1 A User s Guide for Advocates: the Bureau of Land Management s Western Solar Plan Introduction This guide is intended to highlight the most important elements of the Department of Interior s Bureau of Land Management (BLM s) decisions in the agency s western solar plan so that conservationists can effectively use the policy to protect wilderness quality lands, wildlife habitat and other resources and values by guiding large scale solar development to low conflict zones. We hope that use of the guide will ultimately help advance both conservation and responsible utility scale solar development on public lands. Table of Contents 1.0 Background (p. 2) 2.0 Scope of the Solar Programmatic EIS Record of Decision (p. 2) 3.0 Land allocations (p. 2) 3.1 Exclusion areas (p. 3) 3.2 Solar Energy Zones (p. 3) 3.3 Variance lands (p. 3) 4.0 Design features (p. 4) 5.0 Solar energy program policies (p. 5) 5.1 General authorization policies (p. 5) 5.2 Monitoring and adaptive management (p. 5) 5.3 Solar Energy Zone (SEZ) policies (p. 6) National Environmental Policy Act, Endangered Species Act and cultural resources review; tribal consultation (p. 6) Incentives for projects in SEZs (p. 7) Regional mitigation plans for SEZs (p. 8) Identification protocol for new or expanded SEZs (p. 8) Treatment of SEZs identified subsequent to Record of Decision (p. 10) 5.4 Variance area policies (p. x) Factors to be considered in processing Right of Way applications (p. 10) Desert tortoise guidance (p. 11) Greater sage grouse guidance (p. 11) Protecting resources and values of National Park System Units (p. 11) 6.0 Contact information (p. 12) 1

2 1.0 Background The Department of the Interior s Bureau of Land Management (BLM) finalized more than four years of work to establish a coherent set of policies governing large scale solar energy development on the public lands when it signed a Record of Decision (ROD) formally establishing a new western solar plan. The ROD describes the Interior Department s decisions regarding utility scale solar energy development on BLM administered lands in six southwestern states. The ROD documents the BLM s decisions, which consist of land use plan amendments that establish the foundation for a comprehensive Solar Energy Program. In addition, although the BLM has existing guidance for solar energy, the ROD also describes updated and revised BLM policies and procedures related to solar energy development on public lands. The ROD states, These policies and procedures provide internal administrative guidance to the BLM regarding the processing of Right of Way (ROW) applications for utility scale solar energy projects. (ROD at page 1) The proposed action and alternatives, including both land use decisions and policies, were evaluated through the preparation of the Final Programmatic Environmental Impact Statement for Solar Energy Development in Six Southwestern States (Solar PEIS). 2.0 Scope of Solar PEIS Record of Decision (pp. 3 5) The ROD sets out decisions regarding utility scale solar energy development on BLM administered lands in six southwestern states (Arizona, California, Colorado, Nevada, New Mexico, and Utah) aimed at driving a high pace of development with relatively few environmental impacts and at a low cost to the government, developers and stakeholders. Under the western solar plan, utility scale is defined as facilities with capacities of 20 megawatts (MW) or greater, and lands analyzed are limited to those with solar insolation levels greater than 6.5 kwh/m2/day. Plan amendments will not affect required linear infrastructure (roads, pipelines, transmission); guidance for these decisions is in relevant land use plans. 1 The program will guide the processing of all new utility scale solar energy applications on BLM administered lands. The BLM defines new applications as any applications filed within proposed SEZs after June 30, 2009, and any applications filed within proposed variance and/or exclusion areas after the October 28, 2011 (date of publication of the Supplement to the PEIS). The ROD does not provide guidance or direction for pending applications for utility scale solar energy development on BLM administered lands. 2 The ROD does not eliminate the need for site specific environmental reviews for any future utility scale solar energy development project. It also does not provide for any categorical exclusions from the National Environmental Policy Act (NEPA), although it does provide significant analysis which all future projects will refer to as appropriate. 3.0 Land allocations (pp ) The ROD amends 89 plans to identify exclusion areas, identify Solar Energy Zones (SEZs), identify variance lands, and establish design features for solar development. Land use plan decisions being made are applicable only to utility scale 2

3 solar energy generation facilities management decisions for supporting infrastructure and solar projects <20 MW will continue to be made in accordance with existing land use plan decisions and current applicable policy and procedures. The solar energy development program establishes 3 categories of land determinations 3 : 3.1 Exclusion areas (p. 37) Exclusion areas are areas not available for location of solar energy ROWs under any condition. These are lands with sensitive resources or other features incompatible with utility scale solar development to be excluded from utility scale solar energy development (about 79 million acres). All future utility scale solar energy development must be in conformance (43 CFR (b)) with the exclusions adopted through this ROD (see Table A 2, pages 37 41) and the associated land use plan amendments. Some exclusions are defined by geographic area; the geographic boundaries for these exclusion categories are explicitly defined through the ROD and its associated maps. 4 The remaining exclusion categories are defined by the presence of a specific land use designation in an applicable land use plan or the presence of a specific resource or condition. The geographic boundaries for such exclusion categories will change over time as land use plans are revised or amended and new information on resource conditions is developed. Identification or modification of existing exclusion areas will require amendment of existing land use plans. Consistent with existing planning regulations, applicants may request that the BLM amend a land use plan to allow for an otherwise nonconforming proposal (e.g., in an area where insolation is less than 6.5kWh/m 2 /day, or in a BLM designated Special Recreation Management Area). The BLM will consider such requests on a case bycase basis. As is currently the case, the BLM will not accept applications in areas with additional legislative or policy protections (e.g. congressionally designated wilderness areas or national monuments designated under the Antiquities Act). 3.2 Solar Energy Zones (SEZ) (p. 37) SEZs are specific locations found suitable for utility scale production of solar energy (about 285,000 acres) on the basis of environmental review conducted to date. The ROD identifies 17 Solar Energy Zones (SEZs) and establishes a process for identifying new SEZs in the future. The identification of any new or modified SEZ will require the BLM to amend applicable land use plans. Changes to SEZ boundaries must be approved by the Washington Office of the BLM and cannot be made at the field office level. ROWs for utility scale solar energy development in SEZs will be given priority over all other ROW applications (excepting pre existing ROW applications which are not subject to the PEIS). The BLM will develop regional mitigation plans for each SEZ to simplify and improve the mitigation process for future projects in SEZs. 3.3 Variance lands (p. 43) Variance lands are those areas that may be available for a utility scale solar energy ROW with special stipulations or considerations (about 19 million acres). To accommodate the flexibility described in the BLM s program objectives, the program allows for utility scale solar energy development in variance areas. All lands outside exclusion areas and SEZs are considered variance areas. 3

4 The BLM will consider ROW applications in variance areas on a case by case basis and subject to the variance process described in Appendix B.5. The responsibility for demonstrating to the BLM and other coordinating parties that a proposal in a variance area will avoid, minimize, and/or mitigate, as necessary, sensitive resources will rest with the applicant. The modification of variance areas would involve planning level decisions and require the BLM to amend applicable land use plans. Desert tortoise connectivity corridors are generally considered high risk and unsuitable for development under the ROD. However, site specific conditions have not been mapped thoroughly for desert tortoise connectivity. Maps included in the ROD are intended as a first line screening of variance areas, but applicants will be required to follow a special process for site specific assessment and ground truthing of the information in the map to determine whether the proposed location is appropriate to develop. 4.0 Design features (pp ) The ROD also establishes programmatic and site specific design features (similar to best management practices ) for design, construction and operation of projects. Design features are on site minimization and mitigation requirements that have been incorporated into the proposed action or alternatives to avoid and/or minimize adverse impacts. Design features are also identified specific to individual SEZs, and future SEZ designations must also include land use plan amendments to establish required SEZ specific design features. In evaluating project specific determinations, we recommend that conservationists assess the design features for those specific resources or values of concern and use those design features to advocate for minimizing or mitigating impacts to protect the resource. Programmatic design features are presented by resource type and by four project phases as applicable 1) general; 2) site characterization, siting and design, and construction; 3) operations and maintenance; and 4) reclamation and decommissioning. Design features address the broad possible range of direct and indirect impacts that may result from utility scale solar energy development. Management decisions for supporting infrastructure (such as roads and transmission lines) would continue to be made in accordance with existing land use plan decisions and current applicable policy and procedures. The BLM has stated that the expectation is that many of the requirements associated with programmatic design features will be met or substantially met by project developers for lands in SEZs. Programmatic design features are not intended to be unduly burdensome to the applicant. Applicants will not be expected to study resources or collect data beyond what is necessary to disclose and provide knowledge. The BLM will require that the planning and minimization activities specified through the programmatic design features be identified and disclosed as part of the project s Plan of Development (POD) to be submitted to the BLM with a ROW application for solar energy development on public lands. Required design features and any additional mitigation measures will be identified in ROW authorizations for individual projects. These measures will be monitored by solar energy project developers and the appropriate Federal agency to ensure their continued effectiveness. The BLM has committed to developing and incorporating a larger monitoring and adaptive management strategy to ensure that lessons learned are incorporated into the Solar Program and to inform changes to management actions based on resources responses to ongoing activities. 4

5 5.0 Solar energy program policies (pp ) The ROD establishes a range of solar energy program policies including general authorization policies, policies for monitoring and adaptive management, and policies for Solar Energy Zones and variance areas. 5.1 General authorization policies (pp ) The ROD lays out authorization policies that are applicable, noting that the BLM is currently undertaking a rulemaking to consider a competitive process that may supersede some of the authorizations. Key policies include: Competing applications if BLM determines competition exists, the agency has regulatory authority to use competitive bid procedures to determine which of the applications would be processed. Due diligence o Applicant qualifications ROWs require the applicant to include information on financial and technical capacity. In addition, BLM will include provisions in each ROW. The BLM can deny the application where technical and financial capability cannot be demonstrated. The BLM will focus on ensuring that the applicant meets the qualification requirements to prevent holding ROW authorizations for the purpose of speculating or hindering development. The BLM will consider factors including those set out in Instruction Memorandum These requirements are continuous and the BLM may ask for confirmation of applicant conformance with the requirements at any point. o Plan of Development (POD) The POD must be of sufficient detail to provide the basic information to begin the environmental analysis. Timely submittal of an acceptable POD is critical. The BLM initiates the process and developer has 90 days to respond; if there is no response, or response is inadequate, the developer receives another letter and 60 days to comply; a final 30 day show cause letter is provided prior to issuing any denial. Diligent development The ROW will require that the holder begin construction of the initial phase of development within 12 months after issuance of a Notice to Proceed (NTP), but no later than 24 months after the effective date of the ROW. For phased projects, construction of the subsequent phase must be no less than 3 years after the start of the previous construction phase. The BLM may suspend or terminate authorization when the holder fails to comply with terms and conditions. Before suspending or terminating, the BLM will send a written notice. Operating standards The BLM will conduct inspections of operations and may issue a temporary suspension of operations to protect public health, safety or the environment. 10 year review The ROW shall be reviewed at end of the 10 th year of issuance regardless of the operational circumstances, and at regular intervals not to exceed 10 years. Transfers or assignments The ROW may be assigned consistent with regulations but all assignments shall be approved by the BLM authorized officer, and qualifications of assignees must comply with the ROD. 5.2 Monitoring and adaptive management (pp ) The BLM has committed to developing and incorporating into its Solar Energy Program a monitoring and adaptive management strategy to ensure that data and lessons learned about the impacts of solar energy projects will be collected, reviewed, and, as appropriate, incorporated into the BLM s Solar Energy Program and individual projects in the future. See BLM framework for monitoring/adaptive management plan in Final PEIS (Section A.2.4 of Appendix A). The BLM commenced a pilot effort for establishing a monitoring and adaptive management strategy for the Solar Energy Program in the summer of 2012 in the Riverside East SEZ. Results of the pilot will be used by the BLM to refine the framework and establish a monitoring and adaptive management strategy for the Solar Energy Program. The ROD does 5

6 not provide a timeframe for completion. The BLM will issue policy and guidance as necessary following the completion of the pilot. 5.3 Solar Energy Zone policies (pp ) The BLM will establish rules for competitive leasing within SEZs. The rules may include a call for nominations, review of nominations, notice of competitive offer, bonus bid competitive process or other competitive procedures, issuance of competitive ROW lease authorization, and administration of competitive ROW leases. The BLM hopes to facilitate project development and review within designated SEZ in a streamlined and standardized manner. All projects in SEZs are to be authorized by the Department of Interior (DOI) Secretary or his/her deputies, therefore these projects are not subject to appeal to and review by the Interior Board of Land Appeals (IBLA) NEPA, Endangered Species Act and cultural resources review; tribal consultation All projects are subject to site specific NEPA review, though projects can tier their analysis to the analysis in the Solar PEIS. Site specific analyses will focus narrowly on issues not already addressed in the PEIS SEZ analysis and/or the NEPA analysis completed to support the competitive offer (when parcels within SEZs are offered by the BLM through a competitive offer process). The level of tiering and additional analysis required will vary by project. Environmental Assessments (EAs) can be prepared for specific projects tiered under the PEIS SEZ analysis, even if there may be significant effects, if those effects were analyzed in the PEIS. An Environmental Impact Statement (EIS) may need to be prepared if the potentially significant effects of a project were not analyzed in the PEIS analysis. Through the Solar PEIS, extensive public involvement specific to solar energy development in SEZs has occurred. The BLM will use this input to inform future development in SEZs. Endangered Species Act consultation: Additional Endangered Species Act (ESA) consultation will occur as necessary. For projects in SEZs, project specific information will be provided that (1) describes each proposed action and the specific areas to be affected; (2) identifies the species and critical habitat that may be affected; (3) describes the anticipated effects from the proposed project; (4) specifies whether the anticipated effects from the proposed project are consistent with those analyzed in the programmatic Biological Opinion (BO); (5) describes proposed measures to minimize potential effects of the action; and (6) describes additional effects, if any, not considered in the programmatic consultation. The US Fish and Wildlife Service will review this information and, if applicable, will complete a BO that includes a project specific incidental take statement. This will generally require less effort because of the ability to utilize analysis in the programmatic BO. Cultural resources review: A Solar Programmatic Agreement (PA) has been executed among the BLM, the six State Historic Preservation Offices (SHPOs) and the Advisory Council on Historic Preservation (ACHP). For future solar development on public lands, the BLM will consult with the SHPO, Indian tribes, other consulting parties, and the ACHP regarding inventory, eligibility, effect, treatment, and the consideration of post review discoveries in accordance with the terms of the PA. Requirements for additional archeological surveys, ethnographic studies, or other actions needed to consider and protect historic properties shall be fully explained and agreed to as part of the submission of a POD. The 6

7 terms and conditions of the project authorization will require documentation of a completed BLM approved cultural resources mitigation plan before ground disturbance and construction may begin. Tribal consultation: The BLM has conducted tribal consultation through the PEIS. The BLM considers tribal consultation to be an open ended and ongoing process. For future projects in SEZs, BLM field office cultural staff will recommend whether to collect additional archaeological or ethnographic data. As part of development of Regional Mitigation Plans for the SEZs, the BLM will consult with Indian tribes, the SHPOs and the ACHP to devise more effective methods for consulting with tribes Incentives for projects in SEZs Within SEZs, solar developers enjoy multiple benefits designed to incentivize use of SEZs. Facilitate faster and easier permitting for projects in SEZs o The BLM will endeavor to adhere internally to strict schedules for the completion of environmental reviews for projects in SEZs. o DOI will undertake interagency coordination, provide a single point of contact, ensure timely performance of agencies, and facilitate stakeholder reviews. o The BLM will maintain Renewable Energy Coordination Offices (RECOs) in DC, CA, NV and AZ, and Renewable Energy Coordination Teams in CO, NM, and UT. o The BLM may, through its rulemaking process, establish a competitive process that results in the immediate issuance of a ROW lease authorization to the successful bidder. Improve and facilitate mitigation o The BLM will develop regional mitigation plans for SEZs that Will simplify and improve the mitigation process for development in SEZs. Will address mitigation for a variety of resources. Can increase permit efficiencies and financial predictability for developers. Are expected to increase the ability of state and federal agencies to invest in larger scale conservation efforts through the preservation or acquisition of higher quality habitat, improved connectivity between habitat areas, and long term conservation of landscapes. Allow developers to mitigate biological impacts through funding of conservation priorities identified in the regional mitigation plan. o Facilitate the permitting of needed transmission to SEZs The BLM will continue to evaluate the transmission needs of existing SEZs, including capacity on existing lines and the need for new or modified corridors; efforts will also be made to plan for any new or expanded corridors that are needed. As part of the identification process for new or expanded SEZs, BLM will simultaneously evaluate their transmission needs. Corridor designations may be achieved through a joint land use planning and NEPA process. The BLM will offer incentives to projects that propose to bring transmission to SEZs (e.g facilitated permitting of needed gen ties, transmission lines and upgrades by RECO staff, and identification of priority transmission projects that will receive facilitated permitting). The BLM will commit staff from RECOs and coordination teams to engage in ongoing and comprehensive regional and sub regional transmission planning efforts to ensure the recognition of SEZs as a priority in transmission development. For example, BLM will identify a BLM liaison to the Western Electricity Coordinating Council (WECC) and appropriate sub regional planning groups, as well as the California Independent System Operator (CAISO). 7

8 o o The BLM will seek to establish cooperative agreements, MOUs, and MOAs with Federal, state, local, and regional agencies, and tribes, as appropriate, to expedite permitting of needed transmission to support SEZ development. As part of the PEIS, BLM requested that the SEZs be reviewed as a case study by the Transmission Expansion Planning Policy Committee (TEPPC) of the WECC as part of the 2012 Study Program. This request was prioritized as high by the study program, meaning that it will be studied in the first round of TEPPC studies. For all new or expanded SEZs, the BLM will submit study requests for TEPPC analysis as appropriate. In preparing parcels in SEZs for competitive offer, the BLM will seek to make the most efficient use of existing corridors, consider opportunities for co location, and avoid geographically stranding future projects from key transmission interconnection points. Encourage solar energy development on suitable lands adjacent to SEZs For projects located jointly on SEZs and adjacent land low conflict lands, regardless of ownership, DOI s permitting incentives for SEZs would apply to the entire project. However, additional effort may be required to collect necessary data on lands outside of the existing SEZ. Provide economic incentives for development in SEZs The BLM anticipates lower cost recovery for projects in SEZs because of extensive upfront data collection and environmental review in PEIS. The BLM may, through its rulemaking effort: adopt a longer phase in period for rental payments for projects in SEZs (e.g. 10 years), effectively reducing overall cost. establish a fixed megawatt capacity fee for the life of the authorization for projects in SEZs, which could effectively reduce the overall cost. establish a limited base acreage rental payment for projects in SEZs, which could effectively reduce cost. restructure bonding requirements for projects in SEZs (e.g. a fixed or standard bond per acre), which could reduce costs. establish a 30 year fixed term lease with a fixed rental fee for projects in SEZs, which could reduce uncertainty for operators Regional mitigation plans for SEZs The BLM will establish regional mitigation plans for all SEZs, starting with a pilot in the Dry Lake SEZ in Nevada. The BLM will also develop regional mitigation plans for all new SEZs as part of the new SEZ identification process (see below). The BLM presented a draft framework for regional mitigation plans in the Final PEIS (Section A.2.5 of Appendix A). Lessons learned through the pilot will allow for replication of similar processes across all SEZs. The BLM will issue policy and guidance as necessary following the completion of the pilot Identification protocol for new or expanded SEZs The BLM will identify new or expanded SEZs in the context of existing solar market conditions, existing and planned transmission systems, and new or existing state or federal policies affecting the level and location of development. The BLM will assess the need for new or expanded SEZs at least once every 5 years in each of the six states in the PEIS. The process will be open and transparent, with opportunities for substantial stakeholder involvement. Identification will occur at the state or field office level as an individual land use planning effort or as part of an ongoing land use plan 8

9 revision. In all cases, planning will tier from the PEIS. It is the BLM s goal to complete work to identify new SEZs and amend applicable land use plans within 12 to 18 months of initiating such efforts. SEZs should be relatively large areas that provide highly suitable locations for development: where it is economically and technically feasible, where there is good potential for connecting to transmission, and where there is generally low resource conflict. The four steps for identification of a new or expanded SEZ (in order): Assess demand for additional acres in SEZs. o The BLM ultimately makes the determination whether additional acreage is needed. o The BLM will also provide for a petition process, following requirements for demonstrating a need for additional acres. o Petitioners may also request changes to existing SEZs, such as eliminating or revising boundaries due to changes in status of species or critical habitat under the ESA. o The public may also raise the need for new or modified SEZs through the scoping process of individual land use plans (must be submitted through the State Director to the BLM Washington Office for Director s concurrence). o The BLM will rely on outside expert consultation in evaluating the need for new or expanded SEZs. o The BLM assessment of demand may require the development of new state based reasonably foreseeable development scenarios. Establish technical and economical suitability criteria. o Take into account technological advances, load centers, existing and planned transmission lines, known constraints. o Size threshold: generally large enough for multiple projects. o Solar insolation: can be lower than 6.5kWh/m 2 /day, as appropriate. o Slope: can by greater than 5% if otherwise suitable; unlikely that greater than 10% would be technically viable. o Load area to be served. o Infrastructure access. Apply environmental, cultural and other screening criteria to find SEZs with low resource conflicts. BLM shall consider the following: o PEIS exclusions. o Relevant land use plan (LUP) decisions (e.g. ROW avoidance and exclusion areas, timing restrictions). Amendment of LUP decisions may be necessary to identify new or expanded SEZs. o Coordination and outreach: BLM may decide to reach out to stakeholders, which will likely result in development of locally relevant screening criteria. BLM will conduct required consultation with relevant agencies. o The BLM will use landscape scale information. o The BLM will seek opportunities to locate new or expanded SEZs on degraded, disturbed, or previously disturbed lands. o The BLM will take into account opportunities to combine other federal and nonfederal lands. o The BLM will review and consider information gathered through its proposed long term monitoring and adaptive management program. 9

10 Analyze proposed SEZs through a planning and NEPA process. o The BLM will publish a Notice of Intent (NOI) in the Federal Register stating its intent to prepare a land use plan amendment to identify a new or expanded SEZ or SEZs, initiating scoping, including inviting the public to nominate proposed SEZs that meet the objectives of the planning effort. o Goal for NEPA analysis will be to produce comprehensive analyses of resources detailed enough to allow for tiering of future projects in SEZs. NEPA analysis will also include appropriate consultations pursuant to the ESA and the National Historic Preservation Act (NHPA). NEPA analysis will also consider potential impacts from associated infrastructure. The BLM will also seek to designate any necessary utility corridors to support the SEZ. o The draft land use plan amendment and draft NEPA document will be made available for a 90 day public comment period. o The BLM may establish SEZ specific management prescriptions. o The BLM will develop a regional mitigation plan for the SEZ as part of the identification process Treatment of SEZs identified subsequent to PEIS ROD The BLM expects that SEZs analyzed and identified through future planning efforts will generally be treated the same as SEZs identified through this ROD (i.e., that proposed projects in these SEZs will generally include the same level of analysis, follow the same authorization process, and receive the same incentives as projects located in SEZs identified through this ROD and refined through the ongoing rulemaking process). 5.4 Variance area policies (pp ) The ROD lays out many specific policies with regard to accepting and processing applications for variance lands. There is an enhanced role for the National Park Service (NPS) and US Fish & Wildlife Service (FWS) in project application processing. The FWS and NPS have identified sensitive resources and locations within variance areas that require special considerations. The BLM may, under its discretion, apply a competitive leasing process to proposals within variance areas. Two preliminary meetings are required for applications on variance lands, with a key purpose of early coordination with other federal agencies (NPS, FWS, Department of Defense (DOD)). A preliminary public meeting is also required, with the purpose of gathering information on potential issues and concerns and/or opportunities related to the application. In determining whether to proceed or reject an application for variance lands, the BLM will consider the following: o Whether lands within a SEZ could meet the potential applicant s needs, including consideration of access to transmission. o Whether the proposed project will be in conflict with landscape conservation strategies and/or landscape protection, conservation, or restoration objectives established in documents such as the Desert Renewable Energy Conservation Plan or an applicable Resource Management Plan. o Whether the proposed project poses a high potential for conflict with sensitive natural, visual, and/or cultural resources identified by the BLM, NPS, and/or FWS. 10

11 5.4.1 Factors to be considered in processing ROW applications within variance areas The ROD lays out a lengthy list of factors the BLM shall consider, as appropriate, when processing a ROW application in a variance area (pages ). Note: it is up to the BLM s discretion whether to consider these factors for each application. A partial list includes: Adjacency to transmission. A land use plan amendment in this area is acceptable given other factors. The project will be consistent with landscape level conservation data, e.g., rapid ecological assessments (REAs). Technical/financial feasibility of applicant. The proposed project is in an area with low or comparatively low resource conflicts and in a location where conflicts can be resolved. The project will optimize the use of existing infrastructure where there is existing infrastructure (roads, transmission, etc.). The project will be located in an area identified as suitable for development via another plan (DRECP, etc.). Documentation that the project will minimize impacts to: wildlife, recreation, lands with wilderness characteristics, etc. Documentation that the project will not adversely affect lands donated for conservation purposes Desert Tortoise Guidance in Variance Lands For desert tortoise habitat areas not excluded by the ROD, developers that propose utility scale solar energy projects in variance areas which overlap with priority connectivity habitat will be required to meet with the BLM and FWS early in the process. These preliminary meetings will provide developers an opportunity to receive instructions on the appropriate desert tortoise survey protocols and the criteria the BLM and FWS will use to evaluate results of those surveys Greater Sage Grouse Guidance in Variance Lands For greater sage grouse habitat areas not excluded by the ROD, developers that propose utility scale solar energy projects in variance areas which overlap with the range of greater sage grouse will be required to document a number of factors unless a project is otherwise determined by the BLM and FWS and appropriate state wildlife agencies to have acceptable impacts on greater sage grouse Protecting Resources and Values of National Park System Units For developers that propose utility scale solar energy projects in variance areas identified as having a high potential for conflict with the resources of a unit of the National Park System or special areas administered by the NPS, additional documentation on a number of factors will be required. The NPS will prepare a response to the BLM regarding 1) whether the proposed project meets NPS protection, conservation and/or restoration objectives; and 2) whether the resource conflict documentation is adequate to support a finding by the NPS and BLM that the proposed project is likely to avoid a high potential for conflict with resources and values associated with a National Park System unit. 11

12 6.0 For more information about this guide or the Solar PEIS, please contact: Nada Culver, Ext. 117, Alex Daue, Ext. 108, tws.org Chase Huntley, , 1 For the California Desert Conservation Area (CDCA), the ROD amends the CDCA to allow transmission and related infrastructure in SEZs. As is currently the case, all projects requiring transmission and relatedd facilities within the CDCA and outside of SEZs will continue to require separate LUPAs for their transmission and related facilities. 2 Pending applications are any applications (regardless of place in line) filed within proposed variance and/or exclusion areas before the Supplement (October 28, 2011), and any applications filed withinn proposed SEZs before June 30, More information on pending applications can be found in Appendix B, Volume 6, available at //solareis.anl.gov/documents/fpeis/solar_ FPEIS_Volume_6_Part_1.pdf. 3 These designations are subject to revision in any land use plan amendment, including the ongoing Desert Renewablee Energy Conservation Planning Process. 4 Exclusion areas with geographic boundaries (see Table A 2). Specific areas identified since the publication of the Supplement to thee Draft Solar PEIS by the BLM based on continued consultation with cooperating agencies and tribes to protect sensitivee natural, visual, and cultural resources (1,066,497 acres); see Figure A 1, page

Bureau of Land Management is the lead federal agency (available online at:

Bureau of Land Management is the lead federal agency (available online at: PROGRAMMATIC AGREEMENT AMONG THE BUREAU OF LAND MANAGEMENT, THE OFFICE OF HISTORIC PRESERVATION, AND THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, REGARDING RENEWABLE ENERGY DEVELOPMENT ON A PORTION OF

More information

The following draft Agreement supplements, but does not replace, the MOU by and between the Bureau of Land Management (BLM) and the California

The following draft Agreement supplements, but does not replace, the MOU by and between the Bureau of Land Management (BLM) and the California The following draft Agreement supplements, but does not replace, the MOU by and between the Bureau of Land Management (BLM) and the California Department of Fish and Wildlife (CDFW), which was entered

More information

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah

STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah I. Introduction STATEMENT OF WORK Environmental Assessment for the Red Cliffs/Long Valley Land Exchange in Washington County, Utah The Bureau of Land Management s (BLM) St. George Field Office (SGFO) requires

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C October 23, 2003 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT WASHINGTON, D.C. 20240 October 23, 2003 EMS TRANSMISSION 10/23/2003 Instruction Memorandum No. 2003-275 Change 1 Expires: 09/30/2004 In

More information

Notice of Intent to Amend the California Desert Conservation Area, Bakersfield,

Notice of Intent to Amend the California Desert Conservation Area, Bakersfield, This document is scheduled to be published in the Federal Register on 02/02/2018 and available online at https://federalregister.gov/d/2018-02098, and on FDsys.gov 4310-40 DEPARTMENT OF THE INTERIOR Bureau

More information

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT PROGRAMMATIC AGREEMENT AMONG THE BUREAU OF LAND MANAGEMENT, THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, AND THE NATIONAL CONFERENCE OF STATE

More information

[LLNV L ER A; ; MO# ] Notice of Availability of the Record of Decision and Final Supplemental

[LLNV L ER A; ; MO# ] Notice of Availability of the Record of Decision and Final Supplemental This document is scheduled to be published in the Federal Register on 11/21/2013 and available online at http://federalregister.gov/a/2013-28030, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

[LLNVS L PQ0000. LVRWF ; N 90788; MO# ] Notice of Intent to Prepare an Environmental Impact Statement and a Notice of

[LLNVS L PQ0000. LVRWF ; N 90788; MO# ] Notice of Intent to Prepare an Environmental Impact Statement and a Notice of This document is scheduled to be published in the Federal Register on 06/01/2018 and available online at https://federalregister.gov/d/2018-10961, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP

BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP BLM ACTION CENTER www.blmactioncenter.org BLM S LAND USE PLANNING PROCESS AND PUBLIC INVOLVEMENT OPPORTUNITIES STEP-BY-STEP Planning What you, the public, can do the Public to Submit Pre-Planning During

More information

[LLWO L DT0000 LXSIOSHL0000] the BLM Assistant Director s Governor s Consistency Review Determination

[LLWO L DT0000 LXSIOSHL0000] the BLM Assistant Director s Governor s Consistency Review Determination This document is scheduled to be published in the Federal Register on 05/20/2013 and available online at http://federalregister.gov/a/2013-11994, and on FDsys.gov 4310-84 DEPARTMENT OF THE INTERIOR Bureau

More information

[LLNVB01000.L EX0000.LVTFF15F6810 MO# ] Notice of Intent to Prepare an Environmental Impact Statement for the Proposed

[LLNVB01000.L EX0000.LVTFF15F6810 MO# ] Notice of Intent to Prepare an Environmental Impact Statement for the Proposed This document is scheduled to be published in the Federal Register on 09/29/2015 and available online at http://federalregister.gov/a/2015-24432, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MANUAL TRANSMITTAL SHEET Release 9-397 Date 07/13/2012 Subject BLM Manual 6220- National Monuments, National Conservation

More information

USAEC Environmental Performance Assessment System (EPAS) Installation Cultural Resources Program Administrative Assessment SOP

USAEC Environmental Performance Assessment System (EPAS) Installation Cultural Resources Program Administrative Assessment SOP USAEC Environmental Performance Assessment System (EPAS) Installation s Program Administrative Assessment SOP Purpose: Using all documentation available, many cultural resource Environmental Performance

More information

[LLNVS L PQ0000. LVRWF09F1840; N ; MO# ; Notice of Intent to Prepare an Environmental Impact Statement and a Possible

[LLNVS L PQ0000. LVRWF09F1840; N ; MO# ; Notice of Intent to Prepare an Environmental Impact Statement and a Possible This document is scheduled to be published in the Federal Register on 03/15/2018 and available online at https://federalregister.gov/d/2018-05273, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

(Docket ID: BLM ; LLW X.Ll PNOOOOJ

(Docket ID: BLM ; LLW X.Ll PNOOOOJ DEPARTMENT OF THE INTERIOR Bureau of Land Management 43 CFR Part 1600 (Docket ID: BLM-2016-0002; LLW0210000.17X.Ll6100000.PNOOOOJ RIN: 1004-AE39 Resource Management Planning AGENCY: Bureau of Land Management,

More information

Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource

Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau of Land Management (LLUTY01000.L16100000.DP0000) Notice of Intent to Prepare a Master Leasing Plan, Amendments to the Resource Management Plans for the Moab

More information

Notice of Availability of the Desert Renewable Energy Conservation Plan Proposed

Notice of Availability of the Desert Renewable Energy Conservation Plan Proposed This document is scheduled to be published in the Federal Register on 11/13/2015 and available online at http://federalregister.gov/a/2015-28791, and on FDsys.gov 4310-40 DEPARTMENT OF THE INTERIOR Bureau

More information

Notice of Availability of the Record of Decision for the Grand Junction Field Office

Notice of Availability of the Record of Decision for the Grand Junction Field Office This document is scheduled to be published in the Federal Register on 08/24/2015 and available online at http://federalregister.gov/a/2015-20706, and on FDsys.gov 4130-JB DEPARTMENT OF THE INTERIOR Bureau

More information

[LLORW00000.L ER0000.LVRWH09H XL5017AP.WAOR Notice of Availability of the Record of Decision for the Proposed Vantage to

[LLORW00000.L ER0000.LVRWH09H XL5017AP.WAOR Notice of Availability of the Record of Decision for the Proposed Vantage to This document is scheduled to be published in the Federal Register on 01/18/2017 and available online at https://federalregister.gov/d/2017-01000, and on FDsys.gov 4310-33 DEPARTMENT OF THE INTERIOR Bureau

More information

[LLNVW00000.L GN0000.LVEMF X. Notice of Intent to Prepare an Environmental Impact Statement for the Proposed

[LLNVW00000.L GN0000.LVEMF X. Notice of Intent to Prepare an Environmental Impact Statement for the Proposed This document is scheduled to be published in the Federal Register on 03/04/2016 and available online at http://federalregister.gov/a/2016-04806, and on FDsys.gov 4310-HC DEPARTMENT OF THE INTERIOR Bureau

More information

[LLUTC L ER0000-LVRWJ10J4080; UTU ] Notice of Intent to Prepare an Environmental Assessment for the Proposed

[LLUTC L ER0000-LVRWJ10J4080; UTU ] Notice of Intent to Prepare an Environmental Assessment for the Proposed This document is scheduled to be published in the Federal Register on 08/24/2012 and available online at http://federalregister.gov/a/2012-20892, and on FDsys.gov 4310-DQ-P DEPARTMENT OF THE INTERIOR Bureau

More information

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS

CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS CHAPTER 11 PRELIMINARY SITE PLAN APPROVAL PROCESS 11.01.00 Preliminary Site Plan Approval 11.01.01 Intent and Purpose 11.01.02 Review 11.01.03 Application 11.01.04 Development Site to be Unified 11.01.05

More information

[LLOR L DP0000.LXSSH X.HAG ] Notice of Availability of the Draft Resource Management Plan/Environmental

[LLOR L DP0000.LXSSH X.HAG ] Notice of Availability of the Draft Resource Management Plan/Environmental This document is scheduled to be published in the Federal Register on 10/05/2018 and available online at https://federalregister.gov/d/2018-21629, and on govinfo.gov 4310-33 DEPARTMENT OF THE INTERIOR

More information

Aboriginal Consultation and Environmental Assessment Handout CEAA November 2014

Aboriginal Consultation and Environmental Assessment Handout CEAA November 2014 Introduction The Government of Canada consults with Aboriginal peoples for a variety of reasons, including: statutory and contractual obligations, policy and good governance, building effective relationships

More information

CHAPTER 3. Public Schools Facility Element

CHAPTER 3. Public Schools Facility Element CHAPTER 3 Public Schools Facility Element Page 1 of 12 CHAPTER 3 PUBLIC SCHOOL FACILITIES ELEMENT GOAL 3.1: Collaborate and coordinate with the School Board of Volusia County to provide and maintain a

More information

Introduction to the. Responsible Offshore Development Alliance

Introduction to the. Responsible Offshore Development Alliance Introduction to the Responsible Offshore Development Alliance New England Fishery Management Council September 27, 2018 Who is? Broad membership-based coalition of fishing industry associations and fishing

More information

APPENDIX A Vernal Field Office Best Management Practices for Raptors and Associated Habitats

APPENDIX A Vernal Field Office Best Management Practices for Raptors and Associated Habitats APPENDIX A Vernal Field Office Best Management Practices for Raptors and Associated Habitats A-1 A-2 APPENDIX A VERNAL FIELD OFFICE BEST MANAGEMENT PRACTICES FOR RAPTORS AND ASSOCIATED HABITATS September

More information

Riverside, California A Local Government CEQA Perspective

Riverside, California A Local Government CEQA Perspective Historic Resources and CEQA Workshop 6/21/2012 Riverside, California A Local Government CEQA Perspective Erin Gettis, Associate AIA City Historic Preservation Officer and Principal Planner CEQA and Cultural

More information

What is the Southeastern Oregon RMP?

What is the Southeastern Oregon RMP? Resource Management Plans Alan Majchrowicz What is the Southeastern Oregon RMP? The Bureau of Land Management creates Resource Management Plans for planning areas to guide their decision-making about the

More information

Section 106 of the National Historic Preservation Act Consulting Parties Meeting March 8, 2018

Section 106 of the National Historic Preservation Act Consulting Parties Meeting March 8, 2018 Section 106 of the National Historic Preservation Act Consulting Parties Meeting March 8, 2018 Where Have We Been? Purpose of the meetings in March/May 2015 and August 2016: Ensure that the consulting

More information

clarify the roles of the Department and minerals industry in consultation; and

clarify the roles of the Department and minerals industry in consultation; and Procedures for Crown Consultation with Aboriginal Communities on Mineral Exploration Mineral Resources Division, Manitoba Science, Technology, Energy and Mines The Government of Manitoba recognizes it

More information

Introduction to the Revised Environmental Review Primer for Connecticut s Historic Properties

Introduction to the Revised Environmental Review Primer for Connecticut s Historic Properties Introduction to the Revised Environmental Review Primer for Connecticut s Historic Properties March 20, 2012 The first formal revision to SHPO s Environmental Review guidance in 25 years. Dave Poirier

More information

Public Purpose Conveyances S Checkerboard Land Resolution (Title I)

Public Purpose Conveyances S Checkerboard Land Resolution (Title I) Statement of Neil Kornze Director U.S. Department of the Interior, Bureau of Land Management Senate Energy and Natural Resources Committee S. 3102, Pershing County Economic Development and Conservation

More information

BLM Should Take a Hard Look at its Legal Authority to Establish a Master Leasing Plan Prior to Moving Forward

BLM Should Take a Hard Look at its Legal Authority to Establish a Master Leasing Plan Prior to Moving Forward Submitted via email: BLM_UT_Comments_2@blm.gov Brent Northrup Project Manager Utah Bureau of Land Management Canyon Country District Office 82 East Dogwood Moab, UT 84532 Re: Notice of Intent To Prepare

More information

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines

Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines Fifth Edition Fiscal 2007 Environmental Technology Verification Pilot Program Implementation Guidelines April 2007 Ministry of the Environment, Japan First Edition: June 2003 Second Edition: May 2004 Third

More information

[LLIDB00100 LF HT0000 LXSS020D ] Notice of Intent to amend the Cascade Resource Management Plan (RMP) and the

[LLIDB00100 LF HT0000 LXSS020D ] Notice of Intent to amend the Cascade Resource Management Plan (RMP) and the This document is scheduled to be published in the Federal Register on 10/18/2012 and available online at http://federalregister.gov/a/2012-25593, and on FDsys.gov 4310-GG DEPARTMENT OF THE INTERIOR Bureau

More information

Scotian Basin Exploration Drilling Project: Timeline

Scotian Basin Exploration Drilling Project: Timeline Scotian Basin Exploration Drilling Project: Timeline When it comes to exploratory drilling programs that an operator proposes to conduct, the Canada- Nova Scotia Offshore Petroleum Board (CNSOPB) goes

More information

Essay Questions. Please review the following list of questions that are categorized by your area of certification. The six areas of certification are:

Essay Questions. Please review the following list of questions that are categorized by your area of certification. The six areas of certification are: Essay Questions Please review the following list of questions that are categorized by your area of certification. The six areas of certification are: Environmental Assessment Environmental Documentation

More information

EXPLORATION DEVELOPMENT OPERATION CLOSURE

EXPLORATION DEVELOPMENT OPERATION CLOSURE i ABOUT THE INFOGRAPHIC THE MINERAL DEVELOPMENT CYCLE This is an interactive infographic that highlights key findings regarding risks and opportunities for building public confidence through the mineral

More information

Record of Decision for the SunZia Southwest Transmission Project

Record of Decision for the SunZia Southwest Transmission Project U.S. Department of the Interior Bureau of Land Management Record of Decision for the SunZia Southwest Transmission Project Utility Right-of-Way and Mimbres Resource Management Plan Amendment and Socorro

More information

UTAH PUBLIC LAND SETTLEMENTS-- IMPACT ON BLM LAND USE PLAN REVISIONS

UTAH PUBLIC LAND SETTLEMENTS-- IMPACT ON BLM LAND USE PLAN REVISIONS UTAH PUBLIC LAND SETTLEMENTS-- IMPACT ON BLM LAND USE PLAN REVISIONS DENISE A. DRAGOO SNELL & WILMER SALT LAKE CITY, UTAH PROGRAM VICE CHAIR, PUBLIC LANDS SUBCOMMITTEE Negotiations between Secretary of

More information

Appendix I PROGRAMMATIC AGREEMENT

Appendix I PROGRAMMATIC AGREEMENT B2H Final EIS and Proposed LUP Amendments Appendix I Programmatic Agreement Appendix I PROGRAMMATIC AGREEMENT The Bureau of Land Management (BLM), in consultation with the State Historic Preservation Offices

More information

I. THE RELATIONSHIP BETWEEN NATIONAL AND CHAPTERS

I. THE RELATIONSHIP BETWEEN NATIONAL AND CHAPTERS December 9, 2001 (Amended 1/05) AUDUBON CHAPTER POLICY PREAMBLE Since 1986, when the last version of the Chapter Policy was approved, the National Audubon Society has undergone significant changes. Under

More information

MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014

MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES. CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 MEASURES TO INCREASE THE EFFICIENCY OF CIF COMMITTEES CTF-SCF/TFC.11/7/Rev.1 January 27, 2014 I. INTRODUCTION 1. At the May 2013 CIF Committee meetings, the CIF Administrative Unit was requested to give

More information

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy

National Grid s commitments when undertaking works in the UK. Our stakeholder, community and amenity policy National Grid s commitments when undertaking works in the UK Our stakeholder, community and amenity policy Introduction This document describes the ten commitments we have made to the way we carry out

More information

Notice of Final Supplementary Rules for Travel Management on Public Lands in. Gunnison, Montrose, Hinsdale, and Saguache Counties, Colorado

Notice of Final Supplementary Rules for Travel Management on Public Lands in. Gunnison, Montrose, Hinsdale, and Saguache Counties, Colorado This document is scheduled to be published in the Federal Register on 01/23/2015 and available online at http://federalregister.gov/a/2015-01220, and on FDsys.gov DEPARTMENT OF THE INTERIOR Bureau of Land

More information

National Association of Environmental Professionals

National Association of Environmental Professionals October 18, 2018 RE: Proposed Endangered Species Act Rulemaking Dear Acting Director Kurth, On July 25, 2018, the United States Fish and Wildlife (FWS) and National Oceanic and Atmospheric Administration

More information

USFWS Migratory Bird Program

USFWS Migratory Bird Program USFWS Migratory Bird Program Updates for the Bird Conservation Committee North American Wildlife & Natural Resources Conference Norfolk, Va. ~ March 28, 2018 Presented by Sarah Mott & Ken Richkus U.S.

More information

Marine Renewable-energy Application

Marine Renewable-energy Application Marine Renewable-energy Application OFFICE USE ONLY Date Received: Application #: Time Received: Date of Complete Application: Received by: Processed by: Type of Application Permit (unconnected) Permit

More information

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town.

2. As such, Proponents of Antenna Systems do not require permitting of any kind from the Town. Subject: Antenna Systems Policy Number: Date Developed: 2008/09 Date Approved: April 8, 2009 Lead Department: Planning and Development Date Modified: (if applicable) November 26, 2014 A. PROTOCOL STATEMENT:

More information

BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR

BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR BEFORE THE ALBERTA ELECTRIC SYSTEM OPERATOR NORTH AMERICAN ELECTRIC ) RELIABILITY CORPORATION ) NOTICE OF FILING OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION OF PROPOSED RELIABILITY STANDARD

More information

[LLWY L ER0000-LVRWK09K1160; WYW177893; COC72929; Notice of Availability of the Draft Environmental Impact Statement for the

[LLWY L ER0000-LVRWK09K1160; WYW177893; COC72929; Notice of Availability of the Draft Environmental Impact Statement for the This document is scheduled to be published in the Federal Register on 07/03/2013 and available online at http://federalregister.gov/a/2013-16009, and on FDsys.gov 4310-22 (P) DEPARTMENT OF THE INTERIOR

More information

BLM Travel Plans Will Endanger Cultural Resources and Undermine Protection of Roadless Areas on Utah s Public Lands. Problems and Fixes

BLM Travel Plans Will Endanger Cultural Resources and Undermine Protection of Roadless Areas on Utah s Public Lands. Problems and Fixes BLM Travel Plans Will Endanger Cultural Resources and Undermine Protection of Roadless Areas on Utah s Public Lands Problems and Fixes BLM Travel Plans Will Endanger Cultural Resources and Undermine

More information

California State University, Northridge Policy Statement on Inventions and Patents

California State University, Northridge Policy Statement on Inventions and Patents Approved by Research and Grants Committee April 20, 2001 Recommended for Adoption by Faculty Senate Executive Committee May 17, 2001 Revised to incorporate friendly amendments from Faculty Senate, September

More information

Discussion of California Condors and Habitat Conservation Planning in the Tehachapi Wind Resource Area. Friday - April 7, 2017 Mojave, CA

Discussion of California Condors and Habitat Conservation Planning in the Tehachapi Wind Resource Area. Friday - April 7, 2017 Mojave, CA Discussion of California Condors and Habitat Conservation Planning in the Tehachapi Wind Resource Area Friday - April 7, 2017 Mojave, CA Meeting agenda Introductions Presentation by USFWS: setting the

More information

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR

Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR August 31, 2009 Phase 2 Executive Summary: Pre-Project Review of AECL s Advanced CANDU Reactor ACR-1000-1 Executive Summary A vendor pre-project design review of a new nuclear power plant provides an opportunity

More information

Guidance for assessing an area for a potential Antarctic Specially Managed Area designation

Guidance for assessing an area for a potential Antarctic Specially Managed Area designation Resolution 1 (2017) Annex A Guidance for assessing an area for a potential Antarctic Specially Managed Area designation Contents Introduction... 2 Determining the need for ASMA designation... 3 Documentation

More information

STATE PROTOCOL Between The Wyoming Bureau of Land Management State Director and The Wyoming State Historic Preservation Officer

STATE PROTOCOL Between The Wyoming Bureau of Land Management State Director and The Wyoming State Historic Preservation Officer Donald A. Simpson Wyoming BLM Director 5353 Yellowstone Road Cheyenne, WY 82009 Matthew H. Mead Governor State Capitol Cheyenne, WY 82002 PROGRAMMATIC AGREEMENT AMONG THE BUREAU OF LAND MANAGEMENT, ADVISORY

More information

Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology

Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology Procedure for Obtaining Verification of a Stormwater Manufactured Treatment Device from New Jersey Corporation for Advanced Technology For use in accordance with the Stormwater Management Rules, N.J.A.C.

More information

Energy Advisory Board Meeting Thursday, November 5, :00 pm

Energy Advisory Board Meeting Thursday, November 5, :00 pm Energy Advisory Board Meeting Thursday, November 5, 2015 6:00 pm Last Presented to EAB on 11/07/13 almost 2 years ago exactly since then much has occurred, but most notably: 1) The BLM signed the Record

More information

Intellectual Property

Intellectual Property Tennessee Technological University Policy No. 732 Intellectual Property Effective Date: July 1January 1, 20198 Formatted: Highlight Formatted: Highlight Formatted: Highlight Policy No.: 732 Policy Name:

More information

PGNiG. Code. of Responsible Gas and Oil Production

PGNiG. Code. of Responsible Gas and Oil Production PGNiG Code of Responsible Gas and Oil Production The Code of Responsible Gas and Oil Production of Polskie Górnictwo Naftowe i Gazownictwo SA is designed to help us foster relations with the local communities

More information

Greater Sage-Grouse & BLM Guidance. For Colorado Oil & Gas Operators

Greater Sage-Grouse & BLM Guidance. For Colorado Oil & Gas Operators Greater Sage-Grouse & BLM Guidance For Colorado Oil & Gas Operators Background Greater Sage-Grouse managed as BLM Sensitive Species for years USFWS concluded in 2010 listing was warranted but precluded

More information

The 2011 CAPE Awards. Celebrating Milestones in Conservation for our Public Lands

The 2011 CAPE Awards. Celebrating Milestones in Conservation for our Public Lands The 2011 CAPE Awards Celebrating Milestones in Conservation for our Public Lands In 2011 we started to see some of the inspired and celebrated policies put forth last year hit the ground in places The

More information

Crescent Peak Wind Project (Briefing Document)

Crescent Peak Wind Project (Briefing Document) Crescent Peak Wind Project (Briefing Document) Very Diverse & Rich Mojave Desert Habitat in Project Area Project Footprint Crescent Peak Wind Project Regional Context Few places in the American Southwest

More information

Guide to Assist Land-use Authorities in Developing Antenna System Siting Protocols

Guide to Assist Land-use Authorities in Developing Antenna System Siting Protocols Issue 2 August 2014 Spectrum Management and Telecommunications Guide to Assist Land-use Authorities in Developing Antenna System Siting Protocols Aussi disponible en français Contents 1. Introduction...

More information

Sand Mountain WSA. Henry s Fork Watershed Council October

Sand Mountain WSA. Henry s Fork Watershed Council October Sand Mountain WSA Henry s Fork Watershed Council October 17 2017 Wilderness Study Areas On Bureau of Land Management lands, a WSA is a roadless area that has been inventoried (but not designated by Congress)

More information

World Trade Center Memorial and Redevelopment Plan Historic Resources Report July PROJECT SITE DOCUMENTATION UNDER STIPULATIONS 1 AND 5

World Trade Center Memorial and Redevelopment Plan Historic Resources Report July PROJECT SITE DOCUMENTATION UNDER STIPULATIONS 1 AND 5 World Trade Center Memorial and Redevelopment Plan Historic Resources Report July 2006 INTRODUCTION This report on Historic Resources for the World Trade Center Memorial and Redevelopment Plan (Approved

More information

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures

Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures February 2014 Consultation on Amendments to Industry Canada s Antenna Tower Siting Procedures Aussi disponible en français Contents 1. Intent... 1 2. Mandate... 1 3. Policy... 1 4. Background... 1 5. Review

More information

Report concentration: BLM administered lands related to the Owyhee Complex, NV

Report concentration: BLM administered lands related to the Owyhee Complex, NV 1 Wild Horse Education Field Report and Recommendations: Draft: April 4, 2015 Cooperative Horse Removal with Fort McDermitt Pauite-Shoshone Tribe (Forest Service/Bureau of Land Management/Tribal authority)

More information

1313 Sherman Street, Room 618 Denver, Colorado Phone (303) FAX (303) wildlife.state.co.us parks.state.co.

1313 Sherman Street, Room 618 Denver, Colorado Phone (303) FAX (303) wildlife.state.co.us parks.state.co. COLORADO S & WILDLIFE 1313 Sherman Street, Room 618 Denver, Colorado 80203 Phone (303) 866-3437 FAX (303) 866-3206 wildlife.state.co.us parks.state.co.us MEMORANDUM Date: To: From: Re: August 29, 2013

More information

Public Art Accession, Selection Criteria and Gift Policy

Public Art Accession, Selection Criteria and Gift Policy CITY POLICY REFERENCE: C458B Percent for Art to Provide and Encourage Art in Public Areas C459 Statuary Policy C547 Public Art Administration, Registration and Outreach C549 Public Art Conservation, De-accession

More information

Science Impact Enhancing the Use of USGS Science

Science Impact Enhancing the Use of USGS Science United States Geological Survey. 2002. "Science Impact Enhancing the Use of USGS Science." Unpublished paper, 4 April. Posted to the Science, Environment, and Development Group web site, 19 March 2004

More information

(4) The location and design of schools so that they serve as community and neighborhood focal points; and

(4) The location and design of schools so that they serve as community and neighborhood focal points; and DIVISION 3.600 PUBLIC SCHOOL FACILITIES ELEMENT SECTION 3.601 INTRODUCTION The coordination of Polk County public school facility planning and comprehensive land use planning is in the best interests of

More information

SCOPING DOCUMENT. for Amendment 8 to the Atlantic Herring Fishery Management Plan. (Atlantic Herring ABC Control Rule) Prepared by the

SCOPING DOCUMENT. for Amendment 8 to the Atlantic Herring Fishery Management Plan. (Atlantic Herring ABC Control Rule) Prepared by the SCOPING DOCUMENT for Amendment 8 to the Atlantic Herring Fishery Management Plan (Atlantic Herring ABC Control Rule) Prepared by the New England Fishery Management Council Schedule of Herring Amendment

More information

BLM Mission It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and

BLM Mission It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and BLM Mission It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and enjoyment of present and future generations. Scoping

More information

The Marine Mammal Protection Act: A Looming Giant For Offshore Permitting. Ryan Steen Stoel Rives LLP October 7, 2015

The Marine Mammal Protection Act: A Looming Giant For Offshore Permitting. Ryan Steen Stoel Rives LLP October 7, 2015 The Marine Mammal Protection Act: A Looming Giant For Offshore Permitting Ryan Steen Stoel Rives LLP October 7, 2015 1 Roadmap Marine Mammal Protection Act Primer Section 101(a)(5) Incidental Take Authorizations

More information

UW REGULATION Patents and Copyrights

UW REGULATION Patents and Copyrights UW REGULATION 3-641 Patents and Copyrights I. GENERAL INFORMATION The Vice President for Research and Economic Development is the University of Wyoming officer responsible for articulating policy and procedures

More information

British Columbia s Environmental Assessment Process

British Columbia s Environmental Assessment Process British Columbia s Environmental Assessment Process Seminar #2 Guide for Aboriginal Groups and the General Public on the BC Environmental Assessment Process February 23, 2016 Paul Craven About the BC Environmental

More information

TITLE V. Excerpt from the July 19, 1995 "White Paper for Streamlined Development of Part 70 Permit Applications" that was issued by U.S. EPA.

TITLE V. Excerpt from the July 19, 1995 White Paper for Streamlined Development of Part 70 Permit Applications that was issued by U.S. EPA. TITLE V Research and Development (R&D) Facility Applicability Under Title V Permitting The purpose of this notification is to explain the current U.S. EPA policy to establish the Title V permit exemption

More information

October 6, Via electronic mail

October 6, Via electronic mail October 6, 2017 Via electronic mail Todd Yeager, Field Manager U.S. Bureau of Land Management Montana-Dakotas State Office Miles City Field Office 111 Garryowen Road Miles City, MT 59301 BLM_MT_Miles_City_FO@blm.gov

More information

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007

SATELLITE NETWORK NOTIFICATION AND COORDINATION REGULATIONS 2007 BR 94/2007 BR 94/2007 TELECOMMUNICATIONS ACT 1986 1986 : 35 SATELLITE NETWORK NOTIFICATION AND COORDINATION ARRANGEMENT OF REGULATIONS 1 Citation 2 Interpretation 3 Purpose 4 Requirement for licence 5 Submission

More information

Memorandum. Introduction

Memorandum. Introduction Memorandum To: Mark Slaughter, Bureau of Land Management From: Eric Koster, SWCA Environmental Consultants Date: December 6, 2016 Re: Proposed Golden Eagle Survey Protocol for Searchlight Wind Energy Project

More information

Radiocommunication Facility Review Protocol

Radiocommunication Facility Review Protocol Radiocommunication Facility Review Protocol 1.0 PURPOSE 1.1 The purpose of this protocol is to outline the guidelines and review process through which Radiocommunication Facilities are evaluated within

More information

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS)

ENGINEERING DRAWINGS MANAGEMENT POLICY (IFC/AS BUILTS) Approval Amendment Record Approval Date Version Description 15/10/2015 1 This policy takes precedence over L1-NAM-PRO-003 Infrastructure As Built Drawing Management due to business restructures. New Content

More information

Energy Trade and Transportation: Conscious Parallelism

Energy Trade and Transportation: Conscious Parallelism Energy Trade and Transportation: Conscious Parallelism DRAFT Speech by Carmen Dybwad, Board Member, National Energy Board to the IAEE North American Conference Mexico City October 20, 2003 Introduction

More information

Public School Facilities Element

Public School Facilities Element Public School Facilities Element GOAL 1: THROUGH PARTNERSHIPS AND EFFECTIVE COLLABORATION AMONG LOCAL GOVERNMENTS AND THE PINELLAS COUNTY SCHOOL DISTRICT, AND BECAUSE OF A SHARED COMMITMENT TO EDUCATIONAL

More information

II. Statutory and Regulatory Authorities for Underground Coal Mines

II. Statutory and Regulatory Authorities for Underground Coal Mines I. Purposes MEMORANDUM OF UNDERSTANDING BETWEEN THE U.S. DEPARTMENT OF LABOR, MINE SAFETY AND HEALTH ADMINISTRATION AND THE U.S. DEPARTMENT OF THE INTERIOR, BUREAU OF LAND MANAGEMENT The purposes of this

More information

below on Thursday, November 16, 2017 which is scheduled to commence at 10:30 a.m. in Room 17-59))

below on Thursday, November 16, 2017 which is scheduled to commence at 10:30 a.m. in Room 17-59)) This document is scheduled to be published in the Federal Register on 11/24/2017 and available online at https://federalregister.gov/d/2017-25412, and on FDsys.gov 6712-01 FEDERAL COMMUNICATIONS COMMISSION

More information

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design

June Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design June 2013 Phase 3 Executive Summary Pre-Project Design Review of Candu Energy Inc. Enhanced CANDU 6 Design Executive Summary A vendor pre-project design review of a new nuclear power plant provides an

More information

A POLICY in REGARDS to INTELLECTUAL PROPERTY. OCTOBER UNIVERSITY for MODERN SCIENCES and ARTS (MSA)

A POLICY in REGARDS to INTELLECTUAL PROPERTY. OCTOBER UNIVERSITY for MODERN SCIENCES and ARTS (MSA) A POLICY in REGARDS to INTELLECTUAL PROPERTY OCTOBER UNIVERSITY for MODERN SCIENCES and ARTS (MSA) OBJECTIVE: The objective of October University for Modern Sciences and Arts (MSA) Intellectual Property

More information

Art in Public Spaces Policy. City of Burlington

Art in Public Spaces Policy. City of Burlington City of Burlington The incorporates a community-based process for the evaluation and selection of potential artworks in public spaces throughout the City. The policy is intended to provide Council, staff

More information

CENTER FOR DEVICES AND RADIOLOGICAL HEALTH. Notice to Industry Letters

CENTER FOR DEVICES AND RADIOLOGICAL HEALTH. Notice to Industry Letters CENTER FOR DEVICES AND RADIOLOGICAL HEALTH Standard Operating Procedure for Notice to Industry Letters PURPOSE This document describes the Center for Devices and Radiological Health s (CDRH s, or Center

More information

MEMORANDUM OF UNDERSTANDING BETWEEN THE BUREAU OF LAND MANAGEMENT AND THE FRIENDS OF THE MUSTANGS

MEMORANDUM OF UNDERSTANDING BETWEEN THE BUREAU OF LAND MANAGEMENT AND THE FRIENDS OF THE MUSTANGS I. STATEMENT OF JOINT OBJECTIVES MEMORANDUM OF UNDERSTANDING BETWEEN THE BUREAU OF LAND MANAGEMENT AND THE FRIENDS OF THE MUSTANGS A. Purpose. The purpose of this agreement is to facilitate cooperation

More information

AN OVERVIEW OF THE UNITED STATES PATENT SYSTEM

AN OVERVIEW OF THE UNITED STATES PATENT SYSTEM AN OVERVIEW OF THE UNITED STATES PATENT SYSTEM (Note: Significant changes in United States patent law were brought about by legislation signed into law by the President on December 8, 1994. The purpose

More information

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS

ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS ARTICLE 3: WATERSHED MANAGEMENT PERMIT REQUIREMENTS AND SUBMITTALS Introduction This section provides guidance on the submittal requirements for a development to obtain a Watershed Management Permit from

More information

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C

Appeals Policy Council for the Accreditation of Educator Preparation th Street, N.W., Suite 400 Washington, D.C Appeals Policy Council for the Accreditation of Educator Preparation 1140 19th Street, N.W., Suite 400 Washington, D.C. 20036 Website: caepnet.org Phone: 202.223.0077 July 2017 Document Version Control

More information

DNVGL-CG-0214 Edition September 2016

DNVGL-CG-0214 Edition September 2016 CLASS GUIDELINE DNVGL-CG-0214 Edition September 2016 The content of this service document is the subject of intellectual property rights reserved by ("DNV GL"). The user accepts that it is prohibited by

More information

Spectrum Release Plan

Spectrum Release Plan Spectrum Release Plan Schedule of Future Frequency Awards NON-BINDING TRANSLATION Vienna, December 2016 1 Introduction... 3 2 Spectrum Release Plan... 5 3 Background of the Spectrum Release Plan... 6 3.1

More information

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents

Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents Loyola University Maryland Provisional Policies and Procedures for Intellectual Property, Copyrights, and Patents Approved by Loyola Conference on May 2, 2006 Introduction In the course of fulfilling the

More information