1 August, 2008 (DTM) OFFICE OF DESIGN ENGLISH PRELIMINARY SURVEY SPECIFICATIONS A. GENERAL These specifications describe the collection of preliminary field survey data. This data must be sufficiently detailed to enable the design of a highway project. The collection process shall therefore include, but not be limited to: Setting control monuments GPS observations of Horizontal control Completing a transit line (Baseline survey) relative to the GPS control Running bench levels Obtaining surface elevations at spot locations & with break lines Making reference ties to supplemental control points and control monuments (GPS monuments) Preparing property ownership plats along the corridor Determining utility location and ownership Creation of a project index The collection process shall also include the preparation of any special data needed for bridges and culverts, such as: Preliminary bridge and culvert sheets [Iowa Department of Transportation ( I.D.O.T.) Form Nos and ] Stationing-U.S. Survey foot definition If the Survey is in U.S. Survey foot units, the stationing will be based on the one-hundred foot station (1 sta=100feet) A station equation that relates the U.S. Survey foot Stationing of the survey to the U.S. Survey foot stationing of the as-built highway plans will be placed at the project (BOP) and the project (EOP). The format for all Station Equations (relating to an U.S. Survey foot plan) will be as follows: P.O.T. Sta (E) This Survey= P.O.T. Sta (E) As Built Plans, followed by the plan project number. Note: If the existing U.S. Survey foot station at the (BOP) is less than and does not allow for additional survey back of the (BOP), the survey crew will set an arbitrary station value large enough to prevent possible negative stationing on a project. Survey stationing shall normally progress from south to north or from west to east. Occasionally the as-built plans will include stationing in reverse of the norm: ie: increase from north to south or from east to west. If that situation should arise, please contact the Office of Design. 1

2 Project Control Requirements A control network will be set and observed using survey quality Global Positioning and proposed methods preapproved by the Survey Manager of Office of Surveys or a licensed land surveyor who is an employee of the Iowa Department of Transportation. The methods may include but not be limited to use of Online Positioning User Service (OPUS), high accuracy county control and/or HARN control or the Iowa RTN. The network control points will be spaced such that they are inter-visible both ahead and back along the proposed corridor. The frequency of points will vary from a few hundred feet to 1.4 miles depending on the terrain of the project. The U.S. Survey foot values of the control points in a network will be furnished using the following conversion. Iowa North Zone: The metric value of the local project plane coordinate multiplied by Iowa South Zone: The metric value of the local project plane coordinate multiplied by The following G.P.S. Network information will be available: The final project control coordinates in an electronic ASCII format A copy of an aerial photo with point locations spotted on them A text file describing the point, the milemark value and the approx. highway as-built station value (when applicable) Final Project Report Misc. project files All project control furnished by the department will be held fixed while collecting field planning DTM data. If RTK G.P.S. is used, methods pre-approved by the Survey Manager of Office of Surveys or a licensed land surveyor who is an employee of the Iowa Department of Transportation will be adopted. The Department will provide a SAP (Survey and Photogrammetry) number to be used within the Departments file naming convention to name electronic field survey files associated with the Planning DTM data. Survey stationing shall normally progress from south to north or from west to east. The recording of Transit Notes shall be as follows: Rural areas - Electronic Data Collector Urban areas - Electronic Data Collector Field books used for the recording of survey data shall have hard bound covers and include a table of contents of the recorded data. The surveyor shall advise the District Land Surveyor of the survey work prior to beginning work. The Iowa Department of Transportation will provide a survey request aerial. This aerial will define the proposed corridor survey limits. Any proposed modification to the request must be approved by the Office of Survey. 2

3 B. EDM EQUIPMENT REQUIREMENTS Distances shall be measured using a modern electronic measuring device with manufacturer's accuracy specifications of + 5 mm + 5 ppm or better. Angular measurements shall be made using instruments with manufacturer's accuracy specifications of 6 seconds or better. The consultant shall furnish all monuments, stakes, pins, spikes and other incidental supplies. C. GLOBAL POSITIONING EQUIPMENT REQUIREMENTS Equipment used must be specified by the manufacturer to be capable of 2cm or less horizontal and vertical accuracy. Dual Frequency receivers are advised. D. LOCATION OF AS-BUILT CONTROL If the survey is within feet of the existing highway, the surveyor shall make a DILIGENT effort to FIND the AS-BUILT@ P.I. s along the existing highway, as shown on current "AS BUILT" plans. If after a diligent search, the "AS BUILT" P.I.'s cannot be found, the tangent between the P.I.'s shall be located using the P.C. & P.T points or splitting the slab at or near the as-built P.C. and P.T. points. Information recorded in an ASCII file on these As-built P.I.'s and tangent control points shall include: Type of point, either P.I. or tangent control point Point number Station value and distance from the survey baseline Coordinate Value (xc & yc) Station value of a P.I., P.C., P.T., point as found on the as-built plans The format of the ASCII as-built control file report will be as follows: Examples: Control Point #600, Sta , left this survey = P.I. Sta AS-BUILT Plans The yc, xc, and the Radius of the curve Control Point #625, Sta , left this survey = P.I. Sta AS-BUILT Plans The yc, xc, and the Radius of the curve These points will enable easy recreation of the as-built alignment. SURVEY PROCEDURES Control Monuments GPS control monuments 30 inches in length or longer shall be used for proposed permanent control. Monuments should be established in areas that will survive construction of the proposed project when possible. The referencing of permanent control monuments must enable convenient recovery. Reference sketches will be illustrated in the Distance Meter Readings Book or the Transit NoteBook or electronically collected. Additionally, each control monument point shall be referenced to three durable, physical objects (ie: trees, poles, fence posts, etc.) Control Points 3

4 Iron pins, 15 inches long or longer and 1/2 inch or more in diameter, are to be used to monument supplemental control points along the baseline and on sideroad surveys. These pins are to be buried at least 3 inches deep, except in cultivated fields, where they are to be buried 15 inches deep. When permanent points fall on concrete surfaces, crosses may be chiseled. When permanent points fall on asphalt surfaces, frost nails, PK nails, or other similar nails may be set. The referencing of permanent control points must enable convenient recovery. Permanent control points shall therefore be set no further than 1300 feet apart and shall be intervisible. Reference sketches will be illustrated in the Distance Meter Readings Book or the Transit Note Book or electronically collected. Additionally, each permanent point shall be referenced to at least three durable, physical objects (i.e.: trees, poles, fence posts, etc.) with measurements to the nearest one-hundredth of a foot. A nail in the present pavement used as a reference will not be considered a permanent point, and caution will be taken not to set reference nails in valuable trees. All references shall be included in the G sheets. The coordinates of these points are also in the C control file. Other Procedural Information The approximate location of government section lines and city corporation lines shall be noted when crossed. Name and address of the nearest office shall identify the ownership of all utilities. This utility information will be recorded in the utility legend of a field book. An illustration of ownership must be supplied. Property Ownership Plats A 1" = 300 scale property plat will be created on an aerial paper print. The plat will identify the owners and boundaries of all parcels within the survey limits. An alternate product such as a county GIS print or electronic submission may be substituted with the approval of the Office of Survey. E. TOPOGRAPHY Topography obtained in the field shall locate all features both above ground & underground, which cannot be determined from aerial photography, when photogrammetric techniques are applied. Electronically collected field data must have the appropriate feature code. A list of feature codes will be supplied upon request. Field located features will include: Right-of-way rails Speed limit and milemarker signs Telephone pedestals Septic tanks Utility valves Approximate locations of leach beds Wells Buried telephone cables Gas mains Buried water lines Farm tiles Concrete slabs Buried gas tanks Gas tank Monitoring Wells Advertising Billboards All other underground storage tanks 4

5 A report (. rpt files) of these objects shall be created and labeled with a point description, feature and the station-plus and right angle distance from the survey baseline. For file naming definitions, see page 10. Culverts shall have a station-plus and right angle distance right or left from the survey baseline to the inside edge of the headwalls (parapets). Entrance pipes shall be located with station-plus and right angle distance right or left to the ends of existing pipes. Side road culverts shall be referenced to side road centerlines, and their distances right or left from the mainline survey baseline shall be noted on the top of the pink culvert sheet (I.D.O.T. Form ) (see attachment 2). In all cases, the plus and distance out to a culvert must be to the nearest one-hundredth of a foot, accurate to +.03 feet. The size (length, width and height) and material of all culverts and pipes must also be noted (see example). On all culverts, the drainage area and character of the watershed must be noted, and breaks in the barrel (either horizontal or vertical) must be located. If photogrammetric techniques are not applied, all pertinent topography shall be obtained through field survey. Photogrammetric topographic data shall be compiled and submitted, as specified in the Photogrammetric CADD Mapping Specifications. For all mainline and side road bridges within the survey corridor, the station value at the center of the bridge, the size (length, width) of the bridge, the construction material used, a brief description of the bridge, the drainage area, and the character of the watershed shall be noted. This information is recorded on the Preliminary Bridge Sheet (Form ) In urban areas, it will be necessary to note station-plus and right angle distances to the curbs and gutters, the sidewalks, and any buildings abutting the street or survey baseline. Locate both edges of entrance doors and loading docks to commercial buildings. Both the pluses and distances out must be recorded to the nearest onehundredth of a foot. Side Roads A ML/SR, ML/RR, SR/SR, or SR/RR Station-plus to the nearest one-hundredth of a foot shall accurately note side roads and railroads, which intersect the baseline of survey. All intersections shall be equated at survey baselines, and station values shall be assigned by increasing the mainline stationing by 1000, 2000, 3000, etc. at the point of intersection. All side road /mainline tangents will also be equated at intersection points. The type and width of surface, construction material of surface (a/c surf, asphalt, gravel, conc etc.), the width of ROW, and the name of any intersecting road or street shall be noted. F. BENCH LEVELS Benchmarks shall be established on permanent objects at intervals not greater than 1300 feet and at all structure sites (bridges and culverts) near the proposed corridors. If the terrain is rolling, benches shall also be established for every 40 feet of vertical difference. The setting of small spikes in road signs and less stable objects will not be acceptable. Permanent objects are to be used for benchmarks. The following list in order of preference will be used as a guide to determine placement of benches: Found I.H.C. bench on HDWL of RCB culvert Found IDOT bench on HDWL of RCB culvert Found I.H.C., IDOT or (X) on a Bridge Found (X) on HDWL of RCB culvert Cut (X) on a Bridge or on the HDWL of RCB culvert Found a RR Spike in a Power Pole Set a RR, 80d Spike or Larger in a Power Pole Set a 80d Spike or Larger in a Fence Post 5

6 G.P.S. Feno Monuments, GPS rebar and other supplemental control pins will not be used as vertical benchmarks; however, a random sample (the more the better) of the GPS points should be used as turns and sideshots along the bench runs. Due to the unstable nature of rebar and the questionable quality of the Geoid96 model in portions of Iowa, the vertical estimate derived from the Static G.P.S. Control Network may not meet our vertical needs. The relative differences between the points have been useful as a check along a Bench Level Run. The majority of the culverts in the state are constructed with a brass button usually referred to as IHC or IDOT bench marks. These brass markers are usually on the inlet end of the structure. All bench levels shall be run by the three-wire method and checked by the loop method. Note: A run between two 1st, 2nd, or 3rd order monuments will be considered closed if the closure error specification is meet. All raw bench level data will be furnished to the department in an ASCII for adjustment. The department will adjust the raw data in the SDMS Format and return a calculated file. An accurate description of all benchmarks and ties to Network Control points shall be recorded. The x, y, values of all benchmarks will also be furnished to the department in a control file format. For details see Section F. CREATING a CONTROL FILE. All benches will be numbered sequentially from 500 through 999 (Numeric only). Turn points should not be numbered Bench level runs must check within [.05 X the square root of the circuit s length (in Miles)] and be based on NAVD 88 datum. The difference between the middle wire reading and the top or bottom wire readings must be less than The difference between the observed middle wire reading and the computed wire reading must be less than or equal to Example: In this example: top difference 1.00, bottom 0.99 (within tolerance) 1.99 The sum of all three readings is 8.99, divide 8.99 by 3, middle reading is (Within tolerance) In this example: top difference 1.00, bottom 0.98 (out of tolerance) 2.02 The sum of all three readings is 9.02, divide 9.02 by 3, middle reading is (out of tolerance, because the difference between the original middle reading and the computed middle reading, 0.007, exceeds 0.003) Observations Equipment and method of observation to make measurements should adhere to the following requirements: The level should be in good working condition and at least an engineer s compensator (selfaligning) level should be used. A builder s level is not acceptable. All levels should be tested at the beginning of each project, and adjusted if necessary. In addition, any instrument dropped shall be tested before further use. Level adjustments shall be repeated after no more than 20 days of use if project leveling takes longer than 20 days. The level rod should be at least as good as a Philadelphia, Chicago, California rod etc. It should be checked just prior to the work to see that it is adjusted from section to section. The rod should have 6

7 some device to verify that any sections of the rod that lengthen it are adjusted to the bottom section properly. A plastic telescoping rod or builders rod is not accurate enough to do the job. The bottom of the rod should be kept clean at all times. Vertical Equations at the BOP, at the EOP, at USGS, and at NGS (or USC&GS) Vertical Datum marks along the project shall be included in the vertical datum information in the index file. The vertical equations at the BOP and at the EOP shall equate your survey to any adjoining survey. Adjusting the level and inspecting line of sight.doc Adjusting the level & line of sight (two-peg test) In new levels, the compensator has been adjusted at room temperature, so that the line of sight is horizontal even if the instrument is tilted slightly. This situation changes if the temperature fluctuates by more than ten or fifteen degrees, after a long journey, or if the instrument is subjected to strong vibration. It is then advisable to inspect the line of sight, particularly if more than one target distance is being used. 1. In flat terrain, set up two staffs not more than 33 meters or 100 feet apart. 2. Set up the instrument so that it is equidistant from the two staffs (it is enough to pace out the distance) 3. Read off from both staffs and calculate the height difference (Figure 1 above). Example in feet Staff reading A = Staff reading B = H = A B = Note that the thousandth of a foot reading is interpolated using the foot rod. 4. Set up the instrument about two meter or 6 feet on line with and away from one of the two staffs. In this example A, and take the staff reading at rod A (Figure 2 below). Staff reading A = Calculate the required reading B. First read sight A, then subtract H (In this example Sight A is lower) Staff reading A = H = A H so required reading of B = Take the staff reading B. If it differs from the required reading by more than.005 foot or 2mm, adjust the line of sight (refer to instruction manual). Remember to adjust ½ the difference between the actual and 7

8 required reading. 7. Repeat steps 1 through 5 until the specification in step 6 is met. G. DIGITAL TERRAIN MODEL (DTM) DATA Terrain data collected for DTM generation should include 3d line strings along break lines, and spot elevations. Break lines collected in the field should include the following: CL and edge of paved roads, CL of dirt, or gravel roads CL and edge of paved or unpaved entrances or parking lots Curb or center island Back of curb and gutter line Paved or unpaved shoulders Edge of sidewalks CL of river, stream and draw flowlines Top of bank of rivers, streams, and draws Edge of water (lake, pond, stream, river, etc.) Top and toe of dams Other terrain break lines and features which are not visible in the aerial photography Break lines must not cross each other. Shots along the break line should be spaced to define changes along the break line with a maximum spacing of 100 feet. Spot elevations should be taken as needed to identify changes in the terrain. The format for electronic files containing spot shots and break lines should be provided as shown in attachment #8. H. PHOTOGRAMMETRIC CONTROL SURVEYS When applicable, the consultant shall provide the essential ground control survey. Using this survey, the consultant shall then determine the horizontal positions and elevations of all horizontal and vertical control points required for the photogrammetric compilation of planimetric and DTM data. This positioning should be established so that Photogrammetric CADD Mapping Specifications ("Attachment B") are achieved for DTM and planimetric compilation. The necessary horizontal control points shall be established in conjunction with an arbitrary local grid network chosen by the Iowa Department of Transportation. The standards for second-order horizontal control survey 8

9 (Manual of Photogrammetry, 4th ed.) shall be attained (see page 422, , 1:10,000). Vertical control points and the vertical components of full control points should be noted with elevations that are recorded to the nearest one-hundredth of a foot, accurate to ±.03 feet. The consultant shall prepare a control survey report consisting of descriptions, computations, and sketches. Upon completion of the contract, this report and all other material pertaining to the survey will become property of the Iowa Department of Transportation. I. DRAINAGE For streams that have drainage areas of 2 or less, a profile of the streambed must be shot at 100-foot intervals to a distance of 660 feet upstream and downstream from the centerline of survey. All streambed profiles will be measured up or down stream along the centerline of the stream. For an example see attachment 4. The top of the water must be shot at the following locations: The survey baseline Under bridges The tops and bases of dams The tops and bases of rapids 660 feet upstream and downstream These shots must be recorded to the nearest one-hundredth of a foot, accurate to +.03 feet. Low steel or low concrete will be recorded on all bridges within the bounds of the stream profile. For streams with drainage areas of 2 square miles or more, a profile of the streambed must be shot at 100 foot intervals to a distance of 1320 feet upstream and downstream from the centerline of survey. The top of the water must be shot at the following locations: The survey baseline Under bridges The tops and bases of dams The tops and bases of rapids 660 feet upstream and downstream 1320 feet upstream and downstream As with smaller streams, these shots must be recorded to the nearest one-hundredth of a foot, accurate to ±.03 feet. The low steel or low concrete will be recorded on all bridges within the bounds of the stream profile. In rural areas, valley section profiles must be shot downstream for streams with drainage areas of more than 10 square miles. In urban areas, valley section profiles must be shot downstream for streams with drainage areas of 2 square miles or greater. All valley section profiles shall be shot at right angles to the streambed and shall cover elevations at least three feet above known high water marks, both right and left of the streambed. Valley section profiles shall also be shot at the narrowest point in the valley, which is within 1500 feet of the survey baseline or survey centerline. For additional information and an example, see attachment 4 & 4A. Information relating to the extreme high water history of a water shed at a bridge location will be documented in a field book or on the back of form For a field book example, see attachment 4b. 9

10 Drainage Plats Drainage plats shall be created using 1"= 660' scale aerial photos or geographically referenced digital images that can be referenced into Microstation files. The consultant must follow the guidelines below for creating a drainage plat: Water soluble ink shall be used on the 1"= 660' aerial photograph All survey baseline and stationing every 500 feet All ridge lines shall be inked on the photograph to show the sizes of drainage areas All drainage directions (flow arrows) shall be inked on the photograph The drainage area and character of watershed for any draw or stream within the bounds of the survey shall be inked on the photograph Ridge lines shall be field verified Drainage patterns and information shall be included in the topography notes On all draws, and side ditches,(that cross a survey baseline), the drainage area and character of the watershed must be noted on the photo * For an example (in English units), see attachment 5. USGS 7-minute quad maps or the publication "Drainage Area of Iowa Streams" may be used to calculate drainage areas for streams with drainage areas of 640 acres or more. However, the 1"=660' aerial photographs must be used for drainage area calculations less than 640 acres and may be used for any drainage area. Upon request, the Department of Transportation will furnish the 1"= 660' aerial photographs. However, all 1"= 660' aerial photos will remain the property of the Iowa D.O.T., and upon completion of the D1 event date, these photos must be returned to the Department. At stream or draw crossings, the consultant must obtain field located break lines Rt. and Lt. of survey baseline to a distance of 200 feet. These break lines will be on the stream banks, toe of banks, and the centerline of the stream. These elevations must be recorded to the nearest one-hundredth of a foot, accurate to ±.03 feet. Bridges Any mainline or side road bridge which has a span of 20 feet or more and which is within the survey boundaries must have a bridge sheet (Iowa Department of Transportation form ). These existing features will include: 1) Topography from 300 feet back of the existing bridge floor's beginning to 300 feet ahead of the existing bridge floor's end. This topography shall be right and left from the survey baseline to a distance of 200 feet. 2) Elevations along the field located break lines and elevations at field located spot locations within the boundaries of # 1 above. 3) Low steel or low concrete elevations at the abutments and piers on centerline. The consultant must provide ground profile and break points under the centerline of the existing bridge. 4) Contours labeled with elevation, and position & elevation of the stream centerline break line points, the edges of water points, and the banks for any stream or draw within the limits of #1 above. 5) Positions and elevations at the ends of all pier tops. These elevations and positions are to be at the centerline of the piers. 6) Positions and elevations at both ends of the existing bridge deck and at the centerline and gutter line of the bridge. 7) Positions and elevations at the ends of bridge rails and wings. 8) All other drainage structures with positions and elevations within the limits described in #1 above. 10

11 Culverts Any culvert, draw, side-ditch, or pipe which has a drainage area within the survey boundary must have a culvert sheet (Iowa Department of Transportation Form #621001). These existing features will include: 1) Topography 100 feet back and 100 feet ahead of where the culvert crosses the survey baseline, right and left to a distance of 200 feet. 2) Elevations along the field located break lines and elevations at field located spot locations within the boundaries of # 1 above. Elevations noted and labeled on a sketch of the following items: Top of Parapet ( Top of Head wall ) Tops of openings Top of trough Flow lines Dirt, apron, and scour flowlines Locations/elevations of flowlines at any breaks in the barrel 4) Contours covering the area mentioned in # 1 above J. General Because there are unique characteristics to each drainage way, a strict set of requirements for the ground survey is not always practical. In addition to the specifications listed in this document, the drainage survey could include additional information sufficient to complete hydraulic studies, to set culvert flow lines, and to position culverts or bridges correctly. K. Data Collection 1) Electronically collected unedited data files shall be submitted to the Iowa Department of Transportation in a format supported by the Department s mapping software. (Currently Geopak Survey) Field feature coding must be used in accordance with the Geopak.smd library available from the Office of Survey. (Geopak Survey supports most modern data collection formats) 2) A calculated coordinate ASCII file corresponding to the collected data shall be submitted. The format shall be comma separated as follows: Point Number,N,N,E,Z,Feature code (space) description of feature attributes 3) The Department will provide a project number to be used in the naming of all electronic field survey files. 11

12 L. File Naming PRELIMINARY SURVEY FILE NAMING CONVENTION FILE NAMING CONVENTION: T J J J J N N N WHERE: T=FILE TYPE J=PROJECT # FOUR CHARACTOR NUMBER ASSIGNED IN THE PROJECT (SAP #) N=FILE NUMBER (000,002,003,ETC-MAIN LINE) OR A01,B01,C01,ETC-SIDE ROADS) FILE TYPES J J J J * J J J J 0 0 1, 002 & UP- * J J J J A 0 1, A02 & UP- * J J J J B 0 1, B02 & UP- * B J J J J N N N C J J J J N N N PJ J J J N N N EJ J J J N N N HJ J J J N N N CONTROL SURVEY - (Always the 000 file) SURVEY FILES( FIELD TOPO, DTM or X-SECTIONS) Mainline Files SURVEY FILES( FIELD TOPO, DTM or X-SECTIONS) Side Road A SURVEY FILES(FIELD TOPO, DTM or X-SECTIONS) Side Road B * NOTE: FILE NAME 7 CHARACTERS IN LENGTH NOT 8 BENCHES CONTROL FILE PHOTO CONTROL ELEVATION CONTROL HORIZONTAL CONTROL (ALIGNMENT OF BASELINES AND SIDE ROAD CL'S) I J J J J N N N VJ J J J N N N JJJJ.SUR INDEX FILE VALLEY SECTION MICROSTATION FILE WITH REQUIRED MODELS POINT NUMBERS- A point number should be used one time and one time only per project! CONTROL POINTS & GPS POINTS BENCHS PHOTO CONTROL PHOTO CONTROL (IN HOUSE) PHOTO CONTROL PASS POINTS ,999 SURVEY POINTS FILE EXTENSIONS Filename.RAW Original Raw Field file. (Field observations) Filename.ASC Calculated coordinates of the UNEDITED.RAW field file. (Point Number,N,E,Z,Feature code (space) description of feature attributes) Filename.COR EDITED version of the.asc field file. (Point Number,N,E,Z,Feature code (space) description of feature attributes). Edited data includes corrections in feature coding and modifications to descriptions, etc. 12

13 M. PRELIMINARY SURVEY FILE TYPES Traverse Surveys A Traverse is defined as a series of courses and distances that forms a connection between two project control stations for supplemental horizontal control within the project. The traverse between the control monuments shall not exceed 2 miles in length. Two or more single traverses may be combined into one file. Each traverse must have an unadjusted error radius of not more than 0.15 on its closing point. Unedited traverse files will be furnished to the Department. Traverse error will be adjusted according to accepted survey standards. Critical control points on existing alignments included in the project will be included in the traverse or observed and adjusted by multiple Global Positioning observations. 000 Files Control Survey file These files include traverse files described above. This file naming convention is used by IDOT personnel to collect additional control along the survey corridor. In addition to the added horizontal control, all benches shall be tied to the traverse line between the known control stations. This file contains all raw field data to control points, benches, curve points and as-built control points within the survey corridor. Field Survey Files These files contain the majority of field data collected. Record all Topography and Data Terrain Model information in these files. The occupied station and backsight coordinates should be obtained from the control file. B-Bench Files The B files contain electronic 3-wire bench levels data. All bench levels shall be run by the three-wire method and checked by the loop system. A loop will be considered closed when a Datum bench (3rd order or better) is fixed at both ends of the run. Benches shall be recorded to the nearest one-hundredth of a foot and adjusted to the nearest one-thousandth of a foot in the adjustment report. An accurate description of the benchmark shall be recorded. The calculated version of this file shall have a.cal extension. Note: Benchmarks shall have the N, E, Z, value recorded in the (C- Control File) of the project. A stationoffset report of all project benches shall be created. General information and datum equation information shall be described in a narrative supplied the index file. If the bench data is not recorded electronically this data shall be recorded in a field book. A bench adjustment sheet shall be provided on all surveys. Digital levels may be used. Trig leveling and GPS derived orthometric heights (elevation) on benchmarks may be used provided the vertical accuracy in this specification [.05 X the square root of the circuit s length (in Miles)] can be verified. Such verification must be documented. 13

14 P-Photo Control When applicable, the consultant shall provide the essential ground control survey in electronic files using the preliminary survey file naming convention. Using this survey, the consultant shall then determine the horizontal positions and elevations of all horizontal and vertical control points required for the Photogrammetric compilation of planimetric and DTM data. The necessary horizontal control points shall be established in conjunction with an arbitrary local grid network chosen by the Iowa Department of Transportation. The standards for second-order horizontal control survey (Manual of Photogrammetry, 4th ed.) shall be attained (see page 422, , 1:10,000).. Horizontal Alignments Existing plan Horizontal alignments will be submitted in a Geopak database (.gpk) or in a format supported by Geopak software. V-Valley Section When a Valley Section is shot on a stream or river, record all information in a this file. I-Index File The Index file shall be supplied in electronic format and shall include a listing all of the submittal Items listed below. The report shall address the entire project and shall include all of the information necessary to find specific field data, datum information, etc. The report will include, but not necessarily be limited to, the following: 1. Introduction. The introduction shall include, but not necessarily be limited to, the following: The county. The project number. The project description. Time frame of the project ( i.e. arrival and departure dates of the field survey). Vertical Datum information of the project. Horizontal Datum information of the project. The name, mailing addresses, and phone numbers to the point of contact for which the survey was performed and the organization that performed the services. 14

15 2. Personnel. Personnel involved in the data acquisition; data processing, editing, GPS control and creation of the index. 3. Utility legend. A utility legend that clearly defines the feature codes, point descriptions and ownership of all utilities within the bounds of the survey. 4. Feature table used on the project, Control numbers used on the project, Bench numbers used on project, survey point numbers used on the project, and figure numbers used on the project. 5. File listing. A complete listing of all files submitted with the survey. Included with the file name narrative describing the type and location of the information associated with the file. 6. Notes submitted. A complete list of submittals. Iowa Department of Transportation Feature Codes and Mapping A feature code library is maintained by the Office of Survey. It is a Geopak Survey based (SMD) file that controls mapping of survey information into required models in a Microstation file with a.sur extension. The Office of Survey will provide the Microstation seed file and the smd.. A Geopak data file named (DDB) will be provided that contains custom tools used by the Iowa Department of Transportation to automate drawings. Instructions on using a Geopak library and tools will be provided to the surveyor or surveying firm. (SMD) and (DDB) files are subject to updating. Contact the Office of Survey for the most recent release. Consultant Project Submittal List before D1 event can be cleared Electronic files of the field survey Field Survey Information. All field survey data collector files shall be submitted electronically. Files shall include but may not be limited to the following: Traverse, Collection, Index, Control File, Bench Levels, Photo Control, and Alignment. Electronic file names shall conform to the IDOT naming conventions (See File naming section). All field books and/or files containing datum information, alignment information and equations to as built plans. Bench level adjustment information including identification number, station and distance out, horizontal coordinates, and final elevation for each benchmark. Alignment geometry in.gpk compatible format Control point references in a electronic Micro station "G sheet" format. (See Attachment) Culvert pink front/sheet (Form Nos ) for each mainline and sideroad culvert. Bridge front/sheet (Forms Nos ) for each bridge. Drainage Area information. Property owner information. 15

16 Utility Legend identifying ownership (with address and phone numbers) and reference to Micro station file. File containing Photo Control point information. File containing all index information outlined in this specification G sheet example 16

CHAPTER 11 SURVEY CADD

CHAPTER 11 SURVEY CADD CHAPTER 11 SURVEY CADD Chapter Contents Sec. 11.01 Sec. 11.02 Sec. 11.03 Sec. 11.04 Sec. 11.05 Sec. 11.06 Sec. 11.07 Sec. 11.08 Sec. 11.09 Sec. 11.10 General Description of Survey File Contents of Survey

More information

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02

Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 Section E NSPS MODEL STANDARDS FOR TOPOGRAPHIC SURVEYS Approved 3/12/02 1. INTRODUCTION This standard is written to provide the professional surveyor (Surveyor) and the client with a guideline for producing

More information

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS

PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS PART XIII: HYDRAULIC/ HYDROLOGY SURVEYS 13.1 Purpose and Scope Hydraulic surveys are required for flow analysis to determine bridge and culvert design characteristics. A hydraulic survey is usually but

More information

PART XII: TOPOGRAPHIC SURVEYS

PART XII: TOPOGRAPHIC SURVEYS PART XII: TOPOGRAPHIC SURVEYS 12.1 Purpose and Scope The purpose of performing topographic surveys is to map a site for the depiction of man-made and natural features that are on, above, or below the surface

More information

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect

Survey Requirements. Design Guidelines and Standards. June Office of the University Architect Design Guidelines and Standards Survey Requirements June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Survey Requirements

More information

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN

CHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional

More information

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder

9 LAND SURVEYING. 9.1 General. 9.2 Administrative Requirements Standards Meetings Survey Data Provided to the Design-Builder 9 LAND SURVEYING 9.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with land surveying, including Project and supplemental horizontal and vertical control

More information

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS

CITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------

More information

CHAPTER 11. Plan Standards

CHAPTER 11. Plan Standards CHAPTER 11 Plan Standards A. Introduction The city requires uniform public improvement plans for ease of record keeping and understanding. The following standards govern most plan submittals to the city.

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1C-12 Issue date: August 2012 1. General SURVEY, MAPPING AND UTILITY LOCATING This Directive has been developed as a general guide for the survey and mapping effort required for Fund projects.

More information

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS

CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS CITY OF LOMPOC DEVELOPMENT ASSISTANCE BROCHURE E-10 ENCROACHMENT PERMITS AND PUBLIC IMPROVEMENT PLANS The City of Lompoc has determined that the Engineering Division should administer and issue Encroachment

More information

Site Plan/Building Permit Review

Site Plan/Building Permit Review Part 6 Site Plan/Building Permit Review 1.6.01 When Site Plan Review Applies 1.6.02 Optional Pre- Application Site Plan/Building Permit Review (hereafter referred to as Site Plan Review) shall be required

More information

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges

50.24 Type, Size and Location Plans for Culverts, Bridges and Culvert Bridges 50.24 Culverts, Bridges and Culvert Bridges Type, Size and Location (T, S & L) Plans shall be required for all Bridges, Culvert Bridges and Culverts of eight-foot (8') clear span or greater as follows:

More information

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project

Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Bureau of Engineering SURVEY DIVISION REQUEST FOR TOPOGRAPHIC SURVEY Date Requested, 200_ Work Order No. Funding source Name of project Project limits: Purpose of the project Caltrans involvement (must

More information

Plan Preparation Checklist

Plan Preparation Checklist Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC

More information

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee)

LOWNDES COUNTY ENGINEERING PLAN REVIEW CHECKLIST. Design Professional: Phone: Developer: Phone: 2 nd Submittal (No Fee) MEMORANDUM MICHAEL B. FLETCHER, P.E. COUNTY ENGINEER 327 N. Ashley Street Valdosta, GA 31601 Telephone: (229) 671-2424 Fax: (229) 245-5299 mfletcher@lowndescounty.com LOWNDES COUNTY ENGINEERING PLAN REVIEW

More information

CONTRACT PLANS READING

CONTRACT PLANS READING CONTRACT PLANS READING A training course developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2009 revision was carried out under the direction of Ralph Ellis, P. E., Associate Professor of Civil

More information

SURVEY GUIDANCE AND FORMS

SURVEY GUIDANCE AND FORMS Appendix H Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN SURVEY GUIDANCE AND FORMS Version 2.0 April 2014 1 Table of Contents Section 1 Survey and Mapping... 1 1.1 Introduction...

More information

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS

SECTION 3 IMPROVEMENT PLAN REQUIREMENTS SECTION 3 IMPROVEMENT PLAN REQUIREMENTS CONTENTS Page 3-1 Digital Submittals 3-2 3-2 Paper Size and Scale 3-2 3-3 Drafting Standard 3-2 3-4 Title Sheet 3-2 3-5 Title Block 3-3 3-6 Drainage, Sewer, Water,

More information

CITY OF MUSKEGO DRAFTING STANDARDS

CITY OF MUSKEGO DRAFTING STANDARDS CITY OF MUSKEGO DRAFTING STANDARDS GENERAL - These standards apply to all plans. 1. Plans must be prepared on sheets measuring 36 inch across and 22 inch to 24 inch high unless otherwise specified under

More information

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT

REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT REQUEST FOR PROPOSAL AERIAL PHOTOGRAPHY & DIGITAL MAPPING ROADS DEPARTMENT The Cherokee Nation is requesting proposals from qualified professionals to provide aerial photography and digital mapping of

More information

Suveying Lectures for CE 498

Suveying Lectures for CE 498 Suveying Lectures for CE 498 SURVEYING CLASSIFICATIONS Surveying work can be classified as follows: 1- Preliminary Surveying In this surveying the detailed data are collected by determining its locations

More information

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2

CHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW

More information

Survey Data and TOPO Checklist

Survey Data and TOPO Checklist Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand

More information

Town of Westlake Construction Plans Review Checklist

Town of Westlake Construction Plans Review Checklist CONSTRUCTION PLANS CONTENTS All Drawings 24 x 36 Cover Sheet Final Plat Site Plan Demolition Plan Utility Plan Drainage Area Map and Calculations Paving Plan & Profile Sheets Storm Drain Plan & Profile

More information

SECTION SITE SURVEYS

SECTION SITE SURVEYS SECTION 02 21 13 SITE SURVEYS SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section to specify survey required before design

More information

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248)

Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248) Fax (248) Oakland County Michigan Register of Deeds Plat Engineering, GIS, & Remonumentation Dept. Ph: (248)-858-1447 Fax (248)-858-7466 Requirements Needed for Final Condominium Approval General Requirements. 1

More information

Ohio Department of Transportation, VBA Documentation

Ohio Department of Transportation, VBA Documentation Contents 1.1 Current Versions... 2 1.2 Overview... 3 1.3 Supporting Files and Standards... 4 1.3.1 ODOT_Drainage.cel... 4 1.3.2 ODOT2013.ddb... 5 1.4 ODOT_StormSewerPlan2013.mvba... 6 1.4.1 Mode: Place

More information

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS

SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS SECTION 100 PRELIMINARY CONSIDERATIONS & INSTRUCTIONS 101 General 102 Submittal Requirements A. Initial Submittal B. Second Submittal 103 Plan Requirements A. Subdivisions B. Site Plans 104 Approval of

More information

Option 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted

Option 1. Design Options are diverse e.g. new route alignments covering a wide area. Option 2. Design Options are restricted MINIMUM STANDARD Z/16 SURVEY SPECIFICATIONS 1. GENERAL This specification sets out the Consultant s requirements for topographical survey (ground and aerial) for the Detailed Business Case (DBC) and Pre-Implementation

More information

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist

Anne Arundel County Dept. of Inspections and Permits Storm Drain Checklist Project Name Project Number Engineer Plans are to be designed based on the standards set forth in the Anne Arundel County Design Manual Standards and Specifications, and all other manuals as stipulated

More information

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST

B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary

More information

List of Figures. List of Forms

List of Figures. List of Forms City of Columbia Engineering Regulations PART 1: SUBMISSION OF PLANS Table of Contents Paragraph Description Page No. 1.1 General 1-1 1.2 Engineer s Report 1-1 1.3 Plans 1-3 1.4 Revisions to Approved Plan

More information

DEVELOPMENT PLAN CHECKLIST

DEVELOPMENT PLAN CHECKLIST Project Identification Information: DEVELOPMENT PLAN CHECKLIST 1.0 GENERAL 1.1 Additional information as required by specific Land Use 1.2 All sheets to include sheet number ( of ) 1.3 Seal and signature

More information

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO.

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA ROUNDING DETAIL TYPICAL NO. FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2434. TO STA. 244035.16 STA. 244396.83 TO STA. 2449. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) CUT SECTION STA. 242849.86 TO STA. 2453.88

More information

1.1 GENERAL RECORD DRAWING REQUIREMENTS

1.1 GENERAL RECORD DRAWING REQUIREMENTS Page 1 of 5 VILLAGE OF ROMEOVILLE RECORD DRAWINGS CHECKLIST PART I GENERAL Record drawings are required to provide a means of schematic verification that the intent of the approved engineering design has

More information

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS

ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS ACWWA DRAWING SUBMITTAL INFORMATION - UTILITY DRAWING REQUIREMENTS Detailed construction drawings for system extensions shall be prepared for approval with a submittal to the Authority. All construction

More information

PRELIMINARY PLAT CHECK LIST

PRELIMINARY PLAT CHECK LIST Name of Proposed Subdivision: The following items must be included with the initial submittal of a Preliminary Plat: Application, filled out completely Project Narrative Pre-application Conference Report

More information

Automated Machine Guidance

Automated Machine Guidance Design Manual Chapter 5 - Roadway Design 5H - Automated Machine Guidance 5H-1 Automated Machine Guidance A. Concept Automated machine guidance (AMG) for grading is a process in which grading equipment,

More information

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc.

Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc. HIGHWAY PROJECT EXPERIENCE Traffic and Roadway Improvements - Rte 123 (Belmont Street) Brockton, MA Client: BETA Group, Inc. Alpha provided survey services to prepare a base plan of an approximately 2900

More information

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360)

CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA (360) CITY OF TUMWATER 555 ISRAEL RD. SW, TUMWATER, WA 98501 (360) 754-4180 Email: cdd@ci.tumwater.wa.us WATER-SEWER-STREET-STORM (IN CITY) Submittal Checklist TUM - RCVD BY DATE STAMP APPLICANT INFORMATION

More information

B-PERMIT PLAN CHECK MANUAL

B-PERMIT PLAN CHECK MANUAL B-PERMIT PLAN CHECK MANUAL 5. SEWER PLANS Sewer Plans are usually submitted in conjunction with Street Plans to meet the requirements of conditions imposed on a Planning or Zoning action. In some cases

More information

City of Massillon Site Plan Checklist

City of Massillon Site Plan Checklist City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete

More information

Sewer Line Extension Permit Design Checklist

Sewer Line Extension Permit Design Checklist CHECKLIST C1 Revised 4/7/2017 Sewer Line Extension Permit Design Checklist DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling sewer line

More information

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS

MINIMUM DRAWING REQUIREMENTS FOR WATER AND SEWER LINE PROJECTS Public Works Department Water & Wastewater Services WATER & WASTEWATER ENGINEERING DIVISION 2555 West Copans Road Pompano Beach, Florida 33369 954-831-0745 FAX 954-831-0798/0925 MINIMUM DRAWING REQUIREMENTS

More information

CONCEPT REVIEW GUIDELINES

CONCEPT REVIEW GUIDELINES Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES

More information

Surveying & Measurement. Detail Survey Topographic Surveying

Surveying & Measurement. Detail Survey Topographic Surveying Surveying & Measurement Detail Survey Topographic Surveying Introduction Mapping surveys are made to determine the relief of the earth s surface and locate critical points on it. to determine the locations

More information

PRECONSTRUCTION SURVEYING PROCEDURES AND STANDARDS FOR ENGINEERING & DESIGN

PRECONSTRUCTION SURVEYING PROCEDURES AND STANDARDS FOR ENGINEERING & DESIGN SOUTH CAROLINA DEPARTMENT OF TRANSPORATION PRECONSTRUCTION SURVEY MANUAL PRECONSTRUCTION SURVEYING PROCEDURES AND STANDARDS FOR ENGINEERING & DESIGN Revised October, 2012 PREFACE This Preconstruction Survey

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 1.01 DEVELOPMENT METHODS 1.01.01 References 1.01.02 General 1.01.03 Survey and Mapping Methods 1.02 PLAN SHEETS MICHIGAN DESIGN MANUAL 1.02.01 Title Sheet A. Project Location B. Traffic Data C. Project

More information

Alabama Standards of Practice for Surveying

Alabama Standards of Practice for Surveying PDHonline Course L144 (6 PDH) Alabama Standards of Practice for Surveying Instructor: Jerry Thacker, PLS, P.E. and John C. Huang, Ph.D., P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax,

More information

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST

CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation

More information

AMENDMENT NUMBER 5 TO THE AGREEMENT BETWEEN THE CLIENT AND KIMLEY-HORN AND ASSOCIATES, INC.

AMENDMENT NUMBER 5 TO THE AGREEMENT BETWEEN THE CLIENT AND KIMLEY-HORN AND ASSOCIATES, INC. Contract fll429e AMENDMENT NUMBER 5 TO THE AGREEMENT BETWEEN THE CLIENT AND KIMLEY-HORN AND ASSOCIATES, INC. AMENDMENT NUMBER 5 DATED SEPTEMBER 30,2010 to the Agreement between the City of Greenville,

More information

SECTION 4 DESIGN SURVEYS

SECTION 4 DESIGN SURVEYS SECTION 4 DESIGN SURVEYS Table of Contents Page No 4.1 AERIAL PHOTOGRAPHY CRITERIA...1 4.1.1 SCALE OF NEGATIVES... 1 4.1.2 PHOTOGRAMMETRIC GROUND CONTROL... 1 4.1.3 LOW ALTITUDE MAPPING & PHOTOGRAMMETRY

More information

Authorized Agent: City of Manassas Check List Attached: Contact: Address: Phone Number: Fax Number: Developer s Name: Phone Number:

Authorized Agent: City of Manassas Check List Attached: Contact:   Address: Phone Number: Fax Number: Developer s Name: Phone Number: CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street Room 201 Manassas, Virginia, 20110 Phone: 703-257-8278 Fax: 703-257-5831 Application Date: APPLICANT

More information

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)

Site Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.) 1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone

More information

Washington County Road Engineering Plan Submittal/Review Checklist

Washington County Road Engineering Plan Submittal/Review Checklist Washington County Road Engineering Plan Submittal/Review Checklist Washington County Land Use Case File Number: Parcel(s): Developer/Owner Name(s): Developer/Owner E-mail(s): The following elements should

More information

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16

City of Beaumont. Public Works Engineering. Street Improvement Plan Checklist REV 4/18/16 City of Beaumont Public Works Engineering Project Name: TR: Project No.: Date: Street Improvement Plan Checklist Chk A. All Sheets 1. 24" x 36" 2. Signed by the engineer-of-work 3. Marked with the contact

More information

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS

REQUIREMENTS. for ENGINEERING SERVICES PUBLIC CONSTRUCTION PROJECTS REQUIREMENTS for ENGINEERING SERVICES on PUBLIC CONSTRUCTION PROJECTS April, 2007 David W. Johnson Senior Engineer Design & Construction Requirements for Engineering Services on Public Construction Projects

More information

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET

CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET CITY OF OLIVETTE SITE PLAN AND COMMUNITY DESIGN REVIEW INFORMATION PACKET THE FOLLOWING PACKET CONTAINS: PETITION FOR NONRESIDENTIAL DEVELOPMENT SITE PLAN AND COMMUNITY DESIGN REVIEW SCHEDULE OF DATES

More information

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006

BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.

More information

2D/3D Topographic Survey Terrestrial LiDAR (3 Dimensional Laser Scanning)

2D/3D Topographic Survey Terrestrial LiDAR (3 Dimensional Laser Scanning) SURVEYORS REPORT State Road 91 (Florida s Turnpike) Turnpike Widening from Osceola Parkway to Beachline Specific Purpose Survey Financial Project Identification (FPID) No. s 411406 1 32 01 and 411406 4

More information

3. DESIGN SPECIFICATIONS

3. DESIGN SPECIFICATIONS Schedule H to Bylaw 7452, Subdivision Bylaw Page 10 3. DESIGN SPECIFICATIONS 3.1 General 3.1.1 The Design Specifications apply to the design of sanitary sewers, storm drains, waterworks, roadways, and

More information

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3

Florida's Turnpike Enterprise Roadway Phase III (90%) & Phase IV (100%) Check List Per FDM and TDH Part 3 Notes to Reviewers Section 301 Design Exceptions, Variation, and Technical Memorandums Special directives date and source Key Sheet Section 302 Location Map w/ location of project on map All applicable

More information

Ecological Restoration Drafting & Design Guidelines

Ecological Restoration Drafting & Design Guidelines Ecological Restoration Drafting & Design Guidelines Version 2.0 July 2017 Philadelphia Water Ecological Restoration Drafting & Design Guidelines Table of Contents 1.0 INTRODUCTION...2 2.0 GENERAL PLAN

More information

June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) SURVEYING AND MAPPING MANUAL

June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) SURVEYING AND MAPPING MANUAL June 20, 2007 SURVEYING AND MAPPING MANUAL Table of Contents (1) CHAPTER 1 GENERAL SURVEYING AND MAPPING MANUAL TABLE OF CONTENTS 1-1 INTRODUCTION...1 1-1.01 PURPOSE...1 1-1.02 SCOPE...1 1-2 SURVEYING

More information

Subdivision Application Checklist

Subdivision Application Checklist City of Portsmouth, New Hampshire Subdivision Application Checklist This subdivision application checklist is a tool designed to assist the applicant in the planning process and for preparing the application

More information

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE)

Work Type Definition and Submittal Requirements Work Type: Subsurface Utility Engineering (SUE) MUST be qualified under Minnesota Department of Transportation Prequalification Program - Work Type 15.1 Subsurface Utility Engineering The first section, Work Type Definition, provides a detailed explanation

More information

Porter County Plan Commission

Porter County Plan Commission Plan Type: Development Plan Administrative DRC PC Primary Plan Administrative DRC PC Secondary Plat/Replat Administrative DRC PC PUD Conceptual Detailed Final Project Information Project Name: Developer

More information

670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6

670 10/26/17 SSD: 07/14/16, 09/16/17 Page 1 of 6 SSD: 07/14/16, 09/16/17 Page 1 of 6 S P E C I A L P R O V I S I O N Section MISCELLANEOUS INCIDENTALS Item.822 - GNSS Construction Inspection Equipment Description SAMPLE PROJECT 12345 10/30/17 1.1 Work

More information

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION:

CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: CITY OF APACHE JUNCTION DEVELOPMENT SERVICES CIVIL ENGINEERING PLAN REVIEW CHECKLIST PROJECT: LOCATION: LOG NO.: LEGEND REVIEW REVIEWED BY DATE / - Requirement satisfied 1 O Requirement not satisfied 2?

More information

Survey Control Point Observations

Survey Control Point Observations Level Name SURVEY_CTRL SURVEY_CTRL_CHK_NODE SURVEY_CTRL_NODE SURVEY_CTRL_OBS SURVEY_CTRL_REF_SYM SURVEY_CTRL_SETUPS SURVEY_CTRL_SYM SURVEY_CTRL_TXT SURVEY_DTM_BREAKLINE SURVEY_DTM_BREAKLINE_NODE SURVEY_DTM_CHECK_NODE

More information

Update: July 20, 2012

Update: July 20, 2012 Location and Design Manual, Volume 3 ODOT Office of CADD and Mapping Services Update: July 20, 2012 ** NOTE: All metric references have been removed from this manual. ** PREFACE REVISIONS Glossary of Terms

More information

Project Name: County File No.: Checked by: For: Date:

Project Name: County File No.: Checked by: For: Date: Project Name: County File No.: Checked by: For: Date: Print name Firm or agency Items noted in the checklist shall be considered the minimum amount of information necessary for submission of construction

More information

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA

Plan Submittal Checklist for Permit Projects Compliance Required Information. (Answer Yes or Not Applicable (NA)) Yes NA Note: This Checklist has been created to assist in and maintain a uniform review of Construction Design Documents for projects done under permit with the County. This document has been created by the Permit

More information

CHAPTER 5 PHOTOGRAMMETRIC SURVEYS

CHAPTER 5 PHOTOGRAMMETRIC SURVEYS CHAPTER 5 PHOTOGRAMMETRIC SURVEYS Chapter Contents Sec. 5.01 Sec. 5.02 Sec. 5.03 Sec. 5.04 Sec. 5.05 Sec. 5.06 Sec. 5.07 Sec. 5.08 Sec. 5.09 Sec. 5.10 Sec. 5.11 Sec. 5.12 Sec. 5.13 Sec. 5.14 Sec. 5.15

More information

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT

SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SUMMIT COUNTY PLANNING AND ENGINEERING DEPARTMENT SINGLE-FAMILY SITE PLAN INFORMATION PACKET GENERAL INFORMATION This information packet explains how your application for a single-family site plan will

More information

Chapter 13 Plan Submittals

Chapter 13 Plan Submittals Chapter 13 Plan Submittals U30013.DOC 02/01/07 Chapter 13 Plan Submittals Section Topic Page 13.1 General 13.1 13.2 Subdivision Plans 13.1 13.3 Capital Improvement Project Plans 13.12 U30013.DOC 02/01/07

More information

Commonwealth of Virginia Survey Manual. Date: _ Commonwealth of Virginia

Commonwealth of Virginia Survey Manual. Date: _ Commonwealth of Virginia Commonwealth of Virginia Survey Manual Date:1-07-2013_ 2013 Commonwealth of Virginia FOREWORD This manual has been prepared for the guidance of all personnel engaged in securing and using s urvey da ta.

More information

Grease Interceptor Design Checklist

Grease Interceptor Design Checklist CHECKLIST C2 Revised 5/2/2016 Grease Interceptor Design Checklist Public Works DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling private

More information

The several methods for making linear measurements are quite simple and straightforward. They are described below:

The several methods for making linear measurements are quite simple and straightforward. They are described below: INTRODUCTION TO LINEAR MEASUREMENTS Many pay items are measured on the basis of linear measurements - items such as guardrail, pipe culvert, curb and gutter, fencing, etc. These measurements usually are

More information

Section 101. Street Design

Section 101. Street Design Section 101 Street Design This section establishes the uniform policies and procedures for the preparation of street design plans and construction requirements in the City of Irvine. It is not intended

More information

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS

CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1

More information

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1

UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 UTILITY AND STREET CONSTRUCTION PLAN REQUIREMENTS SECTION 1 ENGINEERING STANDARDS FOR UTILITY AND STREET CONSTRUCTION PLANS MARCH 2014 CONSTRUCTION PLAN SHEET FORMAT REQUIREMENTS REPRODUCIBLE MYLAR 1.

More information

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL

WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL WATER & SEWER CONSTRUCTION SITE PLAN DESIGN SUMMARY COMMERCIAL & RESIDENTIAL This summary is not all inclusive of the requirements set forth by the York County Planning & Development Services, York County

More information

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G.

Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters Prepared by Wesley G. Instructors Manual for Construction Surveying and Layout Third Edition Part Three - Applications Chapters 19-22 Prepared by Wesley G. Crawford TABLE OF CONTENTS Chapter 19 - Layout Techniques... 3 Chapter

More information

Lab #4 Topographic Maps and Aerial Photographs

Lab #4 Topographic Maps and Aerial Photographs Lab #4 Topographic Maps and Aerial Photographs Purpose To familiarize you with using topographic maps. Visualizing the shape of landforms from topographic maps is an essential skill in geology. Proficiency

More information

The coordinate system and vertical datum shall be noted in the drawing in the metadata.

The coordinate system and vertical datum shall be noted in the drawing in the metadata. Purpose This document is provided for informational purposes and to assure data compatibility and compliance for as-built drawings or vector data formats specifically for the 354th Civil Engineer Squadron

More information

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc.

This Land Surveying course has been developed by. Failure & Damage Analysis, Inc. This Land Surveying course has been developed by Failure & Damage Analysis, Inc. www.discountpdh.com www.pepdh.com Bridge Surveying SURVEYS Bridge surveying is necessary to locate a site, obtain information

More information

Appendix N: Data Capture Guidelines Summary of Changes

Appendix N: Data Capture Guidelines Summary of Changes Appendix N: Data Capture Guidelines Summary of Changes The following Summary of Changes details revisions of Appendix N subsequent to the initial publication of the Draft Appendix N in April 2004. These

More information

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING

SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1 of 5 SUBMITTAL REQUIREMENTS RCV D REJECT PENDING 1. General Information. 1.1 Applicant s name, address and contact numbers. 1.2 Project name, type, address and legal description of the property. 1.3

More information

Appendix E-4. City of Fort Collins. Requirements for Utility Plans

Appendix E-4. City of Fort Collins. Requirements for Utility Plans Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development

More information

Plan Submittal and Review Checklist

Plan Submittal and Review Checklist Improving quality of life today creating a better tomorrow Plan Submittal and Review Checklist Version 1.2 September 4, 2017 Contents Overview... 2 Plan Submittal Checklist... 2 Plan Review Checklist -

More information

SITE PLAN Application Packet (Required For All Non-Residential Development Projects)

SITE PLAN Application Packet (Required For All Non-Residential Development Projects) SITE PLAN Application Packet (Required For All Non-Residential Development Projects) Community Development Department 90 North Main Street, Tooele, UT 84074 (435) 843-2130 Fax (435) 843-2139 Dear Applicant,

More information

1. Land survey Work. 2. Civil and Structural engineering services.

1. Land survey Work. 2. Civil and Structural engineering services. SECTION 01050 FIELD ENGINEERING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

Cleveland State University

Cleveland State University CVE 212 - Surveying Lab #4 LOCATION SURVEY EQUIPMENT Right angle mirror (pentaprism) Surveyor s tape Plumb bobs Range poles INTRODUCTION Many times the surveyor is called upon to catalog details of a project

More information

COURSE SYLLABUS SURVEYING I

COURSE SYLLABUS SURVEYING I Solution Manual for Surveying Fundamentals and Practices 6th Edition by Nathanson Lanzafama Emeritus Link full download: http://testbankcollection.com/download/solution-manual-forsurveying-fundamentals-and-practices-6th-edition-by-nathanson-lanzafamaemeritus/

More information

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d

CHECKLIST 9-O. 24. Area of project in square feet and acres? C-1 d Development Name: Submitted by: Highlands County Engineering Department Improvement Plan Checklist Date Received: Due Date: Y N E N / S O A Permits/Approvals 1. Copy of water management district permit

More information

Lesson 8: Surveying the Forest

Lesson 8: Surveying the Forest Lesson 8: Surveying the Forest TEACHER: SCHOOL: GRADE LEVEL: 9-12 TASKS/COMPETENCIES ANR8046.172 Set up and operate a transit level and rod. ANR8046.173 Read a rod and a level to calculate slope. ANR8046.174

More information

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT

A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT 400. 402.A. ARTICLE 4 SKETCH PLAN REQUIREMENTS, MAJOR SUBDIVISION AND/OR LAND DEVELOPMENT SECTION 400 PURPOSE The purpose of the Sketch Plan is to provide an opportunity for the applicant to consult early

More information

MAJOR GRADING PLAN CHECKLIST

MAJOR GRADING PLAN CHECKLIST MAJOR GRADING PLAN CHECKLIST PUBLIC WORKS DEPARTMENT / ENGINEERING DIVISION 8130 Allison Avenue, La Mesa, CA 91942 Phone: (619) 667-1166 Fax: (619) 667-1380 Grading plans shall address both rough grading

More information