FAAST DEMONSTRATION UNIT CONSTRUCTION MANUAL. designs supplied by. re:creation

Size: px
Start display at page:

Download "FAAST DEMONSTRATION UNIT CONSTRUCTION MANUAL. designs supplied by. re:creation"

Transcription

1 FAAST DEMONSTRATION UNIT CONSTRUCTION MANUAL designs supplied by

2 CONTENTS FAAST DEMO UNIT #1 - GLASS SHOWCASE 2 FAAST DEMO UNIT #1 - UNIT CONSTRUCTION 3 CENTRAL GRAPHIC FRAMEWORK CONSTRUCTION 4 SMOKE RESISTOR TEST RIG CIRCUIT DIAGRAM 5 FAAST DEMO UNIT #2 - UNIT CONSTRUCTION 6 FAAST DUST UNIT - UNIT CONSTRUCTION 7 FAAST DUST UNIT - ACRYLIC CHAMBER 8 DUST FAN TEST RIG CIRCUIT DIAGRAM 9 FAAST DEMO WiFi 1 6mm lear glass showase loates within for transport purposes FAAST DEMO 6mm aryli hamber loates within for transport purposes

3 FAAST DEMO UNIT #1 - GLASS SHOWCASE 35mm 50mm 50mm 35mm 5mm 5mm 175mm 175mm 350mm 26mm 26mm atual pipe diameter is 25mm 5mm 5mm 35mm 5mm dia holes 35mm 350mm 6mm lear toughened glass bonded/polished edged display ase TOP ELEVATION TOP ELEVATION - GLASS ONLY 6mm 1.5mm steel suspended eiling tile wire 12mm stainless spaers attahed to 340mm x 340mm eiling tile 750mm 750mm eiling tile 40mm ut-out 40mm 40mm SIDE ELEVATION - GLASS ONLY 2

4 FAAST DEMO UNIT #1 - UNIT CONSTRUCTION SHELF #1 SHELF #2 32mm ut-through hole The unit is onstruted from 12mm white MDF panels. 350mm These templates outline eah panel in CAD format and the manufaturing requirements. 350mm x 200mm 330mm 70mm 320mm TOP 12mm White MDF onstrution 12mm White MDF onstrution, edged where seen OPEN 352mm x 352mm 400mm DRAWER BASE SHELF #1 353mm x 153mm When unit is not in use the glass showase is loated in upboard for transport purposes. This internal void is foam lined. 4mm CNC routed SHELF #2 213mm x 78mm DRAWER Drawer runners 6mm deep drill holes, 2mm dia 22.5mm ut-through hole for illuminated demo button swith 335mm 12mm White MDF - template 25mm SIDE LH SIDE RH FRONT DRAWER TOP ELEVATION 350mm 175mm FLIP SIDE ELEVATION 5mm CNC routed DRAWER 19mm ut-through hole 11mm CNC deep reess w/magneti insert (negative) TOP ELEVATION - SIDE VIEW 9.5mm CNC reess w/magneti insert (positive) ACCESS PANEL 6.3mm CNC reess TOP ELEVATION - FRONT VIEW 6mm CNC deep reess 1:20 3

5 CENTRAL GRAPHIC FRAMEWORK CONSTRUCTION keder system The overall graphi panel size is 800mm wide by 1800mm high IN-FRAME rail SLIM single-sided GRAPHIC WILL SLOT INTO Framework setions are loked together using rail onnetor inserts and tightened together with allen key grub srews. THIS CHANNEL outer profile fae as shown in elevation Eah setion of the framework has either one or two 45 deg angled mitred orners. See fig mm 45 deg mitred orners An L shaped aluminium braket is bonded to the framework profile with a 8mm dia drill hole positioned in eah one to allow the fitment of a 6mm bolt. See fig Rail onnetor for ross onnetion, Quantity 4 FACE TO BE 45 DEG MITRED 900mm IN-FRAME rail SLIM single-sided 3D VIEW fig.4.1 FACE TO BE 45 DEG MITRED The 6mm bolt will be inserted to tighten the framework to the bak of the unit plinths via a reessed nut in eah. PLAN VIEW A 3mm printed foamex graphi panel, 792mm x 1792mm (split into two setions, 792mm x 896mm) is inserted into the framework as a bakdrop to the demo. Two 26mm holes will need to be ut into the top left/right orners of the top graphi panel. See fig Rail onnetor, Quantity 2 Bonded 3mm aluminium L shaped braket 25mm 40mm 60mm Fixed to unit 900mm Fixed to unit 6mm dia bolt 3mm Graphi Panel fig.4.2 fig.4.3 reessed nut CNC d into bak of base plinths 1:20 DO NOT SCALE THIS DRAWING 4

6 SMOKE RESISTOR TEST RIG CIRCUIT DIAGRAM 1 Standard 24V 1A PSU 2 Swith whih mounts in 22.5mm dia hole s timer 4 Dim rail mounting strip for timer 5 Terminals with metal spring lamp parts Changeable film resistor Dim rail mounting strip ut to size and fitted within demo unit #1 drawer setion Sprung lamp terminals soldered to PCB (previously a laptop/notebook motherboard has been issued, approx size 350mm sq) s timer omponent 3 2 Illuminated push button swith 1 Standard 24V 1A PSU (previously a laptop/notebook PSU has been issued) DO NOT SCALE THIS DRAWING COMPONENT IMAGES 5

7 FAAST DEMO UNIT #2 - UNIT CONSTRUCTION SHELF# 1 SHELF# 2 The unit is onstruted from 12mm white MDF panels. 32mm ut-through hole These templates outline eah panel in CAD format and the manufaturing requirements. FAAST DEMO 85mm ut-through able management port hole TOP 330mm x 18mm PANEL Loation plate for FAAST unit 400mm 4mm CNC routed 400mm SHELF #1 12mm White MDF onstrution, edged where seen This will be foam lined for transportation purposes of the FAAST unit 868mm x 338mm FAAST DEMO FAAST DEMO UNIT SHELF 12mm White MDF - template SIDE LH SIDE RH FRONT SHELF #2 FLIP 5mm CNC routed 335mm Cabinet hinge 165 deg 35mm 19mm ut-through hole to fit a 1/4 turn upboard lok 865mm ACCESS PANEL DOOR 25mm blak pipework lips are srewed to the inside of the aess panel door for loating the FAAST demo pipework when not in use/ transportation. Example 1:20 6

8 FAAST DUST UNIT - UNIT CONSTRUCTION SHELF# 1 SHELF# 2 The unit is onstruted from 12mm white MDF panels. 32mm ut-through hole These templates outline eah panel in CAD format and the manufaturing requirements. 202mm ut-through for loation of aryli hamber Axial fan TOP 400mm 400mm CUT-THROUGH 120MM X 15MM CUT-THROUGH 120MM X 15MM CUT-THROUGH 120MM X 15MM 4mm CNC routed CUT-THROUGH 120MM X 15MM SHELF #1 12mm White MDF onstrution, edged where seen This will be foam lined for transportation purposes of the aryli dust hamber 868mm x 338mm DUST CHAMBER COMPARTMENT PANEL #1 DUST CHAMBER COMPARTMENT PANEL #2 12mm White MDF - template SIDE LH SIDE RH FRONT SHELF #2 FLIP 5mm CNC routed 335mm Cabinet hinge 165 deg 35mm 19mm ut-through hole to fit a 1/4 turn upboard lok 865mm ACCESS PANEL DOOR 1:20 7

9 FAAST DUST UNIT - ACRYLIC CHAMBER The unit is onstruted from 5mm lear aryli with the hamber aps being loated to the top and bottom. 200mm These templates outline eah panel in CAD format and the manufaturing requirements. ut-through 26mm dia 190mm 26mm dia s 50m m ra 75mm dius radiu 26mm dia 26mm dia 26mm dia 12mm wide setion 200mm dia, white MFC onstrution UPPER CHAMBER CAP - TOP VIEW UPPER CHAMBER CAP - BOTTOM VIEW 735mm 160mm dia gauze filter * 6mm 12mm Rebated 4mm rubber seal/band UPPER CHAMBER CAP - SIDE VIEW 200mm dia, white MFC onstrution 100mm dia ut-through 6mm rebate LOWER CHAMBER CAP - TOP VIEW LOWER CHAMBER CAP - BOTTOM VIEW 1:5 *Original spe was a dyson white filter split in two to inrease air flow through but ontain dust partiles 8

10 DUST FAN TEST RIG CIRCUIT DIAGRAM 1 Standard 24V 2.5A 60w PSU 2 Swith whih mounts in 22.5mm dia hole s timer 4 Dim rail mounting strip for timer 5 UH performane axial fan, 310u.m/h 24V Ball bearing axial fan Dim rail mounting strip ut to size and fitted within dust unit #3 shelf setion s timer omponent 3 2 Illuminated push button swith 1 Standard 24V 2.5A PSU (this will need to be rated to the hosen fan power rating) COMPONENT IMAGES DO NOT SCALE THIS DRAWING 9

Assembly Instructions for Java Furniture: JFV65 & JFV75

Assembly Instructions for Java Furniture: JFV65 & JFV75 Assemly Instrutions for Java Furniture: JFV65 & JFV75 Thank you for Choosing the Java Furniture Line from Sanus Systems. If you have any questions regarding this or any other Sanus Systems produt, please

More information

TIMBER SLIDING LOFT LADDER

TIMBER SLIDING LOFT LADDER POWER ARM SPRING HOUSING ANCHOR & LOCATION STOP ROLLER AR TWIST CATCH TIMER SLIDING LOFT LADDER A1 A2 A6 Installation and Operating Instrutions Read Carefully efore Installation Please hek you have all

More information

Customer Helpline No. (01773)

Customer Helpline No. (01773) Maintenane The ladder and all other wooden parts an be varnished to protet and extend its life. Lubriate all moving metal parts annually. Srews and nuts should be heked from time to time and tightened

More information

GRID CEILING HOOKS FISH CLIP. REGULAR HOOK 2mm galvanized wire with 16mm opening. Ideal for ONE-UP applications. Galvanized wire hook.

GRID CEILING HOOKS FISH CLIP. REGULAR HOOK 2mm galvanized wire with 16mm opening. Ideal for ONE-UP applications. Galvanized wire hook. GRID EILING HOOKS SREW-ON EILING TRAK Ideal for plasterboard ceilings or other non-grid areas. Shift sign placement left or right with ease, install parallel tracks for a 3D layered effect, eg in display

More information

4600 INSTALLATION INSTRUCTION W/ 2190

4600 INSTALLATION INSTRUCTION W/ 2190 1 STILE PREPARATION DOOR VERTIAL L STRIKE PREPARATION ALUMINUM FRAME.218 1.594 5/32" OFFSET (SEE STEP-8) 1 1/4" RIVNUT INSTALLATION FOR SINGLE OR DUAL LEVERS ON ALUMINUM STILE 5/32" OFFSET (SEE STEP-9)

More information

Organisational Kitchen Fittings Kitchen Cabinet Accessories

Organisational Kitchen Fittings Kitchen Cabinet Accessories Kitchen waste bin systems Single waste bin, capacity 1 litres Carcase width: Min. 400 mm For door mounting: For left and right hand use Installation: Screw fixing to side panel Housing: Steel, plastic

More information

Homestead Bar Cabinet IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent s

Homestead Bar Cabinet IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent s 88 5527 991 Homestead Bar Cabinet IMPRTANT NTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or other damages occuring to the wood parts.

More information

SAN DIEGO - Corner TV Unit

SAN DIEGO - Corner TV Unit SN EGO - orner TV Unit ssembly nstructions - lease keep for future reference 385/8651 imensions Width - 100cm epth - 40cm eight - 50cm mportant lease read these instructions fully before starting assembly

More information

Table and Furniture Base Fittings Plinth Adjusting Fittings

Table and Furniture Base Fittings Plinth Adjusting Fittings Adjusting screw with M8 or M thread Rigid, for glide inserts, steel thread Finish/Colour: Black, thread galvanized Version: With acceptance Ø30 mm Thread M8 650.22.381 M 650.22.382 Packing: 1 or 0 pcs.

More information

CROWN IMPERIAL ASSEMBLY INSTRUCTIONS

CROWN IMPERIAL ASSEMBLY INSTRUCTIONS CROWN IMPERIAL ASSEMBLY INSTRUCTIONS Standard Drawer Box Page 1 of 14 Standard Drawer Box Parts Parts Supplied B C D A E F G Page 2 of 14 Part Letter Part Name Quantity 300-600 Deep Pan A Base Panel 1

More information

Handleless Uni t Specification

Handleless Uni t Specification Handleless Uni t Specification QUALITY BRITISH CRAFTSMANSHIP 160 Handless Fitting Guide - Parts Index & Base Cabinet Section 1 150 325 DRAWER 870 870 870 73 73 720 720 DOOR 685 325 2 x

More information

Contents 04LEAN0804-V1. Side Panels. Fixing Kit. Nail Bag & Ironmongery. For Assistance Please Contact Customer Care on

Contents 04LEAN0804-V1. Side Panels. Fixing Kit. Nail Bag & Ironmongery. For Assistance Please Contact Customer Care on 04LAN0804-V1 Contents Please retain Instrutions and label (attahed to your building for future referene See bak of instrutions for Combi greenhouse assembly Side Panels 1 2 3 Before ommening assembly make

More information

STEEL CANTILEVER TYPE E MICHIGAN DEPARTMENT OF TRANSPORTATION NOTE: EDGE OF SIGN VARIABLE 12" (MAX) 5'-0" COLUMN CAP 9'-5" (MAX) (TYP) DETAIL C

STEEL CANTILEVER TYPE E MICHIGAN DEPARTMENT OF TRANSPORTATION NOTE: EDGE OF SIGN VARIABLE 12 (MAX) 5'-0 COLUMN CAP 9'-5 (MAX) (TYP) DETAIL C EDGE OF SIGN VARIABLE 12" (MAX) 25'-0" OLUMN AP 9'-5" (MAX) DETAIL END AP 1'-6" 4'-0" ARMS OPTIONAL SPLIE SIGN SIGN AND ARMS JP 1'-3" (MIN) 5'-0" 0.4 x L (MAX) OPTIONAL SPLIE VAIRES (25'-0" MAX) SEE ONTRAT

More information

Bathroom Installation Manual

Bathroom Installation Manual Bathroom Installation Manual MAKING SPACE MORE VALUABLE May 2016 1 2 Contents page 1. Introduction Page 4 2. Tools required / key Page 5 3. Fittings Page 6 4. 600 cistern unit Page 7 5. 600 vanity unit

More information

INSTALLATION INSTRUCTIONS GT1006E TALL CABINET, RESIN WALL MOUNT

INSTALLATION INSTRUCTIONS GT1006E TALL CABINET, RESIN WALL MOUNT INSTALLATION INSTRUCTIONS GT1006E TALL CABINET, RESIN WALL MOUNT CARTON CONTENTS PART 1 - CABINET ASSEMBLY QUANTITY DESCRIPTION CARTON #1 1 CABINET COMPONENTS PART 2 - WALL MOUNTING QUANTITY DESCRIPTION

More information

Assembly Instructions Nevins Phone Booth

Assembly Instructions Nevins Phone Booth Assembly Instructions Nevins Phone Booth Included Hardware Tools Required supplied by installer Drill & Bit Bolt A - (16) 1/4-20 x 1-1/2 hex head Bolt B - (20) 1/4-20 x 2-1/2 phillips head Screw 1 - (24)

More information

FlexFrame - Storage Components and Skins

FlexFrame - Storage Components and Skins FlexFrame - Storage Components and Skins 1/4 Square Drive Ball-Point Hex-Bit Socket 1/8 Short Hex, 1-1/2 Overall Length McMaster Part # 54075A44 Table of Contents Topic Page Storage Components 2 General

More information

Section 9: Finishing Touches - Other Decor Units

Section 9: Finishing Touches - Other Decor Units Section 9: Finishing Touches - Other Decor Units Butler Sink Units Important: This unit is designed to be used with either This unit is always used between other units. Level the units. Fix together and

More information

aluminium profile system

aluminium profile system aluminium profile system 63 AME System aluminium profiles overview series profiles introduction 80x80 x80 x80/180 x Aluminium profiles are provided with longitudinal grooves which can be used in conjunction

More information

19-in. Mini-Rack Cabinet, Type 1

19-in. Mini-Rack Cabinet, Type 1 Spec-00466 19-in. DP FX (763) Mini-Rack 422-2588 422-2661 Cabinet, Components and Accessories Free-Stand Networking Cabinets 19-in. Mini-Rack Cabinet, Type 1 Industry Standards NEMA Type 1 EIA 310-D /

More information

Technical product descriptions WORKTOPS STANDARD SLIM LINE. 1. Material thickness 38 mm. 2. Core/substrate material Chipboard

Technical product descriptions WORKTOPS STANDARD SLIM LINE. 1. Material thickness 38 mm. 2. Core/substrate material Chipboard Technical product descriptions WORKTOPS I STANDARD 1. 38 mm 2. Chipboard 3. Surface material Laminate (CPL, HPL) 4. Laminate thickness 0,6-0,8 mm 5. Surface structure Wood pore or relief, matt, gloss 6.

More information

Transition Range Installation, Care & Adjustment Instructions

Transition Range Installation, Care & Adjustment Instructions Introduction The following instructions will enable you to complete the final assembly and adjustment of your new furniture. Hardware Box Each of the cabinets contains a Hardware box that contains all

More information

Assembly Instructions Nevins Phone Booth

Assembly Instructions Nevins Phone Booth Assembly Instructions Nevins Phone Booth Included Hardware Tools Required supplied by installer Drill & Bit Socket Wrench Bolt A - (16) 1/4-20 x 1-1/2 hex head Bolt B - (20) 1/4-20 x 2-1/4 phillips head

More information

Standard Product. Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories

Standard Product. Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories Spec-00466 F763.422.2661 763.422.2588 Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories Free-Stand Cabinets 19-in. Mini-Rack Cabinet, Components and Accessories 19-in. Mini-Rack

More information

Bathroom Installation Guide

Bathroom Installation Guide Bathroom Installation Guide Please read instructions carefully and check products before starting. Products should be fitted/installed by an experienced and competent fitter, failure to do so may invalidate

More information

ED1100 /1100F SERIES RIM EXIT DEVICE INSTALLATION INSTRUCTIONS

ED1100 /1100F SERIES RIM EXIT DEVICE INSTALLATION INSTRUCTIONS E1100 /1100F SERIES RIM EIT EVIE INSTALLATION INSTRUTIONS Ver.2 1100 SERIES RIM EIT EVIE End ap End ap Bracket End ap End ap Bracket over Plate Mechanism ase enter ase SPEIAL TOOLS REQUIRE Push Bar Hex

More information

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models.

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models. GE Monogram Installation Instructions Under Cabinet Installation and JX827 Series Built-In Kit Models ZEM200 Series CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:

More information

Locks and Catches Catches and Furniture Bolts

Locks and Catches Catches and Furniture Bolts Magnetic catch with low noise closure Material: Plastic housing Version: with closed surface and internal magnet, magnets no viewable : Press fixing Pull 0. kg, for drilling hole Ø8 mm white 26.01.701

More information

Exponents Bench Cushion

Exponents Bench Cushion Exponents Bench Cushion Power Drill #2 Phillips Bit Bit Holder Page 1 of 2 939500640 Rev A 1. Place cushion on top of the bench, so the black Coalesse tag is in the right rear corner of the bench. 2. From

More information

46, 66, Page /01/17

46, 66, Page /01/17 46, 66, 86 46 Only Instructions Page 29-31 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. 05/01/17 333 1106 No. 6 x 16mm Long 711 F B D E C A G I,H J K L M

More information

SALICE AIR TEMPLATE KIT

SALICE AIR TEMPLATE KIT SALICE AIR TEMPLATE KIT There are two separate templates available for the machining of the AIR hinge; one is used for machining both the top and bottom of the door while the other is used for machining

More information

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02

GROWING BETTER THROUGH DESIGN. 6ft Lean-To LEAN-TO. Assembly Instructions 04/02 GROWING BETTER THROUGH DESIGN 6ft Lean-To LEAN-TO Assembly Instructions 04/02 6ft Lean-To Greenhouse Base Plan Introduction/Tools/Contents / / Contents This is a copy of our Lean-To greenhouse base plan.

More information

Installation Data for Access Stairs and Handrails. PD 63 rev C 01/12/14

Installation Data for Access Stairs and Handrails. PD 63 rev C 01/12/14 Installation Data for Aess Stairs and Handrails 01/12/14 Page 1 of 8 ACCESS STAIRS For road, rail and utilities for aess to maintenane works via an embankment. 1. Sope This doument gives basi guidane on

More information

C Cuisine Cart IMPORTANT NOTE

C Cuisine Cart IMPORTANT NOTE 88 9001 001C Cuisine Cart IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or other damages occuring to the parts. We have taken

More information

CoFold Non-Mortice. Fitting Instructions for top hung exterior folding doors SYSTEM CAPACITY. Diagram 1. Diagram 2. Diagram 3.

CoFold Non-Mortice. Fitting Instructions for top hung exterior folding doors SYSTEM CAPACITY. Diagram 1. Diagram 2. Diagram 3. 1 CoFold Non-Mortice Fitting Instructions for top hung exterior folding doors Diagram 1 SYSTEM CAPACITY Maximum leaf height Maximum leaf weight Maximum leaf width Maximum leaf thickness - 3300mm - 100kg

More information

STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE

STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE STORAGE & SHELVING SYSTEM - INSTALLATION GUIDE If you have ordered storage drawers, shelving, hanging rails or shoe racks this guide will help you install your storage and shelving system, together with

More information

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents.

Pocket Door Kit PD1 / PD2 Installation Instructions. Kit Contents. Pocket Door Kit PD1 / PD2 Installation Instructions Kit Contents. 1, Create Rough Opening In Stud Wall Construct rough opening ensuring all sides are square and level. Rough opening should be; Height =

More information

Installation Instructions

Installation Instructions Installation Instructions Walk-in Shower Screen with 180 o Return Panel (700 + 350mm & 900 + 350mm) Installation Instructions Parts supplied A B C D Wall Channel (x1) Wall fixing screw (x6) Return Straight

More information

SUPREME WALL GARDEN ASSEMBLY INSTRUCTIONS 24/08/16 www.hallsgreenhouses.com Please refer to website for the most up to date instructions. SAFETY WARNING 1. Always wear protective glasses, shoes, gloves

More information

Preference Collection 5580 Treatment Console INSTALLATION GUIDE

Preference Collection 5580 Treatment Console INSTALLATION GUIDE Preference Collection 5580 Treatment Console INSTALLATION GUIDE 0 WARNING Failure to install the 5580 as described in this installation guide may cause the unit to collapse, resulting in serious injury

More information

WARNING. Installation and Assembly - Vision Point Height Adjustable Desktop Mount with Stationary Base for LCD Screens

WARNING. Installation and Assembly - Vision Point Height Adjustable Desktop Mount with Stationary Base for LCD Screens Installation and Assembly - Vision Point Height Adjustable Desktop Mount with Stationary Base for LD Screens IMPORTANT! Read entire instruction sheet before you start installation and assembly. Models:

More information

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax

Copyright Black Box Corporation. All rights reserved Park Drive Lawrence, PA Fax Copyright 2003. Black Box Corporation. All rights reserved. 1000 Park Drive Lawrence, PA 15055-1018 724-746-5500 Fax 724-746-0746 JULY 2003 RM3010A RM315-R2 RM323-R2 RM329 RM451 RM457 RM3020A RM316 RM324-R2

More information

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY

INSTALL INSTRUCTIONS WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES NEWAGE STEEL WELDED CABINETRY NEWAGE STEEL WELDED CABINETRY WELCOME TO THE NEWAGE PERFORMANCE CABINETRY SERIES ALL CABINETS MUST BE MOUNTED TO STUDS ON A SECURE WALL, AS PER THESE INSTRUCTIONS. FAILURE TO DO SO MAY RESULT IN SERIOUS

More information

www.hafeleindia.com www.hafeleindia.com Silver Gold Rose Gold Graphite Dark Bronze PROFIN : ONE RANGE. MANY SOLUTIONS. 2. Stack Modular Shelving Pg. 23-32 3. Rail Door Profiles Pg. 33-41 1. Gola Profiles

More information

Pedestal Desk. D. Side Panel 1 pc. E. Side Panel. I. Back Panel. 2 pcs.

Pedestal Desk. D. Side Panel 1 pc. E. Side Panel. I. Back Panel. 2 pcs. IMPORTANT 88 5530 182 Pedestal Desk Carefully remove all the parts from the carton and place them individually on a soft cloth to prevent scratches or other damage. Carefully and strictly follow these

More information

Interactive Monitor Arm

Interactive Monitor Arm Interactive Monitor Arm Tools Required -5mm Allen wrench -Phillips screwdriver -Plastic mallet There are two ways to attach a Monitor Arm to a Full Frame; with a Beam, or with a Post Mount. Both methods

More information

System 3000 specifications

System 3000 specifications System 3000 specifications Scope: Materials: Type of Bookstack: This specification covers delivery and installation of steel library shelving of the bracket type. Height, depth and accessories shall be

More information

DESIGN TRIPLE PANE BATH SCREEN

DESIGN TRIPLE PANE BATH SCREEN DESIGN TRIPLE PANE BATH SCREEN DBTSC1500 INSTALLATION INSTRUCTIONS IMPORTANT - Please read before installation Please read these instructions carefully before starting installation and keep in a safe place

More information

Ohio Sideboard MADE IN BRITAIN. Assembly Instructions - Please keep for future reference 314/7128

Ohio Sideboard MADE IN BRITAIN. Assembly Instructions - Please keep for future reference 314/7128 Ohio - 6+2 Sideboard ssembly Instructions - Please keep for future reference 14/7128 Dimensions Width - 120cm Depth - 9.5cm Height - 78cm MDE IN RITIN Important - Please read these instructions fully before

More information

Instructions for G5 backplate replacement and motherboard mounting.

Instructions for G5 backplate replacement and motherboard mounting. Instructions for G5 backplate replacement and motherboard mounting. Kit contents: 1 x Motherboard tray; 8 x 8mm M3 Standoffs and washers; 4 x M3.5 short cross head screws (attach mobo tray to up to 4 lower

More information

fold away petite Assembly Instructions

fold away petite Assembly Instructions fold away petite Assembly Instructions fold away Thank you for purchasing a Fold Away etite cabinet. If you have any questions regarding assembly please contact us on 0800 048 8606. petite CASTER (C2)

More information

READ ME! IMPORTANT WARNING! ENG. Front Support arms

READ ME! IMPORTANT WARNING! ENG. Front Support arms Front Support arms Jeep Wrangler JKU Door (007-Current) ENG FAJK00 READ ME! Thank you for purchasing Front Runner Jeep Wrangler JKU door Front Support Arms. Before you start, take a moment to familiarize

More information

Material Packing Brown Grey Pine Black White

Material Packing Brown Grey Pine Black White RTA Connectors Minifix Zinc alloy For housing: 12 or 18 Bolt hole: Ø 7 or 8, depending on choice of connecting bolt Drilling distance B: Distance from centre of Minifix housing to shelf front edge (24

More information

COMPONENTS AND BOX CONTENTS

COMPONENTS AND BOX CONTENTS Hinge Hinge Door Door COMPONENTS AND BOX CONTENTS 1 1 2 3 4 5 6 7 8 9 13 10 14 11 12 No. Description Qty Part No. 1 Wall profile cover caps screw 4 8S410045 2 Upright profile cover cap 2 8SSJ035L/R 3 Wall

More information

C PART LIST HARDWARE LIST. Kitchen Cart IMPORTANT NOTE

C PART LIST HARDWARE LIST. Kitchen Cart IMPORTANT NOTE 88 9200 006C Kitchen Cart IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or other damages occuring to the parts. We have taken

More information

2 Door Base Unit ASSEMBLY GUIDE. Page 1 of 9 28/04/2009 Revision 3. WARNING: Contains small parts, keep out of reach of children.

2 Door Base Unit ASSEMBLY GUIDE. Page 1 of 9 28/04/2009 Revision 3. WARNING: Contains small parts, keep out of reach of children. ASSEMBLY GUIDE 2 Door Base Unit IMPORTANT Before Commencing Assembly: Read all instructions COMPLETELY Ensure all listed parts are present If any parts are missing from Parts List 1, please contact 1800

More information

1 Door Base Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children.

1 Door Base Unit ASSEMBLY GUIDE. Page 1 of 9. WARNING: Contains small parts, keep out of reach of children. Page 1 of 9 ASSEMBLY GUIDE 1 Door Base Unit IMPORTANT Before Commencing Assembly: Read all instructions COMPLETELY Ensure all listed parts are present If any parts are missing from Parts List 1, please

More information

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL

ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL ASSEMBLY INSTRUCTIONS FOR SL500A AND SL500AL January 2013 The SL500A is a square upright glass cabinet with a single hinged lockable door. It has five adjustable shelves plus the base. It also has an optional

More information

Part 7 Assembling the X axis

Part 7 Assembling the X axis Part 7 Assembling the X axis 1 2 The X axis is a key part of the printer, it carries the extruder on a carriage that moves the extruder laterally in the X axis. The x axis itself is moved vertically on

More information

Installation. ng Kitt

Installation. ng Kitt Installation Instructions Alpha SolarSmart 100 Roof Integrated Flashi ng Kitt for the Installation of Alpha Solar Collectors into Tiled Roofs 1 Integrated Flashing kit for Alpha SolarSmart 1000 CONTENTS

More information

CONCEALED ROD CRASH BAR PR-7085 SERIES EXIT DEVICE ASSEMBLY DETAILS PR mm. 10mm. Lock cylinder. 10mm. Cross bar length (see note #8) Dogging

CONCEALED ROD CRASH BAR PR-7085 SERIES EXIT DEVICE ASSEMBLY DETAILS PR mm. 10mm. Lock cylinder. 10mm. Cross bar length (see note #8) Dogging Floor line TITLE ASSEMLY DETAILS PR-7085 4:02 Hinge stile (inside) Lock stile (inside) Lock stile (outside) Drill 5mm (.20) and tap 1/4-20 (2) Drill 7mm (.266) holes (2) 9mm 12mm See note #6 160mm 9.5mm

More information

SPECIFICATION SHEETS SOFTERCLOS HINGE FOR. FRAMELESS GLASS pool fencing

SPECIFICATION SHEETS SOFTERCLOS HINGE FOR. FRAMELESS GLASS pool fencing SPECIFICATION SHEETS SOFTERCLOS HINGE FOR FRAMELESS GLASS pool fencing 8-10mm mm 8 OR 12MM STANDARD GLASS GATE 12MM STANDARD HINGE PANEL AS2208 Heat Soaked & Toughened Glass AS1926.1 Pool Safety Standards

More information

Linear Hook- on Worksurfaces

Linear Hook- on Worksurfaces Linear Hook- on Worksurfaces Linear Hook-On Worksurfaces come in three depths and seven lengths. Different worksurfaces have different reqirements for installation that are outlined below. 27 inch deep

More information

D. Drill Bolt Holes Through Topper Shell and Bed Rails

D. Drill Bolt Holes Through Topper Shell and Bed Rails A. Check Mounting Kit Check to make sure that all of the following items are included in the mounting kit. Call 515-272-4372 if you need to obtain a part from BrandFX. Double-stick tape (1 roll) White

More information

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase

v1.0 ASSEMBLY GUIDE Mia Wide Bookcase v1.0 ASSEMBLY GUIDE Mia Wide Bookcase Components Upon unpacking your bookcase from it s delivery box, you should have the pieces shown. Follow the steps on the next pages to assemble your new bookcase.

More information

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets

STOP. V00029AC Rev. 04 READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID TOOL LIST. NET-ACCESS S-Type Network Cabinets Rev. 04 STOP READ ALL OF THE FOLLOWING INSTRUCTIONS BEFORE REMOVING CABINET FROM SKID NET-ACCESS S-Type Network Cabinets -Phillips screwdriver -Flatblade screwdriver -22mm socket wrench -15mm socket wrench

More information

Installation Type. Edge of Door. Pull (Hinge) Side Mounted. Hinge Edge of Door. Push (Stop) Side Mounted

Installation Type. Edge of Door. Pull (Hinge) Side Mounted. Hinge Edge of Door. Push (Stop) Side Mounted Installation Instructions CAUTION An incorrectly installed or improperly adjusted door closer can cause property damage or personal injury. These instructions should be followed to avoid the possibility

More information

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE

SLIDING MECHANISM TROLLEY CATCH TROLLEY ASSEMBLY FLOOR GUIDE Set A Set B P7001 Standard Kit Glass Door FITTING INSTRUCTIONS SUGGESTED TOOLS DRILL MITRE/CHOP SAW TAPE MEASURE (Image for reference only) HACKSAW POCKER DOOR KIT SHORT / LONG Z SECTION LONG Z SECTION

More information

Kitchen Fittings Hanging Cabinets and Accessories

Kitchen Fittings Hanging Cabinets and Accessories Cabinet hanger Knock-in version, load bearing capacity 130 kg/pair Depth adjustment Finish: Galvanized Concealed mounting of cabinet hanger behind the rear panel (Min. 16 mm free space required) Mounting

More information

SOCCER TABLE. Assembly Instructions

SOCCER TABLE. Assembly Instructions Updated: 9/30/2015 SOCCER TABLE Assembly Instructions Table of Contents Parts Identifier... 3 Hardware Identifier. 4 Table Assembly Instructions... 5 Table Assembly Pictures..... 6, 7, 8 2 Page Parts Identifier

More information

Contents. Fulcrum CE Executive Workstation Light Oak and gloss white lacquer workstation and storage

Contents. Fulcrum CE Executive Workstation Light Oak and gloss white lacquer workstation and storage Contents Fulcrum provides the benchmark for high quality conference tables, executive and managerial desks and reception counters, in veneer, solid hardwood and high gloss lacquer. Fulcrum combines an

More information

Barnside Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratch

Barnside Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratch 88 5516 653 Barnside Pantry IMPORTANT NOTE Carefully remove all the parts from the carton and put them individually on a soft cloth to prevent scratches or other damage occurring to the parts. We have

More information

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST

IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST Set A Set B PFD60 Fire Door Kit FITTING INSTRUCTIONS IF INSTALLING ANY OF THE PORTMAN SELF CLOSING SYSTEMS, PLEASE READ THE CORRESPONDING FITTING INSTRUCTIONS SUPPLIED WITH THE CLOSING SYSTEM FIRST SUGGESTED

More information

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2

Installation Guide. Evolve bi-fold. 8. Door restrictor- optional p9. 1. Before you start p2. 9. Adjustment. 2. Measuring and surveying p2 Evolve bi-fold Installation Guide 1. Before you start p2 8. Door restrictor- optional p9 2. Measuring and surveying p2 3. Configuration details p4 4. Installation p5 5. Glazing p5 6. Glazing packer details

More information

Section 2. Profiles - How to use

Section 2. Profiles - How to use Section s - How to use overview.... page 36 End larder profile - length 94mm/mm... page 37 Mid larder profile - length 94mm/mm... page 38 Worktop profile - length 3000mm.... page 39 Drawer profile - length

More information

1 Door Tall Unit ASSEMBLY GUIDE. WARNING: Contains small parts, keep out of reach of children.

1 Door Tall Unit ASSEMBLY GUIDE. WARNING: Contains small parts, keep out of reach of children. ASSEMBLY GUIDE 1 Door Tall Unit IMPORTANT Before Commencing Assembly: Read all instructions COMPLETELY Ensure all listed parts are present If any parts are missing from Parts List 1, please contact 1800

More information

TOYOTA TACOMA LED BED LIGHTS Preparation

TOYOTA TACOMA LED BED LIGHTS Preparation Preparation Part Number: PT948-35160 Kit Contents Item # Quantity Reqd. Description 1 1 Hardware Kit 2 1 Driver Side LED assembly 3 1 Passenger Side LED assembly 4 1 Main Wire Harness Hardware Bag Contents

More information

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET

INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET HIGH EDGE 2 1/4"(57mm) 03079400070 INSTALLATION INSTRUCTIONS FOR INSTALLING T-SERIES EXTRA HEAVY DUTY LEVER LOCKSET IMPORTANT: THIS LOCK IS NON-HANDED. LOCK IS FACTORY PACKED PREADJUSTED FOR 1³ ₄" (45mm)

More information

The Q Frame PROJECT. a picture frame with secrets created exclusively for the Router Forum

The Q Frame PROJECT. a picture frame with secrets created exclusively for the Router Forum The Q Frame PROJECT a picture frame with secrets created exclusively for the Router Forum 007 OR RELEASE FPLANS APPROVED The Q Frame: Project Overview LIST OF MATERIALS Frame Sides & Face 3/4 x 5 1/2 x

More information

Installation Instructions

Installation Instructions Installation Instructions CAUTION An incorrectly installed or improperly adjusted door closer can cause property damage or personal injury. These instructions should be followed to avoid the possibility

More information

WALL UNIT. Assembly Guide Lift. 288 x x x x 800

WALL UNIT. Assembly Guide Lift. 288 x x x x 800 Assembly uide 288 x 600 288 x 800 360 x 600 360 x 800 or Internal Use: I.WR.INS.032_WKIN00121_WALL_600_800_Lift_Rev2.indd Assembly uide EORE YOU START INSTALLATION SHOULD E PERORMED Y A OMPETENT PERSON

More information

Cold Frame Instructions

Cold Frame Instructions 1 05/13 Cold Frame Instructions Thank you for purchasing your new Alton cold frame. We recommend you familiarise yourself with the instructions and read all safety information before you commence assembly.

More information

1 p

1 p Installation Guide Tiled Wall Installation Acrylic Wall Installation The Cube Shower Door is suitable for both L/H and R/H installations Thank you for your order PH: 09 913 3110 FAX:09 913 3113 5 Smales

More information

INSTALLATION INSTRUCTION New Luxury Slider Door 8mm

INSTALLATION INSTRUCTION New Luxury Slider Door 8mm INSTALLATION INSTRUCTION New Luxury Slider Door 8mm C038-A00-0 Parts Identification 8 0 9 8 7 6 5 4 3 3 4 5 6 7 8 Components List N0. Drawing Description Qty Bottom Rail No8x " Pozi Pan Screw 8 3 4 5 6

More information

KNOB LATCH. Specifications: Glass-To-Wall Installation CAT NO. LAT001 C.R. LAURENCE CO., INC. PROFESSIONAL QUALITY

KNOB LATCH. Specifications: Glass-To-Wall Installation CAT NO. LAT001 C.R. LAURENCE CO., INC. PROFESSIONAL QUALITY Specifications: Material: Solid brass Hole Size Required: 7/8" (22mm) Glass Thickness Range: 3/8" (10mm) to 1/2" (12mm) Includes: Knob, Tapered Strike for wall-to-glass installation and J-Hook for glass-to-glass

More information

Fixings Installation Instruction Manual. Glasdon Buildings, Housings & Shelters

Fixings Installation Instruction Manual. Glasdon Buildings, Housings & Shelters Fixings Installation Instruction Manual Glasdon Buildings, Housings & Shelters Stock No. C000/0157 - DWG No. 12B-091-66 Issue 2 - February 2018 Expanding Anchor Fixing Instructions THROUGHBOLT ANCHORS

More information

SAN DIEGO - TV Unit. Assembly Instructions - Please keep for future reference 389/6620

SAN DIEGO - TV Unit. Assembly Instructions - Please keep for future reference 389/6620 SN GO - TV Unit ssembly nstructions - Please keep for future reference 389/6620 imensions Width - 125cm epth - 40cm eight - 50cm mportant Please read these instructions fully before starting assembly f

More information

55000/55010 Installation Instructions

55000/55010 Installation Instructions A. Install 55015 B. Bolt roof rails, 55020/55025, to front hoop. C. Assemble 55026 D. To install without drilling into bumper. E. If mounting directly to bumper. A. 55015 Installation Instructions 55000/55010

More information

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7

Fig. 2 DORMA-Glas Stand/Issue 02/03 Seite/Page 1/7 FSW Installation instructions Track rail 75 x 72 mm 1. Ceiling substructure and installation of the track rail (Fig. 1): The track rail must be bolted over its entire length (including the stacking track

More information

JURALCO ALUSTORE MODULAR STORAGE SYSTEM. Modular Storage System. Issue 1/16 ISSUE 1/16. ph (09)

JURALCO ALUSTORE MODULAR STORAGE SYSTEM. Modular Storage System. Issue 1/16 ISSUE 1/16.  ph (09) Alustore JURALCO ALUSTORE MODULAR STORAGE SYSTEM Modular Storage System ISSUE 1/16 Juralco Aluminium Building Products Ltd designs and distributes specialist aluminium joinery systems through a national

More information

INSTALLATION STEPS MAXIMUS-3.COM

INSTALLATION STEPS MAXIMUS-3.COM JK WRANGLER MAXIMUS-3 JK ROOF RACK/PLATFORM MAXIMUS-3 RHINO RACK ROOF PLATFORM/RACK IS NOT COMPATIBLE WITH JK 2-DOORS. THIS PRODUCT IS NOT DESIGNED TO WORK WITH JK SOFT TOP ROOF. INSTALLATION GUIDES Please

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS EDGE SLIDER SINGLE ESLSC1100 ESLSC1200 ESLSC1400 ESPSC0760 ESPSC0800 ESPSC0900 ESPSC1000 SLIDER DOOR IN LCOVE SLIDER DOOR & SIDE PNEL INSTLLTION INSTRUCTIONS IMPORTNT - Please read before installation

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS ITEM No. :Quilty/ 3 A helpful Assembly Video can be found on www.arrowcabinets.com in the Video Section under Quilty Incorrect Correct The turning direction of attaching The arrow

More information

33/35A Series. Devices covered by these instructions: Rim Exit Device. CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device

33/35A Series. Devices covered by these instructions: Rim Exit Device. CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device 911402-00 Rim Exit Device 33/35A Series Installation Instructions Devices covered by these instructions: 33/35A Rim Exit Device CD33/35A Rim Exit Device EL33/35A Rim Exit Device SS33/35A Rim Exit Device

More information

33/3527A. Devices covered by these instructions: 33/3527A-F (Fire) Surface Vertical Rod Exit Device

33/3527A. Devices covered by these instructions: 33/3527A-F (Fire) Surface Vertical Rod Exit Device *911403-00* 911403-00 Surface Vertical Rod Exit Device 33/3527A Installation Instructions Devices covered by these instructions: 33/3527A Surface Vertical Rod Exit Device 33/3527A-F (Fire) Surface Vertical

More information

Anatomy of a 3LT Tripod & AirHed

Anatomy of a 3LT Tripod & AirHed User Manual Anatomy of a 3LT Tripod & AirHed Release Plate Lok Tri-Mount Plate Central Column Release Plate Para-Lok Pano Clamp Lok* Collar Loking Ring Leg Cath Hinge Loking Knob Para-Lok Pan Base Boots

More information

VCE VET FURNISHING (CABINET MAKING)

VCE VET FURNISHING (CABINET MAKING) Victorian Certificate of Education 2002 SUPERVISOR TO ATTACH PROCESSING LABEL HERE Figures Words STUDENT NUMBER Letter VCE VET FURNISHING (CABINET MAKING) Written examination Friday 1 November 2002 Reading

More information

FRAMELESS GLASS FENCING DIY GUIDE

FRAMELESS GLASS FENCING DIY GUIDE FRAMELESS GLASS FENCING SITE MEASURE 1. Planning is the first step of any successful project. 2. We have a large range of sizes to allow for varying site requirements. 3. Simply decide where you would

More information

Grain Tank Cross Auger Trough Liner for John Deere 9400 / 9500 Combine

Grain Tank Cross Auger Trough Liner for John Deere 9400 / 9500 Combine www.polyskid.com P. O. Drawer 349, Monticello, GA. 31064 Phone: 800-542-7659, Fax: 706-468-2881 E-Mail: polytech@polyskid.com Grain Tank Cross Auger Trough Liner for John Deere 9400 / 9500 Combine FOR

More information

General Mounting/Installation manual 2019

General Mounting/Installation manual 2019 General Mounting/Installation manual 209 Important, before you start! Read this manual thoroughly! Think about this before you start to mount. Note that this is a general mounting instruction! Pre-assemble

More information