Single Bolt Connectors
|
|
- Mariah Shanna White
- 5 years ago
- Views:
Transcription
1 Single Bolt Connectors
2 Single Bolt Three Piece Clamp Type Connectors. Alongside the standard clamp type connector there has always been a need for a connector where either repeated assembly, operation by remote operated vehicles, or powered drive has favoured the use of single bolt type connectors. Destec Engineering now have many years of experience supplying these single bolt connectors in a very wide range of sizes, materials and pressure ratings. By using the range of Destec s conical seal rings, the units are compact and cost effective, and have significant advantages where weight is a problem. Most of the single bolt connectors have many customeråfs unique special requirements which we are able to incorporate in the designs. Some of the main features and details are listed below : - Weight saving by using Destec s seal rings, sealing at a minimum diameter, and also using high strength heat-treated and tempered materials for the clamps. Materials selected or coated suitable for most environments including subsea. Although there is only a single bolt they can be adapted to meet ASME and other pressure vessel requirements for quick release connectors. As these connectors are often remotely operated, the Destec seal rings can either be permanently attached to one hub or may be removable or replaced by a remote operated tool. Drive to the single bolt connector can be manual, or use air, hydraulic or electric tightening devices. Destec provide operating systems with all the necessary limit and safety controls for operation. Subsea connectors operated by remote operated vehicles are equipped with standard API torque receptacles and guides. Secondary sealing together with tappings for leakage monitoring. On subsea applications this would be provided with a stab connector. Multiple pipe connectors within one large single bolt clamp. Applications include large pressure vessel closures down to pipe connectors used for subsea hook-up. Some of the variety of applications has been shown in detail on the adjoining pages.
3 B10 Single Bolt Clamps for Choke Retrieval Subsea Destec Single Bolt Clamps are in service in the following fields :- BP Foinaven BP Schiehallion BP Swift BP Cirrus Norse Hydro Troll Exxon Mobil EPS / Kizomba British Gas Blake Burullus Gas Scarab/Saffron Amoco King Woodside Echo Yodel Enterprise Cook / Pierce Shell Malampaya Over 350 Destec Single Bolt Clamps are in use on Retrievable Subsea Chokes. The clamp is an integral part of the bonnet cover and is retrievable to the surface together with the valve trim. The bolt is fitted with API torque receptacles, to match the particular field standard, for ROV use. Bearings on the bolt ensure smooth even make-up and break. The clamp mounting plate illustrated is precision bored for additional hydraulic stab connectors and guide pins. This 10 nominal clamp has API ratings of:- 10,000 lb/sq.in. at 7 (180mm) diameter. 7,500 lb/sq.in. at 8 (205mm) diameter. 5,000 lb/sq.in. at 9 (230mm) diameter. Destec Engineering Ltd. Five Mile lane, Washingborough, Lincoln.
4 Destec Connector Chosen for First 15,000 psi ROV Hook-up Destec Engineers worked closely with the Engineers at Sonsub in Houston to perfect the worlds first psi ROV Hook-up. The successful installation is on the Gyrfalcon Field, Block 20 in the Gulf of Mexico. The 8 Connectors were supplied complete with a guidance system preventing damage to the hub ends which are also designed to protect and retain the Destec seal ring. Secondary sealing enables monitoring by the ROV of the connector performance whilst externally preventing the ingress of sea and sand. The adjacent photograph shows hook-up simulation tests being carried out in the fabricators yard. The main guidance system also incorporates soft land equipment which can be activated to assist initial pipeline separation. Destec Engineering Ltd. Five Mile Lane, Washingborough, Lincoln. Tel: 44 (0) Fax: 44 (0) sales@destec.co.uk
5 8 Single bolt Bolt Clamps for for Kerr McGee Janice Field On the Kerr McGee Janice Field eleven 8 inch Destec Spool assemblies are used to connect the flowlines to the wellheads. The units supplied comprise a G8SB Destec hub to 5 1 / 8 API 10K 36 0 fabricated spool clad with Inconel 625, a G8SB Inconel line blind and a Destec single bolt clampset. They form part of the wellhead assembly and are pressure tested to lb/in 2 (1034 bars), and comply with API 6A 75K, PSL3 material class HH, temperature class X and NACE MR In service the blind is removed and the flexible flowline connected by ROV. Destec Engineering Ltd. Five Mile Lane, Washingborough, Lincoln.
6 B8 Single bolt Clamps for Mobil Beryl A Single Point Mooring Platform Long service for 20 Clamps Four of these Destec Single Bolt Connectors are used on the jumper hoses at the base of the Mobil Beryl A Mooring Platform. The connectors at the 120m depth level are diver operated and have been in service since Destec Engineering Ltd. Five Mile Lane, Washingborough, Lincoln.
7 3 Piece Single bolt Subsea Clamps for the Seal Tube Air locks on the Troll Production Platform A total of seven 32 (813 mm) and 49 (1245 mm) diameter Single Bolt Clamps are installed at the base of the Troll Platform Leg at a depth of 1000 ft (325 m). The units form part of Seal Tube Air Locks and are used for current and future Hook Ups to production wells. Operation of the Destec Clamp is by ROV and when required a safety link is removed before opening the Single bolt Clamp. The cover together with the stopple equipment cartridge is then removed and brought to the surface. Design pressure is 508 lb./in 2 (35 bars), with two of Destec s unique conical seals used for internal and external pressurisation. This system allows for monitoring the sealing integrity. The photographs above show the closures during assembly at our factory, and in storage in Scotland after fabrication. On the right, the seven Destec closures are in the final position for construction of the concrete support leg of the Troll platform in Norway. Destec Engineering Ltd. Five Mile Lane, Washingborough, Lincoln.
8 Single Bolt Clamps for the South Arne Gravity Based Structure B12 Destec s Single Bolt Connectors are used in three separate applications on the South Arne GBS. The photograph to the right is a 36 (915 mm) bore roof access hatch on the buffer cell. The hatch is submerged and diver operated. Contained fluid is either product or sea water. Two 24 (600 mm) Destec Single Bolt hatches together with debris guards are installed on the cells of the GSB and fitted with torque receptacles for ROV operation. Four 18 (457 mm) seawater hatches shown below are fitted with 8 valves. Both the Destec Single Bolt Clamp and the valve are ROV operated. These seawater port Closures are fitted to the GBS tower. Destec Engineering Ltd. Five Mile Lane, Washingborough, Lincoln.
9 60 inch Single Bolt Clamp for Multi tube Hygro Generation Vessel This Destec quick action clamp is used to give a rapid turnaround when changing the catalyst, and is now in operation at the Cincinnati Plant of Henkel in the USA. It is a ASME VIII approved vessel with design conditions of 300 bars at 300 C Total clamp weight : 6 tons. The special 60inch Clamp is fitted with a 1450mm bore Destec seal ring and is shown on test at the works of Uhde in Germany. Destec Engineering Ltd 2001
10 GSB Clampsets SINGLE BOLT CLAMP CONNECTORS DESTEC User List GSB Single Bolt Clampsets have been supplied to the following customers:- Contractor Quantity Size Project Applications Depth Pressure Date Supplied Hub Material ABB Offshore Systems AS 11 G6SB Enterprise Corrib Structural Connection at 140 Knm Bending 355m n/a 2002 AISI K ABB Offshore Systems AS 1 G5SB Enterprise Corrib Kicker Line Connection 355m 345 bar 2002 A182 F51 and A694 F60 + Inc 625 Seat Ove ABB Offshore Systems AS 16 G4SB Shell Bonga Subsea Riser Gas Lift System 1200m 345 bar 2002 A182 F51 + Inc 625 Seat Overlay ABB Offshore Systems AS 1 G10SB Development Prototype Multibore Connection for Umbilical 1000bar 2002 A694 F65 ABB Offshore Systems AS 1 G12SB Development Prototype Multibore Connection for Umbilical 2002 AISI K + Inc 625 Seat Overlay ABB Offshore Systems AS 15 G10SB Statoil Snohvit Multibore Connection for Umbilical (ICARUS) 350m 430bar 2003 AISI K with Super Duplex Insert ABB Offshore Systems AS 30 GH12SB Statoil Snohvit Multibore Connection for Choke Module (VSS) 350m 430bar 2003/4 AISI K with Super Duplex Insert ABB Offshore Systems AS 3 G10SB Statoil Snohvit Single Bore, Horizontal Connection (ICARUS) 350m 270bar 2003 A182 F51 + Inc 625 Seat Overlay ABB Offshore Systems AS 3 G8SB Statoil Snohvit Single Bore, Horizontal Connection (ICARUS) 350m 430bar 2003 A182 F51 + Inc 625 Seat Overlay Bluewater Terminals Ltd 3 8" Subsea Connector Soverign Emerald Flexible Pipe on Riser to Seabed Achorage 120m 15 bar 1990 A350 LF2 52K Cameron Ireland Limited " G10SB BP Bruce 2 7.1/16" 10K Subsea Choke Valves 121m Up to 689 bar " Cameron Ireland Limited " G10SB BP Cyrus 7.1/16" 10K Subsea Choke Valves 104m Up to 689 bar " Cameron Ireland Limited " G10SB BP ETAP 7.1/16" 10K Subsea Choke Valves >100m Up to 689 bar " Cameron Ireland Limited " G10SB BP Foinaven 7.1/16" 10K Subsea Choke Valves m Up to 689 bar " Cameron Ireland Limited " G10SB BP Maclure 7.1/16" 10K Subsea Choke Valves 100m Up to 689 bar " Cameron Ireland Limited " G10SB BP Nam Con Som 7.1/16" 10K Subsea Choke Valves 42m Up to 689 bar " Cameron Ireland Limited " G10SB BP Atlantis 7.1/16" 10K Subsea Choke Valves 1000m Up to 689 bar " Cameron Ireland Limited " G10SB BP Schiehallion 7.1/16" 10K Subsea Choke Valves 400m Up to 689 bar " Cameron Ireland Limited " G10SB BP Rhum 7.1/16" 15K Subsea Choke Valve 107m 850bar " Cameron Ireland Limited " G10SB British Gas Blake 7.1/16" 10K Subsea Choke Valves 107m Up to 689 bar " Cameron Ireland Limited " G10SB Burullus Gas Scarab/Saffron 7.1/16" 10K Subsea Choke Valves m Up to 689 bar " Cameron Ireland Limited 600+ G10SB Amoco King 7.1/16" 10K Subsea Choke Valves 30m-2000m Up to 689 bar 1995 to Date Cameron Ireland Limited " G10SB Woodside Echo Yodel 7.1/16" 10K Subsea Choke Valves 122m Up to 689 bar " Cameron Ireland Limited " G10SB Enterprise Cook 7.1/16" 10K Subsea Choke Valves 95m Up to 689 bar " Cameron Ireland Limited " G10SB Enterprise Pierce 7.1/16" 10K Subsea Choke Valves 85m Up to 689 bar " Cameron Ireland Limited " G10SB Conoco West Natuna 7.1/16" 10K Subsea Choke Valves 97m Up to 689 bar " Cameron Ireland Limited " G10SB Exxon Mobil EPS 7.1/16" 10K Subsea Choke Valves 2100m Up to 689 bar " Cameron Ireland Limited " G10SB Exxon Mobil Kizomba B 7.1/16" 10K Subsea Choke Valves 1300m Up to 689 bar " Cameron Ireland Limited " G10SB Norsk Hydro Troll 7.1/16" 10K Subsea Choke Valves m Up to 689 bar " Cameron Ireland Limited " G10SB Shell Conger 7.1/16" 15K Subsea Choke Valve 440m 1000bar " Cameron Ireland Limited " G10SB Chevron / Texaco Tahiti 7.1/16" 15K Subsea Choke Valve " Cameron Ireland Limited " G10SB DNO Heather Broom 7.1/16" 10K Subsea Choke Valves 143m Up to 689 bar " Cameron Ireland Limited " G10SB Shell Malampaya 7.1/16" 10K Subsea Choke Valves 820m Up to 689 bar " Cameron Ireland Limited " G10SB Mariner Energy Falcon 7.1/16" 10K Subsea Choke Valves 1370m Up to 689 bar " Cameron Ireland Limited " G10SB Total Fina Elf Dalia 7.1/16" 10K Subsea Choke Valves 1500m Up to 689 bar " Cameron Ireland Limited " G10SB Husky Energy White Rose 7.1/16" 10K Subsea Choke Valves 125m Up to 689 bar " Cameron Ireland Limited " G10SB Triton Ceiba 7.1/16" 10K Subsea Choke Valves 670m Up to 689 bar " Cooper Cameron (UK) Limited 12 G8SB Kerr McGee Janice 5.1/8" 10K Subsea Riser / Tree Connection 80m 345 bar 1998 AISI K + Inc 625 Seat Overlay EMH Limited 2 20" nb Clampset Mobil Beryl A - SPM Flexible Pipe on Riser to Seabed Achorage 112m 28 bar 1987 A350 LF2 52K Estech Europe Ltd 1 G36SB Demonstration Prototype Vessel Closure for Recycling Municipal Waste n/a 10bar 2003 A105 Framo Engineering AS 2 G14SB BHP Keith Multiphase Flow Meter 130m 345 bar 2000 Not Destec Supply Framo Engineering AS 2 G14SB British Gas Blake Multiphase Flow Meter 130m 345bar 2000 Not Destec Supply Framo Engineering AS 6 G8SB Santos Mutineer / Exeter Subsea Multiphase Pump (L / R Hand drive) 2500m 345bar 2004 A182 F51 3 Phase Measurements AS 2 G10SB BP Schiehallion Subsea Multiphase Flowmeter 400m 345 bar 2002 Not Destec Supply 3 Phase Measurements AS 1 G10SB Lundin Petroleum Broom Subsea Multiphase Flowmeter 200m 345 bar 2003 Not Destec Supply 3 Phase Measurements AS 2 G10SB BP Farragon Subsea Multiphase Flowmeter 200m 345bar 2005 Not Destec Supply 3 Phase Measurements AS 3 G10SB Amerada Hess Ceiba Subsea Multiphase Flowmeter 750m 345bar 2003 Not Destec Supply 3 Phase Measurements AS 10 G6SB Marathon Alvheim Subsea Multiphase Pump 130m 520bar % Cr Duplex (A182 F51) 3 Phase Measurements AS 4 G6SB Total Forvie Subsea Multiphase Pump 120m 520bar % Cr Duplex (A182 F51) Frank Mohn Flatoy AS 8 G6SB Amerada Hess Ceiba Subsea Multiphase Pump (L (Left Hand drive) 750m 345bar 2003 A182 F51 Frank Mohn Flatoy AS 7 G6SB Amerada Hess Ceiba Subsea Multiphase Pump (Right Hand drive) 750m 345bar 2003 A182 F51 Haliburton Brown & Root 1 G12SB Statoil Norne Pig Launcher / Receiver Topside 337 bar 1999 A182 F51 Kvaerner Oilfield Products Ltd 1 G10SB Petro Canada West Gilamore Subsea Multiphase Flowmeter (2 x 4" Bore) 130m 345 bar 1999 Not Destec Supply Kvaerner Oilfield Products Ltd 1 G10SB Petro Canada West Gilamore Subsea Multiphase Flow Meter 130m 345bar 2003 Not Destec Supply Mjorud EAB AS 1 G4SB Norsk Hydro FramVest Gas Injection Flowline 340m 300bar % Cr Duplex (A182 F51) MOFFAT G3SB Exxon Mobil Kizomba B Pipe Spool Connections - Riser Cabinet 1100m 65bar 2004 A182 F51 AISI K or 75K (Not Destec Supply)
11 GSB Clampsets SINGLE BOLT CLAMP CONNECTORS DESTEC User List GSB Single Bolt Clampsets have been supplied to the following customers:- Contractor Quantity Size Project Applications Depth Pressure Date Supplied Hub Material Oceaneering Inc. 1 G14SB Shell Oregano/Sarano Subsea Pig Launcher 1030m 700 bar 2000 A350 LF2 + Inc 625 Seat Overlay OMV (Australia) 2 G6SB OMV / Santos Patricia Baleen Wellhead to Pipeline Connection 55m 345bar 2002 A350 LF2 Sonsub International Inc 2 G8SB Shell Gyrfalcon 5.1/8" 15K Subsea Riser / Tree Connection 269m 1034 bar 1999 AISI K + Inc 625 Seat Overlay Statoil 1 4" nb Automated Statoil K-Lab Automated Closure for Gas Weigh Vessel Topside 260 bar 1986 A182 F316L Taylor Woodrow M & E Ltd 1 36" nb Clampset Amerada Hess South Arne Subsea Access Hatch 60m 6 bar 1998 A350 LF Seat Overlay Taylor Woodrow M & E Ltd 4 24" nb Clampset Amerada Hess South Arne Subsea Access Hatch 60m 6 bar 1998 A350 LF Seat Overlay Taylor Woodrow M & E Ltd 2 18" nb Clampset Amerada Hess South Arne Subsea Access Hatch 60m 6 bar 1998 A350 LF Seat Overlay Technip Coflexip Stena Offshore Norge AS 3 G6SB Horizontal Esso Ringhorne Flexible/Rigid Line/SPS Connectors 128m 207bar 2001 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 4 G6SB Vertical Esso Ringhorne Subsea Pigging Structure Connection 128m 207bar 2001 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 4 G10SB Horizontal Esso Ringhorne Flexible/Rigid Line/SPS Connectors 128m 160bar 2001 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 4 G10SB Vertical Esso Ringhorne Subsea Pigging Structure Connection 128m 160bar 2001 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 6 G12SB Horizontal Esso Ringhorne Flexible/Rigid Line/SPS Connectors 128m 160bar 2001 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 6 G12SB Vertical Esso Ringhorne Subsea Pigging Structure Connection 128m 160bar 2001 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 4 G10SB for 8" nb BP Tambar Flexible/Rigid Line Connectors 70m 380bar 2001 A694 F65 + Inc 625 Seat Overlay or UNS S32750/60 Technip Coflexip Stena Offshore Norge AS 6 G12SB for 10" nb BP Tambar Flexible/Rigid Line Connectors 70m 380bar 2001 A694 F65 + Inc 625 Seat Overlay or UNS S32750/60 Technip Coflexip Stena Offshore Norge AS 8 G12SB for 10" nb BP Vallhall Flexible/Rigid Line Connectors 70m 310bar 2002 UNS S32760 Technip Coflexip Stena Offshore Norge AS 1 G10SB for 8" nb BP Vallhall Flexible/Rigid Line Connectors 70m 448bar 2002 UNS S32760 Technip Coflexip Stena Offshore Norge AS 1 G8SB for 6" nb BP Vallhall Flexible/Rigid Line Connectors 70m 79bar 2002 UNS S32760 Technip Coflexip Stena Offshore Norge AS 5 G6SB Esso Jurassic/Jotun Flexible/Rigid Line/SPS Connectors 126m 240bar 2003 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 1 G10SB for 8" nb Esso Jurassic/Jotun Flexible/Rigid Line Connectors 126m 58bar 2003 AISI K + Inc 625 Seat Overlay Technip Coflexip Stena Offshore Norge AS 1 G12SB Esso Jurassic/Jotun Flexible/Rigid Line Connectors 126m 58bar 2003 AISI K + Inc 625 Seat Overlay Technip Offshore UK Ltd 16 G4SB Burullus Gas Simian/Sapphire Jumper Connection System 500m 345bar % Cr Duplex (A182 F51) Technomarine 3 49" nb Clampset Shell Troll Subsea Seal Tube Closures 303m 35 bar 1991 Carbon steel Technomarine 4 31" nb Clampset Shell Troll Subsea Seal Tube Closures 303m 35 bar 1991 Carbon steel Uhde GmbH 1 60" nb Clampset Henkel Cincinatti USA Closure- Multi Tube Hydrogenation Vessel Topside 300 bar 1991 A336 F22
12 GSB Clampsets User List with Application Data and a Summary of Approvals / Testing Contractor Quantity Size Project Applications Depth Pressure Date Supplied Summary of Approvals / Testing ABB Offshore Systems AS 11 G6SB Enterprise Corrib Structural Connection at 140 Knm Bending 355m n/a 2002 n/a ABB Offshore Systems AS 1 G5SB-D100 Enterprise Corrib Kicker Line Connection 355m 345 bar 2002 Pressure Test, Simulated Hyperbaric Test ABB Offshore Systems AS 16 G4SB-W5D75 Shell Bonga Subsea Riser Gas Lift System 1200m 345 bar 2002 Fit Up Test, Guiding Test, Closing Test, Pressure Tests, Simulated Hyperbaric Test, Simulated Bending Load Closing Test ABB Offshore Systems AS 1 G10SB Development Prototype Multibore Connection for Umbilical 1000bar 2002 n/a ABB Offshore Systems AS 1 G12SB Development Prototype Multibore Connection for Umbilical 2002 n/a ABB Offshore Systems AS 15 G10SB Statoil Snohvit Multibore Connection for Umbilical (ICARUS) 350m 430bar 2003 tba ABB Offshore Systems AS 22 GH12SB Statoil Snohvit Multibore Connection for Choke Module (VSS) 350m 430bar 2003 tba ABB Offshore Systems AS 3 G10SB Statoil Snohvit Single Bore, Horizontal Connection (ICARUS) 350m 270bar 2003 tba ABB Offshore Systems AS 3 G8SB Statoil Snohvit Single Bore, Horizontal Connection (ICARUS) 350m 430bar 2003 tba Bluewater Terminals Ltd 3 8" Subsea Connector Soverign Emerald Flexible Pipe on Riser to Seabed Achorage 120m 15 bar 1990 G10SB Amoco King 7.1/16" 10K Subsea Choke Valves 30m-2000m Up to 689 bar 1995 to Date Design Verification on first off G10SB BP Bruce 2 7.1/16" 10K Subsea Choke Valves 121m Up to 689 bar " " G10SB BP Cyrus 7.1/16" 10K Subsea Choke Valves 104m Up to 689 bar " " G10SB BP ETAP 7.1/16" 10K Subsea Choke Valves >100m Up to 689 bar " " G10SB BP Foinaven 7.1/16" 10K Subsea Choke Valves m Up to 689 bar " " G10SB BP Maclure 7.1/16" 10K Subsea Choke Valves 100m Up to 689 bar " " G10SB BP Nam Con Som 7.1/16" 10K Subsea Choke Valves 42m Up to 689 bar " " G10SB BP Schiehallion 7.1/16" 10K Subsea Choke Valves 400m Up to 689 bar " " G10SB British Gas Blake 7.1/16" 10K Subsea Choke Valves 107m Up to 689 bar " " Cameron Ireland Limited 750+ G10SB Burullus Gas Scarab/Saffron 7.1/16" 10K Subsea Choke Valves m Up to 689 bar " " G10SB Woodside Echo Yodel 7.1/16" 10K Subsea Choke Valves 122m Up to 689 bar " " G10SB Enterprise Cook 7.1/16" 10K Subsea Choke Valves 95m Up to 689 bar " " G10SB Enterprise Pierce 7.1/16" 10K Subsea Choke Valves 85m Up to 689 bar " " G10SB Conoco West Natuna 7.1/16" 10K Subsea Choke Valves 97m Up to 689 bar " " G10SB Exxon Mobil EPS 7.1/16" 10K Subsea Choke Valves 2100m Up to 689 bar " " G10SB Exxon Mobil Kizomba 7.1/16" 10K Subsea Choke Valves 1300m Up to 689 bar " " G10SB Norsk Hydro Troll 7.1/16" 10K Subsea Choke Valves m Up to 689 bar " " G10SB Shell Malampaya 7.1/16" 10K Subsea Choke Valves 820m Up to 689 bar " " G10SB Mariner Energy Falcon 7.1/16" 10K Subsea Choke Valves 1370m Up to 689 bar " " G10SB Triton Ceiba 7.1/16" 10K Subsea Choke Valves 670m Up to 689 bar " " Cooper Cameron (UK) Limited 11 G8SB-D155 Kerr McGee Janice 5.1/8" 10K Subsea Riser / Tree Connection 80m 345 bar 1998 Design Verification, Build Verification, Pressure Tests EMH Limited 2 20" nb Clampset Mobil Beryl A - SPM Flexible Pipe on Riser to Seabed Achorage 112m 28 bar 1987 tba Framo Engineering AS 2 G14SB-D310 BHP Keith Multiphase Flow Meter 130m 345 bar 2000 Design Verification Framo Engineering AS 2 G14SB-D310 British Gas Blake Multiphase Flow Meter 130m 345bar 2000 Design Verification Framo Engineering AS 2 G10SB-D220 British Gas Blake Multiphase Flow Meter 130m 345bar 2002 Design Appraisal 3 Phase Measurements AS 2 G10SB-D220 BP Schiehallion Subsea Multiphase Flowmeter 400m 345 bar 2002 Design Appraisal 3 Phase Measurements AS 3 G10SB-D220 Triton Ceiba Subsea Multiphase Flowmeter 2500m 345bar 2003 tba Frank Mohn Flatoy AS 8 G6SB-HD145 Triton Ceiba Subsea Multiphase Pump (Left Hand) 2500m 345bar 2003 tba Frank Mohn Flatoy AS 7 G6SB-HD145 Triton Ceiba Subsea Multiphase Pump (Right Hand drive) 2500m 345bar 2003 tba Haliburton Brown & Root 1 G12SB-D260 Statoil Norne Pig Launcher / Receiver Topside 337 bar 1999 Pressute Test Kvaerner Oilfield Products Ltd 1 G10SB Petro Canada West Gilamore Subsea Multiphase Flowmeter (2 x 4" Bore) 130m 345 bar 1999 n/a Kvaerner Oilfield Products Ltd 1 G10SB Petro Canada West Gilamore Subsea Multiphase Flow Meter 130m 345bar 2003 n/a Mjorud EAB AS 1 G4SB-W5D60 Norsk Hydro FramVest Gas Injection Flowline 340m 300bar 2003 n/a Oceaneering Inc. 1 G14SB-D255 Oregano/Sarano Subsea Pig Launcher 1030m 700 bar 2000 n/a OMV (Australia) 2 G6SB-W5D150 Patricia Baleen Wellhead to Pipeline Connection 55m 2002 n/a Sonsub International Inc 2 G8SB-D125 Shell Gyrfalcon 5.1/8" 15K Subsea Riser / Tree Connection 269m 1034 bar 1999 Pressure Tests Statoil 1 4" nb Automated Statoil K-Lab Automated Closure for Gas Weigh Vessel Topside 260 bar 1986 tba Taylor Woodrow M & E Ltd 1 36" nb Clampset Amerada Hess South Arne Subsea Access Hatch 60m 6 bar 1998 tba Taylor Woodrow M & E Ltd 4 24" nb Clampset Amerada Hess South Arne Subsea Access Hatch 60m 6 bar 1998 tba Taylor Woodrow M & E Ltd 2 18" nb Clampset Amerada Hess South Arne Subsea Access Hatch 60m 6 bar 1998 tba Technip Coflexip Stena Offshore Norge AS 3 G6SB-W5D155 Horizontal Esso Ringhorne Flexible/Rigid Line/SPS Connectors 128m 207bar 2001 n/a Technip Coflexip Stena Offshore Norge AS 4 G6SB-W5D155 Vertical Esso Ringhorne Subsea Pigging Structure Connection 128m 207bar 2001 n/a Technip Coflexip Stena Offshore Norge AS 4 G10SB-W8D245 Horizontal Esso Ringhorne Flexible/Rigid Line/SPS Connectors 128m 160bar 2001 Technip Coflexip Stena Offshore Norge AS 4 G10SB-W8D245 Vertical Esso Ringhorne Subsea Pigging Structure Connection 128m 160bar 2001 Pressure / Bend Test Technip Coflexip Stena Offshore Norge AS 6 G12SB-W8D290 Horizontal Esso Ringhorne Flexible/Rigid Line/SPS Connectors 128m 160bar 2001 n/a Technip Coflexip Stena Offshore Norge AS 6 G12SB-W8D290 Vertical Esso Ringhorne Subsea Pigging Structure Connection 128m 160bar 2001 n/a Technip Coflexip Stena Offshore Norge AS 4 G10SB-D195 for 8" nb BP Tambar Flexible/Rigid Line Connectors 70m 380bar 2001 Pressure Tests Technip Coflexip Stena Offshore Norge AS 6 G12SB-D235 for 10" nb BP Tambar Flexible/Rigid Line Connectors 70m 380bar 2001 Pressure Tests Technip Coflexip Stena Offshore Norge AS 8 G12SB-W8D245 for 10" nb BP Vallhall Flexible/Rigid Line Connectors 70m 310bar 2002 Pressure Tests Technip Coflexip Stena Offshore Norge AS 1 G10SB-W8D175 for 8" nb BP Vallhall Flexible/Rigid Line Connectors 70m 448bar 2002 Pressure Tests Technip Coflexip Stena Offshore Norge AS 1 G8SB-W8D150 for 6" nb BP Vallhall Flexible/Rigid Line Connectors 70m 79bar 2002 Pressure Tests Technip Coflexip Stena Offshore Norge AS 5 G6SB-W5D155 Esso Jurassic/Jotun Flexible/Rigid Line/SPS Connectors 126m 240bar 2003 Pressure Tests Technip Coflexip Stena Offshore Norge AS 1 G10SB-W8D205 for 8" nb Esso Jurassic/Jotun Flexible/Rigid Line Connectors 126m 58bar 2003 Pressure Tests Technip Coflexip Stena Offshore Norge AS 1 G12SB-W8D290 Esso Jurassic/Jotun Flexible/Rigid Line Connectors 126m 58bar 2003 Pressure Tests Technomarine 3 49" nb Clampset Shell Troll Subsea Seal Tube Closures 303m 35 bar 1991 tba Technomarine 4 31" nb Clampset Shell Troll Subsea Seal Tube Closures 303m 35 bar 1991 tba Uhde GmbH 1 60" nb Clampset Henkel Cincinatti USA Closure- Multi Tube Hydrogenation Vessel Topside 300 bar 1991 tba
GSB SUBSEA SINGLE BOLT CONNECTORS The Destec GSB Subsea Single Bolt Connector is a purpose designed unit for operations where a conventional four bolt G-Range pipe connection would be impractical. ELECTRICAL
More informationVIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application
VIRTUS CONNECTION SYSTEMS Advanced Diverless Connection Solutions for any Subsea Field Application 2 Virtus Subsea Connectors Delivering Long-Lasting Reliability at Each Subsea Connection Subsea production
More informationAn Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years!
An Introduction to Grayloc Products! Serving your Piping and Pressure Vessel requirements for over 50 years! Grayloc Products An Oceaneering International Company Oceaneering is a global oilfield provider
More informationSubsea Structural Engineering Services. Capability & Experience
Subsea Structural Engineering Services Capability & Experience Capability Overview INTECSEA s subsea structural engineering team has a proven track record for providing solutions to problems in the implementation
More informationVertical Tie-in Systems
Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed
More informationVertical Tie-in Systems
Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed
More informationMARS. Multiple application reinjection system
MARS Multiple application reinjection system Unique Technology. Universal Application. Historically, installing processing hardware on existing subsea trees has been a high-risk and costly activity due
More informationQUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY
PEMEX-INTSOK Deepwater Technology Seminar, May 9-10, 2013 UNITECH is QUALITY INNOVATION RELIABILITY ENGINEERED SIMPLICITY Global Reach UNITECH equipment and people support some of the world s most challenging
More informationFES SUBSEA HOT STAB. FES Subsea Merchant Court, Ashington, Northumberland, England, NE63 0YH
FES SUBSEA HOT STAB Flexible Engineered Solutions have built up a reputation for satisfying clients with a range of standard & bespoke ROV operable Hot Stab Connectors for use in fluid transfer systems
More informationUCON Connection Systems
UCON Connection Systems UCON Connection Systems Subsea fields are developed using a variety of connection system solutions. Over the past two decades, FMC Technologies has manufactured a complete range
More informationBP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE
Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel
More informationPipeline Repair Systems
Pipeline Repair Systems Pipeline Repair Systems Subsea Innovation is a world leader in the supply of split sleeve pipeline repair equipment with over 20 systems supplied to major operators around the
More informationCONNECTION. Certified System Components. Subsea Connections
CONNECTION TM Certified System Components Subsea Connections Subsea Connections from Cameron: reliable, versatile links to tie production systems together. Right from the start, the leader Cameron s subsea
More informationCameron MOSAIC. Systems for the Malampaya Project
MOSAIC Certified MALAMPAYA Cameron MOSAIC Systems for the Malampaya Project The Malampaya Project LUZON CALM Loading Buoy UPSTREAM Onshore Gas Plant DOWNSTREAM Alternative Fuel Electricity Power Stations
More informationTABLE OF CONTENTS Page
2 American Petroleum Institute TABLE OF CONTENTS Page POLICY................t... 8 FOREWORD......................................................................................................................f...
More informationPressurised Subsea Pipeline Repair Recent Case Studies
Despite good pipeline design and integrity management schemes, pipelines can and do get damaged and need to be repaired. Damage can be caused by any number of factors, such as dragged anchors, landslides,
More informationCompany Overview DEDICATED TO SAFETY, QUALITY, VALUE, AND PROJECT EXECUTION EXCELLENCE!
Subsea Support Base Company Overview Offshore Inland Marine & Oilfield Services, Inc. (OIMO) corporate headquarters in Pensacola, FL provides a full range of Subsea services and marine construction support
More informationThe World Floating Production Report
Brochure More information from http://www.researchandmarkets.com/reports/350474/ The World Floating Production Report 2005-2009 Description: The fifth edition of this acclaimed business study. Floating
More informationTechnip Floating Production: A Comprehensive Portfolio
Technip Floating Production: A Comprehensive Portfolio Fortis Bank Floating Production Luncheon Ivan Replumaz - CEO Offshore Branch ISIN FR0000131708 I. II. III. IV. V. FLOATER BRIEF INTRODUCTION TECHNIP
More informationNORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.
(12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day
More informationThe intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.
1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local
More informationA marginal field (re-)development using several alternative methodologies 1
Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy
More informationSubsea Chokes and Flow Modules
Subsea Chokes and Flow Modules 2 Relia Designed for maximum flexibility and reliability, FMC s F Series Subsea Chokes and Flow Modules are ideal for production, injection, gas lift and waterflood applications.
More informationEnhancing international subsea well incident intervention
Enhancing international subsea well incident intervention Y C 23 M 2 Y 0 K 63 K While we hope intervention equipment will never be needed, it is critical for the industry to be prepared Archie Smith, Chief
More informationOffshore Development Concepts: Capabilities and Limitations. Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013
Offshore Development Concepts: Capabilities and Limitations Kenneth E. (Ken) Arnold Sigma Explorations Holdings LTD April, 2013 Outline Platforms Floating Structures Semi-Submersible/ Floating Production
More informationTailor Made. Create your unique subsea valve
Tailor Made Create your unique subsea valve Our engineers have developed a comprehensive range of subsea valves, operators and hydraulic actuators to deliver complete tailor made packages meeting the highest
More informationOBSERVATORY SERVICING AND MAINTENANCE
OBSERVATORY SERVICING AND MAINTENANCE How to deploy and maintain a network of observatories around Europe? We don t built what we cannot maintain! Jean-François DROGOU IFREMER Steve ETCHEMENDY M.B.A.R.I
More informationOneSubsea Pumps and Subsea Processing Systems
OneSubsea Pumps and Subsea Processing Systems Pumps and Subsea ProcessING Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our aim is to provide comprehensive technical
More informationFlow Assurance. Capability & Experience
Flow Assurance Capability & Experience Capability Overview Flow assurance encompasses the thermal-hydraulic design and assessment of multiphase production/ transport systems as well as the prediction,
More informationHorizontalBore SUBSEA TREE
HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.
More informationINTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success. Deepsea technologies
INTEGRATED SUBSEA PRODUCTION SYSTEMS Efficient Execution and Cost-Effective Technologies Deliver Project Success Deepsea technologies Streamlining Subsea Production Systems for Smaller Fields AFGlobal
More informationImplementing a Deepwater- Pipeline-Management System
Implementing a Deepwater- Pipeline-Management System L.T.M. Samosir, D. Popineau, and A. Lechon, Total S.A. Summary As an operator, Total has experienced significant deepwater maintenance and repair activities,
More informationOPTICAL FIBER AND CONNECTORS: CRITICAL COMPONENTS OF MANY ADVANCED SUBSEA SYSTEMS. Perry Wright: Fiber-optics Technology Manager, Ocean Design Inc,
OPTICAL FIBER AND CONNECTORS: CRITICAL COMPONENTS OF MANY ADVANCED SUBSEA SYSTEMS Abstract Perry Wright: Fiber-optics Technology Manager, Ocean Design Inc, Since the first connectorized, subsea fiber-optic
More informationULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)
RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.
More informationLEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY. Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves
LEADING THE WAY IN WELLHEAD AND PIPELINE TECHNOLOGY Wellheads Christmas Trees Gate Valves Surface Safety Valves Frac Trees Check Valves OUR Stream-Flo Industries Ltd. is committed to provide premium quality
More informationHorizontal Tie-in Systems
Horizontal s Horizontal Systems Horizontal Tie-in may be used for both first-end and second end tie-in of both flowlines, umbilicals and Jumper spools. The Termination Head on the line may be hauled in
More informationMarginal Project Development
Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor
More informationHPHT Case Study: Kristin Field, North Sea
HPHT Case Study: Kristin Field, North Sea Craig Newman Senior Engineer, Subsea Systems NOV Texas Oil Tools 1 Personal info 2010 BSME Texas Tech University Joined TOT as Mechanical Engineer Worked with
More informationIntroduction to Subsea Production Systems. What is Subsea? 02 What is Subsea? DNV GL DNV GL 2013 August 2015
Introduction to Subsea Production Systems 02 What is Subsea? August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER What is Subsea? 2 1 Goals Know the main building blocks forming a subsea production
More informationSubsea Valve Actuators
Subsea Valve Actuators APPLICATIONS Shafer s experience in providing subsea valve control systems spans 30 years. We have hundreds of subsea actuators currently in service around the world. Subsea valve
More informationSAFER, SMARTER, GREENER
OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree
More informationStandard Horizontal Subsea Trees. Integrated offshore offering for reliable, high-quality, and capitalefficient
Standard Horizontal Subsea Trees Integrated offshore offering for reliable, high-quality, and capitalefficient performance Standard Horizontal Subsea Trees Through standardized processes, common core components,
More informationLocation. Established in 2015 Office location: Klepp Næringspark, Norway.
Location Established in 2015 Office location: Klepp Næringspark, Norway. Vision to be leader within On-Site machining & Decommissioning segment with a main focus on mature plants, offshore installations,
More informationMarine Well Containment Company. Charlie Miller, Chief Technology Officer
Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company
More informationHibernia oil production platform
Mission #3 TOW TANK Oil & gas exploration and production in the North Atlantic: Hibernia platform The Atlantic Ocean has contributed significantly to the development and economy of the countries around
More informationDXe SUBSEA WELLHEAD CONNECTORS
DXe SUBSEA WELLHEAD CONNECTORS Illustration shown: DXe-3 Connector with DXe latching segment Upper Body Indicator Rod Ring Gasket Retainer Latch Segment Spreader Upper Split Ring Retractor Latch Port Ring
More informationSend your directly to
Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.
More informationDeepwater Asset Optimization using Performance Forecasting
Deepwater Asset Optimization using Performance Forecasting PETRONAS-PETRAD-INSTOK-CCOP Deepwater Workshop Alex Tan PERFORMANCE FORECASTING 2 What is Performance Forecasting? Reliability Equipment performance
More informationBy: Derek Watson and Lee Robins, Tracerco, UK
TRACERCO DISCOVERY SUBSEA CT (COMPUTED TOMOGRAPHY) HELPS TO OPTIMISE YOUR OPERATIONAL PIGGING CAMPAIGN AND VERIFY ILI RESULTS: TECHNOLOGY FOR PIPELINE INTEGRITY AND FLOW ASSURANCE VISUALISATION By: Derek
More informationSpeaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015
Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general
More informationOffshore Systems. Cameron s Subsea Production Philosophy
Offshore Systems In today s fast-paced, cost-conscious subsea production industry, Cameron has successfully met the challenge to deliver safe, reliable system solutions. This experience allows Cameron
More informationControls and Communications Connectors Diamould electrical connectors
Controls and Communications Connectors Diamould electrical connectors APPLICATIONS Subsea production systems controls Connectivity to tree, manifold, choke, and chemical injection metering valve (CIMV)
More informationSubsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World
Subsea UK Neil Gordon Chief Executive Officer Championing the UK Subsea Sector Across the World 1 Overview About Subsea UK Facts and figures UK industry evolution Centre of Excellence Technology and Innovation
More informationFLNG in Harsh Environment - Disconnectable and Relocatable Riser System
FLNG in Harsh Environment - Disconnectable and Relocatable Riser System 2H Offshore Engineering Overview Riser design requirements Flexible and steel riser system challenges Design features of Single Line
More informationCURRICULUM VITAE. Diploma - Ocean Engineering BEng (Hons) - Civil Engineering Fellow of the Institute of Marine Engineering Science and Technology
PROFESSION NATIONALITY QUALIFICATIONS PROFESSIONAL INSTITUTIONS Subsea Engineer British MSc - Ocean Engineering Diploma - Ocean Engineering BEng (Hons) - Civil Engineering Fellow of the Institute of Marine
More informationFlexible Pipe Solutions a competitive approach for Shallow water development. Sylvain Cabalery
Flexible Pipe Solutions a competitive approach for Shallow water development Sylvain Cabalery Agenda 1. Subsea at Technip in Brief and Asia Pacific presence 2. Flexible Pipes Solutions a. Main differences
More informationOffshore Drilling Rigs
Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions
More informationOFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING
OFFSHORE CLAMP PRODUCT GUIDE INTELLIGENT ENGINEERING Red Marine provides intelligent engineering solutions to global clients working in the oil & gas, nuclear and renewable energy industries. With a broad
More informationMarine Risers. Capability & Experience
Marine Risers Capability & Experience Capability Overview INTECSEA now offers, in a single company, industry leading capability for all marine riser systems including top-tensioned risers (TTRs) for direct
More informationBolt Tightening Solutions Torque and Tension, we ve got got it covered.
Bolt Tightening Solutions Torque and Tension, we ve got got it covered. Bolt Tightening Solutions Tentec are an innovative producer of bolt tightening equipment with a high level of focus on quality and
More informationInnovative Subsea Engineering
Innovative Subsea Engineering www.subsea.co.uk Innovative Subsea Engineering Formed in 1985 by a team of experienced engineers and diving professionals, Subsea Innovation is a company dedicated to delivering
More informationSubsea Production Market and Industry Teaming. Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management
Subsea Production Market and Industry Teaming Presented by: Bruce Crager Executive Vice President: Expert Advisory Group Endeavor Management February 28, 2017 Worldwide Progression of Water Depth Capabilities
More informationWorld Area Configuration Centers (WACC) offer sales support, service, inventory and commissioning to our global customers. Choose the WACC or sales office nearest you: NORTH & SOUTH AMERICA 19200 Northwest
More informationPROCHEM INSTRUMENTATION. Product solutions for a world of difference BUTECH PIPING PRODUCTS INSTRUMENTATION VALVES MANUFACTURING
PROCHEM Product solutions for a world of difference PIPING PRODUCTS VALVES MANUFACTURING INDENT & PROJECT SERVICES HYDRAULIC The World of Prochem PIPING PRODUCTS VALVES MANUFACTURING INDENT & PROJECT SERVICES
More informationSubsea Tooling Services Range of Dredgers
Subsea Tooling Services Range of Dredgers Subsea Tooling Services UK Ltd (STS) has a large selection of ROV / Diver operated dredgers. The range includes 3 4 6 8 10 and 12 dredgers. We are confident we
More informationCarl-Petter Halvorsen AOG the life cycle solution for flexibles
Carl-Petter Halvorsen AOG 2009 11.06.2009 From Cradle to Grave Introduction to flexlife Delivery Management Project History Integrity Management Strategy Flexible pipe failure modes What the UK HSE say
More informationWe Deliver We Care.
We Deliver We Care www.dayagroup.com.my DAYA MATERIALS BHD (636357-W) Level U1 Block D5, Solaris Dutamas No. 1 Jalan Dutamas 1, 50480 Kuala Lumpur Tel: (603) 6205 3170 Fax: (603) 6205 3171 PROFILE C A
More informationTable Of Contents Casing Head 02 Christmas Tree & Tubing Head Tubing Spool 04 Contact Us
Table Of Contents Casing Head 02 Christmas Tree & Tubing Head 03 Tubing Spool 04 Contact Us 05 1 www.sapwellsglobal.com Casing Head Specialized large-diameter pipe lowered into an open hole and cemented
More informationSUBSEA SYSTEM ARCHITECTURE FOR CORAL SOUTH FLNG
Introduction to Eni Our new mission: We are an energy company. We are working to build a future where everyone can access energy resources efficiently and sustainably. Our work is based on passion and
More informationPumps and Subsea Processing Systems. Increasing efficiencies of subsea developments
Pumps and Subsea Processing Systems Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our
More informationCameron MBO Multi-Bowl Wellhead System
Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead
More informationDeepwater Precommissioning Services
Deepwater Precommissioning Services Featuring Denizen remote subsea technologies Drilling Evaluation Completion Production Intervention Pipeline & specialty services Nitrogen services Pipeline services
More informationFMC Technologies Overview Fourth Quarter Director, Investor Relations Matt Seinsheimer
FMC Overview Fourth Quarter 2016 Director, Investor Relations Matt Seinsheimer +1 281.260.3665 matthew.seinsheimer@fmcti.com This presentation contains forward-looking statements intended to qualify for
More informationStatus på Dvalin-prosjektet. Roy Padget, Topside Host Manager
Status på Dvalin-prosjektet Roy Padget, Topside Host Manager Kristiansund, 31. mai 2018 A brief history of DEA in Norway 1973 1979 1980ies 1990 1991 1991 2010 2015 2016 2017 2018 Company established as
More informationNils J. Vågen Framo Engineering
First World Wide Subsea Raw Seawater Injection System in Operation on CNR s Columba E Field Nils J. Vågen Framo Engineering Columba E First Raw Seawater Injection System PROTECTIVE STRUCTURE & FRAMO DUAL
More informationWellhead equipment CATALOG
equipment CATALOG Wellhead & Christmas tree Fixed the drilled wellhead.connect wellhead casing ring,seal and control the annular of casing. suspend tubing,control wellhead pressure and adjust flow rate,also
More informationGE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions
GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flowmeter The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationCHINA ZHEJIANG ZHONGGONG VALVE GROUP CO,.LTD FORMEN VALVE
INTERNATIONAL SALES: FORMEN VALVE ADD: OUBEI TOWN, YONGJIA COUNTY, WENZHOU, ZHEJIANG, CHINA HEADQUARTER: ZHEJIANG ZHONGGONG VALVE GROUP ADD: WUXING INDUSTRY ZONE, OUBEI TOWN, WENZHOU, CHINA ABOUT US Formen
More informationWATERFLUX 3000 Quick Start
WATERFLUX 3000 Quick Start Electromagnetic flow sensor The documentation is only complete when used in combination with the relevant documentation for the signal converter. KROHNE CONTENTS WATERFLUX 3000
More informationPRE-INSPECTION CLEANING OF UNPIGGABLE SUBSEA OPERATIONAL PIPELINES
PRE-INSPECTION CLEANING OF UNPIGGABLE SUBSEA OPERATIONAL PIPELINES By: Jakub Budzowski and Robert Davidson, Halliburton Pipeline and Process Services Europe Abstract Subsequent to risk based inspection
More informationU-Series. Subsea Screw Jacks & Bevel Gearboxes
U-Series Subsea Screw Jacks & Bevel Gearboxes The Power Jacks U-Series: strength in depth The U-Series is a new proposition from Power Jacks: a range of subsea products specifically designed to operate
More information1
[Type text] www.upstreamflowsolutions.com 1 Upstream Flow Solutions evolved as a solution focused company targeting only the midstream and upstream sectors of the oil & gas industry from drilling operations
More informationSubsea 7 Norway. Monica Th. Bjørkmann Sales and Marketing Director
Subsea 7 Norway 28.06.2012 Monica Th. Bjørkmann Sales and Marketing Director Agenda Subsea 7 Norway What We Do Our Assets Market Going Forward Closing 27-Jun- 12 Page 2 Our new beginning A combination
More informationEmergency Pipeline Repair Systems; A Global Overview of Best Practice
Emergency Pipeline Repair Systems; A Global Overview of Best Practice Brief Introduction to EPRS EPRS: Key Challenges Worldwide EPRS: Global Approaches to These Challenges Best Practice Comparison James
More informationSubsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!
PT Hallin Marine June 18 th, 2014! Introduction Issues and Risks Inspection, Maintenance & Repair Case Study Conclusions and Recommendations 2 Introduction Subsea Pipeline IMR q Obtain data to assess the
More informationFMC Technologies Overview Third Quarter Supervisor, Investor Relations James Davis
FMC Technologies Overview Third Quarter 2015 Supervisor, Investor Relations James Davis +1 281.260.3665 james.davis@fmcti.com This presentation contains forward-looking statements intended to qualify for
More informationRiserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N
Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375
More informationRISER SYSTEMS. Our world class innovation solving your riser challenges
RISER SYSTEMS Our world class innovation solving your riser challenges OUR WORLD CLASS INNOVATION SOLVING YOUR RISER contents Riser Analysis 3 Subsea Riser Systems 4 Connectors (Subsea and Surface) Surface
More informationYour Partner for Subsea Pumping
Your Partner for Subsea Pumping Our Experience Dedicated to Your Success With the drivers of increased oil recovery and the depletion of traditionally accessible oil fields, the trend in oil and gas is
More information16/09/2014. Introduction to Subsea Production Systems. Module structure. 08 Production Control Systems
OIL & GAS Introduction to Subsea Production Systems 08 Production Control Systems September 2014 DNV GL 2013 September 2014 SAFER, SMARTER, GREENER Module structure Section 1 Introduction to control systems
More informationRiser Installation in Deep & Ultra Deep Water
Riser Installation in Deep & Ultra Deep Water Frank Lim 38 th Annual Offshore Pipeline Technology Conference Amsterdam, February 2015 Outline Introduction Overview of current deepwater riser systems and
More informationLocal Contribution to the Aasta Hansteen development
Local Contribution to the Aasta Hansteen development 05th June 20 Stian Sande Who are we Presentation overview What is our role on Aasta Hansteen Onshore activites and local contribution What do we expect
More informationApache Subsea Projects NORTH SEA REGION. Richard Stark Paul Williams
Apache Subsea Projects NORTH SEA REGION Richard Stark Paul Williams INTRODUCTION TO APACHE Presenters Richard Stark, Project Services Manager, Apache North Sea Paul Williams, Subsea Projects Manager, Apache
More informationRapid Deployment System. subsea pipelines
Rapid Deployment System for monitoring i slugging in subsea pipelines Agenda Issue Design criteria Design process Operating principles Qualification strategy System description Future applications 2 Pulse
More informationHeidrun Inverted Gas Lift System
Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques
More informationNo September, Char-Lynn. Power Steering. Repair Information. 20 Series Steering Control Unit 001
Char-Lynn Power Steering No. 7-313 September, 1997 Repair Information 20 Series Steering Control Unit 001 Bearing Race Retaining Ring Needle Thrust Bearing Bearing Race Seal Ring Backup Washer Seal (3
More informationBSOL: Key Standards for the Oil & Gas Industry. bsigroup.com/bsol
BSOL: Key Standards for the Oil & Gas Industry bsigroup.com/bsol What is BSOL? British Standards Online (BSOL) is an online database of standards. It will help you manage standards more efficiently by
More informationSubsea Tooling Services UK Ltd Engineered Subsea Solutions
Subsea Tooling Services UK Ltd Engineered Subsea Solutions Who we are: Subsea Tooling Services - What We Do Dredgers Subsea Baskets Project Tooling HPU s Clump Weights Supplying our clients with advanced
More informationMSP/DRILEX Subsea Oil and Gas Drilling & Production System Equipment. January 30,2018
MSP/DRILEX Subsea Oil and Gas Drilling & Production System Equipment January 30,2018 CONTENTS 1 Company profile 2 MSP/Drilex R&D and results of subsea wellhead system equipment 3 Main subsea projects 4
More information