1 Mutineer-Exeter Development Drilling & Completions Challenges Darren Greer & Peter Dodd (10 March 2005) 1

2 Outline 1. Project Overview 2. Wells Overview 3. Drilling Challenges Outcomes 4. Completions Challenges Outcomes 5. Campaign Outcomes 2

3 Project Overview North West Shelf WA 2 Fields ~160m water depth Light, sweet crude Very low GOR Subsea Development Fast-track project Santos first offshore development World first dual-esp subsea wells tied back to an FPSO 3

4 Wells Overview 30 /20 casing 13-3/8 casing 10-3/4 casing Key Features Tubing Hanger Horizontal Tree Batch drilled and completed Pilot holes utilised 2 x ESP Cables Geosteered horizontal sections ESP Packer Horizontal subsea trees 2 x ESP Dual Electric Submersible Pumps ESP Bypass Retrievable Packer Isolation Nipple Profile 5-1/2 tubing 5-1/2 sand screens 9-5/8 casing 4

5 Drilling Challenges 1. Resources (the right team) 2. Mitigating batch drilling risks 3. Top reservoir uncertainty 4. Geosteering/Palaeosteering 5

6 Drilling Challenges Resources (Team) - Santos first offshore development - Complex wells - Abundant in-house drilling expertise - Limited offshore development expertise Solution - Core staff team - Familiar with Santos systems and culture - Experience/learning retained - Team supplemented with contract personnel - Skill gaps filled 6

7 Drilling Challenges Batch Drilling Pros and Cons Pro Con - Increased operational/logistics efficiency - Reduced cost - Reduced environmental exposure - Potential increased exposure to critical design flaws - Geological unknowns - Formation damage/impaired production Solution - First well drilled and tested to prove design early in campaign - Timely incorporation of optimisations 7

8 Drilling Challenges Top Reservoir Uncertainty - Risk of sub-optimal well placement ( production) - Risk of numerous sidetracks ( cost) Solution Pilot hole - Pilot hole used to locate and evaluate reservoir - Well sidetracked once only - Production hole optimally placed Pilot hole 8

9 Drilling Challenges Geosteering - Empowered Reservoir Navigator imbedded early in subsurface team - Log response modelling performed - Straightforward decision making process Palaeosteering Approaching Shale - Contingency capability at rig - Allows rapid shale identification if a fault is intersected 9

10 Other Success Successful formation damage mitigation Early wellbore stability/geomechanics work Design eliminated 20 casing string Use of TesTrak (LWD formation pressure tool) 10

11 Outcomes 394 days continuous operations 4 Development wells drilled and completed 7 appraisal holes drilled 2 near field exploration wells drilled Wells benchmark favourably with similar development wells Demonstrated continuous improvement Measured Depth (m) Drilling Improvement ,000. 1,500. 2,000. 2,500. 3,000. 3,500. 4,000. Drilling Time Performance (Like Development Wells) 4 wells successfully geosteered Successful batch drilling Visible performance improvement across campaign Mutineer 4 (Actual) Exeter-4 (Actual) Days Completions Improvement % Downtime Completions Down-Time (Dual ESPs - Subsea Wells) Mutineer-Exeter Completions Other Operator (North Sea 2003) Days Mutineer-Exeter Completions Corrected Durations* Run XT Run BOP Run Upper Compl. Landing String Clean Up Suspend Mutineer 4 Mutineer 5 Exeter 4AH Mutineer 9H AFE 11

12 The History of Subsea ESP...Part 1 Operator A - 1 well 3 x Misruns ESP aborted, gas lift installed... 12

13 The History of Subsea ESP...Part 2 Operator B 3 wells 2 x Misruns 43% NPT 13

14 Completions The Challenge. Santos first offshore completions Fast tracked project Schedule critical Complex dual ESP subsea completions Only done successfully once before in the world 14

15 Completion Design Debris Cap Crown Plugs Tubing Hanger Horizontal Production Tree TRSCSSV 2 x ESP Cables ESP Packer Upper Completion 2 x ESP s Bypass Tubing Retrievable Nipple Profile for Deep Set Plug Retrievable Packer Tubing (5-1/2 ) upper and lower Sand Screens Lower Completion 15

16 Completions Outline Lower Completion RIH sand screens and packer. RIH latch seal assembly with deep set plug. Cleanout well to inhibited seawater. Set suspension packer. Upper Completion Install horizontal tree. Retrieve suspension packer. RIH dual ESP completion. Land tubing hanger with subsea test tree. Displace tubing to diesel, set packer. Clean up well to flare. RIH tubing hanger crown plugs. Install debris cap. Perform final electrical checks. ESPs not commissioned on rig. To be done on FPSO. 16

17 Completions Timeline FEED Study completed May 2003 Completions HAZID March 2004 Tree Profile Interface Simulation Modelling March 2004 Tubing Hanger Simulation Test April 2004 Exeter 4AH Well Test May 2004 ESP Running SIT May 2004 Subsea Tree SIT (Landing String and ROV) June 2004 Detailed design finalised June 2004 Tree Handling HAZID July 2004 Complete the Well on Paper Exercise August 2004 Completions (x4 wells) October December

18 Exeter 4AH Well Test 1 st well test of Exeter field. Well did not self kill! Enabled fine tuning of lower completion design, cleanout procedures and well test spread. 18

19 System Integration Testing Cable and equipment damage a high risk 1 week SIT $ < 1 rig day $ ESP and tubing deployment SIT at test rig in Aberdeen Tubing Hanger Simulation Test at Vetco Gray Singapore Subsea Tree SIT with Landing String and ROV at Vetco Gray Singapore 19

20 Riser Angle 2D Simulation determined system limits 1 deg contact (Damage) occurs Aberdeen SIT confirmed these limits- (skidded rig to simulate) m water depth, max 2.7m drift off station Calibration of Bullseyes Calibration of Nautronix riser monitoring system Effect of wind and tides closely monitored Regular ROV monitoring In practice <0.5deg maintained 20

21 Cable Handling Electrical Checks Retractable BJ350 Spider Lasalle Clamp Installation 21

22 Cable Handling MLE Space-out Splicing Retractable BJ350 Spider 22

23 Cable Damage During TH make up, first completion: Lost Electrical signal on Upper Pump Cable TDR indicated a fault at the XT POOH, respliced, continued RIH Incorrect space-out of Protection pups Protection effective during re-run 23

24 Subsea Alignment Aligned Tree, Rig and TH to minimise rotation when landing out Tubing Hanger Position of Cable sheaves important Influenced rig heading and manifold orientation RIG FLOOR AFT CABLE SPOOLERS PORT NORTH KEYWAY FORWARD RIG ORIENTATION: 235deg NORTH PRODUCTION FLANGE KEYWAY APPROX 30deg TUBING HANGER HORIZONTAL TREE ORIENTATION STARBOARD 24

25 BOP Modifications TH Bore offset 1-3/4 to accommodate 2 x Tronic connectors, Dogleg adaptor required between THRT (URT) & SSTT BOP Spaceout required 38 spoolpiece between LPR s and H4 connector Increased height of BOP s prevented lifting onto test stump Solution: Hydraulically Retractable H4 test stump 25

26 ESP Spool Tree Running 1 st subsea tree 26

27 ESP Spool Tree Debris Cap Spool Tree Tubing Hanger 27

28 Deck Management Formal Deck Management Plan Pre-prepared pipe onshore Additional decks installed Minimal test package Backloaded drilling gear (batched sequence) 28

29 Well Cleanliness High focus on wellbore cleanouts. Progressive improvement in well bore cleanliness Successfully retrieved all Lower Completion Junk Catchers and Plugs Sometimes very full 3ft Junk Catcher used 29

30 Phase 1 Completions Performance Days Mutineer-Exeter Completions Corrected Durations Mutineer 4 Mutineer 5 Exeter 4AH Mutineer 9H AFE Run XT Run BOP Run Upper Compl. Landing String Clean Up Suspend Time reduced from 14.5 to 10.2 days. 30% improvement 14.3% NPT 8.3% completion related NPT cf. Operator B NPT 43% TRCFR = 0 during completions. 30

31 Keys to Success SITs invaluable. - Modifying procedures and relationship building. - Saved countless hours of rig time. Planning, planning, planning! - Huge focus on attention to detail. Great team effort from all personnel involved. Continuity of personnel through planning and implementation. - Sought and secured the right people early. Rapidly applied learnings to improve efficiency. - Minimal focus on time targets yet improved by 30%! Batch setting of completions. - Significantly simplified logistics and equipment movements. 31

32 Campaign Outcomes Key Achievements - TRCRF <2 (target 10) - No lost time incidents - 44,465m of hole drilled - Longest step-out well drilled by Santos - Doubled the number of dual-esp completions worldwide - No impact on project schedule - Under budget - On time 32

33 Questions? 33

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS.

Siem WIS. Siem WIS AS. Closed Loop Drilling CLD. August Siem WIS AS. AS Closed Loop Drilling CLD August 2010 2010 AS. Technology summary has secured intellectual property rights (IPR) for all key components of its portfolio: CircSub To drill with constant Mud Circulation

More information

An Introduction to Oil & Gas Drilling and Well Operations

An Introduction to Oil & Gas Drilling and Well Operations An Introduction to Oil & Gas Drilling and Well Operations Educational Material from the IOM 3 Oil and Gas Division The global network for the materials cycle Introduction The Institute of Materials, Minerals

More information

SUBSEA 101. Find more Subsea 101 case studies online

SUBSEA 101. Find more Subsea 101 case studies online SUBSEA 101 The purpose of this document is to help define some of the rationale behind the selection of a subsea tree configuration in a theoretical field for a project we are calling Project X. This section

More information

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure.

The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. 1 The intent of this guideline is to assist the Drilling Engineer in his preparation of the deepwater drill stem test design and procedure. This document is not intended to override any specific local

More information

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl.

NORWAY. Norwegian Industrial Property Office (12) APPLICATION (19) NO (21) (13) A1. (51) Int Cl. (12) APPLICATION (19) NO (21) 11782 (13) A1 NORWAY (1) Int Cl. E21B 43/00 (06.01) E21B 43/01 (06.01) E21B 43/12 (06.01) Norwegian Industrial Property Office (21) Application nr 11782 (86) Int.application.day

More information

Deep Water Definitions

Deep Water Definitions DST in Deep Water Deep Water Definitions Depth of Water (Deepwater >1000ft (300m), Ultra- Deepwater > 5000ft (1500m)) Rig Type - Floaters (Drillships and Semi-Submersibles) Approach and Profile (risk,

More information

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS)

Suspended Subsea Well Monitoring CaTS TM Wireless Technology. Donald Horsfall RPLM (ECIS) Suspended Subsea Well Monitoring CaTS TM Wireless Technology Donald Horsfall RPLM (ECIS) Tuesday 27 th June 2017 Agenda Introduction to CaTS Technology CaTS - Cable-less Telemetry System Industry guidelines

More information

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015

Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Well Control Contingency Plan Guidance Note (version 2) 02 December 2015 Prepared by Maritime NZ Contents Introduction... 3 Purpose... 3 Definitions... 4 Contents of a Well Control Contingency Plan (WCCP)...

More information

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus

International Well Control Forum Well Intervention Pressure Control Subsea Syllabus International Well Control Forum Well Intervention Pressure Control Subsea Syllabus November 2017 Version 1.0 IWCF Well Intervention Pressure Control Subsea Syllabus Contents Guidance Notes... 1. Introduction...

More information

Well Abandonment Services. Plug into a New Approach

Well Abandonment Services. Plug into a New Approach Well Abandonment Services Plug into a New Approach Get it Right the First Time Permanent Solutions to Your Well Abandonment Challenge Thousands of wells await safe and permanent abandonment. It s critical

More information

RPSEA PROJECT STATUS REPORT FEB 2011

RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA PROJECT STATUS REPORT FEB 2011 RPSEA Project 08121-2301-03 Ultra-Deepwater Riserless Intervention System (RIS) & RPSEA Project 09121-3500-07 Ultra-Deepwater Subsea Test Tree (SSTT) and Intervention

More information

SAFER, SMARTER, GREENER

SAFER, SMARTER, GREENER OIL & GAS Introduction to Subsea Production Systems 04 Christmas Tree (XT) Systems August 2015 DNV GL 2013 August 2015 SAFER, SMARTER, GREENER Christmas Tree Systems Onshore tree Offshore tree Subsea tree

More information

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N

Riserless Subsea P&A. Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N Riserless Subsea P&A Deepwater Decommissioning Workshop 2016 W I L D W E L L C O N T R O L S U B S E A I N T E R V E N T I O N 7 Series S U B S E A I N T E R V E N T I O N 7 Series Nominal Bore Size 7.375

More information

4 Briefing. Responsible investor

4 Briefing. Responsible investor Issue Responsible investor 4 Briefing Wednesday 8 th February 2012 In 2010, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP

More information

Quad 204 Schiehallion Field Restarting a brownfield subsea development

Quad 204 Schiehallion Field Restarting a brownfield subsea development Quad 204 Deepsea Aberdeen: New 6 th Gen semi dual derrick Quad 204 New FPSO, Glen Lyon: biggest in N hemi-sphere Quad 204 Schiehallion Field Restarting a brownfield subsea development Thomas Harpley, Reservoir

More information

Subsea Lift. Inwell and caisson lifting systems

Subsea Lift. Inwell and caisson lifting systems Subsea Lift Inwell and caisson lifting systems Two Decades of Subsea Experience With more than 70 percent of the Earth s surface covered by water, it was inevitable for oil and gas fields to eventually

More information

Vertical Tie-in Systems

Vertical Tie-in Systems Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed

More information

Vertical Tie-in Systems

Vertical Tie-in Systems Vertical Tie-in Systems Vertical Tie-In Systems Vertical Tie-in systems may be used for tie-in of flexible flowlines, umbilicals, Jumper spools, Rigid Spools and Inline Tees. Vertical connections are installed

More information

Offshore Drilling Rigs

Offshore Drilling Rigs Offshore Drilling Rigs Drilling Offshore Drilling Rigs Many of the world s potential reserves of hydrocarbons lie beneath the sea, and the hydrocarbon industry has developed techniques suited to conditions

More information

MARS. Multiple application reinjection system

MARS. Multiple application reinjection system MARS Multiple application reinjection system Unique Technology. Universal Application. Historically, installing processing hardware on existing subsea trees has been a high-risk and costly activity due

More information

Marginal Project Development

Marginal Project Development Marginal Project Development A case study of the MC-66 / OCHRE Project Richard Weser MC66 OCHRE Joint Venture Project OCHRE PROSPECT DEVELOPMENT Mississippi Canyon 66 1 Gas Subsea 7.9-Mile Tieback to Taylor

More information

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015

Speaker at the Americas: Decommissioning and Well Abandonment. September 23, 2015 Speaker at the Americas: Decommissioning and Well Abandonment September 23, 2015 TETRA Offshore Services TETRA Offshore Services ISO 9001:2008 Certified 2 Decommissioning Case Study - Agenda A general

More information

HorizontalBore SUBSEA TREE

HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE HorizontalBore SUBSEA TREE Dril-Quip s HorizontalBore Tree is a modular design subsea production component that accommodates numerous completion configuration possibilities.

More information

Multi-Bowl Applications

Multi-Bowl Applications Multi-Bowl Applications Standard Off-the- Shelf Casing Head Lower Profile Solution Common Support Bushing Field Proven Sealing Designs FS Seals require No Plastic Packing C-22 Profile = Standard Off-the-

More information

Designing Subsea Wells for Abandonment & Suspension

Designing Subsea Wells for Abandonment & Suspension Designing Subsea Wells for Abandonment & Suspension Graeme Rae Rig Build Project Engineer Chevron Upstream Europe Aberdeen Designing Subsea Wells for Abandonment & Suspension Subsea Well Design Aspects

More information

Comprehensive Plug and Abandonment Systems

Comprehensive Plug and Abandonment Systems Comprehensive Plug and Abandonment Systems Abandon Your Well. Abandon Uncertainty. Complete, single-trip systems for P&A Schlumberger comprehensive plug and abandonment systems bring certainty and rig-time

More information

ACID STIMULATION CASE STUDY

ACID STIMULATION CASE STUDY ACID STIMULATION CASE STUDY 07/03/2018 AGENDA Introduction Rigless system overview Operational considerations Case Study Interference Test objectives & Equipment Interference Test results Summary Conclusion

More information

@balance Deepwater. MPD services

@balance Deepwater. MPD services @balance Deepwater MPD services Drill faster and reach farther with @balance Deepwater MPD services Achieve drilling objectives with closed-loop systems MPD provides a closed-loop circulation system in

More information

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater.

Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Deepwater riserless (RLWI) enablers for increased oil recovery. Bringing shallow water experience to deepwater. Well Intervention Services Deepwater RLWI success criteria RLWI history Technology Focus

More information

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used

Moduels in PetroTrainer. PetroTrainer. How PetroTrainer is used PetroTrainer E-Learning for the Petroleum industry PetroTrainer is probably the world s largest and most comprehensive tool made for training purposes in the petroleum industry. The ITC Boreskolen started

More information

Subsea Positioning In deep water

Subsea Positioning In deep water Subsea Positioning In deep water PETRONAS - PETRAD - INTSOK CCOP DEEPWATER SUBSEA TIE-BACK Damai Puri Resort & Spa, Kuching, Sarawak, MALAYSIA 24TH - 26TH January, 2011 Supplier to the oil & gas industry

More information

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch

Training Fees 4,250 US$ per participant for Public Training includes Materials/Handouts, tea/coffee breaks, refreshments & Buffet Lunch Training Title WELL HEAD OPERATIONS Training Duration 5 days Training Venue and Dates REF OP035 Well Head Operations 5 08-12 May $4,250 Abu Dhabi, UAE Will be held in any of the 5 star hotels. The exact

More information

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement.

In any of the 5 star hotel. The exact venue will be intimated prior to course commencement. Training Title WELLHEAD OPERATION Training Duration 5 days Training Venue and Dates Wellhead Operations 5 19 23 May $3,750 Abu Dhabi, UAE In any of the 5 star hotel. The exact venue will be intimated prior

More information

Force Seminar, March 28th - 29th, 2001 "Value of Smart Wells"

Force Seminar, March 28th - 29th, 2001 Value of Smart Wells Development and first installation of the remote hydraulic completion concept in a subsea well at Snorre Authors: Egil Østvik (Norsk Hydro) Paul L. Browne (Halliburton) Lars Rasmussen (Norsk Hydro) Jim

More information

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE

BP SWOPS Single Well Oil Production System. Sandy Meldrum CEng, MIMechE Sandy Meldrum CEng, MIMechE Concept A means of producing oil from small offshore fields which would be uneconomic for fixed platforms or other conventional means. System Overview Comprised Production Vessel

More information

COILED TUBING DESIGN & OPERATIONS

COILED TUBING DESIGN & OPERATIONS Training Title COILED TUBING DESIGN & OPERATIONS Training Date & Duration Will be held at any 5 star hotel- 5 Days Coiled Tubing Design & Operations 5 days 15-19 December 2013 US $ 4,250 Abu Dhabi Training

More information

Casing while Drilling. Enhanced Casing Installation

Casing while Drilling. Enhanced Casing Installation Casing while Drilling Enhanced Casing Installation CWD Definition, History & Experience Casing while Drilling means utilizing the casing string as the drill string instead of drill pipe. 1907 Reuben Baker

More information

Sinking of the Deepwater Horizon. 11 perish and 115 survive

Sinking of the Deepwater Horizon. 11 perish and 115 survive Sinking of the Deepwater Horizon 11 perish and 115 survive The Rig Rig cost about $500,000 per day to contract With all the drilling spread, helicopters, support vessels, other services cost about $1,000,000

More information

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS

IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS WIRELESS BARRIER MONITORING JULY 2015 WIRELESS BARRIER MONITORING IMPROVES EFFICIENCY OF SUBSEA TREE CHANGE-OUTS LOCATION: North Atlantic PRODUCT: DATE: CASE STUDY: 1006/01 SERVICE: Deepwater Barrier Verification

More information

7 Briefing. Responsible investor

7 Briefing. Responsible investor Issue Responsible investor 7 Briefing Monday, 5 th October 202 In 200, we accepted all 26 recommendations made by the Bly Report our internal investigation into the Deepwater Horizon incident. BP has committed

More information

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions

GE Oil & Gas Drilling & Production. VetcoGray subsea wellhead systems. Advanced solutions for extreme conditions GE Oil & Gas Drilling & Production VetcoGray subsea wellhead systems Advanced solutions for extreme conditions VetcoGray subsea wellhead systems As offshore drilling pushes past 10,000-foot water depths

More information

PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY

PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY PRODUCT OVERVIEW NEXT-GENERATION (NXG) SOLUTIONS FOR THE OIL AND GAS INDUSTRY A MULTI ACTIVATION CIRCULATION SUB OILSCO Technologies Multi Activation Circulation Sub - it is a breakthrough technology.

More information

Cameron MBO Multi-Bowl Wellhead System

Cameron MBO Multi-Bowl Wellhead System Cameron MBO Multi-Bowl Wellhead System MBO Multi-Bowl Wellhead System The Cameron MBO Multi-Bowl Wellhead System is a compact, unitized wellhead which can be used as an alternative to conventional wellhead

More information

Lifting Engineering. Capability & Experience

Lifting Engineering. Capability & Experience Lifting Engineering Capability & Experience Results for our customers The WorleyParsons consulting group is a collaborative, multidisciplinary team with a broad range of strategic, technical and project

More information

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing

Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Friction Grip in Wellheads: An Innovative Approach to Load Support & Sealing Brent Harrald Principal Engineer Plexus Ocean Systems Ltd. December 2009 Page 1 Table of Contents Introduction Plexus Ocean

More information

Industry Response - Post Macondo

Industry Response - Post Macondo Industry Response - Post Macondo Charlie Williams Chief Scientist Well Engineering Shell Energy Resource Company CSIS Energy and National Security Program - future of offshore oil & gas developments in

More information

Welltec Pareto Offshore Conference September 4, 2013

Welltec Pareto Offshore Conference September 4, 2013 Welltec Pareto Offshore Conference September 4, 2013 Agenda for today s presentation 1. Introduction to Welltec 2. Welltec Well Intervention Services 3. Welltec Flex Well Completion 4. Q&A s 1. Introduction

More information

BT-4000 LIGHT WORKOVER UNIT

BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT BT-4000 LIGHT WORKOVER UNIT DESIGNED TO IMPROVE EFFICIENCY DURING WELL INTERVENTION OPERATIONS The BT-4000 LWO is the new generation DP-3 semi-submersible for efficient light

More information

Heidrun Inverted Gas Lift System

Heidrun Inverted Gas Lift System Heidrun Inverted Gas Lift System ICoTA European Intervention Conference, Aberdeen Nov. 2014 Sivert Gartland, Well Intervention Engineer, Heidrun, Statoil Agenda Background - Field and drainage techniques

More information

Send your directly to

Send your  directly to Welcome to Chess Subsea Production System Training - SPS Subsea production system (SPS) is associated with the overall process and all the equipment involved in drilling, field development, and field operation.

More information

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery

White Paper. Deepwater Exploration and Production Minimizing Risk, Increasing Recovery White Paper Deepwater Exploration and Production Minimizing Risk, Increasing Recovery Deepwater exploration, development and production present unique challenges to operators, and minimizing risk and maximizing

More information

Investor Relations Presentation April 30, 2013

Investor Relations Presentation April 30, 2013 Investor Relations Presentation April 30, 2013 FORWARD LOOKING STATEMENTS In addition to the historical data contained herein, this document may include forward-looking statements regarding the future

More information

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr.

Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier. Brian Piccolo, Technology Development Mgr. Subsea Pump System - Optimized for Rapid Deployment & Operation within the Primary Barrier Brian Piccolo, Technology Development Mgr. Agenda Pumped Riser System (PRS) Vision Initial Concept Operational

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s Commitment The Deepwater Horizon incident was a tragic accident that took 11 lives and impacted thousands of people and the Gulf environment Going forward,

More information

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald

Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Case Study (GoM 2016): Enhanced Production Strategies Throughout Field Life Using Standardised Flow Access Modules (FAM) Ian Donald Managing Director, Enpro Subsea idonald@enpro-subsea.com Agenda Enpro

More information

DE120 Successful Well Completion and Workover Practices:

DE120 Successful Well Completion and Workover Practices: DE120 Successful Well Completion and Workover Practices: A Practical Approach from Design to Field Operations H.H. Sheik Sultan Tower (0) Floor Corniche Street Abu Dhabi U.A.E www.ictd.ae ictd@ictd.ae

More information

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc.

Advanced Well Completion Design. 30 Sep - 04 Oct 2018, Dubai. REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. 30 Sep - 04 Oct 2018, Dubai Approved Centre REP logo, PMI & PMP are registered trademarks of Project Management Institute, Inc. Introduction Organisational Impact This Glomacs Advanced Well training seminar

More information

In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance

In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance In-line Subsea Sampling: Non-disruptive Subsea Intervention Technology for Production Assurance Hua Guan, Principal Engineer, OneSubsea Phillip Rice, Sales&Commercial Manager, OneSubsea February 8, Subsea

More information

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments

Pumps and Subsea Processing Systems. Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems Increasing efficiencies of subsea developments Pumps and Subsea Processing Systems OneSubsea offers unique and field-proven pumps and subsea processing systems. Our

More information

Intervention/Decommissioning

Intervention/Decommissioning Intervention/Decommissioning By Nicholas Samford Lloyds Register Intervention/Decommissioning SME Working together for a safer world Planning Decommissioning Operations Planning Decommissioning and P&A

More information

WRS Artificial Lift System

WRS Artificial Lift System WRS Artificial Lift System Patent Pending Designed to adapt to any type of Artificial Lift Suspension! Artificial Lift and Down hole gauge monitoring Is fast Becoming the go to in the oil production market.

More information

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion

Design and Concept Integration- MPD Technology in Deepwater Rigs. Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion Design and Concept Integration- MPD Technology in Deepwater Rigs Julmar Shaun S. Toralde, Global Deepwater Managed Pressure Drilling Champion Managed Pressure Drilling An adaptive drilling process used

More information

Marty Massey, Chief Executive Officer Marine Well Containment Company

Marty Massey, Chief Executive Officer Marine Well Containment Company Marty Massey, Chief Executive Officer Marine Well Containment Company Phil Smith, General Manager Emergency Management and Deepwater Regulatory, Shell Energy Resources Company About MWCC Leading deepwater

More information

Expro Perforation Services

Expro Perforation Services Expro Perforation Services www.exprogroup.com Expro provide reservoir optimised perforation solutions. From modelling, through to design, operations and validation, Expro provide a full package of services

More information

Subsea Intervention: Is It Worth It? Drummond Lawson

Subsea Intervention: Is It Worth It? Drummond Lawson Subsea Intervention: Is It Worth It? Drummond Lawson 1 Subsea Intervention Is It Worth It? Subsea development timeline Why Intervene? What can you achieve? Intervention methods Intervention drivers What

More information

RISER SYSTEMS. Our world class innovation solving your riser challenges

RISER SYSTEMS. Our world class innovation solving your riser challenges RISER SYSTEMS Our world class innovation solving your riser challenges OUR WORLD CLASS INNOVATION SOLVING YOUR RISER contents Riser Analysis 3 Subsea Riser Systems 4 Connectors (Subsea and Surface) Surface

More information

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS)

ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) RPSEA PROJECT DW 2301 ULTRA-DEEPWATER RISERLESS INTERVENTION SYSTEM (RIS) DTC International, Inc. 5540 Brittmoore Road Houston, Texas 77041 23 March 2010 RIS PROJECT TEAM MEMBERS DTC International, Inc.

More information

Deepwater Precommissioning Services

Deepwater Precommissioning Services Deepwater Precommissioning Services Featuring Denizen remote subsea technologies Drilling Evaluation Completion Production Intervention Pipeline & specialty services Nitrogen services Pipeline services

More information

Advancing Global Deepwater Capabilities

Advancing Global Deepwater Capabilities Advancing Global Deepwater Capabilities BP s commitments Determined to accelerate and further deploy the capabilities and practices that enhance safety in our company and the deepwater industry 200+ meetings

More information

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response

Click to edit Master title style APPEA AWIC UPDATE. Self Audit Checklist Source Control First Response APPEA AWIC UPDATE Click to edit Mutual Master Aid subtitle style Self Audit Checklist Source Control First Response Presenter: Tom Nolan Perth 1st 4 th March, 2010 2012 WHAT IS APPEA? The Australian Petroleum

More information

Recent advancement in well-control technology improves safety and allows cost savings for well designs

Recent advancement in well-control technology improves safety and allows cost savings for well designs Recent advancement in well-control technology improves safety and allows cost savings for well designs Simulation While Drilling and Relief Well Injection Spool 1 Doing More for Less What can we cut? Largest

More information

UCON Connection Systems

UCON Connection Systems UCON Connection Systems UCON Connection Systems Subsea fields are developed using a variety of connection system solutions. Over the past two decades, FMC Technologies has manufactured a complete range

More information

Subsea Chokes and Flow Modules

Subsea Chokes and Flow Modules Subsea Chokes and Flow Modules 2 Relia Designed for maximum flexibility and reliability, FMC s F Series Subsea Chokes and Flow Modules are ideal for production, injection, gas lift and waterflood applications.

More information

Dry trees for cost effective solution with the Wellhead Barge: WHB

Dry trees for cost effective solution with the Wellhead Barge: WHB Dry trees for cost effective solution with the Wellhead Barge: WHB Benjamin MAURIES SAIPEM PAU, FRANCE 5 7 APRIL 2016 Dry Tree Solution for Mild Environments Dry Tree solutions have been developed and

More information

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI)

Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Kuala Lumpur 3 October 2012 State of the Industry of Riserless Light Well Interventions (RLWI) Bevan Morrison, VP Global Subsea Intervention Solutions Agenda Subsea well intervention introduction Economic

More information

SAVE WEEKS DRILLING AND COMPLETING

SAVE WEEKS DRILLING AND COMPLETING SAVE WEEKS DRILLING AND COMPLETING New benchmarking study explains and quantifies exceptional time savings from cesium formate fluids Key findings and conclusions from an extensive benchmarking study by

More information

When a drilling project is commenced, two goals must be achieved:

When a drilling project is commenced, two goals must be achieved: Technologies Drilling Technologies Oil well drilling is a complex operation and the drilling industry engages the services of personnel and a complicated array of machinery and materials to drill an oil/gas

More information

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV

Wintershall Production Optimisation Initiative Value Creation through Innovation. Michael Damm Wintershall Noordzee BV Wintershall Production Optimisation Initiative Value Creation through Innovation Michael Damm Wintershall Noordzee BV Wintershall Noordzee B.V. (WINZ) Subsidiary of Wintershall Holding Operator in NL,

More information

Flow Assurance. Capability & Experience

Flow Assurance. Capability & Experience Flow Assurance Capability & Experience Capability Overview Flow assurance encompasses the thermal-hydraulic design and assessment of multiphase production/ transport systems as well as the prediction,

More information

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine

Vincent/Enfield Conductor and Flowbase Installation Review. Roy Grant, TSMarine Vincent/Enfield Conductor and Flowbase Installation Review Roy Grant, TSMarine Project scope Offshore installation Mobilised in Dampier (KBSB) on 10 October TSMarine scope is onshore project management

More information

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc.

Lloyd s BOP Register energy Risk servicesmodel Project Development. Scotty Roper Project Manager Moduspec USA, Inc. Lloyd s BOP Register energy Risk servicesmodel Project Development Scotty Roper Project Manager Moduspec USA, Inc. October 18, 2012 Agenda Project summary Product demonstration Conclusion Who we are Lloyd

More information

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton

Drilling Systems. Cameron Drilling Control Systems Applications. 1 Semi-submersible Platform Applicaton 7 Drilling Systems Cameron has designed, manufactured and delivered surface and subsea drilling systems from the wellhead through the manifold to meet a wide variety of customer requirements and drilling

More information

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries

AADE-05-NTCE-39. Slender Well Plan for Lower Cost and Improved Safety. Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries AADE-05-NTCE-39 Slender Well Plan for Lower Cost and Improved Safety Nader Sheshtawy and Adel Sheshtawy, TRI-MAX Industries This paper was prepared for presentation at the AADE 2005 National Technical

More information

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil

Implementing FPSO Digital Twins in the Field. David Hartell Premier Oil Implementing FPSO Digital Twins in the Field David Hartell Premier Oil Digital Twins A Digital Twin consists of several key elements and features: 1. A virtual, dynamic simulation model of an asset; 2.

More information

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International

Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International Managed Pressure Drilling New Convention in Deepwater Wells. Brian Grayson, Bhavin Patel, Alice Gomez Weatherford International June 18-19 2014 Vienna, Austria. 2011 Weatherford. All rights reserved. 1

More information

Flexible solutions for your oil and gas needs

Flexible solutions for your oil and gas needs Flexible solutions for your oil and gas needs We are an indigenous company that provide innovative solutions for oil and gas clients in areas of: Efficient and cost effective pigging / ILI technology Non

More information

Casing and Completion Technologies. Run casing strings & completions without string rotation without wiper trips without risk

Casing and Completion Technologies. Run casing strings & completions without string rotation without wiper trips without risk Casing and Completion Technologies Run casing strings & completions without string rotation without wiper trips without risk Deep Casing Tools 2012 Completion Engineering Applications Objective: Land the

More information

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision

Appendix F Lock-Down Sleeve Decision. Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision Appendix F Lock-Down Sleeve Decision After the production casing has been installed in the well and cemented in place, the operator may elect to run a lock-down sleeve.

More information

A marginal field (re-)development using several alternative methodologies 1

A marginal field (re-)development using several alternative methodologies 1 Bart Heijermans Helix ESG Chief Operating Officer Company The Phoenix Update Project A marginal field (re-)development using several alternative methodologies 1 Our Mission Helix Producer I Helix Energy

More information

Marine Well Containment Company. Charlie Miller, Chief Technology Officer

Marine Well Containment Company. Charlie Miller, Chief Technology Officer Marine Well Containment Company Charlie Miller, Chief Technology Officer January 25, 2012 Agenda Company Overview Interim Containment System Expanded Containment System 2012 Priorities 2 Agenda Company

More information

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014!

Subsea Pipeline IMR. PT Hallin Marine June 18 th, 2014! PT Hallin Marine June 18 th, 2014! Introduction Issues and Risks Inspection, Maintenance & Repair Case Study Conclusions and Recommendations 2 Introduction Subsea Pipeline IMR q Obtain data to assess the

More information

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists

MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists MPD ACTIVE PRESSURE MANAGEMENT Next-generation MPD technology, built by manufacturing specialists Our experienced service personnel have supported operators with more than 80+ wells drilled to date. Our

More information

Marathon Drilling Indonesia

Marathon Drilling Indonesia Marathon Drilling Indonesia Case History of Managed Pressure Drilling in Deepwater Marathon International Petroleum Indonesia Limited Introduction Marathon signed a PSC for Pasangkayu block in Makassar

More information

Casing Recovery. Pre-Job Meeting

Casing Recovery. Pre-Job Meeting Casing Recovery Pre-Job Meeting Make up casing spear assembly and rack back Make up casing cutting assembly RIH with cutting assembly to calculated free point Make first cut, flow check. POOH & lay down

More information

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w!

C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! ADVANCED FISHING C o n t a c t U s f o r S p e c i a l C o r p o r a t e R a t e N o w! ADVANCED FISHING Course Overview This course has been written for Advanced-level Operator Staff,, Drilling Contractor

More information

Deepwater well design, construction & drilling operations

Deepwater well design, construction & drilling operations Deepwater well design, construction & drilling operations Training and development 1 Kingdom Drilling Services Ltd Our Mission Deliver a recognized excellence in deepwater industry training, education

More information

Advanced Well Completion Design

Advanced Well Completion Design An Intensive 5 Day Training Course Advanced Well Completion Design 30 Sep - 04 Oct 2018, Dubai 19-OCT-17 This course is Designed, Developed, and will be Delivered under iso Quality standards Advanced Well

More information

COILED TUBING & E-COIL SERVICES COIL DRILLING TECHNOLOGIES

COILED TUBING & E-COIL SERVICES COIL DRILLING TECHNOLOGIES COILED TUBING & E-COIL SERVICES COIL DRILLING TECHNOLOGIES Applying engineering and ingenuity to create innovative solutions. As well telemetry moves beyond traditional well completions, Cudd Energy Services

More information

Innovative Subsea Engineering

Innovative Subsea Engineering Innovative Subsea Engineering www.subsea.co.uk Innovative Subsea Engineering Formed in 1985 by a team of experienced engineers and diving professionals, Subsea Innovation is a company dedicated to delivering

More information

MSV Seawell. The vessel that pioneered subsea light well intervention

MSV Seawell. The vessel that pioneered subsea light well intervention MSV Seawell The vessel that pioneered subsea light well intervention PRODUCTION ENHANCEMENT WELL MAINTENANCE SATURATION DIVING WELL ABANDONMENT/FIELD DECOMMISSIONING MSV Seawell specifications Classification

More information