MISCELLANEOUS SIGN CONNECTION DETAILS TYPICAL ROUTE MARKER ASSEMBLIES SIGN TO POST MICHIGAN DEPARTMENT OF TRANSPORTATION
|
|
- Timothy Cummings
- 6 years ago
- Views:
Transcription
1 5-4" SEE DETAIL I COUPLING BAR ON " CANTILEVER SIGN SUPPORT TYPICAL ROUTE MARKER ASSEMBLIES 5/1 DIAMETER STAINLESS STEEL BOLT AND NYLON INSERT LOCK NUT SELF-ALIGNING STEEL REINFORCING PLATE ( TYPE III SIGN ONLY) TYPE II OR III SIGN FLAT WASHER & NYLON WASHER SIGN TO POST DEPARTMENT DIRECTOR Kirk T. Steudle FOR Michigan Department of Transportation PREPARED BY DESIGN DIVISION APPROVED BY: DIRECTOR, BUREAU OF FIELD SERVICES MISCELLANEOUS SIGN CONNECTION DETAILS DRAWN BY: CHECKED BY: DHD AJU APPROVED BY: DIRECTOR, BUREAU OF HIGHWAY DEVELOPMENT 1 OF 5
2 \ OF POST 3/8 " DIAMETER HOLE () EXTENSION BAR (USE WHEN CARDINAL DIRECTION PANEL REQUIRED) 7" 24" 9" X 33 OR C3" X 4.1 lbs/ft X 33 BAR-2" X X 40" BAR-2" X X 8" (2 PLACES) 14" 14" 12" 8" 18" M1-3, & M1-5 M1-4 & M " 1 1 \ OF POST 3/8 " DIAMETER BAR-2" X X 37" 7 1/2" 24" 5 1/2" HOLE () X 33 OR C 3" X 4.1 lbs/ft X 33 14" BAR-2" X X 8" 14" 4" 18" M1-3 & M1-5 2 M1-4 & M1-6 5" 9" 1 1 (USED WITH 2-ROUTE MARKERS & 2-CARDINAL DIRECTION PANELS) SIDE VIEW OF NOTES: 1. ALL CONNECTIONS ARE INCIDENTAL TO PAY ITEM "SIGN, TYPE _". 2. ALL STEEL PARTS SHALL CONFORM TO MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. 3. FOR SIGN CONNECTIONS TO WOOD SUPPORTS SEE SIGN-210-SERIES. 4. USE BAR FOR WHEN "BANDING CONNECTION TO POLE" IS USED. 2 OF 5 NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE.
3 CANTILEVER POLE CANTILEVER POLE C3" X 4.1 lbs/ft X 3" C3" X 4.1 lbs/ft X 3" SADDLE FLAT WASHER NYLON WASHER OR SIGN TO CANTILEVER POLE SIGN TYPE III ONLY SELF-ALIGNING STEEL REINFORCING PLATE COLUMN POST 5/1 DIAMETER STAINLESS STEEL BOLT, TO POST 5/1 DIAMETER STAINLESS STEEL BOLT, TO COLUMN POST 3/8 " DIAMETER HOLE () BAR 2" X " X 37" 5/1 DIAMETER STAINLESS STEEL BOLT, 18" 4" TO POST 9" 5" M1-3 & M1-5 2 M1-4 & M1-6 3/8" DIAMETER HOLE EXTENSION BAR BAR 2" X X 8" DETAIL I () COUPLING BAR 3 OF 5 NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE.
4 MIN. 3" MAX. () SIGN PANEL ALL HOLES 7/1 DIA. () SIGN PANEL 2" ( FROM C L OF POST) 1 1/4 " x 1/4 " X VARIABLE (BARS) OR 2 lbs POST () EDGE OF PAV T BOTTOM HEIGHT (AS CALLED FOR ON PLANS) HOLES TO MATCH HOLES IN SIGN. PLACE FIBER OR PLASTIC SPACER BEHIND SIGN, WHERE REQUIRED, TO ENSURE FLAT SIGN FACE () 3/4" X 0.032" (MIN.) BANDING () FOR ROUTE C L OF POSTS (AS CALLED FOR ON PLANS) MARKER CLUSTER (4 REQ D) MULTIPLE SIGN PANEL INSTALLATION NOTES: 1. ALL HORIZONTAL MEMBERS ARE TO BE CONNECTED TO THE SIDE OF THE POST FACING TRAFFIC. 2. FOR INSTALLATIONS WHERE THE HORIZONTAL DIMENSION OF THE PANEL(S) IS EQUAL TO OR LESS THAN THE DISTANCE BETWEEN SUPPORTS, USE HORIZONTAL MEMBERS AS IN NOTE 1. ROUTE MARKER CLUSTER 3. WHERE A PANEL(S) HAS A HORIZONTAL DIMENSION 4" GREATER THAN THE CENTERLINE DISTANCE BETWEEN SUPPORTS, THE PANEL(S) IS TO BE FIELD DRILLED AND ATTACHED DIRECTLY TO THE SUPPORTS. POLE 4. THIS ITEM IS PAID PER EACH BAND. BANDING CONNECTION TO POLE 4 OF5 NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE.
5 POLE BANDING SIGN OVER 30" BAND AT 3 LOCATIONS 30" OR LESS, STRAP AT 2 LOCATIONS 3/4 " X O.025" (MIN.) BANDING () FOR SINGLE SIGN PANEL (2 OR 3 REQ D.) SINGLE SIGN PANEL POLE BANDING CONNECTION TO POLE NOTE: BANDING, S, SEALS, NUTS, BOLTS, AND WASHERS SHALL BE STAINLESS STEEL, PER MDOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. A 3 1/2" 1 3/4" 1 3/4" NOTES FOR STEEL SIGN REINFORCING PLATE: " R 7/1 DRILL.44".44".62".62" 1. MATERIAL: 12 GAUGE CARBON STEEL. 2. TOLERANCE ON ALL DIMENSIONS " 3. FINISH-AFTER STAMPING AND PUNCHING, GALVANIZE ACCORDING TO CURRENT SPECIFICATIONS FOR ZINC (HOT GALVANIZE) COATINGS ON PRODUCTS FABRICATED FROM PLATES OR STRIPS VARIES VARIES VARIES EQUAL TO POST THROAT OPENING DIMENSION A FRONT SECTION A-A STEEL SIGN REINFORCING PLATE 5 OF5 NOTE: THE ORIGINAL SIGNED COPY IS KEPT ON FILE AT THE.
TYPE J (20 FT - 40 FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" NOTE: sheet 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.
Column truss connection Chord splice (see details (See details sheets 3 & 4 of 10) s Top truss chord Free end panel 10-0" Support end panels length varies (See chart below) \ Truss Back truss chord Top
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More information(50 FT FT) MICHIGAN DEPARTMENT OF TRANSPORTATION 10-0" 7-6" 8-0" 6-0" Truss Depth. 3" sheets 5 & 6 of 10) DEPARTMENT DIRECTOR. Kirk T.
Column truss connection (See details sheets 3 & 4 of 10) \ Span (Odd number of panels) \ Span (Even number of panels) Back truss chord Top truss chord \ Truss Chord splice Truss depth (See details \ Left
More informationEND VIEW WEDGE TOP VIEW WOOD POST FOUNDATION DETAILS
X (NOMINAL POST) 1-1/ DIA. 2 HOLES X 8" (NOMINAL POST) 3-1/ DIA. 2 HOLES TAPERED HARD WOOD WEDGES (HARDWOOD WEDGE TO BE OAK, MAPLE OR OTHER APPROVED DENSE HARDWOODS) TO HOLD POST IN A STABLE POSITION AFTER
More informationSIG-032-B TRAFFIC SIGNAL MAST ARM POLE AND MAST ARM DETAILS - CATEGORY III LUMINAIRE ARM (SEE CONTRACT) 6'-0", 8'-0", 10'-0" NOMINAL SPREAD
Michigan Department of Transportation 6'-0", 8'-0", 10'-0" NOMINAL SPREAD (SEE CONTRACT) LUMINAIRE ARM (SEE CONTRACT) POLE CAP 1'-6" (6'-0" ARM) 1'-10" (8'-0" ARM) 2'-0" (10'-0" ARM) NOMINAL RISE 2.38"
More informationSIG-030-B TRAFFIC SIGNAL MAST ARM POLE AND MAST ARM DETAILS - CATEGORY I LUMINAIRE ARM 6'-0", 8'-0", 10'-0" NOMINAL SPREAD (SEE CONTRACT) POLE CAP
Michigan Department of Transportation 6'-0", 8'-0", 10'-0" NOMINAL SPREAD (SEE CONTRACT) LUMINAIRE ARM (SEE CONTRACT) POLE CAP 1'-6" (6'-0" ARM) 1'-10" (8'-0" ARM) 2'-0" (10'-0" ARM) NOMINAL RISE 2.38"
More informationFixings & Fastenings. Bright Zinc Plated, Galvanised & Stainless Steel. Lockinex. ea i, ea u i
Fixings & Fastenings Bright Zinc Plated, Galvanised & Stainless Steel Lockinex ea i, ea u i INTRODUCTION The Lockinex Range of Fixings & Fastenings are manufactured in Bright Zinc Plate, Hot dipped galvanised
More informationSteel Casework Metal Framing System
MISCELLANEOUS ITEMS Continuous Slot Metal Framing System Installs quickly Completely adjustable Re-usable Eliminates all welding, drilling and use of special tools G23 METAL FRAMING SYSTEM 1. Place the
More informationFURNITURE LABORATORY METAL FRAMING SYSTEM. For additional information and help in planning contact Mott Manufacturing.
LABORATORY Continuous Slot Metal Framing System For additional information and help in planning contact Mott Manufacturing. G22 Connection Instructions Installs quickly Completely adjustable Re-usable
More informationMAST ARMS & POLES. Ornamental Pole Top & Bases
Ornamental Pole Top & Bases Pelco s decorative pole top and bases make the traffic signal aesthetically pleasing to the eye. In addition to the standar 4-piece, Pelco also manufactures the bases with an
More informationBRIDGE RAILING, 4 TUBE B-26-F POST DETAILS MICHIGAN DEPARTMENT OF TRANSPORTATION
\ ƒ" x 1 " SLOTTED HOLE IN POST AND \ ƒ"! HOLE IN RAIL \ "! x 6" SLOTTED ROUND HEAD BOLTS, WITH 1 PLATE WASHER, 1 LOCK WASHER AND HEX. NUT \ ƒ" x 1 " SLOTTED HOLE IN POST AND \ ƒ"! HOLE IN RAIL \ "! x
More informationSIGN MOUNTED BEACON SIG-027-A SINGLE SIGN MOUNTED FLASHING BEACON INSTALLED ON ONE WOOD POST DETAIL "A-1"
1 1/2" x 60" Galvanized (thread both ends) Top Bolt See Detail "A-1" and Slotted Channel Parallel Conduit Clamp Warning Sign 3 Equal Bolt Spacings (3 places at 12" min. spacing) (1) 3/8"x 7" min. (4"x
More informationTransmission Line Support Systems
Antenna Support Bracket for transmission line The Antenna Support Bracket angle mounts directly to a 4-1/2" (114 mm) OD antenna pipe mount or tower leg. This is ideal for supporting transmission line runs
More informationSTEEL PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Pipe Rails and s shall be in accordance with ASTM A5 Grade B for standard weight pipe and ASTM A500 Grade B, C or D or ASTM A50 for structural tube. Bars for handrail supports
More informationALUMINUM PIPE GUIDERAIL 01/01/
NOTES PIPE RAILING & POSTS: Structural Tube, Pipe and Bar shall be in accordance with ASTM B22 or ASTM B429, Alloy 606-T6. End Rail 90 bends and corner bends with maximum 4-0" post spacing, may be Alloy
More informationNOTES: 4" OVERHANG MAX. (TYP) DETAIL N (SHEET 13)
L " X " X " L " x " x " DETAIL J GUSSET - '-" L " X " X " TRUSS SAN (FT) 50 L L2 (FT) (FT).5 5 TRUSS DATA L CAMBER (FT) (IN).5 5/ ESTIMATED BOX TRUSS WEIGHT (LBS/FT) '-0" x - LAN TO WIND BRACING LOOKING
More informationSECTION TRAFFIC SIGNAGE
SECTION 10 14 53 TRAFFIC SIGNAGE PART 1 - GENERAL 1.01 SECTION INCLUDES A. Furnishing and installing roadside traffic signage. B. Providing additional traffic signs as required in Sections 01 55 28 Controlling
More informationInstallation Instructions TMW Antenna Tower Mount for 4ft (1.2m) Antennas.
Description The following pages show the steps required to assembly and fit the antenna mount to a vertical tower pipe of diameter 48 to 115 mm (1.9 to 4.5"). This mount provides ±20 azimuth or ±15 elevation
More informationPOWER-Skru Large Diameter Concrete Screw
POWER-Skru Large Diameter Concrete Screw Description The POWER-Skru Large Diameter Concrete Screw is a highstrength screw anchor with self-tapping threads that offer a unique undercutting design for anchoring
More informationLeveling Feet, Base Plates and Casters
Leveling Feet, Base Plates and Casters 77 Leveling Foot 1 1 Fastening to profile end Fastening in T-slot of profile For leveling tables and light equipment. Ratchet-type height adjustment requires no tools.
More informationROUND STEEL POLE STRAIGHT
PROJECT NAME: CATALOG NUMBER: NOTES: FIXTURE SCHEDULE: Page: 1 of 7 ROUND STEEL POLE SPECIFICATIONS: Pole Shaft The pole shaft is fabricated from hot rolled steel tubing of onepiece construction with a
More informationFlooring Nails 6-D Flooring Nails $3.40 / 1# 6-D Flooring Nails $14.50 / 5# 8-D Flooring Nails $3.40 / 1# 8-D Flooring Nails $14.
Nails Nails Drywall Screws Common Nails 4D Common Nails $3.85 / 1# 6D Common Nails $3.00 / 1# 6D Common Nails $74.25 / 50# 8D Common Nails $3.00 / 1# 8D Common Nails $74.25 / 50# 10D Common Nails $3.00
More informationExclusive Cantilever Gates
Exclusive Cantilever Gates Chainlink Gates Aluminum Cantilever Gates Single Track Box Frame Components & Hardware Upper Track Lower Track Z4 Truck Assembly Z8 Truck Assembly All Gates Feature Enclosed
More informationM4 Hex Nut [ ] M4 T-Nut 20 [20-044] Appx. 1. 3mm. 20 Series profiles (1 per hole) (1 per hole) Ordering Information
Handles & Light Duty PA 20 1 Assembly of Hinge M4x8 FHCS [24-208-4] M4 T-Nut 20 [20-044] M4 Hex Nut [24-706-4] 60 300-0 PA 20 on panel 2 Hinge positions 3-4 Clearance dimensions 5 Range of swing FOR M4
More informationTIRE RACK INSTALLATION INSTRUCTIONS Dodge Sprinter
Aluminess Products Inc 9402 Wheatlands Ct. #A Santee, CA 92071 619-449-9930 TIRE RACK INSTALLATION INSTRUCTIONS 07-11 Dodge Sprinter Please read before beginning Stainless steel hardware may bind together
More informationTrack Rack. * Track Racks are not lockable
The Track Rack s unique staggered, sliding hook design creates the greatest parking efficiency while still providing easy access to any particular bike. When adding or removing a bike to the rack, simply
More informationMDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop
500 460 MDOTProjectwise\Documents\Reference Documents\Traffic Reference\Statewide Special Details\Develop Check if Applicable TRAFFIC SIGNAL SPECIAL DETAILS INDEX/CHECKLIST *One completed checklist required
More informationAmbient Weather EZ Stable Mounting Kit with Mast for AcuRite Weather Stations User Manual
Ambient Weather EZ-30-12-100 Stable Mounting Kit with Mast for AcuRite Weather Stations User Manual Table of Contents 1. Introduction... 1 2. Accessories... 1 3. Parts... 2 4. Warnings... 2 5. Recommended
More informationStandard Signs Manual
Standard Signs Manual NEW, CHANGED, OR DELETED 1/2017 STANDARD SIGN DETAILS Title Page Number Fractions... 101 Straight Arrows... 102 Double Head Arrows... 102A Double Head Arrows - 90... 102B Advance
More informationOne-sided rack, hot-dip galvanized Space between bicycles 350 mm length approx.kg Part-No. Two-sided rack, hot-dip galvanized
Bicycle rack Sturdy and space-saving due to alternating high and low racks. Racks can be bolted to form a serial system, with boreholes for anchoring or plugging. Bicycle parking rack Frame of angular
More informationBarofor Round System (polyester coated) Panels, Posts, Accessories
1 Scope This Technical Data Sheet specifies the requirements for the Barofor Round System. The complete system exists of: Panels Posts Accessories such as fixation system and posts caps. Panels and posts
More informationRH-412 STEEL DOORS INSTALLATION INSTRUCTIONS
RH-412 STEEL DOORS INSTALLATION INSTRUCTIONS By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side.
More informationDoor Canopy. PDL Building Products Industrial Parkway, N. Olmsted, OH Phone:
Door Canopy Door Canopies are attractive and efficient while eliminating the need and expense of drafting and manufacturing canopies as part of the building package. Construction: 26 gauge material around
More informationINSTALLATION INSTRUCTIONS RH 412 STEEL DOORS
By following the steps outlined below, the assembly, installation and adjustment of the steel doors, will be a simple process. Let s start with the Driver Side. Note: Having the hood open makes the job
More informationTOYOTA MOTOR EUROPE CA Products Division Tel : Fax :
TOYOTA MOTOR EUROPE CA Products Division Tel : + 32 2 745 26 77 Fax : + 33 2 745 26 99 Ordering part numbers Comments Part Numbers Wooden floor one hatch PZ449-D3C42-11 one hatch with carpet PZ449-D3C42-01
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Vertical Cable Panel System with Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all required
More informationItem 550 Chain Link Fence
Item Chain Link Fence 1. DESCRIPTION 2. MATERIALS Furnish, install, remove, repair, or replace chain link fence and gates. Furnish certification from the chain link fence materials manufacturer stating
More informationPIPE/CONDUIT SUPPORTS
PIPE/CONDUIT SUPPORTS Pipe/Conduit Clamps...102-105 Unicushion... 106 Pipe & Tubing (Cush-A-Clamp ) Clamps...107-110 Pipe Hangers... 111 Pipe Rollers...111-112 Pipe Brackets... 113 Reference Tables...114-120
More informationRBP-1215B-RX DODGE RAM QUAD CAB RX3
RBP-1215B-RX3 2002-2017 DODGE RAM 15-3500 QUAD CAB RX3 Passenger side RX-3 Side Step Drill Template Passenger side rear Modular Bracket (6) L Support Brackets Driver side rear Modular Bracket Driver side
More informationDETAILED ILLUSTRATION
FCF1100 Series (Mounting Knuckle to J-Box JB) - INSTALLATION INSTRUCTIONS electricity has been turned off and electrical 4) Reattach j-box cover, gasket and fixture to the j-box. to read these instructions
More informationProcedure for Testing Direct Tension Indicators (DTI) Assemblies
Procedure for Testing Direct Tension Indicators (DTI) Assemblies 1. Scope: This test is to ensure that the bolt will be at or above the specified minimum bolt tension after installation when the direct
More informationInstallation Manual ZGuard Mounting Options
Installation Manual ZGuard Mounting Options Above-Counter Heavy-Duty Flange (EZ-Span) (Entire EZ-Span unit not shown) Lift EZ-Span unit up until bottom of 1.5" diameter post clears internal heavy duty
More informationUP4 LEARN-A-LOT (PLAYFUL) Parts List DESCRIPTION 90 ANGLE BRACKET DOOR WINDOW MUSIC CATERPILLAR CIRCLE FRAME CIRCLE MIRROR YELLOW STAINED GLASS RED STAINED GLASS SQUARE TRIANGLE SPIRAL WHEEL SQUARE MIRROR
More informationHang-TITE Rod Hanger Screws
Description The Hang-TITE Rod Hanger Screw is a one-piece, internally threaded anchor designed for suspending threaded rod for applications like cable-tray, pipe hanging, fire protection, and electrical
More informationTuf-Lite III Fans 3000K Series Hub
Tuf-Lite III Fans 3000K Series Hub INSTALLATION MANUAL Adjustable Pitch Fan Assembly 11 thru 15 Diameter Hudson Tuf-Lite III fan blades Hudson Tuf-Lite III fan blades are of single piece fiberglass reinforced
More informationSquare Straight Steel - 4 Bolt Base Light Poles
Quick Ship Square Bronze over Galvanized Straight Steel Pole - 4 Bolt Base Square Straight Steel - 4 Bolt Base Light Poles Optional Tenon Mounting (specify) "D" Top Diameter Arm Drilling Per Customer Specs.
More informationElements Pole Mounting System
Elements Pole Mounting System Installation Manual www.peavey.com Elements Pole Mounting System Installation Manual The Elements Pole Mounting System is a simple and straightforward pole mounting solution
More informationTuf-Lite II Fans 3000H Series Hub
Tuf-Lite II Fans 3000H Series Hub INSTALLATION MANUAL Adjustable Pitch Fan Assembly 5 through 14 Diameter Hudson Tuf-Lite II Fan Blades Hudson Tuf-Lite II (white, prev. Blue**) are made from fiberglass
More informationUP43 LEARN-A-L0T (NATURAL) Parts List DESCRIPTION 90 ANGLE BRACKET DOOR WINDOW MUSIC CATERPILLAR CIRCLE FRAME CIRCLE MIRROR YELLOW STAINED GLASS RED STAINED GLASS SQUARE TRIANGLE SPIRAL WHEEL SQUARE MIRROR
More informationTuf-Lite II Fans 3000H Series Hub
Tuf-Lite II Fans 3000H Series Hub INSTALLATION MANUAL Adjustable Pitch Fan Assembly 5 through 14 Diameter Hudson Tuf-Lite II Fan Blades Hudson Tuf-Lite II (white, prev. blue**) fan blades are made from
More informationFlat Panel Stand FPZ-655. for 32" to 55" Flat Panel Screens FEATURES. Reinforced universal adapter plate for a strong hold
FPZ-655 Flat Panel Stand for 32" to 55" Flat Panel Screens For a viewing experience that really stands out, Peerless FPZ-655 Universal Flat Panel Stand for 32" 55" flat panel TVs provides a brilliant combination
More informationTuf-Lite II Fans 3000HC Series Hub
Tuf-Lite II Fans 3000HC Series Hub INSTALLATION MANUAL Hudson Tuf-Lite II fan blades Adjustable Pitch Fan Assembly 8 through 10 Diameter Hudson Tuf-Lite II (White) are made from fiberglass reinforced vinyl-ester
More informationINSTALLATION INSTRUCTIONS 3 BULL BAR 99-04, 04 "HERITAGE" F-150/250LD 2WD, 97-04, 04 "HERITAGE" 4WD WD EXPEDITION/ WD EXPEDITION PART
INSTALLATION INSTRUCTIONS 3 BULL BAR PART #B-F1971;B-F2971 PARTS LIST: 1 Bull Bar 2 12-1.75mm x 130mm x 40mm Hex Bolts 1 Driver/Left Mounting Bracket 4 12-1.75mm x 35mm Hex Bolts 1 Passenger/Right Mounting
More informationD. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC
STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,
More informationSECTION MASONRY ANCHORAGE AND REINFORCEMENT. Display hidden notes to specifier. (Don't know how? Click Here)
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 04080 MASONRY ANCHORAGE AND REINFORCEMENT Display hidden notes to specifier. (Don't know how? Click Here) A. Post installed masonry anchors. B. Miscellaneous
More information8.5 Ton Assembly Instructions
8.5 Ton Assembly Instructions Parts list for assembly. 6- Legs 2 1/2 Angle X 92 Long 6- Cone Supports 2 Angle X 60 Long 6-1 1/4 Angle X 27 1/4 Long. 12-1 1/4 Angles X 42 Long 6-1 Flat Straps 23 3/4 Long
More informationINSTALLATION INSTRUCTIONS PART#:17GT23MSS\17GT23MA MODULAR GRILL GUARD FOR CHEVY SILVERADO 1/2 TON 99-02
INSTALLATION INSTRUCTIONS PART#:17GT23MSS\17GT23MA MODULAR GRILL GUARD FOR CHEVY SILVERADO 1/2 TON 99-02 1 guard, center section 1 brush guard, left side 1 brush guard, right side 1 wire guard insert,
More informationSuperstrut. Metal Framing. Beam Clamps. Design Loads. Finishes and Special Materials
Loads Where design loads are indicated, they provide for a safety factor of 3 in conformance with the merican Standard Code for Pressure Piping. For more information, see page 57 for Engineering Data and
More informationLCD/Plasma Mount Manual
LCD/Plasma Mount Manual Product Overview: Thank you for your Cheetah Mount purchase. All Cheetah Mounts are designed to provide excellent function, high quality, easy installation and stylish appearance.
More informationframe bracket Dodge x 2 & 4 x 4 (6-1/2 & 8 Boxes Includes Mega Cab)
, Rev 4 02/19 frame bracket 8552026 Dodge 3500 4 x 2 & 4 x 4 (6-1/2 & 8 Boxes Includes Mega Cab) 14 5 7 2 4 11 9 10 17 3 6 1 8 13 15 16 18 12 ITEM PART # DESCRIPTION QTY. 1 00085.50 FLAT WASHER 10 2 00248
More informationCalf-Tel Pen System Assembly Instructions
Calf-Tel Pen System Assembly Instructions (Instructions work for 4, 6, and the 7 Pen Systems) 1 ASSEMBLY OF PEN FRONT AND WALLS START THE ASSEMBLY BY LINING UP THE TWO UNI-DIRECTIONAL ARROWS IN THE TOP,
More informationLENGTH IDENTIFICATION
58 Power-Bolt HEAVY DUTY, ELF-UNDERCUTTING LEEVE TYPE BAE MATERIAL Concrete, Block, Brick, tone IZE RANGE 1/4" x 1" to 1-1/4" x 9 MATERIAL LENGTH IDENTIFICATION The Power-Bolt anchor has a length identification
More informationB-27-A BRIDGE RAILING, 3 TUBE WITH PICKETS SECTION THROUGH RAILING WITH BRUSH BLOCK SECTION THROUGH RAILING WITH SIDEWALK
3" 1'- ƒ " 11 " 7 " TOP OF REAR FLANE TO BE ROUND 2'- LON PICKET 1'- W6 x 25 1 " THICK BASE PLATE " " ELASTOMERIC BOUND FABRIC PAD 8" SLAB DETAIL A (SEE 3) OVERHAN SECTION THROUH RAILIN WITH BRUSH BLOCK
More informationTuf-Lite III Fans K Hi Temp 3000KHT Series Hub
Tuf-Lite III Fans K Hi Temp 3000KHT Series Hub INSTALLATION MANUAL Adjustable Pitch Fan Assembly 11 thru 15 Diameter Hudson Tuf-Lite III fan blades Hudson Tuf-Lite III Hi Temp (Red) fan blades are of single
More informationTuf-Lite II Fans H Hi Temp 3000HT Series Hub
Tuf-Lite II Fans H Hi Temp 3000HT Series Hub INSTALLATION MANUAL Hudson Tuf-Lite II Hi Temp Fan Blades Adjustable Pitch Fan Assembly 5 through 14 Diameter Hudson Tuf-Lite II Hi Temp fan blades (Red) are
More informationGlideRite Retractable Cover System For Hot Spot Spas (SE & SLX only)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationSize Grade Torque 9/ ft/lbs. 5/ ft/lbs. 3/ ft/lbs. 7/ ft/lbs ft/lbs.
8-3 HJ3205,Rev 4 BOlT TORQUE SPECIfICATIONS STANDARD BOlTS: Size Grade Torque 5/6 5 20 ft/lbs. 3/8 5 35 ft/lbs. 7/6 5 56 ft/lbs. /2 5 85 ft/lbs. Size Grade Torque 9/6 5 23 ft/lbs. 5/8 5 70 ft/lbs. 3/4
More informationPOLE LINE HARDWARE POLE LINE HARDWARE. HI-LINE UTILITY SUPPLY CO. Phone: Fax:
146 MACHINE BOLTS w/ square nut Rolled threads; s six inches or longer have con-type points. Hot dip galvanized. 860412 3/8" 4.5" 3" 250 8706 6" 3" 100 8707 7" 3" 100 8708 1/2" 8" 4" 100 8710 10" 4" 50
More informationHeliac Solar Cooker Assembly Manual
Heliac Solar Cooker Assembly Manual (v4.3) Mirror Assembly 1 Build the outer frame from N2 and N3. Predrill holes and screw the corners together. Use 8x 3.5*40screws for this process. A proper wood glue
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for Fortress Horizontal Cable Panel System with UB-05 Brackets and Fe Posts It is the responsibility of the installer to meet all code and safety requirements, and to obtain all
More informationGlideRite Retractable Cover System For HotSpring & Tiger River Spas (except Classic & pre-2000 Landmark Spas)
List of Contents Quantity Description 12 #10 x 1 ½ Flat Head Phillips Screw (see pg. 2) 2 #10 x ½ Pan Head Phillips Screw (see pg. 2) 8 ¼ x 2 ½ Lag Bolt (see pg. 2) 7 ¼ 20 x 5 / 8 Hex Head Bolt (see pg.
More informationAUXILIARY FRAMING AND ACCESSORIES
CUSTOM CABINETS & RACKS STRUT AND ACCESSO- RIES JUNCTION KITS ANGLE AND BRACE KITS SPLICE KITS BRACE KITS INSTALLATION KITS WALL ANGLE KITS RUBBER END CAPS SUPPORT INSTALLATION AND SUPPORT KITS STANCHION
More informationE:\Wilmot\DGN\14018pp.dgn 3/11/2015 6:49:16 AM
600-06 SHOULDER WIDENING FOR TYPE (SPECIAL) GUARDRAIL TERMINALS E:\Wilmot\DGN\08pp.dgn //05 6:9:6 AM E:\DGN\08SUP.dgn //05 ::55 PM E:\DGN\08SUP.dgn //05 :8:0 PM E:\DGN\08-WRG.dgn //05 :8:5 PM E:\DGN\08SM.dgn
More informationKO LO SH E LT E R. High Capacity and Flexibility
KO LO SH E LT E R High Capacity and Flexibility The unique styling of our redesigned Dero Kolo Shelter will help beautify your facility and provide secure, covered bike parking for cyclists. The Kolo is
More informationTuf-Lite and Tuf-Lite II Fans 4000 Series Hub
Tuf-Lite and Tuf-Lite II Fans 4000 Series Hub INSTALLATION MANUAL Hudson Tuf-Lite and Tuf-Lite II fan blades Adjustable Pitch Fan Assembly 15 thru 20 Diameter Hudson Tuf-Lite (black) fan blades are made
More informationSB-WM-ART2-L-BL SB-WM-ART2-XL-BL
SB-WM-ART2-L-BL SB-WM-ART2-XL-BL Weatherproof Universal Dual-Arm Articulating Mount for Large TVs INSTALLATION MANUAL WARNING The maximum weight of this wall mount is 150 lbs (68.04 kg). Use with heavier
More informationHANDLING AND ASSEMBLY INSTRUCTIONS FOR TRUE FOCUS 3.0M, 3.8M AND 4.2M ANTENNAS WITH POLAR MOUNT
HANDLING AND ASSEMBLY INSTRUCTIONS FOR TRUE FOCUS 3.0M, 3.8M AND 4.2M ANTENNAS WITH POLAR MOUNT Introduction SECTION 1 Thank you for purchasing one of our fine True Focus products. This manual covers the
More informationModular Gazebo Kit Series GardenHouse 12
Octagonal CUPOLA screened with louvers and light fixture Modular Gazebo Kit Series GardenHouse 12 with DOUBLE-TIERED Roof Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or
More informationTO O L K IT. Public Bike Repair
TO O L K IT Public Bike Repair The Dero Tool Kit includes all the necessary tools to perform most routine maintenance and adjustments on most bikes. All the tools are securely fastened with stainless steel
More informationSheet Steel Facts. Most common head design for self-drilling, self-tapping screws.
Sheet Steel Facts Fastener Guide for Sheet Steel Building Products August, 2003 Fastener Materials Fasteners are manufactured from several materials and coatings. For the purpose of this fact sheet, the
More informationDECKS. Stairway illumination Positive attachment of ledger Lateral load connection required board (R507.2) required (R ) (R311.7.
DECKS Max. riser height-7 ¾ Min. tread depth-10 Landings required at (R311.7.5.1) (R311.7.5.2) top and bottom of stairs (R311.7.6) Notched guardrail post NOT allowed Graspable handrail required Spacing
More informationDELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT
200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'
More informationFastener Basics. Common Fastener Types. Fastener Materials. Grade / Class and Fastener Strength
Fastener Basics Common Fastener Types Fastener Grade (US) or Class (metric) refers to the mechanical properties of the fastener material. Generally, a higher number indicates a stronger, more hardened
More informationAPPENDIX FENCE GENERAL NOTES
APPENDIX FENCE GENERAL NOTES 1. Fabric: 9 gage, 2" mesh, knuckle top and bottom, placed on the outside of posts, single fabric width for the entire height. 2. All fencing to be standard galvanized finish.
More informationTuf-Lite and Tuf-Lite II Fans 4000 Series Hub
Tuf-Lite and Tuf-Lite II Fans 4000 Series Hub INSTALLATION MANUAL Hudson Tuf-Lite and Tuf-Lite II fan blades Adjustable Pitch Fan Assembly 15 thru 20 Diameter Hudson Tuf-Lite (black) fan blades are made
More informationTECHNICAL CORRECTION October Process Industry Practices Structural. PIP STF05121 Fabrication and Installation of Anchor Bolts
TECHNICAL CORRECTION October 2006 Process Industry Practices Structural PIP STF05121 Fabrication and Installation of Anchor Bolts PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize
More informationInstallation Instructions Kit, Base Rail Bracket Part # 31413
Installation Instructions Kit, Base Rail Bracket Part # 31413 Dealer / Installer: Provide a copy of these Instructions to the end user of this product. These Instructions provide important operating and
More informationSQUARE STEEL POLE STRAIGHT
PROJECT NAME: CATALOG NUMBER: NOTES: FIXTURE SCHEDULE: Page: 1 of 8 SQUARE STEEL POLE SPECIFICATIONS: Pole Shaft The pole shaft is fabricated from hot rolled steel tubing of onepiece construction with
More informationSTEEL CANTILEVER TYPE E MICHIGAN DEPARTMENT OF TRANSPORTATION NOTE: EDGE OF SIGN VARIABLE 12" (MAX) 5'-0" COLUMN CAP 9'-5" (MAX) (TYP) DETAIL C
EDGE OF SIGN VARIABLE 12" (MAX) 25'-0" OLUMN AP 9'-5" (MAX) DETAIL END AP 1'-6" 4'-0" ARMS OPTIONAL SPLIE SIGN SIGN AND ARMS JP 1'-3" (MIN) 5'-0" 0.4 x L (MAX) OPTIONAL SPLIE VAIRES (25'-0" MAX) SEE ONTRAT
More informationSTRATUS SHELTER. Take bike parking to new heights
Take bike parking to new heights The Stratus Shelter is a striking bike shelter option for any transit station, university campus, or multi-family residential building project. It is constructed of American
More informationUPM 6X Custom. UPM 6X CUSTOM Standard stock Tee socket sized for 5" schedule 40 or 80 Pipe. Page 1 of 8
Page 1 of 8 UPM 6X Custom A. TEE SOCKET: 6 O.D. PIPE SOCKET TO FIT OVER 5 SCHEDULE 40 or 80 STEEL PIPE B. CROSS PIECE: 2 X 2 X 3/16, LENGTH DEPENDENT ON MODULE USED, SQUARE TUBE 2 PLACES C. LONGITUNDINAL:
More informationFortress Fe Posts must always be secured to the deck framing. Fortress Fe Posts should never be attached to only the deck boards.
Installation Instructions for FortressCable V-Series Cable Stair Panel System with UB-05 With ngle dapter and Fe Posts It is the responsibility of the installer to meet all code and safety requirements,
More informationContents. Grade 2, 5, 8 Hex Bolts 4. Heavy Hex Head Structural Bolts 6. A325 and A490 Tension Control Bolts (TC) 13. Nuts 22.
Who we are Amcan Jumax is the result of a merging between Boulons Jumax and Amcan Threaded Products, two successful companies well established, both with excellent reputations. The new entity is a bigger
More informationHEADED ANCHOR BOLT OPTION
Ground Rod 18" min. Depth, 2 Required nchor Bolts. Number (min. 8) and Size as Required by Manufacturer. 6" to 12" Ground Line " dia. Conduit Number and Direction as Shown on Lighting Layout Sheets. Slope
More informationRAIL PANEL AT TRANSITION SECTION PLAN - POST DETAIL PLAN - TUBE SPLICE. Colorado Department of Transportation. Staff Bridge Branch
Limits of pay length for Bridge RailType 10M (For post spacing, see Dwg. No. B ) B60610 (Use with B60610A) 8 min. 1 max. 8 min. 1 max. 10 0 Max. 10 0 Max. post spacing 10 0 Max. 2 5 Post 1 x 1 slotted
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationThe Saddle Rack. For Power And Communication Cables
The Saddle Rack For Power And Communication Cables Underground Devices SADDLE RACKS: Low Cost, But Tough and Non-Corrosive For Temporary Support or Permanent Installation For Use in Manholes, Handholes,
More informationDesign for Manufacturability Guide
Design for Manufacturability Guide WHO WE ARE Short-to-medium run metal stamping manufacturer Annual volume of 250 to 300,000 per part number We serve a very diversified mix of customers & markets Our
More informationIN20733 Rev. B 1/06/2016
14,000 LBS. (6350 Kg.) Bolt-on Alignment Kit Installation Instructions S100129, S100130, S100131 S100132, S100133, S100134 S100135, S100136, S100137, S100173, S100174 Model Max Wheel Base Max 2 Wheel Alignment
More informationGuardrail T40 4MS2 BP for Bridge Parapet
Guardrail for Bridge Parapet Containment level H2 Installation Manual & Specifications Patented EN 1317 1 SUMMARY A. General description B. Crash testing & CE Certificate C. Working D. Installation method
More information