New Bridges with new Technology. Experiences of product modelling in bridge construction projects
|
|
- Aron Carr
- 6 years ago
- Views:
Transcription
1 New Bridges with new Technology Experiences of product modelling in bridge construction projects NVF Annual Bridge Conference 2014
2 Chenab Bridge - modelling of the steel structures 2 New Railway bridge in Jammu - Kashmir in India Steel arch Total length of 1315 metres with the main arch span 467 metres meters wide, carry two tracks 320 metres above the Chenab river NVF Annual Bridge Conference 2014
3 3
4 4
5 5
6 6 NVF Annual Bridge Conference 2014
7 7 NVF Annual Bridge Conference 2014
8 Crusell Bridge New Landmark Bridge in the Helsinki City Center Completed 2010 Spans 92+52,5m, width 24,8m Pylon top +49,0 Product modeling applied comprehensively from design to construction NVF Annual Bridge Conference 2014
9 Geometry of all structural, and almost all non structural components, in the construction coordinate system Steel structures Steel structures plates and profiles Parts joined by welds or by bolting Include material properties Reinforcement Standard bending shapes Include and number, size, placement and material properties
10 10
11 Use of model at the site Collision, detected before installation Drilled steel tube piles and laser scanned points Model viewing for work planning Installation order, collisions Geometrical surveys Single points, measurements, laser scanning NVF Annual Bridge Conference 2014
12 New possibilities Plans and structures for the Pylon leg formwork Scheduling tool was used with the temporary structures NVF Annual Bridge Conference 2014
13 Nahkuri Bridge - Designed 2013, under construction NVF Annual Bridge Conference 2014
14 Design according to the Guidlines for the information modelling by Finnish Transport Agency NVF Annual Bridge Conference 2014
15 NVF Annual Bridge Conference 2014
16 NVF Annual Bridge Conference 2014
17 Required design documentation for construction design Product Model Construction drawings Particular specification Bill of Quantities Cost Estimate Bar bending lists Plan for prestressing works NVF Annual Bridge Conference 2014
18 Proof checking Based on the documentation other than the model Where do you need the drawings if you expect the information read from the model? Drawings shall be prepared according the common practise Filing - Drawings of the standard format are required for filing
19 City Rail Loop (Pisararata) The City Rail Loop is a planned urban railway line for commuter trains under the Helsinki city centre. The loop-shaped railway starts in Pasila and runs in a tunnel via Töölö, Helsinki city centre, Hakaniemi and back to Pasila. At present, problems in train traffic easily lead to disturbances affecting the whole country, since the commuter and longdistance traffic are so closely connected. This new railway line will smooth traffic flow not only for the 1.4 million inhabitants in the Helsinki region, but in the whole country.
20 Largest design project based on information / product modelling in Finland. Complex, built, urban and historical environment. Multidiciplinary Integration of all fields of expertise by modelling In City Rail Loop design process the modelling is expected to: improve communication with authorities and decicion makers give support for city planning help finding possibilities and best practicies improve quality and cost controll in design improve productivity in construction
21
22
23 Thank you for your attention. NVF Annual Bridge Conference 2014
A-SL-1 A-SL-1 HAND RAIL STAIRS STRUCTURE/ ARCH SLIDE FOUNDATION 12" ROUND PIER 20" SQUARE PIER CAP DRILL AND EPOXY BOLTS *SEE FOUNDATION DETAILS
2X2 SQUARE TUBING /" WALL ON STRUCTURAL FRAME /8" WALL RAFTERS & INFILL NO. ISSUE HOUSE # GALVANIZED STEEL STAIRS SLIDE 2 GA SS POLISHED FINSHED LASER CUT FOUNDATION 2" ROUND PIER 20" SQUARE PIER CAP DRILL
More informationAPPENDIX C: MAIN RIVER BRIDGE PLANS. The graphics in this appendix depict the Practical Alternatives.
APPENDIX C: MAIN RIVER BRIDGE PLANS The graphics in this appendix depict the Practical Alternatives. NO. DESCRIPTION BY 4:36:17 PM 10/3/2007 STA.10+843.000 \ PYLON 6.000 5.000 (TYP) PYLON ELEVATION 210.000
More informationCHAPTER 10 MICHIGAN DESIGN MANUAL BRIDGE DESIGN (SI) SHOP DRAWING REVIEW TYPES OF SHOP DRAWINGS Structural Steel
CHAPTER 10 SHOP DRAWING REVIEW 10.01 TYPES OF SHOP DRAWINGS 10.01.01 Structural Steel 10.01.02 Prestressed Concrete 10.01.03 Bearings 10.01.04 Metal Stay - In - Place Forms () 10.01.05 Expansion Joints
More informationSuggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations
Suggested Traffic Signal Design Procedures Indefinite Delivery (ID) Contract Locations and Conventional Signal Contract Locations MDOT SUGGESTED TRAFFIC SIGNAL DESIGN PROCEDURE INDEFINITE DELIVERY INSTALLATION
More informationStandard 25 Wide Structure
Standard 25 Wide Structure Truss Arch Style 2 piece 12ft c/c typical Arch Depth 12 Webbing Diameter 1/2 1 run straight 2 runs straight Wind Brace - up to 120 8 Wind Brace - up to 192 12 Wind Brace - over
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-04) MANUAL: Standard
More informationInstallation Instructions
Column & Beam Units with Debris Netting Installation Instructions Laminated Wood Systems, Inc. Seward, Nebraska 800-949-3526 2015 LWS, INC. AVR-NET INSTALL 05-12-16 AVR Installation Notes 1 Safety The
More information2. Remove from the Standard Plate manual: Standard Plate Index, Sheets 1-4 of 4, Numerical Index of Standard Plates (August 31, 2012)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-04) MANUAL: Standard
More informationshawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.
shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures
More informationManhole or Catch Basin Type A & B Cone Sections Precast - Design F Manhole or Catch Basin Cover (Reducer Cone Section Precast) Design D
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-02) MANUAL: Standard
More informationSteel Framed Miter Saw Bench
Steel Framed Miter Saw Bench Version 1.1 How to build Steel Framed Miter Saw Bench With easy to follow step-by-step instructions, you will be able to cut, assemble, and finish your very own steel miter
More informationTHE TRANSPORTATION ISSUE
Precast Pavement Perfection // Banking on Precast // California s Precast Express WINTER 2018 THE TRANSPORTATION ISSUE Banking on Precast A variety of precast concrete products will offer the new Bonner
More informationTable of Contents. What's New in GRAITEC Advance BIM Designers 2018 R2 ADVANCE BIM DESIGNERS CONCRETE SERIES... 4
What's New 2018 R2 Table of Contents ADVANCE BIM DESIGNERS CONCRETE SERIES... 4 REINFORCED CONCRETE FOOTING DESIGNER... 4 Multi-layer soil calculation... 4 Bottom Constructive Reinforcement... 5 REINFORCED
More information24" B B Joint X501 Joint See MARKINGS Note PCB-RXX-350-TL3 " X501 Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOT
B B Joint Joint See MARKINGS Note PCB-RXX-350-TL3 " Y301 (Typ.) " A PLAN (reinforced casting option shown) A " dia. Hinge Bar (Typ.) NOTES GENERAL: This barrier may be manufactured with reinforcing steel
More informationVPN: ISBXLR. Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax
VPN: ISBXLR Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM649-R2 RM657 RM664 RM861 RM650 RM658-R2 RM665-R2
More informationSUBJECT: Standard Plates 4132, 4155, Drainage Structures and Castings Info
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (18-01) MANUAL: Standard
More informationInnovative composite dowel for steel concrete composite bridges. Neil Westmacott, Wolfram Schwarz
Innovative composite dowel for steel concrete composite bridges Neil Westmacott, Wolfram Schwarz At a glance Cost effective alternative to prestressed bridge girders Introduction New to Australia although
More informationProduct Art.no. Ø Wall thickness Meter per mm mm bundle
Chrome Plated Tubes Direct plated finishes on welded steel tubes manufactured to DIN 2394. Only the very best quality of surface finish steel is used in the production of our tube. Product Art.no. Ø Wall
More information32 Gallon Perforated Square Receptacle
32 Gallon Perforated Square Receptacle 992-031 24 5/" 24 5/" 39 1/2" 30 1/2" ITEM NO. PART NUMBER DESCRIPTION QTY. 1 653-006 Receptacle Base 1 2 653-045 32 Gallon Perforated Side 4 3 653-011 Arch Lid 1
More information3. Barrier elements. Barrier posts. Stainles steel
3. Urban Equipment Building Equipment Stainles steel e 3.1 Tubular hoops 216-223 3.2 Access barriers 224-227 3.3 Height restriction barriers 228-231 3.4 Protective railing 232-237 3.5 City fence 238-240
More informationSUBJECT: Standard Plate Turf Establishment Areas (at Pipe Culvert Ends)
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (14-01) MANUAL: Standard
More informationStandard Plate 7036 is discontinued. It is replaced by Standard Plan Pedestrian Curb Ramp Details.
DEVELOPED BY: Design Standards ISSUED BY: Office of Program Management & Technical Support, Design Support Section TRANSMITTAL LETTER NO. (12-02) MANUAL: Standard Plates DATED: May 11, 2012 SUBJECT: Standard
More informationd e n v e r a r t m u s e u m
d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition
More information2D Laser Cutting. Rotary Laser Cutting. Folding and Bending. Fabrication. Mig & Tig Welding. Complete Project Management
2D Laser Cutting Rotary Laser Cutting Folding and Bending Fabrication Mig & Tig Welding Complete Project Management Laser Marking & Rotary Laser Marking Delivery Service About Us New Touch Industries is
More informationINSTRUCTIONS: 1. Record the transmittal letter number, date, and subject on the transmittal record sheet located in the front of the manual.
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Technical Support Design Services Section TRANSMITTAL LETTER NO. (0-03) MANUAL: Standard Plates DATED: September
More informationComposite Sections. Introduction BETON PRATEGANG TKS Session 10: 2015/4/27
BETON PRATEGANG TKS - 4023 Session 10: Composite Sections Dr.Eng. Achfas Zacoeb, ST., MT. Jurusan Teknik Sipil Fakultas Teknik Universitas Brawijaya Introduction A composite section in context of prestressed
More informationALUMINUM PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy
More informationNo limitations to precast
Infra No limitations to precast Haitsma Beton produces a great diversity of precast concrete elements for engineering structures in the infra industry. Our products cover a wide range of standard cross-sections,
More informationUtility Structures. Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles
Utility Structures Utility vaults, trenches, transformer pads Electrical Pole Bases and switching cubicles PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. UTILITY STRUCTURES Perfect
More informationSTEEL PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports
More informationBarrier posts of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm
of steel tube Ø 76 mm, Ø 89 mm, 70 x 70 mm Steel tube Ø 76, Ø 89, 70 x 70 mm with welded steel cap approx. 900 mm above ground, total length 1400 mm hot-dip galvanized and yellow coated with black stripes
More informationProven precast solutions for every application
Proven precast solutions for every application Seventy five years of UNDISPUTED LEADERSHIP HP shell roof, bowstring girders and trussed gantry girders for L&T Bengaluru Works Larsen & Toubro is a major
More informationSUBJECT: Standard Plate 9102 Turf Establishment Areas At Pipe Culvert Ends
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (17-03) MANUAL: Standard
More informationProduct Art.no. Ø Wall thickness Meter per mm mm bundle
Chrome Plated Tubes Direct plated finishes on welded steel tubes manufactured to DIN 2394. Only the very best quality of surface finish steel is used in the production of our tube. Product Art.no. Ø Wall
More informationCrowdTuff Loop Top Pedestrian Barrier Fencing
Product outline As part of our CrowdTuff powder coated tubular steel fencing range we manufacture a Loop Top style for pedestrian barrier and safety fencing applications. This range of tubular fencing
More informationBio-Sand Filtration Mould Construction Guidelines
Bio-Sand Filtration Mould Construction Guidelines Adriaan Mol & Eric Fewster BioSandFilter.org December 19, 2007 Introduction On the following pages, you will find an illustrated construction guide that
More informationFORM - 2 THE PATENTS ACT, (39 of 1970) THE PATENTS RULES, 2003 COMPLETE. Specification. (See Section 10; Rule 13) OVERPASS BRIDGE
FORM - 2 THE PATENTS ACT, 1970 (39 of 1970) & THE PATENTS RULES, 2003 COMPLETE Specification (See Section 10; Rule 13) OVERPASS BRIDGE DAKE DHANANJAY an Indian National, of "Vedh", 484137, Mitra Mandal
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (15-03) MANUAL: Standard
More informationFireball Fab Welded Baluster Insert Panel System Installation Instructions
Fireball Fab Welded Baluster Insert Panel System Installation Instructions Prior to construction, check with your local regulatory agency for special code requirements in your area. Common railing height
More informationInstallation Instructions Kit, Base Rail Bracket Part # 31413
Installation Instructions Kit, Base Rail Bracket Part # 31413 Dealer / Installer: End User: Provide a copy of these Instructions to the end user of this product. These Instructions provide important operating
More informationSeparating lanes our way Steel guard rail
a Separating lanes our way Steel guard rail Factfile Birstaverken Birstaverken AB was founded in 1961 and is a manufacturing company with its own plant for hot-dip galvanising. We develop, design, manufacture
More informationCONCRETE ACCESSORIES BAR-LOCK REBAR COUPLER SYSTEM
CONCRETE ACCESSORIES BAR-LOCK REBAR COUPLER SYSTEM quick and easy to install no special installation equipment high strength excellent for new construction and rehab projects Bar-Lock Coupler System* ICBO
More informationHIGHWAY T S echnical installation Guide
HIGHWAYS Technical install ation Guide 1 Installation Unless otherwise stated,dynawest Bollards require a minimum below ground depth of 450mm to 500mm and mm square. Setting in concrete to a strength of
More informationHow to Use the Jahn Forming System
How to Use the Jahn Forming System 1. Preparation Gang drilling the plywood is the only preparation required. Holes need to be drilled 1/8" larger than the snap tie head. Normally, a 5/8" diameter drill
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More informationENGINEERING STRUCTURES MADE OF PRECAST ELEMENTS
ENGINEERING STRUCTURES MADE OF PRECAST ELEMENTS CON/SPAN Innovation in bridges Engineering structures made of precast elements of CON/SPAN are used for roads, railways and industrial applications: bridges
More informationInstallation Instructions Kit, Base Rail Bracket Part # 31413
Installation Instructions Kit, Base Rail Bracket Part # 31413 Dealer / Installer: Provide a copy of these Instructions to the end user of this product. These Instructions provide important operating and
More informationABC and Innovative Bridge Construction for Minnesota Local Roads
ABC and Innovative Bridge Construction for Minnesota Local Roads May 23, 2013 To box the cha of t unl qua gra ma all g You ma add Tex Chris Werner, PE Senior Bridge Engineer HDR Engineering, Inc. 763-278-5918
More informationQuality Control and Quality Assurance Guide
Quality Control and Quality Assurance Guide Bridge Division, Design Section April 2017 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants... 6
More informationOHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO
OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO 43216-0899 July 20, 2012 To: Users of the Standard Bridge Drawings From: Tim Keller, Administrator, Office of Structural
More informationPRECAST FLOOR PRODUCTION LONG LINE FOR HALF SLABS
PRECAST FLOOR PRODUCTION LONG LINE FOR HALF SLABS HOW DOES THE LINE WORK? All work phases in the long line are mechanized or automated. Production planning, line control and machine operations are taken
More informationProConcrete. Gernot Jeromin Product Manager Bentley Systems, Incorporated
ProConcrete Gernot Jeromin Product Manager ProConcrete 3D CAD Software for Concrete and Reinforcement 2 WWW.BENTLEY.COM What is ProConcrete AutoCAD Application MicroStation V8i version will be available
More informationSika at work precast tubbing production for the tunnel in gdańsk,
Sika at work precast tubbing production for the tunnel in gdańsk, POLAND Concrete Production: Sika ViscoCrete, Sika Aer Waterproofing: Sikadur Concrete Protection: Sika TR Sika at Work the first road tunnel
More informationUpdate on Bridge Deck Fastener Performance on the FAST Steel Bridge. By Duane Otter and Brian Doe ABSTRACT
Update on Bridge Deck Fastener Performance on the FAST Steel Bridge By Duane Otter and Brian Doe ABSTRACT The performance of several bridge deck fastening systems is being evaluated on the steel bridge
More informationInstallation Instructions
Installation Instructions SRT-350 8 POST Guardrail End Treatment Revised July 2005 TRINITY HIGHWAY SAFETY PRODUCTS, INC. BUILDING TOMORROW S HIGHWAY SAFETY SOLUTIONS TODAY 2 SRT TM 8-POST SYSTEM FOR SPECIFIC
More informationE:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM
600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn
More informationRisk control online deformation monitoring inside an urban TBMdriven tunnel using the tshape measurement system
World Tunnel Congress 2013 Geneva Underground the way to the future! G. Anagnostou & H. Ehrbar (eds) 2013 Taylor & Francis Group, London ISBN 978-1-138-00094-0 Risk control online deformation monitoring
More informationREVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS. September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter
REVISIONS INDEX 2016 ROAD & BRIDGE STANDARDS September 2017 Revision Letter August 2017 Revision Letter February 2017 Revision Letter 506.08 ADDED DETAIL FOR TRANSITION FROM GR-MGS1 TO WEAK POST GUARDRAIL.
More information21 st Century Math Projects
Project Title : CSI Geometry: Trigonometry Standard Focus: Geometry and Spatial Sense Time Range : 1-3 Days Supplies : Pencil and Paper Topics of Focus : - Pythagorean Theorem - Special Right Triangles
More informationFixPad - Create and Assembly instructions
6 7 8 2 9 10 4 3 5 11 1 B.o.m- Bill Of Materials Part No. Part name Production technology File name Martial Info Number of parts Supplier 1 persex sheet Laser cutting, bending Flat pattern base Flat pattern
More informationSKT-SP Tangent Terminal
Assembly Instructions for metric SKT-SP Tangent Terminal & FLEAT-SP Flared Terminal SP Standard Post System Guardrail Terminals ROAD SYSTEMS, INC. P. O. Box 2163 Big Spring, Texas 79721 Phone: (432) 263-2435
More informationBio-Sand Filtration Mould Construction Guidelines
United Kingdom The Shieling, Wreay Carlisle CA4 0RL Tel: +44 (0)1697 47 5369 Mobile: +44 (0) 7739 665 777 Email: info@biosandfilter.org Madagascar Libanona Americain PB 307 Fort Dauphin (614) Tel: +261
More informationState-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA )
State-of-the-art Report On FULL-DEPTH PRECAST CONCRETE BRIDGE DECK PANELS (SOA -01-1911) Vince Campbell Former president of Bayshore Concrete Products Corporation, VA This presentation is developed
More informationMounting Hardware Guide
Mounting Hardware Guide by The key to a successful and trouble-free installation is the selection of appropriate mounting hardware. Versa-Gard offers the most comprehensive array of mounting hardware for
More informationThanks for shopping with Improvements! 7 Wood Garden Bridge with Removable Plugs Item #573366
Thanks for shopping with Improvements! 7 Wood Garden Bridge with Removable Plugs Item #73366 Note: Danger: Do not overload this bridge. This bridge is NOT REOMMENDED for weight of more than 0 lbs. Do not
More informationTABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.
1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4
More informationPrecast Concrete at Paddington Rail Station, London. By George Jones Member of fib Commission 6
Precast Concrete at Paddington Rail Station, London By George Jones Member of fib Commission 6 Precast Concrete at Paddington Rail Station Project background. Reasons for using precast concrete and its
More informationProfiling press braking CNC MACHINING FABRICATION FINISHING
Profiling press braking CNC MACHINING FABRICATION FINISHING +44 (0)114 321 6303 enquiries@dnametalwork.com www.dnametalwork.com Profiling Bevel Capability up to 45 LASER cutting PLASMA cutting WATERJET
More informationB422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422
B422 - PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS - OPSS 422 422.1 GENERAL The work under these tender items consists of the fabrication and installation in open cut of precast reinforced
More informationSWITCH STAND Switch Stand Assembly Connecting Rod Target Assembly (when required) TURNOUT ACCESSORIES Standard Tie Plates Rail Anchors Joints
Turnouts A turnout is an arrangement of a switch, a frog and closure rails, which diverts rolling stock from one track to another. Because industrial trackwork often handles lighter loads at slower speeds
More informationArch Bridge in Nijmegen - new 3D Approach to Workshop Plans
Available online at www.sciencedirect.com Procedia Engineering 40 (2012 ) 114 118 Steel Structures and Bridges 2012 Arch Bridge in Nijmegen - new 3D Approach to Workshop Plans D. Franc a and A. Pechal
More informationWork Type Definition and Submittal Requirements 14.6 Signing Plan Design & Special Provisions. Work Type Definition
Work Type Definition Pages 1-3 detail the work type definition. In order to become pre-qualified for this work type, please see the Work Type Submittal Requirements on pages 4-6. I. Description Signing
More informationReinforcing Mesh Product Guide
Reinforcing Mesh Product Guide Reinforcing New Zealand since 1954 Super Ductile 500E & Hard Drawn NORTH ISLAND Fletcher Reinforcing supplies the reinforcing steel and mesh that provides the strength to
More informationA - Railing Frame Material Specifications
A - Railing Frame Material Specifications NOTE: We strongly recommend stainless steel for exterior applications. R-1 8/1/02 B Stainless Steel Spacers (For Horizontal Railing Double Post End Post using
More informationWORKSHOP FURNITURE. Rugged, Heavy Duty, Quality Steel Construction. Optional drawer. Lower shelf same length as worktop
Designed For Todays Technical Workspace Environment Rugged, Heavy Duty, Quality Steel Construction Bench tops are 29" deep, not 24" as with most common benches Superb powder coat finish Modern design Optional
More information1. CONNOLLY KEYJOINT 1. PRODUCT NAME 2. SUPPLIER 3. PRODUCT DESCRIPTION 4. KEY FEATURES 5. FIXING INSTRUCTIONS 6. SPECIFICATIONS 7.
1. CONNOLLY KEYJOINT 1. PRODUCT NAME 2. SUPPLIER 3. PRODUCT DESCRIPTION 4. KEY FEATURES 5. FIXING INSTRUCTIONS 6. SPECIFICATIONS 7. CAPPING STRIPS 8. WELDED FOOT AND PEG 2. SUPPLIER Canzac Ltd 3 Parkhouse
More informationMH Table of Contents Standard Title/Scope Page Table of Contents SCE Public
MH Table of Contents Standard Title/Scope MH 300 MH 310 MH 318 MH 320 MH 325 MH 330 MH 335 MH 340 MH 350 Manholes Requirements MH 300.1 Manholes Requirements...........................................
More informationHELCOR druk_geosyntetyki II.qxd :22 Strona 2 HELICALLY CORRUGATED STEEL PIPES. HelCor & HelCor PA
HELCOR druk_geosyntetyki II.qxd 2012-09-28 13:22 Strona 2 HELICALLY CORRUGATED STEEL PIPES HelCor & HelCor PA HELCOR druk_geosyntetyki II.qxd 2012-09-28 13:26 Strona 3 1. Introduction The history of corrugated
More informationExit point. Can you do it?
Can you do it? Don t just guess, Be precise! Horizontal directional drilling is a specialized profession nowadays. The days when directional drilling was ruled by assumptions, are far behind us. Clients
More informationSUBSTATION SECURITY WALL INSTALLATION MANUAL
SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended
More informationROUND STEEL POLE STRAIGHT
PROJECT NAME: CATALOG NUMBER: NOTES: FIXTURE SCHEDULE: Page: 1 of 7 ROUND STEEL POLE SPECIFICATIONS: Pole Shaft The pole shaft is fabricated from hot rolled steel tubing of onepiece construction with a
More informationStraight staircases. Practical staircase solutions, outside and indoors
Straight staircases Practical staircase solutions, outside and indoors 2 www.weland.se +46 (0) 371-344 00 Straight staircases - lightweight, attractive designs Standard Straight Flight Staircases Weland
More informationADI CABLE RAILING FOR METAL. AS&D TM Aluminum Railing. Solutions TM Aluminum Railing
TM ADI CABLE RAILING FOR METAL AS&D TM Aluminum Railing pg 120-131 Solutions TM Aluminum Railing pg 132-133 119 AS&D Railing System Overview For the discriminating homeowner, a contemporary, esthetically
More informationPiazzola Pergola Awning Manufacturing and installation guide
Piazzola Pergola Awning Manufacturing and installation guide Date Changes Page General information Maximum and minimum width Width Projection 150 to 349 cm 350 to 500 cm From 200 to 250 cm X From 251 to
More informationAB INDUSTRIES FENCING PRODUCTS
AB INDUSTRIES FENCING PRODUCTS WWW.ABINDUSTRIES.COM.AU Did you know that A&B Industries is the manufacturer? We manufacturer and distribute the products directly to you the Wholesaler. There is no middle
More informationService Release for PLANBAR
Service Release for PLANBAR 2017-1-4 You can only use this version if you have installed one of the following versions: DVD number 05-02-05-17-FTW (PLANBAR 2017-1-3 Release) DVD number 04-02-02-17-FTW
More informationPrecision Machinery for Wire and Tube
Precision Machinery for Wire and Tube H O S T E D B Y : CO-HO S T E D B Y : Industrie 4.0: Close Loop Quality Control for Torsion Spring Production Dr.-Ing. Uwe-Peter Weigmann October 4, 2017 Industrie
More informationONE STEP AHEAD WITH BIM CHANGING OF ORGANISATIONS PROJECTS MINDS
ONE STEP AHEAD WITH BIM CHANGING OF ORGANISATIONS PROJECTS MINDS BIM EXPO 2017 HANOVER, SEP 6 TH & 7 TH Prof. Dr. Katharina Klemt-Albert Director Institute of Construction Management and Digital Engineering
More informationGeodetic network design and strategies followed for drilling a 25 km tunnel in a high speed railway in Spain
Geodetic network design and strategies followed for drilling a 25 km tunnel in a high speed railway in Spain Jesus VELASCO, Juan PRIETO, Tomas HERRERO and Jose FABREGA Technical University of Madrid, Spain
More informationOpen shipping crate and separate all of the different parts. Over The Top Shelters LLC
ASSEMBLY INSTRUCTIONS FOR MODEL SH122110GN and SH122110GY Open shipping crate and separate all of the different parts. Count each part and match up with parts list. Shortages or damaged parts should be
More informationSPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS
SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS
More informationSOME PARTICULARITIES OF STANDARD GROOVED RAIL TURNOUT USED ON ROMANIAN TRAMWAY NETWORKS
Bulletin of the Transilvania University of Braşov CIBv 2014 Vol. 7 (56) Special Issue No. 1-2014 SOME PARTICULARITIES OF STANDARD GROOVED RAIL TURNOUT USED ON ROMANIAN TRAMWAY NETWORKS S. ZVENIGORODSCHI
More informationBentley Rail Track Update
Bentley Rail Track Update Robert Nice Bentley Systems UK Recent Past and Near Future Today, I will discuss recent enhancements to Bentley Rail Track. Some of these enhancements you may be very familiar
More informationReinforcing Mesh Product Guide
Reinforcing Mesh Product Guide Reinforcing New Zealand since 1954 Super Ductile 500E & Hard Drawn SOUTH ISLAND Fletcher Reinforcing supplies the reinforcing steel and mesh that provides the strength to
More informationINSTALLATION INSTRUCTIONS
STRIP DOORS AIR DOORS INSTALLATION INSTRUCTIONS BULK PVC FILM STRIP SHEET PANEL SCREENS, CURTAINS and ENCLOSURES MEGA-PRO SWINGING DOORS DOCK ACCESSORIES IMPORTANT Carefully examine the carton(s) for damage.
More informationAll-Terrain Wheelchair System
All-Terrain Wheelchair System Drawing Package Ohio University Russ College of Engineering and Technology Mechanical Engineering Department June 6th, 2011 Design Team: Brad Geddes Todd Linthicum Matt McAllister
More informationPrecast Bridge. in only Eight Days. profile. Minimizing construction-related traffic delays and improving workzone
Precast Bridge Built in only Eight Days by Peter E. Stamnas and Mark D. Whittemore. New Hampshire Department of Transportation Minimizing construction-related traffic delays and improving workzone safety
More informationGENERAL ELEVATION SECTION A-A
NORTH OR WEST Final pavement Elev. m @ roadway 12 352 out to out precast backwall panels Final pavement Elev. m @ roadway SOUTH OR EAST Pile cut-f Elev. m Pile cut-f Elev. m 3:1 3:1 Approx. existing groundline
More informationSteel Door Frame Installation in Steel Stud Construction
Steel Door Frame Installation in Steel Stud Construction This manual provides step-by-step instructions for the installation of a steel door frame in steel stud construction. It is a companion piece to
More informationCrowdTuff Flat Top Pedestrian Barrier Fencing
Product outline As part of our CrowdTuff powder coated tubular steel fencing range we manufacture a Flat Top style for pedestrian barrier and safety fencing applications. This range of tubular fencing
More information