1 Kevin McShane Transport Planner The Studio 555 Lisburn Road BELFAST BT9 7GQ Tel / mcshanek@btinternet.com Our Ref January 2015 Ms Nicole Thompson DoE Strategic Planning Causeway Exchange 1-7 Bedford Street BT2 7EG Dear Nicole REF TRANSPORT INPUT, 130 SAINTFIELD ROAD, BELFAST Thank you for the copy of the consultation response from Transport NI. We note that the Department had raised a number of details in relation to the design and we have taken these on board within the revised drawings prepared for the road access. The layout of the access and position is unchanged from the original submission but some minor kerb realignments and notes have been added. Please note the departments comments are in italics and our response to each is in normal text font. The draft condition and informatives are noted first. This condition is acceptable and we append to this letter a copy of the departure form set out to deal with the anticipated Departures. These Departures broadly relate to the - 1. The development hereby permitted shall not commence until full engineering details of the vehicular accesses onto the XXXX Road have been submitted to and approved by the Department. All works shall comply with the requirements of the Design Manual for Roads and Bridges and all other relevant standards and technical guidance, including approval of the necessary Departures/ Relaxations from standard, generally in accordance with Drawing No YYYY bearing the Planning Office date stamp ZZ/ZZ/2015. And the Informative: 1. The Applicant must recognise that implementation of the proposal is dependent on the successful completion of the application for Relaxations and Departures from Standard to be determined by Network Services, Transport NI Headquarters, Clarence Court, Adelaide Street, Belfast, BT2 8GB. The applicant should forward an acknowledgement that the above Condition would be acceptable (and at the applicants risk should relaxations and departures not be accepted). 2. Once the access design is accepted in principle a revised Private Streets Determination (PSD) will be required for road widening to accommodate the
2 right turn facility. Once an acceptable layout is achieved the appropriate drawings will be required. Please do not forward multiple copies until then. The condition is considered to be a standard one that is normally applied to designs of new developments associated with the introduction of a new access on to a public road. The drawings have been revised to take on board the individual comments as noted below. The departures applied for are not as a result of the design but relate to departures on the existing road. However as the design is influenced by this existing road we have to apply for these departures. The first informative does highlight that it is normal practice to use departures and relaxations when an access is being improved over the existing arrangements, or where some of the modern standards cannot be achieved due to the use of an existing roadway. We have noted above that these departures relate to the existing road alignment and we assume that there is a reasonable prospect that they would be approved by TNI post the grant of Planning Permission. The second informative seeks to provide a Private Streets Determination for the area of road which is to be widened. A PSD was already submitted as part of the application and we are content to update this, if required, post planning. In summary we do not believe that the roads drawings have materially changed as the access is consistent with the originally submitted design. As such the other comments from Transport NI are reproduced below in italics and our comments are attached. 1. The access will be intensified in use and Transport NI agrees there is a requirement for an appropriately designed right turn facility at the access. The proposed access is onto a high speed, rural road on the Protected Routes network. As such fully dimensioned drawings at 1:200 scale, designed in accordance with the Design Manual for Roads and Bridges, should be submitted. Where this design falls short of the requirements of DMRB any necessary relaxations and departures from DMRB must be applied for through TNI Headquarters. The overall design of the junction should be carried out following TD 95/42 (Geometry of Major/Minor road Junctions), specifically, Layout 5. Following internal consultation with TNI Design and Consultancy Services (DCS) the following points must be addressed on revised drawings before TNI would regard the design acceptable in principle. TNI would also require a draft of proposed relaxations and departures. A layout plan to a scale of 1:200 has been submitted. This has been updated to take on board the comments noted below. We also attach a copy of the Departure Form highlighting the departures sought, together with justification measures. Again we reiterate that the departures are for the existing road rather than for our access. The further detailed points raised by Transport NI are detailed below and we comment on each one.
3 1. Visibility splays RHS, shown as 4.5 m x 150 m, should be 4.5 m x 215 m. LHS, shown as 4.5 m x 160 m, should be 4.5 m x 215 m. If the sightlines cannot be achieved the appropriate departures must be identified. The assessment of the existing road conditions looking at the harmonic Visibility, Bendiness and speed reveals that the road has a design speed of 85A. Therefore a departure has been sought to use the existing design speed as the design speed of the road. This is consistent with the follow on survey carried out by Paul McKeown from TNI and showed an 85 th percentile speed of 50mph. DCAN15 sets out the requirement for calculating sight lines and shows that in paragraph 2.3 that the normal requirements for the priority road distance or y-distance are set out in Table B and the notes thereto. They depend on the speed of traffic on the priority road. The speed of traffic is therefore used to calculate the sightlines. The speed survey at the site highlighted a design speed of less than 50mph at the site. The full design standard set out in DCAN15 for the y distance on the road is 160m at 53mph. For 44mph the full standard is 120m, and interpolating between the two to get to the 50mph speed gives a sight line requirement of 147m for 50mph. As such it is just a matter of justifying the sightlines shown on the drawings already submitted. TD9 does set out a full design requirement of 160m for the stopping sight distance for an 85A. 2. No indication of the Gradient of Access (TD 41/95 paragraph 2.27). This detail must be included. Paragraph 2.27 seeks to have a dwell area of circa 15m on the approach to the priority road with a gradient after this not exceeding 10%. As part of the detailed design a dwell area at a gradient of 2.5% will be provided and the approach road to this dwell area does not exceed 10%. A long section has been prepared showing the access route into the site and this demonstrates these levels. 3. Junction layout does not comply with TD 41/95 Layout 5. Layout 5 allows for widening to take place along both sites of the priority road, as the development only seeks widening on one side of the road the taper is extended to allow for sufficient length to reach the required width. In addition Layout 5 provides a refuge island in the middle of the junction and a taper on the first 40m into the site. Within the proposal the access road starts to curve so that there is no view from the priority road into the site. This is a design feature so that there are no views directly into the quarry site from the road, and as such it required the road to bend into the site. The access road is a private access and will not be adopted. The taper is normally provided to allow HGV s to turn in and start to merge with the existing road width, however in the proposal tracking has been carried out to demonstrate that the HGV s can sweep into the minor road. Copies of the tracking drawings have been appended to this submission. As there are no footways in the area a pedestrian refuge island has not been provided as there is negligible pedestrian activity in the area. We are
4 therefore content that although the layout is not the same as layout 5 in TD41/95 the principle of the issues raised has been accommodated. 4. Approaching Stopping Sight Distances are not shown (horizontal and vertical aspects). This detail must be included. In this situation the Saintfield Road is an existing road and there is no proposal to change the stopping sight distances along the priority road. We have prepared a long section along the existing road which demonstrates a 1.05m to 1.05m stopping sight distance of 160m. The section has shown the view from the proposed access. The departure for the 85A design speed is approved, then the layout complies with the sightline requirement. If the design speed is 100kph then this represents a one-step departure from the full requirement and would normally be considered as a relaxation. In any event it is the sightline that exists along the existing road. 5. The agent will need to demonstrate horizontal and vertical alignment of the road. This detail must be included. As per point 4 above, this is an existing road and a long section has been provided. The vertical alignment is unchanged and the only change to the horizontal alignment is the introduction of the taper to accommodate the right turn lane. 6. Deceleration length, Table 7/5a, design speed 100 kph, appears acceptable however there are no details of gradients. The gradients are to tie into the existing road and will not be changed as part of the development. The new access has been designed with a gradient to comply with the shallow gradient on the approach to the junction. The full 55m deceleration has been provided to be the full design for the 85kph design speed. If the design speed is retained at 100kph then the 55m represents a one-step relaxation. 7. The existing drawing layout is inaccurate. Lanes taper down to 1.8 m, kerbs are not parallel with the ghost island. All the land along the development side of the carriageway is within the control of the applicant and the lane markings and taper location can be optimised to provide an appropriate lane width along this frontage. There were some extraneous lines on the drawing but these have been removed and the revised drawings clearly show an appropriate lane width and taper and we are content that this does not impact upon the principle of the layout drawing already submitted. 8. No swept paths drawings have been provided (TD 42/95 paragraph 7.14). This detail must be included. Swept path drawings were prepared and have been appended to this submission as part of the revised layout 9. TD 41/95, design of the access requires internal tapers and radii would be suitable for all large vehicle, Radii = 15 m, taper 1:6 over 30 m. As noted above the design of the access would normally use a taper to allow access to the site, however in this instance the road curves away to provide screening from the road and the curves used have been tracked to demonstrate that they still fulfil the requirement of the design guide. 10. No check has been carried out effect on adjacent field accesses (TD 41/95). In practice maintenance of existing sightlines should be acceptable however a departure from standard would be required. ). This detail must be included. The x-distance from a field gate is 2m, and as a 2m verge has been retained the impact on the sightlines will be negligible. The sightline is still at least 2x160m.
5 11. Kerb construction details should be as for a high speed road. We are content to provide higher kerbs as requested, however this does not impact on the design of the scheme. 12. There is a drivability requirement to prevent the creation of knuckle points (TD 42/95 para 2.9 and 8.4). This detail must be included. This is really the smoothing of kerbs along the road line. We are content to accept such a requirement and the alignment on the kerb line has been amended on the submitted drawings. The submitted drawings do demonstrate that the works can be introduced along the land controlled by the Department and the lands under the control of the applicant. We thank you for the comments and trust that the above response provides the required clarification that the design will not materially change as a result of these comments. Yours sincerely Kevin McShane BEng CEng MICE MIHT MTPS ENC /P/03, Site Layout 1 of /P/04, Site Layout 2 of /P/11, Construction Details /P/200, Long Sections /P/101, Autotracking Departure Form
Exit 61 I-90 Interchange Modification Justification Study
Exit 61 I-90 Interchange Modification Justification Study Introduction Exit 61 is a diamond interchange providing the connection between Elk Vale Road and I-90. Figure 1 shows the location of Exit 61.
More informationDesign of Roundabouts using Corridor Models (Part 1 of 2)
AUTODESK CIVIL3D Design of Roundabouts using Corridor Models (Part 1 of 2) Dynamic vertical modeling By Jack Strongitharm Civil 3D Technical Sales Manager UK and Ireland jack.strongitharm@autodesk.com
More informationTOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE
TOWN OF OAKVILLE FIRE ROUTE APPLICATION PACKAGE This application package contains: Page1. 2. 3. 4. 5. 6. 7. Application Process Description Minimum Fire Route Design Requirements Drawing Requirements Sample
More informationPETER MALINAS/ANTHONY DELLISOLA (GTA CONSULTANTS) HARDYS ROAD, CLYDE NORTH REVIEW OF TRAFFIC DESIGN ELEMENTS OF EXTERNAL INTERSECTIONS
GTA Memo 2012 MEMORANDUM TO: FROM: GREG BURSILL (DENNIS FAMILY CORPORATION) PETER MALINAS/ANTHONY DELLISOLA (GTA CONSULTANTS) DATE: 6 MAY 2013 OUR REF: 13M1241100 PAGE 1 OF 8 RE: HARDYS, CLYDE NORTH REVIEW
More informationCHAPTER 14: TRAFFIC SIGNAL STANDARDS Introduction and Goals Administration Standards Standard Attachments 14.
14.00 Introduction and Goals 14.01 Administration 14.02 Standards 14.03 Standard Attachments 14.1 14.00 INTRODUCTION AND GOALS The purpose of this chapter is to outline the City s review process for traffic
More informationCHAPTER 2C - PRELIMINARY DESIGN. General... 2C-1. Review of Work Load... 2C-2 Establishing Priorities... 2C-2
SECTION 2C - 1 - PROJECT REVIEW CHAPTER 2C - PRELIMINARY DESIGN General... 2C-1 SECTION 2C - 2 - COORDINATING TIME SCHEDULES Review of Work Load... 2C-2 Establishing Priorities... 2C-2 SECTION 2C 3 - REVIEW
More informationPlan Preparation Checklist
Appendix D Plan Preparation Checklist It is the responsibility of the Designer to complete and submit this checklist along with all required drawings for OUC (EFP) Review. All drawings submitted for OUC
More informationWESTERN POWER DISTRIBUTION
WESTERN POWER DISTRIBUTION Framework Document on cable recording techniques to be read in conjunction with other Western Power Distribution Framework Document Appendices relating to Housing and to Industrial
More informationAppendix L Noise Technical Report. Rehabilitation and Restoration of the Longfellow Bridge
Appendix L Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Noise Technical Report Rehabilitation and Restoration of the Longfellow Bridge Boston, MA May, 2011* Prepared by
More informationSite Plan Review Application. Interest in the Property (e.g. fee simple, land option, etc.)
1. Identification CITY OF FENTON 301 South Leroy Street Fenton, Michigan 48430-2196 (810) 629-2261 FAX (810) 629-2004 Site Plan Review Application Project Name Applicant Name Address City/State/Zip Phone
More informationProposed International Standard on Auditing 315 (Revised) Identifying and Assessing the Risks of Material Misstatement
2 November 2018 Crowe Global 488 Madison Avenue, Suite 1200 New York NY 10022-5734 USA +1.212.808.2000 +1.212.808.2020 Fax www.crowe.com/global david.chitty@crowe.org Professional Arnold Schilder Chairman
More informationHAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review
HAMILTON TOWNSHIP Department of Planning and Zoning Application for a Commercial / Industrial Site Plan Review Date: Application is hereby made for a Site Plan Review for a commercial or industrial use.
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 5 GEOTECHNICAL SUBMISSION GUIDELINES Geotechnical Bulletin GB5 was developed
More informationMaintenance of Traffic sequence of operations including any phasing and detour maps;
All Local-let projects are required to have a Stage 2 submittal to the LPA Manager for review. The only exceptions are 2-lane resurfacing, striping, guardrail, and raised pavement markers, unless otherwise
More informationNEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST
NEWTON COUNTY WATER AND SEWERAGE AUTHORITY RESIDENTIAL, COMMERCIAL, INSTITUTIONAL AND INDUSTRIAL SUBDIVISIONS CONSTRUCTION PLANS CHECK LIST Project Name Checked By Date Designer Check List marks to be
More informationSOUTH DUBLIN COUNTY COUNCIL Traffic Management Centre Roads (Traffic and Transportation) Department
SOUTH DUBLIN COUNTY COUNCIL Roads (Traffic and Transportation) Department TECHNICAL SPECIFICATION 2 SDCC-TS-02 INDUCTIVE LOOPS & ABOVE GROUND DETECTION REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF TRAFFIC
More informationSurvey Data and TOPO Checklist
Checklists Survey Data and TOPO Preliminary Plan Field Review Plans o Field Review Erosion Control Right-of-Way and Utility Meeting Plans Final Plan Field Review Plans Methods of Plan Markups Plan-in-Hand
More informationRef: S935/gb. 13 th April 2012
The Institution of Engineering and Technology Michael Faraday House Six Hills Way, Stevenage Hertfordshire, SG1 2AY United Kingdom T +44 (0) 1438 313311 F +44 (0) 1438 765526 www.theiet.org Ref: S935/gb
More informationPUBLICATION 213. Think Safety First
PUBLICATION 213 (67 PA CODE, CHAPTER 212) Think Safety First Pub 213 (02-08) Appendix Appendix A - Temporary/Portable
More informationCONCEPT REVIEW GUIDELINES
Department of Planning & Community Development @ Jefferson Station 1526 E. Forrest Avenue Suite 100 East Point, GA 30344 404.270.7212 (Phone) 404.765.2784 (Fax) www.eastpointcity.org CONCEPT REVIEW GUIDELINES
More informationWorking Drawing Manual
Working Drawing Manual 2012 Table of Contents Section 1 Working Drawing Types... 1 1.1 General... 1 Section 2 Processing Steps... 1 2.1 Project Manager... 1 2.2 Engineering Document Unit... 2 2.3 Contractor...
More informationWILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305
WILTON MANORS, Island City 2020 WILTON DRIVE, WILTON MANORS, FLORIDA 33305 COMMUNITY DEVELOPMENT SERVICES (954) 390-2180 FAX: (954) 567-6069 This package includes: General Submittal Procedures Submittal
More informationSECTION EDITION - REVISION 2. Large Guide
SECTION 4 0 EDITION - REVISION Large Guide March 017 (This page left intentionally blank) Guide Sign Design Guidelines Design Guidelines There are general guidelines to follow in the design of highway
More informationMEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014
MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 I. INTRODUCTION 1. At the May 2013 CIF Committee meetings, the CIF Administrative Unit was requested to give
More informationDRAINAGE PART 3 HA 102/17 INCORPORATING AMENDMENT DATED FEBRUARY 2018 SPACING OF ROAD GULLIES SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 4 SECTION 2 GEOTECHNICS AND DRAINAGE DRAINAGE PART 3 HA 102/17 INCORPORATING AMENDMENT DATED FEBRUARY 2018 SPACING OF ROAD GULLIES SUMMARY A correction to HA
More informationCITY OF LA MARQUE CHAPTER GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS
CITY OF LA MARQUE CHAPTER 2 -------------------------------------------- GRAPHIC REQUIREMENTS CONSTRUCTION PLAN AND MISCELLANEOUS REQUIREMENTS CHAPTER 2 ------------------------------------------------
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet 1 Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationB.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST
B.2 MAJOR SUBDIVISION PRELIMINARY PLAN CHECKLIST YES* GENERAL SUBMISSION ITEMS Does the submission include: 1. Thirteen (13) copies of completed Application Form? 2. Thirteen (13) copies of the Preliminary
More informationTaylor County July 2011 SECTION SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES
SECTION 01340 SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDED A. Contractor shall submit to the Architect/Engineer for review and exception, if any, such working
More informationADDENDUM No. 1. ITB No Northside Interceptor Condition Assessment. Due: February 1, 2018 at 10:00 A.M. (Local Time)
ADDENDUM No. 1 ITB No. 4521 Northside Interceptor Condition Assessment Due: February 1, 2018 at 10:00 A.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation
More informationOffice for Nuclear Regulation
Office for Nuclear Regulation Redgrave Court Merton Road Bootle Merseyside L20 7HS www.hse.gov.uk/nuclear PROJECT ASSESSMENT REPORT Report Identifier: ONR-Policy-all-PAR-11-001 Revision: 2 Project: Implementation
More informationREPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY (COUNCILLOR RAMESH PATEL)
CITY OF CARDIFF COUNCIL CYNGOR DINAS CAERDYDD CABINET MEETING: 14 JULY 2016 CARDIFF STATUE AND MONUMENT PROTOCOL REPORT OF DIRECTOR OF CITY OPERATIONS AGENDA ITEM: 7 PORTFOLIO: TRANSPORT, PLANNING & SUSTAINABILITY
More informationSiemens ST950 & ST900 Statement of Compliance Against TR 2513 Issue A, September 2005 Performance Specification for Wig Wag Signal Control Equipment
Mobility and Logistics Traffic Solutions Sopers Lane Poole, Dorset BH17 7ER SYSTEM/PROJECT/PRODUCT: Traffic Controllers Siemens ST950 & ST900 Statement of Against TR 2513 Issue A, September 2005 Performance
More information_ To: The Office of the Controller General of Patents, Designs & Trade Marks Bhoudhik Sampada Bhavan, Antop Hill, S. M. Road, Mumbai
Philips Intellectual Property & Standards M Far, Manyata Tech Park, Manyata Nagar, Nagavara, Hebbal, Bangalore 560 045 Subject: Comments on draft guidelines for computer related inventions Date: 2013-07-26
More informationClarifications in italics added July 2018
SECTION 10000 RECORD DRAWING CHECKLIST Clarifications in italics added July 2018 All entities who construct public infrastructure, private streets, private storm drain collection systems and travel lanes,
More informationThe Shoppes at Forney Crossings
F M 548 U.S. HWY 80 U.S. HWY 80 F M 688 F M 548 COOL SPRINGS F M 1641 F M 548 TROPHY BUGLE CALL PHESANT WHITE PORCH SPINAKER The Shoppes at Forney Crossings 18' 14'-8" 18' 15'-8 1 2 " 14' 7' 23'-0" 21'-0"
More informationSECTION SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
SECTION 01334 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES PART 1 GENERAL 1.01 SUMMARY A. Submit to the ENGINEER for review, such working drawings, shop drawings, test reports and data on materials and equipment
More informationDELINEATOR REFERENCE POINT 200' TYPICAL SPACING (YELLOW DELINEATORS) END OF MERGE LANE TAPER DELINEATOR REFERENCE POINT
200' TYP. 600' < EACH SIDE BOTH ROADWAYS END OF MERGE LANE TAPER TYPICAL FOR ALL 2-LANE MERGES EXCEPT WHERE THERE IS A MERGE FROM THE RIGHT AND NO OFFSET IN THE THROUGH LANES END OF MERGE LANE TAPER 200'
More informationNotice of Decision. [2] The subject property is on Plan Blk 1 Lot 51A, located at Avenue NW, within the PU Public Utility Zone.
10019 103 Avenue NW Edmonton, AB T5J 0G9 P: 780-496-6079 F: 780-577-3537 sdab@edmonton.ca edmontonsdab.ca Date: November 2, 2018 Project Number: 286136272-001 File Number: SDAB-D-18-181 Notice of Decision
More informationStrategic Transport Forum 7 th December 2018
Strategic Transport Forum 7 th December 2018 Agenda Item 4: Expressway and Connectivity Study Recommendation: It is recommended that the Forum: a) Write to the Secretary of State for Transport setting
More informationDevelopments in BIM Infrastructure Design. Barry Blake 3 rd June 2014
Developments in BIM Infrastructure Design Barry Blake 3 rd June 2014 BIM Infrastructure Design BIM Collaboration / Sharing / Design validation / Integrating various elements of design What are we delivering
More informationNon-Technical Summary of Environmental Statement
Non-Technical Summary of Environmental Statement Speedway World Cup Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) prepared for the proposed Speedway
More informationA10 Electronic Interference: Application 2 - LBHF
A10 Electronic Interference: Application 2 - LBHF Addendum to the Environmental Statement Volume I January 2012 Introduction A10.1 This Chapter of the Addendum to the June 2011 Environmental Statement
More informationTPS 49 EDITION 2 JUNE 2009
TPS 49 EDITION 2 JUNE 2009 Interim arrangements & guidance on the interpretation of IEC 61672 Sound Level Meters - Periodic Tests CONTENTS SECTION PAGE 1 Purpose and duration 2 2 Statement 2 3 Specific
More informationCONTROL AND COMMUNICATIONS PART 3 TA 74/05 MOTORWAY SIGNALLING SUMMARY
DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 4 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS SYSTEMS DESIGN PART 3 TA 74/05 MOTORWAY SIGNALLING SUMMARY This issue of TA 74 introduces a revised Annex
More informationCHECKLIST PRELIMINARY SUBDIVISION AND PRELIMINARY SITE PLAN
N/A Waiver (1) Four (4) copies of application form. (2) Fifteen (15) copies of plan (3) Subdivision/site plan application fee & professional review escrow deposit (4) Variance application fee & professional
More informationWorking Drawing Procedure
Working Drawing Procedure June 2007 Prepared by Structural Engineering & Construction Services 1.0 Working Drawing Procedure 1.1 General There are two primary types of working drawings, those requiring
More informationSIGN PERMIT APPLICATION
SIGN PERMIT APPLICATION Chocolay Charter Township Planning and Zoning Department 5010 US 41 South Marquette, MI 49855 Phone: 906-249-1448 Fax 906-249-1313 PERMIT #SP- Permanent $ 50.00 Temporary $ 30.00
More informationKing Mill Lambert DRI# 2035 Henry County, Georgia
Transportation Analysis King Mill Lambert DRI# 2035 Henry County, Georgia Prepared for: The Alter Group, Ltd. Prepared by: Kimley-Horn and Associates, Inc. Norcross, GA Kimley-Horn and Associates, Inc.
More informationAppendix E-4. City of Fort Collins. Requirements for Utility Plans
Appendix E-4 City of Fort Collins Requirements for Utility Plans Project Name: Project Planner: Design Engineering Firm: Developer: All applications for final development plans must include final development
More informationTOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE
TOWN OF AMHERST PLANNING DEPARTMENT MINOR SITE PLAN AND MINOR ADJUSTMENT REVIEW AND APPROVAL PROCEDURE This application package includes the following: Application Procedures Application Form & Checklist
More informationSection 101. Street Design
Section 101 Street Design This section establishes the uniform policies and procedures for the preparation of street design plans and construction requirements in the City of Irvine. It is not intended
More informationChapter General. Accessible built-in storage facilities shall comply with Section 905. Chapter 9. Built-in Furnishings and Equipment
Chapter 9 9-1 12 901.1 Scope. Built-in furnishings and equipment required to be accessible by the scoping provisions adopted by the administrative authority shall comply with the applicable provisions
More informationPlease remove and replace the entire Table of Contents, Section A to Section J and all Appendices.
Please remove and replace the entire Table of Contents, Section A to Section J and all Appendices. The following is a list of changes to the Design Criteria: 1. A2.01 General Note 4 Utility Coordination
More informationAPPENDIX D: DRAWING SUBMISSION STANDARDS
1.0 FIRST SUBMISSION CONCEPTUAL DESIGN Once the Developer has obtained approval for a Development Application where Park or Open Space improvements are required, a detailed Park or Open Space submission
More informationState Road A1A North Bridge over ICWW Bridge
Final Report State Road A1A North Bridge over ICWW Bridge Draft Design Traffic Technical Memorandum Contract Number: C-9H13 TWO 5 - Financial Project ID 249911-2-22-01 March 2016 Prepared for: Florida
More informationCITY OF BEVERLY HILLS Department of Public Works and Transportation Civil Engineering Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST
CITY OF BEVERLY HILLS Department of Public Works and Transportation Civil ing Division STREET/ALLEY IMPROVEMENT PLAN REVIEW CHECKLIST The following checklist consists of the minimum requirements for preparation
More informationPerformance Specification for Nearside Signal and Demand Unit
traffic systems and signing TR 2511 Issue A July 2005 Performance Specification for Nearside Signal and Demand Unit Crown Copyright 2005 First published 2005 Printed and published by the Highways Agency
More informationAppendix Traffic Engineering Checklist - How to Complete. (Refer to Template Section for Word Format Document)
Appendix 400.1 Traffic Engineering Checklist - How to Complete (Refer to Template Section for Word Format Document) Traffic Engineering Checksheet How to Complete the Form June 2003 Version 3 Maintained
More informationEdgerail Aluminum Bridge Railing System Specification & Installation Instructions
Edgerail System Specification & Installation Instructions Hill & Smith, Inc 1000 Buckeye Park Road Columbus, Ohio 43207 Tel: 614-340-6294 Fax: 614-340-6296 www.hillandsmith.com Section A System Specification
More informationMARINE ENVIRONMENT PROTECTION COMMITTEE 6 March th Session Original: ENGLISH Agenda item 2 HARMFUL AQUATIC ORGANISMS IN BALLAST WATER
MARINE ENVIRONMENT PROTECTION MEPC 68/2/X COMMITTEE 6 March 2015 68 th Session Original: ENGLISH Agenda item 2 HARMFUL AQUATIC ORGANISMS IN BALLAST WATER Clarification of Resolution MEPC.253(67) On Measures
More informationCity of Massillon Site Plan Checklist
City of Massillon Site Plan Checklist The following information MUST be included with all Site Plans submitted for review and processing in order to constitute a complete Site Plan Package. Incomplete
More informationFrequently Asked Questions
The Synchro Studio support site is available for users to submit questions regarding any of our software products. Our goal is to respond to questions (Monday - Friday) within a 24-hour period. Most questions
More informationDESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN
209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org DESIGN REVIEW BOARD APPLICATION EXTERIOR PLAN / LANDSCAPE PLAN *** IMPORTANT INFORMATION Please
More informationArticle 4.0 Measurements and Exceptions
This Article identifies and explains some of the more common forms of measurement used throughout this Ordinance. It also specifies exceptions to certain requirements of this Ordinance. Sec. 4.1 Measurements
More informationGraphic Communication Assignment General assessment information
Graphic Communication Assignment General assessment information This pack contains general assessment information for centres preparing candidates for the assignment Component of Higher Graphic Communication
More informationStandards Australia LICENCE
Standards Australia LICENCE Title: Licensee: Date: Conditions of use (Click here for full conditions of Licence) Check if current WEB SEARCH Find similar documents StandardsWatch (Info and Login) Visit
More informationUNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003
UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C. 20240 October 23, 2003 EMS TRANSMISSION 10/23/2003 Instruction Memorandum No. 2003-275 Change 1 Expires: 09/30/2004 In
More informationPROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO. PLAN CHECKED BY: 1ST CHECK 3RD CHECK 2ND CHECK COMMENTS FINAL MYLAR DATE CHECKED:
CITY OF COLTON PUBLIC WORKS/ENGINEERING DEPARTMENT STREET IMPROVEMENT PLAN REVIEW LIST (PROVIDE SEPARATE ON-SITE & OFF-SITE STREET IMPROVEMENT PLAN SETS) PROJECT NAME: TRACT, PARCEL MAP PROJECT ID NO.
More informationELECTRONIC DRAFTING GUIDELINES
ELECTRONIC DRAFTING GUIDELINES Edition No. 6 Updated November 2016 TABLE OF CONTENTS Section Title Page 1 Definitions 3 2 Drawing Format 3 2.1 Standards & Guidelines 3 2.2 Survey Plans 4 2.3 Underground
More informationRoad signs Specifications
AS 1743:2018 AS 1743:2018 Road signs Specifications This Australian Standard was prepared by Committee MS-012, Road Signs and Traffic Signals. It was approved on behalf of the Council of Standards Australia
More informationStage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary
South Worcestershire Development Plan Stage 2a Examination: Policy SWDP 45 Directions for Growth Outside the City Administrative Boundary 1.0 Environment Agency (EA) 1.1 EA comments: The EA want the footnote,
More informationDocuments: Response letter and attachments, Prepared by: AMEC Massachusetts, Inc., Dated February 17, 2016.
GCG ASSOCIATES, INC. CIVIL ENGINEERING AND LAND SURVEYING 84 Main Street Wilmington, Massachusetts 01887 Phone: (978) 657-9714 Fax: (978) 657-7915 February 23, 2016 Mr. Nathaniel Strosberg, Town Planner
More informationCHAPTER 26 SITE PLAN REVIEW
CHAPTER 26 SITE PLAN REVIEW Section 26.1. Committee. The Planning Commission shall appoint three members of the Planning Commission to the site plan review committee which shall be responsible for site
More informationPROCEDURE FOR PROCESSING WORKING DRAWINGS
PROCEDURE FOR PROCESSING WORKING DRAWINGS MAY 2005 Procedure for Processing Working Drawings GENERAL: The procedure for the review and processing of working drawings provide for two primary types of drawings,
More informationCHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS
CHAPTER 3 INFORMATION REQUIRED FOR PUBLIC IMPROVEMENT CONSTRUCTION PLANS TABLE OF CONTENTS Section Title Page 3.1 General... 3-1 3.1.1 Plan Set...3-1 A. Loveland (City Limits Only)...3-1 3.1.2 Final Mylars...3-1
More informationZoning District: R-1, R-2, and R-4 Applicant: Exeter Rose Farm, LLC, 953 Islington Street #23D Portsmouth, NH 03801
2220.00, Town Planner Town Planning Office, Town of Exeter 10 Front Street Exeter, NH 03833 Re: Exeter Rose Farm Subdivision Design Review Engineering Services Exeter, New Hampshire Site Information: Tax
More informationSpecifications for Post-Earthquake Precise Levelling and GNSS Survey. Version 1.0 National Geodetic Office
Specifications for Post-Earthquake Precise Levelling and GNSS Survey Version 1.0 National Geodetic Office 24 November 2010 Specification for Post-Earthquake Precise Levelling and GNSS Survey Page 1 of
More informationJEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia
BULLETIN NO. 6 TO THE PLANS AND SPECIFICATIONS FOR JEFFERSON LAB TECHNICAL ENGINEERING & DEVELOPMENT FACILITY (TEDF ONE) Newport News, Virginia EwingCole Architects.Engineers.Interior Designers.Planners
More informationDESIGN PUBLIC HEARING
DESIGN PUBLIC HEARING JUNE 22, 2016 AT TOWN HALL AUDITORIUM 11 TOWN HOUSE ROAD WESTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED DEMOLITION OF LEGACY TOLL PLAZAS ALONG I-90 DISTRICT 6 PLAZAS 14, 15 AND 55
More informationValidation Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015
Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from Mitchell
More informationRadiocommunication Facility Review Protocol
Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within
More informationFinal ballot January BOT adoption February 2015
Standard PRC-024-21(X) Generator Frequency and Voltage Protective Relay Settings Standard Development Timeline This section is maintained by the drafting team during the development of the standard and
More informationSign Combo Permit Application For a Development and Building Permit for Permanent Signs APPLICANT DETAILS
DEVELOPMENT SERVICES (Edmonton Tower) 2nd floor, 10111-104 Avenue NW Edmonton, AB T5J 0J4 Phone: 311, outside Edmonton: 780-442-5311 Email: permanentsigns@edmonton.ca Sign Combo Permit Application For
More informationAugust 25, Please contact the undersigned if you have any questions concerning this filing.
!! August 25, 2017 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric
More information580 - NOISE BARRIERS OPSS 580 INDEX
580 - OPSS 580 INDEX 580.1 GENERAL 580.1.1 Noise Barrier Design Elements 580.1.1.1 Wind-Load Designs 580.1.1.2 Sound-Absorptive Barriers 580.1.1.3 Noise Barrier Colour, Pattern and Texture 580.1.2 Grading
More informationSUBDIVISION PLAT APPLICATION
SUBDIVISION PLAT APPLICATION ONLY COMPLETE SUBMISSIONS WILL BE PROCESSED CITY OF PORT ST. LUCIE P&Z File No. PLANNING & ZONING DEPARTMENT Fee (Nonrefundable)$ (772)871-5212 FAX: (772)871-5124 Receipt #.......................................
More informationSITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS
INCORPORATED VILLAGE OF ROCKVILLE CENTRE BUILDING DEPARTMENT SITE PLAN, SUBDIVISION & EXTERIOR DESIGN REVIEW PROCESS Presubmission - Prior to a formal submission, the applicant should meet in person with
More informationIntroduction. Page 1. Welcome to the signage guidelines for St John Ambulance premises, updated as of September 2012.
Signage guidelines Introduction Welcome to the signage guidelines for St John Ambulance premises, updated as of September 2012. These guidelines provide a signage standard for all St John Ambulance buildings,
More informationE/ECE/324/Rev.1/Add.47/Rev.6/Amend.1 E/ECE/TRANS/505/Rev.1/Add.47/Rev.6/Amend.1
4 October 2010 Agreement Concerning the Adoption of Uniform Technical Prescriptions for Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be Used on Wheeled Vehicles and the Conditions for
More informationNAUTICUS CLASS NOTATIONS
RULES FOR CLASSIFICATION OF SHIPS SHIPS IN OPERATION PART 7 CHAPTER 7 NAUTICUS CLASS NOTATIONS JANUARY 2003 CONTENTS PAGE Sec. 1 General... 5 Sec. 2 Scope of the Rules... 6 Sec. 3 Assignment of Class...
More informationAPPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT
209 South Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR CERTIFICATE OF APPROPRIATENESS IN THE HISTORIC DESIGN REVIEW DISTRICT *** IMPORTANT
More informationProcedure to Petition for Plat Review and Site Plan Review
Economic Development Department (734) 676-7104 or (734) 676-7109 Procedure to Petition for Plat Review and Site Plan Review All site plans shall be submitted to the Economic Development Department to be
More informationProvläsningsexemplar / Preview INTERNATIONAL STANDARD. Aerospace MJ threads Part 1: General requirements
INTERNATIONAL STANDARD ISO 5855-1 Third edition 1999-10-15 Aerospace MJ threads Part 1: General requirements Aéronautique et espace Filetage MJ Partie 1: Exigences générales A Reference number Foreword
More informationBRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006
Project Name: BRASELTON WATER AND WASTEWATER DEPARTMENT CONSTRUCTION PLAN REVIEW CHECKLIST May 2006 Phase: Unit: # Lots: Development Type (residential, commercial, industrial, etc.) Braselton Project No.
More informationConformity assessment procedures for hip, knee and shoulder total joint replacements
1. INTRODUCTION NBRG 307/07 It is the primary purpose of this document to provide guidance to Manufacturers and Notified Bodies in dealing with the application of Directive 2005/50/EC on the reclassification
More informationSECTION CONTRACTOR SUBMITTALS. A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER.
SECTION 01300 - PART 1 - GENERAL 1.1 GENERAL A. All submittals by the CONTRACTOR shall be submitted to the ENGINEER. B. Unless otherwise noted, within 14 days after the date of commencement as stated in
More informationCONWAY PLANNING BOARD MINUTES MAY 12, Review and Acceptance of Minutes April 28, 2011
CONWAY PLANNING BOARD MINUTES MAY 12, 2011 PAGES 1 Review and Acceptance of Minutes April 28, 2011 1 PTF Realty Trust Request for a Concurrent Site Plan and Subdivision Review (PID 265-161.2) Granted 1
More informationAttachment #2 PPW133-07
Attachment #2 PPW133-07 Pg. 1 EXECUTIVE SUMMARY Environmental Assessment Study In January 2005, Regional staff retained to commence a Schedule C Environmental Assessment Study to identify the improvements
More informationSPECIFICATIONS FOR NEW UNDERGROUND RESIDENTIAL DISTRIBUTION SYSTEMS
Page: 4-1 4.0 URD Process and Documentation Requirements 4.1 Process Steps The process of developing underground distribution facilities in a residential area consists of 10 major steps, which are summarized