1 POWER SOURCE # POLE MOUNTED SERVICE TRANSFORMER BY POWER HANDHOLE 0/0V, -PHASE, SERVICE CONDUCTORS; -# AWG SERVICE CONDUCTOR AND -# AWG GROUNDED SERVICE CONDUCTOR (NEUTRAL) SERVICE XFMR SECONDARY. A 0V SINGLE PHASE CIRCUIT; TAPPED IN WIRE TROUGH TO SERVICE CONDUCTORS; -# AWG UNGROUNDED CONDUCTOR AND -# AWG GROUNDED CONDUCTOR (NEUTRAL) METER SOCKET BY CONTRACTOR, METER BY POWER : CONTRACTOR TO COORDINATE WITH POWER TO FURNISH APPROVED METER SOCKET N BUSS SERVICE MAIN DISC. LH # SAFTEY SWITCH.0. ITS SERVICE MAIN DISCONNECT: GENERAL DUTY, TWO-POLE S/N, FUSIBLE, SINGLE THROW SAFETY SWITCH; FUSED AT 0 AMPS; SERVICE ENTRANCE RATED; 0V RATED; 00 AMP RATED; 00K AIC RATED; NEMA R PADLOCKABLE ENCLOSURE; BOND ENCLOSURE TO GROUNDED CONDUCTOR (NEUTRAL) WITH # AWG MAIN BONDING JUMPER A A A 0 LOCAL HUB # A B TO LIGHTING LOAD CENTER B SEE LIGHTING PLANS FOR CONTINUATION AND FURTHER DETAILS AUX. # A A B A A 0 POLE MOUNTED SAFETY SWITCH: GENERAL DUTY, TWO-POLE, NON-FUSIBLE, SINGLE THROW SAFETY SWITCH; 0V RATED; 00 AMP RATED; 0K SSCR MIN.; NEMA R PADLOCKABLE ENCLOSURE LIGHTING SERVICE MAIN DISCONNECT: SEE LIGHTING PLANS FOR FURTHER DETAIL # AWG COPPER GROUNDING ELECTRODE CONDUCTOR (COMMON). BOND THE SERVICE GROUNDED CONDUCTOR (NEUTRAL) TO GROUND IN WIRE TROUGH AT NEUTRAL BUSS. # AWG COPPER GROUNDING ELECTRODE CONDUCTOR " X 0' MIN. GROUNDING ELECTRODE (EXTEND OR ADD ADDITIONAL BONDED WITH # AWG TIN PLATED BARE COPPER GROUND WIRE TO ACHIEVE OHMS OR LESS RESISTANCE TO 0V SINGLE PHASE CIRCUIT: CONDUCTOR SIZE AS SHOWN ON PLAN S 0V SINGLE PHASE CIRCUIT: -# AWG AND -# AWG GROUND FOR DETAILS (0K AIC MIN. RATED) FOR DETAILS (0K AIC MIN. RATED) POLE MOUNTED TYPE S CABINET VDC POWER SUPPLY: REFER TO CABINET WIRING DIAGRAMS FOR DETAILS VDC CIRCUIT: /C # AWG TYPE TC CABLE POLE MOUNTED AUXILIARY CABINET NEMA R WIRE TROUGH SIZED PER NEC FILL REQUIREMENTS; CONTAINING " THICK X " WIDE (MIN.) COPPER GROUNDIN TO SERVE AS COMMON GROUNDING ELECTRODE CONDUCTOR. SEE PLANS FOR CONDUCTOR SIZES NOT INDICATED ON THIS.. SEE PLAN S FOR APPROXIMATE LOCATION OF THE SERVICE CONNECTION POINT. COORDINATE WITH POWER FOR THE SERVICE SOURCE AND POINT OF CONNECTION EXACT LOCATIONS.. REFER TO TYPICAL RISER DIAGRAM, AND TYPICAL INSTALLATION DETAILS, FOR FURTHER INFORMATION. THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE G-.00, F.A.C. ALEXANDER TEAL MIMS, P.E. PE No. 0 0 Spring Vista Drive Phone:..0 DeBary, FL Fax:..0 CERTIFICATION OF AUTHORIZATION # SR SEMINOLE IT- //0 ::0 PM Z:\0 Projects\0 (Wekiva Parkway-Section )\CADD\0000\ITS\ssdtit0.dg

2 POWER SOURCE # POLE MOUNTED SERVICE TRANSFORMER BY POWER 0/0V, -PHASE, UNDERGROUND SERVICE CONDUCTORS; -# AWG SERVICE CONDUCTOR AND -# AWG GROUNDED SERVICE CONDUCTOR (NEUTRAL) HANDHOLE A 0V SINGLE PHASE CIRCUIT; TAPPED IN WIRE TROUGH TO SERVICE CONDUCTORS; -# AWG UNGROUNDED CONDUCTORS AND -# AWG GROUNDED CONDUCTOR (NEUTRAL) SERVICE XFMR SECONDARY. METER SOCKET BY CONTRACTOR, METER BY POWER : CONTRACTOR TO COORDINATE WITH POWER TO FURNISH APPROVED METER SOCKET N BUSS SERVICE MAIN DISC. LH # SAFTEY SWITCH. 0. LH # XFMR SECONDARY 0.0 ITS SERVICE MAIN DISCONNECT: GENERAL DUTY, TWO-POLE S/N, FUSIBLE, SINGLE THROW SAFETY SWITCH; FUSED AT 0 AMPS; SERVICE ENTRANCE RATED; 0V RATED; 00 AMP RATED; 00K AIC RATED; NEMA R PADLOCKABLE ENCLOSURE; BOND ENCLOSURE TO GROUNDED CONDUCTOR (NEUTRAL) WITH # AWG MAIN BONDING JUMPER A POLE MOUNTED SAFTEY SWITCH: GENERAL DUTY, TWO-POLE, FUSIBLE, SINGLE THROW; FUSED AT 0 AMPS; 0V RATED; 00 AMP RATED; 0K AIC MIN. RATED; NEMA R PADLOCKABLE ENCLOSURE A B LIGHTING SERVICE MAIN DISCONNECT: SEE LIGHTING PLANS FOR FURTHER DETAIL A B A 0 LOCAL HUB # A B TO LIGHTING LOAD CENTER D SEE LIGHTING PLANS FOR CONTINUATION AND FURTHER DETAILS AUX. # A A A 0 # AWG COPPER GROUNDING ELECTRODE CONDUCTOR (COMMON). BOND THE SERVICE GROUNDED CONDUCTOR (NEUTRAL) TO GROUND IN WIRE TROUGH AT NEUTRAL BUSS. # AWG COPPER GROUNDING ELECTRODE CONDUCTOR " X 0' MIN. GROUNDING ELECTRODE (EXTEND OR ADD ADDITIONAL BONDED WITH # AWG TIN PLATED BARE COPPER GROUND WIRE TO ACHIEVE OHMS OR LESS RESISTANCE TO 0V SINGLE PHASE CIRCUIT: CONDUCTOR SIZE AS SHOWN ON PLAN S 0V SINGLE PHASE CIRCUIT: -# AWG AND -# AWG GROUND B 0V SINGLE PHASE CIRCUIT: -# AWG AND -# AWG GROUND FOR DETAILS (0K AIC MIN. RATED) FOR DETAILS (0K AIC MIN. RATED) POLE MOUNTED TYPE S CABINET VDC POWER SUPPLY: REFER TO CABINET WIRING DIAGRAMS FOR DETAILS VDC CIRCUIT: /C # AWG TYPE TC CABLE POLE MOUNTED AUXILIARY CABINET KVA POLE MOUNTED DRY TYPE OUTDOOR TRANSFORMER: 0x0V PRIMARY AND 0/0V SECONDARY; NEMA R ENCLOSURE; BOND TRANSFORMER SECONDARY TO EFFECTIVE GROUND-FAULT CURRENT PATH PER NEC REQUIREMENTS; REFER TO WIRING DIAGRAMS FOR FURTHER DETAIL NEMA R WIRE TROUGH SIZED PER NEC FILL REQUIREMENTS; CONTAINING " THICK X " WIDE (MIN.) COPPER GROUNDIN TO SERVE AS COMMON GROUNDING ELECTRODE CONDUCTOR. SEE PLANS FOR CONDUCTOR SIZES NOT INDICATED ON THIS.. SEE PLAN S FOR APPROXIMATE LOCATION OF THE SERVICE CONNECTION POINT. COORDINATE WITH POWER FOR THE SERVICE SOURCE AND POINT OF CONNECTION EXACT LOCATIONS.. REFER TO TYPICAL RISER DIAGRAM, AND TYPICAL INSTALLATION DETAILS, FOR FURTHER INFORMATION. THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE G-.00, F.A.C. ALEXANDER TEAL MIMS, P.E. PE No. 0 0 Spring Vista Drive Phone:..0 DeBary, FL Fax:..0 CERTIFICATION OF AUTHORIZATION # SR SEMINOLE IT- n //0 ::0 PM Z:\0 Projects\0 (Wekiva Parkway-Section )\CADD\0000\ITS\ssdtit0.dg

3 POWER SOURCE # POLE MOUNTED SERVICE TRANSFORMER BY POWER 0/0V SINGLE PHASE CIRCUIT: CONDUCTOR SIZE AS SHOWN ON PLAN S AND WIRING DIAGRAMS HANDHOLE 0/0V, -PHASE, SERVICE CONDUCTORS; -#/0 AWG SERVICE CONDUCTOR AND -#/0 AWG GROUNDED SERVICE CONDUCTOR (NEUTRAL) A 0V SINGLE PHASE CIRCUIT: CONDUCTOR SIZE AS SHOWN PLAN S METER SOCKET BY CONTRACTOR, METER BY POWER : CONTRACTOR TO COORDINATE WITH POWER TO FURNISH APPROVED METER SOCKET 0 SERVICE XFMR SECONDARY. SERVICE MAIN DISC.. POLE MOUNTED SERVICE MAIN DISCONNECT: GENERAL DUTY, TWO-POLE S/N, FUSIBLE, SINGLE THROW SAFETY SWITCH; FUSED AT AMPS; SERVICE ENTRANCE RATED; 0V RATED; 00 AMP RATED; 00K AIC RATED; NEMA R PADLOCKABLE ENCLOSURE POLE MOUNTED NEMA R RATED LOCKABLE OUTDOOR PANELBOARD ENCLOSURE; REFER TO PANELBOARD SCHEDULE FOR FURTHER DETAILS FOR DETAILS (0K AIC MIN. RATED) FOR DETAILS (0K AIC MIN. RATED) GROUND MOUNTED TYPE CABINET PANELBOARD A LOCAL HUB # DMS - DMS - DMS LOAD CENTER DMS - ENCLOSURE VOLTAGE: 0/0 PHASE: WIRES: A PANELBOARD A PANELBOARD A SCHEDULE CKT CKT NAME CONNECTED EQUIP. TRIP POLES A B POLES TRIP CKT NAME CONNECTED EQUIP. CKT -A LH. #, AUX. # 0. KVA. KVA 0 -B DMS - -C DMS - 0. KVA. KVA B KVA 0 LOAD PER 0V LEG: TOTAL LOAD: TOTAL 0V: 0. KVA. KVA. A. KVA -A -C A " X 0' MIN. GROUNDING ELECTRODE (EXTEND OR ADD ADDITIONAL BONDED WITH # AWG TIN PLATED BARE COPPER GROUND WIRE TO ACHIEVE OHMS OR LESS RESISTANCE TO # AWG COPPER GROUNDING ELECTRODE CONDUCTOR. BOND THE SERVICE NEUTRAL TO GROUND AT SERVICE MAIN DISCONNECT. # AWG COPPER GROUNDING ELECTRODE CONDUCTOR A DMS LOAD CENTER DMS - ENCLOSURE MAINS TYPE: BREAKER MAIN CB: A AIC:,000 A 0 LOCAL HUB # A AUX. # VDC POWER SUPPLY: REFER TO CABINET WIRING DIAGRAMS FOR DETAILS VDC CIRCUIT: /C # AWG TYPE TC CABLE POLE MOUNTED AUXILIARY CABINET. SEE PLANS FOR CONDUCTOR SIZES NOT INDICATED ON THIS.. SEE PLAN S FOR APPROXIMATE LOCATION OF THE SERVICE CONNECTION POINT. COORDINATE WITH POWER FOR THE SERVICE SOURCE AND POINT OF CONNECTION EXACT LOCATIONS.. REFER TO TYPICAL RISER DIAGRAM, AND TYPICAL INSTALLATION DETAILS, FOR FURTHER INFORMATION. A THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE G-.00, F.A.C. ALEXANDER TEAL MIMS, P.E. PE No. 0 0 Spring Vista Drive Phone:..0 DeBary, FL Fax:..0 CERTIFICATION OF AUTHORIZATION # SR SEMINOLE IT- n //0 ::0 PM Z:\0 Projects\0 (Wekiva Parkway-Section )\CADD\0000\ITS\ssdtit0.dg

4 POWER SOURCE # POLE MOUNTED SERVICE TRANSFORMER BY POWER 0/0V, -PHASE, SERVICE CONDUCTORS; -# AWG SERVICE CONDUCTOR AND -# AWG GROUNDED SERVICE CONDUCTOR (NEUTRAL) VOLTAGE: 0/0 PHASE: WIRES: PANELBOARD B SCHEDULE 0 PANELBOARD B D LOCAL HUB # CKT CKT NAME CONNECTED EQUIP. TRIP POLES A B POLES TRIP CKT NAME CONNECTED EQUIP. CKT -A LH. # 0. KVA 0. KVA 0 -B LH. #, AUX. # -C SPD 0 SPD 0. KVA A A A LOCAL HUB # 0 LOAD PER 0V LEG: TOTAL LOAD: TOTAL 0V: SPD 0. KVA -A -C.00 KVA. A 0. KVA HANDHOLE -B B MAINS TYPE: BREAKER MAIN CB: 00 A AIC:,000 A C A SERVICE XFMR SECONDARY. PANELBOARD B LH # SAFTEY SWITCH AUX. #.. LH # SAFTEY SWITCH 0.0 LH # XFMR SECONDARY 0. A A A B C 0 # AWG COPPER GROUNDING ELECTRODE CONDUCTOR. BOND THE SERVICE NEUTRAL TO GROUND IN MAIN SERVICE PANEL. # AWG COPPER GROUNDING ELECTRODE CONDUCTOR 0V SINGLE PHASE CIRCUIT: CONDUCTOR SIZE AS SHOWN ON PLAN S 0V SINGLE PHASE CIRCUIT: -# AWG AND -# AWG GROUND 0V SINGLE PHASE CIRCUIT: CONDUCTOR SIZE AS SHOWN ON PLAN S 0V SINGLE PHASE CIRCUIT: -# AWG AND -# AWG GROUND D 0V SINGLE PHASE CIRCUIT: -# AWG AND -# AWG GROUND A FOR DETAILS (0K AIC MIN. RATED) FOR DETAILS (0K AIC MIN. RATED) POLE MOUNTED TYPE S CABINET VDC POWER SUPPLY: REFER TO CABINET WIRING DIAGRAMS FOR DETAILS POLE MOUNTED AUXILIARY CABINET METER SOCKET BY CONTRACTOR, METER BY POWER : CONTRACTOR TO COORDINATE WITH POWER TO FURNISH APPROVED METER SOCKET POLE MOUNTED MAIN SERVICE PANEL: POLE MOUNTED NEMA R RATED LOCKABLE OUTDOOR SERVICE ENTRANCE RATED PANELBOARD ENCLOSURE; REFER TO PANELBOARD SCHEDULE FOR FURTHER DETAILS " X 0' MIN. GROUNDING ELECTRODE (EXTEND OR ADD ADDITIONAL BONDED WITH # AWG TIN PLATED BARE COPPER GROUND WIRE TO ACHIEVE OHMS OR LESS RESISTANCE TO POLE MOUNTED SAFETY SWITCH: GENERAL DUTY, TWO-POLE, FUSIBLE, SINGLE THROW; FUSED AT 0 AMPS; 0V RATED; 00 AMP RATED; 0K AIC MIN. RATED; NEMA R PADLOCKABLE ENCLOSURE POLE MOUNTED SAFETY SWITCH: GENERAL DUTY, TWO-POLE, NON-FUSIBLE, SINGLE THROW; 0V RATED; 00 AMP RATED; 0K SSCR MIN.; NEMA R PADLOCKABLE ENCLOSURE VDC CIRCUIT: /C # AWG TYPE TC CABLE KVA POLE MOUNTED DRY TYPE OUTDOOR TRANSFORMER: 0x0V PRIMARY AND 0/0V SECONDARY; NEMA R ENCLOSURE; BOND TRANSFORMER SECONDARY TO EFFECTIVE GROUND-FAULT CURRENT PATH PER NEC REQUIREMENTS; REFER TO WIRING DIAGRAMS FOR FURTHER DETAIL. SEE PLANS FOR CONDUCTOR SIZES NOT INDICATED ON THIS.. SEE PLAN S FOR APPROXIMATE LOCATION OF THE SERVICE CONNECTION POINT. COORDINATE WITH POWER FOR THE SERVICE SOURCE AND POINT OF CONNECTION EXACT LOCATIONS.. REFER TO TYPICAL RISER DIAGRAM, AND TYPICAL INSTALLATION DETAILS, FOR FURTHER INFORMATION. THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE G-.00, F.A.C. ALEXANDER TEAL MIMS, P.E. PE No. 0 0 Spring Vista Drive Phone:..0 DeBary, FL Fax:..0 CERTIFICATION OF AUTHORIZATION # SR SEMINOLE IT- n //0 ::0 PM Z:\0 Projects\0 (Wekiva Parkway-Section )\CADD\0000\ITS\ssdtit0.dg

5 POLE SERVICE POINT RISER DIAGRAM POWER SOURCE: & N.T.S. CONCRETE POLE PRESTRESSED TYPE P-II, ' LONG ( PER FDOT INDEX 0) XFM R METER SOCKET METER GALV. STEEL U-CHANNEL (TYP.) SIZE " MIN. SERVICE TRANSFORMER RISER NEMA R WIRE TROUGH (SIZE PER NEC FILL REQUIREMENTS) LIGHTING MAIN SERVICE DISCONNECT (SEE LIGHTING PLANS FOR FURTHER DETAIL) HANDHOLE STRAPS (TYP.) POINT OF SERVICE. SEE NOTE. FROM SERVICE (SIZE AND MATERIAL) PER POWER REQUIREMENTS. SERVICE INSTALLATION SHALL MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE (NEC), NATIONAL ELECTRIC SAFTEY CODE (NESC), AND APPLICABLE LOCAL CODES.. CONTRACTOR TO COORDINATE EXACT POINT AND MEANS OF CONNECTION WITH POWER COMPANIES PRIOR TO CONSTRUCTING SERVICE ASSEMBLIES.. THE LIGHTNING ARRESTER CAN BE LOCATED ON THE SIDE OR BOTTOM OF THE SERVICE DISCONNECT ENCLOSURE AT THE CONTRACTOR'S OPTION.. MEET ALL GROUNDING REQUIREMENTS OF SECTION 0 OF THE STANDARD SPECIFICATIONS.. THE MAIN SERVICE DISCONNECTS SHALL BE LOCKABLE BY PADLOCK AND FOUR KEYS PROVIDED TO THE MAINTAINING AGENCY. THE DOOR SHALL HAVE A MINIMUM OF THREE HINGES AND BE LOCKABLE. NO SCREWS TO BE USED TO ATTACH DOOR.. ALL SERVICE EQUIPMENT ENCLOSURES SHALL BE NEMA R OR BETTER RATED. WEATHER TIGHT HUBS SHALL BE USED AT LOCATIONS WHERE S ATTACH TO ENCLOSURES.. CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL BE EITHER RIGID GALVANIZED STEEL OR RIGID ALUMINUM. IF STEEL (FERROUS) IS USED ENSURE IS BONDED TO GROUNDING ELECTRODE CONDUCTOR AT BOTH ENDS IN ACCORDANCE WITH THE NEC.. CONTRACTOR TO PROVIDE 0' OF SLACK SERVICE CONDUCTOR WITHIN HANDHOLE FOR CONNECTION BY POWER. '-" LIGHTNING ARRESTER. SEE NOTE. " RIGID ALUM. (COMMON) GROUNDING ELECTRODE CONDUCTOR (SEE NOTE ) SIZE " MIN. DISCONNECT CONTAINING # AWG COPPER ITS MAIN SERVICE SIZE " MIN. "-" MAX. ELECTRICAL PULL BOX WITH CONC. APRON " MIN. TO ITS LOCAL HUB (SIZE AND COUNT VARIES) TO LIGHTING LOAD CENTER (SIZE AND COUNT VARIES) " X 0' MIN. GROUND ROD (EXTEND OR ADD ADDITIONAL, AT 0' MIN. SPACING, BONDED WITH # AWG TIN PLATED BARE COPPER GROUND WIRE TO ACHIEVE OHMS OR LESS RESISTANCE TO THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE G-.00, F.A.C. ALEXANDER TEAL MIMS, P.E. PE No. 0 0 Spring Vista Drive Phone:..0 DeBary, FL Fax:..0 CERTIFICATION OF AUTHORIZATION # SR SEMINOLE IT- n //0 ::0 PM Z:\0 Projects\0 (Wekiva Parkway-Section )\CADD\0000\ITS\ssdtit0.dg

6 POLE SERVICE POINT RISER DIAGRAM POWER SOURCE: & N.T.S. XFM R SERVICE ENTRANCE ELBOWS CONCRETE POLE PRESTRESSED TYPE P-II, ' LONG ( PER FDOT INDEX 0) SIZE " MIN. SERVICE TRANSFORMER RISER METER SOCKET METER SIZE " MIN. HANDHOLE SIZE " MIN. POINT OF SERVICE. SEE NOTE. (SIZE AND MATERIAL) PER POWER. SERVICE INSTALLATION SHALL MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC.... CODE (NEC), NATIONAL ELECTRIC SAFTEY CODE (NESC), AND APPLICABLE LOCAL CODES.. CONTRACTOR TO COORDINATE EXACT POINT AND MEANS OF CONNECTION WITH POWER COMPANIES PRIOR TO CONSTRUCTING SERVICE ASSEMBLIES. LIGHTNING ARRESTER. SEE NOTE. FROM SERVICE REQUIREMENTS THE LIGHTNING ARRESTER CAN BE LOCATED ON THE SIDE OR BOTTOM OF THE SERVICE DISCONNECT ENCLOSURE AT THE CONTRACTOR'S OPTION. MEET ALL GROUNDING REQUIREMENTS OF SECTION 0 OF THE STANDARD SPECIFICATIONS. THE MAIN SERVICE DISCONNECT OR PANEL SHALL BE LOCKABLE BY PADLOCK AND FOUR KEYS PROVIDED TO THE MAINTAINING AGENCY. THE DOOR SHALL HAVE A MINIMUM OF THREE HINGES AND BE LOCKABLE. NO SCREWS TO BE USED TO ATTACH DOOR. ALL SERVICE EQUIPMENT ENCLOSURES SHALL BE NEMA R OR BETTER RATED. WEATHER TIGHT HUBS SHALL BE USED AT LOCATIONS WHERE S ATTACH TO ENCLOSURES.. CONTAINING GROUNDING ELECTRODE CONDUCTORS SHALL BE EITHER RIGID GALVANIZED STEEL OR RIGID ALUMINUM. IF STEEL (FERROUS) IS USED ENSURE IS BONDED TO GROUNDING ELECTRODE CONDUCTOR AT BOTH ENDS IN ACCORDANCE WITH THE NEC.. CONTRACTOR TO PROVIDE 0' OF SLACK SERVICE CONDUCTOR WITHIN HANDHOLE FOR CONNECTION BY POWER. '-" STRAP (' O.C. TYPICAL) # AWG INSULATED COPPER GROUNDING ELECTRODE CONDUCTOR IN " RIGID. SEE NOTE. " MIN. MAIN SERVICE DISCONNECT OR PANEL BUSHING (TYPICAL) SEE NOTE "-" MAX. GRADE ELECTRICAL PULL BOX WITH CONC. APRON TO ITS LOCAL HUB (SIZE AND COUNT VARIES) " X 0' MIN. GROUND ROD (EXTEND OR ADD ADDITIONAL, AT 0' MIN SPACING, BONDED WITH # AWG TIN PLATED BARE COPPER GROUND WIRE TO ACHIEVE OHMS OR LESS RESISTANCE TO THE OFFICIAL RECORD OF THIS IS THE ELECTRONIC FILE DIGITALLY SIGNED AND SEALED UNDER RULE G-.00, F.A.C. ALEXANDER TEAL MIMS, P.E. PE No. 0 0 Spring Vista Drive Phone:..0 DeBary, FL Fax:..0 CERTIFICATION OF AUTHORIZATION # SR SEMINOLE IT- n //0 ::0 PM Z:\0 Projects\0 (Wekiva Parkway-Section )\CADD\0000\ITS\ssdtit0.dg

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit

2/15/2015. Current will always try to return to its source. In order for there to be current, there must be a complete circuit Current will always try to return to its source In order for there to be current, there must be a complete circuit Current will take as many paths or circuits available to it to return to the source The

More information

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Page Electric Utility Service Specifications

Page Electric Utility Service Specifications T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum - UG-1 Sheet 1 of 3 87 T Y P I C A L U N D E R G R O U N D S E R V I C E R E Q U I R E M E N T S 200 Amps Maximum

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

Electrical Wiring: Commercial, Seventh Canadian Edition

Electrical Wiring: Commercial, Seventh Canadian Edition Electrical Wiring Commercial Canadian 7th Edition Mullin SOLUTIONS MANUAL Full download at: https://testbankreal.com/download/electrical-wiring-commercialcanadian-7th-edition-mullin-solutions-manual/ Unit

More information

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION!

PREFACE ********************************************************** IT IS NOT INTENDED THAT THESE STANDARDS BE COPIED AND USED AS A SPECIFICATION! PREFACE This publication has been prepared as a guide for Architectural and Engineering (A&E) firms in the preparation of documents for the design and construction of new structures and the remodeling

More information

CONTINUING EDUC ATION

CONTINUING EDUC ATION 3 CONTINUING EDUC ATION FOR WISCONSIN ELECTRICIANS 2017 NEC Article 250 2 Hours WISCONSIN CONTRACTORS INSTITUTE N16 W23217 Stone Ridge Drive Suite 290 Waukesha, WI 53188 262-409-4282 www.wcitraining.com

More information

American Electrical Institute

American Electrical Institute American Electrical Institute Oregon Electricians Continuing Education Grounding & Bonding (Article 250) 4 Hours American Electrical Institute PO Box 31131 Spokane, WA 99223 www.aeitraining.com Article

More information

SECTION TRANSFORMERS

SECTION TRANSFORMERS SECTION 16460 - TRANSFORMERS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Section

More information

Wisconsin Contractors Institute Continuing Education

Wisconsin Contractors Institute Continuing Education IMPORTANT NOTE: You should have received an email from us with a link and password to take your final exam online. Please check your email for this link. Be sure to check your spam folder as well. If you

More information

Wiring of the Main Distribution Panelboard

Wiring of the Main Distribution Panelboard Job Sheet 4 Wiring of the Main Distribution Panelboard OBJECTIVE To connect the service-entrance conductors. To ground the main distribution panelboard (MDP). To wire a branch circuit supplying a three-phase

More information

Quality Control Checklist - Design Drawings

Quality Control Checklist - Design Drawings Quality Control Checklist - Design Drawings Date Company Name Address Telephone Fax Email Job Number 1) Drawing Set a) Drawing one is site/location/incoming power i) Should contain location map if not

More information

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition

Jake Leahy s Electrical Code Connection. A look at Grounding and Bonding of Electrical Services Article Florida Building Code 5 th Edition Jake Leahy s Electrical Code Connection A look at Grounding and Bonding of Electrical Services Article 250 2014 Florida Building Code 5 th Edition Wiring Integrity. Completed wiring installations shall

More information

B. Manufacturers: Square-D, G.E. or Westinghosue.

B. Manufacturers: Square-D, G.E. or Westinghosue. SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Article 250 Grounding & Bonding

Article 250 Grounding & Bonding Article 250 Grounding & Bonding AMERICAN ELECTRICAL INSTITUTE N16 W23217 Stone Ridge Dr. Waukesha, WI 53188 855-780-5046 www.aeitraining.com DISCLAIMER NOTE: This course is APPROVED for continuing education

More information

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5

Chapter 1. Applied Grounding and Bonding. Applied Grounding and Bonding 9/18/2011. Introduction. Introduction. Paul Dobrowsky Member NEC Panel 5 Applied Grounding and Bonding Paul Dobrowsky Member NEC Panel 5 1 Introduction This presentation is a representative sample from the following Chapters of Applied Grounding and Bonding. Chapter 1, Introduction

More information

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION

SECTION COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION SECTION 16715 COMMUNICATIONS ELECTRICAL POWER DISTRIBUTION PART 1 - GENERAL 1.01 SECTION DESCRIPTION AND BASIC REQUIREMENTS A. The Electrical Power Distribution System provides power distribution from

More information

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER

GROUNDED ELECTRICAL POWER DISTRIBUTION. Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER GROUNDED ELECTRICAL POWER DISTRIBUTION Excerpt from Inverter Charger Series Manual BY: VIJAY SHARMA ENGINEER .0 Conductors for Electrical Power Distribution For single-phase transmission of AC power or

More information

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer

MV ELECTRICAL TRANSMISSION DESIGN AND CONSTRUCTION STANDARD. PART 1: GENERAL 1.01 Transformer PART 1: GENERAL 1.01 Transformer A. This section includes liquid filled, pad mounted distribution transformers with primary voltage of 12kV or 4.16kV (The University will determine primary voltage), with

More information

MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop

MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop 500 460 MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop Check if Applicable TRAFFIC SIGNAL SPECIAL DETAILS INDEX/CHECKLIST *One completed checklist required

More information

GENERAL GENERAL NOTES & STATEMENT OF ESTIMATED QUANTITIES BRT-G-8 SHEET OF C.P S.A.P SHEET NAME:

GENERAL GENERAL NOTES & STATEMENT OF ESTIMATED QUANTITIES BRT-G-8 SHEET OF C.P S.A.P SHEET NAME: NO DATE BY REVISION / SUBMITTAL APP GENERAL NOTES & STATEMENT OF ESTIMATED QUANTITIES GENERAL BRT-G-8 NO DATE BY REVISION / SUBMITTAL APP STRUCTURAL NOTES STRUCTURAL SAP 027-648-007 BRT-D-5 NO DATE

More information

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI

CONSULTANT PROCEDURES & DESIGN GUIDELINES Liquid-Filled Utility Transformers UNIVERSITY OF MISSOURI GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

Three Phase Transformers

Three Phase Transformers Three Phase Transformers Theory and Calculations 8/29/2016 Copyright 2016 Dan Dudley & Associates Page 1 DELTA Transformer 8/29/2016 Copyright 2016 Dan Dudley & Associates Page 2 WYE Transformer 8/29/2016

More information

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design

Need for grounding Codes and Standards for grounding Wind Turbine Generator grounding design Foundation + Horizontal Electrode grounding design IEEE PES Transmission and Distribution Conference 2008 Panel Session Large Wind Plant Collector Design Wind Farm Collector System Grounding by Steven W. Saylors, P.E. Chief Electrical Engineer Vestas Americas

More information

Article 225: Outside Branch Circuits And Feeders

Article 225: Outside Branch Circuits And Feeders Part C: Code Book Questions Article 225: Outside Branch Circuits And Feeders 1.! Open (individual) aerial overhead conductors shall be insulated or covered when within! feet of a building.! (a) 10! (c)

More information

CHAPTER 29 PROJECT COMPLETION DOCUMENTS

CHAPTER 29 PROJECT COMPLETION DOCUMENTS CHAPTER 29 PROJECT COMPLETION DOCUMENTS PROJECT COMPLETION Upon completion of traffic control signal system and lighting projects, there are forms and checklists to ensure that the project is closed out

More information

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING

NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING 1 1 1 1 1 NOTICE OF RULE MAKING PROCEEDINGS AND PUBLIC HEARING NORTH CAROLINA BUILDING CODE COUNCIL Notice of Rule-making Proceedings is hereby given by NC Building Code Council in accordance with G.S.

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 11 SPEC WRITER NOTES: Use this section only for NCA projects. Delete between // -- // if not applicable to project. Also delete any other item or paragraph

More information

The Variable Threshold Neutral Isolator (VTNI)

The Variable Threshold Neutral Isolator (VTNI) The Variable Threshold Isolator (VTNI) Installation Instructions INTRODUCTION The is designed specifically for installation between the primary neutral of a power utility distribution system and the secondary

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 13 DISTRIBUTION SWITCHBOARDS SPEC WRITER NOTE: Delete between // -- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1

UNIVERSITY OF MISSOURI Liquid-Filled Utility Transformers 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of Medium Voltage, 3 Phase, Pad Mounted Transformers installed at the University of Missouri. Preferred transformers

More information

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220

Table K. Input/Output Ratings & External Wiring Requirements for the Powerware /80 Rating 50/60 Hz. kva kw VOLTS VOLTS / /220 Table K. Input/ Ratings & External Wiring Requirements for the 9390-/ Units Rating 50/0 Hz Basic Unit Rating at 0.9 lagging pf load Input and Bypass Input Rectifier (0.98 min. pf) plus Recharge Current

More information

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost

Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Design Approaches for Hospital Distribution Systems With Considerations for Future Expansion, Operator Safety, and Cost Adam T. Powell, PE President Emerald Engineering, Inc. Jeffrey L. Small, Sr. Senior

More information

Ground Clamps Cable Tray

Ground Clamps Cable Tray commercial and industrial fittings: ing Fittings and Solderless Connectors Clamps Cable Tray Terminates ground wire to cable tray. For aluminum or copper conductors. 1 4 hex wrench tightens both tray and

More information

SECTION 5 TRANSFORMERS

SECTION 5 TRANSFORMERS SECTION 5 TRANSFORMERS Necessary transformers will be installed and maintained by The City of Aspen. The City of Aspen will not furnish transformers unless they are of standard size and voltage as established

More information

CATALOG OF PRODUCTS. Your Best Supplier of Electrical Cables

CATALOG OF PRODUCTS. Your Best Supplier of Electrical Cables CATALOG OF PRODUCTS Isolated Copper Wire THHN/MTW/THWN-2 600V, single conductor having flame-retardant and heat-resistant thermoplastic insulation with a jacket of extruded nylon or equivalent material.

More information

NEW OR UPGRADED ELECTRICAL SERVICE

NEW OR UPGRADED ELECTRICAL SERVICE NEW OR UPGRADED ELECTRICAL SERVICE The following steps summarize the general process and procedures necessary for CVEA to complete construction of a new or upgraded service. Variances may be necessary

More information

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS PREPARED FOR: FOUNDATION PLAN & STRUCTURAL NOTES DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S1 PREPARED FOR: FRAMING PLANS DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S2 PREPARED FOR: SECTION

More information

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5

UBC Technical Guidelines Section Edition Medium-Voltage Transformers Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Coordination Requirements.1 UBC Energy & Water Services.2 UBC Building Operations 1.2 Description.1 UBC requirements for Substation Transformers. 2.0 MATERIAL AND DESIGN REQUIREMENTS

More information

FTTH ENGINEERING AND INSTALLATION INTRODUCTION

FTTH ENGINEERING AND INSTALLATION INTRODUCTION 1 FTTH ENGINEERING AND INSTALLATION INTRODUCTION GROUNDING FTTH SYSTEMS AT THE HOME. By Dean Mischke, P.E., V.P. Grounding and bonding. Why are we worried about such an old school concept in the modern

More information

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868)

WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) WESTERN UNDERGROUND COMMITTEE GUIDE 2.6 (2.6/00/0868) THREE-PHASE SUBSURFACE UNDERGROUND COMMERCIAL DISTRIBUTION (UCD) TRANSFORMER NOTE: This "Guide" summarizes the opinions, recommendations, and practices

More information

Customer Requirements RF Antenna Installations

Customer Requirements RF Antenna Installations Application Terms Attachment requirements and clearances on the Pole for Radio Frequency (RF) antenna equipment installations. This standard is intended to allow electrical workers to perform their normal

More information

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT

SECTION WIREWAYS FOR RADIOLOGY EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 05 36 WIREWAYS FOR RADIOLOGY EQUIPMENT SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also, delete any other item or paragraph not applicable

More information

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT

CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT CHAPTER 15 GROUNDING REQUIREMENTS FOR ELECTRICAL EQUIPMENT A. General In a hazardous location grounding of an electrical power system and bonding of enclosures of circuits and electrical equipment in the

More information

A. Product Data: For each electrical identification product indicated.

A. Product Data: For each electrical identification product indicated. SECTION 16075 - ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Grounding Recommendations for On Site Power Systems

Grounding Recommendations for On Site Power Systems Grounding Recommendations for On Site Power Systems Revised: February 23, 2017 2017 Cummins All Rights Reserved Course Objectives Participants will be able to: Explain grounding best practices and code

More information

BGE STRATEGIC CUSTOMER ENGINEERING

BGE STRATEGIC CUSTOMER ENGINEERING TABLE OF CONTENTS 1. GENERAL. 2 2. BGE SUPPLY FEEDER. 4 3. SWITCHGEAR ENCLOSURE AND ASSEMBLY. 5 4. CIRCUIT BREAKER. 9 5. SWITCHGEAR EQUIPMENT... 10 6. MAIN AND GROUND BUS.... 15 7. GROUND AND TEST DEVICE.

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT OFFICE

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT OFFICE CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT OFFICE SPECIFICATION EO 2018 REVISION 1 October, 2009 EFFECTIVE DATE NOVEMBER 1, 2009

More information

Chapter 25. Lighting Plans

Chapter 25. Lighting Plans Chapter 25 Lighting Plans The following are changes, additions or deletions to the January 2014, Topic #625-000-008, Plans Preparation Manual (PPM), for use on Turnpike projects only. 25.1 General Replace

More information

Grounding for Power Quality

Grounding for Power Quality Presents Grounding for Power Quality Grounding for Power Quality NEC 250.53 states that ground resistance should be less than 25 ohms. Is this true? Grounding for Power Quality No! NEC 250.53 states

More information

Electrical IP Red Seal Practice Exam

Electrical IP Red Seal Practice Exam Electrical IP Red Seal Practice Exam PRACTICE EXAM-3 1. What size 2 pole breaker must you use on a 3HP, 115V single phase motor? A. 40A B. 50A C. 80A. D. 100A. 2. An electrical equipment approved for use

More information

Grounding and Bonding

Grounding and Bonding Grounding and Bonding 2017 Communications Academy Joe Blaschka Jr., PE Grounding/Bonding What is it? Why do we do it? What does the National Electrical Code say? What about fixed locations? What about

More information

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web:

Capstone Turbine Corporation Nordhoff Street Chatsworth CA USA Phone: (818) Fax: (818) Web: Phone: (818) 734-5300 Fax: (818) 734-5320 Web: www.capstoneturbine.com Technical Reference Capstone MicroTurbine Electrical Installation 410009 Rev F (October 2013) Page 1 of 31 Capstone Turbine Corporation

More information

Installation requirements

Installation requirements Installation requirements for SUNNY CENTRAL 500U 1 Contents This document describes the requirements which have to be observed for the installation site of the Sunny Central 500U. The installation and

More information

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned

Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned Low Voltage Power Factor Correction Equipment Specifications Automatic, Automatic Detuned, Automatic Tuned Part 1 - General Scope and Product Description 1.0 This specification contains the minimum design

More information

TRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval

TRANSMITTAL LETTER. As Builts Change Order Contract Copy of Letter Insurance. For approval Approved as submitted Resubmit copies for approval Redwood City Electric, Inc. TRANSMITTAL LETTER To: Transworld Construction, Inc. 1178 Folsom Street San Francisco, CA 94103 Date: 05/31/12 Job #: 9340 Regarding: SFO DATA CENTER Attn: Rob Acero We are

More information

Continued from Part 1 Rules 1 25.

Continued from Part 1 Rules 1 25. Continued from Part 1 Rules 1 25. 26 225.32 Disconnect Location The disconnecting means for a building or structure must be installed at a readily accessible location, either outside the building or structure

More information

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L5: PRE-ENERGIZATION TEST PROCEDURES FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE The following is PG&E's procedure for pre-energization inspections. For PG&E to provide the Load

More information

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit. ECET4520 Exam II Sample Exam Problems Instructions: This exam is closed book, except for the reference booklet provided by your instructor and one (8.5 x11 ) sheet of handwritten notes that may not contain

More information

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4 SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity

More information

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL BELL SYSTEM PRACTICES Plant Series SECTION 508-100-100 Issue 3, October 1970 AT&TCo Standard ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL I. GENERAL 1.01 This section is reissued to: Revise

More information

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.

More information

METER - INSTALLATION Pad Mount Transformer

METER - INSTALLATION Pad Mount Transformer ER 1-210-C PAGE 1 OF 5 USE: Pad mount transformer secondary compartment LATEST REVISION: PREVIOUS REVISION 10-01-12 ORIGINATED 0-94 PREVIOUS NUMBER ER 700, 10-01-86 Added specification for placement and

More information

Grounding and Bonding of Service Equipment

Grounding and Bonding of Service Equipment Grounding and Bonding of Service Equipment 1. Grounding means: attached to an earth ground. 2. Bonding means: physically connected to insure electrical continuity. NEC 250.4 1. Grounding: Electrical Systems

More information

2017 NEC TABLE OF CONTENTS

2017 NEC TABLE OF CONTENTS Article 90 Introduction 90.1 Purpose (A) Practical Safeguarding (B) Adequacy (C) Relation to Other International Standards 90.2 Scope (A Covered (B) Not Covered (C) Special Permission 90.3 Code Arrangement

More information

Lightning Strikes. Presented to the Greater Norwalk Amateur Radio Corporation Inc. February 8, 2017 Steven M. Simons W1SMS

Lightning Strikes. Presented to the Greater Norwalk Amateur Radio Corporation Inc. February 8, 2017 Steven M. Simons W1SMS Lightning Strikes Presented to the Greater Norwalk Amateur Radio Corporation Inc. February 8, 2017 Steven M. Simons W1SMS ARRL CT State Technical Coordinator The Power of Lightning What is a Ground? Design

More information

Power Processor - Series 700F 10KVA to 150KVA

Power Processor - Series 700F 10KVA to 150KVA Power Processor - Series 700F 10KVA to 150KVA Power Conditioning and Regulation for Commercial & Industrial Equipment General Specifications PART 1 - GENERAL 1.1 DESCRIPTION This specification defines

More information

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION

MESP TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Engineering Specification Head of Electrical Engineering MESP 050100-01 TECHNICAL SPECIFICATION FOR AN AUXILIARY OR ESSENTIAL SERVICES AND AUXILIARY TRANSFORMER FOR USE IN A RAILWAY SUBSTATION Version:

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION 16075 ELECTRICAL IDENTIFICATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPECIAL SPECIFICATION 8590 Emergency Vehicle Traffic Signal Priority Control System

SPECIAL SPECIFICATION 8590 Emergency Vehicle Traffic Signal Priority Control System 2004 Specifications CSJ 0002-01-074, etc. SPECIAL SPECIFICATION 8590 Emergency Vehicle Traffic Signal Priority Control System 1. Description. This Item governs the furnishing and installation of emergency

More information

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS 1.0 SCOPE The following specification describes the features, design, and application of the Series 7200A

More information

EPG. by Chris C. Kleronomos

EPG. by Chris C. Kleronomos April 1994 EFFECTIVE EQUIPMENT GROUNDING ECOS Electronics Corporation by Chris C. Kleronomos The quality of the electrical wiring and grounding in a facility containing sensitive electronic equipment is

More information

6B.6 Substation Grounding

6B.6 Substation Grounding 1 No v 1 6 1 No v 1 6 Iu d a Mo r a r a n d ma n a g e r R a c h e le Ha n n o n Vo l.6 -S u b s ta tio n a n d Hig h Vo lta g e E q u ip me n t;p a r tb -S u b s ta tio n Co n fig u r a tio n s 1. Scope

More information

PRIMARY METERING ENCLOSURE

PRIMARY METERING ENCLOSURE I. CONSTRUCTION NOTES I.1. I.2. I.3. I.4. I.5. I.6. I.7. I.8. Metering transformer enclosure furnished and installed by JEA. Line cables furnished and installed by JEA. Meter enclosure furnished by JEA,

More information

PIRANHA 3 (3-phase, Power Conditioning Voltage Regulator)

PIRANHA 3 (3-phase, Power Conditioning Voltage Regulator) PRODUCT SPECIFICATION FOR A 15 THRU 500 kva, THREE PHASE, MODULAR POWER REGULATOR AND CONDITIONER PIRANHA 3 (3-phase, Power Conditioning Voltage Regulator) 1.0 General This specification covers the electrical

More information

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES

TECHNICAL DESCRIPTION TD-77A/3 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES INDEPENDENT POWER TRANSMISSION OPERATOR S.A. TNPRD/ SUBSTATION SPECIFICATION & EQUIPMENT SECTION October 2014 TECHNICAL DESCRIPTION 170 KV COMPACT GAS INSULATED INTEGRATED SUBSTATION MODULES I. SCOPE This

More information

Distribution/Substation Transformer

Distribution/Substation Transformer Distribution/Substation Transformer Type VFI, Vacuum Fault Interrupter Transformer Option Functional Specification Guide Functional specification for 15 kv, 25 kv, or 35 kv vacuum fault interrupter distribution/substation

More information

Specialty Switches. Inertia Engineering & Machine Works, Inc Hardaway Road, Stockton CA 95215

Specialty Switches. Inertia Engineering & Machine Works, Inc Hardaway Road, Stockton CA 95215 Specialty Switches Inertia Engineering & Machine Works, Inc. 6665 Hardaway Road, Stockton CA 95215 Tel: 800-791-9997 Fax: 209-931-8186 E-mail: sales@inertiaworks.com Section 4 - Specialty Switches Specialty

More information

Pole Line Hardware. Heavy-Duty Spool Rack (200 A) No. of Wires. Anti-Vibration Kit for Spool Rack. Heavy-Duty Spool Rack (400 A) No.

Pole Line Hardware. Heavy-Duty Spool Rack (200 A) No. of Wires. Anti-Vibration Kit for Spool Rack. Heavy-Duty Spool Rack (400 A) No. Heavy-Duty Spool Rack (200 A) SS401E - SS802E - SS803E - SS804E No. of Wires Overall Length SS401E 1 9-1/2 300 136.3 10 SS802E 2 17-1/2 520 236.3 SS803E 3 25-1/2 780 354.5 5 SS804E 4 33-1/2 1040 472.7

More information

SECTION ELECTRICAL IDENTIFICATION

SECTION ELECTRICAL IDENTIFICATION SECTION-16075 ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SECTION INCLUDES A. Electrical identification to identify all electrical items for easy operation and maintenance including, but not limited

More information

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL PROVINCE.OF BRITISH COLUMBIA ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL Order in Council No. 0640 Approved and Oidered a -1.1995 cieuisvunigott3mor Executive Council Chambers, Victoria On the recommendation

More information

A. Deviation from this standard must be approved by the Project Architect.

A. Deviation from this standard must be approved by the Project Architect. September 2012, rev. 00 26 5600 Exterior Lighting PART 1. GENERAL 1.01 Related Documents A. Deviation from this standard must be approved by the Project Architect. B. Drawings and general provisions of

More information

2014 NEC Changes Part 1

2014 NEC Changes Part 1 www.garyklinka.com Page 1 of 8 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

Journeyman's Practice Exam

Journeyman's Practice Exam Journeyman's Practice Exam [Time limit 4.0 hrs.] (The test is open book. I've started at the front of the Code Book and worked toward the back for instructional purposes. The real test will not be in order

More information

Outline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions

Outline. Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions www.we-llc.com Outline Grounding Washer, Electrical Equipment Bond (WEEB) Acme Cable Clips Acme Conduit Entry (ACE) Questions Bonding & Grounding Grounding Terms Equipment Grounding: The National Electrical

More information

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents.

SECTION WIRE AND CABLES. A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. SECTION 26 05 19 PART 1 - GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide wires and cable, complete and operable, in accordance with the Contract Documents. 1.2 CONTRACTOR SUBMITTALS A. The

More information

Power Distribution Blocks with Short-Circuit Current Ratings

Power Distribution Blocks with Short-Circuit Current Ratings Power Distribution Blocks with Short-Circuit Current Ratings General Information: The requirements of the 005 National Electric Code (NEC) and UL508A now require many electrical panels to carry a Short

More information

SECTION CABLE TRAYS

SECTION CABLE TRAYS SECTION 16139 CABLE TRAYS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

2.2 American National Standards Institute Corporation and its applicable standards C39.1, C80.1, C89, C84.1.

2.2 American National Standards Institute Corporation and its applicable standards C39.1, C80.1, C89, C84.1. TECHNICAL SPECIFICATIONS for Single Phase, 1 to 3 KVA Power Conditioner with Regulation and Distribution Constant Power 3 (CP3) CP36508A 7/15/04 1.0 General This specification covers the electrical characteristics

More information

Datawave Magnetic Synthesizer

Datawave Magnetic Synthesizer POWER PROTECTION Datawave Magnetic Synthesizer 100 kva to 200 kva; 50 and 60 Hz Installation, Operation, & Maintenance Manual TABLE OF CONTENTS IMPORTANT SAFETY INSTRUCTIONS............................................1

More information

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH

SCHEDULE OF WORK. Balmer Lawrie Co. Ltd. PRICED BID (PART-II) MMLH SCHEDULE OF WORK Supply, Installation, Testing & Commissioning (SITC) of 33KV Electrical Substation for Multi Modal Logistics Hub at Visakhapatnam, Andhra Pradesh. Tender No. MMLH /HTELEC/PT /18 dated

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS. IR Values are to be read on the megger by meggering the Power transformer PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values This is measured to measure the Insulation Resistance of the whole transformer. a) For 33/11 KV Power Transformer

More information

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56 1. Two Electrical Technicians are discussing markings that are required for AC wiring. Tech A says that AC conductors must be rated for 600 volts and must have their jackets and individual conductors marked

More information

LIFE LINE PRODUCT SPECIFICATION FOR A 1 TO 3 KVA, SINGLE PHASE, POWER DISTRIBUTION SYSTEM WITH REGULATION AND CONDITIONING

LIFE LINE PRODUCT SPECIFICATION FOR A 1 TO 3 KVA, SINGLE PHASE, POWER DISTRIBUTION SYSTEM WITH REGULATION AND CONDITIONING LIFE LINE PRODUCT SPECIFICATION FOR A 1 TO 3 KVA, SINGLE PHASE, POWER DISTRIBUTION SYSTEM WITH REGULATION AND CONDITIONING 1.0 General This specification covers the electrical characteristics and general

More information

Customer Connection Guide Updates Effective May 2017

Customer Connection Guide Updates Effective May 2017 This document provides a list of the updates to the EPCOR Distribution and Transmission Inc. (EDTI) Customer Connection Guide. If you have any questions, please contact EDTI Customer Engineering Services

More information