1 PPAP 3rd Edition Check List Supplier: PPAPKIT_F01 Rev. A (May_03) Date: Submission Level: Part #: Eng. Chg. Level: Reviewed By: Yes No N/A Comments 1. Design Records / Drawings 2. Eng. Chg. Documents On file / with Package 3.Engineering Approval Customer Eng. Approval 4. DFMEA, Design Responsible DFMEA present Format to 3rd or latest edition 5. Process Flow Diagram Production Process Flow Diagram 6. PFMEA High RPN's Addressed Corrective Actions in Place Format to 3rd or latest edition Includes entire process(receiving to shipping) Complete 7. Dimensional Results Dimensions Verified Complete and Acceptable 8. Material / Performance See Drawing notes Material Certificates Included Complete and Acceptable 9. Initial Process Study Initial Study Ppk / Cpk > 1.67 Complete 10. MSA Studies GR&R Studies completed Acceptable 11. Qualified Lab Documents Scope and Accreditation Certificate to ISO/IEC Control Plan Matches process flow Acceptable 13. Part Submission Warrant Correct Part Name & Number Purchase Order Number Signed and Dated 14. AAR Appearance Items 15.Bulk Material Checklist Specific Requirements / List 16. Sample Product Sample provided if applicable 17. Master Sample Retained w/ Approval Date Correctly Identified by Part # 18. Checking Aids Checking aids Required GR&R App'd 19. Customer Specific See Drawing notes section and supplier manual for specific requirements Are there any customer specific requirements? Are Parts identified properly? (correct label)
2 Dana Corp., Part Submission Warrant Part Name Part Number Government and/or Safety Regulation Yes No Engineering Drawing Change Level Dated Additional Engineering Changes Dated Shown on Drawing Number Purchase Order Number Weight kg Checking Aid No. Engineering Change Level Dated MANUFACTURING INFORMATION SUBMISSION INFORMATION Dimensional Materials/Functional Appearance Supplier Name Supplier Code Customer Name/Division Street Address Buyer/Buyer Code City State/Province Postal Code Application REASON FOR SUBMISSION Initial Submission Change to Optional Construction or Material Engineering Change Sub-Supplier of Material Source Change Tooling: Transfer, Replacement, Refurbishment, or additional Change in Part Processing Correction of Discrepancy Parts Produced at Additional Location Other please specify REQUESTED SUBMISSION LEVEL (Check one) Level 1 - Dana Warrant, Appearance Approval Report (for designated appearance items only) Level 2 - Dana Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results, Appearance Approval Report. Level 3 - Dana Warrant, Parts, Drawings, Inspection Results, Laboratory Results, and Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gage Study, FMEA. Level 4 - Per Level 3, but without parts. Level 5 - At Supplier Location Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results, Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gage Study, FMEA. SUBMISSION RESULTS Submitting: dimensional measurements material & functional tests appearance criteria? statistical process package These results meet all drawing and specification requirements: YES NO (if NO Explanation required) DECLARATION I hereby affirm that the samples represented by this warrant are representative of our parts, have been made to the applicable Production Part Approval Process Manual 3 rd Edition Requirements. I further warrant these samples were produced at the production rate of / 8 hours. IMDS DECLARATION We affirm that details of the materials used in these parts have been entered onto the IMDS and that the samples conform to all applicable government and safety requirements on restricted materials. YES NO (if NO Explanation required) IMDS Number: I have noted any deviations from this declaration below: EXPLANATION / COMMENTS Print Name Title Phone No. Supplier Authorized Signature Date: FOR DANA USE ONLY Part Disposition: Approved Rejected Other Representative Signature Date PPAP KIT Rev. B (March 04)
3 Feasibility Commitment Dana Locaton: Date: Part # Part description: Feasibility Considerations The following questions are not intended to be all-includsive in performing a feasibility evaluation. Drawings and/or specifications provided are for analysing your ability to meet specified requirements. All NO answers need to be supported with attached explanations, including proposed changes to meet specifications. Please respond to all questions. Yes No Consideration Is product adequately designed (application requirements, etc.) to evaluate feasiblity? Can Engineering Performance Specifications be met as written? Can product be manufactured to tolerances specified on the drawing? Can product be manufactured with Cpk's that meet requirements? Is there adequate capacity to product product? Does the design allow for the use of efficent material handling techniques? Can the product be manufactured without incurring any unusual: Cost fo capital equipment? Cost for tooling? Alternative manufacturing methods? Is statistical process control required on this product? Are you using statistical process control on similar products? Where statistical process control is used on similar products: Are the processes in control and stable? Are Cpk's greater than 1.33? Conclusion (check one) Feasible: Product can be produced as specified with no revisions. Feasible: Changes recommened (see attached.) Not Feasible: Design revision required to produce produce within the specified requirements Supplier Sign-Off List all team members Name Title Date PPAP KIT Rev. B (March 04)
4 Dimensional Test Results Page of PART NUMBER NAME/LOCATION OF INSPECTION FACILITY PART NAME ITEM DIMENSION/ SPECIFICATION MEASUREMENTS NOT COMMENTS (Dana use only) Submitted by: NAME TITLE SIGNATURE DATE PPAPKIT_F03 Rev. A (May_03)
5 Material Test Results Page of PART NUMBER NAME/LOCATION OF LABORATORY PART NAME TYPE OF TEST MATERIAL SPEC. NO./ DATE/ SPECIFICATION TEST RESULTS NOT COMMENTS (Dana use only) Submitted by: NAME TITLE SIGNATURE DATE PPAPKIT_F04 Rev. A (May_03)
6 Performance Test Results Page of PART NUMBER NAME/LOCATION OF LABORATORY PART NAME REF. NO. REQUIREMENTS TEST FREQ TEST QTY. TEST RESULTS AND TEST CONDITIONS NOT COMMENTS (Dana use only) Submitted by: NAME TITLE SIGNATURE DATE PPAPKIT_F05 Rev. A (May_03)
PPAP REQUIREMENTS. Revision: March Methode Electronics, Inc. G-MB of 12 Printed copies are not controlled.
PPAP REQUIREMENTS Revision: March 2018 G-MB-1023 1 of 12 Printed copies are not controlled. Production Part Approval Process (PPAP) A) Introduction: 1) This document explains Methode s PPAP requirements.
More informationProduction Part Approval Process (PPAP) Marion Body Works, Inc.
Production Part Approval Process (PPAP) Marion Body Works, Inc. Training Guide Production Part Approval Process (PPAP) The purpose of PPAP is to determine if all customer engineering design record and
More informationGuideline for initial sample deliveries including initial sample test report to. Pankl Systems Austria GmbH. Systems
Guideline for initial sample deliveries including initial sample test report to, Drivetrain Systems A member of Pankl Racing Systems Copies are only valid on printing date. Page 1 of 15 1. Purpose... 2
More informationOverview of Textron Systems Supplier First Article Inspection (FAI) expectations
Overview of Textron Systems Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions PURPOSE Ensure the product being delivered meets drawing requirements
More informationGPSC Academy Leaders Teach & Leaders Learn. Supplier Technical Review Training Revision 1.0
Leaders Teach & Leaders Learn Supplier Technical Review Training Revision 1.0 Technical Reviews Agenda Agenda 1. Introduction 2. Technical Review Process 3. Technical Review Format 4. Technical Review
More informationCIRRUS AIRCRAFT FAI INSTRUCTION
CIRRUS AIRCRAFT FAI INSTRUCTION 1. PURPOSE The purpose of the first article inspection is to provide objective evidence that all purchase order, engineering, and specification requirements are correctly
More informationBAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement
1 BAE Systems Combat Vehicles Supplier Quality Assurance AS9102 Requirement February 27, 2019 2 Scope The intent of this document is to provide an understanding, and clarification as to what BAE Systems
More information(R) Aerospace First Article Inspection Requirement FOREWORD
AEROSPACE STANDARD AS9102 Technically equivalent to AECMA pren 9102 Issued 2000-08 Revised 2004-01 REV. A Supersedes AS9012 (R) Aerospace First Article Inspection Requirement FOREWORD In December 1998,
More informationCover sheet ISIR (Initial Sample Inspection Report)
Cover ISIR (Initial Sample Inspection Report) Supplier: [Company Name] Electronic GmbH [Street, Number] Your company address Montafonerstr. 8 [Postal Code] [City] AT-6780 Schruns [Country] Österreich Reason
More informationAS9102 Training. First Article Inspection Guide. Rev A
AS9102 Training First Article Inspection Guide Rev A What We Will Cover Challenge Approach AS9102 Rev B FAI Requirements AS9102 Rev B Embedded Guidelines Forms Used Questions/Answers Examples of FAI Problems
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationa. Does a written detailed procedure exist and is it utilized for the soldering process? Identify procedure number and revision.
SECTION I Procedure: A 1. Identify the standard the supplier uses for performing soldering. MIL- STD 454 IPC-A-610 OTHER IF Other, Specify: A 2 a. Does a written detailed procedure exist and is it utilized
More informationDRAWING STANDARDS D01
Revision E 10 Scope These Drawing Standards regulate dimensioning, tolerancing and labelling of technical documents as well as the symbols to be used. This guideline shall apply for all new parts as well
More informationDesign For Manufacturing. Design Documents. Gage R&R DFM
rev.8. 1 Contents Purpose of the Abloy Part Approval Process is: 1. To provide the evidence that all customer engineering designs and required specifications are properly understood and fulfilled by manufacturing..
More informationCOSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES
COSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES C/S T.008 Issue 2 T8NOV05 i C/S T.008 - Issue 2 COSPAS-SARSAT ACCEPTANCE OF 406 MHz BEACON TYPE APPROVAL TEST FACILITIES History
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.
More informationQUALITY CONTROL INSTRUCTIONS
QUALITY CONTROL INSTRUCTIONS QCI NO. 100 REVISION E SPC PROCEDURE WRITTEN BY: R. Zielinski DATE: 2/3/92 APPROVED BY: APPROVED BY: Department Manager Quality Assurance Manager DATE: DATE: SF 118 1 CHANGE
More informationDNVGL-CP-0338 Edition October 2015
CLASS PROGRAMME DNVGL-CP-0338 Edition October 2015 The electronic pdf version of this document, available free of charge from http://www.dnvgl.com, is the officially binding version. FOREWORD DNV GL class
More informationSupplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 16 March 2011
Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 16 March 2011 Approved David Copeland, Manager Supply Chain Quality Suppliers may view this document via the Internet at:
More informationAAR SPECIFICATION M-214 INSPECTION CHECKLIST
AAR SPECIFICATION INSPECTION CHECKLIST I. ORGANIZATION 1. Is there separation between quality control and production responsibility? 2. Are there procedures for qualifying supervisors and methods of training
More informationVCE Product Design and Technology: Administrative information for Schoolbased Assessment in 2018
VCE Product Design and Technology: Administrative information for Schoolbased Assessment in 2018 Units 3 and 4 School-assessed Task The School-assessed Task contributes 50 per cent to the study score and
More information2017 EDITION. CLEARED FOR PUBLIC RELEASE Copyright 2017 Lockheed Martin Corporation. All Rights Reserved
2017 EDITION Copyright 2017 Lockheed Martin Corporation. All Rights Reserved Applicability This document applies to Lockheed Martin Missiles and Fire Control (LMMFC) Dallas and Orlando Procured material.
More information(Non-legislative acts) DECISIONS
4.12.2010 Official Journal of the European Union L 319/1 II (Non-legislative acts) DECISIONS COMMISSION DECISION of 9 November 2010 on modules for the procedures for assessment of conformity, suitability
More informationCHECKLIST FOR DESIGNATING AUTHORITIES DESIGNATION OF NOTIFIED LABORATORY. 1. General Requirement Complies Comments
LAMPIRAN I PERATURAN MENTERI KOMUNIKASI DAN INFORMATIKA REPUBLIK INDONESIA NOMOR TAHUN TENTANG PETUNJUK PELAKSANAAN PENGAKUAN BALAI UJI NEGARA ASING CHECKLIST FOR DESIGNATING AUTHORITIES DESIGNATION OF
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification
More informationApplication for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID
Application for Assessment of a full quality assurance system regarding Measuring Instruments in accordance with MID Company (applicant): hereby applies to RISE Research Institutes of Sweden AB, as Notified
More informationTHE KENYA POWER AND LIGHTING CO. LTD. SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT
THE KENYA POWER AND LIGHTING CO. LTD SPECIFICATIONS for IMPULSE VOLTAGE TEST EQUIPMENT NAME DESIGNATION SIGNATURE DATE Compiled by Ephantus Nyagah Ag. Senior Engineer Checked by Eng. Thagichu Kiiru Deputy
More informationCONTINUED ON NEXT PAGE..
REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 07/23/96 A PAGE 2: ADDED PARAGRAPHS 3.2.1, 3.2.2, AND 3.2.3. PARAGRAPH 3.3.b, ADDED SEE PARAGRAPH 3.2. 12/11/97 PAGE 3: ADDED PARAGRAPHS 3.8.1, 3.8.2,
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation
More informationNZ China EEEMRA. Topics:
NZ China EEEMRA Topics: Mutual Recognition Agreements (MRAs) China Compulsory Certification (CCC) system EEEMRA Advantages of the EEEMRA Beyond the EEEMRA Peter Morfee Principal Technical Advisor EnergySafety
More informationMISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration
SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationSoftware Validation Considerations within Medical Companies per FDA 21 CFR PART 11
Greg Hetland, Ph.D. International Institute of GD&T Software Validation Considerations within Medical Companies per FDA 21 CFR PART 11 One critical challenge facing today s medical OEMs and suppliers is
More informationGENERAL DESCRIPTION OF THE CMC SERVICES
STANDARD FOR CERTIFICATION No.1.1 GENERAL DESCRIPTION OF THE CMC SERVICES MAY 2007 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property and the
More informationLOCOMOTIVE ENGINEERING DEPTT.
SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved
More informationSPECIFICATION FOR SAFETY POLE SIGNS & ACCESSORIES
KP/3CB/TSP/0/00 04-09-9 Page of 9 TABLE OF CONTENTS 0. Circulation List 0. Amendment Record FOREWORD. SCOPE. REFERENCES 3. TERMS AND DEFINITIONS 4. REQUIREMENTS 5. TESTS AND INSPECTION 6. MARKING, LABELLING
More informationObject: Aptiv external communication about Product and/or Process evolution. Raw material securisation (PA 6.6 worldwide capacity shortage)
Change description Désignation APTIV ZI des Longs Réages - BP50025 2231 EPERNON CEDEX - FRANCE Customer Communication N : Date : CAQE 111/67 27-Nov-1 From : Frédéric PAYEN Fax N : / Phone N : +33 2371615
More informationWorking Drawing Manual
Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...
More informationChrysler EMC/Electrical Laboratory DC-11224/5 & DC Self-Assessment
CHRSLER CORPORATION Laboratory Testing Capability Self-Assessment Form: Revision 2.0 Lab Approval Category Code: J-1 Change: August 1, 2007 1.0 GENERAL Chrysler EMC/Electrical Laboratory DC-11224/5 & DC-10615
More informationSEI Certification Program Manual
Safety Equipment Institute SEI Certification Program Manual Section 29: Industrial Protective Clothing and Equipment Program 0 of 6 SEI Certification Program Manual Section 29: Industrial Protective Clothing
More informationSUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project
SUBMITTAL LETTER Capital Renewal Scoates Hall, Texas A &M University, College Station, TX TAMUS Project 02-3113 To: Quimby McCoy Preservation To: (Write-in Consultant) From: Vaughn Construction, LLC Architecture.
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationREVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03
REVISION RECORD REV DESCRIPTION DATE 0 INITIAL RELEASE 06/24/03 A PAGE 3, CHANGED INITIAL RATE OF RADS TO 240 RADS/SEC. 03/15/05 B PAGE 4, CHANGED IN BOTH PARAGRAPHS 4.2, 4.3 IN CONJUNCTION TO 3.3 CHANGED
More informationTPS 49 EDITION 2 JUNE 2009
TPS 49 EDITION 2 JUNE 2009 Interim arrangements & guidance on the interpretation of IEC 61672 Sound Level Meters - Periodic Tests CONTENTS SECTION PAGE 1 Purpose and duration 2 2 Statement 2 3 Specific
More informationEU- T y p e E x a m i n a t i o n C e r t i f i c a t e
MiCOM Labs, Inc.: EU Notified Body Number 2280 EU- T y p e E x a m i n a t i o n C e r t i f i c a t e Rev: A Date: 27 th June 2017 Approval Holder Name: Suhan Kim MANDO corp. Approval Holder Address 32,
More informationMIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A
XXVIII BRAZE/BRAZING PROCESS I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B MIL- B-007883 Rev OTHER (IF Other, Specify :) NAVSEA 0900-LP-001-7000 II:
More informationVCE Systems Engineering: Administrative information for Schoolbased Assessment in 2019
VCE Systems Engineering: Administrative information for Schoolbased Assessment in 2019 Units 3 and 4 School-assessed Task The School-assessed Task contributes 50 per cent to the study score and is commenced
More informationSECTION SUBMITTAL PROCEDURES
SECTION 01330 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide submittals in accordance with the General Conditions as modified by the Supplementary Conditions,
More informationPURCHASE DIVISION DEPARTMENT QUALITY MANUAL Revision No. : 02 Issue No: : 2 Dt of Revision : Issue Dt. :
Section : 0 Document : DQM-01 Topic : FORMAT 6 OF PROCUREMENT PROCEDURE OF CPRI (NON-WORKS) Section I(B)-Technical Specification Tender Enquery No PUR/UARC-02/14-15 Name of the Equipment: Damped Oscillatory
More informationWorking Drawing Procedure
Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring
More informationContent of Presentation
Statistical Analysis Determining payment NEC/AAAE 2017 Annual Airport Conference Hershey, PA Content of Presentation Explain concept behind Percentage Within Limits (PWL) Demonstrate importance of process
More informationBharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT
An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant), TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone: +91 431 257 7653 Fax
More information11-SDMS-03 REV. 02 SPECIFICATIONS FOR
11-SDMS-03 REV. 02 SPECIFICATIONS FOR XLPE INSULATED POWER CABLES FOR RATED VOLTAGES FROM 15 KV UP TO 36 KV (U m ) This specification is property of SEC and subject to change or modification without notice
More informationSECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.
SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in
More informationStandards and Quality In Research Laboratories. By Geoff Visser SABS Research Fellow And Prof Roy Ramphal - UNISA
Standards and Quality In Research Laboratories By Geoff Visser SABS Research Fellow And Prof Roy Ramphal - UNISA Introduction University research team Namibian field study Interesting findings about natural
More informationType Approval JANUARY The electronic pdf version of this document found through is the officially binding version
STANDARD FOR CERTIFICATION No. 1.2 Type Approval JANUARY 2013 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version The content of this service
More informationTECHNICAL SPECIFICATION OF LT SHACKLE BOLT (G. I. BOLT) WITH NUT AND SPRING WASHER
TECHNICAL SPECIFICATION OF LT SHACKLE BOLT (G. I. BOLT) WITH NUT AND SPRING WASHER 1.0 SCOPE: This specification covers the manufacture, testing at works and supply of G. I. Bolts with Nut and Spring Washer
More informationThis specification describes the general requirements for Engineering Services provided to Vale.
1/9 1.0 PURPOSE This specification describes the general requirements for Engineering Services provided to Vale. 2.0 GENERAL For the purposes of this document, the Engineering Consultant shall be referred
More informationGUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) ARLINGTON COUNTY GOVERNMENT (ACG)
GUIDELINES AND MINIMUM ACCEPTANCE CRITERIA FOR THE PREPARATION AND SUBMISSION OF PARKING MANAGEMENT PLANS (PMP) TO ARLINGTON COUNTY GOVERNMENT (ACG) Effective Date: February 15, 2016 Prepared by: Arlington
More informationFIELD CORRELATED LIFE TEST SUPPLEMENT TO SAE/USCAR-2 SUMMARY OF CONTENTS 1. SCOPE OUTLINE REFERENCED DOCUMENTS EQUIPMENT...
The Engineering Society For Advancing Mobility Land Sea Air and Space I N T E R N A T I O N A L 400 Commonwealth Drive, Warrendale, PA 15096-0001 SAE/USCAR-20 Issued December 2001 FIELD CORRELATED LIFE
More informationPower Verification in Racks B and B950-02
Table of Contents 1.0 Introduction... 1 2.0 Accountability... 1 3.0 Hazards Internal to this Rack... 2 4.0 External Hazards Due to Sources in this Rack... 2 5.0 Battery Charger 120 VAC Verification...
More informationAPMP GUIDELINES FOR ACCEPTING A QUALITY SYSTEM(V.2.0 WD2) approved on July 2010
APMP GUIDELINES FOR ACCEPTING A QUALITY SYSTEM(V.2.0 WD2) approved on July 2010 The CIPM global mutual recognition arrangement (global MRA) requires national metrology institutes (NMIs) to have in place
More informationPowerAmp Design. PowerAmp Design EVAL195 EVALUATION KIT FOR MODEL PAD195. Rev B
PowerAmp Design EVALUATION KIT FOR MODEL PAD195 Rev B INTRODUCTION The evaluation kit provides a convenient method to become familiar with the operation of amplifier model PAD195 before your application
More information.2 Accompany all submissions with a transmittal letter, in duplicate, containing:.4 Specification Section number for each submittal
City of Winnipeg Brady Road Landfill Site Section 01300 New Entrance and Scale Facility Page 1 of 4 SUBMITTALS 1. SHOP DRAWINGS 1.1 General.1 Arrange for the preparation of clearly identified Shop Drawings
More informationOperator s Manual. PP016 Passive Probe
Operator s Manual PP016 Passive Probe 2017 Teledyne LeCroy, Inc. All rights reserved. Unauthorized duplication of Teledyne LeCroy documentation materials is strictly prohibited. Customers are permitted
More informationMIL- B Rev NAVSEA 0900-LP
I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B OTHER (IF Other, Specify :) MIL- B-007883 Rev NAVSEA 0900-LP-001-7000 II: ATTRIBUTES: YES NO 2a. Does a
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 6361-3 Third edition 2014-09-15 Wrought aluminium and aluminium alloys Sheets, strips and plates Part 3: Strips: Tolerances on shape and dimensions Aluminium et alliages d aluminium
More informationAccredited calibration of field strength meters
Accredited calibration of field strength meters Calibration laboratory accredited in accordance with DIN EN ISO/IEC 17025:2005 by the Deutsche Akkreditierungsstelle (DAkkS) Application oriented calibration
More informationSPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Edition
SPECIFICATIONS FOR A QUALITY LABEL FOR DECORATION OF COATED ALUMINIUM USED IN ARCHITECTURAL APPLICATIONS Master version ratified by the QUALIDECO Committee on 27 April 2017 Effective from 1 July 2017 Published
More informationReport Number B0622. Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center
Report Number B0622 Requirements for Sellers of Special Tooling to the Boeing St. Louis Tooling Center 1 Index Title Page....1 Index....2 Index of Page Changes.. 3 1.0 Scope....4 1.1 Relations to other
More informationPlant Client Contract Code Document ID Contract No. TECHNICAL SPECIFICATIONS DC SHUNT Rev 00 Page 1 of 2
TECHNICAL SPECIFICATIONS Rev 00 Page 1 of 2 0 IFI Release for Enquiry 14/12/18 SSS 14/12/18 HGG 14/12/18 RBU - Rev. Status Description Date Prepared Date Checked Date Approved AC Based on: PIN-QMC-03-F101
More informationNorris Sucker Rod Project. Andrew Dickey, Justin O Neal, and Daniel Whittlesey
Norris Sucker Rod Project Andrew Dickey, Justin O Neal, and Daniel Whittlesey Table of Contents Introduction Mission Statement 2 Problem Statement 2 Statement of Work 2 Work Breakdown Structure 3 Task
More information(AMMA) American Maritime Modernization Association
(AMMA) American Maritime Modernization Association AUDIT GUIDE FOR THE EVALUATION OF AMMA MEMBER WELDING, BRAZING, AND NON-DESTRUCTIVE TESTING (NDT) PROGRAMS Revised By: Joe Frith, AMMA Welding/Brazing/NDT
More informationThank you for your business. Sincerely, Jason Greeson
Fab2Order receives many requests from many different industries, cultures, and sizes of operation. We have relationships that span a spectrum that includes very successful fortune 100 companies with layers
More informationMATERIALS DIVISION MEMORANDUM
MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete and Concrete Pipe Quality Control/Quality Assurance Programs SPECIFIC SUBJECT: Sections 204.22(c), 204.26(d) and Minimum Acceptance Sampling
More informationSupplier Quality Requirements for First Article Inspection SQR-011. Revision Date: 30 November Approved. Frank Mariot
Supplier Quality Requirements for First Article Inspection SQR-011 Revision Date: 30 November 2016 Approved Frank Mariot Supply Chain Quality Manager Suppliers may view this document via the Internet at:
More informationQ16 - Engineering Directed Standard Tool/Perishable Tool Inspection Requirements
Q16 - Engineering Directed Standard Tool/Perishable Tool Inspection Requirements "IMPORTANT NOTICE: A hard copy of this document may not be the document currently in effect. The current version is always
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More informationSHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01340 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Shop drawings, manufacturer's catalog cuts, product data, samples, and attached Shop Drawing/ Catalog
More informationPart 7: Thermography
INTERNATIONAL STANDARD ISO 18436-7 Second edition 2014-04-01 Condition monitoring and diagnostics of machines Requirements for qualification and assessment of personnel Part 7: Thermography Surveillance
More informationQ16 - Engineering Directed Standard Tool/Perishable Tool Inspection Requirements
Q16 - Engineering Directed Standard Tool/Perishable Tool Inspection Requirements "IMPORTANT NOTICE: A hard copy of this document may not be the document currently in effect. The current version is always
More informationFIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION
PERMITS AND INSPECTIONS FIRE SPRINKLER SYSTEM SUBMITTAL CHECKLIST AND APPLICATION 911 Assigned PROJECT Subdivision: Lot: Blk: Sec: PROJECT New Construction Addition/Remodel Demolition Other: Number of
More informationRESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST
RESIDENTIAL DEMOLITION PERMIT APPLICANT CHECKLIST The purpose of this form is to inform applicants of: 1) the requirements for building permits and stormwater permits for residential demolition projects;
More informationStatistical Software for Process Validation. Featuring Minitab
Statistical Software for Process Validation Featuring Minitab Regulatory Requirements 21 CFR 820 Subpart O--Statistical Techniques Sec. 820.250 Statistical techniques. (a) Where appropriate, each manufacturer
More informationUNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS
Development Services Department, 3363 West Park Place, Pensacola, Fl 32505 (850) 595-3475 UNPLATTED SUBDIVISION APPLICATION PACKAGE SUBMITTAL REQUIREMENTS All Unplatted Subdivision Application Submittal
More informationNotice of Advice. RevA: 18-September-2017 RevB: 26-September Engineering Assessment of Aurizon network's Capital Claim
Notice of Advice AECOM Australia Pty Ltd Level 8 540 Wickham Street PO Box 1307 Fortitude Valley QLD 4006 Australia www.aecom.com +61 7 3553 3740 tel +61 7 3553 2050 fax ABN 20 093 846 925 Attention Graham
More informationStandard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules. 45-day Formal Comment Period with Initial Ballot June July 2014
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationLens Impact Resistance Testing Plan Revised,
Forward Lens Impact Resistance Testing Plan Revised, 2013-12 The Vision Council (TVC) has developed a plan for labs that need to impact test plastic lenses in accordance with FDA requirements. The step-by-step
More informationVCE Media: Administration information for School-based Assessment in 2018
VCE Media: Administration information for School-based Assessment in 2018 Units 3 and 4 School-assessed Task The School-assessed Task contributes 40 per cent to the study score and is commenced in Unit
More informationTECHNOLOGY QUALIFICATION MANAGEMENT
OFFSHORE SERVICE SPECIFICATION DNV-OSS-401 TECHNOLOGY QUALIFICATION MANAGEMENT OCTOBER 2010 FOREWORD (DNV) is an autonomous and independent foundation with the objectives of safeguarding life, property
More informationURBN Fabric Manual (Version 2 March 2016)
URBN Fabric Manual (Version 2 March 2016) Introduction: The purpose of this manual is to give instructions to our fabric mills and garment vendors on the fabric requirements, mandatory testing requirements,
More informationTOOLING ADDENDUM TO PPG QC Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection
TOOLING ADDENDUM TO PPG QC 22-001 (SUPPLIER QUALITY CONTROL REQUIREMENTS) Control and Use of Digital Datasets for the Purpose of Tool Fabrication and Inspection Approved By Charles T. Morris Tooling Manager
More informationStandard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationThe Statistical Cracks in the Foundation of the Popular Gauge R&R Approach
The Statistical Cracks in the Foundation of the Popular Gauge R&R Approach 10 parts, 3 repeats and 3 operators to calculate the measurement error as a % of the tolerance Repeatability: size matters The
More informationTYPE APPROVAL PROCEDURE
Approval Amendment Record Approval Date Version Description 15/06/2012 1 Initial issue under MTM. Replaces Connex documents cml- 8.13-PR-002 & cml-8.21-po-168 30/11/2012 2 Document revised and updated
More informationLessons Learned in Integrating Risk Management and Process Validation
Lessons Learned in Integrating Risk Management and Process Validation Medical Device Congress Harvard March 2007 Jim Handzo Senior Manager QA Innovative Spinal Technologies Fran Akelewicz Principal Practical
More informationEast Central College
SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationSCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 & ANSI/NCSL Z540-1-1994 EAGLE EYE CALIBRATION LABS, INC. 21358 Nordhoff Street, Suite 101 Chatsworth, CA 91311 Kirpal Chhokar Phone: 818 993 0055 CALIBRATION
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.1 DESCRIPTION A. This specification defines the general requirements and procedures for submittals. A submittal is information
More informationStandard VAR-002-2b(X) Generator Operation for Maintaining Network Voltage Schedules
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed