal) Z_95th (V<=132kV)

18 Single site comparisons Include contingencies

19 Normalised Impedance [Zb(50)=1 ] Generic envelope Zbase 2xZbase 3xZbase Zenv new Z mv95 th Z hv95 th 95th Percentile vs linear impedance Frequency [Hz]

20 Voltage emission, Current emission and Impedance Assuming network impedance at time of connection is similar to Example 2: Current at the 9 th harmonic, less than the emission limit will result in a voltage emission exceedence. Eskom strengthens the network and the impedance becomes similar to Example 1: The current emission at the 37 th exceeded the limit, will now result in a voltage emission exceedence. h V_limit [%] 0.50% 0.10% 0.10% I_limit [A] I_meas [A] V_meas (2) [%] 0.19% 0.16% 0.00% V_meas (1) [%] 0.21% 0.00% 0.15%

21 Power Quality Guideline Included in RPP Grid Code Requirements for RPPs Not NSP / Service Provider Measurement principles IEC Class A 7 days Minimum current harmonic emission limit 0.1 A

22 Power Quality Guideline Explain principles Simulation based compliance Emissions (voltage and current) Resonance conditions created / shifted (simulated network harmonic impedance) Measurement based compliance Emissions (current and voltage) Full compliance No problems detected Partial compliance No serious problems detected, the risk to QOS levels acceptable and the IPP will be allowed to connect or continue to operate while mitigation being implemented Non-compliance Serious problems detected requiring mitigation before connection or further operation

23 Proving Compliance Cigre 468: Review of Disturbance Emission Assessment Techniques Small RPPs < 5 MVA IEC / IEC Group Harmonic Distortion HD IlimitGx = nup h=nlow I limit h 2 Where the lower and upper bounds of the calculation are given as follows (as defined in the RPP Grid Code version 2.9): Harmonic Distortion Group 1: nlow = 2 and nup = 13 Harmonic Distortion Group 2: nlow = 14 and nup = 25 Harmonic Distortion Group 3: nlow = 26 and nup = 39 Harmonic Distortion Group 4: nlow = 40 and nup = 50

24 Group Harmonic Distortion

25 Proving Compliance Zero voltage emission Correlation Voltage scaling 3 times impedance

26 Key Requirements 9. Power Quality (1) RPPs of categories A1, A2, A3, and category B with rated power 5MVA shall comply with the requirements as detailed in Appendix 13 - RPP Power Quality Compliance Guideline. (2) The following requirements shall apply to the following RPP categories: (a) Category B with rated power above 5 MVA, (b) All category C RPPs. (3) For grid code compliance the RPP shall monitor and report on power quality using an IEC Class A power quality monitoring device. The reporting will be done to prove compliance at the POC against the NSP requirements specified in the system supply agreements. The power quality parameters to be reported on include: (a) flicker (b) harmonics (c) unbalanced voltages

27 Key Requirements 9. Power Quality (4) Voltage and current quality distortion levels emitted by the RPP at the POC may not exceed the apportioned limits as determined by the relevant NSP. The calculation of these emission levels shall be based on international and local specifications. The allocation shall be fair and transparent. For current harmonics, allowance is made for individual harmonics to exceed specified limits by up to 50%, provided the Group Harmonic Distortion limits for the four bandwidth groupings (specified in Appendix 13: RPP Power Quality Compliance Guideline) are met. (5) Appendix 13 provides guidance to RPP generators on a method to prove compliance to the Power Quality requirements as set out by the NSP. (6) The RPP generator shall ensure that the RPP is designed, configured and implemented in such a way that the specified emission limit values are not exceeded.

28 Key Requirements 9. Power Quality (7) The NSP will manage any voltage harmonic compatibility level exceedances due to the network harmonic impedance at the POC being more than 3 times the base harmonic impedance for the range of reference fault levels at the POC in line with its license conditions. The 3 times base harmonic impedance is calculated using the following equation: Z h = 3 V ll 2 h S sc where h is the harmonic number, V is the nominal voltage (line-to-line) in kv, and S is the fault level in MVA. The angle of the network harmonic impedance is such that the impedance may range from fully inductive to fully capacitive. (8) In order to assist with the maximum resonance of 3 times as per clause (6) above, no RPP may connect equipment, e.g. shunt capacitor banks, that will cause a resonance of more than 3 times at the POC at any frequency.

29 Key Requirements 9. Power Quality (9) The Transmission and Distribution network service providers shall use reasonable endeavours to furnish the RPP with a reliable and continuous connection for the delivery of electrical energy up to the POC. The network operators do not guarantee that the continuity and voltage quality of the connection will always be maintained under all contingencies. It is therefore incumbent upon the RPP to take adequate measures to protect the RPP facility against any losses and/or damage arising from frequency deviations, connection/supply interruptions, voltage variations (including voltage dips), voltage harmonics, voltage flicker, voltage unbalance, voltage swells and transients, undervoltages and overvoltages in the connection. It is also incumbent upon the RPP to take such necessary measures so as not to cause any damage to the TS and DS.

30 Conclusions Significant learning curve Started with customer management principles Adapted (partially) to measurement certainty Guideline available to all Further updates

31

North-West University, 2 Eskom SOC South Africa

North-West University, 2 Eskom SOC South Africa Electricity Supply to Africa and Developing Economies. Challenges and opportunities. Technology solutions and innovations for developing economies Advances in Power Quality Requirements for RPPs MG BOTHA

More information

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs)

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) 1.0 GRID CONNECTION CODE BASIS 1.1 LEGISLATION 1.1.1 The legal basis for this RPP Code (RPP Code) is specified in terms of the [Electricity] Act 2016

More information

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS

GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.9 (July 2016) This document is approved

More information

POWER QUALITY SPECIFICATIONS AND GUIDELINES FOR CUSTOMERS ENGINEERING STANDARDS CITY OF LETHBRIDGE ELECTRIC

POWER QUALITY SPECIFICATIONS AND GUIDELINES FOR CUSTOMERS ENGINEERING STANDARDS CITY OF LETHBRIDGE ELECTRIC CITY OF LETHBRIDGE ELECTRIC ENGINEERING STANDARDS POWER QUALITY SPECIFICATIONS AND GUIDELINES FOR CUSTOMERS The City of Lethbridge acknowledges the use of other utility industry and industry committee

More information

POWER QUALITY AND SAFETY

POWER QUALITY AND SAFETY POWER QUALITY AND SAFETY Date : November 27, 2015 Venue : 40 th IIEE Annual National Convention and 3E XPO 2015 PRESENTATION OUTLINE Power Quality I. INTRODUCTION II. GRID CODE REQUIREMENTS III. ERC RESOLUTION

More information

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax:

POWER CORPORATION. Power Quality. Specifications and Guidelines for Customers. Phone: Fax: POWER CORPORATION Power Quality Specifications and Guidelines for Customers Phone: 403-514-3700 Fax: 403-514-3719 1 GENERAL OVERVIEW........................................ 1.1 WHAT DOES THIS SPECIFICATION

More information

Roadmap For Power Quality Standards Development

Roadmap For Power Quality Standards Development Roadmap For Power Quality Standards Development IEEE Power Quality Standards Coordinating Committee Authors: David B. Vannoy, P.E., Chair Mark F. McGranghan, Vice Chair S. Mark Halpin, Vice Chair D. Daniel

More information

Southern Company Power Quality Policy

Southern Company Power Quality Policy Southern Company Power Quality Policy Alabama Power Georgia Power Gulf Power Mississippi Power i Table of Contents: Southern Company Power Quality Policy SCOPE AND PURPOSE... 1 DEFINITIONS... 2 I. HARMONICS...

More information

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard KENYA STANDARD KS 2236-3:2010 ICS 03.120.10; 91.140.50 Electricity Supply Quality of supply Part 3: Voltage characteristics, compatibility levels, limits and assessment methods BALLOT DRAFT, MAY 2010 KEBS

More information

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management

Target Mchunu and Themba Khoza Eskom Transmission Division, System Operator Grid Code Management GRID CONNECTION CODE FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE ELECTRICITY TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Target Mchunu and Themba Khoza Eskom Transmission

More information

ELECTRICITY ASSOCIATION SERVICES LIMITED 2001

ELECTRICITY ASSOCIATION SERVICES LIMITED 2001 ELECTRICITY ASSOCIATION SERVICES LIMITED 2001 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical,

More information

ELECTRICITY SUPPLY POWER QUALITY AND RELIABILITY Code of Practice

ELECTRICITY SUPPLY POWER QUALITY AND RELIABILITY Code of Practice ICS 29.240:03.120 Zambian Standard ELECTRICITY SUPPLY POWER QUALITY AND RELIABILITY Code of Practice Part 3: Application Guidelines for Enterprises ZAMBIA BUREAU OF STANDARD DATE OF PUBLICATION This Zambian

More information

PQ Monitoring Standards

PQ Monitoring Standards Characterization of Power Quality Events Charles Perry, EPRI Chair, Task Force for PQ Characterization E. R. Randy Collins, Clemson University Chair, Working Group for Monitoring Electric Power Quality

More information

POWER QUALITY REPORT

POWER QUALITY REPORT Power Quality Research Lab., I-7, Wyb. Wyspiaoskiego 27, 50-370 Wrocław, Poland phone +48713202626, fax +48713202006, email: zbigniew.leonowicz@pwr.wroc.pl Facility: XXX POWER QUALITY REPORT Start Monitoring:

More information

Power Quality Requirements for Connection to the Transmission System

Power Quality Requirements for Connection to the Transmission System Power Quality Requirements for Connection to the Transmission System Revision: 1.0 Date: September 2015 Introduction and Purpose of this Document The purpose of this document is to provide clarity to Customers

More information

TS RES - OUTSTANDING ISSUES

TS RES - OUTSTANDING ISSUES TS RES - OUTSTANDING ISSUES This document has been officially issued as DRAFT until the following outstanding issues have been resolved. At that time the document will be officially reissued as the next

More information

Version 2.6 October Comments to this document can be forwarded to:

Version 2.6 October Comments to this document can be forwarded to: GRID CONNECTION CODE REQUIREMENTS FOR RENEWABLE POWER PLANTS (RPPs) CONNECTED TO THE TRANSMISSION SYSTEM (TS) OR THE DISTRIBUTION SYSTEM (DS) IN SOUTH AFRICA Version 2.6 October 2012 Comments to this document

More information

IEEE sion/1547revision_index.html

IEEE sion/1547revision_index.html IEEE 1547 IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces http://grouper.ieee.org/groups/scc21/1547_revi sion/1547revision_index.html

More information

GRID INTERCONNECTION OF EMBEDDED GENERATION. Part 2: Small-scale embedded generation

GRID INTERCONNECTION OF EMBEDDED GENERATION. Part 2: Small-scale embedded generation ISBN 978-0-626-29938-5 NRS 097-2-3:2014 Edition 1 GRID INTERCONNECTION OF EMBEDDED GENERATION Part 2: Small-scale embedded generation Section 3: Simplified utility connection criteria for low-voltage connected

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL SPECIFICATION IEC TS 62749 Edition 1.0 2015-04 colour inside Assessment of power quality Characteristics of electricity supplied by public networks IEC TS 62749:2015-04(en) THIS PUBLICATION IS

More information

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana

RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana RENEWABLE ENERGY SUB-CODE for Distribution Network connected Variable Renewable Energy Power Plants in Ghana JANUARY 2015 i Table of Content PART A: 1 1 Introduction 1 1.1 Scope 1 1.2 Status 1 1.3 Terms

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Aggregated Generating Facilities Technical Requirements Division 502 Technical Applicability 1(1) Section 502.1 applies to: Expedited Filing Draft August 22, 2017 the legal owner of an aggregated generating facility directly connected to the transmission system

More information

Table of Contents. Introduction... 1

Table of Contents. Introduction... 1 Table of Contents Introduction... 1 1 Connection Impact Assessment Initial Review... 2 1.1 Facility Design Overview... 2 1.1.1 Single Line Diagram ( SLD )... 2 1.1.2 Point of Disconnection - Safety...

More information

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017

Grid codes and wind farm interconnections CNY Engineering Expo. Syracuse, NY November 13, 2017 Grid codes and wind farm interconnections CNY Engineering Expo Syracuse, NY November 13, 2017 Purposes of grid codes Grid codes are designed to ensure stable operating conditions and to coordinate the

More information

Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks

Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks 2014 Technical Requirements for Connecting Small Scale PV (sspv) Systems to Low Voltage Distribution Networks This document specifies the technical requirement for connecting sspv to the low voltage distribution

More information

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements

ISO Rules Part 500 Facilities Division 502 Technical Requirements Section Wind Aggregated Generating Facilities Technical Requirements Applicability 1(1) Section 502.1 applies to the ISO, and subject to the provisions of subsections 1(2), (3) and (4) to any: (a) a new wind aggregated generating facility to be connected to the transmission

More information

Wind Power Facility Technical Requirements CHANGE HISTORY

Wind Power Facility Technical Requirements CHANGE HISTORY CHANGE HISTORY DATE VERSION DETAIL CHANGED BY November 15, 2004 Page 2 of 24 TABLE OF CONTENTS LIST OF TABLES...5 LIST OF FIGURES...5 1.0 INTRODUCTION...6 1.1 Purpose of the Wind Power Facility Technical

More information

BED INTERCONNECTION TECHNICAL REQUIREMENTS

BED INTERCONNECTION TECHNICAL REQUIREMENTS BED INTERCONNECTION TECHNICAL REQUIREMENTS By Enis Šehović, P.E. 2/11/2016 Revised 5/19/2016 A. TABLE OF CONTENTS B. Interconnection Processes... 2 1. Vermont Public Service Board (PSB) Rule 5.500... 2

More information

IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces

IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces IEEE PES Boston Chapter Technical Meeting IEEE 1547: Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces P1547 Chair David

More information

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation

DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation DP&L s Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Technical Requirements for Interconnection and Parallel Operation of Distributed Generation Single Phase

More information

Quality of supply regulation in Norway c

Quality of supply regulation in Norway c Quality of supply regulation in Norway c Kjell Sand, Gerd H. Kjølle SINTEF Energy Research Oct. 2005/ Aug. 2006 updated April 2009 SINTEF Energy Research 1 Electrical energy consumption per capita x 1

More information

Power Quality - 1. Introduction to Power Quality. Content. Course. Ljubljana, Slovenia 2013/14. Prof. dr. Igor Papič

Power Quality - 1. Introduction to Power Quality. Content. Course. Ljubljana, Slovenia 2013/14. Prof. dr. Igor Papič Course Power Quality - 1 Ljubljana, Slovenia 2013/14 Prof. dr. Igor Papič igor.papic@fe.uni-lj.si Introduction to Power Quality Content Session 1 Session 2 Session 3 Session 4 1st day 2nd day 3rd day 4th

More information

Harmonic distortion analysis on the MV and LV distribution networks: problems, influencing factors and possible solutions

Harmonic distortion analysis on the MV and LV distribution networks: problems, influencing factors and possible solutions Harmonic distortion analysis on the MV and LV distribution networks: problems, influencing factors and possible solutions Fernando Bastião and Humberto Jorge Department of Electrical Engineering and Computers

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Version 1 (ISSUED) Energy Networks Association Insert presentation title here ENA EREC P28 Issue 2 2018 Key Technical Modifications Grid Code and SQSS Mods Name Position Date

More information

METHOD TO DETERMINE CONTRIBUTION OF THE CUSTOMER AND THE POWER SYSTEM TO THE HARMONIC DISTURBANCE

METHOD TO DETERMINE CONTRIBUTION OF THE CUSTOMER AND THE POWER SYSTEM TO THE HARMONIC DISTURBANCE C I R E D 17 th International Conference on Electricity Distribution Barcelona, 1-15 May 3 METHOD TO DETERMINE CONTRIBUTION OF THE CUSTOMER AND THE POWER SYSTEM TO THE HARMONIC DISTURBANCE Olivier GONBEAU

More information

Power Quality Summary

Power Quality Summary Power Quality Summary This article provides an overview of how voltage harmonic distortion is managed on the distribution network and focuses on the current at future issues surround the connection of

More information

Technical Brief: Flow Direction of Harmonics and High- order Harmonics

Technical Brief: Flow Direction of Harmonics and High- order Harmonics Technical Brief: Harmonics Harmonics are generated by semi- conductor controlled devices in the power supply of equipment as a result of distorted voltage and current waveforms. When the harmonic component

More information

Harmonic control devices. ECE 528 Understanding Power Quality

Harmonic control devices. ECE 528 Understanding Power Quality ECE 528 Understanding Power Quality http://www.ece.uidaho.edu/ee/power/ece528/ Paul Ortmann portmann@uidaho.edu 208-733-7972 (voice) Lecture 12 1 Today Harmonic control devices In-line reactors (chokes)

More information

Emission Limits for Customer Facilities Connected to the Hydro-Québec Transmission System

Emission Limits for Customer Facilities Connected to the Hydro-Québec Transmission System Emission Limits for Customer Facilities Connected to the Hydro-Québec Transmission System Études de réseaux Direction Planification des actifs Hydro-Québec TransÉnergie Original in French dated December

More information

MEASUREMENT CAMPAIGN AND ASSESSMENT OF THE QUALITY OF SUPPLY IN RES AND DG FACILITIES IN SPAIN

MEASUREMENT CAMPAIGN AND ASSESSMENT OF THE QUALITY OF SUPPLY IN RES AND DG FACILITIES IN SPAIN MEASUREMENT CAMPAIGN AND ASSESSMENT OF THE QUALITY OF SUPPLY IN RES AND DG FACILITIES IN SPAIN Eugenio PEREA*, Eduardo ZABALA*, J. Emilio RODRÍGUEZ*, Asier GIL DE MURO*, Hugo GAGO * * * Fundación LABEIN,

More information

Voltage Sags Evaluating Methods, Power Quality and Voltage Sags Assessment regarding Voltage Dip Immunity of Equipment

Voltage Sags Evaluating Methods, Power Quality and Voltage Sags Assessment regarding Voltage Dip Immunity of Equipment s Evaluating Methods, Power Quality and s Assessment regarding Voltage Dip Immunity of Equipment ANTON BELÁŇ, MARTIN LIŠKA, BORIS CINTULA, ŽANETA ELESCHOVÁ Institute of Power and Applied Electrical Engineering

More information

EN 50160:2010 IMPROVEMENTS OF THE REVISED VERSION. TC8X System Aspects of Electricity Supply

EN 50160:2010 IMPROVEMENTS OF THE REVISED VERSION. TC8X System Aspects of Electricity Supply Joint Workshop CEER/ECRB EURELECTRIC on Voltage Quality Monitoring Brussels, 1 st October 2012 EN 50160:2010 IMPROVEMENTS OF THE REVISED VERSION Maurizio Delfanti Politecnico di Milano Dipartimento di

More information

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs

INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES. Technical Requirements for Grid-Tied DERs INTERIM ARRANGEMENTS FOR GRID TIED DISTRIBUTED ENERGY RESOURCES Technical Requirements for Grid-Tied DERs Projects Division 6/29/2017 Contents 1 Definitions and Acronyms... 1 2 Technical Interconnection

More information

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV)

Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) Intermittent Renewable Resources (Wind and PV) Distribution Connection Code (DCC) At Medium Voltage (MV) IRR-DCC-MV 1. Introduction 1 IRR-DCC-MV 2. Scope 1 IRR-DCC-MV 2.1. General 1 IRR-DCC-MV 2.2. Affected

More information

Power Quality Basics. Presented by. Scott Peele PE

Power Quality Basics. Presented by. Scott Peele PE Power Quality Basics Presented by Scott Peele PE PQ Basics Terms and Definitions Surge, Sag, Swell, Momentary, etc. Measurements Causes of Events Possible Mitigation PQ Tool Questions Power Quality Measurement

More information

Insights in the impact of special projects on voltage quality in the HV/EHV networks

Insights in the impact of special projects on voltage quality in the HV/EHV networks Authors: Vladimir Ćuk Konstantinos Tzanakakis Department of Electrical Engineering, Electrical Energy Systems Checked by: prof. J.F.G. (Sjef) Cobben Frans van Erp (Tennet) Date: 05.12.2014. Version: 0.0

More information

Power Conditioning Equipment for Improvement of Power Quality in Distribution Systems M. Weinhold R. Zurowski T. Mangold L. Voss

Power Conditioning Equipment for Improvement of Power Quality in Distribution Systems M. Weinhold R. Zurowski T. Mangold L. Voss Power Conditioning Equipment for Improvement of Power Quality in Distribution Systems M. Weinhold R. Zurowski T. Mangold L. Voss Siemens AG, EV NP3 P.O. Box 3220 91050 Erlangen, Germany e-mail: Michael.Weinhold@erls04.siemens.de

More information

Rationalized User Specification

Rationalized User Specification ICS 91.140.50 NRS 048-4:1999 Edition 1.1 ISBN 0-626-15418-9 (First edition: Incorporating Amendment No. 1:1999) Rationalized User Specification ELECTRICITY SUPPLY QUALITY OF SUPPLY Part 4: Application

More information

STUDY OF THE EFFECTS OF HARMONICS IN THE DESIGN OF TRANSMISSION NETWORK SHUNT COMPENSATORS: NETWORK SIMULATION AND ANALYSIS METHODS

STUDY OF THE EFFECTS OF HARMONICS IN THE DESIGN OF TRANSMISSION NETWORK SHUNT COMPENSATORS: NETWORK SIMULATION AND ANALYSIS METHODS STUDY OF THE EFFECTS OF HARMONICS IN THE DESIGN OF TRANSMISSION NETWORK SHUNT COMPENSATORS: NETWORK SIMULATION AND ANALYSIS METHODS In fulfillment of Master of Science in Electric Power and Energy Systems,

More information

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard

Draft Kenya Standard for Balloting Not to be Cited as Kenya Standard KENYA STANDARD KS 2236-4:2010 ICS 91.140.50 Electricity Supply Quality of supply Part 4: Application guidelines for utilities BALLOT DRAFT, MAY 2010 KEBS 2010 First Edition 2010 TECHNICAL COMMITTEE REPRESENTATION

More information

UNDERSTANDING POWER QUALITY

UNDERSTANDING POWER QUALITY Technical Note No. 1 June 1998 UNDERSTANDING POWER QUALITY This Technical Note describes the range of problems, what causes them, what they affect and what could be done to manage them. Integral Energy,

More information

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at

Use only for doing work with or for BC Hydro. Complete Legal Acknowledgement is at Reviewed: Sergey Kryuchkov Distribution Engineering Scott Merriman Distribution Standards Valentina Dabic Distribution Planning Warren Quan Distribution Operations, FVO Raj Solanki Distribution Engineering

More information

HV / MV / LV electrical network quality analyzers Class A. Communication port: local, modem, integrated Ethernet, multi-point

HV / MV / LV electrical network quality analyzers Class A. Communication port: local, modem, integrated Ethernet, multi-point 2010 MAP Range HV / MV / LV electrical network quality analyzers Class A > Network quality Analyzers PRODUCT ADVANTAGES COMPLIANT with the EN 61000-4-30 standard, Class A DETECTION of the fault LOCATION

More information

Power Quality Evaluation of Electrical Distribution Networks

Power Quality Evaluation of Electrical Distribution Networks Power Quality Evaluation of Electrical Distribution Networks Mohamed Idris S. Abozaed, Suliman Mohamed Elrajoubi Abstract Researches and concerns in power quality gained significant momentum in the field

More information

POWER QUALITY MONITORING - PLANT INVESTIGATIONS

POWER QUALITY MONITORING - PLANT INVESTIGATIONS Technical Note No. 5 January 2002 POWER QUALITY MONITORING - PLANT INVESTIGATIONS This Technical Note discusses power quality monitoring, what features are required in a power quality monitor and how it

More information

Power quality report. A Manufacturing Plant

Power quality report. A Manufacturing Plant Power quality report Prepared for A Manufacturing Plant 6 May 2016 by Dr Angelo De Francesco Power Quality Consultant Page 1 Contents 1 EXECUTIVE SUMMARY... 4 2 INTRODUCTION... 5 2.1 SITE MONITORED...

More information

QUESTION BANK PART - A

QUESTION BANK PART - A QUESTION BANK SUBJECT: EE6005-Power Quality SEM / YEAR: VII SEMESTER / ACADEMIC YEAR 08-09 UNIT I - INTRODUCTION TO POWER QUALITY Terms and definitions: Overloading - under voltage - over voltage. Concepts

More information

T-68 Protecting Your Equipment through Power Quality Solutions

T-68 Protecting Your Equipment through Power Quality Solutions T-68 Protecting Your Equipment through Power Quality Solutions Dr. Bill Brumsickle Vice President, Engineering Nov. 7-8, 2012 Copyright 2012 Rockwell Automation, Inc. All rights reserved. 2 Agenda What

More information

Harmonic filter design for IEC compliance

Harmonic filter design for IEC compliance Harmonic filter design for IEC 61000 compliance Marius Jansen ALSTOM Grid Power System Compensation Brisbane, Australia marius.jansen@alstom.com Abstract The paper 1 provides a guideline for the selection

More information

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK

LIMITS FOR TEMPORARY OVERVOLTAGES IN ENGLAND AND WALES NETWORK LIMITS FOR TEMPORARY OEROLTAGES IN ENGLAND AND WALES NETWORK This document is for internal and contract specific use only. Disclaimer NGG and NGET or their agents, servants or contractors do not accept

More information

APPLICATION NOTE STANDARD EN VOLTAGE CHARACTERISTICS OF ELECTRICITY SUPPLIED BY PUBLIC ELECTRICITY NETWORKS

APPLICATION NOTE STANDARD EN VOLTAGE CHARACTERISTICS OF ELECTRICITY SUPPLIED BY PUBLIC ELECTRICITY NETWORKS APPLICATION NOTE STANDARD EN 50160 VOLTAGE CHARACTERISTICS OF ELECTRICITY SUPPLIED BY PUBLIC ELECTRICITY NETWORKS Antoni Klajn, Marta Bątkiewicz-Pantuła March 2013 ECI Available from www.leonardo-energy.org/node/145851

More information

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 9

The University of New South Wales. School of Electrical Engineering and Telecommunications. Industrial and Commercial Power Systems Topic 9 The University of New South Wales School of Electrical Engineering and Telecommunications Industrial and Commercial Power Systems Topic 9 POWER QUALITY Power quality (PQ) problem = any problem that causes

More information

MEASUREMENT METHODS OF THE CHARACTERISTICS AND TARGET VALUES OF THE VOLTAGE QUALITY SUPPLIED BY HYDRO-QUEBEC SYSTEM

MEASUREMENT METHODS OF THE CHARACTERISTICS AND TARGET VALUES OF THE VOLTAGE QUALITY SUPPLIED BY HYDRO-QUEBEC SYSTEM MEASREMENT METHODS OF THE CHARACTERISTICS AND TARGET VALES OF THE VOLTAGE QALITY SPPLIED BY HYDRO-QEBEC SYSTEM Report no.: IREQ-99-0 Revision #1 This document is a translated version of the French document

More information

HEC-70LCN-350TDAF Rev B

HEC-70LCN-350TDAF Rev B A. Features High Efficiency (Up to 90%). Active Power Factor Correction (Up to 0.96). Isolation Class II. All-Round Protection: OVP/SCP/OPP Fully isolated metal case with IP20 and dry location. Class 2

More information

Generation and Load Interconnection Standard

Generation and Load Interconnection Standard Generation and Load Interconnection Standard Rev. 0A DRAFT Name Signature Date Prepared: Approved: VP Acceptance APEGGA Permit to Practice P-08200 TABLE OF CONTENTS 1.0 INTRODUCTION...5 1.1 Purpose...5

More information

Technical Interconnection Requirements For Transmission Voltage Customers for Service at 60,000 to 287,000 Volts R XX

Technical Interconnection Requirements For Transmission Voltage Customers for Service at 60,000 to 287,000 Volts R XX Technical Interconnection Requirements For Transmission Voltage Customers for Service at 60,000 to 287,000 Volts R XX May 2018 Disclaimer This document provides general technical interconnection requirements

More information

Harmonic Distortion Evaluations

Harmonic Distortion Evaluations Harmonic Distortion Evaluations Harmonic currents produced by nonlinear loads can interact adversely with the utility supply system. The interaction often gives rise to voltage and current harmonic distortion

More information

HARMONIC FILTERS Design for IEC compliance

HARMONIC FILTERS Design for IEC compliance HARMONIC FILTERS Design for IEC 61000 compliance Marius Jansen February 2011 GRID Overview What is a filter Types of harmonic filters What is harmonic compliance Designing for compliance Designing for

More information

1C.4.1 Harmonic Distortion

1C.4.1 Harmonic Distortion 2 1 Ja n 1 4 2 1 J a n 1 4 Vo l.1 -Ge n e r a l;p a r tc-p o we r Qu a lity 1. Scope This handbook section contains of PacifiCorp s standard for harmonic distortion (electrical pollution) control, as well

More information

THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES

THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES THE IMPACT OF NETWORK SPLITTING ON FAULT LEVELS AND OTHER PERFORMANCE MEASURES C.E.T. Foote*, G.W. Ault*, J.R. McDonald*, A.J. Beddoes *University of Strathclyde, UK EA Technology Limited, UK c.foote@eee.strath.ac.uk

More information

Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services

Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services Section 11: Power Quality Considerations Bill Brown, P.E., Square D Engineering Services Introduction The term power quality may take on any one of several definitions. The strict definition of power quality

More information

Aspects of Network Harmonic Impedance Modelling in High Voltage Distribution Networks

Aspects of Network Harmonic Impedance Modelling in High Voltage Distribution Networks Aspects of Network Harmonic Impedance Modelling in High Voltage Distribution Networks Diptargha Chakravorty Indian Institute of Technology Delhi (CES) New Delhi, India diptarghachakravorty@gmail.com Jan

More information

Mitigation of Voltage Sag and Swell using D-STATCOM to improve Power Quality

Mitigation of Voltage Sag and Swell using D-STATCOM to improve Power Quality Mitigation of Voltage Sag and Swell using D-STATCOM to improve Power Quality Deeksha Bansal 1 Sanjeev Kumar Ojha 2 Abstract This paper shows the modelling and simulation procedure for power quality improvement

More information

Power Quality Measurements the Importance of Traceable Calibration

Power Quality Measurements the Importance of Traceable Calibration Power Quality Measurements the Importance of Traceable Calibration H.E. van den Brom and D. Hoogenboom VSL Dutch Metrology Institute, Delft, the Netherlands, hvdbrom@vsl.nl Summary: Standardization has

More information

POWER QUALITY A N D Y O U R B U S I N E S S THE CENTRE FOR ENERGY ADVANCEMENT THROUGH TECHNOLOGICAL I NNOVATION

POWER QUALITY A N D Y O U R B U S I N E S S THE CENTRE FOR ENERGY ADVANCEMENT THROUGH TECHNOLOGICAL I NNOVATION POWER QUALITY A N D Y O U R B U S I N E S S A SUMMARY OF THE POWER QUALITY REPORT PUBLISHED BY THE CENTRE FOR ENERGY ADVANCEMENT THROUGH TECHNOLOGICAL I NNOVATION H YDRO ONE NETWORKS INC SEPTEMBER 2014

More information

Power Quality in High Density Residential Distribution Grids

Power Quality in High Density Residential Distribution Grids Power Quality in High Density Residential Distribution Grids Gustav R. Krüger, Raj M. Naidoo Abstract Research in the field of power quality challenges in distribution grids is gaining a strong foothold.

More information

Recommendations for Harmonic and Power Measurements in Electrical Networks

Recommendations for Harmonic and Power Measurements in Electrical Networks Recommendations for Harmonic and Power Measurements in Electrical Networks Analysis implementation and reporting requirements regarding grid power quality and equipment loads Power Capacitor Division Recommendations

More information

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar

Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar Analysis and modeling of thyristor controlled series capacitor for the reduction of voltage sag Manisha Chadar Electrical Engineering department, Jabalpur Engineering College Jabalpur, India Abstract:

More information

ABB DRIVES Technical guide No. 6 Guide to harmonics with AC drives

ABB DRIVES Technical guide No. 6 Guide to harmonics with AC drives ABB DRIVES Technical guide No. 6 Guide to harmonics with AC drives 2 TECHNICAL GUIDE NO. 6 GUIDE TO HARMONICS WITH AC DRIVES Guide to harmonics This guide is part of ABB s technical guide series, describing

More information

HVDC CAPACITOR COMMUTATED CONVERTERS IN WEAK NETWORKS GUNNAR PERSSON, VICTOR F LESCALE, ALF PERSSON ABB AB, HVDC SWEDEN

HVDC CAPACITOR COMMUTATED CONVERTERS IN WEAK NETWORKS GUNNAR PERSSON, VICTOR F LESCALE, ALF PERSSON ABB AB, HVDC SWEDEN HVDC CAPACITOR COMMUTATED CONVERTERS IN WEAK NETWORKS GUNNAR PERSSON, VICTOR F LESCALE, ALF PERSSON ABB AB, HVDC SWEDEN Summary Capacitor Commutated Converters (CCC) were introduced to the HVDC market

More information

Guidance and Declaration - Electromagnetic Compatibility (EMC) for the Delfi PTS ii Portable Tourniquet System

Guidance and Declaration - Electromagnetic Compatibility (EMC) for the Delfi PTS ii Portable Tourniquet System Guidance and Declaration - Electromagnetic Compatibility (EMC) for the Delfi TS ii ortable Tourniquet System Guidance and manufacturer s declaration electromagnetic emissions The TS ii ortable Tourniquet

More information

Harmonic Planning Levels for Australian Distribution Systems

Harmonic Planning Levels for Australian Distribution Systems Abstract Harmonic Planning Levels for Australian Distribution Systems V.J. Gosbell 1, V.W. Smith 1, D. Robinson 1 and W. Miller 2 1 Integral Energy Power Quality Centre, University of Wollongong 2 Standards

More information

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star.

Phase-phase/phase-neutral: 24/13.8 kv star, 13.8 kv delta, 12/6.9 kv star. Summary Of Interconnection Technical Guidelines for Renewable Energy Systems 0-100 kw under Standard Offer Contract (Extract from JPS Guide to Interconnection of Distributed Generation) This document is

More information

Features. Regulated Converters. RAC01-C RAC02-C 1-2 Watt Single Output RAC0_- C. AC/DC Converter

Features. Regulated Converters. RAC01-C RAC02-C 1-2 Watt Single Output RAC0_- C. AC/DC Converter Features Regulated Converters Description Compact low profile AC-DC power supply mw no load power consumption Class II power supply with kvac isolation Universal input voltage range (~VAC) Low output ripple/noise

More information

INCREASING NETWORK CAPACITY BY OPTIMISING VOLTAGE REGULATION ON MEDIUM AND LOW VOLTAGE FEEDERS

INCREASING NETWORK CAPACITY BY OPTIMISING VOLTAGE REGULATION ON MEDIUM AND LOW VOLTAGE FEEDERS INCREASING NETWORK CAPACITY BY OPTIMISING VOLTAGE REGULATION ON MEDIUM AND LOW VOLTAGE FEEDERS Carter-Brown Clinton Eskom Distribution - South Africa cartercg@eskom.co.za Gaunt CT University of Cape Town

More information

Power Quality Report. A Manufacturing Plant

Power Quality Report. A Manufacturing Plant Power Quality Report Prepared for A Manufacturing Plant 6 May 2016 by Dr Angelo De Francesco Power Quality Consultant CHK Power Quality Pty Ltd Page 1 Contents 1 EXECUTIVE SUMMARY... 4 2 INTRODUCTION...

More information

Generation Interconnection Requirements at Voltages 34.5 kv and Below

Generation Interconnection Requirements at Voltages 34.5 kv and Below Generation Interconnection Requirements at Voltages 34.5 kv and Below 2005 March GENERATION INTERCONNECTION REQUIREMENTS AT 34.5 KV AND BELOW PAGE 1 OF 36 TABLE OF CONTENTS 1. INTRODUCTION 5 1.1. Intent

More information

Research and Trends in Power Quality

Research and Trends in Power Quality Institute of Control and Industrial Electronics Warsaw University of Technology Research and Trends in Power Quality Roman Barlik Institute of Control and Industrial Electronics Warsaw University of Technology

More information

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009

POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 POWER TRANSFORMER SPECIFICATION, DESIGN, QUALITY CONTROL AND TESTING 18 MARCH 2009 Nkosinathi Buthelezi Senior Consultant: Power Transformers and Reactors Presentation Content Standardization of Power

More information

Reliability and Power Quality Indices for Premium Power Contracts

Reliability and Power Quality Indices for Premium Power Contracts Mark McGranaghan Daniel Brooks Electrotek Concepts, Inc. Phone 423-470-9222, Fax 423-470-9223, email markm@electrotek.com 408 North Cedar Bluff Road, Suite 500 Knoxville, Tennessee 37923 Abstract Deregulation

More information

Harmonic resonances due to transmission-system cables

Harmonic resonances due to transmission-system cables International Conference on Renewable Energies and Power Quality (ICREPQ 14) Cordoba (Spain), 8 th to 1 th April, 214 Renewable Energy and Power Quality Journal (RE&PQJ) ISSN 2172-38 X, No.12, April 214

More information

Coupling modes. Véronique Beauvois, Ir Copyright 2015 Véronique Beauvois, ULg

Coupling modes. Véronique Beauvois, Ir Copyright 2015 Véronique Beauvois, ULg Coupling modes Véronique Beauvois, Ir. 2015-2016 General problem in EMC = a trilogy Parameters Amplitude Spectrum Source (disturbing) propagation Coupling modes Victim (disturbed) lightning electrostatic

More information

EMC Aspects of Power Quality

EMC Aspects of Power Quality EMC Aspects of Power Quality Picture or Drawing 20.7 x 8.6 cm From Ohm s Law to Smart Grids Frits J.K. Buesink, Senior Researcher EMC frits.buesink@utwente.nl Power Quality: Phenomena Based (more or less)

More information

50W Constant Current (700mA) Dimming LED Driver

50W Constant Current (700mA) Dimming LED Driver 50W Constant Current (700mA) Dimming LED Driver IZC070-050A-9267C-SA Product Overview The IZC070-050A-9267C-SA operate from a 90-305 Vac input range. This unit will provide up to a 700mA of output current

More information

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE

INTERNATIONAL TELECOMMUNICATION UNION SERIES K: PROTECTION AGAINST INTERFERENCE INTERNATIONAL TELECOMMUNICATION UNION ITU-T K.42 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (05/98) SERIES K: PROTECTION AGAINST INTERFERENCE Preparation of emission and immunity requirements for

More information

An Introduction to Power Quality

An Introduction to Power Quality 1 An Introduction to Power Quality Moderator n Ron Spataro AVO Training Institute Marketing Manager 2 Q&A n Send us your questions and comments during the presentation 3 Today s Presenter n Andy Sagl Megger

More information

HEC-45LTN-45PFAS Rev A

HEC-45LTN-45PFAS Rev A A. Features High Efficiency (Up to 85%). Active Power Factor Correction (Typical 0.96). Isolation Class II. All-Round Protection: OVP/SCP/OPP. Fully isolated plastic case with IP20 and dry location. Class

More information

IMPLICATIONS OF APPLYING DIFFERENT VAR SUPPORT TECHNOLOGIES IN THE ESKOM TRANSMISSION NETWORK WITH PARTICULAR EMPHASIS ON THE LIFECYCLE COST

IMPLICATIONS OF APPLYING DIFFERENT VAR SUPPORT TECHNOLOGIES IN THE ESKOM TRANSMISSION NETWORK WITH PARTICULAR EMPHASIS ON THE LIFECYCLE COST IMPLICATIONS OF APPLYING DIFFERENT VAR SUPPORT TECHNOLOGIES IN THE ESKOM TRANSMISSION NETWORK WITH PARTICULAR EMPHASIS ON THE LIFECYCLE COST Teboho Ken Ramorapeli A research report submitted to the Faculty

More information

II. RESEARCH METHODOLOGY

II. RESEARCH METHODOLOGY Comparison of thyristor controlled series capacitor and discrete PWM generator six pulses in the reduction of voltage sag Manisha Chadar Electrical Engineering Department, Jabalpur Engineering College

More information

Contents. All Rights Reserved

Contents. All Rights Reserved Code of Practice 290 Issue 1 January 2004 Power Quality Contents 1 Introduction 2 Scope 3 Definitions 4 Elements of Power Quality 5 Power Quality Standards 6 Power Quality Measurement Standards 7 Practical

More information