1 Technical specification for Purchase requisition number: Fabrication, Testing and Supply of the Heat Exchanger & Tube Bundle 1. Scope of Supply: Fabrication, Testing and Supply of one (01) nos Heat Exchanger Off gas Cooler Tube(EA33223) along with attachment/loose items like saddle, channel cover davit etc.,one(01) no Tube Bundle for heat exchanger CBD Cooler (EA33250) & one (01) nos Tube Bundle for heat exchanger FGC Blow down Cooler (EA33251) along with equired Dummy shell /Test ings/test Flanges/Test Covers designed & Manufactured by the vendor for the purpose of Hydro testing of the Tube Bundle at the vendor s shop. Detailed Fabrication Dimensions are as per following Drawing No:- a) H-1194/FAD/2009 sh 01 to 04 b) MAPL-C-1828 Sh 02 of 06 ev 3 c) MAPL-C-1829 Sh 02 of 06 ev 3 d) MPL Specification 00-ES Heat Exchanger EA33223 No of Tubes: 228 Nos. Tube Sizes: 25mm OD x 2.5mm thk (minimum) Tube Length: 2750 mm Tubing Specification-SA179 Design Data: Shell M.O.C Killed Carbon Steel Tube CS/SA179 (HIC esistant) Design Pressure (kg/cm 2 ) Design Temperature ( 0 C) Hydro test pressure (kg/cm 2 ) Process Fluid Sour Gas Cooling Water Design Code: ASME Sect VIII Div1 ED 2007 and TEMA Class "" ED 2007 Type: AEM # Horizontal Position The exchanger material procurement and fabrication shall be as per the details given in Exchanger OEM drawing no: H-1194/FAD/2009 sheet 1 of 4 to sheet 4 of 4, applicable. Material Specifications: a) All pressure bearing materials used for construction of this exchanger shall be in normalized condition and carbon content for plates shall not exceed 0.23%. b) All carbon steel material in contact with shell side fluid shall be killed quality and shall meet the requirements of NACE standard - M0103 for wet sour service. c) All tubes shall be cold drawn, seamless and in annealed condition. d) Necessary chemistry control for the shell side materials along with restrictions on manufacturing process, hardness restrictions during fabrication welding/haz, Post Weld heat treatment to restrict hardness of weld and HAZ need to be complied as per the standard.
2 e) The Chemistry control, hardness of the material shall be as per NACE M0103 and resistance of the tubes to HIC shall be carried out as per NACE P-0284 using solution A of NACE TM For all other notes on Material and Fabrication including for Tube bundle please refer drawing supplied Tube Bundle for Heat Exchanger EA33250 No of tubes: 529 Tube MOC: SA 179 Tube Sizes: 25 mm OD x 2.5 mm thk (minimum) Tube Length: 6000 mm Design Data: Shell Tube Design Pressure (kg/cm 2 ) Design Temperature ( 0 C) Hydro test pressure (kg/cm 2 ) Process Fluid Hydrocarbon Cooling Water Design Code: ASME Sect VIII Div ED and TEMA Class "" 2007 ED. TEMA: AES# Horizontal Position For bundle procurement and bill of materials, please refer drawing no: MAPL-C-1828 sheet 2 of 6 to sheet 6 ev Tube Bundle for Heat Exchanger EA33251 No of tubes: 26 Tube MOC: SA 179 Tube Sizes: 25 mm OD x 2.5 mm thk (minimum) Tube Length: 6000 mm Design Data: Shell Tube Design Pressure (kg/cm 2 ) Design Temperature ( 0 C) Hydro test pressure (kg/cm 2 ) Process Fluid FGC Blowdown Cooling Water Design Code: ASME Sect VIII Div ED and TEMA Class "" 2007 ED. TEMA: AES# Horizontal Position For bundle procurement and bill of materials, please refer drawing no: MAPL-C-1829 sheet 2 of 6 ev 3. a) Indicative QAP for tube bundle procurement is attached as Annexure-1. However, QAP and fabrication drawing along with bill of material shall be submitted for approval to MPL prior to commencement of fabrication. Dummy shell fabricated for testing the bundle shall be supplied to MPL along with the new tube bundle. 2. General Specification for Tube & Bundle 2.1. All Tubing shall be seamless & cold drawn Tube gauge / thick specified is the required minimum wall thickness unless otherwise specified.
3 2.3. Tubing shall be in the fully heat treated conditions as received from the mill Product analysis of tubes shall be carried out & reported. Material test Certificate to be submitted along with the Tube Bundle Tube to tube sheet expansion shall be done as per MPL specification 00-ES No distortion whatsoever shall be permitted on the gasket seating surfaces, If distorted the same shall be machined Sliding strips shall be provided to facilitate pulling the removable tube bundles. Sliding strips shall be properly seated in the baffles, secured with a complete seal weld (both sides) and attached to the stationary tube sheet with a full penetration weld. The sliding strips shall protrude 2mm beyond the periphery of the baffles When mechanical cleaning is required on shell side (square pitch patterns), the sliding strips shall not obstruct the tube lanes or pass partition Baffles shall be tied together with rods and spacers and provided when necessary with 90 top and bottom notches 10 mm wide for venting and draining. The drainage notches shall be increased to 25 mm width in case shell side fluid is exceptionally dirty or contains slurry The use of a 2-pass shell employing a continuous longitudinal baffle shall require buyer's approval If necessary, impingement protection shall be provided either by a square plate or round- plate baffle, two rows of impingement rods and a distributing belt or by an enlarged inlet nozzle with an internal distributor plate Impingement baffle shall be as per VS-42. If special baffle is specified, the following criteria shall be applied Plate baffles shall extend at least 25 mm beyond the projection of the nozzle bore The unrestricted bundle entrance flow area at the impingement plate baffle shall not be less than the flow area of the inlet nozzle. 3. Inspection scope 3.1. Inspection of all material shall be done by TUV / TEIL / DNV / BV/ LLOYDS only and this inspection is in the scope of the vendor. Vendor shall submit relevant certificates along with the materials. The quote from vendor shall be inclusive of third party inspection charges eview of Quality Assurance Plan (QAP), approval by MPL eview of Test certificate for traceability of material meeting original specification for all pressure& non-pressure parts eview of Heat Treatment report as per material specification as applicable If the material is sourced from vendor other than manufacturer, then selection of samples (min two samples from each heat/lot) for mechanical and chemical(product analysis) test. All mechanical test required as per applicable material specification shall be witnessed by TPI. Product chemical analysis shall be reviewed in accordance with NACE requirements for SSC Witness of UT scanning and Impact test of Forgings eview of HIC esistance testing as per M P eview of ECT of tubes & Witness Hydrotest of tubes (100%) eview of WPS/PQ, NDT procedures, tube to tube sheet expansion procedure eview of Mock up test for tube to tube sheet expansion joint Witness DP test on the knuckle portion and welds (if any) after forming.
4 3.12. Witnessing Air soap solution test of tube to tube sheet joint, visual inspection, and liquid penetrant examination as applicable and random checking expansion percentage Stage wise inspection during fabrication as per approved QAP Witness DP test of welds after back grinding eview of welding electrodes test certificates eview of adiography reports Witness Tube sheet inspection after drilling and skeleton assembly (shell to tubesheet fit-up) before tube insertion Inspect percentage thinning, Length of Expansion etc of Tube to tube sheet joint eview of Heat Treatment report of formed parts / shell side of exchanger as per specification/drawings Witness F pad pneumatic test and Tube to Tube sheet joint leak test eview calibration reports of measuring instruments Witness hydro test of the exchanger Shell, Tube side Inspection for dimensional conformance and marking on the exchanger eview surface preparation and witness paint DFT of the equipment Issue Product release note giving details of inspection carried out.eview of Quality Assurance Plan (QAP), approval of QAP shall be done by MPL. 4. Hydrostatic test and other tests 4.1. These tests shall be witnessed by MPL / MPL authorized inspectors or Third party inspectors at vendor s shop. Hydrostatic test shall be performed with indicating pressure gauge connected to the uppermost part of the equipment. Water used for these tests shall be salt free. Minimum metal temperature during hydrotest shall be 20º C. and the test pressure shall be maintained for duration of minimum one hour period Final hydrotest shall be carried out at factory test pressures mentioned in the drawing. equired Dummy shell /Test ings/test Flanges/Test Covers shall be designed & Manufactured by the vendor for the purpose of Hydro testing of the Tube Bundle at the vendor s shop. 5. Design codes with latest editions The latest design codes given below shall be used for design, manufacture, testing and acceptance of the equipment. i. ASME Boiler and Pressure Vessel code Sec. VIII div. I ii. TEMA, standard of tubular exchanger manufacturers association ( class as specified on the drawings / Data sheets) iii. ASTM specification iv. AWS -ASME specification for welding electrodes v. ANSI (American national standard institute) B 16.5 steel pipe flanges and flanged fitting and B16.11 Forged fittings socket welding & threaded. 6. Design and Drawings approvals 6.1. The drawing & Material of Construction Sheet issued with this enquiry is for estimation purpose only.
5 6.2. The manufacturer shall prepare detailed QAP, fabrication drawings and material of construction and it shall be submitted for approval. Procurement of materials, fabrications etc shall start only after such approval. 7. Delivery Period The item should deliver within 06 month from date of approval of Drawing/QAP. Drawing/QAP shall be submitted within 02 month of placement of Purchase Order. 8. Guarantee The manufacturer shall be responsible for any defects due to any inferior materials or workmanship developed under operating conditions within 12 months from the date of the commissioning or 18 months from the date of receipt of the equipment at the site whichever is earlier. The manufacture shall attend his own cost & make necessary repairs and /or replacements without delay
6 CLIENT P.O. NO./ DATE MANGALOE EFINEY AND PETOCHEMICALS ANNEXUE-1 QUALITY ASSUANCE PLAN TUBE BUNDLE Document No. QAP/MPL/003 EQUIPMENT NO./Name SITE MANGALOE, KANATAKA TEMA TYPE OF EXCHANGE INSPECTION BY (TPI) TUBE MOC: SCOPE OF INSPECTION Sl. No. ACTIVITY DESCIPTION EXTENT OF CHECK EFEENCE DOCUMENT ACCEPTANCE STD FOMAT OF EPOT Supplier TPI MPL EMAKS 1 Quality Assurance Plan Stages of inspection & Testing 100% P, Drawing P QAP H A efer Note:3 2 Drawing Drawings 100% P., Drawing 3 Approval of Documents 3.1 NDE Procedures PT/UT/MT etc. as applicable - ASME Sec V,P. 3.2 Heat Treatment Procedure PWHT of skeleton assembly as applicable 3.3 Inspection & testing Procedure Hardness/PMI/Hydrotesting Welding & Testing Plan Welding & Testing Plan Qualification of WPS/PQ Qualification of Welders / Welding Operators Qualification of Tube to Tubesheet Mock up eview Existing WPS/PQ Prepare new WPS&PQ & Test eview Existing WPQ Prepare new WPQ eview Existing Prepare new ASME Sec VIII Div.1, P ASME Sec VIII Div.1, P ASME Sec VIII Div.1, P., Drawing ASME Sec IX, P., Drawing ASME Sec IX, P., Drawing ASME sec. VIII Div.I, P, Drawing P, ASME Sec VIII Drawing, TEMA Div 1 CL ASME Sec VIII Div.1, P., ASME Sec VIII Div.1, P ASME Sec VIII Div.1, P ASME Sec VIII Div.1, P., Written Procedure Written Procedure Written Procedure Written Procedure ASME Sec IX WPS/PQ H ASME Sec IX Welder List / WPQ H ASME Sec VIII Div.1, P, Test ecord H A efer Note:3 H H H H H W W W W W W W efer.note:1 efer.note:1 efer.note:1 efer.note:1 efer.note:1 efer.note:1 efer.note:1
7 SCOPE OF INSPECTION Sl. No. ACTIVITY DESCIPTION EXTENT OF CHECK EFEENCE DOCUMENT ACCEPTANCE STD FOMAT OF EPOT Supplier TPI MPL EMAKS 4 Material control 4.1 Inspection at rececipt stage a) Plates (For pressure parts as well as non pressure parts) 1) eview of MTC,Visual, dimensional, and marking inspection, correlation with MTC. 2) Impact test as applicable. Impact energy values as per UG-84. 3)Heat treatment: Normalized & Tempered 4) Tension test as per product material specification. 5) Product analysis shall be reported. 6) Hardness check as applicable 7) Specific requirement as per applicable P 100% ASME Sec II A, P, Approved Drawing ASME Sec II A, P, Approved Drawing Mill test, Heat Treatment reports, Chemical analysis report, Mechanical test reports, Hardness Check eports etc. H (All Materials for Pressure parts shall be inspected at sub Vendor's shop by TPI) efer.note:2 b) Forgings (For pressure parts as well as non pressure parts) 1) eview of MTC,Visual, dimensional, and marking inspection, correlation with MTC. 2) Impact test as applicable. Impact energy values as per UG-84. 3) Heat Treatment: Normalized & Tempered 4) Hardness check as applicable 5) Non destructive test : All forgings shall be 100% Ultrasonically examined as per SA ) Product analysis shall be reported. 7) Specific requirement as per applicable P/TDC. 100% ASME Sec II A, P, Approved Drawing ASME Sec II A, P,UT-Sec.VIII Div.2, Mill test, Heat Treatment reports, Chemical analysis report, Mechanical test reports, Hardness Check eports etc. H (All Materials for Pressure parts shall be inspected at sub Vendor's shop by TPI) efer.note:2
8 SCOPE OF INSPECTION Sl. No. ACTIVITY DESCIPTION EXTENT OF CHECK EFEENCE DOCUMENT ACCEPTANCE STD FOMAT OF EPOT Supplier TPI MPL EMAKS c) Tubes 1) eview of MTC, Visual, dimensional and marking inspection, correlation with MTC. 2) Tubes i) Seam less & cold drawn condition. ii) Heat treatment as per tube materiaal specification iii) Product analysis shall be reported. v) Hardness ckeck of finished tubes as applicable vi) Mechanical testing: Flattening, Flaring, flange test and hardness test vii) Hydrotest as per applicable pressure. 3) Specific requirement as per applicable P/TDC. 100% ASME Sec II A, Sec VIII Div 1, P, Approved Drawing ASME Sec II A, Sec VIII Div 1, P, Approved Drawing Mill test, Heat Treatment reports, Chemical analysis report, Mechanical test reports, Hardness Check eports, H (All Materials for Pressure parts shall be inspected at sub Vendor's shop by TPI) efer.note:2 d) Welding consumables eview of test certificates. 100% ASME Sec II C ASME Sec II C Test certificates H efer.note:2
9 SCOPE OF INSPECTION Sl. No. ACTIVITY DESCIPTION EXTENT OF CHECK EFEENCE DOCUMENT ACCEPTANCE STD FOMAT OF EPOT Supplier TPI MPL EMAKS 4.2 Material Identification a) Pressure parts & non pressure parts welded to pressure parts.(plates, forgings, etc.,) eview of MTC Check test report (If required) Visual & Dimensions Identification marking 100% ASME Sec II A, Sec VIII div 1, Approved Drawing, P ASME Sec II A, Sec VIII div 1, Approved Drawing Inspection Progress Chart H H H W H H efer.note:2 b) Non Pressure parts. (Baffels, Tie rods, Spacers, Structurals etc.) eview of MTC / Check test report. Visual & Dimensions. Identification Marks. 100% ASME Sec II A, Sec VIII ASME Sec II A, Div I, Approved Drawing, Sec VIII Div I, P. Approved Drawing Job Card H W W efer.note:2 5 Inspection of Welds a) Complete Welds Weld visual and size of fillet. NDE as per WTP as applicable. 100% ASME Sec VIII Div. I, ASME Sec. VIII Approved Drawing, WTP. Div. I, Drawing. ASME Sec. V. Inspection Progress Chart, NDE eports. H W efer.note:2
10 SCOPE OF INSPECTION Sl. No. ACTIVITY DESCIPTION EXTENT OF CHECK EFEENCE DOCUMENT ACCEPTANCE STD FOMAT OF EPOT Supplier TPI MPL EMAKS 6 Tube Bundle In Fabrication Process. 6.1 Tube Sheets Identification Marking. Visual and dimensions (Tube Hole Finish, GO-No-Go Check, Expansion, Hole layout, Partition groove, Ligament, Tie rod holes, Pulling bolt holes,sealing strip,central rod,sliding strip) Dimensions and finish of Gasket seating face. Visual and Dimensions. 6.2 Baffle & Support Plates (Tube Hole finish, Hole layout, Size, Chamfer, Notch, Tie rod holes, Baffle Cut orientation., Helix angle) i)visual & Dimensions. 6.3 Skeletons for Tube Bundle ii) Welding Arrangement & Spacing. iii)tube hole & Tubes cleaning before tubes insertion. 100% 100% 100% Approved Drawing, TEMA CL Approved Drawing, TEMA CL Approved Drawing, TEMA CL Approved Drawing, eports H W TEMA CL Approved Drawing, eports H W TEMA CL Approved Drawing, eports H W TEMA CL 6.4 Tube to Tube Sheet Joint Expansion of Tubes 100% Approved Drawing, TEMA CL, P TEMA CL,, Mock-up Test ecord. eports H (*) (*) TPI to check expansion % for 10% of the tubes, per tube-sheet. If any irregularities observed, 100% to be checked by TPI.
11 SCOPE OF INSPECTION Sl. No. ACTIVITY DESCIPTION EXTENT OF CHECK EFEENCE DOCUMENT ACCEPTANCE STD FOMAT OF EPOT Supplier TPI MPL EMAKS 7 Final Inspection. 7.1 Tube Bundle 8 Testing Completeness of Bundle, Visual examination & Dimensional check 100% TEMA CL, Approved Drawing, P., TEMA CL, Inspection eports, Approved Drawing, NDE eports P. H W efer.note:2 8.1 Hydro Test The exchanger shell and tube side testing shall be carried out using dummy shell at the Factory test pessures mentioned in drawing. Also, ring test to be carried out seperately to check for tube to tube sheet joints. 100% TEMA CL, ASME Sec. VIII Div. I, Approved Drawing, Hydro Procedure. TEMA CL, ASME Sec. VIII Div. I, Approved Drawing, No leakage. eports H W efer.note:2 8.2 Draining & Drying Tube ID and OD Side 100% P and Approved drawing No traces of Water eport H 9 Final Dispatch 9.1 Dispatch Clearance and Documents submission Original IN along with one set of approved copy of all the documents reviewed by TPI during stage wise inspection like MTC, eports, Manufacturer data book, gaurantee certificates etc., Approved Drawings 3 sets in A1 size (both soft and hard copies). 100% P P IN and other reports H H
12 SCOPE OF INSPECTION Sl. No. ACTIVITY DESCIPTION EXTENT OF CHECK EFEENCE DOCUMENT ACCEPTANCE STD FOMAT OF EPOT Supplier TPI MPL EMAKS LEGEND: NOTES : H : Hold (Not to proceed unless the stage is cleared by QC / TPI as Note 1 TPI to review is already approved procedure is available. If not available, TPI to witness and approve a new procedure. W : Witness Note 2 Where ever the code reference is stated, Edition & Addenda shall be the latest edition : eview of ecords Note 3 Fabrication of the exchanger shall start only after Drawing and QAP has been approved by MPL A : Approve W : andom Witness P : Purchase equisition PO : Purchase Order TPI : Third Party Inspection Agency MPL : Mangalore efinery & Petrochemicals Ltd. IN : Inspection elease Note. MDMT: Minimum Design Metal Temperature. PQ : Procedure Qualification ecord. WPQ : Welder Performance Qualification. WPS : Welding Procedure Specification. WTP : Welding & Testing Plan. NDE : Non Distructive Examination. PEPAED BY CHECKED BY APPOVED BY
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28 General Notes: 1. The exchanger material procurement and fabrication shall be as per the details given in exchanger OEM drawing no: H-1194/FAD/2009 sheet 1 of 4 to sheet 4 of 4, as applicable. 2. Material Specifications: a) All pressure bearing materials used for construction of this exchanger shall be in normalised condition and carbon content for plates shall not exceed 0.23%. b) All carbon steel material in contact with shell side fluid shall be killed quality and shall meet the requirements of NACE standard - M0103 for wet sour service. c) All tubes shall be cold drawn, seamless and in annealed condition. d) Necessary chemistry control for the shell side materials along with restrictions on manufacturing process, hardness restrictions during fabrication welding/haz, Post Weld heat treatment to restrict hardness of weld and HAZ need to be complied as per the standard. e) The Chemistry control, hardness of the material shall be as per NACE M0103 and resistance of the tubes to HIC shall be carried out as per NACE P-0284 using solution A of NACE TM For all other notes on Material and Fabrication including for Tube bundle please referdrawingsupplied. Scope for Third Party Inspection 1. eview of Quality Assurance Plan (QAP), approval by MPL. 2. eview of Test certificate for traceability of material meeting original specificationfor all pressure& non-pressure parts. 3. eview of Heat Treatment report as per material specification as applicable. 4. If the material is sourced from vendor other than manufacturer, then selection of samples (min two samples from each heat/lot) for mechanical and chemical(product analysis) test. All mechanical test required as per applicable material specification shall be witnessed by TPI. Product chemical analysis shall be reviewed in accordance with NACE requirements for SSC. 5. Witness of UT scanning and Impact test of Forgings. 6. eview of HIC esistance testing as per M P eview of ECT of tubes & Witness Hydrotest of tubes (100%). 8. eview of WPS/PQ, NDT procedures, tube to tube sheet expansion procedure 9. eview of Mock up test for tube to tube sheet expansion joint. 10. Witness DP test on the knuckle portion and welds (if any) after forming. 11. Stage wise inspection during fabrication as per approved QAP. 12. Witness DP test of welds after back grinding. 13. eview of adiography reports. 14. Witness Tube sheet inspection after drilling and skeleton assembly (shell to tubesheet fit-up) before tube insertion. 15. Inspect percentage thinning, Length of Expansion etc of Tube to tube sheet joint. 16. eview of Heat Treatment report of formed parts / shell side of exchanger as per specification/drawings. 17. Witness F pad pneumatic test and Tube to Tube sheet joint leak test.
29 18. eview calibration reports of measuring instruments. 19. Witness hydro test of the exchanger Shell, Tube side. 20. Inspection for dimensional conformance and marking on the exchanger. 21. eview surface preparation and witness paint DFT of the equipment. 22. Issue Product release note giving details of inspection carried out. As-Built drawings along with all applicable documents reviewed/approved by TPI along with manufacturer data book and shall be submitted as final documents to MPL. For exchanger fabrication (Offgas Cooler) and bill of materials please refer OEM drawing no: H-1194/FAD/2009 sheet 1 of 4 to sheet 4 of 4, as applicable. QAP and fabrication drawing along with bill of material shall be submitted forapproval to MPLprior to commencement of fabrication. Bundle procurement recommendation for EA The cooler is of TEMA AES type (four pass - tube, floating head) having 529 tubes of SA 179 (carbon steel MOC) having 25 mm OD x 2.5 mm thk (min.) x 6000 mm long tubes. Scope of supply: The bidder shall supply tube bundle, floating head cover along with dummy shell (designed & fabricated for bundle testing purpose) Quantity: 01 no. Specifications for spare tube bundle Design Code: ASME Section VIII Division I and TEMA Class. Type: AES (H) Design Data: DESCIPTION UNIT SHELL TUBE M.O.C SA 516 Gr 60 SA179 Design Pressure Kg/cm² g Design Temperature C Operating Pressure Kg/cm² g 7 4 Operating Temperature (In/Out) C 160 / / 45 Fluid (Circulated) Hydrocarbon Cooling Water No. of Tubes Nos 529 Scope of Third Party Inspection: ü eview of Quality Assurance Plan (QAP), approval of QAP shall be done by MPL. ü eview of Test certificate for traceability of material meeting original material specification for all pressure& non-pressure parts. ü eview of Heat Treatment report as per material specification as applicable. ü If material is sourced from vendor other than manufacturer, then TPI shall select samples (minimum two samples from each heat/lot) for mechanical and chemical (product analysis) test. All Mechanical test required as per the applicable material specification shall be carried out and witnessed by TPI. Product chemical analysis report shall be reviewed.
30 ü eview of hydro test certificate of tubes. ü eview of WPS/PQ, NDT procedures, tube to tube sheet expansion procedure ü Inspection of tube sheet after machining. ü Witnessing Air soap solution test of tube to tube sheet joint, visual inspection, and liquid penetrant examination as applicableand random checking expansion percentage. ü Stage wise inspection during fabrication as per QAP. ü Inspection for dimensional conformance. ü Witness hydro test of tube bundle assembly. ü Issue product release note giving details of all inspection activities carried-out As-Built drawings along with all applicable documents reviewed/approved by TPI along with manufacturer data book. All these documents shall be submitted to MPL. For bundle procurement and bill of materials, please refer OEM: M/s Meenakshi Associates Pvt Limited drawing no: MAPL-C-1828 ev 3 sheet 1 of 6 to sheet 6 of 6, as applicable. Indicative QAP for tube bundle procurement is attached as Annexure-1. However, QAP and fabrication drawing along with bill of material shall be submitted forapproval to MPLprior to commencement of fabrication. Dummy shell fabricated for testing the bundle shall be supplied to MPL along with the new tube bundle. Bundle procurement recommendation for EA The cooler is of TEMA AEM(H) type (two pass - tube, floating head) having 26 tubes of SA 179 (carbon steel MOC) having 25 mm OD x 2.5 mm thk (min.) x 6000 mm long tubes. Scope of supply: The bidder shall supply tube bundle, floating head cover along with dummy shell (designed & fabricated for bundle testing purpose) Quantity: 01 no. Specifications for spare tube bundle Design Code: ASME Section VIII Division I and TEMA Class. Type: AES (H) Design Data: DESCIPTION UNIT SHELL TUBE M.O.C SA 516 Gr 60 SA179 Design Pressure Kg/cm² g Design Temperature C Operating Pressure Kg/cm² g Operating Temperature (In/Out) C 100 / / 45 Fluid (Circulated) FGC blowdown Cooling Water No. of Tubes Nos 26
31 Scope of Third Party Inspection: ü eview of Quality Assurance Plan (QAP), approval of QAP shall be done by MPL. ü eview of Test certificate for traceability of material meeting original material specification for all pressure& non-pressure parts. ü eview of Heat Treatment report as per material specification as applicable. ü If material is sourced from vendor other than manufacturer, then TPI shall select samples (minimum two samples from each heat/lot) for mechanical and chemical (product analysis) test. All Mechanical test required as per the applicable material specification shall be carried out and witnessed by TPI. Product chemical analysis report shall be reviewed. ü eview of hydro test certificate of tubes. ü eview of WPS/PQ, NDT procedures, tube to tube sheet expansion procedure ü Inspection of tube sheet after machining. ü Witnessing Air soap solution test of tube to tube sheet joint, visual inspection, and liquid penetrant examination as applicableand random checking expansion percentage. ü Stage wise inspection during fabrication as per QAP. ü Inspection for dimensional conformance. ü Witness hydro test of tube bundle assembly. ü Issue product release note giving details of all inspection activities carried-out As-Built drawings along with all applicable documents reviewed/approved by TPI along with manufacturer data book. All these documents shall be submitted to MPL. For bundle procurement and bill of materials, please refer OEM: M/s Meenakshi Associates Pvt Limited drawing no: MAPL-C-1829 ev 3 sheet 1 of 6 to sheet 6 of 6, as applicable. Indicative QAP for tube bundle procurement is attached as Annexure-1. However, QAP and fabrication drawing along with bill of material shall be submitted forapproval to MPLprior to commencement of fabrication. Dummy shell fabricated for testing the bundle shall be supplied to MPL along with the new tube bundle. ecommendations for procurement of tubes: As recommended, all the old tube bundles shall be re-tubed and kept as maintenance spares. All these bundles have same tube material and thickness with varying no. of tubes in each exchanger. The total no. of tubes required for re-tubing of the above bundles is about 700 numbers. It is considered that the tubes having lesser length (for EA 33223) can be utilised from the longer tubes of 6000 mm by splitting single tube into 2 tubes. Specification for Tubes:SA 179 (carbon steel MOC), 25 mm OD x 2.5 mm thk (min.) x 6000 mm long Scope of Third Party Inspection (TPI) for tubes:- ü eview of Test certificate for traceability of material meeting original material specification ü eview of chemical analysis/witness of mechanical testing ü If material is sourced from vendor other than manufacturer, TPI shall select samples (minimum two samples from each heat/lot) for mechanical and chemical (product analysis) test. All Mechanical test required as per the applicable material specification shall be witnessed by TPI. Product chemical analysis report shall be reviewed.
32 ü Witnessing hydro test of tubes ü Inspection for dimensional conformance and marking on the tubes ü Issue of inspection release note showing all activities carried Indicative QAP for tubes procurement is attached as Annexure-2. However, the final QAP shall be submitted for approval to MPL.
Specifications for EA31002 U Tube Bundle for CDU 3
Specifications for EA31002 U Tube Bundle for CDU 3 Tube Bundle Specificatio Tube Bundle for Heat Exchanger EA31002A/B/C/D Quantity required : One with Dummy shell Exchanger Type: BEU Horizontal No of U
More informationAnnexure - V. Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material)
Annexure - V Specifications, Typical Drawing & Data Sheet for Split TEE (Hot Tapping Material) CONTENTS SL NO. DESCRIPTION 1.0 SCOPE 2.0 REFERENCE DOCUMENTS 3.0 MANUFACTURER'S QUALIFICATION 4.0 MATERIALS
More informationINSPECTION AND TEST PLAN
BOILER AND TEST PLAN No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING SPEC. SPEC. MOM H H H Before Manufacturing 2 DWG, DESIGN,
More informationInspection and Test Plan for Water Tube Boiler
www.inspectionforindustry.com Inspection and Test Plan for Water Tube Boiler No. AND TEST PLAN REFERENCE DOCUMENT ACCEPTANCE CRITERIA VERIFING DOCUMENT ACTIVITY BY MANUF. TPI CLIENT REMARK 1 PRE MEETING
More informationfor industry.com
Inspection and Test Plan for Shell and Tube Heat Exchanger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Manuf. TPI Client Remark 1 Pre Inspection Meeting
More informationModule 4 Design for Assembly IIT BOMBAY
Module 4 Design for Assembly Lecture 8 Case Studies - IV Instructional objectives The objective of this lecture is to exhibit how real components are designed in industry following some of the principles
More informationShell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015
Shell-and-Tube Heat Exchangers API STANDARD 660 NINTH EDITION, MARCH 2015 Special Notes API publications necessarily address problems of a general nature. With respect to particular circumstances, local,
More informationDOLPHIN SHELL & TUBE MARINE CONDENSERS (DSTMC)
PIOEER I HEAT TRASFER TECHOLOGY DOLPHI SHELL & TUBE MARIE CODESERS (DSTMC) Dolphin Shell & Tube Marine Condenser (DSTMC) General Information Dolphin carries out Thermal Design, Mechanical Design & detailed
More informationNote: Do not bury sulphur dioxide lines Use stainless steel pipe and fittings only where specified on project drawings.
1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Liquid and High Pressure Gaseous Dry Sulphur Dioxide (Less than 100 ppm of water)
More informationFORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2
Page of FORM A-1P MANUFACTURER'S DATA REPORT FOR PLATE HEAT EXCHANGERS As Required by the Provisions of the ASME Code Rules, Section VIII, Division 2 1. Manufactured and certified by: 2. Manufactured for:
More informationISO INTERNATIONAL STANDARD. Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers
INTERNATIONAL STANDARD ISO 16812 Second edition 2007-02-15 Petroleum, petrochemical and natural gas industries Shell-and-tube heat exchangers Industries du pétrole, de la pétrochimie et du gaz naturel
More informationLOCOMOTIVE ENGINEERING DEPTT.
SHEET 1 OF 9 SUBJECT: FOR DESIGN MANUFACTURING INSTALLATION OF FIXTURES FOR MANUFACTURING OF SHELL ASSEMBLY OF WAG7 LOCOMOTIVE Enclosures: Rev Date Prepared Rev Date Prepared Rev Date Prepared Approved
More informationGURANTEED TECHNICAL PARTICULARS OF BACK CLAMP FOR LT CROSS ARM
Technical Specification of Back Clamp for LT Cross Arm (MS) Back clamp for LT Cross Arm made out of 50 x 6mm MS Flat suitable for 8m X 300 Kg PSC poles. After fabrication the cross arm shall be painted
More informationBHARAT HEAVY ELECTRICALS LIMITED
FIELD QUALITY PLAN OF BOILER PRESSURE PARTS (Erection & Commissioning) FOR BHEL-JHANSI BHARAT HEAVY ELECTRICALS LIMITED BHEL-JHANSI DOC. NO.: REV. NO. : R00 FIELD QUALITY PLAN OF BOILER PRESSURE PARTS
More informationMETAL FABRICATION SECTION 8: METAL FABRICATION SCOPE MATERIAL.
METAL FABRICATION SCOPE This specification applies to all metal intended to be rubber lined. Metals furnished must conform to this specification with respect to suitability for rubber lining or covering.
More informationRequirements for manufacture of anchors
W29 (June 2005) Requirements for manufacture of anchors 1. General requirements 1.1 Scope These Rules apply to the materials, manufacture and testing, and certification of anchors, shanks and anchor shackles
More informationThis specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface.
SPEC-3500 1/9 1.0 PURPOSE This specification describes the minimum requirements for service water piping systems (ie: cooling water, process water, etc.), located on surface. Note: This specification does
More informationCalculations per ABS Code along with ASME Sec. VIII Div.1 XXXX
Calculations per ABS Code along with ASME Sec. VIII Div.1 XXXX Grouping of Boilers and Pressure Vessels: PART 4 CHAPTER 4 SECTOIN 1 Table #2 and #3 >> Group II PART 4 CHAPTER 4 SECTOIN 1 Appendix 1 Rules
More informationCOMPLETE REVISION October Process Industry Practices Piping. PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details
COMPLETE REVISION October 2007 Process Industry Practices Piping PIP PNFJ8000 Jacketed Piping Fabrication and Installation Details PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize
More informationQUALITY ASSURANCE SPECIFICATION
Page 1 of 8 QAS: 2.02 QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 MATERIAL PURCHASING Code Material Purchase Specification for Pipe, Valves, Fitting, and Flanges PAGE 1 OF 8 1.0 Purpose
More informationThis specification describes the minimum requirements for piping systems for the following service:
201/01/13 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Air Design Conditions Operating Conditions Blast Air (see Note 1)
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 10407-2 First edition 2008-10-15 Petroleum and natural gas industries Rotary drilling equipment Part 2: Inspection and classification of used drill stem elements Industries du
More informationSECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationSTANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 STANDARD SPECIFICATION FOR STEEL FRAMING FOR RAILROAD SHELTERS REVISION DATE SPECIFICATION # F-S-306_ DATE:
More informationCORPORATE QUALITY SYSTEM PROCEDURE
Number: JVICQC-14.0 03/07/2016 Revision: 5 Page: Page 1 of 6 Approvals Author Director of Quality Assurance Name: Gary Corley Doyle Cassity Signature: Date: 03/07/2016 03/07/2016 Electronic versions of
More informationThis specification describes the minimum requirements for piping systems for the following service:
SPEC-3501 1/ 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Instrument Air Design Conditions 150 PSIG @ 180 F Operating Conditions 125
More informationSPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING
SPECIFICATION FOR PIPEWORK WELDING, INSPECTION, SUPPORTING AND TESTING CU11 14/11/2012 Page 1 of 108 Contents SECTION 1: SPECIFICATION FOR PIPEWORK WELDING INSPECTION AND TESTING GENERAL CLASSIFICATION
More informationTECHNICAL SPECIFICATION FOR LEVEL CONTROL VALVE HANDLING WATER
ANNEXURE-C TO TENDER BAP/FGD/2012/OT-1 BONGAIGAON 3X250 MW FLUE GAS DESULFURIZATION SYSTEM TECHNICAL SPECIFICATION LEVEL CONTROL VALVE HANDLING WATER CUSTOMER : NATIONAL THERMAL POWER CORPORATION LIMITED
More informationFluid Sealing Association
Fluid Sealing Association STANDARD FSA-MG-501-02 STANDARD TEST METHOD FOR INWARD BUCKLING OF SPIRAL-WOUND GASKETS 994 Old Eagle School Road, Suite 1019 Wayne, Pennsylvania 19087-1866 Phone: (610) 971-4850
More informationGUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT
GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT COURSE CURRICULUM COURSE TITLE: FABRICATION TECHNOLOGY-II (Code: 3345505) Diploma Programme in which this course is offered Semester in which offered
More informationOIL INDIA LIMITED (A Govt. of India Enterprise) P.O. Duliajan , Assam. Fax No ,
Page : 1 / 4 10 03548380 OIL INDIA LIMITED (A Govt. of India Enterprise) P.O. Duliajan-786602, Assam. Fax No. 91-374-2800533, E-mail:material@oilindia.in Tender No. TUBING HEAD SPOOL Tubing Head Spool
More informationSECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationBharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirappalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT
An ISO 9001 Company Bharat Heavy Electricals Limited (High Pressure Boiler Plant), TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT ENQUIRY NOTICE INVITING TENDER Phone: +91 431 257 7653 Fax
More informationPIPING NOMENCLATURE. Header Branch connection Valve Flange Expansion joint Expansion loop Pipe support Reducer Elbow
PIPING COMPONENTS Piping components are mechanical elements suitable for joining or assembly into pressure-tight fluid containing piping systems. Components include pipe, tubing, fittings, flanges, gaskets,
More informationTechnical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO).
IDM UID: R22L3M ver 1.4 Technical Specifications: Supply of Seamless Grade TP304L Pipe and Grade WP304L Pipework Fittings to the ITER Organization (IO). Contents 1 Terms and Acronyms... 3 2 Background...
More informationInspection and Test Plan for Battery Charger
Inspection and Test Plan for Battery Charger No. Inspection and Test Plan Reference Document Acceptance Criteria Verifying Document Activity By Remark Manuf. TPI Client 1 Pre Inspection Meeting Spec. Spec.
More informationSection COUPLINGS AND COUPLING ADAPTERS. This Section covers couplings and coupling adapters for ductile iron and steel pipe.
PART 1 GENERAL 1.01 SUMMARY Section 15155 This Section covers couplings and coupling adapters for ductile iron and steel pipe. 1.02 MEASUREMENT AND PAYMENT A. No separate payment for Work performed under
More informationTECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE)
TECHNICAL SPECIFICATION FOR ANNUBAR (DELTA TUBE) SPEC NO.: PE-SS-999-145-I009 REV. NO. 01 DATE : 20.04.2012 SHEET 1 OF 4 1.0 SCOPE This specification covers the Design, Manufacture, Inspection and Testing
More informationMILITARY SPECIFICATION
MIL-R-47196A(MI) 6 September 1977 SUPERSEDING MIL-R-46196(MI) 12 July 1974 MILITARY SPECIFICATION RIVETS, BUCK TYPE, PREPARATION FOR AND INSTALLATION OF This specification is approved for use by US Army
More informationA. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.
SECTION 22 05 16 LOOPS FOR PLUMBING PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING
SECTION 230516 - EXPANSION FITTINGS AND LOOPS FOR HVAC PIPING PART I - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationThis specification describes the minimum requirements for piping systems for the following service:
SPEC-3004 1/7 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Service Water Design Conditions Operating Conditions 10 PSIG @ 33 o F to
More informationINSTALLATION OF SERRATED METAL CORE WITHOUT FULL DISASSEMBLY OF A HEAT EXCHANGER
PVP2010 25685 INSTALLATION OF SERRATED METAL CORE WITHOUT FULL DISASSEMBLY OF A HEAT EXCHANGER Abstract Problem Russ Currie R Davis Flexitallic Limited Scandinavia Mill Cleckheaton West Yorkshire UK Rcurrie@flexitallic.eu
More informationSection Meetings Section Material and Equipment. None Required
January 2000 Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK PART 2 PRODUCTS The General Conditions of the Contract, General Requirements and Supplemental
More informationSECTION VIII. ASME Boiler and Pressure Vessel Code An International Code. Div ision 1 ASME BPVC.VI I I
ASME BPVC.VI I I.1-2017 SECTION VIII R u l e s f o r C o n stru cti o n o f P re ssu re Ves s els 2017 ASME Boiler and Pressure Vessel Code An International Code Div ision 1 Markings such as ASME, ASME
More informationPRODUCT CATALOGUE. Major Features: Arc Bends Manufactured to: Pipestar now offering full-line of flanged Arcbends
PRODUCT CATALOGUE Pipestar now offering full-line of flanged Arcbends Pipestar offers a range of seamless long radius Arc HDPE sweep bends made to the highest quality standards. Pipestar offers a range
More informationTABLE OF CONTENTS. 1.0 Scope. 2.0 References. 3.0 Definitions. 4.0 Submission and Design Requirements. 5.0 Materials 5.1 General 5.
1.0 Scope 2.0 References 3.0 Definitions 4.0 Submission and Design Requirements 5.0 Materials 5.1 General 5.2 Marking 6.0 Equipment 7.0 Production 7.1 Steel Octagonal Poles 7.2 Base Plate 7.3 Top Cap 7.4
More information5/16" Flange nut. Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc plated bolt w/ washers and nut. Anchor 3" sq. 7 Ga.
2 1/2" x 2 1/2" x 10 Ga. 6" 5" 4" Variable Slipbase (8" Sq. SYS.) 5/16 Corner Bolt W/ nut 5/16" Flange nut Stub Insert (8" Sq. SYS.) Bolt Keeper Plate (8" Sq. SYS.) (3) 1/2" x 3" Hex head connector zinc
More informationMIL- B Rev NAVSEA 0900-LP
I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B OTHER (IF Other, Specify :) MIL- B-007883 Rev NAVSEA 0900-LP-001-7000 II: ATTRIBUTES: YES NO 2a. Does a
More informationANSI ORIFICE FLANGES METAL-KOREA
METAL-KOREA ANSI ORIFICE FLANGES ORIFICE FLANGES are widely used in conjunction with orifice meters for measuring the rate of flow of liquids and gases. They are basically the same as standard welding
More informationA representative from Occupational Health is to be involved in the commissioning process to address any Respiratory Protection Program requirements.
SPEC-3017 1/8 1.0 PURPOSE This specification describes the minimum requirements for the installation of breathing air distribution systems (indoor and outdoor) up to the connection to the breathing air
More informationTYPE OF PIPING PRESSURE TESTING. For large diameter piping hand wipe/ sweep should be applied as much as possible (inspection to be recorded).
ATTACHMENT A (1/1) TYPE OF PIPING PRESSURE TESTING TEST TYPE TEST MEDIUMS APPLIED (As per Block Dia.) WORK SEQUENCE HYDROSTATIC Water * For SS/HA piping Max. Cl. 40 ppm General CASE-1 (Base Case) CASE-2
More informationASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE VIII. Rules for Construction of Pressure Vessels. Division 1
2013 ASME Boiler and Pressure Vessel Code AN INTERNATIONAL CODE VIII Rules for Construction of Pressure Vessels Division 1 AN INTERNATIONAL CODE 2013 ASME Boiler & Pressure Vessel Code 2013 Edition July
More informationThe Evolution & Future of API Coiled Tubing Standards. Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing
The Evolution & Future of API Coiled Tubing Standards Ryan Addison Tenaris Coiled Tubes API Co-Chairman Resource Group for Coiled Tubing API Overview Presentation Outline Resource Group on Coiled Tubing
More informationTIE-ROD AND PIPE JOINTS
CHAPTER 5 Machines use various parts which are joined in several ways for the machine to function as whole. We have learnt about some devices like fasteners (temporary & permanent) and some simple joints
More informationWHO WE ARE. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA.
WHO WE ARE and Non-destructive Examination Company operating within Western Canada. ITS holds a Certificate of Authorization Permit (CAP) under the AB-5I5 program from ABSA. We service Western Canada from
More informationStepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS
Stepping ahead in technology & innovation PIPING INSTITUTE OF TECHNOLOGY & ANALYSIS SOLUTIONS PIPING ENGINEERING & PLANT DESIGN Chapter 1. Introduction of Piping Industry & Role of Piping Engineer 1.1.
More informationProduct Guide Specification
HALFEN USA Inc. March 2012 8521 FM 1976 P.O. Box 547 Converse, TX 78109 Toll Free 800-423-9140 Fax 888-277-1695 Website www.halfenusa.com E-mail info@halfenusa.com Product Guide Specification Specifier
More informationMIL- B B. MIL- B Rev NAVSEA 0900-LP II: ATTRIBUTES: YES NO N/A
XXVIII BRAZE/BRAZING PROCESS I: REQUIREMENTS 1. Identify the standard the supplier uses for performing brazing. MIL- B-007883B MIL- B-007883 Rev OTHER (IF Other, Specify :) NAVSEA 0900-LP-001-7000 II:
More informationNEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION
NEW APPROACH TO THE PIPE TO GUSSET PLATE CONNECTION Prepared by Liftech Consultants Inc. Quality Assurance Review for Liftech Consultants Inc. Author: Kenton Lee Structural Engineer Editor: Erik Soderberg
More informationSECTION STRUCTURAL STEEL. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationISO INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO 28781 First edition 2010-08-15 Petroleum and natural gas industries Drilling and production equipment Subsurface barrier valves and related equipment Industries du pétrole et
More informationStargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe
Stargrip series 3000 Mechanical Joint Wedge Action Restraint for Ductile Iron Pipe INFORMATION The Stargrip Mechanical Joint Restraint System is a unique product with a proven design that provides an exceptional
More informationNAVSEA STANDARD ITEM T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods
NAVSEA STANDARD ITEM ITEM NO: 009-48 DATE: 29 JUL 2011 CATEGORY: II 1. SCOPE: 1.1 Title: Pressure Seal Bonnet Valve; repair (shop) 2. REFERENCES: 2.1 S9086-CJ-STM-010/CH-075, Fasteners 2.2. T9074-AS-GIB-010/271,
More informationSECTION BULLET- RESISTANT DOORS
1 SECTION 08 3950 BULLET- RESISTANT DOORS PART 1- GENERAL 1.01 SUMMARY A. This Section Includes: 1. Bullet- resistant steel door and frame systems. 2. Door hardware for bullet- resistant steel door and
More informationSeries 80 In-Line Mounted Centrifugal Pumps
Bulletin B-G Bell & Gossett Series In-Line Mounted Centrifugal Pumps Applications Hydronic Heating & Cooling Systems Industrial Process General Service Pressure Boosting Advantages Close Coupled Space
More informationMachine Shop Processes
Machine Shop Processes 100-1122-00 Owner 1 of 6 Approvals: Department Approved. Date Engineering D. Scott Timms 11/7/17 Manufacturing D. Scott Emond 11/7/17 Quality Andrew Ware 11/7/17 Change History Rev
More informationSAMAMAT FLOW CONTROL L.L.C.
SAMAMAT FLOW CONTROL L.L.C. SFC-MK-LS-001 Rev.: 03 COMPANY PROFILE Company Location Company Information Company Size Nearest Transportation Company Name SAMAMAT FLOW CONTROL L.L.C Company Address Plot
More informationSECTION VIII. ASME Boiler and Pressure Vessel Code An International Code. Div ision 2 A lter n ative Ru les ASME BPVC.VI I I.
ASME BPVC.VI I I.2-2017 SECTION VIII R u l e s f o r C o n stru cti o n o f P re ssu re Ves s els 2017 ASME Boiler and Pressure Vessel Code An International Code Div ision 2 A lter n ative Ru les Markings
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION
Sheet 1 of 5 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION NOTE: This special provision is generally written in the imperative mood. The subject, "the
More informationSECTION METAL FABRICATIONS
SECTION 05100 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for metal fabrications, including minimum requirements for fabricator, and galvanizing. 1.02 REFERENCE STANDARDS A. ASTM
More informationRADIOGRAPHIC EXAMINATION PROCEDURE
Page 1 of 19 Doc. No. KNS/RT/01.REV 0 RADIOGRAPHIC EXAMINATION PROCEDURE Page: 19 of 19 Date: 15.09.2012 RADIOGRAPHIC EXAMINATION PROCEDURE PREPARED & APPROVED BY NDE- Level III CERTIFIED BY REVIEWED BY
More informationTECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) S. No. PARTICULARS BHEL SPECIFICATIONS
TECHNICAL SPECIFICATIONS for 300KV CONSTANT POTENTIAL X RAY EQUIPMENT (for industrial applications) BIDDER s OFFER S. No. PARTICULARS BHEL SPECIFICATIONS 1.0 Area of Application The 300kV Constant potential
More informationCode for Construction of Industrial Metallic Piping Engineering
UllC NATIONAL STANDARD OF THE PEOPLE'S REPUBLIC OF CHINA p r:fl ~A ~~'Jl IE r@ ~t"flit GB 50235-2010 Code for Construction of Industrial Metallic Piping Engineering GB 50235-2010 -- How to BUY & immediately
More informationTECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS.
TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. SECTION - C Technical Specifications for RF Coaxial Switches and Bi-directional Coupler INTRODUCTION: In ADITYA Upgrade (ADITYA-U) machine it was proposed
More informationThis specification describes the minimum requirements for piping systems for the following service:
201/11/2 1/9 1.0 APPLICATION This specification describes the minimum requirements for piping systems for the following service: Underground Service Water Note: This specification does not apply to piping
More informationMEC-QW-E-2002 Senior QA/QC Welding Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
101835-MEC-QW-E-2002 Senior QA/QC Welding Engineer Holds a B. Sc. in Mechanical Power Engineering and has about 15 years hands-on experience working as QA/QC Engineer & Welding Inspector in several industrial
More informationBHARAT HEAVY ELECTRICALS LIMITED TIRUCHIRAPALLI 620 014 QUALITY ASSURANCE SIP:NP:02 /02 PAGE : 1 Of 11 TRIAL ASSY OF COLUMNS, CEILING GIRDERS, MONORAIL & RUNWAY BEAMS REV. DATE PREPARED REVIEWED APPROVED
More informationFAIRBANKS NIJHUIS 1590 SERIES SINGLE STAGE VERTICAL INLINE PUMP.
FAIRBANKS NIJHUIS 0 SERIES SINGLE STAGE VERTICAL INLINE PUMP www.fairbanksnijhuis.com FAIRBANKS NIJHUIS 0 Series Single Stage Vertical Inline Pump Capacities to 00 GPM (,00 m/hr) Heads to 0 Feet ( m) Temperatures
More informationTECHNICAL SPECIFICATION & DRAWINGS
TENDER DOCUMENT NIT No.: BHI/PI(S)/665/1053 FOR Tender for Detail Engineering, Manufacturing, Testing and Supply of SNUB PULLEY PACKAGE AND ASSOCIATED WORKS for the project of Augmentation of Raw Material
More informationEngineering Policy & Procedure
FPD > Engineering > Global Standards Engineering Policy & Procedure Revision History Number: G2-4 Section: G Subject: Radiographic Examination Procedure 1.0 SCOPE This procedure specifies the requirements
More informationPS901500E IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS
SECURITY CLASS: UNCLASSIFIED COML. CLASS: UNCLASSIFIED DOCUMENT IDENTIFIER SUBJECT: IDENTIFICATION, MARKING, HANDLING, PROCESSING AND INSPECTION OF CRITICAL PARTS MATERIAL ENGINEERING & TECHNOLOGY DEVELOPMENT
More informationTHERMOWELLS CONSTRUCTION FROM BARSTOCK OR FABRICATED
age 1 of 5 THERMOWELLS CONSTRUCTION FROM BARSTOCK OR FABRICATED A thermowell is a thermally conductive socket recommended to: rotect the delicate instrument sensing elements against corrosive effects.
More informationFlange Dimensions Class 125 Bronze Flange Dimensions Class 300 Bronze Flange Dimensions Class 150 Bronze Flange Dimensions
Dimensions Class Bronze Dimensions Meets Ib. A.S.M.E. Stard Class 00 Bronze Dimensions Meets ANSI STD B. Nominal Dim. A O.D. Dim. B Circle Dim. C Hole No. Holes Nominal Dim. A Diam. Dim. B Min. Dim. C
More information5.1 MUELLER CORPORATION VALVES. MUELLER 300 Ball Type Corporation Valves
MUELLER CORPORATION VALVES 5.1 Shaded area indicates changes Rev. 4-14 Machine inserted corporation stops were developed by Hieronymus Mueller in conjunction with his development of the drilling and tapping
More informationThis Injection Mold Standard is used for the design and fabrication of Plastic Injection Molds.
This Injection Mold Standard is used for the design and fabrication of Plastic Injection Molds. 1. Mold Design 1.1. A preliminary mold design review will be conducted, preferably with the customer present,
More information0.20. Record Page 1 of 19
Page 1 of 19 Page 2 of 19 Page 3 of 19 Page 4 of 19 Page 5 of 19 ASME BPVC.III.1.ND-2015 Page 6 of 19 ð15þ Figure ND-3325-1 Some Acceptable Types of Unstayed Flat Heads and Covers GENERAL NOTE: The illustrations
More informationTENDER COVER PAGE (CHECK LIST)
CORRIGENDUM 01 ON 15.06.2015 BHEL Tender Enquiry :: 15E0035 Dt: 21.05.2015 Due date extended up to 23.06.2015 BHEL NIT No :: NIT_22630 Dt: 22.05.2015 Tender Item :: SPBD FABRICATION ON JOB WORK BASIS TENDER
More informationStandard Specification for High-Strength Bolts for Structural Steel Joints [Metric] 1
Designation: A 325M 00 METRIC An American National Standard Standard Specification for High-Strength Bolts for Structural Steel Joints [Metric] 1 This standard is issued under the fixed designation A 325M;
More informationPrecision Chucks for Improved Accuracy and Increased Productivity
Precision Workholding Technology Precision Chucks for Improved Accuracy and Increased Productivity Precision Air Chucks (Self Contained Design) MicroCentric Precision Air Chucks feature a patented open
More informationD. Thermally Sprayed Metallic Coating (Flame Spray): STD SPEC
STANDARD SPECIFICATION SECTION 05121 MISCELLANEOUS METALWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, fabrication, and installation of structural steel, connecting bolts, pipes,
More informationWELDING FABRICATION NYS
WELDING FABRICATION NYS PURPOSE To evaluate each contestant s preparation for employment and to recognize outstanding students for excellence and professionalism in the field of fabrication. ELIGIBILITY
More information11-1/4 OD at Transition Point. Microcosmic. 4th and Brannan Street Platform Station Project. Elevation. Moto Ohtake 2014
74 480 330 90 72 180 150 60 90 18 11- OD at Transition Point 36 184 74 Microcosmic Elevation 14 1 Moto Ohtake I. GENERAL NOTES: A. SCULPTURE DESIGN CRITERIA 1. CALIFORNIA BUILDING CODE (CBC, 2010 EDITION)
More informationHSB Global Standards ASME Code Changes and Discussions
HSB Global Standards ASME Code Changes and Discussions Presented by: David M. Allore Field Services Manager September 12, 2012 AGENDA Guidelines for AI Review of Design Calculations Frequent Mistakes on
More informationThe surveillance test is a physical inspection of the product and a comparison with the specifications of the original type tested sample.
SOLAR KEYMARK SPECIFIC SCHEME RULES ANNEX A2. SOLAR KEYMARK SURVEILLANCE TEST Normative annex. Version of 2012-09-09. 1 Introduction This document gives a brief description of the procedure of the so called
More informationREVISION #1. Section. fire alarm B. C. the hot. intent of. required. manufacturer. materials. C. Warranty
HOT AISLE CONTAINMENT SYSTEM (HACS) REVISION #1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. B. C. Drawings and general provisions of the Contract, including General and Supplementary. Conditions apply to
More informationINSPECTION REPORT N o
Page: 1/11 PROJECT: TPI for Stud, bolt, nut and washer Ref: INS/SH-16/0074 BV Client: Simgetek Manufacturing and Engineering Co. Lnc Supplier: Jiaxing Haina Fastener Co., Ltd P/o nr: N/A (client to BV)
More informationEMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL
EMMEGI ARCHITECTURAL FENCING MASTER SPECIFICATION SECTION 05720 METAL FENCING, GATES & RAILING SYSTEM PART 1 GENERAL EMMEGI ARCHITECTURAL FENCING is a high quality steel fencing system comprised of a hybrid
More informationMATERIAL COMBINATION NUMBER 2: Corrosive environment requiring harder, wear-resistant seating faces and resistance to dezincification.
Cast Iron Slide Gates Spec Sheet General The contractor shall furnish and install the following cast iron slide gate assemblies as listed on the Gate Schedule and detailed on the manufacturer s drawings.
More informationSprinkler wet pipe and dry pipe. For FM approval of the dry pipe model "I" shall be used. SBF 120: 7 applies to model "E".
Product Name Nordic Flow FM Thin Wall Pipes Application Sprinkler wet pipe and dry pipe. For FM approval of the dry pipe model "I" shall be used. SBF 120: 7 applies to model "E". Manufacturing Standard