Archaeological Survey Ballintober Castle Ballintober, Co. Roscommon Ireland RO Niall Brady. for. Castle Studies Trust 2014 Grant award

Size: px
Start display at page:

Download "Archaeological Survey Ballintober Castle Ballintober, Co. Roscommon Ireland RO Niall Brady. for. Castle Studies Trust 2014 Grant award"

Transcription

1 Archaeological Survey Ballintober Castle Ballintober, Co. Roscommon Ireland RO Niall Brady for Castle Studies Trust 2014 Grant award Figures 18-34

2 interior shattered base batter fosse Section Point cloud data 0 4 ndow/gun loop Plan Section line Figure 18: Plan and section of the mural stairs on the north wall Note: The figure shows the point cloud data acquired by laser scan survey on the left side, and the archaeological interpretation on the right side.

3 Figure 19: Isometric view through the Southwest tower, looking southwest 0 15

4 Second Floor level lines of floor plans First Floor Ground Floor Long Section A-A1 A Cross Section B-B1 ga ch B st A B1 Ground Floor First Floor Second Floor Figure 20: Southwest corner tower, floor plans and sections Notes: ch - chamber - fireplace ga - garderobe st - stairwell - ndow

5 recess for Second-Floor joists First-Floor fireplace recess for First- Floor joists arched recesses for Ground-Floor ceiling West-facing elevation view of main chamber garderobe details lay outside the scanned zone West-facing elevation view of north chamber 0 10 Figure 21: Ortho-images shong interior perspective of Southwest tower Note: Within the north chamber, survey was only possible on the ground floor level, but the result reveals the detail of the main unit and the base ot its barrel-vaulted ceiling.

6 Figure 22: Isometric view of the Northwest tower, looking east Note: this view and Figure 25 were processed in Bentley Pointools, which proved less easy to work in than Realworks, which was used for processing the cloud point data in the other figures. The lighter colour on the base batter is a processing issue and does not exist in reality.

7 Third Floor Second Floor bl level lines of floor plans First Floor Ground Floor bl A Long Section A-A1 bl bl B Cross Section B-B1 B st A1 Ground Floor First Floor Second Floor Third Floor Figure 23: Northwest corner tower, plans and sections Notes: - fireplace ndow st - stairwell bl - blocked ndow

8 East-facing West-facing gable Roof line Third Floor sl cb cb sl sl Second Floor sl cb cb cb sl North sl First Floor North Notes: cb - corbel - fireplace sl - joist slot ndow sl Ground Floor sl sl Figure 24: Ortho images shong interior perspective of main chamber in Northwest tower 0 5

9 Figure 25: Long-section view through the Northwest tower

10 Figure 26: Isometric view through Northeast tower, looking northeast 0 5

11 First Floor level lines of floor plans Ground Floor Section A-A1 0 5 A A1 Figure 27: Northeast corner tower, floor plans and sections Notes: - fireplace ndow Wall thicknesses need to be checked due to growth

12 North-facing East-facing First floor Ground floor north perimeter wall northeast corner tower Notes: - fireplace ndow Figure 28: Ortho images shong north and east walls of Northeast tower 0 5

13 buttress Figure 29: Isometric view through Southeast tower, looking southeast 0 5

14 First floor level lines of floor plans Ground floor buttress Section A-A1 0 5 A1 buttress buttress A Figure 30: Southeast corner tower, floor plans and section Notes: ndow Wall thicknesses need to be checked due to growth

15 East-facing South-facing Southwest-facing First floor First floor Ground Ground floor floor 0 5 buttress Figure 31: Ortho images shong east and south walls of Southeast tower Notes: ndow/gun loop opening

16 Figure 32: Isometric view through eastern entrance, looking out southeast 0 5

17 First Floor level lines of floor plans Ground Floor Basement top of slope Handball Alley base of slope West-facing elevation, shong slice lines of floor plans Cross Section A-A1 A1 Handball Alley rc fc base of slope hole Basement Ground Floor First Floor A Figure 33: Eastern entrance towers, floor plans and section Notes: fc - front chamber rc - rear chamber - ndow/gun loop opening 0 20

18 North-facing South-facing castle interior rc 0 5 fc castle exterior castle exterior fc hole (basement level) rc castle interior Figure 34: Ortho images shong internal perspectives of eastern entrance Notes: fc - front chamber rc - rear chamber - ndow/gun loop opening

The Castle House Assembly Instructions By Laser Dollhouse Designs

The Castle House Assembly Instructions By Laser Dollhouse Designs The Castle House Assembly Instructions By Laser Dollhouse Designs HOUSE PARTS First floor slots labeled 1A-1G First floor Walls labeled 1A-1G First floor interior door frames (4) Wall 1A frames (6) Main

More information

The Rowen Victorian Assembly Instructions By Laser Dollhouse Designs

The Rowen Victorian Assembly Instructions By Laser Dollhouse Designs The Rowen Victorian Assembly Instructions By Laser Dollhouse Designs Parts Listing 1. Four main floors A. Base Floor with markings S1 thru S6 B. 1 st Floor with markings 1A thru 1H C. 2 nd Floor with markings

More information

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB

BRYANT HERITAGE PLAZA 5301 Magasin Avenue Beaumont, AB BRYANT HERITAGE PLAZA, AB RE-ISSUED FOR BUILDING PERMIT May 9, 206 L I S T O F D R A W I N G S HD ENGINEERING SERVICES LTD. D.B.K. ENGINEERING LTD. D.B.K. ENGINEERING LTD. JUBILEE ENGINEERING CONSULTANTS

More information

185'-3 5/8" LOT DEPTH 92'-7 13/16" 92'-7 13/16" N89 54'02"W ' 24' HEIGHT LIMIT 31' HEIGHT LIMIT

185'-3 5/8 LOT DEPTH 92'-7 13/16 92'-7 13/16 N89 54'02W ' 24' HEIGHT LIMIT 31' HEIGHT LIMIT 0.670.7, CO 5.6., TX 0.670.7 x7 5'- 5/" LOT DEPTH LOT BLOCK #6 ADJACENT RESIDENCE 9'-7 /6" 9'-7 /6" ADJACENT RESIDENCE 9.6' 55'-0" 7'-0" '-0" S00 00'00"E 7.00' +9. +9.5 5' REAR SETBACK 6'-0 /6"REAR 5%

More information

KENT COUNTY. Reynolds House K November 1998-January 1999

KENT COUNTY. Reynolds House K November 1998-January 1999 Kent County 67 KENT COUNTY Site Name: CRS Number: HABS Number: Location: Date of Field Work: Type of Documentation: Reynolds House K-4406 DE-O~~ South side of Delaware Route 10 between Routes 108 and 251

More information

Yew Cottage 87, Main Street. Elevations

Yew Cottage 87, Main Street. Elevations Modern County/Historic County East Yorkshire/East Riding YORKSHIRE VERNACULAR BUILDINGS STUDY GROUP Parish/Township West Cowick Name of Building Yew Cottage 87, Main Street National Grid Ref SE 6521 2151

More information

Vertical Offset Base and Safety Rail System Installation Instructions

Vertical Offset Base and Safety Rail System Installation Instructions Section 5 Vertical Offset Base and Safety Rail System Installation Instructions The vertical offset base and safety rail assembly are designed to be used in residential construction for sloped or flat

More information

Kristiana Tudor Assembly Instructions By Laser Dollhouse Designs

Kristiana Tudor Assembly Instructions By Laser Dollhouse Designs Kristiana Tudor Assembly Instructions By Laser Dollhouse Designs Parts for assembly Second floor base Third floor base First floor base First floor walls and porch rails Second floor walls Third floor

More information

The Hamlin Assembly Instruction By Laser Dollhouse Designs

The Hamlin Assembly Instruction By Laser Dollhouse Designs The Hamlin Assembly Instruction By Laser Dollhouse Designs NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also gives

More information

Trefadog, Llanfaethlu

Trefadog, Llanfaethlu 1021 North West Wales Dendrochronology Project: Trefadog, Llanfaethlu Ymddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust North West Wales Dendrochronology Project: Trefadog, Llanfaethlu

More information

Hegeler Carus Mansion Assembly Instructions By Laser Dollhouse Designs

Hegeler Carus Mansion Assembly Instructions By Laser Dollhouse Designs Hegeler Carus Mansion Assembly Instructions By Laser Dollhouse Designs Parts for assembly 2 nd floor base 3 rd floor base 1 st floor base 4 th floor base Lower roof panel Mid roof panel Upper roof panel

More information

Carpentry/Carpenter CIP Task Grid

Carpentry/Carpenter CIP Task Grid 1 Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify

More information

Carnton Mansion E.A. Johnson Center for Historic Preservation, Middle Tennessee State University, Murfreesboro, Tennessee, USA

Carnton Mansion E.A. Johnson Center for Historic Preservation, Middle Tennessee State University, Murfreesboro, Tennessee, USA Carnton Mansion E.A. Johnson Center for Historic Preservation, Middle Tennessee State University, Murfreesboro, Tennessee, USA INTRODUCTION Efforts to describe and conserve historic buildings often require

More information

GUIDELINES FOR MEASURING BUILDING HEIGHT

GUIDELINES FOR MEASURING BUILDING HEIGHT GUIDELINES FOR MEASURING BUILDING HEIGHT THE CITY S POLICIES ON BUILDING HEIGHT In 1994, the City adopted a new General Plan that sets direction for development within Brisbane. Among its policies affecting

More information

GlasRoc Sheathing Type X

GlasRoc Sheathing Type X Wall / Fire-Rated Systems 3-5/8" (92 mm) Steel Studs ProRoc Steel Stud System 3-5/8" (92 mm) Steel Track 3-1/2" (89 mm) Glass Fiber or Mineral Wool Insulation GlasRoc Sheathing Type X UL Design U465 Cavity

More information

Hall of Waters List of Historic Drawings

Hall of Waters List of Historic Drawings List of Historic Drawings The following represents the historic drawings of the PROJECT PWA PROJECT NUMBER JOB NUMBER SHEET NUMBER SHEET TITLE DATE NOTES 1935 Drawing Piping Layout at Tank Room for Mineral

More information

The Antigua OPTIONAL ELEVATION C

The Antigua OPTIONAL ELEVATION C The Antigua OPTIONAL ELEVATION C Elevations INCLUDED ELEVATION A OPTIONAL ELEVATION B OPTIONAL ELEVATION C FIRST FLOOR Elevation A, B & C ELEVATIONS A & B SECOND FLOOR Elevation B THIRD FLOOR Elevation

More information

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227

March 1, Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 March 1, 2017 Courtney Wilton Portland Public Schools 501 North Dixon Portland, OR 97227 Via email: Regarding: cwilton@pps.net Lead Paint Condition Assessment Sunnyside School 3421 SE Salmon Street Portland,

More information

Photo Robin Road, looking west (contributing) Photo Robin Road, looking northwest (contributing)

Photo Robin Road, looking west (contributing) Photo Robin Road, looking northwest (contributing) CULTURAL RESOURCES EVALUATION OF PROPERTIES IN THE CITY OF AUDUBON PARK FOR RESIDENTIAL SOUND INSULATION LOUISVILLE REGIONAL AIRPORT AUTHORITY, JEFFERSON COUNTY, KENTUCKY Photo 39. 3306 Robin Road, looking

More information

St Aidan, Thorneyburn An Archaeological Assessment March 2014

St Aidan, Thorneyburn An Archaeological Assessment March 2014 St Aidan, Thorneyburn An Archaeological Assessment March 2014 The Church from the South West 1 Aidan, Thorneyburn St Aidan s Church (NGR NY 7862087688), built by the Commissioners for Greenwich Hospital

More information

RECORD GROUP NUMBER 156

RECORD GROUP NUMBER 156 DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION HOSPITAL AND SCHOOL FOR THE RETARDED ARLINGTON, TENN. BLUEPRINTS, 1965 RECORD GROUP NUMBER 156 Processed by: David R. Sowell Archival Technical Services

More information

Entry Level Assessment Blueprint Carpentry

Entry Level Assessment Blueprint Carpentry Entry Level Assessment Blueprint Test Code: 4115 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Safety Demonstrate safe material handling practices Display comprehension of workplace/job-site

More information

Michigan THE. Colonial Series ELEVATION 4

Michigan THE. Colonial Series ELEVATION 4 THE Michigan ELEVATION 4 Colonial Series Additional Elevations ELEVATION 1 ELEVATION 2 ELEVATION 3 ELEVATION 4 f. ce met First Floor Wall Oven Gourmet Gourmet Pantry Pan Morning Sliding Glass Pantry Pantry

More information

Drywall, Wood and Truss Uplift

Drywall, Wood and Truss Uplift Drywall, Wood and Truss Uplift Drywall (gypsum board) has to: provide rigidity provide aesthetics provide fire protection not leak air Concerns Wood moves. Drywall does not move. Interesting problem. The

More information

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS

LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS LESSON 1: UNDERSTANDING CONSTRUCTION DRAWINGS INTRODUCTION In this lesson, you ll learn about the different types of drawings used in the construction industry, and how to read floor plans, section drawings,

More information

Little Briana Cottage Dollhouse assembly instructions

Little Briana Cottage Dollhouse assembly instructions Little Briana Cottage Dollhouse assembly instructions NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit. This also gives

More information

North West Wales Dendrochronology Project Bron Goronwy, Ffestiniog, Gwynedd

North West Wales Dendrochronology Project Bron Goronwy, Ffestiniog, Gwynedd North West Wales Dendrochronology Project Bron Goronwy, Ffestiniog, Gwynedd EAS Client Report 2011/07 May 2011 Engineering Archaeological Services Ltd Unit 2 Glanypwll Workshops Ffordd Tanygrisiau Blaenau

More information

SECOND FLOOR 1159 sq. ft.

SECOND FLOOR 1159 sq. ft. Nook 9'11" x 11'11" Great Room 12'11" x 11'11" Walk-in Closet Master 12'5" x 12'11" Half room Walk-in Closet Shelves Foyer Linen onus Room 13'5" x 12'11" D W FRONT GARAGE HOME TWO STOREY ATHROOMS 2.5 EDROOMS

More information

Grade Level Benchmarks and Components

Grade Level Benchmarks and Components Grade Level Benchmarks (GLB) describe the concepts and skills we want students to know and be able to demonstrate in each grade level and each course. Teachers will assess student academic performance

More information

2D Drawings Levels of Detail Specification

2D Drawings Levels of Detail Specification 2D Drawings Levels of Detail Specification March 2018 2D Measured Building Survey Level of detail Level of detail should be chosen based on the intention that the final drawings will be used for. It should

More information

3647 N SOUTHPORT AVE CHICAGO, IL 60613

3647 N SOUTHPORT AVE CHICAGO, IL 60613 DEVELOPER P.O. BOX 1041 EVANSTON, ILLINOIS 60204 P: (773) 529-3700 P: (773) 977-8072 C O P Y R I G H T 2 0 1 7, S U L L I V A N G O U L E T T E W I L S O N, L T D. ARCHITECT SULLIVAN GOULETTE & WILSON,

More information

ST PETER S CHURCH HUMSHAUGH Northumberland. The church from the north-east

ST PETER S CHURCH HUMSHAUGH Northumberland. The church from the north-east ST PETER S CHURCH HUMSHAUGH Northumberland The church from the north-east 1 ST PETER S CHURCH, HUMSHAUGH The village of Humshaugh is situated on the west side of the North Tyne valley c 8km north of Humshaugh,

More information

THE. Harbor Master ELEVATION 2

THE. Harbor Master ELEVATION 2 THE Harbor Master ELEVATION 2 Additional Elevations ELEVATION 1 ELEVATION 3 Lower Level Patio 28'10" x 12'0" Mechanicals on Raised Platform H Lower Entry HVAC Parking 20'4" x 48'0" Side Entry Garage Side

More information

*For complete material(s) information, refer to

*For complete material(s) information, refer to Butler Community College Science, Technology, Engineering, and Math Division Brett Trimpe Revised Spring 2016 Implemented Fall 2016 COURSE OUTLINE Residential Design and CAD I Course Description EN 103.

More information

Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs

Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs Craftman One Car Garage Assembly Instruction by Laser Dollhouse Designs NOTE 1: Please do a dry assembly using only tape to hold house together. This will get you familiar with parts, location, and fit.

More information

Twin plate stanchions supporting folded metal panels

Twin plate stanchions supporting folded metal panels Twin plate stanchions supporting folded metal panels design elements S1 Twin plate stanchions supporting folded metal panels S1 design Utilising folded plate as balustrade infill rather than the more common

More information

Fairmont at Carillon Club - Naperville. Fairmont Options drhorton.com/carillon facebook.com/drhortonchicago

Fairmont at Carillon Club - Naperville. Fairmont Options drhorton.com/carillon facebook.com/drhortonchicago COME HOME TO STAY... COME HOME TO STAY... Fairmont Options Fairmont at Carillon Club - Naperville Available Luxury Bath Available Serenity Shower Available Luxury Serenity Shower Elevation A Elevation

More information

Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural

Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural Design Technology Architectural Design 2 The second in a sequence of courses that prepares individuals with knowledge of residential architectural and related construction. This course includes instruction

More information

ARCHITECTURAL DESIGN II (544)

ARCHITECTURAL DESIGN II (544) DESCRIPTION The second in a series, Architectural Design II prepares students with knowledge of residential architectural and related construction. Topics include; building materials, building codes, typical

More information

NATIONAL REGISTER OF HISTORIC PLACES INVENTORY -- NOMINATION FORM

NATIONAL REGISTER OF HISTORIC PLACES INVENTORY -- NOMINATION FORM Form No. 10-300a (Rev. 10-74) UNITED STATES DEPARTMENT OF THh INTHRIOR NATIONAL PARK SERVICE NATIONAL REGISTER OF HISTORIC PLACES INVENTORY -- NOMINATION FORM DEPRESSION-ERA BUILDINGS CONTI NUAT1ON SHEET

More information

A step by step guide to recording a building

A step by step guide to recording a building BUCKINGHAMSHIRE ARCHAEOLOGICAL SOCIETY HISTORIC BUILDINGS GROUP A step by step guide to recording a building First, the essential safety bit! Never work alone (unless you are surveying your own house!)

More information

Appendix A Site Reconnaissance Photographs

Appendix A Site Reconnaissance Photographs Appendix A Site Reconnaissance Photographs PHOTOGRAPH 1. Access to the Site from the intersection of 7 th Street and Michigan Avenue Direction : West PHOTOGRAPH 2. Access to the Site from the intersection

More information

Develop an Interior perspective from a floor plan using 2 points. using orthographic projection techniques

Develop an Interior perspective from a floor plan using 2 points. using orthographic projection techniques Develop an Interior perspective from a floor plan using 2 points using orthographic projection techniques Obtain a floor of the space to be drawn Digital or hand drawn plan Plan must be to scale Often

More information

Section 11 CABLE & ROD SYSTEMS, SIGN FIXING & SIGN STANDOFFS. Web. acrylicdesign.ie .

Section 11 CABLE & ROD SYSTEMS, SIGN FIXING & SIGN STANDOFFS. Web. acrylicdesign.ie  . Section 11 CABLE & ROD SYSTEMS, SIGN FIXING & SIGN STANDOFFS Web. acrylicdesign.ie Email. sales@acrylicdesign.ie Acrylic Design 2004-2015 Mobile Cable System Components Single panel clamp Stand Off for

More information

Allied Tool is a freelance model of a small manufacturing company that grew from production in a home basement to a new building. Assume a gentleman starts assembling gauges in his basement and the business

More information

ConstructDXF DXF Drawing Requirements User Guide <Virtual Environment> 6.0

ConstructDXF DXF Drawing Requirements User Guide <Virtual Environment> 6.0 ConstructDXF DXF Drawing Requirements User Guide 6.0 Page 1 of 8 Contents 1 Introduction... 3 1.1 Purpose of this Guide... 3 1.2 What is ConstructDXF?... 3 2 Preparation of the DXF

More information

What Plans Do I Need for a Building Permit?

What Plans Do I Need for a Building Permit? What Plans Do I Need for a Building Permit? 6 CITY OF PORTLAND, OREGON - BUREAU OF DEVELOPMENT SERVICES 1900 SW 4th Avenue, Por tland, Oregon 97201 503-823-7300 www.portlandoregon.gov/bds This brochure

More information

BUILDING PLANS. BUILDING DEPARTMENT

BUILDING PLANS. BUILDING DEPARTMENT BUILDING PLANS BUILDING DEPARTMENT 952-446-1660 www.cityofminnetrista.com This handout is intended only as a guide and is based in part on the 2015 Minnesota Residential Code, Minnetrista City ordinances,

More information

WALL TO FABRICATED FLOOR

WALL TO FABRICATED FLOOR WALL TO FABRICATED FLOOR PERIMETER WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN PARTITION WALL IS HELD IN PLACE BY WOODEN STRIP SCREED OPTIONAL NSF COVED FLOOR IS SHOWN

More information

ASSEMBLY INSTRUCTIONS FOR 14 x 14 SONOMA ARCHED TOP PERGOLA : OPTIONAL SIDEWALL WINDOW LATCHES Wall Panel Batten Strip Top Cap For Wall Base Beam For

ASSEMBLY INSTRUCTIONS FOR 14 x 14 SONOMA ARCHED TOP PERGOLA : OPTIONAL SIDEWALL WINDOW LATCHES Wall Panel Batten Strip Top Cap For Wall Base Beam For ASSEMBLY INSTRUCTIONS FOR 14 x 14 SONOMA ARCHED TOP PERGOLA : OPTIONAL SIDEWALL WINDOW LATCHES Wall Panel Batten Strip Top Cap For Wall Base Beam For Wall Size: 60.8 1543mm Size: 60 1520mm 4 Panel Wall

More information

Guide to The Craftsman Architects Drawings,

Guide to The Craftsman Architects Drawings, Avery Architectural and Fine Arts Library Department of Drawings & Archives Guide to The Craftsman Architects Drawings, 1904-1915 1000.032 Date Range: 1904-1915 Size: Preferred Citation: Acquisition Information:

More information

TO WHOM IT MAY CONCERN:

TO WHOM IT MAY CONCERN: TO WHOM IT MAY CONCERN: A lot of questions are asked throughout the year as to when a building permit is required. This list may help identify some of the instances when a permit would be required: Permit

More information

CORTEZ VILLAGE, MANATEE COUNTY, FLORIDA PREPARED FOR:

CORTEZ VILLAGE, MANATEE COUNTY, FLORIDA PREPARED FOR: ARCHITECTURAL DOCUMENTATION DORIS GREEN RESIDENCE CORTEZ VILLAGE, MANATEE COUNTY, FLORIDA PREPARED FOR: CORTEZ WATERFRONTS FLORIDA PARTNERSHIP COMMUNITY AND FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS PREPARED

More information

1 of 5. Directions: Upper Cornice. View of complete model

1 of 5. Directions: Upper Cornice. View of complete model Glue Storefront J K Cornice Here To Add Upper and Storefront Cornices 1. Cut out both Cornice pieces and fold all dotted lines. 2. Glue Upper Cornice tabs H and together to form a square tube. 3. Glue

More information

Entry Level Assessment Blueprint Architectural Drafting

Entry Level Assessment Blueprint Architectural Drafting Entry Level Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Preparing to Draw Identify drafting tools, materials, and

More information

Architectural Drafting

Architectural Drafting Measuring What Matters in Job Ready Assessment Blueprint Architectural Drafting Test Code: 4004 / Version: 01 Copyright 2012 General Assessment Information Blueprint Contents General Assessment Information

More information

2 Point Perspective. Point Perspective. Slide 1 of 40: Requirements

2 Point Perspective. Point Perspective. Slide 1 of 40: Requirements 2 Slide 1 of 40: Requirements Before we move on to How to draw a two point perspective, you will require a plan and an elevation of the Object you wish to draw perspective of. With a more complex object

More information

CARRIER OVERHANG 1'-0" MAX PANEL LENGTH 3'-0" MIN - 16'-0" MAX (RECOMMENDED) SPECIFICATIONS (unless noted otherwise)

CARRIER OVERHANG 1'-0 MAX PANEL LENGTH 3'-0 MIN - 16'-0 MAX (RECOMMENDED) SPECIFICATIONS (unless noted otherwise) DETAIL 5 32 5 " 27 32 " 6" OPTIONAL FLAT RECESSED CLOSURE 1 1 4 " 17 32 " 1 25 32 " OPTIONAL BUTTERFLY CLOSURE CARRIER OVERHANG 1'-0" MAX CARRIER SPAN 4'-0" 12 GA HANGER WIRE, BY OTHERS, NOT BY HUNTER

More information

SHEET INDEX PROJECT LOCATION. ARCHITECTS FORUM 8555 North River Road, Suite 220 Indianapolis, Indiana [P] [F]

SHEET INDEX PROJECT LOCATION. ARCHITECTS FORUM 8555 North River Road, Suite 220 Indianapolis, Indiana [P] [F] TRANSWESTERN 900 West Loop South, Suite 00 Houston, Texas 7707 [P] 7.70.7700 [F] 7.70.685 SYSTEM 8465 Keystone Crossing, Suite 0 4640 [P] 7.46.5544 ARCHITECTS FORUM 8555 North River Road, Suite 0 4640

More information

British Columbia Carpenter Apprenticeship Program

British Columbia Carpenter Apprenticeship Program British Columbia Carpenter Apprenticeship Program Level 3 Line H Competency H-7 Build Intersecting Roofs 7960003573 Ordering Crown Publications, Queen s Printer PO Box 9452 Stn Prov Govt 563 Superior St.

More information

CHARLESTON. excelhomes.ca IN MAHOGANY FRONT DRIVE HOME. 3 Bedrooms 21/2 Baths Two Storey 2354 sq. ft. finished sq. ft. unfinished basement

CHARLESTON. excelhomes.ca IN MAHOGANY FRONT DRIVE HOME. 3 Bedrooms 21/2 Baths Two Storey 2354 sq. ft. finished sq. ft. unfinished basement FRONT DRIVE HOME HRLESTON IN MHOGNY Last updated on September 3, 2015 3 edrooms 21/2 aths Two Storey 2354 sq. ft. finished + 696 sq. ft. unfinished basement Main Floor 1053 sq. ft. Second Floor 1301 sq.

More information

Chicago Public Schools 6 Month Asbestos Surveillance Fall

Chicago Public Schools 6 Month Asbestos Surveillance Fall Chicago Public Schools 6 Month Surveillance 2016 - Fall School: Chicago Military Academy - Bronzeville Oracle Unit: 70070 Building ID: 1800 Address: 3516 South Giles Avenue Region: 04 Mail Room: 41 Surveyor:

More information

PRELIMINARY INVENTORY OF PHILIP JOHNSON ARCHITECTURAL PROJECTS,

PRELIMINARY INVENTORY OF PHILIP JOHNSON ARCHITECTURAL PROJECTS, http://oac.cdlib.org/findaid/ark:/13030/kt0h4nd9mz No online items PROJECTS, 1984-1995 Finding Aid prepared by Vladimira Stefura Getty Research Institute Research Library Special Collections and Visual

More information

Experienced Worker Assessment Blueprint Carpentry

Experienced Worker Assessment Blueprint Carpentry Blueprint Carpentry Test Code: 0207 / Version: 01 Specific Competencies and Skills Tested in this Assessment: Hand Tools Use and maintain fastening and prying tools Use and maintain sawing and cutting

More information

Sample CREDITS. Line Developer: Simon Powell. Writing: Steven J. Black. Editing: James Sutton, Dawn Sutton. Layout: Dawn Sutton

Sample CREDITS. Line Developer: Simon Powell. Writing: Steven J. Black. Editing: James Sutton, Dawn Sutton. Layout: Dawn Sutton 2 CREDITS Special thanks go out to Steven J. Black for his help in writing and creativity, Vidar Edland for being my sounding board, and the Dundjinni forums for miles and miles of inspiration. ~Simon

More information

HDC November 13, 2013

HDC November 13, 2013 Charlotte Historic District Commission Application for a Certificate of Appropriateness HDC 2013-169 November 13, 2013 ADDRESS OF PROPERTY: SUMMARY OF REQUEST: OWNER: APPLICANT: 2309 Dilworth Road West,

More information

APPENDIX 6. SIGNAGE TYPES: Signage as manufactured by KROY Sign Systems, N. Hayden Road, Scottsdale AZ 85260

APPENDIX 6. SIGNAGE TYPES: Signage as manufactured by KROY Sign Systems, N. Hayden Road, Scottsdale AZ 85260 SIGNAGE TYPES: Signage as manufactured by KROY Sign Systems, 14555 N. Hayden Road, Scottsdale AZ 85260 STANDARD for all signs: Arch Gray color Plate & Border. University Logo (for sign types B & C). Helvetica

More information

Residential Design Using AutoCAD 2018

Residential Design Using AutoCAD 2018 Daniel John Stine CSI, CDT Residential Design Using AutoCAD 2018 Includes video instruction SDC P U B L I C AT I O N S Better Textbooks. Lower Prices. www.sdcpublications.com ACCESS CODE UNIQUE CODE INSIDE

More information

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1" = 10' - 0" SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD

S T U D I O P C M A R T I N E Z EXISTING SITE PLAN SCALE: 1 = 10' - 0 SET # GENERAL NOTES: Site/Roof Drainage Plan OCTOBER 16, 2015 CHABAD \\CANDELA\projects\-Chabad Center\Current Drawings\Chabad - -A-.0-extg-demo-site-plan.dwg, 0/0/0 :: PM, DWG To PDF.pc A-.0 SITE PLAN SCALE: " = 0' - 0" NORTH GENERAL NOTES: Site/Roof Drainage Plan. THE

More information

EASY STONE CENTER PHONE FAX NATURAL STONE SILLS AND SURROUNDS 3, 4 AND 5 INCH HEIGHT STANDARD

EASY STONE CENTER PHONE FAX NATURAL STONE SILLS AND SURROUNDS 3, 4 AND 5 INCH HEIGHT STANDARD NATURAL STONE SILLS AND SURROUNDS 3, 4 AND 5 INCH HEIGHT STANDARD S121 S126 S127 S132 S118 S124 S163 S129 S145 S143 5 AND 6 INCH HEIGHT STANDARD S188 S122 S261 S171 S156 S164 S135 S178 S184 S192 S204 S183

More information

Architectural Design Process

Architectural Design Process Architectural Design Process Custom Residential A. Schematic Design Phase Pre-Design Meeting Site Analysis Site Survey Conceptual Design & Project Scope Design Program Guideline Project Team Formation

More information

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC

COTTAGES AT OVERBROOK THE 'WOODSIDE' 541 LOWNDES HILL ROAD GREENVILLE, SC GREENVILLE, SC TYPE: MUNICIPAL ADDRESS: CUSTOM RESIDENTIAL XXX STREET GREENVILLE SC, 9607 A E J P T : OWNER:, LLC TAX MAP #: PROPERTY AREA: ZONING DISTRICT: BUILDING MATERIAL: BUILDING HEIGHT: FOUNDATION

More information

EXCEL HOMES GARNET MAIN FLOOR OPTIONS KITCHEN OPTION LOCATION OVERVIEW. excelhomes.ca

EXCEL HOMES GARNET MAIN FLOOR OPTIONS KITCHEN OPTION LOCATION OVERVIEW. excelhomes.ca Zero lot line home requires window to be removed. #10901 Half Mudroom Nook 12'11" x 9'11" 14'3" x 14'11" Foyer Zero lot line home requires window to be removed. #10901 Walk-in Closet Master edroom 15'11"

More information

A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING

A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING January, 2013 BUILDING DIVISION A GUIDE TO APPLYING FOR A BUILDING PERMIT FOR A DETACHED GARAGE OR ACCESSORY BUILDING This bulletin is for general guidance only. It does not replace by-laws or other legal

More information

Rembrandt THE. Colonial Series ELEVATION 5

Rembrandt THE. Colonial Series ELEVATION 5 THE Rembrandt ELEVATION 5 Colonial Series Additional Elevations ELEVATION 13 ELEVATION 33 ELEVATION 5 ELEVATION 4 First Floor Std. Vaulted Ceiling Std. Std. Vaulted Vaulted Ceiling Ceiling Morning Room

More information

Academic Plan Building Construction 2

Academic Plan Building Construction 2 Academic Plan Building Construction 2 Orientation to the Trade PACING: 3 weeks Unit Number: 1 Construction lab/ shop rules. Safety Contract Tool usage procedures. 1. Describe the history of the carpentry

More information

Industrial Technology Curriculum

Industrial Technology Curriculum Industrial Technology Curriculum Written 2009-2010 Mission Statement: Industrial Technology The Mission of the Oskaloosa Community School Industrial Technology Department is to provide opportunities to

More information

ST. ANDREWS TINY HOME VILLAGE SITE PLAN

ST. ANDREWS TINY HOME VILLAGE SITE PLAN 16 PUBLIC ALLEY FENCE ENCLOSURE = 70-0 4 WOOD FENCE AROUND SLEEPING UNITS 10-0 10-0 14-0 11-6 13-0 4 WOOD FENCE AROUND 14-9 12-8 3/4 BATH HOUSE PAVILION ADA SLEEPING UNIT FENCE ENCLOSURE = 73-5 SLEEPING

More information

Math 21 Home. Book 8: Angles. Teacher Version Assessments and Answers Included

Math 21 Home. Book 8: Angles. Teacher Version Assessments and Answers Included Math 21 Home Book 8: Angles Teacher Version Assessments and Answers Included Year Overview: Earning and Spending Money Home Travel & Transportation Recreation and Wellness 1. Budget 2. Personal Banking

More information

A-SL-1 A-SL-1 HAND RAIL STAIRS STRUCTURE/ ARCH SLIDE FOUNDATION 12" ROUND PIER 20" SQUARE PIER CAP DRILL AND EPOXY BOLTS *SEE FOUNDATION DETAILS

A-SL-1 A-SL-1 HAND RAIL STAIRS STRUCTURE/ ARCH SLIDE FOUNDATION 12 ROUND PIER 20 SQUARE PIER CAP DRILL AND EPOXY BOLTS *SEE FOUNDATION DETAILS 2X2 SQUARE TUBING /" WALL ON STRUCTURAL FRAME /8" WALL RAFTERS & INFILL NO. ISSUE HOUSE # GALVANIZED STEEL STAIRS SLIDE 2 GA SS POLISHED FINSHED LASER CUT FOUNDATION 2" ROUND PIER 20" SQUARE PIER CAP DRILL

More information

BTR 100. Blueprint Reading

BTR 100. Blueprint Reading BTR 100 Blueprint Reading Approved: December 3, 2010 EFFECTIVE DATE: Fall 2011 COURSE PACKAGE FORM Team Leader and Members Ken Kramer, Frank Port, Curtis Clough, Andra Goldberg Date of proposal to Curriculum

More information

Midterm Exam_STUDY GUIDE_70 questions

Midterm Exam_STUDY GUIDE_70 questions Class: Date: CADD 2 Midterm Exam_STUDY GUIDE_70 questions Multiple Choice Identify the choice that best completes the statement or answers the question. 2. 3. 4. 5. 6. 7. 8. 9. 10. 1. Producing computer

More information

OBX Beach Builders L.L.C.

OBX Beach Builders L.L.C. WRITTEN APPROVAL OF NO DERIVATIVE WORKS OF THIS PLAN MAY BE MADE WITHOUT PRIOR WRITTEN PERMISSION. THE PURCHASE OF THIS HOME PLAN ENTITLES THE PURCHASER TO USE THIS SET OF BEDROOM # BEDROOM #3 GREAT ROOM

More information

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING

DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY DWELLING INFORMATION BULLETIN / GENERAL INFORMATION REFERENCE NO.: None DOCUMENT NO. P/GI 2014-007 Previously Issued As: P/GI 2011-007 Effective: 01-01-2014 Revised: DOCUMENT SUBMITTAL REQUIREMENTS FOR A NEW MULTI-FAMILY

More information

Casa de Dios. 16 x 20 House. Construction Plans

Casa de Dios. 16 x 20 House. Construction Plans Casa de Dios 16 x 20 House Construction Plans In Association with Baja Christian Ministries www.bajachristian.org Downloads (PDF) available on-line at www.teamcasa.org Also available VIP Latrine plans

More information

Wall and Ceiling Framing

Wall and Ceiling Framing Student Edition Developed by the Curriculum and Instructional Materials Center for the Trade and Industrial Education Division Oklahoma Department of Career and Technology Education 00-00000 TI3674 Copyright

More information

12ft Octagon (Precut) Creekside Gazebo Assembly Manual

12ft Octagon (Precut) Creekside Gazebo Assembly Manual 12ft Octagon (Precut) Creekside Gazebo Assembly Manual Aug 1st, 2008 Revision #9 In Florida, additional hardware may be required that is not included in kit due to hurricane winds. Please check with local

More information

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings.

Dimension Below are the critical settings in AutoCAD. Other software should follow the same settings. 8.1 Drawing Standard 8.1.1 Introduction This drawing standard applies to all building drawings being prepared for the University of Calgary (UCalgary) by external consultants or vendors and internal staff

More information

House Design Tutorial

House Design Tutorial House Design Tutorial This House Design Tutorial shows you how to get started on a design project. The tutorials that follow continue with the same plan. When you are finished, you will have created a

More information

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft

Material Description Qty Units Cost Total SQUARE FOOTAGE TOTAL Area 1692 sqft Material Report for plan: Willowdale A Page 1 of 7 SQUARE FOOTAGE TOTAL Area 1692 sqft EXCAVATION & FOUNDATION EXCAVATION & BACKFILL Conc. Footing (volume) 5 m³ 122.50 612.50 Conc. Footing (length) 6"x20"

More information

Framing Tech 1

Framing Tech 1 Western Technical College 31410366 Framing Tech 1 Course Outcome Summary Course Information Description Career Cluster Instructional Level Total Credits 3.00 Total Hours 108.00 This course introduces the

More information

Fortuna Station Associates LP 2310 Terwood Road Huntingdon Valley, PA 19006

Fortuna Station Associates LP 2310 Terwood Road Huntingdon Valley, PA 19006 Fortuna Station Associates LP 2310 Terwood Road Huntingdon Valley, PA 19006 Fortuna Station GN-1 General Notes Fortuna Station DIAGRAMMATIC STAIR DETAIL GN-2 General Notes Fortuna Station ¾" GN-3 General

More information

Chapter 7 Computer-Aided Design and Drafting in Architecture 2D vs. 3D 3 Advantages/ Disadvantages

Chapter 7 Computer-Aided Design and Drafting in Architecture 2D vs. 3D 3 Advantages/ Disadvantages Chapter 7 Computer-Aided Design and Drafting in Architecture 2D vs. 3D 3 Advantages/ Disadvantages What is CADD or CAD CADD- CAD- BIM- What does BIM require? Intro to CADD & BIM 1 Autodesk AutoCAD REVIT

More information

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit

C.00. Ullrich Aluminium Co. Ltd. Ulltraclad Aluminium Cladding September Wall Batten Elevation. Horizontal battens between verticals at soffit Horizontal battens between verticals at soffit 2 C.04 600 600 600 600 Cavity batten at 600 mm centres 1 C.03 Batten fixing points 1 C.04 1 C.07 1 C.12 1 C.13 1 C.14 Meter Box Window 1 C.08 1 C.09 800 800

More information

Questions. Paul Ross Wallach V7198. Published by Hearlihy P.O. Box 1747 Pittsburg, KS

Questions. Paul Ross Wallach V7198. Published by Hearlihy P.O. Box 1747 Pittsburg, KS Questions for Blueprint-Reading Exams Paul Ross Wallach Published by Hearlihy P.O. Box 1747 Pittsburg, KS 66762 866-622-1003 www.hearlihy.com 81861 V7198 Copyright 2007 by Hearlihy. Except for making transparencies

More information

Bolton Chapel An Archaeological Assessment July 2013

Bolton Chapel An Archaeological Assessment July 2013 Bolton Chapel An Archaeological Assessment July 2013 1 Bolton Chapel Bolton Chapel, a chapel-of-ease (its dedication unknown) in the Parish of Edlingham, stands on an intriguing site, on top of a little

More information

STORAGE SHED. Storage Shed Project Plan #854 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks.

STORAGE SHED. Storage Shed Project Plan #854 Sheet 1 of Riverside Dr., Suite 212 Metairie, LA SouthernPine.com SouthernPineDecks. STORAGE SHED Project Plan #854 Sheet 1 of 6 Enjoying your backyard can be relaxing, but it can also get crowded. There s lawn furniture, gardening tools and supplies, camping gear, maybe even pool equipment.

More information

Step 1. Step 2. Step 3. Step 4. Painting Guide RF Reversible Slate Roof. RF Reversible Slate Roof Page 1 of 3. Side 1. Side 2.

Step 1. Step 2. Step 3. Step 4. Painting Guide RF Reversible Slate Roof. RF Reversible Slate Roof Page 1 of 3. Side 1. Side 2. RF-008 - Reversible Slate Roof Step 1 Step 2 White Base Gray (12:1) Step 3 White (GT002-W) Base Wood* (GT002-BW) Apply Base Wood over the wooden beams and window trim with a #3 (Painting) brush. Be careful

More information

Project Description: Welches #PTLDORPW47

Project Description: Welches #PTLDORPW47 Project Description: Welches #PTLDORPW47 Agency: Project #: Adapt #: FCC Form: Form 620 Project: Surveyor: Welches PTLDORPW47 OR12-17640-NEPA Dave Pinyerd with Historic Preservation Northwest for Adapt

More information

Gregg, Edd R., Architectural drawings, COLLAB- ORATOR (ROLE) PROJECT TYPE

Gregg, Edd R., Architectural drawings, COLLAB- ORATOR (ROLE) PROJECT TYPE MSS AR G89 Gregg, Edd R., 897-96 ural drawings, 939-956 BOX # FLDR # PROJECT NAME/ CLIENT/ TITLE PROJECT # (Class #) LOCATION CITY, COUNTY, OR STATE DATE Residence for Mr. and Mrs. Marshall Barnes -- basement

More information