1 PROVINCIAL CONTEST DESCRIPTION & INSTRUCTIONS ELECTRICAL WIRING TRADE 18 Post Secondary 2016

2 GENERAL INSTRUCTIONS... 3 SAFETY... 3 MATERIAL... 3 DIMENSIONS... 3 DISCUSSION... 3 STUD WALL WIRING... 3 SURFACE WALL WIRING... 3 SCHEDULE... 4 TESTING & COMPLETION... 4 STUD WALL WIRING... 5 DRAWINGS... 9 BOXES... 5 HOME RUNS... 5 CIRCUITRY... 5 FINISHING... 5 SURFACE WALL WIRING... 6 DRAWINGS BOXES... 6 PANEL... 6 HOME RUNS... 6 CIRCUITRY, CABLE & CONDUITS... 6 CONTROL CIRCUITS... ERROR! BOOKMARK NOT DEFINED. FINISHING... 7 Rev.1 Page 2 15 Apr, 2015

3 GENERAL INSTRUCTIONS Safety Safety equipment must be worn at all times in the competition area Hard hat and steel toed footwear are mandatory at all times Safety glasses are to be worn at all times. Hearing protection are to be worn depending on the task Maintain a clean work area, brooms and dustpans are available All garbage and extra material is to remain in the work area DO NOT energize stations without judge present and safety glasses There is only one cord for testing so it will be shared All judges will monitor the competitors to see that proper safety practices are followed. Work safely at all times Material Each station area contains the material for the entire competition Please check the material with the packing slip to ensure that it is all there Extra material needed later will result in marks lost Some of the material is used, this can be replaced later if found to be defective or damage No marks will be lost for replacing damaged components Miscellaneous wire and materials are located in central areas This is to be shared by all competitors Please take only the amount of material that you need, and keep it in your area Excessive wire and material use will be marked Straps, supports, staples are marked based on minimum code requirements and enough to look good. Use just enough without being excessive. Dimensions All dimensions are from the floor or plywood edge Even if not level please go off the floor to the indicated side on the diagram. All dimensions are given in millimetres The print indicates the side of box being measured and location (top/bottom/center) Discussion During the contest direct all questions to the judges only All competitors will receive the same answer to questions If necessary a written answer will be passed out. Please no talking to people outside the contest area. We encourage fair competition and want you to interact with the other competitors Please refrain from discussing the competition You may leave the competition area to use the washroom but please let the judges know and no talking to anyone about the competition Stud Wall Wiring This will evaluate your ability to install common residential circuits and devices. The wiring will use NMD cable fed from the panelboard. You will be evaluated on accuracy of measurements, circuit operation, cable installation & termination. All installation will be done safely to code. Surface Wall Wiring This will evaluate your ability to install motor control and common commercial circuits & devices. The wiring will use BX cable and conduit fed from a panel. You will be evaluated on accuracy of measurements, circuit operation, cable installation & termination, conduit bending & installation. All installations will be done safely to code. Rev.1 Page 3 15 Apr, 2015

4 Schedule The contest is 6 hours in length. Lunch is 30 minutes (time to be determined) All competitors must stop working The competition will have 3 components, Stud Wiring & Surface Wiring, and troubleshooting. Competitors may move to surface wiring once they have finished the stud wiring Stud wiring will be judged after 4 hours of competition time All competitors must move to Surface wiring after 4 hours Once started on surface wiring you may not return to stud wiring When called upon by the judges, you must immediately stop work and proceed with the judges to the troubleshooting area. You will have 20 minutes to complete the troubleshooting competition. Registration & Set-up Orientation, contest outline Contest Start Lunch Stud Wiring Finished Competition Finished Clean-up 7:30-7:45 AM 7:45-8:00 AM 8:00 AM 12:30 PM 2:30 PM 2:30-2:45 PM (pack up tools and tidy work area) These are estimated times and may be adjusted to account for any delays. Testing & Completion You may test your circuitry if time allows Before testing you must notify the judge and have proper PPE When you finish one contest area unplug the power cord, turn all breakers off and make area safe. Notify the judge before leaving the stud wiring and starting the surface wiring Notify the judge once the competition if finished Rev.1 Page 4 15 Apr, 2015

5 Stud Wall Wiring Drawings There is 1 drawing for the stud wall at the back of this package which shows both the box details and elevations. Boxes All of the boxes are to be mounted on the side of the stud indicated on the drawing allowing for ½ drywall. The dimensions are given; the drawing is not to scale. Boxes that are aligned on the drawing are at the same elevation, even if dimensions are not indicated. There are two plastic octagon boxes for the keyless lampholders; two1 gang device boxes for 3 way switches, two 1 gang boxes for 20 amp T slot GFCI receptacles, and two 1 gang boxes for 15 amp AFCI protected receptacles. Box Type Drawing Label Devices Plastic Octagon L Keyless lampholder 1 gang device box B 3 way Switch 1 gang device box C Recept. GFCI protected, 20A T slot 1 gang device box F AFCI protected 15 amp receptacle Home runs The 3-phase cord end will be used but only line 1, line 2 and the neutral will be connected to the single phase panelboard. The cord has been wired already but not tested. Please be sure to check the cord end connections. Please use all 6 circuits with home runs as shown, and label the panel schedule as follows; circuits #1 750 watt baseboard heater circuit # 2- w/p GFCI receptacle, circuit #3- AFCI protected receptacles, circuit # 4- GFCI receptacles, circuit # 5 stud wall lighting, circuit # 6 surface wall fan and light. Circuitry Finishing The stud wall will use NMD wire only. Installation and circuits should meet CEC and the minimum material to wire the job neatly. Circuit and device groupings for circuits are indicated on the drawings. The devices should operate for the following conditions The two T slot receptacles are fed from a 2 wire 20 amp circuit (cct 4),GFCI protected. The two lamps (L) are controlled from two locations by the switches labelled S3, and are on their own circuit (cct. 5). The two AFCI receptacles are to be fed with 14/2 NMD7 loomex with a blue outer jacket to identify it from other circuits. An AFCI circuit breaker is to be installed in the panel on circuit 3. Covers are not required to be installed on any of the boxes. However devices should be mounted ready for covers. There are covers that can be used to guide device installations. When you are finished at this area please clean up, make all connections safe, and notify judges before moving on.nk. Rev.1 Page 5 15 Apr, 2015

6 Surface Wall Wiring Drawings There is 1 drawing for the surface wall at the back of this package showing the boxes and elevations.. Boxes All of the boxes are to be mounted securely on the surface of the wall. The measurements will be taken from the point indicated on the drawing. The dimensions are given; the drawing is not to scale. Boxes that are aligned on the drawing are at the same elevation, even if dimensions are not indicated. The panel is to be used for all devices on this wall. It is aligned with the edge of the wall. One surface box and taylor plate houses a mechanical time switch. The other houses a single pole switch with pilot light which should illuminate when the switch is in the on position. The weatherproof receptacle box houses a GFCI receptacle with an enclosed type weatherproof cover. Panel The panel is a single phase that will be wired as a sub panel fed with the 3-phase cord end. The cord has been wired already but not tested. Please be sure to check the cord end connections. Use 2 of the 3 power wires to connect the panel; cap the unused wire. Be sure to label all circuits on the panel directory (if necessary ask for labels to use) Home Runs The home runs for the wiring on this wall are not indicated on the drawing but are explained below. Circuitry, Cable & Conduits Box Type Drawing Devices Label Panel Panel Breakers Fan (no box req d) Fan Wall mounted Metal Octagon L1 Keyless lampholder 4 X 4 shallow box & taylor plate S t Mechanical time switch 4 X 4 shallow box & taylor plate S l 1 pole switch with pilot light T stat (no box req d) T stat Built in installs on heater The W/P receptacle shall be fed from circuit 2. It shall be fed with #14 solid cu conductors in ½ emt, and GFCI protected. The fan and the heater will be fed using armoured cable (BX). The fan and light L1 shall both be fed from circuit 6with #14 cu conductors in ½ emt. The heater shall be fed from circuit 1. The mechanical time switch shall control the fan only. The pilot light switch controls the light L1 only, and the pilot light should be illuminated when L1 light is on. Rev.1 Page 6 15 Apr, 2015

7 Finishing Please install the covers on all boxes on the surface wall. When you are finished at this area please clean up, make all connections safe, put all breakers in the off position and notify the judges before leaving the area. Rev.1 Page 7 15 Apr, 2015

8 General Marking & Evaluation These are some guidelines to follow: Operation (250) Ensure that all circuitry works safely and properly. Check the panel wiring. Equipment (100) Check that all devices are installed properly. Use of supplies (50) No unnecessary material is used. No KO fillers.( others than those already installed in used equipment) Measurement (100) Measure to within 3mm. Accuracy is important, within small tolerances. Cable Installation (100) Tubing & Conduit (100) No kinking of EMT Offsets as required Connections and Terminations (100) Health & Safety (100) Maintain a clean work area & use safety equipment. There will be three checks at different time throughout the day. Troubleshooting (100) Tie Break The first tie break is the higher operation score The second tiebreaker is the higher safety score The third tiebreaker is the higher troubleshooting score The fourth tiebreaker is the time of completion when judge is notified. Remember everyone enjoy the day. GOOD LUCK and HAVE FUN! Rev.1 Page 8 15 Apr, 2015

9 Stud Wall Circuitry Diagram Rev.1 Page 9 15 Apr, 2015

10 Surface Wall Box Diagram Rev.1 Page Apr, 2015

11 Rev.1 Page Apr, 2015

SkillsUSA 2013 Contest Projects Electrical Construction Wiring

SkillsUSA 2013 Contest Projects Electrical Construction Wiring SkillsUSA 2013 Contest Projects Electrical Construction Wiring Click the Print this Section button above to automatically print the specifications for this contest. Make sure your printer is turned on

More information

Wiring Devices. Description. Lesson Outcomes. Assumptions. Electrician

Wiring Devices. Description. Lesson Outcomes. Assumptions. Electrician Description Once a house has been roughed in and has passed an electrical inspection, it s time for the electricians to do the final job of wiring and installing devices. Most trades have a finishing process

More information

Electrical Wiring Projects

Electrical Wiring Projects Electrical Wiring Projects Name: Date: Description: Students will learn how to properly install and wire using common industrial devices on an Electrical Board. Students will practice using common electrical

More information

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models.

GE Monogram. Installation. Instructions. Microwave Oven. Under Cabinet Installation. and. JX827 Series Built-In Kit. Models. GE Monogram Installation Instructions Under Cabinet Installation and JX827 Series Built-In Kit Models ZEM200 Series CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT:

More information

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL

SECTION LOW-VOLTAGE ELECT. DIST. DESIGN AND CONSTRUCTION STANDARDS _ February 2015 PART I: GENERAL PART I: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. a.

More information

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56

National Marine Manufacturers Association Compliance Specialist Examination A.C. Electrical (2018 Model Year) ABYC E-11 Supplement 56 1. Two Electrical Technicians are discussing markings that are required for AC wiring. Tech A says that AC conductors must be rated for 600 volts and must have their jackets and individual conductors marked

More information

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades

Electrical requirements for plans on all new homes, additions, remodels & Service upgrades CHERRY HILLS VILLAGE COLORADO Electrical requirements for plans on all new homes, additions, remodels & Service upgrades Due to the size and uniqueness of homes built in Cherry Hills Village, a policy

More information

SCNC OCMT ELECTRICAL INSTALLATIONS INSTALLATIONS ELECTRIQUES SKILLS CANADA NATIONAL COMPETITION OLYMPIADES CANADIENNES DES MÉTIERS ET DES TECHNOLOGIES

SCNC OCMT ELECTRICAL INSTALLATIONS INSTALLATIONS ELECTRIQUES SKILLS CANADA NATIONAL COMPETITION OLYMPIADES CANADIENNES DES MÉTIERS ET DES TECHNOLOGIES SCNC SKILLS CANADA NATIONAL COMPETITION OCMT OLYMPIADES CANADIENNES DES MÉTIERS ET DES TECHNOLOGIES CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS ELECTRICAL INSTALLATIONS INSTALLATIONS ELECTRIQUES POST-

More information

CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS ELECTRICAL INSTALLATIONS INSTALLATIONS ÉLECTRIQUES SECONDARY / NIVEAUX SECONDAIRE

CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS ELECTRICAL INSTALLATIONS INSTALLATIONS ÉLECTRIQUES SECONDARY / NIVEAUX SECONDAIRE CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS ELECTRICAL INSTALLATIONS INSTALLATIONS ÉLECTRIQUES SECONDARY / NIVEAUX SECONDAIRE Table of Contents 1 THE ESSENTIAL SKILLS FOR CAREERS IN THE SKILLED TRADES

More information

TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY. Test Code: 5171 Version: 01

TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY. Test Code: 5171 Version: 01 TEACHER ASSESSMENT BLUEPRINT ELECTRICAL CONSTRUCTION TECHNOLOGY Test Code: 5171 Version: 01 Specific Competencies and Skills Tested in this Assessment: OSHA Regulations and Electrical Safety Practices

More information

SCNC OCMT ELECTRICAL INSTALLATIONS INSTALLATIONS ÉLECTRIQUES SKILLS CANADA NATIONAL COMPETITION OLYMPIADES CANADIENNES DES MÉTIERS ET DES TECHNOLOGIES

SCNC OCMT ELECTRICAL INSTALLATIONS INSTALLATIONS ÉLECTRIQUES SKILLS CANADA NATIONAL COMPETITION OLYMPIADES CANADIENNES DES MÉTIERS ET DES TECHNOLOGIES SCNC SKILLS CANADA NATIONAL COMPETITION OCMT OLYMPIADES CANADIENNES DES MÉTIERS ET DES TECHNOLOGIES CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS ELECTRICAL INSTALLATIONS INSTALLATIONS ÉLECTRIQUES SECONDARY

More information

Electrical IP Red Seal Practice Exam

Electrical IP Red Seal Practice Exam Electrical IP Red Seal Practice Exam PRACTICE EXAM-3 1. What size 2 pole breaker must you use on a 3HP, 115V single phase motor? A. 40A B. 50A C. 80A. D. 100A. 2. An electrical equipment approved for use

More information

Article 225: Outside Branch Circuits And Feeders

Article 225: Outside Branch Circuits And Feeders Part C: Code Book Questions Article 225: Outside Branch Circuits And Feeders 1.! Open (individual) aerial overhead conductors shall be insulated or covered when within! feet of a building.! (a) 10! (c)

More information

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality.

1. All electrical switches and outlets used shall be equal to Hubbell heavy duty, specification grade or equivalent quality. PART 1: GENERAL 1.01 Wiring Devices A. This section of the standard includes design requirements for wiring connections, including receptacles and switches to equipment specified in other sections. 1.02

More information

SECTION EQUIPMENT WIRING

SECTION EQUIPMENT WIRING PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 26 27 17 EQUIPMENT WIRING A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and Section 26 00 01, Electrical General Provisions,

More information

Installation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio

Installation Guide. Model #400. Corporate Office: 349 Highland Road East Macedonia, Ohio Installation Guide Model #400 Corporate Office: 349 Highland Road East Macedonia, Ohio 44056 1.866.822.7328 www.ezbreathe.com Copyright 2006, EZ Breathe, LLC WHAT S INSIDE Before installing your EZ Breathe

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 9/8/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions conduit? 9/8/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Can branch circuits of different services be installed in the same Yes, see 300.3(C)(1) for conductors of different systems

More information

MaxLite Linear Strip ECO Series

MaxLite Linear Strip ECO Series General Safety Information To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts, cuts/abrasions, and other hazards read all warnings and instructions

More information

12.6 Delta Phase versus Line Current

12.6 Delta Phase versus Line Current Unit 12 Delta/Delta and Delta/Wye Transformers Electrical NEC Exam Preparation 12.6 Delta Phase versus Line Current Since each line conductor from a delta transformer is actually connected to two transformer

More information

Standard PS-P61 Punch Stapler

Standard PS-P61 Punch Stapler Standard PS-P61 Punch Stapler Instruction Manual Provided By http://www.mybinding.com http://www.mybindingblog.com PUNCH STAPLE PS-P61 Important Information - This manual is designed to help you to install,

More information

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL

ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL BELL SYSTEM PRACTICES Plant Series SECTION 508-100-100 Issue 3, October 1970 AT&TCo Standard ELECTRIC GROUNDING AND WIRING REQUIREMENTS BOOTHS-METAL I. GENERAL 1.01 This section is reissued to: Revise

More information

Steel Door Frame Installation in Steel Stud Construction

Steel Door Frame Installation in Steel Stud Construction Steel Door Frame Installation in Steel Stud Construction This manual provides step-by-step instructions for the installation of a steel door frame in steel stud construction. It is a companion piece to

More information

Single Sided Height Adjustable Benching

Single Sided Height Adjustable Benching Single Sided Height Adjustable Benching Bit Holder Power Drill Long # Square Drive Bit 5mm Hex Drive Bit T-30 Torx Drive Bit Hex Key -.5mm (Provided) SERIES 5 Hex Key - 3mm Socket Adaptor (or) If you have

More information

HOLE CUTTER SHARPENER ASSEMBLY & SERVICE MANUAL

HOLE CUTTER SHARPENER ASSEMBLY & SERVICE MANUAL HOLE CUTTER SHARPENER ASSEMBLY & SERVICE MANUAL WARNING You must thoroughly read and understand this manual before operating the equipment, paying particular attention to the Warning & Safety instructions.

More information

INSTALLATION RECOMMENDATIONS For The Con-Tech ODYSSEY Line Voltage Flexible Track System

INSTALLATION RECOMMENDATIONS For The Con-Tech ODYSSEY Line Voltage Flexible Track System INSTALLATION RECOMMENDATIONS For The Con-Tech ODYSSEY Line Voltage Flexible Track System IMPORTANT SAFETY INSTRUCTIONS: Read all instructions before installation. Save these instructions for later use.

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 200-215.3 CHANGES FROM 2011 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 200 Use and Identification of Grounded Conductors 200.2 General Grounded Conductors

More information

JUDGING CRITERIA: Please refer to SkillsUSA Championships Technical Standards.

JUDGING CRITERIA: Please refer to SkillsUSA Championships Technical Standards. SkillsUSA California 2019 Regional Plumbing Competition SCOPE OF THE COMPETITION: - Knowledge Performance The contest criteria were drawn from the CTE Curriculum Standards for the Building Trades. The

More information

ELPT 1429 RESIDENTIAL WIRING

ELPT 1429 RESIDENTIAL WIRING SYLLABUS ELPT 1429 RESIDENTIAL WIRING INDUSTRIAL AND COMMERCIAL ELECTRICITY BRAZOSPORT COLLEGE LAKE JACKSON TEXAS PREPARED BY: Larry Grable DATE: September 13, 2005 INSTRUCTOR RECOMMENDED BY: RECOMMENDED

More information

Module 2 Unit 6, 7, 8

Module 2 Unit 6, 7, 8 Module 2 Unit 6, 7, 8 1. What is the definition of an ideal conductor? Material that will carry the greatest current with the lowest temperature rise 2. How much does copper weigh compared to aluminum?

More information

Installation Manual DOC R1 Date: 05/27/99. Plug-in Meter Installation Manual

Installation Manual DOC R1 Date: 05/27/99. Plug-in Meter Installation Manual Installation Manual DOC-4004-5015-R1 Date: 05/27/99 Plug-in Meter Installation Manual Document Number: Doc-4004-5015-R1 Document Release Date: 5/99 Copyright 1999 TeCom Inc. All rights reserved. No part

More information

Stud Wall Pages

Stud Wall Pages Pages 125-144 125 Box Mounting Bracket For Electric Box Easily attaches 4" and 411 /16" outlet boxes to metal stud (HS3 switch boxes). Support leg reduces movement of box in wall. Can be attached to metal

More information

Assembly Instructions

Assembly Instructions InTandem Table System November 20 InTandem Table System - Worksurface #4 x/" 4 wood screw power beam Tools Provided T-0 Extended Torx Driver T-25 Torx Driver Additional Tools Required Soft protective

More information

High-impact resistant thermoplastic construction

High-impact resistant thermoplastic construction Residential Grade Devices Receptacles TradeMaster Receptacles Tamper-Resistant Receptacles High-impact resistant thermoplastic construction Extra-long strap, Quickloop wire looping aid Long-term blade

More information

Spring Steel Fasteners

Spring Steel Fasteners Cable Support Supports up to 4 runs of MC and AC cable and up to 6 runs of nonmetallic sheathed cable Installs with nails or staple or sheet metal screws Complies with CEC article 12-516 for all wood and

More information

Chapter 25. Lighting Plans

Chapter 25. Lighting Plans Chapter 25 Lighting Plans The following are changes, additions or deletions to the January 2014, Topic #625-000-008, Plans Preparation Manual (PPM), for use on Turnpike projects only. 25.1 General Replace

More information

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS

NORTHWEST FLORIDA STATE COLLEGE MONUMENT SIGNS WITH LED DISPLAYS PREPARED FOR: FOUNDATION PLAN & STRUCTURAL NOTES DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S1 PREPARED FOR: FRAMING PLANS DESIGNED BY: NJB DRAWN BY: NJB REVIEWED BY: BLSE S2 PREPARED FOR: SECTION

More information

Arched Top Lantern Pendant Assembly and Installation Instructions. Country of Destination: US/CN UK/EU/AUS Middle East

Arched Top Lantern Pendant Assembly and Installation Instructions. Country of Destination: US/CN UK/EU/AUS Middle East CAUTION: Arched Top Lantern Pendant Assembly and Installation Instructions Country of Destination: US/CN UK/EU/AUS Middle East BEFORE INSTALLING FIXTURE, MAKE SURE THE POWER TO THE CIRCUIT IS TURNED OFF

More information

DIVISION 26 ELECTRICAL SECTION ELECTRICAL

DIVISION 26 ELECTRICAL SECTION ELECTRICAL DIVISION 26 ELECTRICAL SECTION 26 1000 ELECTRICAL PART 1 - GENERAL 1.1 WORK INCLUDED A. Furnish all labor, material and equipment necessary for the complete installation of the Electrical System as shown

More information

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General

03/7/12 Issuance UTD Section Page 1 of 5 Electrical General SECTION 26 01 00 ELECTRICAL GENERAL PART 1: GENERAL 1.1 Electrical/Telecommunications Design 1.1.1 This section of the design and construction standard outlines general requirements for electrical and

More information

SURETRACE CIRCUIT TRACER YOUR IDEAL TROUBLESHOOTING SOLUTION. DESIGNED TO FIND EVERYTHING, WHILE SAVING YOU TIME AND MONEY.

SURETRACE CIRCUIT TRACER YOUR IDEAL TROUBLESHOOTING SOLUTION. DESIGNED TO FIND EVERYTHING, WHILE SAVING YOU TIME AND MONEY. SURETRACE CIRCUIT TRACER YOUR IDEAL TROUBLESHOOTING SOLUTION. DESIGNED TO FIND EVERYTHING, WHILE SAVING YOU TIME AND MONEY. FINDS... BREAKERS AND FUSES SPLICE ERRORS DEAD SHORTS WIRES IN WALLS, CEILINGS,

More information

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit.

a) Determine the smallest, standard-sized circuit breaker that should be used to protect this branch circuit. ECET4520 Exam II Sample Exam Problems Instructions: This exam is closed book, except for the reference booklet provided by your instructor and one (8.5 x11 ) sheet of handwritten notes that may not contain

More information

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST

STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST STANDARD COMMENTS 2016 ELECTRICAL PLAN REVIEW CHECK LIST Item Comments 1. The electrical plan check is approved and ready to have the electrical permit issued, pending the building permit being issued.

More information

Variable Transformers Product Design & Engineering Data

Variable Transformers Product Design & Engineering Data Variable Transformers Product Design & Engineering Data Product Design & Engineering Data Type 1010B Cutaway General Information STACO ENERGY PRODUCTS CO. is a leading manufacturer of variable transformers,

More information

Thanks for shopping with Improvements! Pre-Lit Snowman Tree - 5 Item #484125

Thanks for shopping with Improvements! Pre-Lit Snowman Tree - 5 Item #484125 Thanks for shopping with Improvements! Pre-Lit Snowman Tree - 5 Item #484125 IMPORTANT: READ THESE INSTRUCTIONS CAREFULLY AND KEEP FOR FUTURE REFERENCE. PARTS LIST: 1 EA. Tree Stand (with 3 screws) 1 EA.

More information

Installation Manual Porter Road, Sarasota FL fax

Installation Manual Porter Road, Sarasota FL fax 072015 Installation Manual BEFORE YOU BEGIN: Read these instructions completely and carefully. FOR YOUR SAFETY: Read and observe all CAUTIONS and WARNINGS shown throughout these instructions. Risk of injury.

More information

Senior Swing. Caution

Senior Swing. Caution *740132* 740132 2800 Overhead Concealed Series 9500 Surface Applied Series Senior Swing Installation Instructions Caution LCN Senior Swing The Senior Swing Power Operator System is a low energy product

More information

B. Manufacturers: Square-D, G.E. or Westinghosue.

B. Manufacturers: Square-D, G.E. or Westinghosue. SECTION 16470 - PANELBOARDS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Shannon s CCR Spiral Tree

Shannon s CCR Spiral Tree Shannon s CCR Spiral Tree http://www.shannonclaus.com Disclaimer: I take no responsibility for design failures or injuries related to this design. This document is created for informational purposes only

More information

Electrical Construction Technology

Electrical Construction Technology Measuring What Matters in Job Ready Assessment Blueprint Electrical Construction Technology Test Code: 4130 / Version: 01 Copyright 2011 General Assessment Information Electrical Construction Technology

More information

WPS crew Doors Installation instructions

WPS crew Doors Installation instructions WPS-132-133 crew Doors Installation instructions ORDER OF INSTALLATION FOR A COMPLETE ENCLOSURE OF A CREW WPS (Weather Protection System) IS AS FOLLOWS: 1. Heater 2. Rear Thresholds - Right Hand & Left

More information

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Electric. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Electric Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS... 3 3.

More information

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS

POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS POWER DELEGATOR SERIES 7200A POWER DISTRIBUTION UNIT WITH POWER CONDITIONING GENERAL SPECIFICATIONS 1.0 SCOPE The following specification describes the features, design, and application of the Series 7200A

More information

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33

Part VIII Electrical GENERAL REQUIREMENTS CHAPTER 33 Part VIII Electrical CHAPTER 33 GENERAL REQUIREMENTS < SECTION E3301 GENERAL E3301.1 Scope. The installation of electrical systems, equipment and components indoors and outdoors that are within the scope

More information

Instruction Sheet Tool Kit [ ] (for SL Series 110 Jack Connectors)

Instruction Sheet Tool Kit [ ] (for SL Series 110 Jack Connectors) Instruction Sheet Tool Kit 1725150 [ ] (for SL Series 110 Jack Connectors) 26 FEB 04 PROPER USE GUIDELINES Cumulative Trauma Disorders can result from the prolonged use of manually powered hand tools.

More information

Skills Canada National Competition Contest Description 26 Carpentry / Secondary and Post-Secondary May 27-30, 2015 Saskatoon

Skills Canada National Competition Contest Description 26 Carpentry / Secondary and Post-Secondary May 27-30, 2015 Saskatoon Skills Canada National Competition Contest Description 26 Carpentry / Secondary and Post-Secondary May 27-30, 2015 Saskatoon 1. The Importance of Essential Skills for Careers in the Skilled Trades and

More information

2. Determine the number of Modules/Microinverters required. (1134 modules is 2 less than 250 KW but works well with max comm.

2. Determine the number of Modules/Microinverters required. (1134 modules is 2 less than 250 KW but works well with max comm. Commercial System Design Guidelines Application Note 1. Introduction... 1 2. Determine the number of Modules/Inverters required.... 1 3. Determining the number of Microinverters per branch circuit... 1

More information

Thanks for shopping with Improvements! 7 ft. Wall Christmas Tree w/ Stand Item #419359

Thanks for shopping with Improvements! 7 ft. Wall Christmas Tree w/ Stand Item #419359 Thanks for shopping with Improvements! 7 ft. Wall Christmas Tree w/ Stand Item #419359 IMPORTANT: RETAIN FOR FUTURE REFERENCE. READ CAREFULLY. PARTS LIST: NOTES: (1) Tree Section A (1) Tree Section B (1)

More information

Single-Family Dwelling Submittal Requirements

Single-Family Dwelling Submittal Requirements Single-Family Dwelling Submittal Requirements The purpose of this guideline is to assist our customers in preparing for plan submittal. The items listed must be included before your plans can be accepted

More information

300 Series Racks. 19" Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails. Applications. Features. In The Box. Options

300 Series Racks. 19 Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails. Applications. Features. In The Box. Options 300 Series Racks 19" Wide Opening Stand-Alone Wall Cabinet with Adjustable Rails Applications The 300 Series is ideal to house electronic equipment for any type of application, both commercial and residential,

More information

CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS MECHATRONICS MÉCATRONIQUE POST- SECONDARY / NIVEAUX POSTSECONDAIRE

CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS MECHATRONICS MÉCATRONIQUE POST- SECONDARY / NIVEAUX POSTSECONDAIRE CONTEST DESCRIPTION / DESCRIPTION DE CONCOURS MECHATRONICS MÉCATRONIQUE POST- SECONDARY / NIVEAUX POSTSECONDAIRE Table of Contents 1 THE ESSENTIAL SKILLS FOR CAREERS IN THE SKILLED TRADES AND TECHNOLOGY...

More information

InterBOARD TM 12 Channel Transmitter and Receiver Evaluation Board User Guide

InterBOARD TM 12 Channel Transmitter and Receiver Evaluation Board User Guide InterBOARD TM 12 Channel Transmitter and Receiver Evaluation Board User Guide SN-E12-X00501 Evaluation Board Features: Single Board compatible with Transmitter and Receiver Designed to operate up to 3.5

More information

ADDENDUM No. 4 Page 1 of 8 (includes attachment)

ADDENDUM No. 4 Page 1 of 8 (includes attachment) ADDENDUM No. 4 Page 1 of 8 (includes attachment) Date Issued: November 27, 2017 Project: TOWNSHIP OF NORWICH FIRE SERVICE STATION No: 3 BURGESSVILLE, ONTARIO 385435 HIGHWAY 59, BUGESSVILLE, ONTARIO N0J

More information

WARNINGS & SAFETY INFORMATION: PLEASE READ CAREFULLY AND KEEP A COPY ON THE PROPERTY FOR FUTURE REFERENCE!

WARNINGS & SAFETY INFORMATION: PLEASE READ CAREFULLY AND KEEP A COPY ON THE PROPERTY FOR FUTURE REFERENCE! WARNINGS & SAFETY INFORMATION: PLEASE READ CAREFULLY AND KEEP A COPY ON THE PROPERTY FOR FUTURE REFERENCE! General Safety Information To reduce the risk of death, personal injury or property damage from

More information

Technical Assignment #2 Electrical Existing Conditions Report

Technical Assignment #2 Electrical Existing Conditions Report Technical Assignment #2 Electrical Existing Conditions Report SYSTEM TYPE: THIS IS A RADIAL DISTRIBUTION SYSTEM BECAUSE ALL PANELS, THE MOTOR CONTROL CENTER AND THE MECHANICAL EQUIPMENT DISTRIBUTION SYSTEM

More information

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC

More information

ATD AMP Variable Speed Reciprocating Saw Owner s Manual

ATD AMP Variable Speed Reciprocating Saw Owner s Manual ATD-10535 7 AMP Variable Speed Reciprocating Saw Owner s Manual Manufactured in China To ATD Tools, Inc. Specifications TECHNICAL SPECIFICATIONS Voltage: 120V Frequency: 60Hz Power input: 7 Amps No load

More information

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY

AN EXAMPLE OF A STANDARD ARC FLASH PPE LABELING STRATEGY The Electrical Power Engineers Qual-Tech Engineers, Inc. 201 Johnson Road Building #1 Suite 203 Houston, PA 15342-1300 Phone 724-873-9275 Fax 724-873-8910 www.qualtecheng.com AN EXAMPLE OF A STANDARD ARC

More information

Build a Full Height Wall

Build a Full Height Wall Youth Explore Trades Skills Description Standard wall sections are an important feature in residential house construction, and their components must conform to building code specifications. In this lesson,

More information

GLOSSARY OF ELECTRICAL INDUSTRY TERMS

GLOSSARY OF ELECTRICAL INDUSTRY TERMS A ADD-A-DEPTH RING a means of extending the walls of a device box to the wall surface, providing a barrier between a wiring device and the surrounding wall material. AIR PLENUM a compartment or chamber

More information

GE Monogram. Installation. Instructions. 27" Built-In Ovens. Models ZEK757WW ZEK757BW ZEK737WW ZEK737BW

GE Monogram. Installation. Instructions. 27 Built-In Ovens. Models ZEK757WW ZEK757BW ZEK737WW ZEK737BW GE Monogram Installation Instructions 27" Models ZEK757WW ZEK757BW ZEK737WW ZEK737BW CAUTION WARNING Before you begin Read these instructions completely and carefully. IMPORTANT: Save these instructions

More information

Installation Instructions

Installation Instructions Installation Instructions 30 Built-In Wall Oven with Microwave JTP86, JT965 If you have questions, call 1.800.GE.CARES or visit our website at: ge.com Before You Begin Read these instructions carefully

More information

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118

4. Special Systems Design: including Fire Alarm and Security. C. Electrical and Telecommunications Ductbanks: Refer to Section 16118 PART 1: GENERAL This section of the design standard outlines general requirements for electrical and telecommunications designs to be performed for the University of Texas at Austin. This standard is intended

More information

Skills USA Welding Fabrication Competition Update 2018

Skills USA Welding Fabrication Competition Update 2018 Skills USA Welding Fabrication Competition Update 2018 State Welding Fabrication Winners: Congratulations on your accomplishments thus far. Please review these guidelines for the national competition in

More information

Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER

Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER Here are some guidelines to help make assembling your unit much easier: -Read and

More information

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible.

2. Electrical rooms shall be centrally located and stacked so that feeder conduits and bus duct are run as straight and short as possible. PART 1: GENERAL 1.01 Electrical/Telecommunications Design A. This section of the design and construction standard outlines general requirements for electrical and telecommunications designs to be performed

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 2/9/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. I have a 500 KVA generator, with no overcurrent protection

More information

7. INSPECTION AND TEST PROCEDURES

7. INSPECTION AND TEST PROCEDURES 7.1 Switchgear and Switchboard Assemblies A. Visual and Mechanical Inspection 1. Compare equipment nameplate data with drawings and specifications. 2. Inspect physical and mechanical condition. 3. Inspect

More information

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL

PROVINCE.OF BRITISH COLUMBIA. ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL PROVINCE.OF BRITISH COLUMBIA ORDER OF THE LIEUTENANfelOVERNOR IN COUNCIL Order in Council No. 0640 Approved and Oidered a -1.1995 cieuisvunigott3mor Executive Council Chambers, Victoria On the recommendation

More information

Installation Instructions

Installation Instructions Installation Instructions Self-Cleaning Radiant Trivection Electric Slide-In Range JS998 Questions? Call 800.GE.CARES (800.432.2737) or Visit our Website at: www.geappliances.com BEFORE YOU BEGIN Read

More information

Basic Electricity 30 Hour - Part 1 Student Workbook Issue: US140/30/2a-IQ-0402A. Written by: LJ Technical Dept

Basic Electricity 30 Hour - Part 1 Student Workbook Issue: US140/30/2a-IQ-0402A. Written by: LJ Technical Dept Basic Electricity 30 Hour - Part Issue: US40/30/a-IQ-040A Copyright 004,. No part of this Publication may be adapted or reproduced in any material form, without the prior written permission of. Written

More information

Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER

Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER Read Below! Read Below! Read Below! Read Below! Read Below! Read Below! STOP READ TIPS BELOW TO MAKE ASSEMBLY MUCH EASIER Here are some guidelines to help make assembling your unit much easier: -Read and

More information

Round/Octagon Boxes and Accessories

Round/Octagon Boxes and Accessories Round/Octagon Boxes and Accessories 4" Round Boxes DEPTH BOTTOM CAT. NO. (IN.) CAPACITY DESCRIPTION CONDUIT CTN. 56111 1 2 6.0 Steel outlet box 4 1 2 50 56111-CFB* 1 2 6.0 Ceiling fan box with plastic

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section ELECTRICAL IDENTIFICATION PART 1 GENERAL 1.01 SUMMARY Section 16195 A. This Section includes electrical identification for the following: 1. Nameplates and labels 2. Wire and cable markers 3. Conduit markers 4. Cable tray markers

More information

MC CHANGER CABINET INSTALLATION INSTRUCTIONS

MC CHANGER CABINET INSTALLATION INSTRUCTIONS 8M00356 REV. 10 www.standardchange.com 1-800-968-6955 Technical Phone Support is from 8:00AM to 7:30PM E.S.T., Monday-Friday Walk-in Service is from 8:00AM to 4:30PM E.S.T., Monday-Friday Parts Department

More information

SECTION PANELBOARDS

SECTION PANELBOARDS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 24 16 PANELBOARDS SPEC WRITER NOTE: Delete between // --- // if not applicable to project. Also, delete any other item or paragraph not applicable in the section

More information

Residential Construction Checklist Single and Two Family Construction

Residential Construction Checklist Single and Two Family Construction DATE: _ Building Inspection Submittal Requirements Residential Construction Checklist Single and Two Family Construction Submit a City of Big Spring Permit Application, checklist, and 3 complete hard copy

More information

INSTALLATION INSTRUCTIONS Xenix Incandescent Series XN12, XN24, XN36, XN48

INSTALLATION INSTRUCTIONS Xenix Incandescent Series XN12, XN24, XN36, XN48 INSTALLATION INSTRUCTIONS Xenix Incandescent Series XN12, XN24, XN36, XN48 IMPORTANT SAFETY INSTRUCTIONS ---- CAUTION! --- READ THIS FIRST 11500 Melrose Avenue Franklin Park, Illinois 60131 Phone: 847-451-0700

More information

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE

Michigan State University Construction Standards SWITCHBOARDS, PANELBOARDS, AND CONTROL CENTERS PAGE PAGE 262400-1 SECTION 262400 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

3.1 Overview of ATCO Electric s URD System Design

3.1 Overview of ATCO Electric s URD System Design Page: 3-1 3.0 URD DESIGN GUIDELINES 3.1 Overview of ATCO Electric s URD System Design ATCO Electric s design for distribution power supply to URD areas is a primary looped supply system. This is generically

More information

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4

SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: Document Number: KUCSH0039 Rev: 4 SAFETY AND HEALTH STANDARD ELECTRICAL GROUNDING Effective Date: 07/17/10 Standard: 16.10 Document Number: KUCSH0039 Rev: 4 16.10.1 INTRODUCTION 16.10.1.1 The intent of this standard is to ensure that continuity

More information

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents

LCD LIFT Flat Panel Display System Installation Manual. Table of Contents LCD LIFT Flat Panel Display System Installation Manual Table of Contents Page Installation Overview... 2 Trim Ring Installation... 3 LCD Lift Installation....4 Actuator Switch Installation.5 Top Plate

More information

PFT CABLE GYM INSTRUCTION MANUAL

PFT CABLE GYM INSTRUCTION MANUAL PFT CABLE GYM INSTRUCTION MANUAL QUESTION? As a quality home gym supplier we are committed to your complete satisfaction. If you have questions, or find missing or damaged parts, we will guarantee your

More information

campfire big lamp Assembly Instructions

campfire big lamp Assembly Instructions campfire big lamp Assembly Instructions tools needed Here's what's in the box BOX #3 For assembly videos go to myturnstone.com/campfire/instructions BOX #1 Base (1) assembly time needed video X screw (4)

More information

C a r r i a g e A s s e m b l y R e p l a c e m e n t

C a r r i a g e A s s e m b l y R e p l a c e m e n t E1 TF-CR C a r r i a g e A s s e m b l y R e p l a c e m e n t October 2007 Software Version 5.0 and higher IMPORTANT! TigerStop must be enabled with a code that must be obtained from TigerStop Customer

More information

A great addition to Sub-Zero's complete line of

A great addition to Sub-Zero's complete line of with Refrigeration Drawers Discreet lighting Full-view glass door (standard) Roller-assembly shelves UV-resistant glass Lighted electronic control panel Divider gasket Model 427R Lighted display shelf

More information

2014 NEC Changes Part 1

2014 NEC Changes Part 1 www.garyklinka.com Page 1 of 8 Instructions: Fee $20 1. Print these pages. 2. Circle the correct answers and transfer them to the answer sheet. 3. Page down to the last page for the verification forms

More information

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights

1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights 1 Exam Prep NFPA 70: National Electric Code 2011 Tabs and Highlights These 1 Exam Prep Tabs are based on NFPA 70: National Electrical Code, 2011. Each 1 Exam Prep Tabs sheet has five rows of Tabs. Start

More information

41P Portable Calibrator User Manual

41P Portable Calibrator User Manual Trig-Tek 41P Portable Calibrator User Manual Publication No. 980961 Rev. A Astronics Test Systems Inc. 4 Goodyear, Irvine, CA 92618 Tel: (800) 722-2528, (949) 859-8999; Fax: (949) 859-7139 atsinfo@astronics.com

More information

Alternating Current Power

Alternating Current Power Chapter 4 Alternating Current Power MElec-Ch4-1 Overview What is Alternating Current AC Hazards AC Power Requirements Shoreside Utility System On-Board Generators MElec-Ch4-2 What is Alternating Current

More information

OCTAGON WORKSTATION W/ PEDESTAL

OCTAGON WORKSTATION W/ PEDESTAL 1514K, 1514KF, 1516K, 1516KF, 1614K, 1614KF, 1616K, & 1616KF SERIES 1. MODEL VIEWS MAY NOT REPRESENT EXACT MODEL PURCHASED : : : ALL VALUES ± OVERALL NAME ECN NO. 1 OF 8 1616K & KF SERIES.dwg, 11/8/2018

More information