1 63PZ02XX Report For: Project: Elkton, V VENDOR DOCUMENT REQUIREMENTS Document No.: -J-VD-4008 Title: PRESSURE GUGES Jacobs Project No. Latest Version 16 Jun 2014 REV DTE BY CK PPROVLS PGES PROJ. CLIENT-DTE 16 Jun 2014 FB FB JS ll REMRKS Issued for Bid Submitted by: Jacobs Engineering Group Inc. Conshohocken,P

2 GENERL INSTRUCTIONS Package Title: PRESSURE GUGES Client: Document No.: -J-VD-4008 Location: Elkton, V Date: 16 Jun 2014 HRD COPY DOCUMENT DESTINTIONS w/ Quote submit to: for pproval & Certified submit to: for Turnover Package submit to: Jacobs Engineering Group Inc. Jacobs Engineering Group Inc. Jacobs Engineering Group Inc. Three Tower Bridge Three Tower Bridge Three Tower Bridge Two sh Street - Suite 3000 Two sh Street - Suite 3000 Two sh Street - Suite 3000 Conshohocken, P Conshohocken, P Conshohocken, P tt: See RFQ Document for Contact ttn: Document Control For: ttn: Document Control For: - - w/ quote submit to: Refer to RFQ Documents ELECTRONIC COPY DOCUMENT DESTINTIONS for pproval & Certified submit to: for Turnover Package submit to: /[Your Company PGE] /[Your Company PGE] STTUS PPROVED (P) PPROVED S NOTED (N) REVISE ND RESUBMIT (RR) DISPPROVED - RESUBMIT (DR) NOT REQUIRED FOR REVIEW (NRR) CERTIFIED/FINL/S BUILT (C/F) SUBMITTL PPROVL CODES DESCRIPTION Released For Fabrication, Resubmit Certified, s-built, Final Documentation Released For Fabrication,Incorporate and Resubmit Certified, s-built, Final Documentation Not Released For Fabrication Major Revision Required, Incorporate nd Resubmit For pproval Not Released For Fabrication Total Revision Required, Incorporate nd Resubmit For pproval Information p Only or Documentation ( p Not Requested, ) y No Technical q, Review Required Documentation such as Manuals or Catalog cuts that are 100% cceptable GENERL INSTRUCTIONS 1. The Seller shall submit the indicated quantities of all drawings and documents, as listed on the attached "Vendor Document Requirements" (VDR) form, to the hard copy and electronic copy destinations listed below Failure to include the required quantities of "w/ Quote" documents with the Seller's proposal may result in disqualification of the Seller's proposal from consideration for purchase. fter an order is placed, unless otherwise explicitly authorized by the Buyer in writing, the Seller shall not purchase materials or begin fabrication until all applicable drawings and documents are approved by the Buyer. The Seller shall include a transmittal with each document submittal. The Seller shall assign a unique sequential number to each transmittal. In addition, each transmittal shall include the following information: Client Name Jacobs VDR Numbers (per attached form) Purchase Order Number (Vendor) Drawing Numbers Project Name Drawing Revision Numbers and Dates Jacobs Project Number Purpose of Submittal (e.g. "Preliminary," "For Equipment Tag Number(s) pproval," "Certified," etc.) File Name: 63PZ02XX_-J-VD-4008 Page 2 of 6

3 GENERL INSTRUCTIONS Package Title: PRESSURE GUGES Client: Document No.: -J-VD-4008 Location: Elkton, V Date: 16 Jun GENERL INSTRUCTIONS (CONTINUED) The Seller shall mark LL documents with the equipment tag number and the Jacobs VDR numbers (indicated on the VDR Form.) If multiple VDR numbers apply to a single document, the Seller shall list all applicable VDR numbers. ll hard copy documents shall be submitted on white bond paper. Electronic files shall use dobe PDF fter "pproved" or "pproved as Noted" documents are returned to the Seller, the Seller shall incorporate all Buyer comments and submit revised drawings marked Certified within two weeks. Draft copies of all Turn Over Package (TOP) documents shall be available for Buyer review 2 weeks prior to the time of Factory cceptance Testing (if applicable,) or sooner, if indicated on the VDR Form. t the conclusion of all factory inspection and testing, the Seller shall update all documents to reflect "as built" conditions. 11. The Seller shall prepare and submit binders (data books) and CDs that include all "Turnover Package" documents listed on the attached Vendor Document Requirements (VDR) Form. Documents shall be collated in each binder (data book) in the order that they are listed on the VDR Form. Each binder (data book) shall include the following:. B. C. Binder Cover Page including the manufacturer name, client name, project name, purchase order number, Jacobs project number, equipment name or description, equipment tag number(s) and date. The binder cover page shall include the "volume number" when multiple binders are needed. Binder Spine Insert including the same information as on the Binder Cover Page. Labeled Binder Divider Tabs for each of the category headings listed on the VDR Form. The Seller shall include additional divider tabs for each valve and instrument type. 12. The Seller shall prepare CDs with electronic copies of all turnover package documents. Hand written documents (such as shop travelers) shall be scanned and included electronically. Electronic documents shall be stored in subfolders for each of the category headings listed on the VDR Form. CDs labels shall include the same project information as required (above) for the Binder Cover Page. Electronic files on the CDs shall be organized in subfolders an assembled to match the order of documents in the hard copy binders. File Name: 63PZ02XX_-J-VD-4008 Page 3 of 6

4 Property of Jacobs Engineering Group. Unauthorized use is prohibited. Contact Jacobs legal department if unauthorized use is detected. VENDOR DOCUMENT REQUIREMENTS Package Title: PRESSURE GUGES Client: Location: Elkton, V Tag No.(s): Doc No.: -J-VD-4008 Rev: / 16 Jun 2014 Refer to Datasheets FT=vailable at FT, RD=fter Return of pproved Documents, RO=fter Receipt of Order, UR=vailable Upon Request S=fter Shipment, BD=Before Delivery, CD=Compact Disc, E=Electronic File, HC=Hard Copy, PFT=Prior to FT, WS=With Shipment LIST OF REQUIRED VENDOR SUBMITTLS w/ Quote For Review / pproval Final Record (TOP) #### Qty Req'd Qty Req'd Date Due Qty Req'd Date Due Comments 000 GENERL: 001 Document Index 002 Installation, Operation & Maintenance Manual 003 Warranty Certificate or Statement 1 E / 3 HC 004 Recommended Spare Parts List 009 Exceptions and Clarifications List 1 E / 3 HC * CLCS & COMPONENT DETILS: 202 Component Cut Sheets and/or Drawings 1 E / 3 HC 4 wks RO 216 Instrument Calibration Certificates WELDING, MTERILS, SURFCE FINISHING: 703 Material Test Reports (MTRs) 705 (Material) Certificates of Compliance NOTES If not included in the Seller's standard documentation package, the Seller may provide an optional price adder for this item. Please note that the term "WS" (with shipment) refers to the timing of document issue and NOT to the method. TOP documents must NOT to be shipped to the same address as the equipment. ll TOP documents must be issued to the Jacobs physical address and address indicated on the General Instructions page of the VDR. Failure to comply with this requirement may delay payment. File Name: 63PZ02XX_-J-VD-4008 Page 4 of 6

5 DEFINITIONS Client: Location: Elkton, V Document No.: Date: -J-VD Jun 2014 VDR No. Document Definition 000 GENERL: 1 Document Index -. The Document Index shall be used as the Table of contents for the Turn Over Package (TOP.) B. The index shall include all documents required per the VDR Form, plus any Seller-standard TOP documents not listed on the VDR form. C. Documents shall be listed in sequential VDR number order with section headers as indicated on the VDR Form. 2 Installation, Operation & Maintenance Manual - Including the following:. Vendor Information - name, address, telephone, website, etc. B. (High level) Equipment / system / process description C. Safety precautions D. Basis of design (applies only to custom systems) E. Installation requirements - Information and procedures for offloading, rigging, uncrating, handling, setting in place, aligning, connecting utilities, grounding and mechanical isolation as applicable F. Pre-startup check list; including all required safety checks G. Start-up commissioning checklists, data sheets, etc. H. Start-up and shut-down procedures I. Operating instructions J. Sequence of operations K. Troubleshooting guide L. Routine and preventative maintenance schedule and procedures M. Design calculations (applies only to custom systems) N. Utility requirements and/or utility consumption data O. Engineering data and reference P. Bill of materials Q. Calibration procedures for all instruments. Note: Note: The Seller shall include manuals for all procured, tagged sub-components (e.g. equipment, instruments, valves, piping components etc.) under VDR number 219. The Seller shall include manuals for all electrical and control components (e.g. PLCs, OIT, VFDs, singleloop controllers, timers, counters, etc.) under VDR number Warrantee Certificate or Statement - Including the specific nature of the warranty (e.g. "defects in design, materials and workmanship") the warranty duration (from the time of shipment and/or from when the equipment is put into service) and applicability of warranties provided by sub-component vendors. Recommended Spare Parts List - list of all recommended spare parts, including part numbers, part descriptions, and required quantities. Seller shall add unit pricing and lead times upon request. 9 Exceptions and Clarifications List - The Seller shall list all exceptions and clarifications to the Buyer's specification package. The Seller shall cite the specification section or data sheet line number for each exception. Please note that in cases of conflict between the Buyer's specifications and the Seller's quotation, the Buyer's specifications shall take precedence; unless the item is listed by the Seller on the exceptions & clarifications list and stated to be "accepted" by the Buyer. 200 CLCS & COMPONENT DETILS: 202 Component Cut Sheets and/or Drawings - For systems and packaged equipment, the Seller shall provide cut File Name: 63PZ02XX_-J-VD-4008 Page 5 of 6

6 DEFINITIONS Client: Location: Elkton, V Document No.: Date: -J-VD Jun 2014 VDR No. Document Definition sheets and/or drawings for all tagged items. For custom equipment included in systems (e.g. Vessels, gitators, Heat Exchangers, etc.) the Seller shall provide a General rrangement Drawing from the equipment manufacturer in accordance with the "General rrangement Drawing" requirements listed above. For standard components such as instruments, valves, steam traps, strainers, check valves, flow orifices and flex hoses, the Seller shall provide a cut sheet (often called a "Product Data Sheet."). The cut sheet (or "Product Data Sheet") shall describe the component features and must provide "ordering information" (i.e. an explanation of exactly what is designated by each digit of the model number.) The cut sheet must also indicate dimensional information, materials of construction, surface finish, connection sizes and types, and instrument ranges. The Seller must indicate the component tag number, model number and description of exactly which options are selected on every cut sheet. For configured components (e.g. filters, pumps, fans, ported valves, machined block valves, etc.) the Seller shall include both a drawing and a cut sheet. For custom equipment (e.g. Vessels, Pumps with instrumentation) the Seller shall provide cut sheets for all standard purchased components (e.g. sight glasses, lights, outlet valves, instrumentation, etc.) 216 Instrument Calibration Certificates - NIST traceable, unless explicitly stated otherwise in the instrumentation specifications or equipment data sheets, including: The instrument manufacturer, model number, serial number and tag number Calibration date, location and technician identification Calibration procedure referenced Calibration data - Table for each point including measured output, deviation, limit, pass/fail status Confirmation the calibration performed is traceable to NIST or equivalent EU standard Note: Each instrument shall include a sticker with the calibration date and technician identification WELDING, MTERILS, SURFCE FINISHING: Material Test Reports (MTRs) - Material test reports certified by the producing mill, shall be provided for all process contact parts, pressure containing parts and structural supports. Each MTR shall include heat numbers, material designations (e.g. STM / SME / NSI), chemical composition data, physical properties data, a description of the material configuration (e.g. pipe, fitting, flanges, sheet, plate, etc.) and a description of any heat treatment. In cases where Material Test Reports for metallic components are not available, the Seller shall use Positive Material Identification (e.g. Niton gun) to verify the chemical composition of the components in question. The Seller shall include a test report and print out from the Niton gun to document the results. The Seller must indicate exactly where in the equipment or system each MTR can be found. This "traceability" shall be provided via the Weld Maps, Heat Maps and Weld Logs. In addition, the Seller may include notes on each MTR which indicate where in the equipment or system the material can be found. (Material) Certificates of Compliance (C of Cs) - The Seller shall provide (Material) Certificates of Compliance for all product-contact components for which a traceable Material Test Report cannot be provided. For metallic components, the C of C shall confirm the material, surface finish, part number and/or description and manufacturer's name. For non-metallic components in sanitary service, the C of C shall confirm the part number, material description and/or compound number, manufacturer's name, batch or lot number, date of manufacture or cure date, and conformance with FD 21CFR, 177 ad USP Section 88 Class VI specification and biological reactivity testing. In cases there the equipment data sheets for autoclaves or washers required USP Class VI door gaskets, C of Cs for the door gaskets must be provided. File Name: 63PZ02XX_-J-VD-4008 Page 6 of 6

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS

SECTION CLOSEOUT SUBMITTALS SECTION CLOSEOUT SUBMITTALS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Record Documents. B. Operation and Maintenance Manuals. C. Warranties and bonds. 1.02 RELATED REQUIREMENTS SECTION 01 78 00 A. Section 01 30 00 - Administrative

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards]

[Note to PSC: Include these sections in the Contract Documents, even though some are not included in the U of I Facilities Standards] SECTION 01 78 23 - OPERATION AND MAINTENANCE DATA PART I - GENERAL 1.1 SUMMARY A. Operation and Maintenance Data shall be submitted in appropriately-sized binders, with dividers, and organized by each

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Heat Exchanger Construction Checklist

Heat Exchanger Construction Checklist Heat Exchanger Checklist Project: Pump tag: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

SECTION OPERATION AND MAINTENANCE DATA

SECTION OPERATION AND MAINTENANCE DATA SECTION 01787 OPERATION AND MAINTENANCE DATA PART 1 GENERAL 1.01 SUMMARY A. Compile product data and related information appropriate for OWNER's maintenance and operation of products furnished under Contract.

More information

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.

SECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in

More information

Section Meetings Section Material and Equipment. None Required

Section Meetings Section Material and Equipment. None Required January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.:

WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO Job No.: WATER MAIN ALONG ENTRANCE TO ENCINO PS / HWY 281 TO ENCINO TANK Solicitation Number: CO-00111 Job No.: 16-7003 To Respondent of Record: ADDENDUM 2 July 5, 2017 This addendum, applicable to work referenced

More information

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals.

A. This section specifies procedural requirements for Shop Drawings, product data, samples, and other miscellaneous Work-related submittals. SECTION 01300 PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Requirements B. Submittal Procedures C. Specific Submittal Requirements D. Action on Submittals E. Repetitive Review 1.2 DESCRIPTION

More information

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS

SECTION SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS SECTION 01300 SUBMITTALS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification Sections,

More information

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal

.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ

UNION COUNTY VOCATIONAL-TECHNICAL SCHOOLS West Hall Addition Project Raritan Road, Scotch Plains, NJ SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 General

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA SECTION 01 78 00 CLOSE-OUT SUBMITTALS PART 1 - GENERAL 1.1 GUARANTEES A. Compile and submit guarantees, bonds, and service and maintenance contracts specified in the individual B. Guarantees from Subcontractors

More information

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer

Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Designer CM/Owner s Rep Prime Contractor SubContractor Supplier Manufacturer Construction Documents 1.1 to 1.6 Create Submittal Log 1.1 Construction Docs Focus of this process is to transmit submittal

More information

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014)

***************************************************************************** DRAFT UFGS- 01 XX XX (FEB 2014) DRAFT UFGS- 01 XX XX (FEB 2014) ------------------------ Drafting Activity: USACE UNIFIED FACILITIES GUIDE SPECIFICATION SECTION TABLE OF CONTENTS DIVISION 01 GENERAL REQUIREMENTS SECTION 01 XX XX (FEB

More information

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES

DIVISION 1 GENERAL REQUIREMENTS SECTION SUBMITTAL PROCEDURES DIVISION 1 GENERAL REQUIREMENTS SECTION 01 33 00 PART 1 - GENERAL 1.1 SUMMARY A. This section includes administrative and procedural requirements for submittals required for performance of the work, including

More information

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES

STANDARD SPECIFICATIONS SECTION SUBMITTAL PROCEDURES STANDARD SPECIFICATIONS SECTION 01330 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 DESCRIPTION A. Section includes general requirements and procedures related to preparation and transmittal of Submittals to

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment

More information

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Project Coordination. B. Preconstruction meeting. C. Progress meetings. D. Preinstallation conferences. E. Requests for information (RFI). F. Coordination drawings.

More information

Construction Phase Project Management and Documentation

Construction Phase Project Management and Documentation Construction Phase Project Management and Documentation Bill Mason CDM Smith Outline Design Bidding Construction Start-up & Closeout 2 DESIGN Design Preliminary Engineering Report Plans Specifications

More information

This specification describes the general requirements for Engineering Services provided to Vale.

This specification describes the general requirements for Engineering Services provided to Vale. 1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBMITTALS DIVISION 1 - GENERAL REQUIREMENTS SECTION 01300 - SUBMITTALS PART 1 - GENERAL 1.1 STIPULATIONS A. The section "Special Requirements" forms a part of this section by this reference thereto and shall have

More information

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES

Taylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working

More information

LETTER OF TRANSMITTAL

LETTER OF TRANSMITTAL LETTER OF TRANSMITTAL Max Foote Construction Company, LLC 225 Antibes West Mandeville, LA 70448 Telephone: (985)-624-8569 Fax: (985)-624-8580 Date: 02/02/2017 Job #: 289-11805 Submittal #: D-11135-003-A

More information

B. Division-16 Basic Materials and Methods section apply to work specified in this section.

B. Division-16 Basic Materials and Methods section apply to work specified in this section. Section 16745 PREMISE CABLING SYSTEMS PART ONE GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification

More information

SUBMITTAL PROCEDURES

SUBMITTAL PROCEDURES SUBMITTAL PROCEDURES PART 1 GENERAL The ASPA Project Engineer (APE) may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective

More information

SECTION SUBMITTALS

SECTION SUBMITTALS SECTION 01300 SUBMITTALS PART 1- GENERAL 1.01 SCOPE OF WORK A. This Section specifies the general methods and requirements of submissions applicable to Shop Drawings, Product Data, Samples and Operations

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS

2016 CDM Smith All Rights Reserved July 2016 SECTION PROJECT MEETINGS PART 1 GENERAL 1.01 REQUIREMENTS INCLUDED SECTION 01 20 00 PROJECT MEETINGS A. Construction Manager shall schedule and administer pre-construction meeting, periodic progress meetings, and specially called

More information

QUALITY ASSURANCE SPECIFICATION

QUALITY ASSURANCE SPECIFICATION Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose

More information

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days.

Anticipated schedule, Page 2. Change the Contract Term from 635 Days to be 1,127 Days. This addendum is hereby made part of the Request for Bid for the above-named project and shall be taken into consideration by all firms preparing a submittal on this project. Acknowledge receipt of this

More information

Answer: Qualification statement should be provided with the bid.

Answer: Qualification statement should be provided with the bid. Little Diversified Architectural Consulting, Inc. 5815 Westpark Drive Charlotte, North Carolina 28217 Phone: 704-525-6350 Fax: 704-561-8700 Lincoln County Probation Renovation 208 N. Government Street

More information

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement

BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement 1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems

More information

Jacksonville District Master

Jacksonville District Master -01 33 00 (April 2006) From USACE / NAVFAC / AFCESA UFGS UNIFIED FACILITIES GUIDE SPECIFICATIONS Revised thoughout - changes not indicated by CHG tags SECTION TABLE OF CONTENTS DIVISION 01 - GENERAL REQUIREMENTS

More information

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE

WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) CITY OF CARTERSVILLE WTP FILTERS REHABILITATION (FILTERS 1, 2, 3, & 7) ADDENDUM NO.1 ADDENDUM NO. 1 DATE: OCTOBER 16, 2018 To BID, CONTRACT, BONDS AND SPECIFICATIONS FOR CONSTRUCTING WATER TREATMENT PLANT FILTERS REHABILITATION

More information

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents.

SECTION A. RFI: Request from Contractor seeking interpretation, information, or clarification of the Contract Documents. SECTION 01 3000 PART 1 GENERAL 1.1 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Submittals for review, information, and project closeout. D. Submittal procedures.

More information

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete. REQUIREMENTS (indicate with an "") 011100 1.4 Detailed Construction Phasing Plan 011100 1.4 Sub-Surface Utility Location Plan 013100 1.3 Letter Designating Project Superintendent 013100 1.3 Construction

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (August 2017) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (February 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION III SUBMITTALS AND APPROVALS

SECTION III SUBMITTALS AND APPROVALS SECTION III SUBMITTALS AND APPROVALS In order to expedite the approval process of new water distribution system and sanitary sewer collection system extensions, the Hilton Head No. 1 Public Service District

More information

Select, wear adjust, use and maintain personal protective equipment

Select, wear adjust, use and maintain personal protective equipment ANALYSIS PROFILE PROTECT SELF AND OTHERS Identify, interpret and apply applicable Acts, Codes and regulations Select, wear adjust, use and maintain personal protective Recognize and assess hazards and

More information

00-General Drawings. Doc. no.: NA-00-STS002

00-General Drawings. Doc. no.: NA-00-STS002 Gæðaskjal (GSK) GSK-1773 Date of issue: 24.11.2016 Revision no.:2.0 Responsible: Einar Friðgeir Björnsson Editor: Rafn Magnús Jónsson 00-General Drawings Doc. no.: NA-00-STS002 This standard technical

More information

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly:

MINUTES OF MEETING. The following Questions were asked and answers were provided accordingly: MINUTES OF MEETING Meeting Date : July 15, 2014 Place : Greenwood Shop Main Conference Room Contract Title : Supply of Reworked T1 Trip Switch Brackets Proposal No. : T31BG14139 Present : TTC - A. Mckay

More information

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant), TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone: +91 431 257 7653 Fax

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-11 47 00 (February 2009) ----------------------------- Preparing Activity: USACE Superseding UFGS-11 47 00 (January 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS

PS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT

More information

Section Project Closeout

Section Project Closeout Section 01700 - Project Closeout PART 1 GENERAL A. STIPULATIONS The section Special Requirements forms a part of this section by this reference thereto and shall have the same force and effect as if printed

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

Reliance SG777 Series Steel Water Gage Valves

Reliance SG777 Series Steel Water Gage Valves Installation, Operation, & Maintenance Instructions R500.SG777 10/16/2016 Reliance SG777 Series Steel Water Gage Valves Note: Design variations in Steel Water Gage Valves necessitate typical illustrations,

More information

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.

TABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5. 1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4

More information

Booster Pumping Station 115 Booster Pump Procurement

Booster Pumping Station 115 Booster Pump Procurement Madison Water Utility Tom Heikkinen General Manager 119 E. Olin Avenue Alan L. Larson PE, BCEE Principal Engineer Madison, Wisconsin 53713 Telephone: 608 266-4653 FAX: 608 266-4426 email: allarson@cityofmadison.com

More information

SECTION PROJECT MANAGEMENT AND COORDINATION

SECTION PROJECT MANAGEMENT AND COORDINATION SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.

The surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample. SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called

More information

F Replaced cancelled documents. Editorial changes throughout. 18 OCT 2016 Thomas Hess

F Replaced cancelled documents. Editorial changes throughout. 18 OCT 2016 Thomas Hess REVISIONS LTR DESCRIPTION DTE PPROVED Page 10, add new paragraph 6.5, Patents. 24 OCT 1985 Ivan Jones B dded marking requirements. Editorial corrections throughout. 17 DEC 1987 Randy Larson C D E Corrected

More information

SECTION MECHANICAL IDENTIFICATION

SECTION MECHANICAL IDENTIFICATION Buebtel/Perlcins Community Learning Center GPD - 2001271.15 SECTION 15075 MECHANICAL IDENTIFICATION PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

(R) Aerospace First Article Inspection Requirement FOREWORD

(R) Aerospace First Article Inspection Requirement FOREWORD AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,

More information

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty

REVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to

More information

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS:

INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: INDEX OF SPECIFICATIONS SECTION F SPECIAL CONDITIONS DIVISION 1 - GENERAL REQUIREMENTS: 013300 SUBMITTAL PROCEDURES 018116 CONSTRUCTION WASTE MANAGEMENT DIVISION 2 EXISTING CONDITIONS: 023000 EARTHWORK

More information

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM

DWG, Inc. Coastal Carolina University State Project No. Consulting Engineers HTC Arena Lighting H17-N112-JM SECTION 011000 SUMMARY PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Work under other contracts. 3. Use of premises. 4. Specification

More information

THE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT

THE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT THE KENYA POWER AND LIGHTING CO. LTD SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT NAME DESIGNATION SIGNATURE DATE Compiled by Ephantus Nyagah Ag. Senior Engineer Checked by Eng. Thagichu Kiiru Deputy

More information

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SUBMITTALS. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 013300 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM

American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM American Society of Sanitary Engineering PRODUCT (SEAL) LISTING PROGRAM ASSE STANDARD #1051 - REVISED: 2009 Individual and Branch Type Air Admittance Valves MANUFACTURER: CONTACT PERSON: E-MAIL: ADDRESS:

More information

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo 2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract

More information

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements.

This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. 1/5 1.0 PURPOSE This specification is intended to provide guidance to the Engineer (Internal or Consultant) in regards to Vendor Information Requirements. It outlines the expectations for requesting Vendor

More information

835 Gil Harbin Industrial Blvd Valdosta, GA 31601

835 Gil Harbin Industrial Blvd Valdosta, GA 31601 QUALITY CONTROL PLAN NAVFAC SE PUBLIC WORKS MAYPORT FEAD MAYPORT 1966 BONHOMME RICHARD STREET MAYPORT NAVAL STATION FL 32228-0073 N69450-08-D-1781/0004 835 Gil Harbin Industrial Blvd Valdosta, GA 31601

More information

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN

Spec Section: , Complete Elec, Comm, and Fire Alarm , Complete Elec, Comm, and Fire Alarm Data Sheets RAN/GCAN SUBMITTAL REVIEW Submittal: No. 019.00 Spec Section: 26 0000, 28 0000 Complete Elec, Comm, and Fire Alarm Reviewed By: Laura Landon, Comma-Q Architecture Date: June 29, 2012 Project: BPS Belgrade Elementary

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes. 1. Submittal procedures. 2. Product data. 3. Shop drawings. 4. Samples. 5. Design data. 6. Test reports. 7. Certificates.

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 15547-2 First edition 2005-11-01 Petroleum, petrochemical and natural gas industries Plate-type heat exchangers Part 2: Brazed aluminium plate-fin heat exchangers Industries

More information

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)

Annexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA If project is not administered in PRISM, coordinate use of Exhibit 6 submittal schedule with this section. SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED

More information

Drawings & Documentation Rotary Compressors

Drawings & Documentation Rotary Compressors Drawings & Documentation Rotary Compressors Effective Date: 2/4/11 Cancels: All Previous Standard Drawings and Docs - Certified Only Standard Drawings and Docs - Print Approval PDF format: CCN 39657051

More information

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2

FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 Page of FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 1. Manufactured and certified by: 2. Manufactured for:

More information

Pre-Filter. Brushless/ Sparkless Blower. HEPA Filter. Fluorescent Light

Pre-Filter. Brushless/ Sparkless Blower. HEPA Filter. Fluorescent Light A Pre-Filter Brushless/ Sparkless Blower HEPA Filter Fluorescent Light B TO: Nayan Patel Central Drugs Compounding Pharmacy 520 W. La Habra Blvd. La Habra, CA 90631 QUOTATION DATE: QUOTATION NO: PHONE

More information

SECTION ADMINISTRATIVE REQUIREMENTS

SECTION ADMINISTRATIVE REQUIREMENTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Electronic document submittal service. B. Preconstruction meeting. C. Progress meetings. D. Construction progress schedule. E. Coordination drawings. SECTION 013000

More information

Emission-Pak Assemblies

Emission-Pak Assemblies Emission-Pak Assemblies 25, 35 and 45 Installation, Maintenance and Operating Instructions IMO-266 EN 11/2017 2 IMO-266 EN TABLE OF CONTENTS 1. GENERAL... 3 2. INSTALLATION... 3 2.1 Installation Into Pipeline...

More information

11-SDMS-03 REV. 02 SPECIFICATIONS FOR

11-SDMS-03 REV. 02 SPECIFICATIONS FOR 11-SDMS-03 REV. 02 SPECIFICATIONS FOR XLPE INSULATED POWER CABLES FOR RATED VOLTAGES FROM 15 KV UP TO 36 KV (U m ) This specification is property of SEC and subject to change or modification without notice

More information

FORM Q-120 PROCEDURE SPECIFICATION FOR CLASS II VESSELS (Revision C 2017) Part I Fabrication

FORM Q-120 PROCEDURE SPECIFICATION FOR CLASS II VESSELS (Revision C 2017) Part I Fabrication FORM Q-120 Part I Fabrication PROCEDURE SPECIFICATION NUMBER: NOTE: Procedure Specification Form Q-120 for Class II vessels consists of three parts. Part I, Fabrication, shall be completed for each separately

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-166 SPECIAL PROVISION 000--363 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230553 - IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 SUBMITTALS A.

More information

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT

CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT ADDENDUM NO. 1 TO REQUEST FOR PROPOSALS For EQUIPMENT FOR THE 2014 CITY OF MORRO BAY / CAYUCOS SANITARY DISTRICT WASTEWATER TREATMENT PLANT IMPROVEMENT PROJECT:

More information

Section XV - PER, Design, and Construction Submittal Requirements

Section XV - PER, Design, and Construction Submittal Requirements Section XV - PER, Design, and Construction Submittal Requirements A. Introduction - In an effort to reduce paper and to further implement the Oracle Unifier Project Management System, the Engineering Department

More information

REQUEST FOR QUOTATION INVITATION

REQUEST FOR QUOTATION INVITATION REQUEST FOR QUOTATION INVITATION DATE: July 15, 2010 DPS: REQUIREMENT: SUBJECT: Patricia Farina DPS Contract Administrator Email: Patricia.Farina@cityofchicago.org Telephone: 312-744-7660 Silver Halide

More information

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015

Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,

More information

(AMMA) American Maritime Modernization Association

(AMMA) American Maritime Modernization Association (AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT

More information

001: 2007 CEB STANDARD

001: 2007 CEB STANDARD 001: 2007 CEB STANDARD ALUMINIUM RE-DRAW RODS FOR ELECTRICAL PURPOSES CEYLON ELECTRICITY BOARD SRI LANKA Specification for ALUMINIUM RE-DRAW RODS FOR ELECTRICAL PURPOSES CEB Standard 001: 2007 CEYLON ELECTRICITY

More information

Specifications for EA31002 U Tube Bundle for CDU 3

Specifications for EA31002 U Tube Bundle for CDU 3 Specifications for EA31002 U Tube Bundle for CDU 3 Tube Bundle Specificatio Tube Bundle for Heat Exchanger EA31002A/B/C/D Quantity required : One with Dummy shell Exchanger Type: BEU Horizontal No of U

More information

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT Henderson Engineers, Inc. PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. Extent of Plumbing work to be identified as required by this Section

More information

TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS.

TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. SECTION - C Technical Specifications for RF Coaxial Switches and Bi-directional Coupler INTRODUCTION: In ADITYA Upgrade (ADITYA-U) machine it was proposed

More information

Facility Services Subgroup Preface for Divisions 21` through 28

Facility Services Subgroup Preface for Divisions 21` through 28 Facility Services Subgroup Preface for Divisions 21` through 28 1.1 EXECUTIVE SUMMARY A. This document provides standards for the Consultants and Contractors producing mechanical and electrical design

More information