ROLE STATEMENT MERCER HUMAN RESOURCE CONSULTING

Size: px
Start display at page:

Download "ROLE STATEMENT MERCER HUMAN RESOURCE CONSULTING"

Transcription

1 ROLE STATEMENT POSITION TITLE: MILCast Production Officer REPORTS TO: MILCast Production Supervisor DATE: March 2014 ROLES REPORTING TO THIS ONE: Nil PRIMARY OBJECTIVES Perform all precast concrete product manufacturing and yard duties as directed by the MILCast Production Supervisor including but not limited to preparation and cleaning of molds, manufacture of reinforcement, pouring and stripping concrete products, operation of yard plant and equipment, assisting with loading of customer trucks or trailers with concrete product, yard cleaning and minor maintenance of equipment. KEY ACCOUNTABILITIES KEY RESULT AREA MAJOR ACTIVITIES PERFORMANCE MEASURES 1. Preparation and stripping of Agricultural and Commercial concrete product molds. Prepare and strip concrete product molds used in production of Precast Agricultural and Commercial concrete products; in accordance with production guidelines and MILCast Safe Work Method Statements (SWMS). Molds are stripped, cleaned and oiled in accordance with MILcast procedures. Work area cleaned in preparation for re assembling of mold and pouring of new product. Mold re assembled with bungs, block outs and reinforcement in preparation for re pouring. Molds not required for immediate reuse are removed from the production floor to the storage area.

2 KEY RESULT AREA MAJOR ACTIVITIES PERFORMANCE MEASURES 2. Manufacture & Installation of Check product drawing for reinforcement specification, select Reinforcement material ordered in Reinforcement material (bar, mesh or fibre). accordance with the product design If the drawing specifies bar reinforcement, the cogged bars are to specification. be pre ordered and delivered as per specification. Cogged and Reinforcement cages are plain bars are to be assembled into the reinforcement cage as per manufactured in accordance with the specification and either welded or wired in to position as per product specification. specification. Manufacture of mesh reinforcement is manufactured on site from commercial sheet mesh. The mesh is cut, folded and assembled in to the reinforcement cage in accordance with the design specification. If fibre specified, ensure the correct quantity is added to the mix and blended before the pour. 3. Pouring and curing of concrete product When concrete arrives on site review documentation to ensure concrete strength and volume are as per order. Ensure concrete sample taken for slump and strength testing. Concrete to be vibrated to remove air voids during the pour in accordance with the product specification. All exposed concrete surfaces are to be troweled to a good finish and a MILCast product stock code and pour date are inscribed in the wet concrete. The exposed concrete surfaces are covered with wet hessian during the curing period. When concrete product is stripped from the mold, the product is quality inspected for cracks, voids and porosity. Concrete verified quantity and strength prior to pouring. Concrete to be poured, vibrated and finished in accordance with specification. Concrete to be cured in accordance with specification. New products are inspected and classified in accordance with MILCast quality standards.

3 KEY RESULT AREA MAJOR ACTIVITIES PERFORMANCE MEASURES 4. Plant operation Operate MILCast plant and equipment in accordance with MILCast guidelines and SWMS. Maintain vigilance at all times when operating plant items in order to ensure the safety of self and others within the work area. Conduct the daily pre-operation checks of plant and record the 5. Manufacture and installation of precast product ancillary items. checks and record in the plant log book. Report any plant faults to the Production Supervisor who will report the fault to the Fleet Maintenance Officer and if required; tag out the plant item for a serious fault. Undertake minor servicing and clean plant and equipment according to Murray Irrigation standards and procedures to ensure that the plant item is maintained in a good serviceable condition. Manufacturer of rubber flap regulator control of agriculture precast products in accordance with product specification. Installation of contractor manufactured aluminum sliding door controls and rubber flap regulator controls into precast products in accordance with the product design specification. 6. Other duties as required To assist with other activities within the operations of MILCast when required, which may include but not limited to assisting with orders, sales, delivery and yard cleaning. Plant pre operation checks are completed and recorded in accordance with procedures. Plant faults are reported to the MILCast Production Supervisor for rectification. Plant is operated in a safe manner at all times by qualified plant operators or under the instruction of a qualified plant operator. Regularly complete minor servicing and cleaning of plant items. Ancillary items for precast products are manufactured and installed in accordance with product specifications. Willingness to assist others and across MILCast operations. FREEDOM TO ACT The Production Officer has the freedom to act, within guidelines set by the MILCast Production Supervisor, to perform all production services as directed by the MILCast Production Supervisor including but not limited to perform all precast concrete product manufacturing and yard duties as directed. (See Murray Irrigation Delegations of Authority for further details).

4 KEY CHALLENGES Manufacturing Precast products in accordance with product specification. Maintaining quality control of manufactured products. Operating plant and equipment in a safe and efficient manner. KEY RELATIONSHIPS/INTERACTIONS Internal Executive Manager Corporate Affairs MILCast oversight MILCast Production Supervisor to seek guidance and direction in daily activities, seek advice on production of precast products and maintenance of plant and equipment. Other related matters associated with the operation of the MILCast production site. MILCast Commercial Solutions Supervisor same as MILCast Production Supervisor MILCast Accounts Support Officer External Customers limited contact to identify customer needs, to re direct customer enquiries or to offer assistance on minor issues.

5 KNOWLEDGE/EXPERIENCE REQUIREMENTS Essential Experienced in working with concrete and reinforcement. An understanding of precast concrete production. Ability to work independently or as part of a team with limited supervision. Capacity to perform the physical tasks associated with the position (heavy lifting/adverse production conditions). An understanding of Workplace Health and Safety Legislation Driver s Licence Desirable Knowledge and understanding of Murray Irrigation s MILCast operating environment First Aid Certificate Manual Handling Certificate Confined Space Certificate WH&S General Induction for Construction Work in NSW Crane and Forklift Licenses Computer Skills Total Staff Numbers: 0 FTE POSITION DIMENSIONS Operating Expenditure: Capital Expenditure: Total Expenditure: $0.0M $0.0M $0.0M

6 MURRAY IRRIGATION LIMITED Murray Irrigation Limited provides irrigation water to over 2,300 farms owned by 1,200 family farm businesses in southern NSW Murray Irrigation's area of operation stretches from Mulwala in the east, to Moulamein in the west - approximately 748,000 hectares of farmland north of the Murray River. ROLE OF DIVISION/BRANCH MILCast is a business unit of Murray Irrigation, currently located within the Corporate Affairs Division. MILCast is responsible for the manufacture of precast concrete production for Murray Irrigation and for the manufacture and sale of agricultural and commercial precast productions for a diverse range of customers. SIGNATURES: We certify that the content of this position description is accurate: Employee / / Manager / /

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete INSPECTION OPENINGS History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience

More information

NZQA registered unit standard version 1 Page 1 of 6. Manufacture precast concrete beams and columns

NZQA registered unit standard version 1 Page 1 of 6. Manufacture precast concrete beams and columns Page 1 of 6 Title Manufacture precast concrete beams and columns Level 3 Credits 25 Purpose People credited with this unit standard are able to: prepare, set up moulds and storage areas, carry out the

More information

SECTION COUNTERTOPS ecox PART 1 GENERAL

SECTION COUNTERTOPS ecox PART 1 GENERAL SECTION 11456 COUNTERTOPS ecox PART 1 GENERAL 1.1 SECTION INCLUDES A. Countertops B. Bar tops C. Vanity tops D. Table tops E. Reception counters F. Cash/back wraps G. Transaction counters H. Service counters

More information

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete ACCESS COVERS History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within

More information

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions.

shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. shawprecastsolutions.com BEBO Arch Systems PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. BEBO ARCH SYSTEMS BEBO ARCH units are high quality, low maintenance precast structures

More information

MATERIALS DIVISION MEMORANDUM

MATERIALS DIVISION MEMORANDUM MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Precast Concrete and Concrete Pipe Quality Control/Quality Assurance Programs SPECIFIC SUBJECT: Sections 204.22(c), 204.26(d) and Minimum Acceptance Sampling

More information

METHOD STATEMENT. Sika FloorJoint S

METHOD STATEMENT. Sika FloorJoint S METHOD STATEMENT Table of Contents 1 SCOPE 3 2 PRODUCT 3 2.1 3 3 SUBSTRATE REQUIREMENTS 3 4 Preparation of the Substrate 3 4.1 Mapping of the joint panels on the floor for the saw cuts 3 4.2 Execution

More information

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete STORMWATER History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within

More information

NZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture

NZQA registered unit standard version 1 Page 1 of 6. Demonstrate knowledge of structural precast concrete element manufacture Page 1 of 6 Title Demonstrate knowledge of structural precast concrete element manufacture Level 3 Credits 25 Purpose People credited with this unit standard are able to demonstrate knowledge of: preparation,

More information

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete.

SUBMITTAL LIST Note: See tab below for Samples and Instructions. Attach to end of Specification Section when complete. REQUIREMENTS (indicate with an "") 011100 1.4 Detailed Construction Phasing Plan 011100 1.4 Sub-Surface Utility Location Plan 013100 1.3 Letter Designating Project Superintendent 013100 1.3 Construction

More information

Product Catalog. Since 1980 The Natural Choice for Preservative-Treated Wood

Product Catalog. Since 1980 The Natural Choice for Preservative-Treated Wood Product Catalog Since 1980 The Natural Choice for Preservative-Treated Wood Escue Wood is the natural choice for pressure treated lumber. Family owned since 1980, our company manufactures Wolmanized brand

More information

Cooke Precast Concrete

Cooke Precast Concrete Cooke Precast Concrete History Cooke Precast Concrete Pty. Ltd. commenced business in September 1996, with a staff combining together bringing many decades of knowledge and experience within the precast

More information

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS

SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS SPECIFICATIONS FOR THE MANUFACTURE AND DESIGN OF PRECAST THREE SIDED ARCH STRUCTURES, WINGWALLS AND HEADWALLS 1. DESCRIPTION THESE SPECIFICATIONS ARE FOR A PRECAST THREE SIDED ARCH STRUCTURE, HEADWALLS

More information

ARMTEC.COM. Built to last. Custom Precast Solutions For Your Home. Custom Steps Custom Decks Standard Steps Window Wells Brackets Stairwells

ARMTEC.COM. Built to last. Custom Precast Solutions For Your Home. Custom Steps Custom Decks Standard Steps Window Wells Brackets Stairwells ARMTEC.COM Built to last. Custom Precast Solutions For Your Home Custom Steps Custom Decks Standard Steps Window Wells Brackets Stairwells PRESTIGE UNIVERSAL CUSTOM STEPS AND DECKS Universal design Custom

More information

Sunshine Coast Open Space Landscape Infrastructure Manual

Sunshine Coast Open Space Landscape Infrastructure Manual Sunshine Coast Open Space Landscape Infrastructure Manual Exercise Equipment Technical Drawings () 1.0 Overview... 2 2.0 Technical drawing index... 3 3.0 Technical drawings... 4 EE-01 (1of1) - Bolt down

More information

ARMTEC.COM. Built to last. Custom Precast Solutions For Your Home. Custom Steps Custom Decks Window Wells Stairwells Brackets

ARMTEC.COM. Built to last. Custom Precast Solutions For Your Home. Custom Steps Custom Decks Window Wells Stairwells Brackets ARMTEC.COM Built to last. Custom Precast Solutions For Your Home Custom Steps Custom Decks Window Wells Stairwells Brackets PRESTIGE UNIVERSAL CUSTOM STEPS AND DECKS Universal design Custom features PRESTIGE

More information

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

A. Action Submittals: Written and graphic information that requires Engineer's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SERVICE MANUAL for Telescopic pole, Gripo Alu

SERVICE MANUAL for Telescopic pole, Gripo Alu Telescopic pole Gripo Alu Side 1 av 11 HEPRO aid manufacturer HEPRO is a Norwegian industrial company that develops, manufactures and sells technical aids for adults and children with mobility impairment.

More information

Protection of Privacy Policy

Protection of Privacy Policy Protection of Privacy Policy Policy No. CIMS 006 Version No. 1.0 City Clerk's Office An Information Management Policy Subject: Protection of Privacy Policy Keywords: Information management, privacy, breach,

More information

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS

PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS PREMIUM CONCRETE COUNTERTOP MIX INSTALLATION INSTRUCTIONS High Strength Fast Setting Pourable Helpful Items: TCC Materials February 09 Version 2.0 Tools Required: Concrete mixer or ½ drill (600 RPM or

More information

Ritch Rappel Enbridge

Ritch Rappel Enbridge Ritch Rappel Enbridge Pipeline Safety Trust October 21, 2016 Quality is Free When it is Done Right. n Inspection does more quantity survey than quality documentation." n Each inspector is required to complete

More information

A. Extent of structural precast concrete work is shown on drawings and in schedules.

A. Extent of structural precast concrete work is shown on drawings and in schedules. SECTION 03 41 00 - STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 specification

More information

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

SECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES SECTION 01 33 23 - SHOP DRAWINGS, PRODUCT DATA, AND PART 1 - GENERAL 1.1 SUMMARY A. Products include, but are not limited to, the following construction submittals: 1. Shop Drawings. 2. Product Data. 3.

More information

SELF APPRAISAL OF SKILLS - STANDARD FOR ALL DISCIPLINES

SELF APPRAISAL OF SKILLS - STANDARD FOR ALL DISCIPLINES Applicant Name: Position(s) Applied For: Date: Application Reg. No: To The Applicant: The following questionnaire is designed to indicate the range of skills you will bring to the company. The company

More information

14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE

14 March 2016 City Hall Station Renovations Bid Documents 15 th Street Station Phase Station Improvements SECTION PRECAST CONCRETE SECTION 03400 PRECAST CONCRETE PART 1 GENERAL 1.01 DESCRIPTION A. The work specified in this Section consists of designing, furnishing and installing precast concrete components. 1.02 RELATED SECTIONS

More information

Heavy and Medium Duty Fire Doors

Heavy and Medium Duty Fire Doors Heavy and Medium Duty Fire Doors 10 06.06.2011 Add. Section 1.4. JES VK 09 14.12.2009 New doc. Frontpage JES VK 08 29.11.2006 Page 8 and 13 revised JES VK 07 08.11.2006 Page 15 revised JES VK 06 08.03.2005

More information

Safe work Method Statement

Safe work Method Statement Safe work Method Statement For Federal Safety Commissioner (FSC) approved companies or builders who require a high level of Safe Work Method Statements the attached SWMS is a guide only. As some FSC approved

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

SILVERBROOK DRILLING SERVICES CAPABILITY PROFILE 1. Contact Details

SILVERBROOK DRILLING SERVICES CAPABILITY PROFILE 1. Contact Details SILVERBROOK DRILLING SERVICES CAPABILITY PROFILE 1. Contact Details Firm Name: Silverbrook Drilling Street address 492 Linthorpe Rd, Pittsworth, Qld 4350 Main Contacts Carol McIntyre Owner / Manager Chris

More information

Section 7. Pouring Concrete. Section 7: Pouring Concrete

Section 7. Pouring Concrete. Section 7: Pouring Concrete Section 7 Pouring Concrete Section 7: Pouring Concrete PRE-POUR CHECKLIST CHECK OUTSIDE PERIMETER FOR THESE THINGS OUTSIDE CORNERS Any missing boards on outside corner bracing? Does the outside corner

More information

More Than Four Decades of Safety, Service, Quality

More Than Four Decades of Safety, Service, Quality More Than Four Decades of Safety, Service, Quality Mission Our commitment to safety and service has been the key to our phenomenal success. On behalf of Imperial Crane and the Bohne family, I would like

More information

SAFE WORK METHOD STATEMENTS MBS CPD Points

SAFE WORK METHOD STATEMENTS MBS CPD Points SAFE WORK METHOD STATEMENTS MBS 7.01 2 CPD Points Copyright and Disclaimer: MyBuildingSite Pty Ltd (MBS) owns the copyright of the content on this website, unless otherwise stated. The courses and information

More information

North Australian Centre for Oil and Gas. Fuelling our future

North Australian Centre for Oil and Gas. Fuelling our future North Australian Centre for Oil and Gas Fuelling our future Developing skills and expertise for the energy industry > > >Training and education: apprenticeships, > short courses, diplomas and degrees >

More information

SKILLS FOR OIL AND GAS ASSESSMENT GUIDELINES FOR OPITO VOCATIONAL QUALIFICATIONS FOR OIL AND GAS ENGINEERING MAINTENANCE

SKILLS FOR OIL AND GAS ASSESSMENT GUIDELINES FOR OPITO VOCATIONAL QUALIFICATIONS FOR OIL AND GAS ENGINEERING MAINTENANCE SKILLS FOR OIL AND GAS ASSESSMENT GUIDELINES FOR OPITO VOCATIONAL QUALIFICATIONS FOR OIL AND GAS ENGINEERING MAINTENANCE REVISION 0: January 2017 Revision 0 (24/01/2017) 1 Document Control Revision 0 January

More information

Safe use of meat bandsaws

Safe use of meat bandsaws Guidance note Safe use of meat bandsaws This information sheet provides practical advice for employers about controlling hazards while using meat bandsaws. February 2011 Background Meat bandsaws are commonly

More information

A. Action Submittals: Written and graphic information that requires Architect's responsive action.

A. Action Submittals: Written and graphic information that requires Architect's responsive action. SECTION 01330 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1073 PRECAST CONCRETE CERTIFICATION PROGRAM JULY 20, 2018 1073.01 Program Overview 1073.02 Qualification 1073.03 Documentation Phase 1073.04 Documentation

More information

Knowledge Requirements. Protective Coatings Applicator Abrasive Blast Cleaning Operator Spray Painting Operator. trainthepainter.

Knowledge Requirements. Protective Coatings Applicator Abrasive Blast Cleaning Operator Spray Painting Operator. trainthepainter. Knowledge Requirements Protective Coatings Applicator Abrasive Blast Cleaning Operator Spray Painting Operator trainthepainter.com Knowledge Requirements The Knowledge Requirements the protective coatings

More information

24" Dia. 36" Dia. WE BUILD CONFIDENCE

24 Dia. 36 Dia. WE BUILD CONFIDENCE WE BUILD CONFIDENCE WE BUILD CONFIDENCE PRECAST STRUCTURES SERVE AS KEY COMPONENTS OF OUR UTILITY AND TRANSPORTATION INFRASTRUCTURE. AND MAKING THE INDUSTRY S BEST PRECAST PRODUCTS TAKES DEDICATION, ATTENTION

More information

EE171. H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

EE171. H.H. Sheikh Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E EE171 Electrical Equipment & Control System: Electrical Maintenance Transformers, Motors, Variable Speed Drives, Generators, Circuit Breakers, Switchgears & Protective Systems H.H. Sheikh Sultan Tower

More information

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL

INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL INSTALLATION INSTRUCTIONS FOR PLASCORE F5075 FRAME WALL The following information is provided by Plascore, Inc., as a general guideline for the installation of the F5075 Frame Wall System. This information

More information

Capability Statement

Capability Statement Capability Statement Who we are RCS Telecommunications (RCST) is a leading Australian telecommunications service provider for medium to large organisations. With over 35 years experience in communication

More information

AL NASR ENGINEERING (AL QUSAIS FACILITY)

AL NASR ENGINEERING (AL QUSAIS FACILITY) AL NASR ENGINEERING (AL QUSAIS FACILITY) CNC MACHINE SHOP, SPECIAL PURPOSE MACHINE MANUFACTURING, RETROFITTING, AVIATION EQUIPMENTS, ROBOTICS AND AUTOMATION TABLE OF CONTENTS INDUSTRIAL LICENSE COMMERCIAL

More information

Safe Work Method Statement SWMS 81213

Safe Work Method Statement SWMS 81213 Safe Work Method Statement SWMS 81213 This safe work method statement is generic in nature. It documents the risks and hazards associated with each step of a task and the control measures in place to minimise

More information

Model Curriculum. Irrigation Service Technician

Model Curriculum. Irrigation Service Technician Model Curriculum Irrigation Service Technician TABLE OF CONTENTS 1. Curriculum 04 2. Trainer Prerequisites 09 3. Annexure: Assessment Criteria 10 Irrigation Service Technician CURRICULUM / SYLLABUS This

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 01 3300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Metal and Engineering

Metal and Engineering 2007 HIGHER SCHOOL CERTIFICATE EXAMINATION Metal and Engineering Total marks 80 General Instructions Reading time 5 minutes Working time 2 hours Write using black or blue pen Board-approved calculators

More information

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo

2016 Specification Treads, Base, Stringers and other Amenities Wausau Tile Precast Epoxy Terrazzo 2016 Specification Treads, Base, Stringers and other Amenities 09400 Wausau Tile Precast Epoxy Terrazzo PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to complete, as indicated by the Contract

More information

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 01 33 00 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2 Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details

More information

SlipGrip Data Sheet & Installation Guide

SlipGrip Data Sheet & Installation Guide SlipGrip Data Sheet & Installation Guide Stair Treads Landing Covers Flat Sheets 9/2015 SlipGrip Technical Data Description SlipGrip products are high performance safety stair treads, landing covers and

More information

DROPSHORE SHORING SYSTEM USER MANUAL

DROPSHORE SHORING SYSTEM USER MANUAL www.dropshore.com DROPSHORE SHORING SYSTEM USER MANUAL USING DROPSHORE SETTING DROPSHORE SET DROPHEAD TO LOCKED POSTION WITH A HAMMER BLOW TO THE LOCKING NUT. ADJUST POST SHORE TO PROPER PIN HOLE POSITION

More information

ELECTRIC DRAFTING TECHNICIAN I ELECTRIC DRAFTING TECHNICIAN II

ELECTRIC DRAFTING TECHNICIAN I ELECTRIC DRAFTING TECHNICIAN II CITY OF ROSEVILLE ELECTRIC DRAFTING TECHNICIAN I ELECTRIC DRAFTING TECHNICIAN II DEFINITION To perform a variety of technical engineering drafting and mapping duties related to the design, construction,

More information

NZQA Expiring unit standard version 3 Page 1 of 8. Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing

NZQA Expiring unit standard version 3 Page 1 of 8. Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing Page 1 of 8 Title Operate bitumen handbar sprayer equipment, and handspray bitumen for chipseal surfacing Level 3 Credits 10 Purpose This unit standard is for people working in the pavement surfacing industry.

More information

PD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground

PD 3 Dowel Cradle. Load Transfer System Industrial Slab on Ground PD 3 Dowel Cradle Industrial Slab on Ground Provides the flattest joints Assists in reducing long term maintenance costs Extends the life-cycle of the floor and the asset Engineered to meet Super Flat

More information

INSPIRING TECHNICAL EXCELLENCE

INSPIRING TECHNICAL EXCELLENCE INSPIRING TECHNICAL EXCELLENCE A new world-class training facility for Oman Introducing TPO Takatuf Petrofac Oman (TPO) is a new joint venture founded by Takatuf, the Human Capital solutions provider,

More information

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1

UNDERGROUND UTILITY TRENCHES AND VAULTS Page 1 of 6 ADDENDUM #1 Page 1 of 6 ADDENDUM #1 PART 1 GENERAL 1.01 PRINCIPAL WORK IN THIS SECTION A. The requirements of the Owner's General Conditions, Supplementary Conditions, Special Conditions, and Division 1 - General

More information

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA

PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA PROCEDURE FOR INSPECTION OF ELECTRICAL INSTALLATIONS ABOVE 250KVA Generally inspection of electrical installations is carried out under Regulation-30 (Periodical inspection & testing) & Regulation-43 (Approval

More information

HC Precast System ( 100 % Malaysia Technology With 6 IPs )

HC Precast System ( 100 % Malaysia Technology With 6 IPs ) Choose Industrialised Building System ( IBS ) for Economical Construction Industrialised Building System ( IBS ) functions as a comprehensive superstructure construction system whereby flexibility in it's

More information

EE223D: Distribution Power Transformer

EE223D: Distribution Power Transformer EE223D: Distribution Power Transformer Aug 07-09, 2018 / Dubai EE223 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This intensive course is designed to provide participants with the skills

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the

More information

FOR RELEASE MAY 19, 2016

FOR RELEASE MAY 19, 2016 FOR RELEASE MAY 19, 2016 TRAYLOR BROS. TO ACQUIRE FIFTY PERCENT OWNERSHIP OF STERLING BOILER & MECHANICAL INC., A&D CONTRACTORS INC., AND ONYETT FABRICATORS (EVANSVILLE, IN, May 19, 2016) Traylor Bros.,

More information

Level 3 Certificate in Occupational Safety and Health. Unit 2: Controlling Hazards in the Workplace. Specimen Examination Question Paper

Level 3 Certificate in Occupational Safety and Health. Unit 2: Controlling Hazards in the Workplace. Specimen Examination Question Paper Level 3 Certificate in Occupational Safety and Health Unit 2: Controlling Hazards in the Workplace Specimen Examination Question Paper DO NOT OPEN THIS BOOKLET UNTIL YOU ARE INSTRUCTED TO DO SO PLEASE

More information

Clear Solutions to Oily Water Separation and Treatment

Clear Solutions to Oily Water Separation and Treatment Clear Solutions to Oily Water Separation and Treatment www.roviconoilfields.com info@roviconoilfields.com KM 2 IGBO-ETCHE ROAD, RUMUKWURUSI PORT-HARCOURT, RIVERS STATE. USA Office: 12808 WEST AIRPORT BLVD.

More information

Frequently asked questions about our armoured joint with disruptive face technology.

Frequently asked questions about our armoured joint with disruptive face technology. Frequently asked questions about our armoured joint with disruptive face technology. What is disruptive face technology? Traditional armoured joints consist of two parallel faces. As the joint opens, passing

More information

Installation Guidelines

Installation Guidelines Insulated Concrete Form Installation Guidelines Steps for installing the Diamond Snap-Form (DSF) Insulated Concrete Form (ICF). The Diamond Snap-Form ICF System consists of Foam- Control EPS with Perform

More information

ELECTRICAL EQUIPMENT. Inspection. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

ELECTRICAL EQUIPMENT. Inspection. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E ELECTRICAL EQUIPMENT Inspection H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: The course begins with the fundamental principles that always

More information

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia

JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners

More information

ClearSpan Grab Bag Canopy

ClearSpan Grab Bag Canopy ClearSpan Grab Bag Canopy Photo may show a different but similar model. 2008 ClearSpan All Rights Reserved. Reproduction is prohibited without permission. STK# DIMENSIONS 104385 10 W x 20 L 1 YOU MUST

More information

National Certificate in Wood Product Manufacturing (Level 3)

National Certificate in Wood Product Manufacturing (Level 3) NQF Ref 0815 Version 3 Page 1 of 10 National Certificate in Wood Product (Level 3) Level 3 Credits 80 This qualification is expiring. The last date to meet the requirements is 31 December 2011. Purpose

More information

Stop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977

Stop Gates & Stop Logs. Series 500. ine. Manufacturing high quality gates since 1977 Stop Gates & Stop Logs Series 500 Manufacturing high quality gates since 1977 ine Stop Gates & Stop Logs Series 500 Contents Stop Gate Introduction 3 Model 501 3 Model 503 4 Model 503-C 4 Stop Gate Specification

More information

Health and Safety Training in Design and Technology Design and Technology Association Specialist Extension Level S8HS Planer/Thicknesser Machines

Health and Safety Training in Design and Technology Design and Technology Association Specialist Extension Level S8HS Planer/Thicknesser Machines Specialist Extension Level S8HS Forename: Surname: School / College/ Institution Course date: / / These Training and Accreditation Guidelines are based on the following essential publications: Health and

More information

Two Louvre at Housing Project. Plain Precast Posts. Concrete Class ** Steel Reinforcing 20-24/13 6mm 4mm. Post Dimensions (mm)

Two Louvre at Housing Project. Plain Precast Posts. Concrete Class ** Steel Reinforcing 20-24/13 6mm 4mm. Post Dimensions (mm) erw civils ERW Precast Walls Standard Dimensions & Weights 087-255-7911 sales@erwcivils.co.za Manufacturer and Installer of Precast Concrete Products: Precast Walling, Concrete Palisade, Ranch Rails, Retaining-

More information

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration

MISSISSIPPI STATE UNIVERSITY Office of Planning Design and Construction Administration SECTION 01 340 - SHOP DRAWINGS, PRODUCT DATA AND SAMPLES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other

More information

1. Architectural precast concrete cladding units.

1. Architectural precast concrete cladding units. SECTION 034500 - PRECAST ARCHITECTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Architectural precast concrete cladding units. 1.2 DEFINITION A. Design Reference

More information

Considerations in Making Paint Selections for Your Condo Association or HOA

Considerations in Making Paint Selections for Your Condo Association or HOA Considerations in Making Paint Selections for Your Condo Association or HOA Introduction 03 Conditions Behind When and Why to Meet Repair Needs 04 Condo Association or HOA Guidelines for Color Selection

More information

3400 Tectura Designs Precast Concrete

3400 Tectura Designs Precast Concrete 3400 Tectura Designs Precast Concrete PART 1 - GENERAL 1.1 SUMMARY A. Perform all work required to furnish and complete the proper installation of precast concrete. B. Types of Precast Concrete work include:

More information

Contents. Before you begin. Introduction: Using construction tools and equipment 1. Element 1: Planning and preparing 3

Contents. Before you begin. Introduction: Using construction tools and equipment 1. Element 1: Planning and preparing 3 Contents Contents Before you begin v Introduction: Using construction tools and equipment 1 Element 1: Planning and preparing 3 Section 1.1: Obtaining, confirming and applying work instructions 4 and operational

More information

Guideline Food Safety Management Statement: Production of Eggs Only

Guideline Food Safety Management Statement: Production of Eggs Only Guideline Food Safety Management Statement: Production of Eggs Only Guideline Food Safety Management Statement for Egg Producers: Production of eggs only, no grading NOTE: This Guideline food safety management

More information

HEAVY-DUTY BASKETBALL BACKSTOPS

HEAVY-DUTY BASKETBALL BACKSTOPS INSTALLATION, OPERATION &MAINTENANCE MANUAL HEAVY-DUTY BASKETBALL BACKSTOPS No. 00195-580 Single Extension No. 00195-582 Double Extension No. 00195-582 5'-0" 5'-0" 5'-0" No. 00195-580 THE OWNER OF THIS

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

PRECAST TO LAST. S C Lam, K C Chung and S W Sham Hong Kong Housing Department

PRECAST TO LAST. S C Lam, K C Chung and S W Sham Hong Kong Housing Department PRECAST TO LAST S C Lam, K C Chung and S W Sham Hong Kong Housing Department Abstract: The Hong Kong Housing Authority (HA) pioneered the precast concrete construction in high-rise residential buildings

More information

Fat vs. Thin. MPE Engineering 2018 Irrigation Technical Conference

Fat vs. Thin. MPE Engineering 2018 Irrigation Technical Conference Fat vs. Thin MPE Engineering Precast or Cast-in-Place Concrete Why should we consider Precast Concrete for Control Structures? Do we want to potentially save money? Do we have project time constraints?

More information

SECTION SUBMITTAL PROCEDURES

SECTION SUBMITTAL PROCEDURES SECTION 013300 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply

More information

ROUND TOP RV SHELTER

ROUND TOP RV SHELTER ROUND TOP RV SHELTER 94182 ASSEMBLY AND OPERATING INSTRUCTIONS Visit our website at: http://www.harborfreight.com Read this material before using this product. Failure to do so can result in serious injury.

More information

SECTION BONDED TERRAZZO FLOORING

SECTION BONDED TERRAZZO FLOORING SECTION 09 66 13.19 BONDED TERRAZZO FLOORING THIS GUIDE SPECIFICATION HAS BEEN PREPARED BY THE NATIONAL TERRAZZO AND MOSAIC ASSOCIATION, INC., AND IS DISTRIBUTED FOR USE BY ITS MEMBERS AND DESIGN PROFESSIONALS.

More information

DESIGN REVIEW PROCESS AND APPLICATION

DESIGN REVIEW PROCESS AND APPLICATION DESIGN REVIEW PROCESS AND APPLICATION Design review is the first step in the process of any construction project requiring permits. The Community Redevelopment Agency (CRA) Board is responsible for ensuring

More information

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL

UCCS University Hall Fire Sprinkler System Upgrade March 1, 2011 RTA SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

Curriculum for Remote Operated Vehicle Operations VG3 / in-service training at a training establishment

Curriculum for Remote Operated Vehicle Operations VG3 / in-service training at a training establishment Curriculum for Remote Operated Vehicle VG3 / in-service training at a training establishment Dette er en oversettelse av den fastsatte læreplanteksten. Læreplanen er fastsatt på Bokmål Laid down as a regulation

More information

Aftermarket services, spares and retrofit. World-class support for world-leading variable pitch axial fans

Aftermarket services, spares and retrofit. World-class support for world-leading variable pitch axial fans Aftermarket services, spares and retrofit World-class support for world-leading variable pitch axial fans Your choice of axial flow fan equipment is a significant investment. Only L&T Howden spares, services

More information

East Central College

East Central College SECTION 013300 - SUBMITTAL PROCEDURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

BANDARI COLLEGE TRAINING CALENDER 2016 DURATION. COURSE Days Start End CATEGORY TARGET

BANDARI COLLEGE TRAINING CALENDER 2016 DURATION. COURSE Days Start End CATEGORY TARGET JANUARY National Cohesion and Integration 3 1/25 1/27 All All Diploma in Nautical Studies II 110 1/25 11/25 Commercial DNS I holders Diploma in Marine Engineering II 110 1/25 11/25 Commercial DMarE I holders

More information

SUBSTATION SECURITY WALL INSTALLATION MANUAL

SUBSTATION SECURITY WALL INSTALLATION MANUAL SUBSTATION SECURITY WALL INSTALLATION MANUAL JULY 26, 2016 OLDCASTLE PRECAST, INC. 3000 New McEver Rd, Acworth, Ga 30101 Substation Security Wall Installation Manual This Installation Manual is intended

More information

G r a d e 1 1 A F o u n d a t i o n s a n d F l o o r F r a m i n g

G r a d e 1 1 A F o u n d a t i o n s a n d F l o o r F r a m i n g G r a d e 1 1 A F o u n d a t i o n s a n d F l o o r F r a m i n g G r a d e 1 1 A : F o u n d a t i o n s a n d F l o o r F r a m i n g Course Description Carpentry 11A: Foundations and Floor Framing

More information

Company 'A' Wind Turbine Safety Rules (3 rd Edition) Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES

Company 'A' Wind Turbine Safety Rules (3 rd Edition) Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES Company 'A' Wind Turbine Safety Rules (3 rd Edition) 2015 Support Procedure P2 PROCEDURE FOR APPROVAL OF TOOLS, EQUIPMENT AND PROCESSES 1. INTRODUCTION The purpose of this procedure is to enable Company

More information

COMMUNICATIONS POLICY

COMMUNICATIONS POLICY COMMUNICATIONS POLICY This policy was approved by the Board of Trustees on June 14, 2016 TABLE OF CONTENTS 1. INTRODUCTION 1 2. PURPOSE 1 3. APPLICATION 1 4. POLICY STATEMENT 1 5. ROLES AND RESPONSIBILITIES

More information

MANuFACturers industry QuALity statement.

MANuFACturers industry QuALity statement. MANuFACturers industry QuALity statement Precast New Zealand Inc. (PCNZ) was established in 1999 and is a national industry association of precast concrete manufacturers representing over 90% of the off

More information

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE

GENERAL OPERATIONAL PRECAUTIONS PRECAUTIONS ON USING CUT-OFF MACHINE GENERAL OPERATIONAL PRECAUTIONS WARNING! When using electric tools, basic safety precautions should always be followed to reduce the risk of fire, electric shock and personal injury, including the following.

More information

Tested and ready to use Quality from a single-source

Tested and ready to use Quality from a single-source Tested and ready to use Quality from a single-source 2 Cable fabrication 100% tested and ready to use for all-round certainty Quickly assembled and reliable in operation that is how machine components

More information

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E

Electrical Switchgear & Power Transformer Testing. H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E Electrical Switchgear & Power Transformer Testing H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae Course Introduction: This will provide you with practical knowledge

More information